Power system and control method thereof, inverter, bypass switch and control method thereof

By first controlling the conduction of the bypass switch in the power system to ensure that the voltage at both ends of the switch is the same, and then turning on the switch, the problem of overload adhesion caused by excessive current when the inverter is connected to the grid is solved and the stability of the system is improved. sex and safety.

CN118739205AInactive Publication Date: 2024-10-01SUNGROW (SHANGHAI) CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410993149.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In a multi-machine parallel system, when the inverter is connected to the grid, the grid-connected switch is overloaded and stuck due to excessive current, which may cause failure and damage to the inverter, affecting the stability and safety of the power system.

Method used

Design a power system that includes multiple inverters and bypass switches. First, control the bypass switch to turn on under the conditions of grid-connected operation, so that the voltage at both ends of the switch is the same, and then control the switch to turn on to avoid current flow. impact, reducing the switch impact current.

Benefits of technology

It effectively avoids the overload adhesion failure of the switch due to excessive current, improves the stability and safety of the power system, and prevents the inverter from being damaged due to excessive current impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739205A_ABST
    Figure CN118739205A_ABST
Patent Text Reader

Abstract

The invention relates to a power system and a control method thereof, an inverter, a bypass switch and a control method thereof. The power system comprises a plurality of inverters and a bypass switch; the inverter comprises an inverter circuit, a change-over switch, a first port and a second port, the first end of the change-over switch is connected with the output end of the inverter circuit and the second port, and the second end of the change-over switch is connected with the first port; each first port is used for connecting a first end of the bypass switch and an external power network, and each second port is used for connecting a second end of the bypass switch and a load; the power system is configured to control the bypass switch to be switched on and then control the change-over switches to be switched on under the condition that grid-connected operation conditions are met. According to the power system, when grid connection is carried out, current impact generated by the change-over switches is very small, the inverter cannot be damaged due to the fact that the impact current is too large, and high safety and stability are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of photovoltaic power generation, and in particular to a power system and a control method thereof, an inverter, a bypass switch and a control method thereof. Background Art

[0002] A multi-machine parallel system refers to a system in which multiple energy storage converters or multiple inverters operate in parallel. The grid-connected ports of the multiple energy storage converters or multiple inverters are centrally connected to the external power network, and the off-grid ports are centrally connected to the load.

[0003] When the external grid is bypassed and loaded, when the grid-connected relay of an inverter in the multi-machine parallel system is first energized, all the load current flows through the relay, causing the relay to be overloaded and stuck. Summary of the invention

[0004] Based on this, it is necessary to provide a power system and its control method, inverter, bypass switch and its control method to avoid the overload and sticking of the grid-connected switch caused by excessive current flowing through the grid-connected switch in order to solve the above technical problems.

[0005] In a first aspect, the present application provides a power system, comprising a plurality of inverters and bypass switches; the inverter comprises an inverter circuit, a switching switch, a first port and a second port, the first end of the switching switch is connected to the output end of the inverter circuit and the second port, and the second end of the switching switch is connected to the first port; each of the first ports is used to connect the first end of the bypass switch and an external power network, and each of the second ports is used to connect the second end of the bypass switch and a load;

[0006] The power system is configured as follows:

[0007] When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0008] In one embodiment, each of the inverters includes a first inverter;

[0009] The first inverter executes the steps of first controlling the bypass switch to be turned on and then controlling each of the switching switches to be turned on when the grid-connected operation conditions are met.

[0010] In one embodiment, each of the inverters includes a second inverter; the second inverter is an inverter other than the first inverter in each of the inverters;

[0011] The first inverter is specifically configured as follows:

[0012] When it is detected that the grid-connected operation condition is met, a first control instruction is sent to the bypass switch, so that the bypass switch is turned on after receiving the first control instruction;

[0013] After the bypass switch is turned on, the switching switch in the first inverter is controlled to be turned on, and a second control instruction for the switching switch is sent to a second inverter among the multiple inverters, so that the second inverter controls the corresponding switching switch to be turned on after receiving the second control instruction.

[0014] In one embodiment, after the bypass switch and each of the switching switches are turned on, the first inverter is further configured as follows:

[0015] In response to the bypass switch and each of the switching switches being turned on, when the off time of the bypass switch is greater than or equal to the preset time, a third control instruction is sent to the bypass switch to turn off the bypass switch.

[0016] In one embodiment, the first inverter is specifically configured as:

[0017] When it is detected that the grid-connected operation conditions are met and the current operation state is not an off-grid operation state, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0018] In one of the embodiments, the power system is further configured to:

[0019] When it is detected that the grid-connected operation condition is met and the current operation state is an off-grid operation state, each of the switching switches is controlled to be turned on.

[0020] In one of the embodiments, the power system is further configured to:

[0021] Obtaining the operating power of the load;

[0022] When it is detected that the grid-connected operation condition is met and the total output power of the plurality of inverters is greater than or equal to the operation power, each of the switching switches is controlled to be turned on.

[0023] In one of the embodiments, the power system is further configured to:

[0024] Obtaining the operating power of the load;

[0025] When it is detected that the grid-connected operation conditions are met and the total output power of the multiple inverters is less than the operating power, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0026] In one of the embodiments, the power system is further configured to:

[0027] When the external power network is abnormal and the current operating state of the power system is a grid-connected operating state, each of the switching switches is controlled to be disconnected.

[0028] In one embodiment, each of the inverters is configured as:

[0029] When the grid-connected operation conditions are met, the corresponding bypass switches are first controlled to be turned on, and then the corresponding switching switches are controlled to be turned on.

[0030] In a second aspect, the present application further provides a control method for an electric power system, wherein the electric power system comprises a plurality of inverters and a bypass switch; the inverter comprises an inverter circuit, a switching switch, a first port and a second port, the first end of the switching switch is connected to the output end of the inverter circuit and the second port, and the second end of the switching switch is connected to the first port; each of the first ports is used to connect the first end of the bypass switch and an external power network, and each of the second ports is used to connect the first end of the bypass switch and a load; the method comprises:

[0031] When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0032] In one embodiment, the plurality of inverters include a first inverter and at least one second inverter;

[0033] When the grid-connected operation condition is met, firstly controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, comprises:

[0034] When it is detected that the grid-connected operation condition is met, a first control instruction is sent to the bypass switch, so that the bypass switch is turned on after receiving the first control instruction;

[0035] After the bypass switch is turned on, the switching switch in the first inverter is controlled to be turned on, and a second control instruction for the switching switch is sent to the second inverter, so that the second inverter controls the corresponding switching switch to be turned on after receiving the second control instruction.

[0036] In one embodiment, when the grid-connected operation condition is met, first controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, includes:

[0037] When it is detected that the grid-connected operation conditions are met and the current operation state is not an off-grid operation state, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0038] In one of the embodiments, when the grid-connected operation conditions are met, first controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, further includes:

[0039] When it is detected that the grid-connected operation condition is met and the current operation state is an off-grid operation state, each of the switching switches is controlled to be turned on.

[0040] In one embodiment, when the grid-connected operation condition is met, first controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, includes:

[0041] Get the operating power of the load;

[0042] When the grid-connected operation condition is met and the total output power of the plurality of inverters is greater than or equal to the operating power, controlling each of the switching switches to be turned on;

[0043] When it is detected that the grid-connected operation conditions are met and the total output power of the multiple inverters is less than the operating power, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

[0044] In a third aspect, the present application further provides an inverter, comprising an inverter circuit, a switching switch, a first port, and a second port, wherein the first end of the switching switch is connected to the output end of the inverter circuit and the second port, and the second end of the switching switch is connected to the first port; the first port is used to connect the first end of a bypass switch and an external power network, and the second port is used to connect the second end of the bypass switch and a load;

[0045] The inverter is configured as:

[0046] When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then the switching switch is controlled to be turned on; or,

[0047] Based on the received second control instruction, the switching switch is controlled to be turned on; wherein the second control instruction is generated when the bypass switch is turned on.

[0048] In a fourth aspect, the present application further provides a method for controlling a bypass switch, wherein a first end of the bypass switch is respectively used to connect to a first port of an inverter and an external power network, and a second end of the bypass switch is respectively used to connect to a load and a second port of the inverter; wherein the inverter further comprises an inverter circuit and a switching switch, wherein the first end of the switching switch is connected to an output end of the inverter circuit and the second port, and the second end of the switching switch is connected to the first port;

[0049] The method comprises:

[0050] Based on the received first control instruction, the bypass switch is controlled to be turned on; the first control instruction is generated when the inverter meets the grid-connected operation conditions and before the switching switch is turned on.

[0051] In a fifth aspect, the present application also provides a bypass switch, which is applied to the control method of the bypass switch provided in any of the above embodiments.

[0052] In the embodiment of the present application, when the power system meets the grid-connected operation conditions, the bypass switch can be controlled to be turned on first. At this time, the voltages at both ends of each switching switch are almost the same, and then each switching switch can be controlled to be turned on. In this way, the impact current generated when each switching switch is turned on is almost zero, which significantly reduces the impact current when each switching switch is closed. It can avoid the occurrence of overload adhesion failure of the switching switch due to excessive current flowing through the switching switch, and it can also avoid the inverter from being damaged due to excessive current impact, thereby improving the stability and safety of the entire power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 is a schematic diagram of the structure of a power system in one embodiment;

[0054] Figure 2 A schematic diagram of the structure of another power system in an embodiment;

[0055] Figure 3 is an interaction diagram between an internal controller of a power system and each inverter in an embodiment;

[0056] Figure 4 is an interaction diagram between inverters in a power system in one embodiment;

[0057] Figure 5 It is a flowchart of the steps of first controlling the bypass switch to be turned on and then controlling each of the switching switches to be turned on when the grid-connected operation conditions are met in one embodiment;

[0058] Figure 6 A flowchart of the steps of first controlling the bypass switch to be turned on and then controlling each of the switching switches to be turned on when the grid-connected operation conditions are met in another embodiment;

[0059] Figure 7 is a schematic structural diagram of an inverter in one embodiment;

[0060] Figure 8 FIG. 4 is a schematic diagram of the structure of an inverter in another embodiment.

[0061] Description of reference numerals:

[0062] 100 - inverter, 101 - first inverter, 102 - second inverter, 110 - inverter circuit, 120 - switch, 130 - first port, 140 - second port, 200 - bypass switch, 300 - external power network, 400 - load, 500 - controller. DETAILED DESCRIPTION

[0063] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0064] In a power system with multiple inverters connected in parallel, it is impossible to achieve complete synchronization when the grid-connected switches inside the multiple inverters are closed, and a large impact current will be generated in the switches inside the inverter. When this impact current flows through the grid-connected switches inside the inverter, it may cause the grid-connected switches to be overloaded and stuck, unable to disconnect normally, and may even exceed the short-time withstand current of the grid-connected switches inside the inverter, damaging the inverter.

[0065] Based on this, the present application proposes a power system, which includes a bypass switch and a plurality of inverters. Each inverter includes an inverter circuit, a switching switch, a first port and a second port. The first end of the switching switch is connected to the output end and the second port of the inverter circuit, and the second end of the switching switch is connected to the first port. Among them, each first port can be used to connect the first end of the bypass switch and the external power network, and each second port can be used to connect the first end of the bypass switch and the load. When the power system is connected to the grid, the bypass switch can be controlled to be turned on first, at which time the voltages at both ends of each switching switch are almost the same, and then each switching switch is controlled to be turned on. In this way, the impact current generated when each switching switch is turned on is almost zero, which significantly reduces the impact current when each switch is switched closed, and can avoid the occurrence of overload adhesion failure of the switching switch due to excessive current flowing through the switching switch, and can also avoid the inverter from being damaged due to excessive current impact, thereby improving the stability and safety of the power system.

[0066] The power system of the present application is described below with reference to the accompanying drawings.

[0067] In one embodiment, Figure 1-Figure 2As shown, the power system includes a bypass switch 200 and a plurality of inverters 100. Each inverter 100 includes an inverter circuit 110, a switch 120, a first port 130, and a second port 140. The first end b1 of the switch 120 is connected to the output end a of the inverter circuit 110 and the second port 140, and the second end b2 of the switch 120 is connected to the first port 130. Each first port 130 can be used to connect the first end c1 of the bypass switch 200 and the external power network 300, and each second port 140 can be used to connect the second end c2 of the bypass switch 200 and the load 400.

[0068] It can be understood that the first ports 130 of the plurality of inverters 100 are all connected to the first end c1 of the bypass switch 200 and the external power network 300, and the second ports 140 of the plurality of inverters 100 are all connected to the second end c2 of the bypass switch 200 and the load 400, and the plurality of inverters are in parallel. The bypass switch 200 can be a switch such as a contactor, a relay, etc., and the power level of the bypass switch 200 needs to be greater than or equal to the power level of the power system. The bypass switch 200 can be set independently of the inverter 100, such as Figure 1 As shown, it can also be integrated inside the inverter 100, such as Figure 2 shown.

[0069] The power system is configured to: when the grid-connected operation conditions are met, first control the bypass switch 200 to be turned on, and then control each switching switch 120 to be turned on.

[0070] The power system meets the grid-connected operation conditions, which means that the power system is in a normal state with the external power network 300, and each inverter 100 completes voltage synchronization with the external power network 300. In the power system, a voltage detection circuit is integrated in the first port 130, and the voltage of the external power network 300 can be detected through the first port 130 of the inverter 100. For example, the voltage of the external power network 300 can be detected through the first port 130 of any inverter 100, or the voltage of the external power network 300 can be detected by the first ports 130 of multiple inverters 100. The average value is taken to determine whether the external power network 300 is normal. For example, if the voltage information of the external power network 300 is between 190V-240V, it can be considered that the external power network 300 is normal. After detecting that the external power network 300 is normal, the power system will control the output voltage of the inverter and the voltage synchronization of the external power network 300 through phase-locked loop control and the like.

[0071] In such Figure 1 In the power system shown, when the power system meets the conditions for grid-connected operation, the bypass switch 200 can be controlled to be turned on first, and then each switching switch 120 can be controlled to be turned on to complete the grid-connection.

[0072] In such Figure 2In the power system shown, when the power system meets the conditions for grid-connected operation, the bypass switch 200 integrated in any inverter 100 can be controlled to be turned on first, and then the switching switches 120 can be controlled to be turned on to complete the grid connection. Alternatively, the bypass switches 200 in all inverters 100 can be controlled to be turned on, and then the switching switches 120 can be controlled to be turned on to complete the grid connection.

[0073] In addition, for Figure 1 or Figure 2 In the power system shown in the figure, when the grid connection conditions are met, the power system can control the bypass switch 200 to be turned on first, and then control each switch 120 to be turned on, according to the control instruction sent by the external device. Optionally, the power system can also control the bypass switch 200 to be turned on first, and then control each switch 120 to be turned on, through the internal controller 500. For example, Figure 3 As shown, when the power system meets the grid-connected operation conditions, the controller 500 first sends a first control instruction to the bypass switch 200 to turn on the bypass switch 200, and then sends a second control instruction to each inverter 100 to make each inverter 100 control the corresponding switching switch 120 to turn on according to the second control instruction.

[0074] In this embodiment, the power system includes a bypass switch 200 and a plurality of inverters 100. Each inverter 100 includes an inverter circuit 110, a switch 120, a first port 130, and a second port 140. The first end b1 of the switch 120 is connected to the output end a of the inverter circuit 110 and the second port 140, and the second end b2 of the switch 120 is connected to the first port 130. Each first port 130 can be used to connect the first end c1 of the bypass switch 200 and the external power network 300, and each second port 140 can be used to connect the second end c2 of the bypass switch 200 and the load 400. When the power system meets the grid-connected operation conditions, the bypass switch 200 can be controlled to be turned on first. At this time, the voltages at both ends of each switching switch 120 are almost the same, and then each switching switch 120 is controlled to be turned on. In this way, the impact current generated when each switching switch 120 is turned on is almost zero, which significantly reduces the impact current when each switching switch is closed, and can avoid the inverter from being damaged due to excessive current impact generated when the switching switch is closed, thereby improving the stability and safety of the power system.

[0075] In one embodiment, the plurality of inverters 100 include a first inverter 101. The first inverter 101 is any one of the plurality of inverters. In the event that the initially selected first inverter fails, any one of the other normally operating inverters in the power system may be selected as a new first inverter.

[0076] The first inverter 101 executes the steps of first controlling the bypass switch 200 to be turned on and then controlling each switching switch 120 to be turned on when the grid-connected operation condition is met.

[0077] Understandably, in Figure 1 In the power system shown, when the power system meets the grid-connected operation conditions, the first inverter can first control the bypass switch 200 to turn on. At this time, the voltages across the switching switches 120 inside each inverter are almost the same. Afterwards, the first inverter can control each switching switch 120 to turn on to complete the grid connection. The impact current generated when each switching switch 120 is closed is very small.

[0078] In such Figure 2 In the power system shown, when the power system meets the grid-connected operation conditions, the first inverter can control the bypass switch 200 integrated in the first inverter to turn on, and then control the switching switch 120 in each inverter to turn on, so as to complete the grid connection. Optionally, the first inverter 101 can also send an instruction to control the bypass switch 200 to turn on to other inverters, so that the bypass switches 200 in other inverters are turned on, and then control the switching switches 120 in each inverter to turn on, so as to complete the grid connection.

[0079] In one embodiment, each inverter 100 includes a second inverter 102. The second inverter 102 is an inverter other than the first inverter 101. The first inverter 101 and the second inverter 102 are in communication connection.

[0080] The first inverter 101 is specifically configured to, when it is detected that the grid-connected operation conditions are met, send a first control instruction to the bypass switch 200, so that the bypass switch 200 is turned on after receiving the first control instruction; after the bypass switch 200 is turned on, control the switching switch 120 in the first inverter 101 to be turned on, and send a second control instruction for the switching switch 120 to the second inverter 102 among the multiple inverters, so that the second inverter 102 controls the corresponding switching switch 120 to be turned on after receiving the second control instruction.

[0081] like Figure 4 As shown, the first inverter 101 sends a first control instruction to the bypass switch 200 to turn on the bypass switch 200. After the bypass switch 200 is turned on, the first inverter 101 can control the switching switch 120 inside the first inverter 101 to turn on, and send a second control instruction to multiple second inverters 102, so that the second inverter 102 controls the corresponding switching switch 120 to turn on after receiving the second control instruction, thereby realizing the grid-connected operation of the power system.

[0082] In one embodiment, after the bypass switch 200 and each switching switch 120 are turned on, the first inverter 101 is further configured to: in response to the bypass switch 200 and each switching switch 120 being turned on, when the off time of the bypass switch 200 is greater than or equal to the preset time, send a third control instruction to the bypass switch 200 to disconnect the bypass switch 200. Exemplarily, the preset time may be 20ms. It can be understood that when the off time of the bypass switch 200 is greater than or equal to the preset time, the first inverter may send the third control instruction to the bypass switch 200, so that the bypass switch 200 is disconnected after receiving the third control instruction, so as to avoid affecting the seamless switching of the power system between the grid and the off-grid.

[0083] When the off-time of the bypass switch 200 is less than the preset time, after the bypass switch 200 and each switching switch 120 are turned on, the bypass switch 200 can be kept in the current on state. In this case, the off-time of the bypass switch 200 has a very small impact on the seamless switching between the grid and the off-grid, which can be ignored. Optionally, when the off-time of the bypass switch 200 is less than the preset time, the first inverter 101 can also send a third control instruction to the bypass switch 200 to disconnect the bypass switch 200.

[0084] In one embodiment, the first inverter 101 is specifically configured to: when it is detected that the grid-connected operation condition is met and the current operation state is not an off-grid operation state, first control the bypass switch 200 to be turned on, and then control each switching switch 120 to be turned on.

[0085] The power system meets the grid-connected operation state and the current operation state is a non-off-grid operation state, that is, the power system is in a non-grid-connected and non-off-grid operation state, such as an initial startup state, a standby state, etc.

[0086] For example, Figure 4 As shown, when the power system meets the grid-connected operation conditions and the current operating state of each inverter is a non-off-grid operating state, the first inverter 101 can send a first control instruction to the bypass switch 200 to turn on the bypass switch 200. After the bypass switch 200 is turned on, the voltages across each switching switch 120 are almost the same. The first inverter 101 can control the switching switch 120 in the first inverter to turn on, and send a second control instruction for the switching switch 120 to the second inverter 102 among the multiple inverters, so that the second inverter 102 controls the corresponding switching switch 120 to turn on after receiving the second control instruction. At this time, the current impact when each switching switch 120 is turned on is very small, thereby achieving safe grid connection of the power system.

[0087] Alternatively, if Figure 5As shown, when the power system meets the grid-connected operation conditions and the current operating state of each inverter is a non-off-grid operating state, a controller 500 independent of each inverter in the power system can first send a first control instruction to the bypass switch 200 to turn on the bypass switch 200, and then send a second control instruction to each inverter 100 to make each inverter 100 control the corresponding switching switch 120 to turn on.

[0088] In one embodiment, the power system is further configured to: when it is detected that the grid-connected operation conditions are met and the current operation state is an off-grid operation state, control each of the switching switches to be turned on.

[0089] It can be understood that when the power system detects that the grid-connected operation conditions are met and the current operating state of each inverter is an off-grid operation state, each switch can be turned on by a controller independent of each inverter set inside the power system, or by an external device. In addition, the first inverter can be set so that when the power system is in an off-grid operation state, the first inverter can directly control the switching switch 120 inside it to turn on, and send a second control instruction to each second inverter so that the second inverter controls the corresponding switching switch 120 to turn on.

[0090] When the power system switches from an off-grid operating state to a grid-connected operating state, although a surge current will be generated when each switching switch 120 in the inverter is closed, the surge current is generally smaller than the short-time withstand current of each switching switch 120. Therefore, the first inverter may not control the bypass switch 200 to be turned on, thereby reducing the actions that the power system needs to perform when connected to the grid and speeding up the switching from off-grid to grid-connected.

[0091] In addition, when the grid-connected operation conditions are met and the current operation state is an off-grid operation state, the power system can control the bypass switch 200 to always be in an off state, or control the bypass switch 200 to be turned on before the switching switch 120 is turned on.

[0092] In one embodiment, the power system is further configured to: obtain the operating power of the load 400, and control each switching switch 120 to conduct when it is detected that the grid-connected operating conditions are met and the total output power of multiple inverters is greater than or equal to the operating power.

[0093] For example, the power system can obtain the operating power of the load 400 by means of a DC black start, that is, the power system can first operate the load 400 at an independent voltage to determine whether the total output power of the power system can support the normal operation of the load 400.

[0094] When the total output power of the power system is greater than or equal to the operating power of the load 400, the impact current generated when the switch 120 in each inverter is turned on is generally smaller than the short-time withstand current of the switch 120. Therefore, the power system can directly control the switching switches 120 to be turned on. When controlling the switching switches 120 to be turned on, the power system can control the switching switches to be turned on by a controller independent of each inverter, or determine the first inverter, and the first inverter can control the switching switches 120 to be turned on.

[0095] It should be noted that when the total output power of the power system is greater than or equal to the operating power of the load 400, the power system can control the bypass switch 200 to always be in the off state, or control the bypass switch 200 to be turned on before the switching switch 120 is turned on.

[0096] Furthermore, the power system is also configured to: when it is detected that the grid-connected operation conditions are met and the total output power of multiple inverters is less than the operating power, first control the bypass switch 200 to be turned on, and then control each switching switch 120 to be turned on.

[0097] When the total output power of multiple inverters, that is, the output power of the power system is less than the operating power of the load 400, the impact current generated when the switching switch 120 in the inverter is turned on is relatively large, and may even exceed the short-time withstand current of the switching switch 120. Therefore, the power system needs to first control the bypass switch 200 to turn on, so that the voltages at both ends of each switching switch 120 are almost the same and the voltage difference is almost zero. After that, each switching switch 120 is controlled to be turned on. In this way, the impact current generated when each switching switch 120 is turned on can be reduced, and the safe grid connection of the power system can be achieved.

[0098] Specifically, the power system can adopt Figure 3 In the manner shown, a controller independent of each inverter first controls the bypass switch 200 to be turned on, and then controls each switch 120 to be turned on. Optionally, the power system may also adopt Figure 4 In the manner shown, the first inverter first sends a first control instruction to the bypass switch 200 to turn on the bypass switch 200, then controls the switching switch 120 in the first inverter to turn on, and sends a second control instruction to each second inverter to make the second inverter control the corresponding switching switch 120 to turn on.

[0099] In one embodiment, the power system is further configured to: when the external power network 300 is abnormal and the current operation state of the power system is a grid-connected operation state, control each switch 120 to be disconnected.

[0100] The abnormality of the external power network 300 includes power failure of the power grid, undervoltage of the power grid, etc. It can be understood that the power system detects the voltage of the external power network 300 through the first port 130 of the inverter. When the voltage of the external power network 300 exceeds the normal range, it is considered that the external power network 300 is abnormal. Exemplarily, the normal voltage range may be 190V-140V. If an abnormality occurs in the external power network 300 and the power system is in a grid-connected operation state, the power system can control each switching switch 120 to disconnect and enter an off-grid operation state to avoid the abnormality of the external power network 300 from affecting the normal operation of the load 400.

[0101] In one embodiment, the bypass switch 200 includes a relay, and the off time of the relay is less than or equal to 20ms. It is necessary to use a relay with a shorter off time as the bypass switch 200 to reduce the impact of the off time of the bypass switch 200 on the seamless switching of the power system. Exemplarily, the off time of the bypass switch 200 can be 10ms.

[0102] In one embodiment, each of the inverters is configured to: when the grid-connected operation conditions are met, first control the corresponding bypass switch to be turned on, and then control the corresponding switching switch to be turned on.

[0103] See also Figure 2 A bypass switch 200 is provided in each inverter 100. When the power system meets the grid-connected operation conditions, each inverter 100 can control the corresponding bypass switch 200 to close, and then control the corresponding switching switch 120 to close.

[0104] In one embodiment, the present application also provides a control method for an electric power system, which can be applied to Figure 1 or Figure 2 In the power system shown in FIG. 1 , the control method of the power system includes the steps of first controlling the bypass switch to be turned on, and then controlling each switching switch to be turned on, when the grid-connected operation conditions are met.

[0105] The power system can first detect the voltage of the external power network 300 through the first port 130 of the inverter, and when the voltage of the external power network 300 is within the normal range (e.g., 190V-240V), control each inverter to synchronize with the voltage of the external power network 300 to meet the grid-connected operation conditions. Afterwards, the power system can first control the bypass switch 200 to be turned on, so that the voltages at both ends of each switching switch 120 are almost the same, and then control the switching switch 120 of each inverter to be turned on, and the impact current generated when each switching switch 120 is turned on is almost zero.

[0106] In this embodiment, by first controlling the bypass switch 200 to be turned on and then controlling each switching switch 120 to be turned on when the grid-connected operation conditions are met, the impact current generated when each switching switch 120 is turned on can be significantly reduced, thereby achieving safe grid connection of the power system and improving the safety and stability of the power system.

[0107] In one embodiment, Figure 5 As shown, when the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each switching switch is controlled to be turned on, including steps S110-S120.

[0108] S110, when it is detected that the grid-connected operation condition is met, sending a first control instruction to the bypass switch, so that the bypass switch is turned on after receiving the first control instruction.

[0109] It can be understood that when it is detected that the power system meets the grid-connected operation conditions, the first inverter may first send a first control instruction to the bypass switch 200 to turn on the bypass switch 200. Optionally, the first inverter may send the first control instruction to the bypass switch 200 directly connected to the first inverter, and may also send an instruction to instruct the bypass switch 200 to turn on to the second inverter, so that the second inverter controls the bypass switch 200 directly connected to the second inverter to turn on.

[0110] S120, after the bypass switch is turned on, control the switching switch in the first inverter to be turned on, and send a second control instruction for the switching switch to the second inverter, so that the second inverter controls the corresponding switching switch to be turned on after receiving the second control instruction.

[0111] After the bypass switch 200 is turned on, the first inverter can control the switching switch 120 in the first inverter to be turned on, and send a second control instruction to the second inverter, so that the second inverter controls the corresponding switching switch 120 to be turned on according to the second control instruction.

[0112] In this embodiment, when it is detected that the power system meets the grid-connected operation conditions, the first inverter first controls the bypass switch 200 to close, and then controls each switching switch 120 to close, which can significantly reduce the impact current when each switching switch 120 is closed, thereby achieving safe grid-connected operation of the power system.

[0113] In one embodiment, when the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each switching switch is controlled to be turned on, including the step of first controlling the bypass switch to be turned on, and then controlling each switching switch to be turned on, when it is detected that the grid-connected operation conditions are met and the current operation state is not an off-grid operation state.

[0114] It can be understood that when it is detected that the power system meets the grid-connected operation conditions and is currently in a non-off-grid operation state, such as an initial startup state, a standby state, etc., the power system can first turn on the bypass switch 200, so that the voltages at both ends of the switching switches 120 in multiple inverters are almost the same, and the voltage difference is almost zero, and then each switching switch 120 can be controlled to be turned on. The power system can control the bypass switch and the switching switch to be turned on according to the control instructions of the external device, or it can adopt Figure 3 or Figure 4 The bypass switch and each switching switch are controlled to be turned on in the manner shown.

[0115] In one embodiment, when the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each switching switch is controlled to be turned on. The step also includes controlling each switching switch to be turned on when it is detected that the grid-connected operation conditions are met and the current operating state is an off-grid operating state.

[0116] It can be understood that when it is detected that the grid-connected operation conditions are met and the current operating state of the power system is an off-grid operation state, the power system controls each switching switch 120 to be turned on through an internal controller 500 independently set up from each inverter, and a first inverter 101 can also be set, and the first inverter 101 controls each switching switch 120 to be turned on.

[0117] When the power system switches from an off-grid operating state to a grid-connected operating state, although a surge current will be generated when each switching switch 120 in the inverter is closed, the surge current is generally smaller than the short-time withstand current of each switching switch 120. Therefore, the first inverter may not control the bypass switch 200 to be turned on, thereby reducing the actions that the power system needs to perform when connected to the grid and speeding up the switching from off-grid to grid-connected.

[0118] In one embodiment, Figure 6 As shown, when the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each switching switch is controlled to be turned on, including steps S210-S230.

[0119] S210, obtaining the operating power of the load.

[0120] The power system can first operate at a self-supporting voltage with load through a DC black start method, thereby obtaining an operating power of 400 kW for the load.

[0121] S220, when the grid-connected operation conditions are met and the total output power of the multiple inverters is greater than or equal to the operating power, control each switching switch to be turned on.

[0122] When the total output power of the power system is greater than or equal to the operating power of the load 400, the impact current generated when the switching switch 120 in each inverter is turned on is generally smaller than the short-time withstand current of the switching switch 120. Therefore, the power system can directly control the switching on of each switching switch 120.

[0123] S230, when it is detected that the grid-connected operation conditions are met and the total output power of the multiple inverters is less than the operating power, first control the bypass switch to be turned on, and then control each switching switch to be turned on.

[0124] When the total output power of multiple inverters, that is, the output power of the power system is less than the operating power of the load 400, the impact current generated when the switching switch 120 in the inverter is turned on may exceed the short-time withstand current of the switching switch 120. Therefore, the power system needs to first control the bypass switch 200 to be turned on, so that the voltages at both ends of each switching switch 120 are almost the same and the voltage difference is almost zero. After that, each switching switch 120 is controlled to be turned on to reduce the impact current generated when each switching switch 120 is turned on, thereby realizing the safe grid connection of the power system.

[0125] In this embodiment, the power system determines whether to control the bypass switch 200 to be turned on based on the comparison result of the operating power of the load 400 and the total output power of the power system, which can reduce the frequency of use of the bypass switch 200, reduce the consumption of the bypass switch 200, and increase the service life of the bypass switch 200.

[0126] For better understanding, two more specific examples are given to illustrate the control method of the power system of the present application.

[0127] Example 1: The power system detects the voltage of the external power network 300 in real time. When it is determined that the external power network 300 is normal, the output voltage of each inverter is controlled to be synchronized with the voltage phase of the external power network 300. If the power system is in a standby state or an initial startup state at this time, the first inverter sends a first control instruction to the bypass switch 200 to control the bypass switch 200 to be turned on. At this time, the voltage difference across each switching switch 120 is almost zero. After the bypass switch 200 is turned on, the first inverter controls its own switching switch 120 to be turned on, and sends a second control instruction to each second inverter to make the second inverter The first inverter controls the corresponding switch 120 to turn on, and the impact current generated when each switch 120 is closed is zero. After that, the first inverter disconnects the bypass switch 200, realizing the safe grid-connected operation of the power system; if the power system is in an off-grid operation state at this time, the first inverter controls its own switch 120 to turn on, and sends a second control instruction to each second inverter, so that the second inverter controls the corresponding switch 120 to turn on. In this case, the impact current generated by the switch 120 is usually less than the short-time withstand current of the switch 120, and the bypass switch 200 is always in the disconnected state. In addition, the power system determines whether it needs to control the bypass switch 200 to close when it is about to be connected to the grid according to its own operating state, which reduces the action frequency of the bypass switch 200 and improves the service life of the bypass switch 200.

[0128] Example 2: The power system detects the voltage of the external power network 300 in real time. When it is determined that the external power network 300 is normal, the output voltage of each inverter is controlled to be synchronized with the voltage phase of the external power network 300 to meet the grid-connected operation conditions. When the grid-connected operation conditions are met, the power system can first operate independently by means of a DC black start, supply power to the load 400, and detect the operating power of the load 400.

[0129] When the operating power of the load 400 is less than the total output power of multiple inverters in the power system, and the operating power of the load 400 is greater than the output power of a single inverter, the first inverter controls its own switching switch 120 to turn on, and sends a second control instruction to each second inverter, so that the second inverter controls the corresponding switching switch 120 to turn on, and the bypass switch 200 is always in the off state. In this way, unnecessary switching actions of the bypass switch 200 can be reduced and the service life of the bypass switch 200 can be improved.

[0130] When the operating power of the load 400 is less than the total output power of multiple inverters in the power system, and the operating power of the load 400 is less than the output power of a single inverter, the first inverter controls its own switch 120 to turn on, and sends a second control instruction to each second inverter, so that the second inverter controls the corresponding switch 120 to turn on, and the bypass switch 200 is always in the off state. In addition, in this case, the external power network 300 is normal and it can be considered that the grid connection conditions are met. Since the power of the load 400 is small, even if the voltage synchronization of the inverter and the external power network 300 is not performed, seamless switching from off-grid to grid connection can be achieved.

[0131] When the operating power of the load 400 is greater than or equal to the total output power of multiple inverters in the power system, the first inverter sends a first control instruction to the bypass switch 200 to control the bypass switch 200 to turn on. After the bypass switch 200 is turned on, the first inverter controls its own switching switch 120 to turn on, and sends a second control instruction to each second inverter to make the second inverter control the corresponding switching switch 120 to turn on. After that, the first inverter disconnects the bypass switch 200.

[0132] In one embodiment, Figure 7 As shown, the present application also provides an inverter. The inverter includes an inverter circuit 110, a switch 120, a first port 130 and a second port 140, the first end b1 of the switch 120 is connected to the output end a of the inverter circuit 110 and the second port 140, and the second end b2 of the switch 120 is connected to the first port 130. The first port 130 is used to connect the first end c1 of the bypass switch and the external power network, and the second port 140 is used to connect the second end c2 of the bypass switch and the load.

[0133] Alternatively, if Figure 8 As shown, the inverter includes an inverter circuit 110, a switch 120, a first port 130, a second port 140, and a bypass switch 200. The first end b1 of the switch 120 is respectively connected to the output end a of the inverter circuit 110, the second port 140, and the first end c1 of the bypass switch, and the second end b2 of the switch 120 is respectively connected to the first port 130 and the second end c2 of the bypass switch 200. The first port 130 is used to connect the first end c1 of the bypass switch and the external power network, and the second port 140 is used to connect the second end c2 of the bypass switch and the load.

[0134] The inverter is configured to: when the grid-connected operation conditions are met, first control the bypass switch to be turned on, and then control the transfer switch to be turned on.

[0135] It can be understood that when it is detected that the inverter meets the grid-connected operation conditions, the inverter can first control the bypass switch 200 to be turned on, so that the voltage difference across the switching switch 120 inside the inverter is zero. Thereafter, the inverter controls the switching switch 120 to be turned on, and the current impact generated when the switching switch 120 is turned on is very small.

[0136] Optionally, the inverter may be configured to: control the switching switch to be turned on based on the received second control instruction, wherein the second control instruction is generated when the bypass switch is turned on.

[0137] It can be understood that the inverter can receive a second control instruction sent by other devices (such as a controller or other inverters) after the bypass switch 200 is turned on, and control the switching switch 120 to be turned on according to the second control instruction.

[0138] In one embodiment, the present application also provides a method for controlling a bypass switch. Figure 1 or Figure 2 In the structure shown, the first end c1 of the bypass switch 200 is connected to the first port 130 of the inverter 100 and the external power network 300, respectively, and the second end c2 of the bypass switch 200 is connected to the second port 140 of the inverter 100 and the load 400, respectively. The inverter 100 includes an inverter circuit 110 and a switch 120, the first end b1 of the switch 120 is connected to the output end a of the inverter circuit 110 and the second port 140, and the second end b1 of the switch 120 is connected to the first port 130.

[0139] The method for controlling a bypass switch includes the step of controlling the bypass switch to be turned on based on a received first control instruction.

[0140] The first control instruction is generated when the inverter meets the grid-connected operation conditions and before the switching switch is turned on.

[0141] It can be understood that when the inverter 100 meets the grid-connected operation conditions, before the switching switch 120 is turned on, the bypass switch 200 can be controlled to be turned on according to the first control instruction sent by the inverter 100, or the first control instruction sent by a controller independent of the inverter 100 in the power system. In this way, the voltage difference across the switching switch 120 in the inverter 100 can be made zero, thereby reducing the current impact when the switching switch 120 is turned on.

[0142] In one embodiment, the present application further provides a bypass switch, which can be applied to the bypass switch control method provided in any of the above embodiments. The bypass switch can be a relay, and the off-time of the bypass switch can be less than or equal to 20ms.

[0143] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0144] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A power system, characterized in that: The invention comprises a plurality of inverters and bypass switches; the inverter comprises an inverter circuit, a switch, a first port and a second port, the first end of the switch is connected to the output end of the inverter circuit and the second port, and the second end of the switch is connected to the first port; Each of the first ports is used to connect a first end of the bypass switch and an external power network, and each of the second ports is used to connect a second end of the bypass switch and a load; The power system is configured as follows: When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

2. The power system according to claim 1, characterized in that: Each of the inverters includes a first inverter; The first inverter executes the steps of first controlling the bypass switch to be turned on and then controlling each of the switching switches to be turned on when the grid-connected operation conditions are met.

3. The power system according to claim 2, characterized in that: Each of the inverters includes a second inverter; the second inverter is an inverter other than the first inverter in each of the inverters; The first inverter is specifically configured as follows: When it is detected that the grid-connected operation condition is met, a first control instruction is sent to the bypass switch, so that the bypass switch is turned on after receiving the first control instruction; After the bypass switch is turned on, the switching switch in the first inverter is controlled to be turned on, and a second control instruction for the switching switch is sent to the second inverter, so that the second inverter controls the corresponding switching switch to be turned on after receiving the second control instruction.

4. The power system according to claim 3, characterized in that: The first inverter is further configured as: In response to the bypass switch and each of the switching switches being turned on, when the off time of the bypass switch is greater than or equal to the preset time, a third control instruction is sent to the bypass switch to turn off the bypass switch.

5. The power system according to claim 2, characterized in that: The first inverter is specifically configured as follows: When it is detected that the grid-connected operation conditions are met and the current operation state is not an off-grid operation state, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

6. The power system according to claim 1, characterized in that: The power system is also configured to: When it is detected that the grid-connected operation condition is met and the current operation state is an off-grid operation state, each of the switching switches is controlled to be turned on.

7. The power system according to claim 1, characterized in that: The power system is also configured to: Obtaining the operating power of the load; When it is detected that the grid-connected operation condition is met and the total output power of the plurality of inverters is greater than or equal to the operation power, each of the switching switches is controlled to be turned on.

8. The power system according to claim 1, characterized in that: The power system is also configured to: Obtaining the operating power of the load; When it is detected that the grid-connected operation conditions are met and the total output power of the multiple inverters is less than the operating power, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

9. The power system according to claim 1, characterized in that: The power system is also configured to: When the external power network is abnormal and the current operating state of the power system is a grid-connected operating state, each of the switching switches is controlled to be disconnected.

10. The power system according to claim 1, characterized in that: Each of the inverters is configured as: When the grid-connected operation conditions are met, the corresponding bypass switches are first controlled to be turned on, and then the corresponding switching switches are controlled to be turned on.

11. A control method for an electric power system, characterized in that: The power system includes a plurality of inverters and a bypass switch; the inverter includes an inverter circuit, a switch, a first port and a second port, the first end of the switch is connected to the output end of the inverter circuit and the second port, and the second end of the switch is connected to the first port; Each of the first ports is used to connect the first end of the bypass switch and the external power network, and each of the second ports is used to connect the first end of the bypass switch and the load; the method includes: When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

12. The method according to claim 11, characterized in that Each of the inverters includes a first inverter and at least one second inverter; When the grid-connected operation condition is met, firstly controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, comprises: When it is detected that the grid-connected operation condition is met, a first control instruction is sent to the bypass switch, so that the bypass switch is turned on after receiving the first control instruction; After the bypass switch is turned on, the switching switch in the first inverter is controlled to be turned on, and a second control instruction for the switching switch is sent to the second inverter, so that the second inverter controls the corresponding switching switch to be turned on after receiving the second control instruction.

13. The method according to claim 11, characterized in that When the grid-connected operation condition is met, firstly controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, comprises: When it is detected that the grid-connected operation conditions are met and the current operation state is not an off-grid operation state, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

14. The method according to claim 11, characterized in that When the grid-connected operation condition is met, firstly controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, further comprising: When it is detected that the grid-connected operation condition is met and the current operation state is an off-grid operation state, each of the switching switches is controlled to be turned on.

15. The method according to claim 11, characterized in that When the grid-connected operation condition is met, firstly controlling the bypass switch to be turned on, and then controlling each of the switching switches to be turned on, comprises: Get the operating power of the load; When the grid-connected operation condition is met and the total output power of the plurality of inverters is greater than or equal to the operating power, controlling each of the switching switches to be turned on; When it is detected that the grid-connected operation conditions are met and the total output power of the multiple inverters is less than the operating power, the bypass switch is first controlled to be turned on, and then each of the switching switches is controlled to be turned on.

16. An inverter, characterized in that: The invention comprises an inverter circuit, a switch, a first port and a second port, wherein the first end of the switch is connected to the output end of the inverter circuit and the second port, and the second end of the switch is connected to the first port; the first port is used to connect the first end of the bypass switch and the external power network, and the second port is used to connect the second end of the bypass switch and the load; The inverter is configured as: When the grid-connected operation conditions are met, the bypass switch is first controlled to be turned on, and then the switching switch is controlled to be turned on; or, Based on the received second control instruction, the switching switch is controlled to be turned on; wherein the second control instruction is generated when the bypass switch is turned on.

17. A method for controlling a bypass switch, characterized in that: The first end of the bypass switch is used to connect to the first port of the inverter and the external power network respectively, and the second end of the bypass switch is used to connect to the load and the second port of the inverter; wherein the inverter further comprises an inverter circuit and a switch, the first end of the switch is connected to the output end of the inverter circuit and the second port, and the second end of the switch is connected to the first port; The method comprises: Based on the received first control instruction, the bypass switch is controlled to be turned on; the first control instruction is generated when the inverter meets the grid-connected operation conditions and before the switching switch is turned on.

18. A bypass switch, characterized in that: Applicable to the control method as claimed in claim 17.

Citation Information

Cited By

  • Grouping method of inversion equipment and distributed power generation system

    CN122600255A

  • Power system, control method therefor, power converter, bypass switch and control method therefor

    WO2026021334A1