Multi-printed-matter cross processing layout method and system based on printing production line

By collecting and classifying printed products in real time on the printing production line, analyzing abnormal risks and performance changes of the processing production line, and establishing a cross-processing layout model, the problem of low printing processing efficiency in the existing technology has been solved, and a more efficient and accurate process has been achieved. resource allocation and operational risk reduction.

CN118735218APending Publication Date: 2024-10-01SHAANXI PRINTING SCI & TECH RES INST CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411122760.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology lacks multi-dimensional data analysis for printed products and processing production lines, which makes it difficult to achieve rational planning and layout of cross-processing of printed products, thereby affecting the efficiency improvement of the original production lines.

Method used

By collecting multiple print categories in real time, classifying them into main categories and secondary categories, assessing their processing needs, and analyzing abnormal risks and performance changes based on the maintenance and update logs of the processing production line, establishing a cross-processing layout management and control model, and accurately allocating tasks to The most suitable production line.

Benefits of technology

It improves the efficiency and accuracy of printing processing, optimizes resource allocation, reduces operational risks, reduces manual intervention through automated management, and improves the stability and reliability of the overall printing processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735218A_ABST
    Figure CN118735218A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-printed-matter-class cross processing layout method and system based on a printing production line, and relates to the technical field of processing layout, and the method comprises the steps: a class collection module collects multiple printed matter classes in real time, classifies the multiple printed matter classes into primary and secondary classes, recognizes a primary task and a secondary task, and sends the primary task and the secondary task to a processing layout module; the demand evaluation module is used for determining the processing demand of a to-be-processed task, the log collection module collects a maintenance log and an update log of a processing production line, the state evaluation module evaluates the risk state and the performance change of the server based on the maintenance log and the update log, and the management and control module combines the demand evaluation result and the state evaluation result. And a cross processing cooperation model is constructed, and tasks are intelligently distributed to the most suitable processing production line. The method has the advantages that the category processing efficiency and accuracy are improved, the resource allocation is optimized, the operation risk is reduced, and manual intervention is reduced through automatic management, so that the stability and reliability of the whole system are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of printing planning technology, and in particular to a method and system for cross-processing layout of multiple printing categories based on a printing production line. Background Art

[0002] In order to meet the production demand of printed materials, printing manufacturers need to continuously expand their production scale. The expansion of production scale mainly includes two aspects: one is to improve the efficiency of the original production line, and the other is to increase the production line. Efficient and reasonable planning can help increase the production line.

[0003] The solutions for improving the efficiency of the original production lines in the existing technology lack multi-dimensional data analysis for printing categories and processing production lines, making it difficult to achieve a rational planning and layout of cross-processing production lines for printing categories, resulting in a lack of obvious effect on improving the efficiency of the original production lines. Summary of the invention

[0004] In order to solve the above-mentioned technical problems, a method and system for the cross-processing layout of multiple printed products based on a printing production line are provided. This technical solution solves the problem that the solutions in the above-mentioned prior art for improving the efficiency of the original production line lack multi-dimensional data analysis for printed products and processing production lines, making it difficult to rationally plan and layout the cross-processing of printed products and processing production lines, resulting in unclear efficiency improvement effects on the original production lines.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is: A multi-printing product cross-processing layout method based on a printing production line, comprising: Collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; Based on the main tasks and the secondary tasks, evaluate the processing requirements of the main tasks and the secondary tasks; Obtain maintenance logs and update logs for each processing line; Analyze the abnormal risk status of each processing line based on the maintenance log and update log of each processing line; Based on the maintenance log and update log of each processing line, predict the performance change status of each processing line; According to the abnormal risk status of the processing production line and the performance change status of the processing production line, a cross-processing layout management and control model is established to allocate the main tasks and secondary tasks to the processing production line.

[0006] Preferably, the step of evaluating the processing requirements of the primary task and the secondary task based on the primary task and the secondary task includes: Determine the processing volume of the main tasks and the processing volume of the secondary tasks; According to the basic printing process of the main task and the secondary task, analyze the time and production line space required for the execution of the basic printing process, and determine the processing resource requirements of the main task and the secondary task; Determine the resource utilization of the main task and the secondary task according to the maximum number of parallel processing of the main task and the secondary task; Based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task, the processing requirements of the main task and the secondary task are evaluated through the performance requirement formula.

[0007] Preferably, the performance requirement formula is specifically: In the formula, The overall processing requirements for the main and secondary tasks, For the main task processing needs, For secondary task processing needs, The time required to execute the printing process is determined by To determine the production line space required for the execution of the printing process, is the maximum number of parallel processing, is the resource utilization rate, and k is the number of the main task and the secondary task.

[0008] Preferably, based on the maintenance log and update log of each processing line, analyzing the abnormal risk status of each processing line specifically includes: Based on the maintenance log of the processing production line, abnormal events of the processing production line are screened out; the abnormal events include but are not limited to: hardware failure and software error; Based on logistic regression, a failure risk probability prediction model for the processing production line is established; The fault risk probability prediction model based on the processing line takes the abnormal events of each processing line in the historical maintenance log as input, and takes the abnormal risk probability of the processing line under the influence of the abnormal events of each processing line as output; Among them, the failure risk probability prediction model expression of the processing production line is: In the formula, To maintain a log in history Under the condition, the abnormal risk probability of Y occurring in the processing line is: For the history maintenance log An abnormal event, is an exponential function, V represents the total number of abnormal events, , , , are the coefficients of the model.

[0009] Preferably, based on the update log of each processing line, predicting the performance change state of each processing line specifically includes: Determine the update time of the update log of the processing production line; Based on the update log of the processing production line, mark the event features that have an impact on performance and obtain the iterative event feature categories of the processing production line; Establish performance prediction analysis model; Based on the performance prediction analysis model, the iterative event feature category of each processing line is used as the output, and the quantified performance increase value of the iterative event feature of the processing line is used as the output. According to the time from the iterative event feature of the processing line to the current time, the overall performance change status indicator of the processing line is predicted; Among them, the performance prediction analysis model expression is: In the formula, is the overall performance change indicator of the predicted processing production line. is the time from the iterative event feature of the processing production line to the current time. is the iterative event feature vector of the jth processing line, is the error term, is the intercept term, is the coefficient of the iteration time, , is the eigenvector coefficient of the iteration event, and m is the total number of iteration events.

[0010] Preferably, the establishing of a cross-processing layout control model according to the abnormal risk status of the processing production line and the performance change status of the processing production line, and allocating the main tasks and the secondary tasks to the processing production line includes: Classify the processing lines based on the abnormal risk status indicator level values ​​of the processing lines to obtain a low-risk processing line array and a high-risk processing line array; Determine the processing requirements for primary and secondary tasks; The processing requirements of primary and secondary tasks are used as feature categories, and the arrays of low-risk processing production lines and high-risk processing production lines are used as label categories; Obtain the overall processing requirements of primary and secondary tasks; Determine the overall performance change status indicators of low-risk processing production lines and high-risk processing production lines; Analyze whether the overall performance change status indicators of all low-risk processing production lines meet the overall processing requirements of the main tasks and secondary tasks. If so, randomly assign the main tasks and secondary tasks. If not, perform mixed assignments. If mixed allocation is performed, the performance change state indicators of each low-risk processing production line and the performance change state indicators of the high-risk processing production line are analyzed as the upper limit of the low-risk and high-risk processing production line operation task carrying capacity, the main tasks are traversed and screened, and the secondary tasks are defined as alternatives. The main tasks and secondary tasks are run with the upper limit of the operation task carrying capacity of the maximum low-risk and high-risk processing production lines to obtain several allocation plans; Based on the failure risk probability prediction model of the processing production line, several allocation schemes are substituted into the model to obtain the abnormal risk probabilities of several allocation schemes; According to the abnormal risk probabilities of several allocation plans, the allocation plan corresponding to the minimum abnormal risk probability is screened out as the final allocation plan.

[0011] Furthermore, a multi-printing product cross-processing layout system based on a printing production line is proposed, which is used to implement the multi-printing product cross-processing layout method based on a printing production line as described above, including: A category collection module, which is used to collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; A demand assessment module, the demand assessment module is connected to the type collection module by wires, and the demand assessment module is used to assess the processing requirements of the main task and the secondary task based on the main task and the secondary task; Log collection module: The log collection module is used to obtain the maintenance log and update log of each processing production line; A status assessment module, the status assessment module is connected to the log collection module by wires, and the status assessment module is used to analyze the abnormal risk status of each processing line based on the maintenance log and update log of each processing line, and to predict the performance change status of each processing line based on the maintenance log and update log of each processing line; The control module is connected to the demand assessment module and the status assessment module by electrical wiring. The control module is used to establish a cross-processing collaborative model based on the abnormal risk status of the processing production line and the performance change status of the processing production line, and allocate the main tasks and secondary tasks to the processing production line.

[0012] Optionally, the demand assessment module internally includes: Category conversion unit, converting the category analog signals in the primary task and the secondary task into digital signals, and determining the processing amount of the primary task and the processing amount of the secondary task; The resource requirement unit analyzes the time and production line space required to execute the basic printing process according to the basic printing process of the main task and the secondary task, and determines the processing resource requirements of the main task and the secondary task; A resource utilization unit determines resource utilization of the primary task and the secondary task according to the maximum number of parallel processing of the primary task and the secondary task; The processing requirement calculation unit evaluates the processing requirements of the main task and the secondary task through a performance requirement formula based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task.

[0013] Optionally, the control module includes: A grouping unit, which classifies the processing lines based on the abnormal risk status indicator level values ​​of the processing lines, and obtains a low-risk processing line array and a high-risk processing line array; Task requirement unit, determines the processing requirements of primary and secondary tasks; Feature unit, taking the processing requirements of the main task and the secondary task as the feature category, and taking the low-risk processing line array and the high-risk processing line array as the label category; Model building unit, building cross-processing collaborative model; The model prediction unit, based on the cross-processing collaborative model, takes the processing requirements of the main tasks and the secondary tasks as the characteristic categories as the model input, and takes the label categories of low-risk processing production lines that meet the processing requirements of the main tasks and the high-risk processing production lines that meet the processing requirements of the secondary tasks as outputs to obtain the task allocation plan.

[0014] Compared with the prior art, the present invention has the following beneficial effects: The present invention proposes a multi-print category cross-processing layout solution based on the printing production line. By establishing an intelligent cross-processing collaborative model, the main tasks and secondary tasks can be accurately allocated to the most suitable processing production line, thereby improving the efficiency and accuracy of printing processing, optimizing resource allocation, reducing operational risks, and reducing manual intervention through automated management, thereby improving the stability and reliability of the entire printing processing. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a flow chart of the cross-processing layout method for multiple printing categories based on a printing production line proposed by the present invention; Figure 2 A flow chart of a method for evaluating processing requirements of a primary task and a secondary task based on the primary task and the secondary task in the present invention; Figure 3 A flow chart of a method for evaluating the abnormal risk status of each processing line in the present invention; Figure 4 A flow chart of a method for predicting the performance change state of each processing production line in the present invention; Figure 5This is a structural block diagram of the multi-printing category cross-processing layout system based on the printing production line proposed by the present invention. DETAILED DESCRIPTION

[0016] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0017] Reference Figure 1 As shown, a multi-printing product cross-processing layout method based on a printing production line includes: Collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; Based on the main tasks and the secondary tasks, evaluate the processing requirements of the main tasks and the secondary tasks; Obtain maintenance logs and update logs for each processing line; Analyze the abnormal risk status of each processing line based on the maintenance log and update log of each processing line; Based on the maintenance log and update log of each processing line, predict the performance change status of each processing line; According to the abnormal risk status of the processing production line and the performance change status of the processing production line, a cross-processing layout management and control model is established to allocate the main tasks and secondary tasks to the processing production line.

[0018] By establishing an intelligent cross-processing collaborative model, main and secondary tasks can be accurately assigned to the most appropriate processing production line, thereby improving the efficiency and accuracy of printing processing, optimizing resource allocation, and reducing operational risks.

[0019] Reference Figure 2 As shown, based on the main task and the secondary task, the processing requirements of the main task and the secondary task are evaluated, including: Determine the processing volume of the main tasks and the processing volume of the secondary tasks; According to the basic printing process of the main task and the secondary task, analyze the time and production line space required for the execution of the basic printing process, and determine the processing resource requirements of the main task and the secondary task; Determine the resource utilization of the main task and the secondary task according to the maximum number of parallel processing of the main task and the secondary task; Based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task, the processing requirements of the main task and the secondary task are evaluated through the performance requirement formula.

[0020] The performance requirement formula is as follows: In the formula, The overall processing requirements for the main and secondary tasks, For the main task processing needs, For secondary task processing needs, The time required to execute the printing process is determined by To determine the production line space required for the execution of the printing process, is the maximum number of parallel processing, is the resource utilization rate, and k is the number of the main task and the secondary task.

[0021] It should be noted that this solution provides a basic framework to evaluate and plan the demand for processing resources. However, in actual resource planning, other factors need to be considered, such as: task priority, real-time requirements, performance redundancy of the processing line, and fault recovery capability.

[0022] Reference Figure 3 As shown in the figure, based on the maintenance log and update log of each processing line, the abnormal risk status of each processing line is analyzed, including: Based on the maintenance log of the processing production line, abnormal events of the processing production line are screened out; the abnormal events include but are not limited to: hardware failure and software error; Based on logistic regression, a failure risk probability prediction model for the processing production line is established; The fault risk probability prediction model based on the processing line takes the abnormal events of each processing line in the historical maintenance log as input, and takes the abnormal risk probability of the processing line under the influence of the abnormal events of each processing line as output; Among them, the failure risk probability prediction model expression of the processing production line is: In the formula, To maintain a log in history Under the condition, the abnormal risk probability of Y occurring in the processing line is: For the history maintenance log An abnormal event, is an exponential function, V represents the total number of abnormal events, , , , are the coefficients of the model.

[0023] Reference Figure 4 As shown, based on the update log of each processing line, the performance change status of each processing line is predicted to include: Determine the update time of the update log of the processing production line; Based on the update log of the processing production line, mark the event features that have an impact on performance and obtain the iterative event feature categories of the processing production line; Establish performance prediction analysis model; Based on the performance prediction analysis model, the iterative event feature category of each processing line is used as the output, and the quantified performance increase value of the iterative event feature of the processing line is used as the output. According to the time from the iterative event feature of the processing line to the current time, the overall performance change status indicator of the processing line is predicted; Among them, the performance prediction analysis model expression is: In the formula, is the overall performance change indicator of the predicted processing production line. is the time from the iterative event feature of the processing production line to the current time. is the iterative event feature vector of the jth processing line, is the error term, is the intercept term, is the coefficient of the iteration time, , are the eigenvector coefficients of iterative events, and m is the total number of iterative events.

[0024] This solution provides reliable decision-making categories for subsequent task allocation by evaluating the abnormal risk indicators of the processing production line and the overall performance change status indicators of the processing production line. Secondly, by analyzing the abnormal risk indicators of the processing production line, the main tasks can be distributed to the processing production line with smaller abnormal risk indicators in a targeted manner to ensure the stability and reliability of the overall system.

[0025] The cross-processing layout control model is established according to the abnormal risk status of the processing production line and the performance change status of the processing production line, and the main tasks and secondary tasks are allocated to the processing production line, including: Classify the processing lines based on the abnormal risk status indicator level values ​​of the processing lines to obtain a low-risk processing line array and a high-risk processing line array; Determine the processing requirements for primary and secondary tasks; The processing requirements of primary and secondary tasks are used as feature categories, and the arrays of low-risk processing production lines and high-risk processing production lines are used as label categories; Obtain the overall processing requirements of primary and secondary tasks; Determine the overall performance change status indicators of low-risk processing production lines and high-risk processing production lines; Analyze whether the overall performance change status indicators of all low-risk processing production lines meet the overall processing requirements of the main tasks and secondary tasks. If so, randomly assign the main tasks and secondary tasks. If not, perform mixed assignments. If mixed allocation is performed, the performance change state indicators of each low-risk processing production line and the performance change state indicators of the high-risk processing production line are analyzed as the upper limit of the low-risk and high-risk processing production line operation task carrying capacity, the main tasks are traversed and screened, and the secondary tasks are defined as alternatives. The main tasks and secondary tasks are run with the upper limit of the operation task carrying capacity of the maximum low-risk and high-risk processing production lines to obtain several allocation plans; Based on the failure risk probability prediction model of the processing production line, several allocation schemes are substituted into the model to obtain the abnormal risk probabilities of several allocation schemes; According to the abnormal risk probabilities of several allocation plans, the allocation plan corresponding to the minimum abnormal risk probability is screened out as the final allocation plan.

[0026] Reference Figure 5 As shown, a multi-printing product cross-processing layout system based on a printing production line includes: A category collection module, which is used to collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; A demand assessment module, the demand assessment module is connected to the type collection module by wires, and the demand assessment module is used to assess the processing requirements of the main task and the secondary task based on the main task and the secondary task; Log collection module: The log collection module is used to obtain the maintenance log and update log of each processing production line; A status assessment module, the status assessment module is connected to the log collection module by wires, and the status assessment module is used to analyze the abnormal risk status of each processing production line based on the maintenance log and update log of each processing production line; Based on the maintenance log and update log of each processing line, predict the performance change status of each processing line; The control module is connected to the demand assessment module and the status assessment module by electrical wiring. The control module is used to establish a cross-processing collaborative model based on the abnormal risk status of the processing production line and the performance change status of the processing production line, and allocate the main tasks and secondary tasks to the processing production line.

[0027] It is understandable that there is a big gap in the status of different processing production lines, so the categories are classified into primary categories (important categories) and secondary categories (unimportant categories). In the final category allocation, the primary categories are allocated to processing production lines with better status, and the secondary categories are allocated to processing production lines with average status, so as to improve the reliability of printing processing and enhance category security.

[0028] The needs assessment module includes: Category conversion unit, determine the processing volume of main tasks and secondary tasks; The resource requirement unit analyzes the time and production line space required to execute the basic printing process according to the basic printing process of the main task and the secondary task, and determines the processing resource requirements of the main task and the secondary task; A resource utilization unit determines resource utilization of the primary task and the secondary task according to the maximum number of parallel processing of the primary task and the secondary task; A processing requirement calculation unit, which evaluates the processing requirements of the main task and the secondary task through a performance requirement formula based on the processing amount of the main task and the processing amount of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization rate of the main task and the secondary task; The status assessment module includes: The risk assessment unit analyzes the abnormal risk status of each processing line based on the maintenance log and update log of each processing line; The performance prediction unit predicts the performance change status of each processing line based on the update log of each processing line; The control module includes: A grouping unit, which classifies the processing lines based on the abnormal risk status indicator level values ​​of the processing lines, and obtains a low-risk processing line array and a high-risk processing line array; Task requirement unit, determines the processing requirements of primary and secondary tasks; Feature unit, taking the processing requirements of the main task and the secondary task as the feature category, and taking the low-risk processing line array and the high-risk processing line array as the label category; Model building unit, building cross-processing collaborative model; The model prediction unit, based on the cross-processing collaborative model, takes the processing requirements of the main task and the secondary task as the characteristic categories as the model input, and takes the label categories of the low-risk processing production lines that meet the processing requirements of the main task and the high-risk processing production lines that meet the processing requirements of the secondary task as the output, to obtain the task allocation plan; Among them, the cross-processing collaborative model expression is: Where Z is the objective function of the cross-processing collaborative model, The weight of the tasks to be performed is uniformly distributed according to the main tasks and secondary tasks. is a binary decision variable, indicating whether the task r to be executed is assigned to the jth processing line. is the processing requirement of the rth task to be executed within the kth (primary / secondary) task, is the energy change state indicator of the jth processing production line, L is the total number of tasks to be executed, and m is the total number of processing production lines.

[0029] It can be understood that this solution constructs an objective function with the processing requirements of the main and secondary tasks as conditions, maximizes the use of the performance change state indicators of the processing production line, and uses the processing production line that satisfies the most tasks to be executed as the allocation plan. , ensuring that the processing demand of each task will not exceed the performance change state indicator of the processing production line to which it is assigned. , ensuring that each task can only be assigned to one processing line.

[0030] The model prediction unit includes: The first condition subunit, based on the overall performance change state indicator of the processing production line, satisfies the most main tasks and secondary tasks as the first allocation condition; The second condition subunit takes the minimum abnormal risk state of the primary task and the secondary task as the second allocation condition; Among them, based on the overall performance change state indicator restriction of the processing production line, the first allocation condition that satisfies the most primary tasks and secondary tasks specifically includes: Obtain the overall processing requirements of primary and secondary tasks; Determine the overall performance change status indicators of low-risk processing production lines and high-risk processing production lines; Analyze whether the overall performance change status indicators of all low-risk processing production lines meet the overall processing requirements of the main tasks and secondary tasks. If yes, randomly assign the main tasks and secondary tasks. If not, perform mixed assignment; If mixed allocation is performed, the performance change state indicators of each low-risk processing production line and the performance change state indicators of the high-risk processing production line are analyzed as the upper limit of the low-risk and high-risk processing production line operation task carrying capacity, the main tasks are traversed and screened, and the secondary tasks are defined as alternatives. The main tasks and secondary tasks are run with the upper limit of the operation task carrying capacity of the maximum low-risk and high-risk processing production lines to obtain several allocation plans; Among them, the second allocation condition of taking the minimum abnormal risk state of the primary task and the secondary task as the second allocation condition specifically includes: Based on the failure risk probability prediction model of the processing production line, several allocation schemes are substituted into the model to obtain the abnormal risk probabilities of several allocation schemes; According to the abnormal risk probabilities of several allocation plans, the allocation plan corresponding to the minimum abnormal risk probability is screened out as the final allocation plan.

[0031] The use process of a multi-printing product cross-processing layout system based on a printing production line is as follows: Step 1: Collect multiple printed categories in real time, and classify them into primary categories and secondary categories to obtain primary tasks and secondary tasks; Step 2: Based on the main tasks and the secondary tasks, evaluate the processing requirements of the main tasks and the secondary tasks; Step 3: According to the basic printing processes of the main tasks and the secondary tasks, analyze the time and production line space required to execute the basic printing processes, and determine the processing resource requirements of the main tasks and the secondary tasks; Step 4: Determine the resource utilization of the main task and the secondary task according to the maximum parallel processing quantity of the main task and the secondary task; Step 5: Based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task, the processing requirements of the main task and the secondary task are evaluated through the performance requirement formula; Step 6: Obtain the maintenance log and update log of each processing production line; Step 7: Based on the maintenance log and update log of each processing line, analyze the abnormal risk status of each processing line; Step 8: Based on the update log of each processing line, predict the performance change status of each processing line; Step 9: Classify the processing lines based on the abnormal risk status indicator level values ​​of the processing lines to obtain a low-risk processing line array and a high-risk processing line array; Step 10: Determine the processing requirements of primary and secondary tasks; Step 11: The processing requirements of the main tasks and the secondary tasks are used as feature categories, and the low-risk processing production line array and the high-risk processing production line array are used as label categories; Step 12: Construct cross-processing collaborative model; Step 13: Based on the cross-processing collaborative model, the processing requirements of the main tasks and the secondary tasks are used as the characteristic categories as the model input, and the label categories of low-risk processing production lines that meet the processing requirements of the main tasks and high-risk processing production lines that meet the processing requirements of the secondary tasks are used as outputs to obtain the task allocation plan.

[0032] To sum up, the advantages of the present invention are: by establishing an intelligent cross-processing collaborative model, the main tasks and secondary tasks can be accurately allocated to the most suitable processing production line, thereby improving the efficiency and accuracy of printing processing, optimizing resource allocation, reducing operational risks, and reducing manual intervention through automated management, thereby improving the stability and reliability of the entire printing processing.

[0033] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A multi-printing product cross-processing layout method based on a printing production line, characterized in that: include: Collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; Based on the main tasks and the secondary tasks, evaluate the processing requirements of the main tasks and the secondary tasks; Obtain maintenance logs and update logs for each processing line; Analyze the abnormal risk status of each processing line based on the maintenance log and update log of each processing line; Based on the maintenance log and update log of each processing line, predict the performance change status of each processing line; According to the abnormal risk status of the processing production line and the performance change status of the processing production line, a cross-processing layout management and control model is established to allocate the main tasks and secondary tasks to the processing production line.

2. According to claim 1, a multi-printing product cross-processing layout method based on a printing production line is characterized in that: Based on the main tasks and the secondary tasks, the processing requirements of the main tasks and the secondary tasks are evaluated, including: Determine the processing volume of the main tasks and the processing volume of the secondary tasks; According to the basic printing process of the main task and the secondary task, analyze the time and production line space required for the execution of the basic printing process, and determine the processing resource requirements of the main task and the secondary task; Determine the resource utilization of the main task and the secondary task according to the maximum number of parallel processing of the main task and the secondary task; Based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task, the processing requirements of the main task and the secondary task are evaluated through the performance requirement formula.

3. According to claim 2, a multi-printing product cross-processing layout method based on a printing production line is characterized in that: The performance requirement formula is as follows: In the formula, The overall processing requirements for the main and secondary tasks, For the main task processing needs, For secondary task processing needs, The time required to execute the printing process is determined by To determine the production line space required for the execution of the printing process, is the maximum number of parallel processing, is the resource utilization rate, and k is the number of the main task and the secondary task.

4. According to claim 3, a multi-printing product cross-processing layout method based on a printing production line is characterized in that: Based on the maintenance log and update log of each processing line, the abnormal risk status of each processing line is analyzed, including: Based on the maintenance log of the processing production line, abnormal events of the processing production line are screened out; the abnormal events include but are not limited to: hardware failure and software error; Based on logistic regression, a failure risk probability prediction model for the processing production line is established; The fault risk probability prediction model based on the processing line takes the abnormal events of each processing line in the historical maintenance log as input, and takes the abnormal risk probability of the processing line under the influence of the abnormal events of each processing line as output; Among them, the failure risk probability prediction model expression of the processing production line is: In the formula, To maintain a log in history Under the condition, the abnormal risk probability of Y occurring in the processing line is: For the history maintenance log An abnormal event, is an exponential function, V represents the total number of abnormal events, , , , are the coefficients of the model.

5. According to claim 4, a multi-printing product cross-processing layout system based on a printing production line is characterized in that: Based on the update log of each processing line, the performance change status of each processing line is predicted to include: Determine the update time of the update log of the processing production line; Based on the update log of the processing production line, mark the event features that have an impact on performance and obtain the iterative event feature categories of the processing production line; Establish performance prediction analysis model; Based on the performance prediction analysis model, the iterative event feature category of each processing line is used as the output, and the quantified performance increase value of the iterative event feature of the processing line is used as the output. According to the time from the iterative event feature of the processing line to the current time, the overall performance change status indicator of the processing line is predicted; Among them, the performance prediction analysis model expression is: In the formula, is the overall performance change indicator of the predicted processing production line. is the time from the iterative event feature of the processing production line to the current time. is the iterative event feature vector of the jth processing line, is the error term, is the intercept term, is the coefficient of the iteration time, , are the eigenvector coefficients of iterative events, and m is the total number of iterative events.

6. The method for cross-processing layout of multiple printing categories based on a printing production line according to claim 5 is characterized in that: The cross-processing layout control model is established according to the abnormal risk status of the processing production line and the performance change status of the processing production line, and the main tasks and secondary tasks are allocated to the processing production line, including: Classify the processing lines based on the abnormal risk status indicator level values ​​of the processing lines to obtain a low-risk processing line array and a high-risk processing line array; Determine the processing requirements for primary and secondary tasks; The processing requirements of primary and secondary tasks are used as feature categories, and the arrays of low-risk processing production lines and high-risk processing production lines are used as label categories; Obtain the overall processing requirements of primary and secondary tasks; Determine the overall performance change status indicators of low-risk processing production lines and high-risk processing production lines; Analyze whether the overall performance change status indicators of all low-risk processing production lines meet the overall processing requirements of the main tasks and secondary tasks. If so, randomly assign the main tasks and secondary tasks. If not, perform mixed assignments. If mixed allocation is performed, the performance change state indicators of each low-risk processing production line and the performance change state indicators of the high-risk processing production line are analyzed as the upper limit of the low-risk and high-risk processing production line operation task carrying capacity, the main tasks are traversed and screened, and the secondary tasks are defined as alternatives. The main tasks and secondary tasks are run with the upper limit of the operation task carrying capacity of the maximum low-risk and high-risk processing production lines to obtain several allocation plans; Based on the failure risk probability prediction model of the processing production line, several allocation schemes are substituted into the model to obtain the abnormal risk probabilities of several allocation schemes; According to the abnormal risk probabilities of several allocation plans, the allocation plan corresponding to the minimum abnormal risk probability is screened out as the final allocation plan.

7. A multi-printing product cross-processing layout system based on a printing production line, characterized in that: The method for implementing the multi-printing product cross-processing layout method based on a printing production line as described in any one of claims 1 to 6 comprises: A category collection module, which is used to collect multiple printed categories in real time, and classify the multiple printed categories into primary categories and secondary categories, and record the processing tasks of the primary categories as primary tasks, and record the processing tasks of the secondary categories as secondary tasks; A demand assessment module, the demand assessment module is connected to the type collection module by wires, and the demand assessment module is used to assess the processing requirements of the main task and the secondary task based on the main task and the secondary task; Log collection module: The log collection module is used to obtain the maintenance log and update log of each processing production line; A status assessment module, the status assessment module is connected to the log collection module by wires, and the status assessment module is used to analyze the abnormal risk status of each processing line based on the maintenance log and update log of each processing line, and to predict the performance change status of each processing line based on the maintenance log and update log of each processing line; The control module is connected to the demand assessment module and the status assessment module by electrical wiring. The control module is used to establish a cross-processing collaborative model based on the abnormal risk status of the processing production line and the performance change status of the processing production line, and allocate the main tasks and secondary tasks to the processing production line.

8. The multi-printing product cross-processing layout system based on a printing production line according to claim 7, characterized in that: The demand assessment module includes: Category conversion unit, converting the category analog signals in the primary task and the secondary task into digital signals, and determining the processing amount of the primary task and the processing amount of the secondary task; The resource requirement unit determines the processing resource requirements of the main and secondary tasks by analyzing the time and production line space required to execute the basic printing processes according to the basic printing processes of the main and secondary tasks; A resource utilization unit determines resource utilization of the primary task and the secondary task according to the maximum number of parallel processing of the primary task and the secondary task; The processing requirement calculation unit evaluates the processing requirements of the main task and the secondary task through a performance requirement formula based on the processing volume of the main task and the processing volume of the secondary task, the processing resource requirements of the main task and the secondary task, and the resource utilization of the main task and the secondary task.

9. The multi-printing product cross-processing layout system based on a printing production line according to claim 8, characterized in that: The control module includes: A grouping unit, which classifies the processing lines based on the abnormal risk status indicator level values ​​of the processing lines, and obtains a low-risk processing line array and a high-risk processing line array; Task requirement unit, determines the processing requirements of primary and secondary tasks; Feature unit, taking the processing requirements of the main task and the secondary task as the feature category, and taking the low-risk processing line array and the high-risk processing line array as the label category; Model building unit, building cross-processing collaborative model; The model prediction unit, based on the cross-processing collaborative model, takes the processing requirements of the main task and the secondary task as the characteristic categories as the model input, and takes the label categories of the low-risk processing production lines that meet the processing requirements of the main task and the high-risk processing production lines that meet the processing requirements of the secondary task as the output, to obtain the task allocation plan; The cross-processing collaborative model expression is: Where Z is the objective function of the cross-processing collaborative model, is the weight of the rth task to be executed, which is uniformly assigned to the main task and the secondary task. is a binary decision variable, indicating whether the task r to be executed is assigned to the jth processing line. is the processing requirement of the rth task to be executed within the kth primary / secondary task, is the performance change status indicator of the jth processing line, L is the total number of tasks to be executed, and U is the total number of processing lines.

Citation Information

Cited By

  • Printing order automatic processing method and system based on intelligent matching

    CN120782316A