Nuclear reactor core control method and device and electronic equipment
Through the combination of the core condition prediction model and the genetic algorithm, the problem of cumbersome strategy adjustment in nuclear reactor core control is solved, fast and efficient control strategy optimization is achieved, and the operating efficiency of the staff is improved.
Patent Information
- Application Number
- CN202410836353.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-26
AI Technical Summary
During the nuclear reactor core control process, staff need to constantly adjust control strategies and calculations, resulting in a cumbersome search process and a lack of fast and efficient methods to obtain the ideal core control strategy.
A genetic algorithm based on the core operating condition prediction model is used to obtain the optimal individual through iterative processing through initialization population adaptability assessment and dominant population generation. The control parameters of the optimal individual are used for core control, which simplifies the adjustment of the control strategy. and calculation process.
It achieves the rapid and efficient acquisition of the ideal core control strategy, reduces the adjustment and calculation burden of staff in core control, and improves the optimization efficiency of the control strategy.
Smart Images

Figure CN118737503A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of nuclear control, and in particular to a nuclear reactor core control method, device and electronic equipment. Background Art
[0002] At present, when nuclear power plants are in operation, in order to ensure the stable operation of the nuclear reactor core, it is necessary to control the core according to specific strategies. Common types of control methods include but are not limited to adjusting the boron concentration and inserting control rods. However, the work of core control is still completed by the staff based on their own experience and the current state of the core. Sometimes, the staff will perform theoretical calculations based on the operating history of the core to obtain a reference control strategy, but this process requires the staff to constantly adjust the control strategy and calculate to meet the operating requirements, resulting in a cumbersome search process. Summary of the invention
[0003] The purpose of the embodiments of the present application is to provide a nuclear reactor core control method, device and electronic equipment, so that staff can quickly and efficiently obtain an ideal core control strategy.
[0004] In a first aspect, an embodiment of the present application provides a nuclear reactor core control method, the method comprising:
[0005] In the case where a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, the plurality of first predicted operating condition parameter groups are used as an initialization population, wherein each of the first control parameter groups includes at least one first control parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups includes at least one first predicted operating condition parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups corresponds to an individual in the initialization population, and a factor in the individual is a first control parameter corresponding to each time step in the first control parameter group;
[0006] Based on the deviation value of each individual in the initialization population, an iterative process of adaptability evaluation and dominant population generation is performed to obtain an optimal individual, wherein the deviation value is associated with a difference between each first predicted operating condition parameter and a preset initial operating condition parameter in a first predicted operating condition parameter group corresponding to the individual, the dominant population generation is used to generate a dominant population according to the result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process satisfies an iterative termination condition;
[0007] The core is controlled using the first control parameter corresponding to the optimal individual.
[0008] In some embodiments, the suitability assessment comprises:
[0009] Determine the difference between each of the first predicted operating condition parameters in the first predicted operating condition parameter group corresponding to each of the individuals and the initial operating condition parameters;
[0010] The deviation value of each of the individuals is determined based on all of the difference values of each of the individuals.
[0011] In some embodiments, before determining the deviation value of each of the individuals according to all of the difference values of each of the individuals, the method further comprises:
[0012] Determine whether each of the differences meets the error requirement;
[0013] In the case where the difference does not meet the error requirement, performing differentiation processing on the difference;
[0014] The differentiation process is used to prevent individuals corresponding to the difference from participating in the generation of the dominant population.
[0015] In some embodiments, generating a dominant population comprises:
[0016] Determine the probability of each individual being excluded according to the deviation value of each individual;
[0017] Eliminate individuals from all the individuals according to the exclusion probability of each individual, and obtain multiple elite individuals;
[0018] The plurality of elite individuals are used to perform individual factor variation and factor crossover between individuals to obtain the dominant population.
[0019] In some embodiments, when a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, before using the plurality of first predicted operating condition parameter groups as the initialization population, the method further includes:
[0020] Using a plurality of second control parameter groups of working conditions to be simulated, performing xenon oscillation simulation processing to obtain simulation data of each of the working conditions to be simulated, wherein the plurality of working conditions to be simulated are generated based on a random strategy, each of the simulation data includes the second control parameter group and a second predicted working condition parameter group, each of the second control parameter groups includes at least one second control parameter corresponding to at least one time step, and each of the second predicted working condition parameter groups includes at least one second predicted working condition parameter corresponding to at least one time step;
[0021] Using the second predicted operating condition parameter groups in each of the simulation data, the second control parameter groups in the simulation data are labeled to generate training samples corresponding to the simulation data;
[0022] Based on the training samples corresponding to the simulation data of the multiple operating conditions to be simulated, the model to be trained is iteratively trained to obtain the core operating condition prediction model.
[0023] In some embodiments, the model to be trained is a long short-term memory network model. Before iteratively training the model to be trained based on training samples corresponding to the simulation data of the multiple operating conditions to be simulated to obtain the core operating condition prediction model, the method further includes:
[0024] The parameters to be added are added to the training sample, and together with the second control parameter group in the training sample, serve as the annotation objects of the second predicted operating condition parameter group in the training sample. The parameters to be added include
[0025] The preset initial operating condition parameters.
[0026] In some embodiments, each of the simulation data includes parameters related to a first number of time steps, and each of the training samples includes parameters related to a second number of time steps, the first number being greater than the second number.
[0027] The method of using the second predicted operating condition parameter group in each of the simulation data to label the second control parameter group in the simulation data to generate training samples corresponding to the simulation data includes:
[0028] In the time steps involved in the parameters included in the simulation data, taking any time step as a starting point, selecting a plurality of groups of the second number of time steps;
[0029] generating samples to be labeled based on the second control parameters corresponding to each group of the second number of time steps;
[0030] generating a labeled sample based on the second predicted operating condition parameters corresponding to each group of the second number of time steps,
[0031] The corresponding samples to be labeled are labeled using each of the labeled samples to generate training samples corresponding to the simulated data.
[0032] In some implementations, the parameter type of the first control parameter includes:
[0033] Core control power type parameters, core control rod position type parameters and time step size.
[0034] In a second aspect, an embodiment of the present application provides a nuclear reactor core control device, the device comprising:
[0035] An initialization population determination module is used for, when a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on a core operating condition prediction model, using the plurality of first predicted operating condition parameter groups as an initialization population, wherein each of the first control parameter groups includes at least one first control parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups includes at least one first predicted operating condition parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups corresponds to an individual in the initialization population, and a factor in the individual is a first control parameter corresponding to each time step in the first control parameter group;
[0036] an optimal individual acquisition module, configured to perform an iterative process of performing an adaptability evaluation and generating a dominant population based on a deviation value of each individual in the initialization population, to obtain an optimal individual, wherein the deviation value is associated with a difference between each first predicted operating condition parameter and a preset initial operating condition parameter in a first predicted operating condition parameter group corresponding to the individual, the dominant population generation module is configured to generate a dominant population based on a result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process satisfies an iterative termination condition;
[0037] The core control module is used to perform core control using the first control parameter corresponding to the optimal individual.
[0038] A third aspect of the present application provides an electronic device, including:
[0039] a memory configured to store instructions; and
[0040] The processor is configured to call the instructions from the memory and implement the nuclear reactor core control method provided according to the first aspect of the present application when executing the instructions.
[0041] In an embodiment of the present application, multiple first control parameter groups representing multiple core control strategies are used as the initial population in the genetic algorithm, multiple first predicted operating condition parameters corresponding to the multiple first control parameter groups are predicted by the core operating condition prediction model, and the first predicted operating condition parameters in the first predicted operating condition parameter group are used to perform adaptability evaluation on the corresponding individuals in the initial population and iterative processing of dominant population generation to obtain the optimal individual, which represents the ideal core control strategy obtained by the genetic algorithm iteration. In this way, there is no need to constantly adjust the control strategy and calculate the control results, so that the staff can quickly and efficiently obtain the ideal core control strategy, and use the first control parameter in the first control parameter group corresponding to the optimal individual representing the core control strategy to perform core control. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1It is a schematic flow chart of a nuclear reactor core control method provided in an embodiment of the present application;
[0043] Figure 2 is a schematic structural diagram of a nuclear reactor core control device provided in an embodiment of the present application;
[0044] Figure 3 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0045] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0046] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the terms used in this way are interchangeable where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0047] The nuclear reactor core control method and device, and electronic device provided in the embodiments of the present application are described in detail below with reference to the accompanying drawings through specific embodiments and their application scenarios.
[0048] See also Figure 1 , is a flow chart of a nuclear reactor core control method provided in an embodiment of the present application, which is applied to electronic equipment. Figure 1 As shown, the nuclear reactor core control method includes the following steps S100 to S300:
[0049] Step S100: When a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, the plurality of first predicted operating condition parameter groups are used as an initialization population, wherein each first control parameter group includes at least one first control parameter corresponding to at least one time step, each first predicted operating condition parameter group includes at least one first predicted operating condition parameter corresponding to at least one time step, each first predicted operating condition parameter group corresponds to an individual in the initialization population, and the factor in the individual is the first control parameter corresponding to each time step in the first control parameter group.
[0050] The core operating condition prediction model in the embodiment of the present application can predict the operating state of the core by receiving the first control parameter group that characterizes the core control strategy, and the operating state of the core is characterized by the first predicted operating condition parameter group. That is, the core operating condition prediction model is used to predict the operating state of the core after being controlled according to the core control strategy according to the core control strategy.
[0051] In an embodiment of the present application, the first control parameter group characterizing the core control strategy includes at least one first control parameter corresponding to at least one time step, that is, in the first control parameter group, each time step corresponds to a first control parameter. It can be understood by those skilled in the art that a time step characterizes a time interval in the core control strategy, and two adjacent time steps are adjacent time intervals at both ends in the core control strategy. It can be seen that each first control parameter in the first control parameter group characterizes the core control strategy within each time step.
[0052] The first predicted operating condition parameter group characterizing the operating state of the core includes at least one first predicted parameter corresponding to at least one time step, that is, in the first predicted operating condition parameter group, each time step corresponds to a first predicted operating condition parameter. Each first predicted operating condition parameter in the first predicted operating condition parameter group characterizes the operating state of the core at the end of each time step.
[0053] The electronic device can generate multiple different first control parameter groups according to the random strategy, that is, multiple core control strategies are generated. After multiple groups of first predicted operating condition parameter groups corresponding to multiple groups of first control parameter groups are predicted based on the core operating condition prediction model, each first control parameter group is regarded as an individual, and each first control parameter in the first control parameter group is a factor that constitutes the individual and can be crossover or mutated. All individuals constitute an initialization population for subsequent iterative processing based on the genetic algorithm and generation of a dominant population.
[0054] Exemplarily, the parameter types of the first predicted operating condition parameters may include the axial power offset (AO) of the core and the enthalpy rise factor (FDH) of the core, and the parameter types of the first control parameters may include the relative power (P) of the core, the time step size (T), and the rod position (S) of the temperature control rod. The core control strategy includes 3 time steps, a first predicted operating condition parameter group can be written as [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)], and a first control parameter group can be written as [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)]. The electronic device generates a plurality of [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] with different specific parameter values according to a random strategy, each [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] is regarded as an individual, (P1, T1, S1), (P2, T2, S2) and (P3, T3, S3) are factors in the individual, and all [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] constitute an initialization population for subsequent iterative processing based on a genetic algorithm and generation of a dominant population.
[0055] Step S200: Based on the deviation value of each individual in the initialized population, an adaptability evaluation and an iterative process of generating a dominant population are performed to obtain the optimal individual, wherein the deviation value is associated with the difference between each first predicted operating condition parameter and the preset initial operating condition parameter in the first predicted operating condition parameter group corresponding to the individual, and the dominant population generation is used to generate a dominant population based on the result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process satisfies the iteration termination condition.
[0056] The electronic device uses multiple groups of first predicted operating condition parameters to perform adaptability evaluation on corresponding multiple groups of first control parameters, and performs iterative processing on dominant population generation according to the adaptability evaluation results until the iteration termination condition is met, so as to obtain the optimal individual in the dominant population when the iteration terminates.
[0057] In an embodiment of the present application, when using multiple first predicted operating condition parameter groups to perform adaptability evaluation, the electronic device needs to determine the deviation value of each individual, and the determination of the deviation value involves the difference between each first predicted operating condition parameter and the preset initial operating condition parameter in the individual.
[0058] Exemplarily, during the genetic algorithm process, the electronic device first needs to perform an adaptability assessment on each individual in the initialized population, that is, [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] with different specific parameter values.
[0059] For a single [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)], the adaptability assessment, i.e., the determination of the deviation value, needs to utilize the [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)] corresponding to the [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] predicted by the core operating condition prediction model. The adaptability assessment also utilizes the preset initial operating condition parameters of the core already in the database. The adaptability assessment is associated with the difference between [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)] and the preset initial operating condition parameters. Those skilled in the art can understand that the parameter type of the preset initial operating condition parameters is the same as the parameter type of the first preset operating condition parameters, including the initial axial power offset (AO0) of the core and the initial enthalpy rise factor (FDH0) of the core. The adaptability evaluation involves the difference between the axial power offset and enthalpy rise factor corresponding to each time step in the individual and the initial axial power offset and initial enthalpy rise factor. All differences of an individual can be expressed as: [(AO1-AO0, FDH1-FDH0), (AO2-AO0, FDH2-FDH0), (AO3-AO0, FDH3-FDH0)].
[0060] After the adaptability evaluation of each [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] is completed, the dominant population is generated according to the adaptability evaluation result, that is, an iterative update of all individuals is performed. Then the dominant population obtained after the iteration is subjected to adaptability evaluation and dominant population generation, that is, it is iterated again until the iteration termination condition is met to obtain the [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] corresponding to the optimal individual. It can be understood by those skilled in the art that in each iteration process, the core operating condition prediction model needs to be used to predict the first predicted operating condition parameter corresponding to each individual as a basis for adaptability evaluation.
[0061] Step S300: Perform core control using the first control parameter corresponding to the optimal individual.
[0062] The first control parameter group corresponding to the optimal individual represents an ideal core control strategy obtained by iterative genetic algorithm, and the electronic equipment can use the first control parameter in the first control parameter group corresponding to the optimal individual to perform core control.
[0063] Exemplarily, the first control parameters corresponding to the optimal individual are [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)]. The staff can use these first control parameters as control strategies to control the relative power of the core, the time step size and the rod position of the temperature control rod.
[0064] Through the above steps S100 to S300, multiple first control parameter groups representing multiple core control strategies are used as the initial population in the genetic algorithm, and multiple first predicted operating condition parameters corresponding to the multiple first control parameter groups are predicted by the core operating condition prediction model. The first predicted operating condition parameters in the first predicted operating condition parameter group are used to perform adaptability evaluation on the corresponding individuals in the initial population and iterative processing of dominant population generation to obtain the optimal individual, which represents the ideal core control strategy obtained by the genetic algorithm iteration. In this way, there is no need to constantly adjust the control strategy and calculate the control results, so that the staff can quickly and efficiently obtain the ideal core control strategy, and use the first control parameter in the first control parameter group corresponding to the optimal individual representing the core control strategy to perform core control.
[0065] In some implementations, the parameter type of the first control parameter may include at least one of the following:
[0066] Core control power type parameters, core control rod position type parameters and time step size.
[0067] The parameter type of the first control parameter may include at least one of a core control power type parameter, a core control rod position type parameter, and a time step length. The core control power type parameter includes the relative power of the core, the fuel consumption of the core, etc., and the core control rod position type parameter includes the temperature control rod position, the power control rod total position, etc. The staff can make adaptive parameter selections at the stage of training the core condition prediction model according to the implementation scenario or control requirements of the control strategy and the network structure type of the core condition prediction model.
[0068] In some implementations, the parameter type of the first predicted operating condition parameter may include at least one of the following:
[0069] The core's axial power offset, the core's enthalpy rise factor, the core's hot spot factor, and the core's boron concentration.
[0070] The parameter type of the first predicted operating condition parameter may include at least one of the enthalpy rise factor of the core, the hot spot factor of the core, and the boron concentration of the core. The staff may select adaptive parameters at the stage of training the core operating condition prediction model according to the implementation scenario or control requirements of the control strategy and the network structure type of the core operating condition prediction model.
[0071] In some implementations, the iteration termination condition may be that the number of iterations reaches a preset threshold, or the deviation value of an individual in the generated dominant population reaches a preset threshold.
[0072] In some embodiments, a fitness assessment may include:
[0073] Determine the difference between each first predicted operating condition parameter in the first predicted operating condition parameter group corresponding to each individual and the initial operating condition parameter;
[0074] The deviation value of each individual is determined based on all the difference values of each individual.
[0075] When performing adaptability evaluation, the electronic device first determines the difference between each first predicted operating condition parameter in the first predicted operating condition parameter group corresponding to each individual and the initial operating condition parameter, and then determines the deviation value of each individual based on all the differences of each individual. The deviation value can be determined by selecting the absolute value of the difference with the largest absolute value among all the differences of the individual as the deviation value of the individual, or it can be the sum of the absolute values of all the differences of the individual.
[0076] The goal of the selection, iteration and optimization of the core control strategy in the embodiment of the present application is to maintain the first predicted operating parameters of each time step at a relatively stable level, that is, to minimize the gap between the first predicted operating parameters and the initial operating parameters. Therefore, if the deviation value is determined as the absolute value of the difference with the largest absolute value among the differences corresponding to each time step of the individual, then the absolute value represents the maximum gap between the first predicted operating parameters in the first predicted operating parameter group corresponding to the individual and the initial operating parameters. If the deviation value is determined as the sum of the absolute values of all differences of the individual, then the sum of the absolute values of all differences represents the overall gap between the first predicted operating parameters in the first predicted operating parameter group corresponding to the individual and the initial operating parameters. It can be seen that in the case of the adaptability evaluation method provided in the embodiment of the present application, the smaller the deviation value, the better the control strategy corresponding to the individual, and the optimal individual is the individual with the best fitness evaluation performance in the dominant population when the iteration ends, that is, the individual with the smallest deviation value.
[0077] Exemplarily, the difference between each first predicted operating condition parameter and the initial operating condition parameter in the first predicted operating condition parameter group corresponding to the individual is expressed as [(AO1-AO0, FDH1-FDH0), (AO2-AO0, FDH2-FDH0), (AO3-AO0, FDH3-FDH0)], and the electronic device first takes the absolute value of all the differences in the individual. For the convenience of description, [(AO1-AO0, FDH1-FDH0), (AO2-AO0, FDH2-FDH0), (AO3-AO0, FDH3-FDH0)] after taking the absolute value is simplified to [(d1, e1), (d2, e2), (d3, e3)], and it is set that: k1=d1+e1, k2=d2+e2, k3=d3+e3, if the deviation value is determined as the sum of the absolute values of all differences of the individual, then the deviation value K of the individual is: K=k1+k2+k3.
[0078] In some embodiments, before determining the deviation value of each individual according to all the difference values of each individual, the method may further include:
[0079] Determine whether each difference meets the error requirements;
[0080] In the case where the difference does not meet the error requirement, the difference is differentiated;
[0081] Among them, differentiation processing is used to prevent individuals corresponding to the difference from participating in the generation of dominant populations.
[0082] Sometimes, the gap between a first predicted operating condition parameter of an individual and the initial operating condition parameter is large, then the control strategy corresponding to the individual cannot be selected, and the individual, as a relatively inferior individual, cannot participate in the generation of the dominant population. Therefore, before determining the deviation value of each individual, it is possible to first judge whether each difference meets the error requirement. The judgment can be based on the size relationship between the absolute value of each difference and the preset error threshold. If the absolute value of a certain difference is greater than the preset error threshold, then the difference does not meet the error requirement and needs to be differentiated. The differentiation process can be to add a very large number to the absolute value of the difference, so that the deviation value of the individual corresponding to the difference reaches a level that cannot participate in the generation of the dominant population.
[0083] Exemplarily, the absolute value of the difference between each first predicted operating condition parameter and the initial operating condition parameter in the first predicted operating condition parameter group corresponding to the individual is expressed as [(d1, e1), (d2, e2), (d3, e3)]. If e1 is greater than the preset error threshold, a very large value is added to e1, and the specific size of the value can be adaptively determined according to the parameter type of the first predicted operating condition parameter and the optimization requirements of the genetic algorithm. In this way, the deviation value of the individual is added with a very large value. Because the generation of the dominant population needs to be based on the results of the adaptive evaluation, the inferior individual cannot participate in the generation of the dominant population, and its factors will not be passed on to the next generation of the dominant population.
[0084] In some embodiments, dominant population generation may include:
[0085] According to the deviation value of each individual, determine the probability of each individual being excluded;
[0086] Eliminate individuals from all individuals according to the probability of each individual being excluded, and obtain multiple elite individuals;
[0087] Use multiple elite individuals to perform individual mutation and crossover between individuals to obtain a dominant population.
[0088] The generation of dominant populations requires the identification of elite individuals that perform better in the fitness evaluation. The electronic device determines the probability of exclusion of each individual based on the deviation value of each individual. The smaller the deviation value of the individual, that is, the better the performance in the fitness evaluation, the smaller the probability of exclusion. For example, the exclusion probability can be set to K / K s , K is the individual deviation value, K s The sum of the deviation values of all current individuals.
[0089] The electronic device then uses the roulette method to eliminate individuals from all individuals based on the probability of individuals being excluded, and obtains multiple elite individuals. Multiple elite individuals undergo individual factor mutation and factor crossover between individuals to obtain new individuals to form a dominant population. The number of individuals in the dominant population is consistent with the number of individuals before individual elimination.
[0090] It is worth noting that when performing individual factor variation, that is, when performing changes in the first control parameter corresponding to the individual, a setting variation range of the first control parameter can be set according to the parameter type of the first control parameter.
[0091] In some embodiments, when a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, before using the plurality of first predicted operating condition parameter groups as the initialization population, the method may further include:
[0092] Using a plurality of second control parameter groups of working conditions to be simulated, performing xenon oscillation simulation processing to obtain simulation data of each working condition to be simulated, wherein the plurality of working conditions to be simulated are generated based on a random strategy, each simulation data includes a second control parameter group and a second predicted working condition parameter group, each second control parameter group includes at least one second control parameter corresponding to at least one time step, and each second predicted working condition parameter group includes at least one second predicted working condition parameter corresponding to at least one time step;
[0093] Using the second predicted operating condition parameter group in each simulation data, the second control parameter group in the simulation data is labeled to generate training samples corresponding to the simulation data;
[0094] Based on training samples corresponding to simulation data of multiple operating conditions to be simulated, the model to be trained is iteratively trained to obtain a core operating condition prediction model.
[0095] For the training of the core condition prediction model, the staff can use a computer to calculate and determine the training samples of the core condition prediction model through xenon oscillation simulation processing. First, the electronic device can generate multiple different second control parameter groups according to the random strategy, that is, multiple core control strategies are generated. It can be understood by those skilled in the art that each second control parameter group also includes at least one second control parameter corresponding to at least one time step, and the parameter type included in the second control parameter is the same as the parameter type included in the first control parameter.
[0096] The electronic device uses the plurality of second control parameter groups to perform xenon oscillation simulation processing to obtain simulation data of each second control parameter group, wherein the simulation data includes a second predicted operating condition parameter group corresponding to the second control parameter group. It can be understood by those skilled in the art that each second predicted operating condition parameter group also includes at least one second predicted operating condition parameter corresponding to at least one time step, and the parameter type included in the second control parameter is the same as the parameter type included in the first predicted operating condition parameter.
[0097] The simulation data also includes a second control parameter set for the xenon oscillation simulation process.
[0098] Exemplarily, the parameter type of the second predicted operating condition parameter is the axial power offset, which is the same as the first control parameter and the first predicted operating condition parameter. In addition to the relative power of the core, the parameter type of the second control parameter may also include the time step length and the rod position of the temperature control rod. The core control strategy includes 3 time steps, a second predicted operating condition parameter group can be written as [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)], and a second control parameter group can be written as [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)]. The electronic device generates a plurality of [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] with different specific parameter values according to the random strategy, which are used for xenon oscillation simulation processing to obtain simulation data of each [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)]. The simulation data includes [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)] corresponding to [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)], and also includes [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] itself.
[0099] The second control parameter group in the simulation data is labeled using the second predicted operating condition parameter group in the acquired simulation data to generate training samples for model training, and the training model to be trained is iteratively trained using the training samples corresponding to the simulation data of multiple operating conditions to be simulated to obtain a core operating condition prediction model.
[0100] In some embodiments, the model to be trained is a long short-term memory network model. Before iteratively training the model to be trained based on training samples corresponding to simulation data of multiple operating conditions to be simulated to obtain a core operating condition prediction model, the method may further include:
[0101] The parameters to be added are added to the training sample, and together with the second control parameter group in the training sample, serve as the annotation objects of the second predicted operating condition parameter group in the training sample. The parameters to be added may include preset initial operating condition parameters.
[0102] The network structure of the model to be trained, i.e., the core operating condition prediction model, can be a long short-term memory network (LSTM). Since the LSTM is sensitive to time-series related data and is good at capturing long-term dependencies between features, in order to enhance the accuracy of the model during training, the annotated part of the training sample is suitable for adding initial features. Therefore, data related to the core control strategy can be added to the training sample. The data is the parameters to be added, and the parameters to be added are selected as the preset initial operating condition parameters of the core that already exist in the database.
[0103] Exemplarily, the preset initial operating condition parameters may include at least one of the following parameter types: temperature control rod position, reactor effective proliferation coefficient, axial power offset, core enthalpy rise factor, core hot spot factor, core boron concentration and core burnup.
[0104] Those skilled in the art can understand that when the network structure of the core operating condition prediction model is a network structure other than the long short-term memory network, the types of parameters to be added can also be adaptively adjusted according to the network structure type of the core operating condition prediction model.
[0105] In some embodiments, each simulation data includes parameters related to a first number of time steps, each training sample includes parameters related to a second number of time steps, and the first number is greater than the second number.
[0106] Using the second predicted operating condition parameter group in each simulation data, labeling the second control parameter group in the simulation data to generate training samples corresponding to the simulation data may include:
[0107] In the time steps involved in the parameters included in the simulation data, taking any time step as a starting point, selecting a plurality of groups of the second number of time steps;
[0108] The second control parameter set corresponding to each group of the second number of time steps is set as a sample to be labeled;
[0109] The second predicted operating condition parameter set corresponding to each group of the second number of time steps is set as a labeled sample;
[0110] The corresponding samples to be labeled are labeled using each labeled sample to generate training samples corresponding to the simulated data.
[0111] In order to expand the number of training samples, when performing xenon oscillation simulation processing, the number of time steps involved in the parameters in the simulation data can be set to be greater than the number of time steps of the required control strategy, that is, greater than the number of time steps involved in the parameters in the training samples. In an embodiment of the present application, the parameters included in the simulation data involve a first number of time steps, and the parameters included in the training samples involve a second number of time steps.
[0112] In this way, multiple groups of second number of time steps can be selected from any time step as the starting point in the simulation data, and the second control parameter set corresponding to each group of second number of time steps is set as a sample to be labeled, and the second predicted operating condition parameter set corresponding to each group of second number of time steps is set as a labeled sample, and finally the corresponding samples to be labeled are labeled using each labeled sample to generate training samples corresponding to the simulation data. In this way, the number of training samples can be greater than the number of simulation data, and the number of training samples is expanded, so that the trained core operating condition prediction model has stronger generalization ability.
[0113] Exemplarily, the first number is 4, the second number is 3, and the second control parameter group included in the simulation data can be expressed as [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3), (P4, T4, S4)]. In [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3), (P4, T4, S4)], taking any time step as the starting point, multiple groups of second control parameters involving 3 time steps are selected, and the selected groups of second control parameters involving 3 time steps are: [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)], and [(P2, T2, S2), (P3, T3, S3), (P4, T4, S4)].
[0114] Correspondingly, the groups of second predicted operating condition parameters involving 3 time steps selected in the simulation data are: [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)], and [(AO2, FDH2), (AO3, FDH3), (AO4, FDH4)].
[0115] [(AO1, FDH1), (AO2, FDH2), (AO3, FDH3)] are used to annotate [(P1, T1, S1), (P2, T2, S2), (P3, T3, S3)] to form the first training sample of the simulated data, and [(AO2, FDH2), (AO3, FDH3), (AO4, FDH4)] are used to annotate [(P2, T2, S2), (P3, T3, S3), (P4, T4, S4)] to form the second training sample of the simulated data. That is, two different training samples are obtained using one simulated data, thereby expanding the number of training samples.
[0116] See also Figure 2 , is a schematic diagram of the structure of a nuclear reactor core control device provided in an embodiment of the present application. In a second aspect of an embodiment of the present application, a nuclear reactor core control device 10 is provided. The device 10 includes:
[0117] An initialization population determination module is used to use the multiple first prediction condition parameter groups as the initialization population when multiple first prediction condition parameter groups corresponding to the multiple first control parameter groups are predicted based on the core condition prediction model, wherein each first control parameter group includes at least one first control parameter corresponding to at least one time step, each first prediction condition parameter group includes at least one first prediction condition parameter corresponding to at least one time step, each first prediction condition parameter group corresponds to an individual in the initialization population, and the factor in the individual is the first control parameter corresponding to each time step in the first control parameter group;
[0118] The optimal individual acquisition module is used to perform an iterative process of adaptability evaluation and dominant population generation based on the deviation value of each individual in the initialization population to obtain the optimal individual, wherein the deviation value is associated with the difference between each first predicted operating condition parameter and the preset initial operating condition parameter in the first predicted operating condition parameter group corresponding to the individual, and the dominant population generation is used to generate a dominant population according to the result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process meets the iteration termination condition;
[0119] The core control module is used to perform core control using the first control parameter corresponding to the optimal individual.
[0120] The nuclear reactor core control device 10 provided in the second aspect of the embodiment of the present application can implement the various processes implemented in the above-mentioned method embodiment and achieve the same beneficial effects. To avoid repetition, it will not be described here.
[0121] See also Figure 3 , is a structural diagram of an electronic device provided in an embodiment of the present application. The third aspect of an embodiment of the present application provides an electronic device 1000, including a processor 1100 and a memory 1200. The memory 1200 stores machine executable instructions that can be executed by the processor 1100. The processor 1100 can execute the machine executable instructions to implement the above-mentioned nuclear reactor core control method.
[0122] A fourth aspect of an embodiment of the present application provides a machine-readable storage medium, on which instructions are stored. When the instructions are executed by a processor, the processor implements the above-mentioned nuclear reactor core control method.
[0123] In some embodiments, the embodiments of the present application also provide a computer program product, including a computer program, which, when executed by a processor, implements the nuclear reactor core control method according to the above-mentioned embodiment.
[0124] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0125] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0126] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0127] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0128] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0129] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0130] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
[0131] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.
Claims
1. A nuclear reactor core control method, It is characterized in that The method comprises: In the case where a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, the plurality of first predicted operating condition parameter groups are used as an initialization population, wherein each of the first control parameter groups includes at least one first control parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups includes at least one first predicted operating condition parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups corresponds to an individual in the initialization population, and a factor in the individual is a first control parameter corresponding to each time step in the first control parameter group; Based on the deviation value of each individual in the initialization population, an iterative process of adaptability evaluation and dominant population generation is performed to obtain an optimal individual, wherein the deviation value is associated with a difference between each first predicted operating condition parameter and a preset initial operating condition parameter in a first predicted operating condition parameter group corresponding to the individual, the dominant population generation is used to generate a dominant population according to the result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process satisfies an iterative termination condition; The core is controlled using the first control parameter corresponding to the optimal individual.
2. The method according to claim 1, It is characterized in that The adaptability assessment includes: Determine the difference between each of the first predicted operating condition parameters in the first predicted operating condition parameter group corresponding to each of the individuals and the initial operating condition parameters; The deviation value of each of the individuals is determined based on all of the difference values of each of the individuals.
3. The method according to claim 2, It is characterized in that Before determining the deviation value of each of the individuals according to all the difference values of each of the individuals, the method further includes: Determine whether each of the differences meets the error requirement; In the case where the difference does not meet the error requirement, performing differentiation processing on the difference; The differentiation process is used to prevent individuals corresponding to the difference from participating in the generation of the dominant population.
4. The method according to claim 1, It is characterized in that The generation of the dominant population includes: Determine the probability of each individual being excluded according to the deviation value of each individual; Eliminate individuals from all the individuals according to the exclusion probability of each individual, and obtain multiple elite individuals; The plurality of elite individuals are used to perform individual factor variation and factor crossover between individuals to obtain the dominant population.
5. The method according to claim 1, It is characterized in that In the case where a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on the core operating condition prediction model, before using the plurality of first predicted operating condition parameter groups as the initialization population, the method further includes: Using a plurality of second control parameter groups of working conditions to be simulated, performing xenon oscillation simulation processing to obtain simulation data of each of the working conditions to be simulated, wherein the plurality of working conditions to be simulated are generated based on a random strategy, each of the simulation data includes the second control parameter group and a second predicted working condition parameter group, each of the second control parameter groups includes at least one second control parameter corresponding to at least one time step, and each of the second predicted working condition parameter groups includes at least one second predicted working condition parameter corresponding to at least one time step; Using the second predicted operating condition parameter groups in each of the simulation data, the second control parameter groups in the simulation data are labeled to generate training samples corresponding to the simulation data; Based on the training samples corresponding to the simulation data of the multiple operating conditions to be simulated, the model to be trained is iteratively trained to obtain the core operating condition prediction model.
6. The method according to claim 5, It is characterized in that The model to be trained is a long short-term memory network model. Before iteratively training the model to be trained based on training samples corresponding to the simulation data of the multiple operating conditions to be simulated to obtain the core operating condition prediction model, the method further includes: The parameters to be added are added to the training sample, and together with the second control parameter group in the training sample, serve as the annotation objects of the second predicted operating condition parameter group in the training sample, wherein the parameters to be added include the preset initial operating condition parameters.
7. The method according to claim 5, It is characterized in that Each of the simulation data includes parameters related to a first number of time steps, and each of the training samples includes parameters related to a second number of time steps, the first number being greater than the second number, The method of using the second predicted operating condition parameter group in each of the simulation data to label the second control parameter group in the simulation data to generate training samples corresponding to the simulation data includes: In the time steps involved in the parameters included in the simulation data, taking any time step as a starting point, selecting a plurality of groups of the second number of time steps; generating samples to be labeled based on the second control parameters corresponding to each group of the second number of time steps; generating a labeled sample based on the second predicted operating condition parameters corresponding to each group of the second number of time steps, The corresponding samples to be labeled are labeled using each of the labeled samples to generate training samples corresponding to the simulated data.
8. The method according to claim 1, It is characterized in that The parameter types of the first control parameters include: Core control power type parameters, core control rod position type parameters and time step size.
9. A nuclear reactor core control device, It is characterized in that The device comprises: An initialization population determination module is used for, when a plurality of first predicted operating condition parameter groups corresponding to a plurality of first control parameter groups are predicted based on a core operating condition prediction model, using the plurality of first predicted operating condition parameter groups as an initialization population, wherein each of the first control parameter groups includes at least one first control parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups includes at least one first predicted operating condition parameter corresponding to at least one time step, each of the first predicted operating condition parameter groups corresponds to an individual in the initialization population, and a factor in the individual is a first control parameter corresponding to each time step in the first control parameter group; an optimal individual acquisition module, configured to perform an iterative process of performing an adaptability evaluation and generating a dominant population based on a deviation value of each individual in the initialization population, to obtain an optimal individual, wherein the deviation value is associated with a difference between each first predicted operating condition parameter and a preset initial operating condition parameter in a first predicted operating condition parameter group corresponding to the individual, the dominant population generation module is configured to generate a dominant population based on a result of the adaptability evaluation, and the optimal individual is an individual in the dominant population generated when the iterative process satisfies an iterative termination condition; The core control module is used to perform core control using the first control parameter corresponding to the optimal individual.
10. An electronic device, It is characterized in that include: a memory configured to store instructions; as well as A processor is configured to call the instructions from the memory and implement the nuclear reactor core control method according to any one of claims 1 to 8 when executing the instructions.
Citation Information
Patent Citations
Pressurized water reactor (PWR) nuclear power plant reactor core power model predictive control method based on genetic algorithm
CN105759611A
Nuclear reactor design scheme optimization method and device, computer equipment and medium
CN114444383A
Method and apparatus for determining nuclide in nuclear material composed of only one nuclide, and for determining nuclide composition ratio in nuclear material composed of several nuclides
KR1020100079602A
Method and arrangement for determining nuclear reactor core designs
US20040122632A1
Prediction method and system of high slope deformation
US20210049515A1
Cited By
Parameter determination method and device of reactor control system and electronic equipment
CN119920502A
Intelligent peak shaving method for nuclear power plant based on model and data dual drive
CN120562832A
A model and data double-driven intelligent peak regulation method for nuclear power plants
CN120562832B
Nuclear reactor xenon oscillation prediction method based on data assimilation and physical constraint
CN120596779A