Intelligent supply chain logistics intelligent optimization management method and system
By identifying the logistics delivery place and establishing a logistics route network, it solves the problem that existing technology cannot select delivery time and place according to user needs, enables users to independently select delivery time and place, and improves the efficiency of logistics management. and user experience.
Patent Information
- Application Number
- CN202310772385.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-28
- Publication Date
- 2024-10-01
AI Technical Summary
Existing supply chain logistics management methods cannot select the delivery time and delivery location according to the user's personal needs. As a result, users cannot predict the delivery time of goods after shopping, which affects the user experience.
By identifying the identity and delivery time of the logistics delivery place, a logistics route network is established, the optimal route is determined based on traffic proportion and timeliness, and a platform for users to independently select delivery time and place is provided, combining geographical collection, logistics distribution and route planning. The unit performs data transmission and screening, and determines the optimal route.
It realizes personalized delivery according to user needs in the supply chain management process. Users can choose the delivery time and place by themselves, which improves the shopping experience and logistics efficiency.
Smart Images

Figure HDA0004308299440000011 
Figure HDA0004308299440000012 
Figure HDA0004308299440000021
Abstract
Description
Technical Field
[0001] The present invention relates to the field of logistics delivery technology, and specifically to an intelligent supply chain logistics intelligent optimization management method and system. Background Art
[0002] The logistics supply chain is a chain formed by all the logistics activities involved in the economic activities from the time when the market demand for products or services begins to meet the demand. Supply chain logistics is roughly divided into three parts: procurement, production and marketing. The logistics usually refers to warehousing and transportation, which belongs to the production part. Under the current situation of increasing external pressure and enterprises facing survival difficulties, the role of logistics supply chain management in controlling costs, reducing inventory and dispersing risks has been recognized and valued by more and more entrepreneurs.
[0003] However, in the process of supply chain management, due to the large variety of logistics products, high frequency of mobilization, large information differences between logistics products, and scattered distribution of supply areas, conventional supply chain logistics management methods are inefficient and cannot meet the logistics delivery needs of users. Even after purchasing the goods, users can only listen to the seller's face-to-face words, cannot choose the delivery time and place by themselves, and cannot predict the delivery time, resulting in users knowing nothing about the purchased goods after shopping. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a smart supply chain logistics intelligent optimization management method and system, which solves the problem that conventional logistics cannot meet the logistics delivery needs of users according to their personal needs, and users cannot choose the delivery time and place by themselves, and cannot predict the delivery time, resulting in users knowing nothing about the purchased goods after shopping.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a smart supply chain logistics intelligent optimization management method, comprising the following steps:
[0006] Step 1:
[0007] Set the identity of each logistics shipping location according to the abbreviation of the province and the city where it is located, and determine the shipping time of the shipping vehicle at the current logistics shipping location;
[0008] Step 3:
[0009] In order, according to the cargo information, the received cargo is stored in the divided area, and when the predetermined value is reached, the stored cargo is transferred to the delivery vehicle, and the cargo is transported by the delivery vehicle;
[0010] Step 4:
[0011] Obtaining logistics supply requirements, the logistics supply requirements including the geographical location and current traffic proportion of the supply storage location, the geographical location and current traffic proportion of multiple logistics delivery locations, and the delivery time of multiple logistics;
[0012] Step 5:
[0013] Based on the logistics supply demand information obtained in step 4, a logistics route network of supply storage locations and several logistics shipping locations is established. The logistics route network is screened according to the current traffic share, the timeliness of several logistics shipping locations, and the delivery time of the shipping vehicle. The optimal logistics route is determined by combining the current cargo order time with the time required for the current logistics route network.
[0014] Preferably, the delivery time of the delivery vehicle is:
[0015] a. Delivery every 10 to 12 hours;
[0016] b. The volume of stored goods accounts for 80% to 85% of the total inventory volume and will be shipped immediately.
[0017] Preferably, the cargo information includes: cargo name, cargo volume, cargo weight and time limit information.
[0018] Preferably, the predetermined value includes:
[0019] The volume of the stored goods, where the total volume of the stored goods is 95% of the storage space of the delivery vehicle;
[0020] The mass of the stored goods, the total mass of the stored goods being 90% to 93% of the load of the delivery vehicle;
[0021] The time for storing the goods reaches the time for the goods to be shipped by the shipping vehicle.
[0022] Preferably, the optimal logistics route determination step in step 5 is:
[0023] a. If the time required by the current logistics route network is not longer than the delivery time of the delivery vehicle, the optimal logistics route network is selected;
[0024] b. If the time required for the current logistics route network, combined with the current cargo order time, exceeds the delivery time of the delivery vehicle, the optimal logistics route network will be given according to the next closest delivery time of the delivery vehicle.
[0025] A smart supply chain logistics intelligent optimization management system includes a platform for interactive communication between users and suppliers, the platform including:
[0026] Logistics management system, which is used to manage and plan the information of the shipping place
[0027] A logistics route planning system, wherein the logistics route planning system is used to determine the optimal logistics route between a supply storage location and a plurality of logistics delivery locations;
[0028] A communication bridge is established between the logistics management system and the logistics route planning system for data transmission.
[0029] Preferably, the logistics management system includes:
[0030] A warehouse management unit, which is used to manage the goods stored at the logistics delivery location, and is composed of a gravity sensor, a counter, a logistics information input device, an infrared sensor, and a prompt light;
[0031] The transport management unit is used to manage the delivery time of the delivery vehicle, and is composed of a counter, a logistics information input device and a prompt light.
[0032] Preferably, a bridge of communication is established between the transportation management unit and the warehousing management unit for data transmission.
[0033] Preferably, the logistics route planning system includes:
[0034] A geographic collection unit, which is used to collect the geographic location of a supply storage location and the geographic locations of multiple logistics delivery locations;
[0035] A logistics distribution unit, wherein the logistics distribution unit is used to determine the transportation path of the goods;
[0036] A route planning unit is used to plan the transportation routes of different goods and select the transportation routes according to the goods to be transported.
[0037] The logistics collection unit, the logistics collection form is used to collect goods information for the purchased goods.
[0038] Preferably, a bridge of communication is established between the geographic collection unit, the logistics distribution unit, the route planning unit and the logistics collection unit for transmission of data.
[0039] The present invention provides a smart supply chain logistics intelligent optimization management method and system.
[0040] Beneficial effects:
[0041] In the process of supply chain management, the present invention can meet the logistics delivery according to the personal needs of users. After purchasing the goods, the users do not need to listen to the seller's face-to-face words. They can choose the delivery time and place of delivery and plan the delivery time by themselves, so that the users can know the delivery time of the purchased goods after shopping. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 is a system diagram of the present invention;
[0043] Figure 2 It is a system diagram of the logistics management system in the present invention;
[0044] Figure 3 It is a system diagram of the logistics route planning system in the present invention. DETAILED DESCRIPTION
[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] Embodiment 1:
[0047] The embodiment of the present invention provides a smart supply chain logistics intelligent optimization management method, comprising the following steps:
[0048] Step 1:
[0049] Set the identity of each logistics shipping location according to the abbreviation of the province and the city where it is located, and determine the shipping time of the shipping vehicle at the current logistics shipping location. The shipping time of the shipping vehicle is:
[0050] a. Delivery every 10 to 12 hours;
[0051] b. The volume of the stored goods accounts for 80% to 85% of the total inventory volume and shall be shipped immediately;
[0052] Step 3:
[0053] In order, according to the cargo information, including cargo name, cargo volume, cargo weight and time limit information, the received cargo will be stored in the divided area, and when the predetermined value is reached, the stored cargo will be transferred to the delivery vehicle, and the cargo will be transported by the delivery vehicle.
[0054] The predetermined values include:
[0055] The volume of the goods stored. The total volume of the goods stored is 95% of the storage space of the delivery vehicle;
[0056] The mass of the stored goods. The total mass of the stored goods is 90% to 93% of the load of the dispatching vehicle;
[0057] The storage time of the goods reaches the delivery time of the delivery vehicle;
[0058] Step 4:
[0059] Obtain logistics supply demand, which includes the geographical location and current traffic share of the supply storage location, the geographical location and current traffic share of multiple logistics delivery locations, and the delivery time of multiple logistics;
[0060] Step 5:
[0061] According to the logistics supply demand information obtained in step 4, a logistics route network of supply storage locations and several logistics delivery locations is established. The logistics route network is screened according to the current traffic proportion, the timeliness of several logistics delivery locations and the delivery time of the delivery vehicle. The optimal logistics route is determined by combining the current cargo order time with the time required by the current logistics route network.
[0062] The steps to determine the optimal logistics route in step 5 are:
[0063] a. If the time required by the current logistics route network is not longer than the delivery time of the delivery vehicle, the optimal logistics route network will be selected;
[0064] b. If the time required by the current logistics route network, combined with the current cargo order time, exceeds the delivery time of the delivery vehicle, the optimal logistics route network will be given according to the next closest delivery time of the delivery vehicle.
[0065] Embodiment 2:
[0066] Please see attached Figure 1 - Attachment Figure 3 The embodiment of the present invention provides a smart supply chain logistics intelligent optimization management system, including a platform for interactive communication between users and suppliers, the platform including:
[0067] Logistics management system, which is used to manage and plan the information of the shipping place
[0068] Logistics route planning system, which is used to determine the optimal logistics route between the supply warehouse and several logistics delivery locations;
[0069] A communication bridge is established between the logistics management system and the logistics route planning system for data transmission.
[0070] The logistics management system includes:
[0071] The warehouse management unit is used to manage the goods stored at the logistics delivery location. It consists of a gravity sensor, a counter, a logistics information input device, an infrared sensor, and a prompt light;
[0072] The transportation management unit is used to manage the delivery time of the delivery vehicle, and is composed of a counter, a logistics information input device and a prompt light.
[0073] A bridge of mutual communication is established between the transportation management unit and the warehousing management unit for the transmission of data.
[0074] The logistics route planning system includes:
[0075] A geographic collection unit, which is used to collect the geographic locations of supply storage locations and multiple logistics delivery locations;
[0076] A logistics allocation unit is used to determine the transportation path of the goods;
[0077] Route planning unit, which is used to plan the transportation routes of different goods and select the transportation routes according to the goods to be transported
[0078] Logistics collection unit, the logistics collection form is used to collect goods information for the purchased goods.
[0079] A bridge of communication is established between the geographic collection unit, the logistics distribution unit, the route planning unit and the logistics collection unit for the transmission of data.
[0080] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A smart supply chain logistics intelligent optimization management method, characterized in that: The following steps are involved: Step 1: Set the identity of each logistics shipping location according to the abbreviation of the province and the city where it is located, and determine the shipping time of the shipping vehicle at the current logistics shipping location; Step 3: In order, according to the cargo information, the received cargo is stored in the divided area, and when the predetermined value is reached, the stored cargo is transferred to the delivery vehicle, and the cargo is transported by the delivery vehicle; Step 4: Obtaining logistics supply requirements, the logistics supply requirements including the geographical location and current traffic proportion of the supply storage location, the geographical location and current traffic proportion of multiple logistics delivery locations, and the delivery time of multiple logistics; Step 5: Based on the logistics supply demand information obtained in step 4, a logistics route network of supply storage locations and several logistics shipping locations is established. The logistics route network is screened according to the current traffic share, the timeliness of several logistics shipping locations, and the delivery time of the shipping vehicle. The optimal logistics route is determined by combining the current cargo order time with the time required for the current logistics route network.
2. According to claim 1, a smart supply chain logistics intelligent optimization management method is characterized in that: The delivery time of the delivery vehicle is: a. Delivery every 10 to 12 hours; b. The volume of stored goods accounts for 80% to 85% of the total inventory volume and will be shipped immediately.
3. According to claim 1, a smart supply chain logistics intelligent optimization management method is characterized in that: The cargo information includes: cargo name, cargo volume, cargo weight and time limit information.
4. According to claim 1, a smart supply chain logistics intelligent optimization management method is characterized in that: The predetermined values include: The volume of the stored goods, where the total volume of the stored goods is 95% of the storage space of the delivery vehicle; The mass of the stored goods, the total mass of the stored goods being 90% to 93% of the load of the delivery vehicle; The time for storing the goods reaches the time for the goods to be shipped by the shipping vehicle.
5. According to claim 1, a smart supply chain logistics intelligent optimization management method is characterized in that: The optimal logistics route determination steps in step 5 are: a. If the time required by the current logistics route network is not longer than the delivery time of the delivery vehicle, the optimal logistics route network is selected; b. If the time required for the current logistics route network, combined with the current cargo order time, exceeds the delivery time of the delivery vehicle, the optimal logistics route network will be given according to the next closest delivery time of the delivery vehicle.
6. A smart supply chain logistics intelligent optimization management system, using a smart supply chain logistics intelligent optimization management method as described in any one of claims 1-5, characterized in that: A platform for interactive communication between users and suppliers is included, and the platform includes: Logistics management system, which is used to manage and plan the information of the shipping place A logistics route planning system, wherein the logistics route planning system is used to determine the optimal logistics route between a supply storage location and a plurality of logistics delivery locations; A communication bridge is established between the logistics management system and the logistics route planning system for data transmission.
7. The intelligent supply chain logistics intelligent optimization management system according to claim 1 is characterized in that: The logistics management system comprises: A warehouse management unit, which is used to manage the goods stored at the logistics delivery location, and is composed of a gravity sensor, a counter, a logistics information input device, an infrared sensor, and a prompt light; The transport management unit is used to manage the delivery time of the delivery vehicle, and is composed of a counter, a logistics information input device and a prompt light.
8. The intelligent supply chain logistics intelligent optimization management system according to claim 7 is characterized in that: A bridge of mutual communication is established between the transportation management unit and the warehousing management unit for data transmission.
9. The intelligent supply chain logistics intelligent optimization management system according to claim 1 is characterized in that: The logistics route planning system comprises: A geographic collection unit, which is used to collect the geographic location of a supply storage location and the geographic locations of multiple logistics delivery locations; A logistics distribution unit, wherein the logistics distribution unit is used to determine the transportation path of the goods; A route planning unit is used to plan the transportation routes of different goods and select the transportation routes according to the goods to be transported. The logistics collection unit, the logistics collection form is used to collect goods information for the purchased goods.
10. The intelligent supply chain logistics intelligent optimization management system according to claim 9 is characterized in that: A bridge of mutual communication is established between the geographic collection unit, the logistics distribution unit, the route planning unit and the logistics collection unit for data transmission.
