Smart city self-starting drainage method and system
Through graph neural network and time series analysis technology, the water volume changes of the urban drainage system are predicted and drainage parameters are adjusted, which solves the problem of untimely response of the traditional system, improves the response speed and efficiency of the urban drainage system, and reduces the cost and maintenance difficulty.
Patent Information
- Application Number
- CN202411225956.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When facing complex and changeable meteorological conditions, traditional urban drainage systems do not respond promptly enough and are difficult to effectively adjust drainage parameters, leading to urban waterlogging and poor drainage problems.
Using graph neural network and time series analysis technology, by obtaining the city's historical hydrological data, the model is trained to predict future water volume changes, and drainage parameters are adjusted based on real-time data, including the opening and closing status of the drainage pump and drainage speed, to improve the efficiency of the drainage system. Responsiveness and efficiency.
Significantly improves the response speed of the drainage system, reduces the need for manual intervention, improves the level of automation and overall efficiency, reduces operating costs and maintenance difficulty, extends the service life of the equipment, and improves the reliability and economy of the system.
Smart Images

Figure CN118735753A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of smart cities, and in particular relates to a smart city self-starting drainage method and system. Background Art
[0002] In modern cities, drainage systems are an important part of urban infrastructure, responsible for managing and treating urban rainfall and wastewater. However, due to the accelerated urbanization process, urban drainage systems are facing increasing pressure. Especially in seasons with frequent rainfall, the load on the drainage system increases sharply, leading to increasingly prominent problems of urban waterlogging and poor drainage. This not only affects the quality of life of urban residents, but may also cause economic losses and environmental pollution.
[0003] Traditional urban drainage systems usually rely on preset operation strategies and manual intervention. This method often does not respond promptly enough when faced with complex and changeable meteorological conditions, and it is difficult to adjust drainage parameters in a timely and effective manner to cope with sudden rainfall. In order to improve the responsiveness and efficiency of drainage systems, the concept of smart cities has emerged, using the Internet of Things (IoT), big data analysis and artificial intelligence technologies to carry out intelligent transformation of urban drainage systems. Summary of the invention
[0004] In order to solve the problems in the prior art, the present invention provides a smart city self-starting drainage method, the method comprising the following steps: obtaining historical hydrological data of the city, the historical hydrological data including the topological structure, environmental data, and drainage parameters of the drainage network; the topological structure at least includes the connection relationship between nodes and pipes; the environmental data at least includes rainfall; the drainage parameters at least include the on / off state of the drainage pump and the drainage speed of the drainage pump; the historical hydrological data is represented by a graph, the graph includes nodes and edges; the nodes represent the various intersections or devices of the drainage network, and the node attributes include rainfall, the on / off state of the drainage pump, the drainage speed ... closed state, drainage speed of the drainage pump; the edge represents the pipeline, and the edge attributes include: length, diameter, flow direction, and flow rate; the historical hydrological data represented by the graph is organized into time series data; the time series data is used to train a first model, the first model includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at a future time; the current hydrological data of the city is obtained, the water volume of each node is predicted according to the current hydrological data and the first model, and the drainage parameters are adjusted according to the water volume of each node.
[0005] Another aspect of the present invention provides a smart city self-starting drainage system, the system comprising the following modules: The acquisition module is used to acquire the historical hydrological data of the city, wherein the historical hydrological data includes the topological structure of the drainage network, environmental data, and drainage parameters; the topological structure includes at least the connection relationship between nodes and pipes; the environmental data includes at least rainfall; and the drainage parameters include at least the on / off state of the drainage pump and the drainage speed of the drainage pump; A data processing module is used to represent the historical hydrological data in a graph, wherein the graph includes nodes and edges; the nodes represent the intersections or devices of the drainage network, and the node attributes include rainfall, the on / off state of the drainage pump, and the drainage speed of the drainage pump; the edges represent the pipelines, and the edge attributes include: length, diameter, flow direction, and flow rate; the historical hydrological data represented by the graph is organized into time series data; A training module is used to train a first model using the time series data, wherein the first model includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at a future time; The regulation module is used to obtain the current hydrological data of the city, predict the water volume of each node according to the current hydrological data and the first model, and adjust the drainage parameters according to the water volume of each node.
[0006] The present invention can produce the following beneficial effects through the above technical solution: By using graph neural networks and time series analysis technology, the water volume changes at each node in the future can be accurately predicted. The model can make full use of the topological structure of the drainage network and historical hydrological data, capture the spatial relationship between nodes and the dynamic changes in the time dimension, thereby improving the prediction accuracy. Real-time acquisition of current hydrological data and rapid prediction and adjustment significantly improves the response speed of the drainage system and avoids waterlogging and poor drainage.
[0007] Based on the prediction results, this embodiment can dynamically adjust drainage parameters, including the on / off status of the drainage pump and the drainage speed. Through real-time monitoring and prediction analysis, the operation strategy of the drainage pump and the gate is automatically optimized to ensure the efficient operation of the drainage system under different weather and flow conditions. This not only reduces the need for manual intervention, but also improves the automation level and overall efficiency of the drainage system.
[0008] The combination of graph convolutional layers and gated recurrent units can fully utilize the spatial relationship of graph structure data and the dynamic changes of time series data. GRU has advantages in dealing with long-term dependency problems, and has high computational efficiency, making it suitable for processing large-scale time series data. This design improves the robustness and adaptability of the model and can effectively cope with the complex and changing urban drainage environment.
[0009] Through the Internet of Things technology and intelligent sensor networks, hydrological data at key locations in the city can be obtained in real time, including rainfall, water level, flow, and drainage pump status. Combined with the trained neural network model, intelligent drainage management can be achieved, drainage parameters can be predicted and adjusted in time, and waterlogging and poor drainage can be prevented. Intelligent drainage management not only improves the operating efficiency of the urban drainage system, but also provides technical support for the construction of smart cities.
[0010] Through the intelligent prediction and adjustment method, this embodiment can effectively reduce the operating cost and maintenance difficulty of the drainage system. It reduces unnecessary energy consumption and equipment wear and tear, and prolongs the service life of drainage equipment. At the same time, intelligent management reduces the frequency of manual intervention and maintenance, and improves the reliability and economy of the urban drainage system. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0012] Figure 1 is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0013] Below, the invention is preferably described in conjunction with the accompanying drawings and specific implementation methods.
[0014] This embodiment solves the above problem through the following steps: In one embodiment, reference Figure 1 The present invention provides a smart city self-starting drainage method.
[0015] This embodiment first obtains the historical hydrological data of the city, and the historical hydrological data includes the topological structure, environmental data, and drainage parameters of the drainage network; the topological structure includes at least the connection relationship between nodes and pipes; the environmental data includes at least rainfall; and the drainage parameters include at least the opening and closing status of the drainage pump and the drainage speed of the drainage pump.
[0016] Historical hydrological data refers to the historical records and measurement data related to the urban drainage system. These data usually include the following aspects: The topological structure of the drainage network: describes the physical layout and connection relationships of the drainage system.
[0017] Environmental data: This includes meteorological and hydrological information that affects the operation of the drainage system, such as rainfall.
[0018] Drainage parameters: describe the operating status and performance parameters of drainage equipment.
[0019] The topological structure of the drainage network refers to the connection relationship and layout between nodes and pipes in the urban drainage system. Specifically, it includes: Node: An intersection, branch point, or specific equipment location (such as a drainage pump station or valve) in a drainage network.
[0020] Pipeline: Pipes connecting nodes for drainage. Pipeline properties include length, diameter, material, etc.
[0021] Environmental data refers to the external natural environment information related to the operation of the urban drainage system. Specifically, it includes: Rainfall: The amount of precipitation over a period of time, usually expressed in millimeters (mm), is an important parameter in the design and operation of drainage systems.
[0022] Other environmental data: such as temperature, humidity, wind speed, etc. These factors may also have an impact on the drainage system. This embodiment mainly uses rainfall, and the above-mentioned other environmental data can also be used to improve the accuracy of the model.
[0023] Drainage parameters refer to specific indicators that describe the operating status and performance of various equipment (such as drainage pumps) in the drainage system. Specifically include: Drain pump on / off status: Indicates whether the drain pump is currently on or off.
[0024] Drainage speed of the drainage pump: indicates the working efficiency of the drainage pump, usually expressed in flow units (such as cubic meters per hour, m³ / h).
[0025] Obtain historical records from the urban drainage management department or relevant database. These records should include drainage system operation data, environmental data and drainage equipment parameters.
[0026] The various intersections in the drainage network, such as drainage pumping stations, sewage treatment plant inlets, rainwater wells, etc. All drainage pipes connecting these nodes, record the length, diameter, material of each pipe and which nodes it is connected to.
[0027] Precipitation data at different time periods (such as hours, days, and months). Precipitation data can be obtained from meteorological departments or environmental monitoring stations.
[0028] Record whether the drainage pump is on or off at different points in time. This helps analyze the response of the drainage system under different weather and flow conditions. Record the drainage speed (flow rate) of the drainage pump at different time periods. This data helps evaluate the performance of the drainage pump and the drainage capacity of the system.
[0029] Through these detailed historical hydrological data, we can fully understand the operation of the urban drainage system and provide a solid data foundation for subsequent neural network model training and real-time prediction.
[0030] Furthermore, the historical hydrological data is represented by a graph, which includes nodes and edges; the nodes represent the various intersections or equipment of the drainage network, and the node attributes include rainfall, the on / off status of the drainage pump, and the drainage speed of the drainage pump; the edges represent the pipelines, and the edge attributes include: length, diameter, flow direction, and flow rate.
[0031] The historical hydrological data of the urban drainage network is converted into a graph structure so that water volume prediction can be performed using graph neural networks. The specific process includes determining the nodes and edges of the graph and assigning appropriate attributes to each node and edge. The specific steps include: Define nodes and edges, and determine all nodes and their connection relationships based on the topological structure of the drainage network. Each node represents an intersection or device, and each edge represents a section of pipe.
[0032] Assign node attributes to each node, such as rainfall, the on / off status of the drainage pump, and the drainage speed of the drainage pump. Make sure these attribute data cover the required time period.
[0033] Assign edge attributes, such as length, diameter, flow direction, and flow rate, to each edge. The edge attribute data should be able to reflect the physical characteristics of the pipe and the water flow conditions.
[0034] Generate a graph structure, organize the nodes and edges and their attributes into a graph structure. You can use a graph data structure (such as an adjacency matrix or an adjacency list) to represent the entire drainage network.
[0035] Simplified example: A hydrological environment includes the following nodes and edges: Nodes: Node1, Node2, Node3 Edges: Edge1 (connecting Node1 and Node2), Edge2 (connecting Node2 and Node3) The composition graph is represented as: node: Node1:{Rainfall: 15mm, Drainage pump open / close status: 1, Drainage pump drainage speed: 100m³ / h} Node2:{Rainfall: 20mm, Drainage pump open / close status: 0, Drainage pump drainage speed: 0m³ / h} Node3:{Rainfall: 25mm, Drainage pump open / close status: 1, Drainage pump drainage speed: 150m³ / h} side: Edge1:{length: 500m, diameter: 0.5m, flow direction: Node1→Node2, flow rate: 50m³ / s} Edge2:{length: 1000m, diameter: 0.7m, flow direction: Node2→Node3, flow rate: 70m³ / s} In order to facilitate training, the historical hydrological data represented by the graph is further organized into time series data.
[0036] Organizing the historical hydrological data represented by the chart into time series data is a key step in using time series data to dynamically analyze and predict changes in the drainage network. This process involves expanding the static graph structure data by time dimension to form continuous time series data, which provides a basis for subsequent neural network training and prediction. The specific steps include: Determine the time step, which is the time interval between each data record. The step size can be minutes, hours, days, etc., depending on the frequency of data collection and prediction needs.
[0037] Collect and organize time series data, from sensor networks and historical records, and collect attribute data for each node and edge at a determined time step.
[0038] Data organization: organize the data at each time step into a time series format to ensure that the data at each time point contains the attributes of all nodes and edges.
[0039] Construct a time series graph, and construct a time series for each node's attributes, such as rainfall, the on / off status of the drainage pump, the drainage speed of the drainage pump, etc. Construct a time series for each edge's attributes, such as length, diameter, flow direction, flow rate, etc.
[0040] Construct input-output pairs, taking a certain number of time steps of data as the input sequence to form the input of the model. For example, select the data of the past 𝑘 time steps as the input. Take the next time step data as the output sequence to form the prediction target of the model. For example, predict the attribute changes of nodes and edges in one or more future time steps.
[0041] Data organization and storage: formatting time series data into a data structure suitable for graph neural network training. Common formats include adjacency matrix or adjacency list, combined with time series data to form a three-dimensional tensor.
[0042] Simplified example: Time series data organization Time step 𝑡1: Node1:{R:10mm,S:1,P:100m³ / h} Node2:{R:8mm,S:0,P:0m³ / h} Edge1:{L:500m,D:0.5m,F:1,Q:50m³ / s} Edge2:{L:1000m,D:0.7m,F:1,Q:70m³ / s} Time step 𝑡2: Node1:{R:12mm,S:1,P:120m³ / h} Node2:{R:10mm,S:0,P:0m³ / h} Edge1:{L:500m,D:0.5m,F:1,Q:55m³ / s} Edge2:{L:1000m,D:0.7m,F:1,Q:75m³ / s} … Through the above steps, the historical hydrological data is successfully organized into time series data, ready to be input into the neural network model for training and prediction. This organization method not only retains the topological structure information of the drainage network, but also captures the dynamic changes in the time dimension, providing a solid data foundation for efficient and accurate water volume prediction.
[0043] After acquiring the data, the time series data is used to train a first model, which includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at future moments.
[0044] The model architecture of this embodiment is: Input Layer Node attribute characteristics: including rainfall, on / off status of drainage pump, drainage speed of drainage pump, etc.
[0045] Edge attribute characteristics: including pipe length, diameter, flow direction, flow rate, etc.
[0046] Hidden Layer Graph convolution layer: used to extract node and edge features from graph structured data. The graph convolution layer can update the feature representation of each node through the information of neighboring nodes, thereby capturing the spatial relationship of the graph.
[0047] Recurrent neural network layer: used to process time series data and capture dynamic changes in the time dimension. This embodiment preferably uses a gated recurrent unit (GRU).
[0048] The combination of Graph Convolutional Layer and Gated Recurrent Unit (GRU) can make full use of the spatial relationship of graph structure data and the dynamic changes of time series data, thereby improving prediction accuracy and system robustness. GRU can effectively handle long-term dependency problems and has high computational efficiency, which is suitable for processing time series data of this scale in this implementation.
[0049] Output Layer Output the water volume of each node in the future: By predicting the water volume of each node in the future, it helps to adjust the drainage parameters and optimize the operation of the drainage system.
[0050] When training a model, divide the preprocessed time series data into training set, validation set, and test set. Make sure that the training set contains enough historical data for model training; the validation set is used for hyperparameter adjustment and model selection; and the test set is used for the final evaluation of model performance.
[0051] Choose a suitable loss function, such as mean square error (MSE), to measure the difference between the predicted value and the true value. Use Adam or other optimization algorithms to iteratively update the model parameters to minimize the loss function.
[0052] Perform multiple iterations on the training set, each of which includes forward propagation, loss calculation, backpropagation, and parameter update. Evaluate model performance on the validation set to prevent overfitting.
[0053] Adjust hyperparameters such as learning rate, number of hidden layer nodes, number of graph convolutional layers and recurrent neural network layers to find the best model configuration. Use regularization techniques (such as L2 regularization and Dropout) to prevent overfitting and improve the generalization ability of the model. Stop training early when the loss on the validation set no longer decreases to avoid overfitting.
[0054] Evaluate the final performance of the model on the test set to ensure that the model performs well on unseen data.
[0055] A specific network structure example of the first model: 1. Input layer Input data: node attribute characteristics (rainfall, on / off status of drainage pump, drainage speed of drainage pump) and edge attribute characteristics (pipe length, diameter, flow direction, flow rate).
[0056] Input shape: Assume that the shape of input data is (batch size, number of time steps, number of nodes, number of features).
[0057] 2. Graph Convolutional Layer First graph convolution layer: Input: node attribute features and edge attribute features.
[0058] Operation: Convolve the features of a node with the features of its neighboring nodes to update the feature representation of each node.
[0059] Activation function: ReLU Output shape: Same as input shape, but feature dimensions may vary.
[0060] Second graph convolutional layer (optional): Input: Output of the first graph convolutional layer.
[0061] Operation: Further aggregate the information of neighboring nodes and refine the node feature representation.
[0062] Activation function: ReLU Output shape: Same as the output shape of the first graph convolutional layer, but the feature dimension may change further.
[0063] 3. Gated Recurrent Unit GRU Layer: Input: Node feature time series after being processed by the graph convolution layer.
[0064] Operation: Process time series data to capture dynamic changes in the time dimension.
[0065] Output: node feature representation at each time step, and hidden state at the final time step.
[0066] Output shape: batch size, number of time steps, number of nodes, hidden state dimension.
[0067] 4. Output Layer Linear Transformation Layer: Input: The output of the GRU layer, i.e., the node feature representation at each time step.
[0068] Operation: Perform linear transformation on the features output by the GRU layer to generate the predicted water volume value of each node at the future moment.
[0069] Output shape: batch size, number of time steps, number of nodes, output feature dimension (i.e. predicted water volume).
[0070] Finally, the current hydrological data of the city is obtained, the water volume of each node is predicted based on the current hydrological data and the first model, and the drainage parameters are adjusted based on the water volume of each node. Specifically: Sensors deployed at key locations in the city include rainfall sensors, water level sensors, flow sensors, and drainage pump status sensors. Sensor data is collected in real time through the Internet of Things (IoT) platform or data acquisition system.
[0071] The current hydrological data is used as the input of the model, including node attribute characteristics (such as rainfall, the opening and closing status of the drainage pump, and the drainage speed of the drainage pump) and edge attribute characteristics (such as pipe length, diameter, flow direction, and flow rate).
[0072] Using the trained first model, the future water volume of each node is calculated through forward propagation. The current data and the historical data of the previous period are combined into a time series and input into the model for prediction. The model outputs the predicted water volume value of each node in the future period.
[0073] Analyze the water volume prediction results output by the model to identify possible risk areas and nodes requiring intervention.
[0074] Node water volume exceeds the limit: Identify nodes where the water volume exceeds the safety threshold and mark them as high-risk areas.
[0075] Water volume change trend: Analyze the water volume change trend and predict potential drainage needs in advance.
[0076] Furthermore, drainage parameter adjustment strategy is carried out according to the predicted water volume data: Open / Close status adjustment: Determine whether to open or close the drainage pump based on the predicted water volume changes. For high-risk areas, open the drainage pump in advance to drain water.
[0077] Drainage speed adjustment: Dynamically adjust the drainage speed of the drainage pump to ensure that the drainage efficiency matches the demand.
[0078] Opening and closing status adjustment: According to the water volume forecast results, adjust the opening and closing status of the gates in the pipe network to optimize the water flow path and prevent water accumulation in certain areas.
[0079] Drain in advance: Before rainfall is predicted, drain some drainage pipes and water storage facilities in advance to leave space for the upcoming rainfall.
[0080] Deploy emergency drainage equipment: Deploy emergency drainage pumps and mobile drainage vehicles in high-risk areas to deal with sudden waterlogging.
[0081] On the other hand, the present invention also provides a smart city self-starting drainage system, comprising: The acquisition module is used to acquire the historical hydrological data of the city, wherein the historical hydrological data includes the topological structure of the drainage network, environmental data, and drainage parameters; the topological structure includes at least the connection relationship between nodes and pipes; the environmental data includes at least rainfall; and the drainage parameters include at least the on / off state of the drainage pump and the drainage speed of the drainage pump; A data processing module is used to represent the historical hydrological data in a graph, wherein the graph includes nodes and edges; the nodes represent the intersections or devices of the drainage network, and the node attributes include rainfall, the on / off state of the drainage pump, and the drainage speed of the drainage pump; the edges represent the pipelines, and the edge attributes include: length, diameter, flow direction, and flow rate; the historical hydrological data represented by the graph is organized into time series data; A training module is used to train a first model using the time series data, wherein the first model includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at a future time; The regulation module is used to obtain the current hydrological data of the city, predict the water volume of each node according to the current hydrological data and the first model, and adjust the drainage parameters according to the water volume of each node.
[0082] Furthermore, the specific implementation methods of the above-mentioned smart city self-starting drainage system are the same as a smart city self-starting drainage method, and all further technical solutions in a smart city self-starting drainage method are fully introduced into a smart city self-starting drainage system.
[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
[0084] The present invention does not particularly specify the structure of some modules, which shall be subject to the contents recorded in the prior art. The prior art mentioned in the above background technology section and the specific embodiment section of the present invention can be used as part of the present invention to understand the meaning of some technical features or parameters. The scope of protection of the present invention shall be subject to the contents actually recorded in the claims.
Claims
1. A smart city self-starting drainage method, characterized in that The method comprises the following steps: Acquire historical hydrological data of the city, wherein the historical hydrological data includes the topological structure, environmental data, and drainage parameters of the drainage network; the topological structure includes at least the connection relationship between nodes and pipes; the environmental data includes at least rainfall; and the drainage parameters include at least the on / off state of the drainage pump and the drainage speed of the drainage pump; Representing the historical hydrological data in a graph, wherein the graph includes nodes and edges; The nodes represent various intersections or devices of the drainage network, and the node attributes include rainfall, the on / off status of the drainage pump, and the drainage speed of the drainage pump; The edge represents a pipeline, and the edge attributes include: length, diameter, flow direction, and flow rate; Organizing the historical hydrological data represented by the graph into time series data; The time series data is used to train a first model, wherein the first model includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at a future time; The current hydrological data of the city is obtained, the water volume of each node is predicted according to the current hydrological data and the first model, and the drainage parameters are adjusted according to the water volume of each node.
2. A smart city self-starting drainage method according to claim 1, characterized in that Organizing the historical hydrological data represented by the graph into time series data includes: formatting the graph represented data into an adjacency matrix or an adjacency list, and then combining the time series data to form a three-dimensional tensor.
3. A smart city self-starting drainage method according to claim 1, characterized in that The recurrent neural network layer is specifically a gated recurrent unit.
4. A smart city self-starting drainage method according to claim 1, characterized in that The method of predicting the water volume of each node based on current hydrological data and the first model includes: combining current data with historical data of a previous period of time into a time series, inputting the time series into the first model for prediction, and the first model outputting the predicted value of the water volume of each node in the future period of time.
5. A smart city self-starting drainage method according to claim 1, characterized in that The method of adjusting the drainage parameters according to the water volume of each node includes: Open / Close status adjustment: Determine whether to open or close the drainage pump based on the predicted water volume changes. For high-risk areas, open the drainage pump in advance to drain water. Drainage speed adjustment: dynamically adjust the drainage speed of the drainage pump to ensure that the drainage efficiency matches the demand; Opening and closing state adjustment: According to the water volume forecast results, adjust the opening and closing state of the gates in the pipe network to optimize the water flow path and prevent water accumulation in certain areas; Drain in advance: Before rainfall is predicted, drain some drainage pipes and water storage facilities in advance to leave space for the upcoming rainfall; Deploy emergency drainage equipment: Deploy emergency drainage pumps and mobile drainage vehicles in high-risk areas to deal with sudden waterlogging.
6. A smart city self-starting drainage system, characterized in that The system includes the following modules: An acquisition module, used to acquire the historical hydrological data of the city, wherein the historical hydrological data includes the topological structure of the drainage network, environmental data, and drainage parameters; the topological structure includes at least the connection relationship between nodes and pipes; the environmental data includes at least rainfall; and the drainage parameters include at least the on / off state of the drainage pump and the drainage speed of the drainage pump; A data processing module is used to represent the historical hydrological data in a graph, wherein the graph includes nodes and edges; the nodes represent the intersections or devices of the drainage network, and the node attributes include rainfall, the on / off state of the drainage pump, and the drainage speed of the drainage pump; the edges represent the pipelines, and the edge attributes include: length, diameter, flow direction, and flow rate; the historical hydrological data represented by the graph is organized into time series data; A training module is used to train a first model using the time series data, wherein the first model includes an input layer, a hidden layer, and an output layer; the input layer inputs node attribute features and edge attribute features, the hidden layer includes a graph convolution layer and a recurrent neural network layer, and the output layer outputs the water volume of each node at a future time; The regulation module is used to obtain the current hydrological data of the city, predict the water volume of each node according to the current hydrological data and the first model, and adjust the drainage parameters according to the water volume of each node.
7. A smart city self-starting drainage system according to claim 6, characterized in that Organizing the historical hydrological data represented by the graph into time series data includes: formatting the graph represented data into an adjacency matrix or an adjacency list, and then combining the time series data to form a three-dimensional tensor.
8. The smart city self-starting drainage system according to claim 6 is characterized in that The recurrent neural network layer is specifically a gated recurrent unit.
9. The smart city self-starting drainage system according to claim 6 is characterized in that The method of predicting the water volume of each node based on current hydrological data and the first model includes: combining current data with historical data of a previous period of time into a time series, inputting the time series into the first model for prediction, and the first model outputting the predicted value of the water volume of each node in the future period of time.
10. The smart city self-starting drainage system according to claim 6 is characterized in that The method of adjusting the drainage parameters according to the water volume of each node includes: Open / Close status adjustment: Determine whether to open or close the drainage pump based on the predicted water volume changes. For high-risk areas, open the drainage pump in advance to drain water. Drainage speed adjustment: dynamically adjust the drainage speed of the drainage pump to ensure that the drainage efficiency matches the demand; Opening and closing state adjustment: According to the water volume forecast results, adjust the opening and closing state of the gates in the pipe network to optimize the water flow path and prevent water accumulation in certain areas; Drain in advance: Before rainfall is predicted, drain some drainage pipes and water storage facilities in advance to leave space for the upcoming rainfall; Deploy emergency drainage equipment: Deploy emergency drainage pumps and mobile drainage vehicles in high-risk areas to deal with sudden waterlogging.
Citation Information
Patent Citations
Control method and control device of urban drainage system
CN112989538A
Municipal drainage pipe network state prediction method based on graph and deep learning
CN116227362A
Urban inland inundation real-time simulation method and system based on deep neural network
CN117688844A
Cited By
Optimized scheduling method and system for water storage project
CN119338084A
