Construction site equipment management system and method based on Internet of Things
By modeling and multi-dimensional analysis of construction site environmental data, combined with Internet of Things technology, the intelligent deployment and management of construction site access control equipment is realized, which solves the problem of insufficient adaptability to the construction site environment in existing technologies and improves safety and efficiency. , achieving in-depth analysis of data and intelligent decision-making.
Patent Information
- Application Number
- CN202410928548.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing IoT solutions lack adaptability to the special environment of the construction site in construction site management, cannot effectively handle complex and changing personnel flow patterns, are difficult to achieve in-depth analysis of data and intelligent decision-making, and are difficult to improve while ensuring safety. System efficiency and flexibility.
By modeling and analyzing the construction site environment data, a multi-point deployment model of access control equipment is generated, and multi-dimensional data analysis and intelligent matching algorithms are used to realize intelligent deployment and management of access control equipment. Combined with Internet of Things technology and unified communication protocols, data Integrate and process, perform multi-level processing and noise elimination, generate personnel flow pattern reports, perform intelligent analysis and generate decision-making solutions.
It has realized the intelligent deployment and management of construction site access control equipment, improved safety and traffic efficiency, significantly improved the accuracy and reliability of data, timely discovered potential safety hazards, improved the level of construction site safety management, and adopted data-driven decision-making solutions. , rationally allocate human and equipment resources and improve resource utilization efficiency.
Smart Images

Figure CN118735210A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of equipment information processing technology, and in particular to an Internet of Things-based construction site equipment management system and method. Background Technology
[0002] With the rapid development and digital transformation of the construction industry, construction site management faces increasingly complex challenges. Traditional construction site management methods often rely on manual supervision and paper records, which are not only inefficient but also prone to omissions and errors. This is especially true in large-scale construction projects, where frequent personnel movement and widely distributed equipment make effective management even more difficult. These problems not only affect project progress and quality but may also pose safety hazards.
[0003] In recent years, the rapid development of IoT technology has offered new possibilities for solving these problems. However, effectively applying IoT technology to construction site management, especially in the field of access control equipment management, still faces many challenges. Existing IoT solutions often lack adaptability to the special environment of construction sites, cannot effectively handle complex and ever-changing personnel flow patterns, and struggle to achieve in-depth data analysis and intelligent decision-making. Furthermore, how to improve system efficiency and flexibility while ensuring security is also an urgent problem to be solved. Summary of the Invention
[0004] This application provides an Internet of Things (IoT) based construction site equipment management system and method, which comprehensively considers the environmental characteristics, personnel flow patterns and safety requirements of the construction site to achieve intelligent deployment and management of access control equipment.
[0005] Firstly, this application provides a construction site equipment management method based on the Internet of Things (IoT), the method comprising: By modeling and analyzing the construction site environmental data, a multi-point deployment model for construction site access control equipment was obtained; The multi-point deployment model of the construction site access control equipment is intelligently matched to obtain the configuration scheme of the entrance and exit access control equipment; The access control equipment configuration scheme is integrated with the Internet of Things to obtain raw personnel entry and exit information data; The original personnel entry and exit information data is processed in multiple layers and noise is eliminated to obtain cleaned personnel data. A multi-dimensional analysis of the cleaned personnel data is performed to obtain a personnel flow pattern report; The personnel flow pattern report is intelligently analyzed and processed to obtain a construction site management decision-making scheme.
[0006] Secondly, this application provides an Internet of Things (IoT)-based construction site equipment management system, which includes: The modeling module is used to model and analyze construction site environmental data to obtain a multi-point deployment model of construction site access control equipment; The processing module is used to perform intelligent matching processing on the multi-point deployment model of the construction site access control equipment to obtain the configuration scheme of the entrance and exit access control equipment; The integration module is used to perform IoT integration on the configuration scheme of the access control equipment to obtain raw personnel entry and exit information data; The noise elimination module is used to perform multi-level processing and noise elimination on the original personnel entry and exit information data to obtain cleaned personnel data. The analysis module is used to perform multi-dimensional analysis on the cleaned personnel data to obtain a personnel flow pattern report; The analysis module is used to intelligently analyze and process the personnel flow pattern report to obtain a site management decision-making scheme.
[0007] A third aspect of this application provides an IoT-based construction site equipment management device, comprising: a memory and at least one processor, wherein the memory stores instructions; the at least one processor invokes the instructions in the memory to cause the IoT-based construction site equipment management device to execute the aforementioned IoT-based construction site equipment management method.
[0008] A fourth aspect of this application provides a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to perform the above-described IoT-based construction site equipment management method.
[0009] The technical solution provided in this application utilizes a construction site spatiotemporal evolution model and dynamic update processing. This method enables real-time adjustment of access control equipment deployment according to the construction progress, ensuring the system always maintains optimal efficiency. By employing multi-dimensional data analysis and intelligent matching algorithms, the most suitable access control equipment and verification modes are customized for each entrance / exit, improving security and passage efficiency. The adoption of IoT technology and a unified communication protocol achieves seamless integration of access control equipment, significantly improving data collection and transmission efficiency. Through multi-level processing and adaptive noise cancellation, the accuracy and reliability of personnel data are significantly improved. Combining multiple dimensions such as time, space, and attributes, personnel flow patterns are comprehensively depicted. Anomaly pattern detection and risk assessment promptly identify potential safety hazards, improving the level of construction site safety management. Knowledge graphs and multi-objective optimization technologies enhance management efficiency. Through full-process risk assessment and quantitative analysis, various risks in construction site management are effectively reduced. Data-driven decision-making solutions enable more rational allocation of human and equipment resources, improving resource utilization efficiency. This application comprehensively considers the environmental characteristics, personnel flow patterns, and safety requirements of the construction site, achieving intelligent deployment and management of access control equipment. Attached Figure Description
[0010] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0011] Figure 1 This is a schematic diagram of one embodiment of the IoT-based construction site equipment management method in this application. Figure 2 This is a schematic diagram of one embodiment of the IoT-based construction site equipment management system in this application. Detailed Implementation
[0012] This application provides an Internet of Things (IoT)-based construction site equipment management system and method. The terms "first," "second," "third," "fourth," etc. (if present) in the specification, claims, and accompanying drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments described herein can be implemented in a sequence other than that illustrated or described herein. Furthermore, the terms "comprising" or "having" and any variations thereof are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or device that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or devices.
[0013] For ease of understanding, the specific process of the embodiments of this application is described below. Please refer to [link / reference]. Figure 1 One embodiment of the IoT-based construction site equipment management method in this application includes: Step S101: Model and analyze the construction site environmental data to obtain a multi-point deployment model for construction site access control equipment; It is understood that the executing entity of this application can be an IoT-based construction site equipment management system, or it can be a terminal or a server; no specific limitation is made here. This application's embodiment uses a server as the executing entity for illustration.
[0014] Specifically, the site topography data is processed into a 3D digital model to obtain a 3D digital model of the site. This 3D digital model is acquired through surveying technology and data acquisition equipment, and then modeled using computer-aided design software or geographic information system software. After completing the 3D modeling, the 3D digital model is gridded to generate a gridded map of the site. Grid division can be based on factors such as the actual geographical features of the site, the size and shape of the construction area, etc. The gridded map is dynamically updated according to the site's construction plan to obtain a spatiotemporal evolution model of the site. The construction plan typically includes information on construction arrangements, material scheduling, and personnel arrangements for each stage. Dynamic updating needs to consider this time-series data so that the spatiotemporal evolution model can reflect the actual state of the site at different points in time. Simultaneously, statistical analysis is performed on the site's personnel flow data to obtain a site personnel density distribution map. Personnel flow data is collected in real time by sensors and monitoring equipment installed at various entrances and key areas of the site, and statistical and visualization processing is performed using data analysis algorithms. Based on the site personnel density distribution map, weights are assigned to the spatiotemporal evolution model to generate a weighted site model. A quantitative assessment of safety risk factors at the construction site is conducted to obtain a safety risk level matrix. Safety risk factors may include high-altitude work areas, hazardous material storage locations, and construction machinery operation areas. Quantifying these risk factors allows for better identification and prediction of potential safety hazards. Based on the safety risk level matrix, a safety analysis is performed on a weighted construction site model, generating a safety heatmap of the site. The safety heatmap is a visualization tool that intuitively reflects the safety risk level of different areas of the construction site through color gradients and graphical representation. Darker colors indicate higher safety risks, while lighter colors indicate lower safety risks. The performance parameters of access control equipment are standardized to obtain a database of equipment performance indicators. These parameters may include recognition accuracy, response speed, durability, and environmental temperature adaptability. Standardization unifies and normalizes the parameters of different devices. Based on the site's safety heatmap and the equipment performance indicator database, a multi-point deployment model for the site's access control equipment is generated.
[0015] Step S102: Perform intelligent matching processing on the multi-point deployment model of the construction site access control equipment to obtain the configuration scheme of the entrance and exit access control equipment; Specifically, the access control device library is parameterized to obtain a set of device feature vectors. This set includes detailed parameters for various access control devices, such as recognition speed, accuracy, durability, and power consumption. Simultaneously, a functional analysis is performed on the verification mode library, extracting features from each verification mode to form a verification mode feature matrix. Verification modes may include fingerprint recognition, facial recognition, and iris recognition. Based on a multi-point deployment model for construction site access control devices, construction site entrances and exits are categorized, resulting in a list of entrance and exit types. Considering the actual conditions of different areas on the construction site, such as the main gate, construction area entrance, and warehouse entrance, the requirements for access control devices may differ significantly. A requirements analysis is performed on the list of entrance and exit types, specifically identifying the specific functional requirements for each type of entrance and exit, forming a functional requirements matrix. These functional requirements may involve security levels, flow efficiency, and the adaptability of verification modes. Based on the obtained functional requirements matrix, correlation calculations are performed on the device feature vector set and the verification mode feature matrix to find the most suitable combination of device and verification mode for each type of entrance and exit requirement, generating a device-verification mode combination scheme. By calculating the functional matching degree between the characteristics of each device and the characteristics of each verification mode, it is ensured that the selected devices and verification modes can meet the specific needs of different entrances and exits. The device-verification mode combination schemes are then weighted and iteratively optimized based on historical usage data. Historical usage data includes the actual usage effect of the devices, failure rate, user feedback, etc. This data allows for adjusting the weights of each combination scheme to select the optimal configuration. Through multiple iterative optimizations, the accuracy and effectiveness of the scheme are gradually improved, resulting in an optimized entrance and exit access control device configuration scheme.
[0016] Step S103: Integrate the access control equipment configuration scheme with the Internet of Things to obtain the original personnel entry and exit information data; Specifically, network topology analysis is performed on the access control device configuration scheme to generate a device communication topology diagram. This topology diagram illustrates the network connections between various access control devices, helping to understand the overall system communication structure. Based on the device communication topology diagram, communication protocols are matched between the access control devices to form a device communication protocol mapping table. Compatibility testing is performed on the device communication protocol mapping table to obtain a protocol conversion matrix. The success of protocol conversion between devices is verified, ensuring no data loss or errors occur during transmission. Based on the protocol conversion matrix, the data streams from the access control devices are formatted to generate standardized data streams. These standardized data streams are then encrypted to generate secure data packets. A distributed storage structure is constructed based on these secure data packets to obtain an edge computing node configuration scheme. The distributed storage structure improves data storage and processing efficiency, while the edge computing node configuration scheme rationally distributes computing tasks across edge nodes to improve overall system performance. Load balancing calculations are performed on the edge computing node configuration scheme to obtain a data routing strategy. Load balancing ensures that each computing node can handle the data load evenly, preventing overload of any single node and subsequent system performance degradation. Based on the data routing strategy, the real-time data stream is split into multiple channels. Multiple channels improve data transmission efficiency and enable more parallel data processing. The multiple channels are timestamped to generate a time-consistent dataset. Based on this time-consistent dataset, data aggregation and preliminary filtering are performed to obtain the original personnel entry and exit information. Data aggregation integrates data from different sources, while preliminary filtering removes noise and outliers to ensure data accuracy and reliability.
[0017] Step S104: Perform multi-level processing and noise removal on the original personnel entry and exit information data to obtain cleaned personnel data; Specifically, outlier detection is performed on the original personnel entry and exit information data. Statistical analysis and machine learning algorithms are used to identify and remove abnormal data, resulting in a pre-filtered dataset. Based on this pre-filtered dataset, data type identification is performed, classifying the data into multiple modalities to obtain multimodal data classification results. In the multimodal data classification results, image data undergoes image enhancement processing to improve image quality, resulting in optimized image data. This includes adjusting image brightness, contrast, denoising, and edge enhancement. Feature points are extracted from the optimized image data to extract key feature points representing personnel identity, forming personnel feature vectors. For biometric data in the multimodal data classification results, dimensionality reduction techniques, such as principal component analysis or linear discriminant analysis, are used to reduce data dimensionality while retaining important features, resulting in a compressed feature matrix. The compressed feature matrix is then fused with the personnel feature vectors to obtain a comprehensive feature representation. Feature fusion can employ methods such as weighted averaging, concatenation, or deep learning models to improve the accuracy and completeness of the feature representation. Cluster analysis is performed on the comprehensive feature representation, dividing the data into multiple clusters using clustering algorithms to obtain the data clustering results. Cluster analysis helps identify potential patterns and structures in data, which can be used to more effectively detect noisy data. Based on the data clustering results, noisy data within the clusters is identified, forming a noise pattern library. This library contains various types of noisy data and their feature descriptions. An adaptive noise filtering model is then constructed based on this library. This model adaptively adjusts its filtering strategy according to information from the noise pattern library, effectively removing noisy data. Through this adaptive noise filtering model, the comprehensive feature representation is cleaned, removing noise from the data to obtain cleaned personnel data.
[0018] Step S105: Perform multi-dimensional analysis on the personnel data after cleaning to obtain a personnel flow pattern report; Specifically, the cleaned personnel data undergoes time-series decomposition to obtain a time-dimensional feature matrix. Time-series decomposition reveals the temporal patterns of personnel entering and leaving the construction site, including daily peak and off-peak periods. Based on the time-dimensional feature matrix, periodic analysis is performed to establish a personnel flow cycle model, clarifying the patterns and characteristics of personnel flow in different time periods. Spatial clustering is then performed on the cleaned personnel data to generate a spatial distribution map. Spatial clustering analysis helps identify the distribution of personnel in different areas of the construction site, and hotspot areas are identified using this distribution data, resulting in a list of hotspot areas. Hotspot areas are typically areas with frequent personnel movement and may include construction sites, rest areas, and material storage areas. Based on the spatial analysis, attribute association analysis is performed on the personnel data to construct a personnel attribute association network. Attribute association analysis reveals the relationships and interaction patterns between personnel, such as work groups and collaboration frequency. Social network analysis is then performed using this association data to obtain a personnel interaction pattern diagram. The personnel flow cycle model, the list of hotspot areas, and the personnel interaction pattern diagram are then fused in multiple dimensions to generate a preliminary flow pattern sketch. Based on this preliminary flow pattern sketch, anomaly detection is performed to identify a candidate set of abnormal events. Anomaly pattern detection identifies unusual events that deviate from normal flow patterns, such as unauthorized entry or high-frequency entry / exit. These anomalies may indicate potential safety risks or violations. A risk assessment is performed on the candidate set of anomalies, generating a risk level rating table. The risk assessment evaluates the impact on site safety and management by analyzing the nature and potential consequences of the anomalies. Based on the risk level rating table, the initial flow pattern sketch is annotated and optimized, resulting in the final personnel flow pattern report. The annotation and optimization steps include further refinement and explanation of the flow pattern, as well as special marking and handling recommendations for high-risk areas and events.
[0019] Step S106: Perform intelligent analysis and processing on the personnel flow pattern report to obtain the site management decision-making scheme.
[0020] Specifically, semantic segmentation is performed on personnel flow pattern reports to extract key information elements. Using natural language processing (NLP) technology, the report content is decomposed into several elements with independent meaning, such as personnel flow paths, high-frequency activity areas, and safety hazard points. A knowledge graph is constructed based on the key information element set, forming a site management knowledge network. A knowledge graph is a tool that represents information and its relationships in a graph structure, systematically and visually displaying various types of information in site management through the connection of nodes and edges. The site management knowledge network is analyzed to identify potential problems and generate a potential problem list. By analyzing the nodes and edges of the knowledge network, potential risks and deficiencies in site management are discovered, such as areas with excessively high personnel flow and uncovered safety monitoring points. Based on the potential problem list, a risk quantification assessment is performed to generate a risk matrix. The risk matrix quantifies and ranks the risk level of each potential problem, helping managers clarify the urgency and importance of each problem. The risk matrix is prioritized to obtain a problem handling sequence, and a preliminary decision set is generated based on this sequence. The problem handling sequence assesses the risk level and impact of each potential problem. For each priority issue, a preliminary set of solutions is generated, including possible handling measures and coping strategies. This preliminary set of solutions is then optimized to obtain more effective and feasible solutions. The optimization process typically involves refining and adjusting the solutions, incorporating practical considerations and existing experience to ensure each solution is more efficient and less risky during implementation. Simulations are then performed based on the optimized solutions, generating a feasibility assessment report. These simulations, using computer simulation technology, preview the effects and potential problems of each solution in real-world applications, evaluating their feasibility and reliability. Sensitivity analysis is conducted on the feasibility assessment report to identify the key factors with the greatest impact on the solutions, generating a list of key influencing factors. Sensitivity analysis involves changing the model's input parameters and observing changes in the output results to determine which factors are decisive for the successful implementation of the solutions. These key influencing factors may include resource allocation, environmental changes, and manpower configuration. Based on the list of key influencing factors, the optimized solutions are adjusted and improved to ensure they can flexibly cope with various uncertainties and challenges in practical applications, ultimately forming the site management decision-making plan.
[0021] In this embodiment, by using a construction site spatiotemporal evolution model and dynamic update processing, the method can adjust the deployment of access control equipment in real time according to the construction progress, ensuring that the system always maintains optimal efficiency. Utilizing multi-dimensional data analysis and intelligent matching algorithms, the most suitable access control equipment and verification mode are customized for each entrance / exit, improving security and passage efficiency. Employing IoT technology and a unified communication protocol, seamless integration of access control equipment is achieved, significantly improving the efficiency of data collection and transmission. Through multi-level processing and adaptive noise cancellation, the accuracy and reliability of personnel data are significantly improved. Combining multiple dimensions such as time, space, and attributes, personnel flow patterns are comprehensively depicted. Through abnormal pattern detection and risk assessment, potential safety hazards are identified in a timely manner, improving the level of construction site safety management. Knowledge graphs and multi-objective optimization technologies are used to improve management efficiency. Through full-process risk assessment and quantitative analysis, various risks in construction site management are effectively reduced. Based on data-driven decision-making solutions, human and equipment resources can be allocated more rationally, improving resource utilization efficiency. This application comprehensively considers the environmental characteristics, personnel flow patterns, and safety requirements of the construction site, realizing intelligent deployment and management of access control equipment.
[0022] In one specific embodiment, the process of performing step S101 may specifically include the following steps: (1) Perform three-dimensional modeling processing on the construction site terrain data to obtain a three-dimensional digital model of the construction site, and perform grid division on the three-dimensional digital model of the construction site to obtain a gridded map of the construction site. (2) The gridded map of the construction site is dynamically updated according to the construction plan to obtain the spatiotemporal evolution model of the construction site, and the flow data of construction site personnel is statistically analyzed to obtain the distribution map of construction site personnel density. (3) The construction site spatiotemporal evolution model is weighted according to the construction site pedestrian density distribution map to obtain a weighted construction site model, and the construction site safety risk factors are quantitatively evaluated to obtain a construction site safety risk level matrix. (4) Based on the construction site safety risk level matrix, a safety analysis of the weighted construction site model is performed to obtain a construction site safety heat map, and the performance parameters of the access control equipment are standardized to obtain a database of equipment performance indicators. (5) Generate a multi-point deployment model of site access control equipment based on the site safety heat map and equipment performance index library.
[0023] Specifically, topographic data of the construction site is collected. This data can be obtained through high-precision surveying techniques such as drone aerial photography, laser scanning, or positioning systems. These data collection methods generate topographic point cloud data, which contains information on the elevation, buildings, and obstacles of the construction site surface. Using CAD (Computer-Aided Design) or GIS (Geographic Information System) software, the collected point cloud data is converted into a 3D digital model of the construction site. This model not only includes details of the terrain surface but also represents the undulations and complex landforms of different construction areas. The 3D digital model is then gridded to obtain a gridded map of the construction site. Gridding can be done according to a certain grid size, dividing the entire construction site into several small units, each containing its corresponding topographic and structural information. Based on the construction plan, the gridded map of the construction site is dynamically updated to generate a spatiotemporal evolution model of the construction site. Construction plans are usually adjusted continuously as the project progresses, requiring dynamic updates to the model to reflect the actual site status at each time point. For example, the construction progress in a certain area may change the topography and structure of that area. Statistical analysis is then performed on the personnel flow data at the construction site. Personnel flow data can be collected in real time through access control devices and other sensors installed at various entrances and exits. This data includes information such as the time, location, and number of people entering and leaving the construction site. Statistical analysis generates a site personnel density distribution map. Based on this map, weights are assigned to the site's spatiotemporal evolution model, resulting in a weighted site model. Areas with high personnel density and frequent construction activities are highlighted for greater attention in subsequent access control device deployments. The weighting can be done using the following formula: ; in, Indicates the first The time period and the first The weight of each region This indicates the population density within that time period and area. This represents the area. A quantitative assessment of site safety risk factors is conducted to generate a site safety risk level matrix. Safety risk factors include high-altitude work areas, hazardous material storage locations, and construction machinery operation areas. These factors can be quantified through expert evaluation and historical data analysis, forming a multi-dimensional risk level matrix. Each element of the matrix represents the risk level of a specific area within a specific time period. Based on the safety risk level matrix, a safety analysis is performed on the weighted site model to obtain a site safety heatmap. The safety heatmap visually reflects the safety risk level of each area of the site through color gradients and graphical displays. For example, red represents high-risk areas, yellow represents medium-risk areas, and green represents low-risk areas. This heatmap helps managers quickly identify and prioritize monitoring high-risk areas. Simultaneously, the performance parameters of access control equipment are standardized to obtain an equipment performance index library. The performance parameters of access control equipment include recognition speed, accuracy, durability, and environmental temperature adaptability. Standardization unifies and standardizes the parameters of different devices, facilitating comparison and selection. Based on the construction site safety heat map and equipment performance index library, a multi-point deployment model for construction site access control equipment is generated. Taking into account factors such as security, pedestrian density, and equipment performance, an optimization algorithm determines the optimal deployment scheme for the access control equipment. For example, in high-risk and high-pedestrian-density areas, high-performance access control equipment can be deployed to ensure both safety and efficiency. In low-risk areas, lower-cost equipment can be selected to conserve resources.
[0024] In one specific embodiment, the process of performing step S102 may specifically include the following steps: (1) Perform parameterization on the access control equipment library to obtain the equipment feature vector set, and perform functional analysis on the verification pattern library to obtain the verification pattern feature matrix; (2) Classify the entrances and exits of the construction site according to the multi-point deployment model of the access control equipment, obtain a list of entrance and exit types, and conduct a requirement analysis on the list of entrance and exit types to obtain the functional requirement matrix of each type of entrance and exit; (3) Based on the functional requirements matrix, the correlation between the equipment feature vector set and the verification mode feature matrix is calculated to obtain the equipment-verification mode combination scheme; (4) Based on historical usage data, the weights of the device-verification mode combination scheme are adjusted and iteratively optimized to obtain the configuration scheme of the access control equipment.
[0025] Specifically, the devices in the access control equipment library are parameterized. Access control equipment parameters include recognition speed, recognition accuracy, device durability, ambient temperature range, and power consumption. These parameters are standardized to form a set of device feature vectors. Each feature vector represents a device's multi-dimensional parameter attributes, allowing for direct comparison and calculation of the performance of different devices. Functional analysis is performed on the verification pattern library to obtain a verification pattern feature matrix. Verification patterns include fingerprint recognition, facial recognition, and iris recognition, each with unique functions and applicable scenarios. By analyzing the characteristics and application scope of each verification pattern, a verification pattern feature matrix is formed. This matrix contains characteristic indicators for each verification pattern in terms of recognition speed, accuracy, and environmental adaptability. Based on the multi-point deployment model of construction site access control equipment, construction site entrances and exits are classified to obtain a list of entrance and exit types. Different entrances and exits may have different security requirements and pedestrian density; therefore, they need to be classified to allow for targeted configuration of access control equipment. Classification criteria include the location of the entrance and exit (main entrance, side door, warehouse entrance, etc.), pedestrian density, and required security level. A requirements analysis is performed on the list of entrance / exit types to obtain a functional requirements matrix for each type. This matrix contains specific requirements for each type of entrance / exit in terms of recognition speed, accuracy, durability, and environmental adaptability. By specifying these requirements, suitable access control equipment and verification modes can be matched more accurately. Based on the functional requirements matrix, correlation calculations are performed on the equipment feature vector set and the verification mode feature matrix to obtain the equipment-verification mode combination scheme. The correlation calculation can be performed using the following formula: ; in, This represents the correlation score between the i-th type of entrance / exit and the j-th type of device-verification mode combination. This represents the weight of the i-th type of entrance / exit on the k-th demand. This represents the score of the j-th device-verification mode combination on the k-th feature. By calculating the relevance score, the most suitable device-verification mode combination scheme for each type of entrance / exit is determined. The initial device-verification mode combination schemes are then weighted and iteratively optimized based on historical usage data. Historical usage data includes actual device performance, failure rate, and user feedback. This data can be used to adjust the weights of each combination scheme, ensuring that the final scheme is more reliable and efficient in practical applications. The iterative optimization process gradually improves the overall performance of the scheme by continuously adjusting parameters and recalculating the relevance score.
[0026] In one specific embodiment, the process of executing step S103 may specifically include the following steps: (1) Perform network topology analysis on the configuration scheme of access control equipment to obtain the equipment communication topology diagram, and perform communication protocol matching on access control equipment according to the equipment communication topology diagram to obtain the equipment communication protocol mapping table; (2) Perform compatibility testing on the device communication protocol mapping table to obtain the protocol conversion matrix, and perform format unification processing on the access control device data stream according to the protocol conversion matrix to obtain a standardized data stream; (3) Encrypt the standardized data stream to obtain a secure data packet, and construct a distributed storage structure based on the secure data packet to obtain an edge computing node configuration scheme; (4) Perform load balancing calculations on the edge computing node configuration scheme to obtain the data routing strategy, and perform split processing on the real-time data stream according to the data routing strategy to obtain a multi-channel data stream; (5) Timestamp synchronization of multi-channel data streams to obtain a time-consistent dataset, and data aggregation and preliminary filtering based on the time-consistent dataset to obtain the original personnel entry and exit information data.
[0027] Specifically, the location and network connection information of all access control devices is collected. This information can be obtained by recording and drawing the physical location, connection method (wired or wireless), and network topology of each device on the construction site. Using this information, a device communication topology map is generated, showing the connection relationships and communication paths of each access control device in the network. Communication protocol matching is then performed on the access control devices. Different devices may use different communication protocols; to ensure smooth communication between devices, a device communication protocol mapping table is established. This table lists the communication protocols used by each device and their compatibility. Based on the device communication protocol mapping table, compatibility testing is performed, generating a protocol conversion matrix. Compatibility testing is a crucial step in ensuring interoperability between different protocols through protocol conversion. The protocol conversion matrix is a two-dimensional array where each element... Indicates equipment With equipment The feasibility and efficiency of protocol conversion between different protocols are assessed. Values in the matrix can be determined through experiments and test data. The data stream from the access control device is format-unified to obtain a standardized data stream, converting data from different protocols and formats into a unified format for subsequent processing and analysis. The standardized data stream is encrypted to ensure data security during transmission. Encryption can employ symmetric encryption algorithms (such as AES) or asymmetric encryption algorithms (such as RSA) to generate secure data packets. Based on the secure data packets, a distributed storage structure is constructed to obtain an edge computing node configuration scheme. The distributed storage structure improves data storage efficiency and security by distributing data across multiple edge nodes. The edge computing node configuration scheme includes information such as the storage capacity, computing power, and network bandwidth of each node. Load balancing calculations are performed on the edge computing node configuration scheme to obtain a data routing strategy. Load balancing ensures that each computing node can handle the data load evenly, preventing overload of any node and subsequent system performance degradation. Load balancing calculations can employ hash algorithms, round-robin algorithms, or weighted scheduling algorithms. The data routing strategy uses these algorithms to determine the optimal transmission path for each data packet. Based on the data routing strategy, the real-time data stream is split into multiple channels to generate a multi-channel data stream. Multi-channel data streams improve data transmission efficiency and enable more parallel data processing. The splitting process can be performed according to rules such as data type, source, or priority, allocating data packets to different communication channels. Timestamp synchronization is performed on the multi-channel data streams to ensure consistency in time across all data packets. Timestamp synchronization is achieved by adding timestamps to data packets and using a network time protocol or a precise time protocol. The timestamp synchronization formula is as follows: ; in, Indicates the timestamp after synchronization. This represents the original timestamp of the received data packet. This indicates clock offset. Based on a time-consistent dataset, data aggregation and preliminary filtering are performed to obtain the original personnel entry and exit information. Multiple data packets are merged into a single comprehensive dataset, improving data processing efficiency. Preliminary filtering removes redundant and noisy data, ensuring data accuracy and reliability.
[0028] In one specific embodiment, the process of executing step S104 may specifically include the following steps: (1) Perform outlier detection on the original personnel entry and exit information data to obtain a pre-filtered dataset, and perform data type identification based on the pre-filtered dataset to obtain multimodal data classification results; (2) Image enhancement processing is performed on the image data in the multimodal data classification results to obtain optimized image data, and feature points are extracted based on the optimized image data to obtain personnel feature vectors; (3) Dimensionality reduction is performed on the biometric data in the multimodal data classification results to obtain a compressed feature matrix, and feature fusion is performed on the compressed feature matrix and the personnel feature vector to obtain a comprehensive feature representation; (4) Perform cluster analysis on the comprehensive feature representation to obtain the data cluster partitioning results, and identify the noise data based on the data cluster partitioning results to obtain the noise pattern library; (5) Construct an adaptive noise filtering model based on the noise pattern library, and clean the comprehensive feature representation through the adaptive noise filtering model to obtain cleaned personnel data.
[0029] Specifically, outlier detection is performed on the raw personnel entry and exit data using statistical methods or machine learning algorithms. For example, the Z-score method can be used to detect outliers, with the following formula: ; in, Indicates the first Z-score values of each data point This represents the value of the data point. This represents the mean of the dataset. This represents the standard deviation of the dataset. It is determined by setting a threshold (e.g., ...). This process identifies and removes outliers, resulting in a pre-filtered dataset. Based on this pre-filtered dataset, data type identification is performed, classifying the data into multiple modalities, such as image data, biometric data (e.g., fingerprints, iris scans), and text data (e.g., identity information). Multimodal data classification can use rule-based methods, such as classification based on data format and field names, or machine learning algorithms to automatically identify data types by training a classification model. In the multimodal data classification results, image data requires image enhancement to improve its quality and reduce noise. Image enhancement can include techniques such as brightness adjustment, contrast enhancement, denoising, and edge enhancement. For example, histogram equalization can be used to adjust the brightness and contrast of an image, making image details clearer. After image enhancement, feature point extraction is performed to extract key feature points representing a person's identity, such as facial feature points. These feature points can be extracted using algorithms such as Harris corner detection or SIFT (Scale Invariant Feature Transform), ultimately forming a person feature vector. For biometric data in the multimodal data classification results, dimensionality reduction is performed to reduce the data's dimensionality while retaining its main features. Dimensionality reduction can be achieved using techniques such as principal component analysis (PCA) or linear discriminant analysis (LDA). PCA projects the original data into a new, lower-dimensional space, preserving as much of the original data's variance as possible. Feature fusion is then performed on the compressed feature matrix and the personnel feature vectors to obtain a comprehensive feature representation. Feature fusion can utilize methods such as weighted averaging, concatenation, or deep learning models to improve the accuracy and completeness of the feature representation. Cluster analysis is then applied to the comprehensive feature representation, dividing the data into multiple clusters using clustering algorithms. Cluster analysis can employ algorithms such as K-means, DBSCAN, or hierarchical clustering. Taking K-means as an example, its goal is to minimize the distance from each data point to the center of its cluster, as shown in the following formula: ; in, Indicates data cluster partitioning, Indicates the number of clusters, Represents data points, Indicates the first The center of each cluster. Through cluster analysis, latent patterns and structures in the data are identified. Based on these structures, noisy data is further identified, forming a noise pattern library. An adaptive noise filtering model is constructed based on this library. This model dynamically adjusts its filtering strategy using information from the noise pattern library to effectively remove noisy data. The model can be trained using machine learning algorithms to identify and filter different types of noisy data. The adaptive noise filtering model is then used to clean the comprehensive feature representation, removing noise from the data, ultimately yielding cleaned personnel data.
[0030] In one specific embodiment, the process of executing step S105 may specifically include the following steps: (1) Perform time series decomposition on the cleaned personnel data to obtain the time dimension feature matrix, and perform periodic analysis based on the time dimension feature matrix to obtain the personnel flow cycle model; (2) Spatial clustering is performed on the cleaned personnel data to obtain a spatial dimension distribution map, and hotspot areas are identified based on the spatial dimension distribution map to obtain a list of hotspot areas of the construction site; (3) Perform attribute association analysis on the cleaned personnel data to obtain the personnel attribute association network, and perform social network analysis based on the personnel attribute association network to obtain the personnel interaction pattern diagram; (4) The personnel flow cycle model, the list of hot spots on the construction site and the personnel interaction pattern diagram are integrated in multiple dimensions to obtain a preliminary flow pattern sketch; (5) Based on the preliminary flow pattern sketch, anomaly pattern detection is performed to obtain anomaly event candidate set, and risk assessment is performed on the anomaly event candidate set to obtain a risk level scoring table; (6) Annotate and optimize the preliminary flow pattern sketch according to the risk level scoring table to obtain the personnel flow pattern report.
[0031] Specifically, time series decomposition is performed on the cleaned personnel data to extract trend, seasonality, and residual components. An additive model can be used for time series decomposition. ; in, Indicates time The original data, Indicates trend components, Indicates seasonal ingredients. This represents the residual components. Through decomposition, a time-dimensional feature matrix is generated, containing trend, seasonality, and residual data for each time period. Periodic analysis based on the time-dimensional feature matrix can identify periodic patterns in personnel movement. For example, Fourier transform can analyze the frequency components of the data, identifying daily, weekly, or monthly periodic variations. These periodic patterns help predict future personnel movement, forming a personnel movement cycle model. Spatial clustering is performed on the cleaned personnel data, classifying personnel entry and exit data according to spatial location to identify the distribution of personnel in different areas. The K-means clustering algorithm can be used to divide the construction site into several regions, each representing a cluster. The formula is as follows: ; in, Indicates cluster partitioning, Indicates the number of clusters, Represents data points, Indicates the first The center of each cluster. Spatial clustering generates a spatial distribution map, showing the personnel density in each area. Based on the spatial distribution map, hotspot areas are identified. Hotspot areas are areas with frequent personnel movement, usually representing key locations on the construction site, such as main entrances, construction areas, and rest areas. By analyzing the personnel density in each area, a list of hotspot areas is generated to help managers focus on monitoring and managing these key areas. Simultaneously, attribute association analysis is performed on the cleaned personnel data to identify relationships between personnel. These attributes can include job type, length of service, working hours, etc. By constructing a personnel attribute association network, the interaction relationships and collaboration patterns between personnel are revealed. A personnel interaction pattern diagram is generated through social network analysis. Social network analysis uses graph theory methods, treating personnel as nodes and interactions between personnel as edges, constructing a social network graph. The personnel flow cycle model, the list of hotspot areas on the construction site, and the personnel interaction pattern diagram are fused in multiple dimensions to generate a preliminary flow pattern sketch. Multi-dimensional fusion, by integrating data from three dimensions—time, space, and attributes—provides a comprehensive perspective on personnel flow patterns, showing the activity trajectories and interaction relationships of personnel within the construction site. Anomaly detection is performed on the initial flow pattern sketch to identify a candidate set of abnormal events. Anomaly detection identifies non-standard events, such as unauthorized entry or high-frequency entry / exit, by comparing the flow pattern with normal flow patterns. These abnormal events may indicate potential safety risks or violations. A risk assessment is then performed on the candidate set of abnormal events, generating a risk level rating table. The risk assessment analyzes the nature and potential consequences of abnormal events to evaluate their impact on site safety and management. Based on the risk level rating table, the initial flow pattern sketch is annotated and optimized to generate the final personnel flow pattern report. The annotation and optimization steps include further refinement and explanation of the flow pattern, as well as special marking and handling recommendations for high-risk areas and events.
[0032] In one specific embodiment, the process of executing step S106 may specifically include the following steps: (1) Semantically segment the personnel flow pattern report to obtain a set of key information elements, and construct a knowledge graph based on the set of key information elements to obtain a construction site management knowledge network; (2) Analyze the knowledge network of construction site management to obtain a list of potential problems, and conduct a risk quantification assessment based on the list of potential problems to obtain a risk matrix; (3) Prioritize the risk matrix to obtain the problem handling sequence, and generate a preliminary decision scheme set based on the problem handling sequence; (4) Optimize the preliminary decision scheme set to obtain the optimized decision scheme, and simulate the optimized decision scheme to obtain the scheme feasibility assessment report; (5) Conduct a sensitivity analysis on the feasibility assessment report of the scheme to obtain a list of key influencing factors, and adjust the optimized decision scheme according to the list of key influencing factors to obtain the site management decision scheme.
[0033] Specifically, natural language processing (NLP) technology is used to decompose the report text into several semantically meaningful fragments. These fragments include time information, location data, personnel identity, activity type, etc. Through semantic segmentation, a set of key information elements is extracted, such as entry and exit times, hotspot areas, and personnel interaction patterns. Named entity recognition (NER) algorithms are used to identify these key elements, classify them, and store them. A knowledge graph is constructed based on the set of key information elements, systematizing and visualizing various types of information in construction site management. A knowledge graph is a graph structure where nodes represent key information elements and edges represent relationships between elements. By constructing the knowledge graph, a construction site management knowledge network is generated. The knowledge graph helps to intuitively display and understand the complex relationships and dynamic changes in construction site management. The construction site management knowledge network is analyzed to identify potential problems and risks. For example, by analyzing the connection strength of nodes and edges, areas with high personnel flow can be identified, or high-risk factors for certain key nodes can be identified. A list of potential problems is generated, including various safety hazards, management loopholes, and resource shortages. A risk quantification assessment is performed based on the potential problem list, generating a risk matrix. The risk quantification assessment can use a risk scoring model to quantify the risk level of each problem. A risk matrix is generated by calculating the risk score for each problem, where each element represents the risk score of a specific problem. The risk matrix is then prioritized to obtain a problem-solving sequence. Prioritization is based on risk scores, with high-risk problems addressed first. A sorting algorithm can be used to sort the risk matrix, generating a problem-solving sequence arranged from highest to lowest risk level. Based on the problem-solving sequence, a preliminary set of decision-making solutions is generated. Each solution addresses one or more problems, proposing specific measures. For example, for identified high-risk areas, additional monitoring equipment or strengthened personnel management could be implemented. The preliminary set of solutions proposes multiple possible solutions through comprehensive problem analysis. The preliminary set of solutions is then optimized to obtain optimized decision-making solutions. The optimization process can be performed using multi-objective optimization algorithms, considering factors such as cost, resources, and time to find the optimal combination of solutions. The optimized decision-making solutions are more operable and economical, and can achieve better results in practical applications. Simulations are conducted based on the optimized decision-making solutions to generate a feasibility assessment report. The simulations use computer simulation technology to preview the effects and potential problems of each solution in practical applications. For example, the changes in personnel flow after adding monitoring equipment can be simulated to assess the actual feasibility and effectiveness of the plan. Sensitivity analysis of the feasibility assessment report can then be conducted to identify the key factors that have the greatest impact on the plan. Sensitivity analysis involves changing the model's input parameters and observing the changes in the output results to determine which factors play a decisive role in the successful implementation of the plan. These key influencing factors can include resource allocation, environmental changes, and staffing.Based on the list of key influencing factors, the optimized decision-making scheme is adjusted and improved to ensure that the scheme can flexibly cope with various uncertainties and challenges in practical applications, and finally form a site management decision-making scheme.
[0034] The above describes the IoT-based construction site equipment management method in the embodiments of this application. The following describes the IoT-based construction site equipment management system in the embodiments of this application. Please refer to [link / reference]. Figure 2 One embodiment of the IoT-based construction site equipment management system in this application includes: Modeling module 201 is used to model and analyze construction site environmental data to obtain a multi-point deployment model of construction site access control equipment; Processing module 202 is used to perform intelligent matching processing on the multi-point deployment model of construction site access control equipment to obtain the configuration scheme of entrance and exit access control equipment; Integration module 203 is used to integrate the configuration scheme of entrance and exit access control equipment with the Internet of Things to obtain raw personnel entry and exit information data; The noise elimination module 204 is used to perform multi-level processing and noise elimination on the original personnel entry and exit information data to obtain cleaned personnel data. Analysis module 205 is used to perform multi-dimensional analysis on the personnel data after cleaning to obtain a personnel flow pattern report; The parsing module 206 is used to intelligently analyze and process personnel flow pattern reports to obtain site management decision-making solutions.
[0035] Through the collaborative efforts of the aforementioned components, and by employing a construction site spatiotemporal evolution model and dynamic update processing, this method can adjust the deployment of access control equipment in real time according to the construction progress, ensuring the system always maintains optimal efficiency. Utilizing multi-dimensional data analysis and intelligent matching algorithms, the most suitable access control equipment and verification modes are customized for each entrance / exit, improving security and passage efficiency. Employing IoT technology and a unified communication protocol, seamless integration of access control equipment is achieved, significantly improving the efficiency of data collection and transmission. Through multi-level processing and adaptive noise cancellation, the accuracy and reliability of personnel data are significantly improved. Combining multiple dimensions such as time, space, and attributes, personnel flow patterns are comprehensively characterized. Through anomaly pattern detection and risk assessment, potential safety hazards are identified in a timely manner, improving the level of construction site safety management. Knowledge graphs and multi-objective optimization technologies are used to improve management efficiency. Through full-process risk assessment and quantitative analysis, various risks in construction site management are effectively reduced. Data-driven decision-making solutions enable more rational allocation of human and equipment resources, improving resource utilization efficiency. This application comprehensively considers the environmental characteristics, personnel flow patterns, and safety requirements of the construction site, realizing intelligent deployment and management of access control equipment.
[0036] This application also provides an IoT-based construction site equipment management device, which includes a memory and a processor. The memory stores computer-readable instructions. When the computer-readable instructions are executed by the processor, the processor performs the steps of the IoT-based construction site equipment management method described in the above embodiments.
[0037] This application also provides a computer-readable storage medium, which can be a non-volatile computer-readable storage medium or a volatile computer-readable storage medium, wherein the computer-readable storage medium stores instructions that, when executed on a computer, cause the computer to perform the steps of the Internet of Things-based construction site equipment management method.
[0038] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.
[0039] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0040] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application.
Claims
1. A construction site equipment management method based on the Internet of Things, characterized in that: The method comprises: Model and analyze the construction site environmental data to obtain a multi-point deployment model for construction site access control equipment; Perform intelligent matching processing on the multi-point deployment model of the construction site access control equipment to obtain a configuration plan for the entrance and exit access control equipment; The configuration scheme of the entrance and exit access control equipment is integrated with the Internet of Things to obtain the original personnel entry and exit information data; Perform multi-level processing and noise elimination on the original personnel entry and exit information data to obtain cleaned personnel data; Performing multi-dimensional analysis on the cleaned personnel data to obtain a personnel flow pattern report; The personnel flow pattern report is intelligently analyzed and processed to obtain a construction site management decision-making plan.
2. The construction site equipment management method based on the Internet of Things according to claim 1 is characterized in that: The modeling and analysis of the construction site environment data to obtain a multi-point deployment model of the construction site access control equipment includes: Performing three-dimensional modeling processing on the construction site terrain data to obtain a three-dimensional digital model of the construction site, and gridding the three-dimensional digital model of the construction site to obtain a grid map of the construction site; Dynamically updating the grid map of the construction site according to the construction plan of the construction site to obtain a spatiotemporal evolution model of the construction site, and statistically analyzing the personnel flow data of the construction site to obtain a personnel flow density distribution map of the construction site; Assigning weights to the construction site spatiotemporal evolution model according to the construction site human flow density distribution map to obtain a weighted construction site model, and quantitatively evaluating the construction site safety risk factors to obtain a construction site safety risk level matrix; Performing safety analysis on the weighted construction site model according to the construction site safety risk level matrix to obtain a construction site safety heat map, and performing standardization on the performance parameters of access control equipment to obtain an equipment performance index library; A multi-point deployment model for construction site access control equipment is generated based on the construction site safety heat map and the equipment performance indicator library.
3. The construction site equipment management method based on the Internet of Things according to claim 1, characterized in that: The intelligent matching process of the multi-point deployment model of the construction site access control equipment is performed to obtain the configuration scheme of the entrance and exit access control equipment, including: Perform parameterization on the access control device library to obtain the device feature vector set, and perform functional analysis on the verification mode library to obtain the verification mode feature matrix; Classifying the entrances and exits of the construction site according to the multi-point deployment model of the construction site access control equipment to obtain a list of entrance and exit types, and performing demand analysis on the list of entrance and exit types to obtain a functional demand matrix for each type of entrance and exit; According to the functional requirement matrix, correlation calculation is performed on the device feature vector set and the verification mode feature matrix to obtain a device-verification mode combination scheme; The device-verification mode combination scheme is weighted and iteratively optimized according to historical usage data to obtain an entrance and exit access control device configuration scheme.
4. The construction site equipment management method based on the Internet of Things according to claim 1, characterized in that: The IoT integration of the entrance and exit access control equipment configuration scheme is performed to obtain original personnel entry and exit information data, including: Performing a network topology analysis on the configuration scheme of the entrance and exit access control equipment to obtain a device communication topology diagram, and performing communication protocol matching on the access control equipment according to the device communication topology diagram to obtain a device communication protocol mapping table; Performing compatibility testing on the device communication protocol mapping table to obtain a protocol conversion matrix, and performing format unification processing on the access control device data stream according to the protocol conversion matrix to obtain a standardized data stream; Encrypting the standardized data stream to obtain a secure data packet, and constructing a distributed storage structure according to the secure data packet to obtain an edge computing node configuration scheme; Perform load balancing calculation on the edge computing node configuration scheme to obtain a data routing strategy, and perform flow splitting processing on the real-time data stream according to the data routing strategy to obtain a multi-channel data stream; The multi-channel data stream is synchronized with the timestamp to obtain a data set with consistent time sequence, and data aggregation and preliminary filtering are performed based on the data set with consistent time sequence to obtain original personnel entry and exit information data.
5. The construction site equipment management method based on the Internet of Things according to claim 1, characterized in that: The original personnel entry and exit information data is subjected to multi-level processing and noise elimination to obtain cleaned personnel data, including: Performing outlier detection on the original personnel entry and exit information data to obtain a preliminary filtered data set, and performing data type identification based on the preliminary filtered data set to obtain a multimodal data classification result; Performing image enhancement processing on the image data in the multimodal data classification result to obtain optimized image data, and performing feature point extraction based on the optimized image data to obtain a person feature vector; Performing dimensionality reduction processing on the biometric data in the multimodal data classification result to obtain a compressed feature matrix, and performing feature fusion on the compressed feature matrix and the personnel feature vector to obtain a comprehensive feature representation; Performing cluster analysis on the comprehensive feature representation to obtain a data cluster division result, and identifying noise data according to the data cluster division result to obtain a noise pattern library; An adaptive noise filtering model is constructed according to the noise pattern library, and the comprehensive feature representation is cleaned by the adaptive noise filtering model to obtain cleaned personnel data.
6. The construction site equipment management method based on the Internet of Things according to claim 1, characterized in that: The multi-dimensional analysis of the cleaned personnel data is performed to obtain a personnel flow pattern report, including: Performing time series decomposition on the cleaned personnel data to obtain a time dimension feature matrix, and performing periodic analysis based on the time dimension feature matrix to obtain a personnel flow cycle model; Performing spatial clustering on the cleaned personnel data to obtain a spatial dimension distribution map, and identifying hot spots based on the spatial dimension distribution map to obtain a list of hot spots on the construction site; Performing attribute association analysis on the cleaned personnel data to obtain a personnel attribute association network, and performing social network analysis based on the personnel attribute association network to obtain a personnel interaction pattern diagram; Perform multi-dimensional fusion on the personnel flow cycle model, the construction site hotspot area list and the personnel interaction pattern diagram to obtain a preliminary flow pattern sketch; Performing abnormal pattern detection according to the preliminary flow pattern sketch to obtain an abnormal event candidate set, and performing risk assessment on the abnormal event candidate set to obtain a risk level scoring table; The preliminary flow pattern sketch is annotated and optimized according to the risk level scoring table to obtain a personnel flow pattern report.
7. The construction site equipment management method based on the Internet of Things according to claim 1, characterized in that: The intelligent analysis and processing of the personnel flow pattern report to obtain a construction site management decision plan includes: Performing semantic segmentation on the personnel flow pattern report to obtain a key information element set, and constructing a knowledge graph based on the key information element set to obtain a construction site management knowledge network; Analyze the construction site management knowledge network to obtain a potential problem list, and perform risk quantitative assessment based on the potential problem list to obtain a risk matrix; Prioritizing the risk matrix to obtain a problem processing sequence, and generating a preliminary decision solution set based on the problem processing sequence; Optimizing the preliminary decision solution set to obtain an optimized decision solution, and performing simulation based on the optimized decision solution to obtain a solution feasibility assessment report; A sensitivity analysis is performed on the feasibility assessment report of the scheme to obtain a list of key influencing factors, and the optimized decision-making scheme is adjusted according to the list of key influencing factors to obtain a construction site management decision-making scheme.
8. A construction site equipment management system based on the Internet of Things, characterized in that: Used to execute the construction site equipment management method based on the Internet of Things as described in any one of claims 1 to 7, the system comprises: Modeling module, used to model and analyze construction site environmental data to obtain a multi-point deployment model for construction site access control equipment; A processing module, used to perform intelligent matching processing on the multi-point deployment model of the construction site access control equipment to obtain a configuration plan for the entrance and exit access control equipment; An integration module is used to integrate the configuration scheme of the entrance and exit access control equipment into the Internet of Things to obtain original personnel entry and exit information data; An elimination module is used to perform multi-level processing and noise elimination on the original personnel entry and exit information data to obtain cleaned personnel data; An analysis module, used to perform multi-dimensional analysis on the cleaned personnel data to obtain a personnel flow pattern report; The analysis module is used to intelligently analyze and process the personnel flow pattern report to obtain a construction site management decision-making plan.
9. A construction site equipment management device based on the Internet of Things, characterized in that: The construction site equipment management device based on the Internet of Things includes: a memory and at least one processor, wherein instructions are stored in the memory; The at least one processor calls the instructions in the memory to enable the Internet of Things-based construction site equipment management device to execute the Internet of Things-based construction site equipment management method as described in any one of claims 1-7.
10. A computer-readable storage medium having instructions stored thereon, characterized in that: When the instructions are executed by the processor, the construction site equipment management method based on the Internet of Things as described in any one of claims 1-7 is implemented.