Project information management system
Through the project classification display and work record module of the project information management system, combined with the speech-to-text algorithm, the problem of low efficiency in project information management and summary is solved, automated task distribution and information organization are realized, and work efficiency is improved.
Patent Information
- Application Number
- CN202410828838.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-01
AI Technical Summary
During the project, it is difficult to efficiently manage and summarize project information with existing technology, resulting in low work efficiency and the need to manually organize meeting records and task assignments.
A project information management system is designed, including a project classification display module, a project details module and a work record module. It uses a speech-to-text algorithm to automatically record and organize work content and automatically distribute tasks. The project classification display module and work record module are used to realize the project. Detailed recording and management of information.
It improves the convenience and work efficiency of project information management, reduces the time of manual sorting and task distribution, and ensures the accuracy and detail of information.
Smart Images

Figure CN118735447A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project information processing, and in particular to a project information management system. Background Art
[0002] When a project is in progress, common office software is generally used to establish groups for project-related personnel to report work. During the project, regular meetings are required to report and summarize the progress and content of the project work.
[0003] After the voice report is completed at the meeting, the staff will have to summarize the report content by typing, and some unnecessary information needs to be excluded during the summary. In addition, project tasks are assigned or recorded by hand in project records, which reduces work efficiency. For this reason, we propose a project information management system that can improve work efficiency. Summary of the invention
[0004] The object of the present invention is to provide a project information management system to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: a project information management system, comprising:
[0006] A project classification display module, which is used to display all projects by category;
[0007] A project details module, which is used to record work items in the project;
[0008] A work record module, wherein the work record module is used to record daily work reports.
[0009] Preferably, the project classification display module includes a project name unit, a project leader unit and an estimated project completion time unit;
[0010] The project name unit is used for the user to directly input the project name to enter the corresponding project details;
[0011] The project leader unit is used for the user to input the project leader to search for all projects that the project leader is responsible for, and to enter the corresponding project details by clicking on the project name;
[0012] The estimated project completion time unit is used for the user to input a time point to search for all projects that need to be completed before the time point, and enter the corresponding project details by clicking on the project name.
[0013] Preferably, the project classification display module may also include planned units, ongoing units, completed units and overdue units;
[0014] The plan unit includes all projects, and the user can directly click on the project name in the plan unit to enter the corresponding project details;
[0015] The ongoing unit includes all projects that are not overdue and in progress. Users can directly click on the project name in the ongoing unit to enter the corresponding project details;
[0016] The completed unit includes all completed projects. The user can directly click on the project name in the completed unit to enter the corresponding project details;
[0017] The overdue unit includes all overdue and unfinished projects. The user can enter the corresponding project details by directly clicking the project name in the overdue unit.
[0018] Preferably, the project classification display module is further provided with a project overdue prediction unit, which is used to predict the probability of project overdue. The calculation formula of the project overdue prediction unit is:
[0019]
[0020] in,
[0021] P delay represents the probability of project overdue;
[0022] P i represents the probability that the i-th overdue factor causes the project to be overdue, where i = 1, 2, …, n;
[0023] w i represents the weight of the i-th overdue factor, where i = 1, 2, ..., n;
[0024] The delay factors include but are not limited to weather factors, project staff leave factors, material supply problems factors and process approval factors.
[0025] Preferably, the project classification display module can also be used for administrator backend login. After the administrator enters the project information and the personnel involved in the project in the system backend and submits it, the project personnel can view the projects they participate in in the project classification display module.
[0026] Preferably, the data displayed in the project details module includes the title, due date and status of the work items, and the project details module includes an approval process unit, which is used by the user to initiate a specific process for the project and send the application to the corresponding staff for approval.
[0027] Preferably, the work record module includes a text input unit, a voice input unit and an attachment upload unit;
[0028] The text input unit is used for the user to input work records in text form;
[0029] The voice input unit is used for the user to input work records by voice, and the voice input method includes on-site voice recording and voice file uploading;
[0030] The attachment uploading unit is used for users to upload attachments, and the formats of the attachments include but are not limited to pictures, documents and videos.
[0031] Preferably, the voice input unit is provided with a voice-to-text algorithm, and the process of the voice-to-text algorithm specifically includes:
[0032] Preprocessing, processing the original speech signal, including but not limited to noise removal and normalization;
[0033] Feature extraction, extracting features from the preprocessed speech signal, the features include but are not limited to Mel frequency cepstral coefficients;
[0034] Model training, using machine learning or deep learning technology to build a speech recognition model;
[0035] Speech recognition: the extracted speech features are input into the trained model, and the model outputs the corresponding text sequence. The extracted text is also classified using, but not limited to, the transformer AI model and automatically generates labels to store the work in a labeled manner, which is convenient for quick search by label in the future.
[0036] Post-processing, processing the recognition results, including but not limited to spelling checking and grammar correction.
[0037] The present invention also provides a mobile terminal, comprising a microphone, a camera, a memory and at least one processor;
[0038] The memory is used to install the project information management system described above;
[0039] The microphone is used for the voice input unit;
[0040] The camera is used for users to upload pictures and videos as attachments;
[0041] The at least one processor is used to call the project information management system in the memory;
[0042] The mobile terminal may be a mobile phone.
[0043] The present invention also provides a PC terminal, comprising a display, a camera, a memory, a keyboard, a mouse, a microphone and at least one processor;
[0044] The memory is used to install the project information management system described above;
[0045] The camera is used for users to upload pictures and videos as attachments;
[0046] The at least one processor is used to call the project information management system in the memory;
[0047] The display is used to display the project information management system;
[0048] The keyboard is used for the work of the text entry unit;
[0049] The microphone is used for the operation of the voice input unit.
[0050] Technical effects and advantages of the present invention:
[0051] The project information management system of the present invention can use voice-to-text to make work arrangements based on voice records, and automatically identify the content to automatically fill in relevant content. At the same time, after the on-site report, the staff can directly export the report content when they return to the office to avoid additional manual sorting. At the same time, project scheduling can automatically distribute tasks to the person in charge, thereby improving the convenience of project information management and work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 It is a schematic diagram of the project information management system of the present invention.
[0053] Figure 2 This is a schematic diagram of the project classification display module of the present invention.
[0054] Figure 3 This is a schematic diagram of the work recording module of the present invention. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] The present invention provides Figure 1-3A project information management system shown includes a project classification display module, a project details module and a work record module. The project classification display module is used to display all project categories, the project details module is used to record the work items in the project, and the work record module is used to record daily work reports. The voice-to-text function in the work record module is used to make work arrangements based on the voice records, and the content is automatically recognized to automatically fill in the relevant content. At the same time, after the on-site report, the staff can directly export the report content when they return to the office to avoid additional manual sorting. At the same time, the project scheduling can automatically distribute tasks to the person in charge, thereby improving the convenience of project information management and work efficiency. The project classification display module allows users to call up corresponding projects according to needs, thereby facilitating users to process project information. The work record module uses text, voice and attachments to make work records more detailed, without information omissions, ensuring the accuracy and efficiency of work records.
[0057] A login system is also set up in the project information management system. The login system is logged in with an account and password. There are two types of project information management systems. One is project staff, who can view and record in the project information management system, and the other is management personnel. After the management personnel log in to the project information management system, they can directly add projects and add project staff to the project information. After the project staff log in to the project information management system, they can automatically view the corresponding project information. The registration of accounts in the project information management system requires real-name registration, and the user name must be a real name. After the real-name registration in the project information management system is completed, the biometric information can be entered into the project information management system so that biometric login can be performed directly in the future. The biometric information includes fingerprint recognition, facial recognition, etc.
[0058] The project information management system also has a text message binding unit, and its actual process is as follows:
[0059] Users bind their mobile phone numbers. Add the option of binding mobile phone numbers on the user registration or settings page to verify the validity of the mobile phone number. The verification can be performed by sending a verification code.
[0060] Integrate SMS service provider, select and integrate an SMS service provider, and obtain the API key and necessary configuration parameters;
[0061] Develop SMS sending function, develop SMS sending unit on the server side of project information management system, and call API of SMS service provider;
[0062] Process the sending logic, call the SMS sending unit in the scenario where SMS needs to be sent, and construct the SMS content;
[0063] Implement the code;
[0064] Process the sending structure, check the SMS sending results, handle the sending failure, and record the sending log to facilitate future troubleshooting;
[0065] The above implementation code can be:
[0066]
[0067]
[0068] #Example: Send a text message
[0069] phone_number = '+1234567890'#Mobile phone number bound by the user
[0070] sms_message = 'Your account has new notifications, please check it in time.'
[0071] message_sid=send_sms(phone_number,sms_message)
[0072] print(f"SMS sent successfully, SID:{message_sid}");
[0073] The above-mentioned "XXX" is the SMS service provider.
[0074] Among them, the project classification display module includes a project name unit, a project leader unit and an estimated project completion time unit; the project name unit is used for users to directly input the project name to enter the corresponding project details; the project leader unit is used for users to input the project leader to find all projects that the project leader is responsible for, and enter the corresponding project details by clicking the project name; the estimated project completion time unit is used for users to input a time point to find all projects that need to be completed before that time point, and enter the corresponding project details by clicking the project name. The project name unit, the project leader unit and the estimated project completion time unit allow users to directly search for projects according to different key information, and after searching for multiple projects, they can directly enter the project details by clicking the corresponding project name. Among them, the project name unit, the project leader unit and the estimated project completion time unit can also be superimposed, that is, after completing a search for the project name unit, the project leader unit or the estimated project completion time unit can be searched again in the results, and finally the last unfinished unit search can be performed in the search results, thereby making the work of the project classification display module more detailed and convenient for users to search for projects.
[0075] Among them, the project classification display module can also include a planned unit, an ongoing unit, a completed unit and an overdue unit; the planned unit includes all projects, and the user directly clicks the project name in the planned unit to enter the corresponding project details; the ongoing unit includes all projects that are not overdue and in progress, and the user directly clicks the project name in the ongoing unit to enter the corresponding project details. The user can view all ongoing projects in the ongoing unit, and they will be sorted according to the project end date. The projects that reach the end date earlier will be displayed first; the completed unit includes all completed projects, and the user directly clicks the project name in the completed unit to enter the corresponding project details; the overdue unit includes all overdue but uncompleted projects, and the user directly clicks the project name in the overdue unit to enter the corresponding project details. A project overdue prediction unit is also provided in the project classification display module. The project overdue prediction unit is used to predict the probability of project overdue. The project overdue probability is only for reference, but the project overdue probability has a critical value. When the probability of project overdue is greater than this critical value, the staff needs to make corresponding policy adjustments to ensure that the project can be completed on time. The calculation formula of the project overdue prediction unit is:
[0076]
[0077] in,
[0078] P delay represents the probability of project overdue;
[0079] P i represents the probability that the i-th overdue factor causes the project to be overdue, where i = 1, 2, …, n;
[0080] w i represents the weight of the i-th overdue factor, where i = 1, 2, ..., n;
[0081] Delay factors include but are not limited to weather factors, project staff leave factors, material supply issues and process approval factors.
[0082] Among them, the project classification display module can also be used for administrator backend login. After the administrator enters the project information and the personnel involved in the project in the system backend and submits it, the project personnel can view the projects they participate in in the project classification display module.
[0083] Among them, the data displayed in the project details module includes work items, which will display the title, due date and status. The project details module includes an approval process unit. The approval process unit is used by users to initiate the specific process that the project needs to go through and send the application to the corresponding staff for approval. In the project details, users can click the new button to add a work record. In the new work, you can manually fill in the work steps, person in charge, due date, label, notes, and upload attachments. You can also use voice to convert voice into text using AI, and automatically identify the key parts of the text and fill in the work steps, person in charge, due date, labels, etc., to speed up the user's work efficiency. The process of text information extraction is: text preprocessing, removing noise, including punctuation and stop words, and splitting the text into separate words or phrases; named entity recognition, using algorithms to identify entities in the text to extract person in charge and date information; pattern matching and regular expressions, using regular expression matching to extract work steps and labels; mapping the extracted information to the corresponding fields; demonstrating how to extract key information and fill in fields through sample text; integrating the above extraction and mapping logic into the system; adding data verification and error handling logic to ensure the preparation of extracted information;
[0084] Among them, the algorithm code for text preprocessing is:
[0085]
[0086] The algorithm code for extracting named entities is:
[0087]
[0088]
[0089] The algorithm code of the regular expression is:
[0090]
[0091] The algorithm code for information mapping is:
[0092]
[0093] The algorithm code for example text processing is: text = """
[0094] Step 1: Complete project planning#Planning leader: AliceExpiration date: 2024-06-01
[0095] Step 2: Conduct a requirements analysis#Requirement analysis responsible: BobExpiration date: 2024-06-15"""
[0096] fields=map_to_fields(text)print(fields);
[0097] The algorithm code integrated into the system is:
[0098]
[0099] The algorithm code for data verification is:
[0100]
[0101]
[0102] Among them, the work record module includes a text input unit, a voice input unit and an attachment upload unit; the text input unit is used by users to input work records in text form, and the text input unit is often used by users to summarize information after integrating information; the voice input unit is used by users to input work records in voice form, and the voice input methods include on-site voice recording and voice file uploading. On-site voice recording can be recorded at the meeting site. If the project information management system cannot record on-site, other recording devices can be used to record the meeting content at the meeting site. After the meeting, the recording file of the recording device can be directly uploaded to the project information management system; the attachment upload unit is used by users to upload attachments. The formats of attachments include but are not limited to pictures, documents and videos. When uploading attachments, if the attachments are too large, the attachments are compressed. The compression of the attachments can be achieved through the zipfile library, as shown in the following algorithm code:
[0103]
[0104]
[0105]
[0106] The above algorithm code can be used to receive large attachments in Flask and compress them before uploading. In the above code, the uploaded files will be saved in a folder called "uploads". If the uploaded attachment size exceeds 10MB, the file will be compressed and then saved in ZIP format, and the original file will be deleted. Bandwidth and upload time can be saved by compression. Compressing attachments can greatly reduce the file size, thereby saving bandwidth and time required for uploading. Especially for large files, compression can significantly reduce transmission time while saving storage space. Compressed files occupy less disk space than original files, so storage space can be saved, which is especially important when storing a large number of files and reducing network transmission costs. For scenarios where files need to be transferred through cloud services or other network storage, compressed files can reduce network transmission costs because the amount of data transferred is less, maintaining file structure and integrity, compressing multiple files into one file and uploading it can maintain file structure and integrity without confusion or omissions due to multiple files, convenient file management, compressed files are usually easier to manage and can be more easily backed up, moved or shared.
[0107] A speech-to-text algorithm is provided in the speech input unit, and the process of the speech-to-text algorithm specifically includes: preprocessing, processing the original speech signal, including but not limited to noise removal and normalization; feature extraction, extracting features from the preprocessed speech signal, the features include but are not limited to Mel-frequency cepstral coefficients; model training, using machine learning or deep learning technology to establish a speech recognition model; speech recognition, inputting the extracted speech features into the trained model, and the model outputs the corresponding text sequence. The extracted text will also be classified using but not limited to AI models such as transformer and automatically generate labels to store the work in a labeled manner, so as to facilitate quick search through labels in the future. For example, if the words such as security issues appear in the report content many times, the system will automatically generate a label for the security issue. When similar content appears in the next object, it will be labeled with the security issue label. After that, clicking on the security issue will display the previous report content, and the model can also identify whether the report content is set to other staff members as the person in charge of the work; post-processing, processing the recognition results, including but not limited to spelling checking and grammar correction. Therefore, during the meeting, the conference audio can be recorded and then directly converted into text, avoiding the need for staff to handwrite meeting minutes during the meeting and improving the convenience of integrating meeting content.
[0108] After adding a new work record, the user can directly export it with one click and use it directly for reporting work content. After the on-site report, there is no need to spend extra time to summarize the work content again. Flask and a library such as Pandas can be used to generate Excel or CSV files. One implementation example is as follows:
[0109] Install the library;
[0110] Set up a Flask application, which contains a simple task recording system and supports exporting task records as Excel files. The algorithm code is as follows:
[0111]
[0112]
[0113] The specific steps are:
[0114] Install and import libraries: Install Flask for building web applications, install Pandas for processing data and generating Excel files, and install Openpyxl to support Pandas writing Excel files;
[0115] Set up CORS: Use Flask-CORS so that the front-end application can call the API;
[0116] Task database: Use a list to simulate the task database;
[0117] API for adding new work records: Use the / add_task route to handle POST requests for adding new tasks, obtain task information from the requested JSON data and add it to the task database;
[0118] API for exporting task records: Use the / export_tasks route to handle GET requests, convert the task database into a Pandas DataFrame, use the to_excel method to generate an Excel file, and use the send_file method to send the file to the user.
[0119] The PC terminal can input the content of the project progress when the project is established or confirmed. Before the time entered in the project progress, the system can automatically create the work content and notify the relevant personnel, without manually creating the work content. For example, if the project progress requires an on-site inspection on March 20, the work content will be automatically created for the person in charge on March 15. The person in charge will know that he needs to make a work plan and can upload relevant data at the same time. In order to realize the function of automatically establishing work content, the project information management system needs to meet the task scheduling, automatic task creation and notification mechanisms, which are as follows:
[0120] Task scheduling: Use the task scheduler to regularly check projects that are about to expire and create related work content in advance;
[0121] Automatic task creation, creating work content in advance based on projects that are about to expire;
[0122] Notification mechanism to send notifications to relevant persons in charge;
[0123] The specific implementation steps are:
[0124] Install the required Python libraries;
[0125] Set up Flask and APScheduler, and integrate APScheduler in the Flask application to periodically check tasks and create new tasks;
[0126] Run the application, run the above Flask application, every other day, the scheduler will check the task database, if it finds that there is a task due in five days, it will create a new task and notify the person in charge. Set the algorithm code of Flask and APScheduler as follows:
[0127]
[0128]
[0129] The responsible person can be notified via SMS, and the implementation code algorithm is as follows:
[0130]
[0131]
[0132]
[0133] When users add a new work record, there is a microphone icon on the mobile and PC terminals. Users can click the microphone icon to use the microphone of the mobile phone or computer to record. After recording, the platform will use an algorithm to convert the voice into text, analyze the report content, and automatically fill in the person in charge, due date, and tags, etc.
[0134] Users can record work content by typing or voice, and can also attach pictures and PDFs (other file formats are also acceptable) to supplement the work records. After returning to the office, they can directly output the content of daily or weekly meetings.
[0135] The project information management system of the present invention can use voice-to-text to make work arrangements based on voice records, and automatically identify the content to automatically fill in relevant content. At the same time, after the on-site report, the staff can directly export the report content when they return to the office to avoid additional manual sorting. At the same time, project scheduling can automatically distribute tasks to the person in charge, thereby improving the convenience of project information management and work efficiency.
[0136] The present invention also provides a mobile terminal, including a microphone, a camera, a memory and at least one processor; the memory is used to install the above-mentioned project information management system; the microphone is used for the operation of the voice input unit, and the camera is used for users to upload pictures and videos as attachments; at least one processor is used to call the project information management system in the memory; the mobile terminal can be a mobile phone, and the system is compatible with both Android and iOS systems in current mobile phones. The application of the project information management system directly in the mobile phone can directly perform voice input through the microphone of the mobile phone.
[0137] The present invention also provides a PC terminal, including a display, a camera, a memory, a keyboard, a mouse, a microphone and at least one processor; the memory is used to install the above-mentioned project information management system; the camera is used for users to upload pictures and videos as attachments; at least one processor is used to call the project information management system in the memory; the display is used to display the project information management system; the keyboard is used for the text input unit; the microphone is used for the voice input unit. The PC terminal can be either a laptop computer or a desktop computer, but both must be equipped with a microphone for use. At the same time, the PC terminal can also be equipped with a camera component to record the meeting process.
[0138] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A project information management system, characterized in that: include: A project classification display module, which is used to display all projects by category. The project classification display module includes a project name unit, a project leader unit, and an estimated project completion time unit; A project details module, which is used to record work items in the project and includes an approval process unit; A work record module, which is used to record daily work reports. The work record module includes a text input unit, a voice input unit and an attachment upload unit.
2. A project information management system according to claim 1, characterized in that: The project name unit is used for the user to directly input the project name to enter the corresponding project details; The project leader unit is used for the user to input the project leader to search for all projects that the project leader is responsible for, and to enter the corresponding project details by clicking on the project name; The estimated project completion time unit is used for the user to input a time point to search for all projects that need to be completed before the time point, and enter the corresponding project details by clicking on the project name.
3. A project information management system according to claim 1, characterized in that: The project classification display module may also include planned units, ongoing units, completed units and overdue units; The plan unit includes all projects, and the user can directly click on the project name in the plan unit to enter the corresponding project details; The ongoing unit includes all projects that are not overdue and in progress. Users can directly click on the project name in the ongoing unit to enter the corresponding project details; The completed unit includes all completed projects. The user can directly click on the project name in the completed unit to enter the corresponding project details; The overdue unit includes all overdue and unfinished projects. The user can enter the corresponding project details by directly clicking the project name in the overdue unit.
4. A project information management system according to claim 3, characterized in that: The project classification display module is also provided with a project overdue prediction unit, which is used to predict the probability of project overdue. The calculation formula of the project overdue prediction unit is: in, P delay represents the probability of project overdue; P i represents the probability that the i-th overdue factor causes the project to be overdue, where i = 1, 2, …, n; w i represents the weight of the i-th overdue factor, where i = 1, 2, ..., n; The delay factors include but are not limited to weather factors, project staff leave factors, material supply problems factors and process approval factors.
5. A project information management system according to claim 1, characterized in that: The project classification display module can also be used for administrator backend login. After the administrator enters the project information and the personnel involved in the project in the system backend and submits it, the project personnel can view the projects they participate in in the project classification display module.
6. A project information management system according to claim 1, characterized in that: The data displayed in the project details module includes the title, due date and status of the work items, and the approval process unit is used by the user to initiate the specific process required for the project and send the application to the corresponding staff for approval.
7. A project information management system according to claim 1, characterized in that: The text input unit is used for the user to input work records in text form; The voice input unit is used for the user to input work records by voice, and the voice input method includes on-site voice recording and voice file uploading; The attachment uploading unit is used for users to upload attachments, and the formats of the attachments include but are not limited to pictures, documents and videos.
8. A project information management system according to claim 6, characterized in that: The speech input unit is provided with a speech-to-text algorithm, and the process of the speech-to-text algorithm specifically includes: Preprocessing, processing the original speech signal, including but not limited to noise removal and normalization; Feature extraction, extracting features from the preprocessed speech signal, the features include but are not limited to Mel frequency cepstral coefficients; Model training, using machine learning or deep learning technology to build a speech recognition model; Speech recognition: the extracted speech features are input into the trained model, and the model outputs the corresponding text sequence. The extracted text is also classified using, but not limited to, the transformer AI model and automatically generates labels to store the work in a labeled manner, which can be quickly searched by label in the future; Post-processing, processing the recognition results, including but not limited to spelling checking and grammar correction.
9. A mobile terminal comprising a microphone, a camera, a memory and at least one processor, characterized in that: The memory is used to install the project information management system as described in claims 1-8; The microphone is used for the voice input unit; The camera is used for users to upload pictures and videos as attachments; The at least one processor is used to call the project information management system in the memory; The mobile terminal may be a mobile phone.
10. A PC terminal, comprising a display, a camera, a memory, a keyboard, a mouse, a microphone and at least one processor, characterized in that: The memory is used to install the project information management system as described in claims 1-8; The camera is used for users to upload pictures and videos as attachments; The at least one processor is used to call the project information management system in the memory; The display is used to display the project information management system; The keyboard is used for the work of the text entry unit; The microphone is used for the operation of the voice input unit.