Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

843results about How to "Reduce build time" patented technology

Epidemic preventing and controlling system for detecting and searching people with abnormal temperatures

InactiveCN101999888APay attention to the epidemic situation in real timeEffective prevention and control informationDiagnostic recording/measuringSensorsScheduling instructionsComputer module
The invention discloses an epidemic preventing and controlling system for detecting and searching people with abnormal temperatures. The system comprises an information acquisition processing module, a communication processing module and a terminal processing module. The information acquisition processing module consists of an infrared detector, a camera and an information acquisition processor, wherein the infrared detector is used for acquiring face temperature information; the camera is used for acquiring face video information; and the information acquisition processor is used to perform motion target division and profile extraction on the face temperature information and the face video information so as to obtain information of people with abnormal temperatures. The communication processing module is used for transmitting the information of the people with the abnormal temperatures to the terminal processing module. The terminal processing module performs real-time dynamic searching of the people with abnormal temperatures in a monitored area and can send scheduling instruction information for giving an epidemic prompt and tracking people and the like. The system of the invention can monitor and recognize the people with abnormal temperatures in the monitored area and accordingly make a correct response and give good warning for coming epidemics, so that even epidemics outbreak, the people with abnormal temperatures can be found at first time and the epidemic preventing efficiency is improved as high as possible.
Owner:BEIHANG UNIV

Prefabricated node and prefabricated frame structure and construction method thereof

The invention discloses a prefabricated node and a prefabricated frame structure and a construction method thereof. The prefabricated node can be subjected to workshop prefabrication according to the structure. The prefabricated frame structure is mainly characterized in that the prefabricated node with a node overhanging beam section and a node overhanging column section is prefabricated, prefabricated nodes of various kinds are designed according to a graph, the prefabricated nodes are accurately mounted, and the overall prefabricated assembled integral type structure is constructed by means of connecting beams or columns of the prefabricated nodes in site. The construction method includes the steps of 1), positioning, lifting and correcting the prefabricated nodes in site; 2), fixing and mounting the prefabricated nodes; 3), casting a beam connection portion and a column connection portion in site. A novel construction mode is innovatively put forward for the prefabricated frame structure, and the node prefabricated structure with the beams and the columns is put forward; unfavorable situation that durability and reliability of the nodes are pool due to conventional prefabricated beams and columns and in-site casting of reinforced concrete nodes is favorably improved, construction time is saved, and construction cost is reduced.
Owner:赵挺生

Integrated assembly type steel structure building

The invention provides an integrated assembly type steel structure building. The integrated assembly type steel structure building comprises a main body framework, floor bearing plates, internal wall bearing plates, external wall bearing plates and a roof; the floor bearing plates, the internal wall bearing plates, the external wall bearing plates and the roof are connected with the main body framework through connecting parts, the internal wall bearing plates are arranged to be adjacent to the external wall bearing plates, the roof is arranged at the upper end of the main body framework, and the outer surfaces of the internal wall bearing plates, the outer surfaces of the external wall bearing plates and the outer surface of the roof are each provided with decoration and fitment plates in an integrated mode, and the interiors of the decoration and fitment plates are correspondingly provided with cable conduits and water pipes in an integrated mode. In this way, the integrated assembly type steel structure building has the advantages of being stronger in integrity, convenient to construct, high in repeating utilization rate, capable of reducing production cost and wide in application range, and integral installation and disassembly of prefabricated part and the connecting parts in a factory can be achieved; meanwhile, large-scale production at a construction site is easy to achieve, and construction waste is greatly reduced.
Owner:CHINA CONSTR STEEL STRUCTURE CORP LTD

Final assembly method of ship shafting and rudder system

The invention relates to a final assembly method of a ship shafting and a rudder system. The final assembly method comprises first performing expansion and final assembly to relative subsections of the shafting of the ship on a final assembly platform so that the relative subsections of the shafting become a shafting block, performing expansion and final assembly to relative subsections of the rudder system so that the relative subsections of the rudder system become a rudder system block, inspecting the manufactured shafting block and the rudder system block until the shafting block and the rudder system block fully meet the construction requirements, performing hole boring to the shafting and the rudder system respectively according to the shafting center line of the shafting block and the rudder system center line of the rudder system block, performing alignment and lap welding to the manufactured shafting block and the rudder system block on the final assembly platform, installing the shafting and the rudder system, and finally integrally lifting the shafting block and the rudder system block which are integrated by lapping into a dock so that the shafting block and the rudder system block and other blocks are lapped into a main ship body. The method improves manufacturing precision and quality of the shafting block and the rudder system block of the ship, deformation of the shafting block and the rudder system block of the ship in the lapping process is effectively controlled, and degree and progress of final assembly shipbuilding are improved.
Owner:SHANGHAI JIANGNAN CHANGXING SHIPBUILDING +1

Fault recovery uniform model method simultaneously considering reconstruction and island division for active power distribution network

The invention discloses a fault recovery uniform model method simultaneously considering reconstruction and island division for an active power distribution network. The fault recovery uniform model method comprises the following steps of 1) acquiring power grid fault information and power distribution network information, and summarizing data required by model construction; 2) determining a target function of a fault recovery running strategy; 3) building a uniform mathematical model containing DistFlow power flow constraint, employing virtual power flow connection constraint and comprising reconstruction and island division; and 4) solving the built uniform mathematical model comprising reconstruction and island division to obtain a final fault recovery running strategy of the active power distribution network. The fault recovery running strategy of the power distribution network simultaneously considers two strategies of network fault reconstruction and island division, and the controllability of load and distribution power supply output is considered; and compared with a traditional power distribution network fault recovery, the fault recovery strategy is optimized and cover more possibilities, the problem is converted to hybrid integer linear planning, the strategy generation time is saved, and the optimal solution can be more accurately solved.
Owner:SOUTHEAST UNIV +1

Automatic construction and uploading method and device for application program, computer equipment and storage medium

The invention belongs to the field of computers, and relates to an automatic construction and uploading method and a device for an application program, computer equipment and a storage medium. The method comprises the steps of receiving an application program construction uploading request; acquiring a program code file according to the application program construction uploading request and transmitting the program code file to a program construction directory; acquiring program construction configuration information matched with the category of the application construction uploading request,and compiling a program code file according to the program construction configuration information to generate a compiled file; packaging the compiled file to generate a package file to be uploaded; and signing and verifying the package file, and uploading the package file to a target software platform after the package file passes the verification, thereby finishing automatic construction and uploading of the application program. According to the method provided by the invention, the links of code acquisition, compiling construction, uploading review and the like are connected in series and integrated together, operation is carried out in an automatic mode, continuous integration can be accessed, the application program construction time can be greatly saved, and the working efficiency isimproved.
Owner:CHINA PING AN PROPERTY INSURANCE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products