By adopting the parallel control method in the inverter system and utilizing the parallel bus networking between the master and slave machines to detect the grid status in real time and switch the working mode, it solves the problem when the inverter switches between off-grid and grid-connected states. eliminate overload and short-circuit problems, improving system reliability and efficiency.
Patent Information
- Application Number
- CN202410829168.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-01
AI Technical Summary
Existing inverters are prone to overload or short circuit problems when switching between off-grid and grid-connected states. It is especially difficult to ensure safety and stability when multiple energy storage inverters operate at the same time.
An inverter parallel control method is adopted. By selecting any inverter as the host and the remaining inverters as slaves, and using the parallel bus to form a network, the host detects the status of the power grid in real time and switches to unified control when the power grid is abnormal. Off-grid working mode, when normal operation is restored, it will be switched to grid-connected working mode to avoid overload and short circuit.
It effectively avoids the overload and short-circuit problems of the inverter during state switching, improves the reliability and efficiency of the system, simplifies the power supply structure, and ensures stable power supply to the load.
Smart Images

Figure CN118739425A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power electronics technology, and in particular to an inverter parallel control method, device, equipment and storage medium. Background Art
[0002] In recent years, the public's demand for energy has been increasing. The new energy industry has driven the rapid development of photovoltaic power generation and its energy storage technology. The installed capacity has increased year by year, and the application scenarios have become more and more extensive. In order to adapt to the various application needs and scenarios of user families, the inverter installation system solution is no longer single, and various highly adaptable improvement solutions have been derived. Among them, the full load solution is Figure 1 As shown: when the power grid is normal, the energy storage inverter will control the switching device to switch to point A, and the load in the system is powered by the energy storage inverter and the power grid together. The energy storage inverter controls the system energy to achieve economic maximization. When the power grid fails, the energy storage inverter will control the switching device to switch to point B, and the load in the system is powered by the energy storage inverter. When the emergency power supply of the load is met, the energy storage inverter still controls the system energy to achieve economic maximization.
[0003] As the number of household loads or grid-connected inverters increases, the capacity of the energy storage inverter also needs to be increased; if the cost of replacing a larger capacity device is high, it will be more economical to connect a device of the same model at this time; however, the parallel connection of energy storage inverters will bring new problems, especially such as Figure 1 As shown in the figure, the energy storage inverter with a single-port output of the switching device: when the power grid changes from a normal state to an abnormal state, it is necessary to ensure that all devices can output off-grid after the switching device switches from point A to point B; in order to be able to supply power to large loads normally, it is necessary to ensure that all energy storage inverters output power off-grid at the same time to prevent overload problems caused by insufficient power of one device; when the power grid changes from an abnormal state to a normal state, in order to prevent short circuits, it is necessary to ensure that all devices stop outputting off-grid before the switching device switches from point B to point A. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the problem of overload or short circuit that easily occurs when the inverter switches between off-grid and grid-connected states in the prior art, thereby providing an inverter parallel control method, device, equipment and storage medium.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] In a first aspect, the present invention provides an inverter parallel control method, which is applied to the situation where at least two inverters supply power to a load, and the method includes: selecting any one inverter as an inverter master and the remaining inverters as inverter slaves; networking all the inverters through a parallel bus; after the inverter is normally connected to the grid, the inverter master detects the grid status in real time, and when the grid is abnormal, the inverter master and the inverter slave stop the grid-connected output at the same time, the inverter switches to an off-grid working mode, and the inverter master and the inverter slave supply power to the load; when the inverter switches to the off-grid working mode, the inverter master detects the grid status in real time, and when the grid changes from an abnormal state to a normal state, the inverter master and the inverter slave stop the off-grid output at the same time, the inverter switches to the grid-connected working mode, and the inverter master, the inverter slave and the grid supply power to the load.
[0007] The inverter parallel control method provided by the present invention is that the inverter host can detect the power grid status in real time. When the power grid is abnormal, the inverter host controls itself and the inverter slave lines to stop the grid-connected output, and then switches to the off-grid working mode; when the power grid returns to normal, the inverter host controls itself and the inverter slaves to first stop the off-grid output, and then switch to the grid-connected working mode. This can avoid the situation where the off-grid output is not stopped when the inverter is switched to the grid-connected working mode, resulting in a short circuit between multiple inverters, thereby improving the reliability of the inverter.
[0008] The inverter host of the present invention can flexibly switch the working state of itself and multiple inverter slaves according to the state of the power grid, so that all inverters are in an off-grid output state or a grid-connected output state at the same time, avoiding the situation where an inverter is insufficient in power and causes an overload fault. Since one inverter host can control multiple inverter slaves at the same time, the power supply system structure is simplified and the working efficiency of the system is improved.
[0009] In an optional implementation, each inverter slave is connected to the inverter master via a set of parallel buses; the inverter master is connected to the power grid and the load via a switching device.
[0010] In an optional embodiment, the process of the inverter host and the inverter slave simultaneously stopping the grid-connected output includes: the inverter host controls the parallel bus in the parallel bus to switch to a waiting-for-conversion state; when the inverter host and the inverter slave both detect the waiting-for-conversion state signal, the inverter host and the inverter slave simultaneously stop the grid-connected output.
[0011] In an optional embodiment, the process of switching the inverter to an off-grid operating mode includes: the inverter host disconnects the power grid and the load by controlling the switching state of the switching device; after the inverter host controls the parallel bus in the parallel bus to switch to an off-grid allowing state, the inverter switches to the off-grid operating mode.
[0012] In an optional embodiment, the process of the inverter host and the inverter slave simultaneously stopping off-grid output includes: the inverter host controls the parallel bus in the parallel bus to switch to a grid-connected state; when the inverter host and the inverter slave both detect a grid-connected state signal, the inverter host and the inverter slave simultaneously stop off-grid output.
[0013] In an optional embodiment, the process of switching the inverter to the grid-connected working mode includes: the inverter host connects the power grid and the load by controlling the switching state of the switching device; after the inverter host and the inverter slave simultaneously perform grid-connected self-test startup, the inverter switches to the grid-connected working mode.
[0014] In an optional embodiment, when the inverter is in standby working mode and the power grid is normal, the process of the inverter being connected to the grid normally includes: after the inverter host controls the switching state of the switching device to connect the power grid to the load, the inverter host and the inverter slave simultaneously connect to the grid for output, and the inverter host, the inverter slave and the power grid supply power to the load.
[0015] In an optional implementation, when the inverter is in a standby working mode and the power grid is abnormal, the method further includes: the inverter switches to an off-grid working mode, the inverter host and the inverter slave simultaneously start off-grid output, and the inverter host and the inverter slave supply power to the load.
[0016] In an optional embodiment, the process of switching the inverter to an off-grid operating mode includes: the inverter host disconnects the power grid and the load by controlling the switching state of the switching device; after the inverter host and the inverter slave simultaneously perform off-grid self-test startup, the inverter switches to the off-grid operating mode.
[0017] In a second aspect, the present invention provides an inverter parallel control device, comprising: a selection module, used to select any one inverter as the inverter host and the remaining inverters as inverter slaves; a networking module, used to network all the inverters through a parallel bus; an off-grid control module, used to enable the inverter host to detect the grid status in real time after the inverter is normally connected to the grid. When the grid is abnormal, the inverter host and the inverter slave simultaneously stop the grid-connected output, the inverter switches to the off-grid working mode, and the inverter host and the inverter slave supply power to the load; a grid-connected control module, used to enable the inverter host to detect the grid status in real time when the inverter switches to the off-grid working mode. When the grid changes from an abnormal state to a normal state, the inverter host and the inverter slave simultaneously stop the off-grid output, the inverter switches to the grid-connected working mode, and the inverter host, the inverter slave and the grid supply power to the load.
[0018] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the inverter parallel control method of the first aspect of claim by executing the computer instructions.
[0019] In a fourth aspect, the present invention provides a computer-readable storage medium, characterized in that computer instructions are stored on the computer-readable storage medium, and the computer instructions are used to enable a computer to execute the inverter parallel control method of the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a structural schematic diagram of an inverter installation system of the related technology;
[0022] Figure 2 is a flow chart of an inverter parallel control method according to an embodiment of the present invention;
[0023] Figure 3 is a structural schematic diagram of an inverter system according to an embodiment of the present invention;
[0024] Figure 4 is a schematic diagram of a duty cycle of a parallel bus state according to an embodiment of the present invention;
[0025] Figure 5 is a schematic diagram of a specific flow chart of an inverter parallel control method according to an embodiment of the present invention;
[0026] Figure 6 is a structural block diagram of an inverter parallel control device according to an embodiment of the present invention;
[0027] Figure 7 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0030] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0031] In related technologies, such as Figure 1 As shown, when the power grid is normal, the inverter will control the switching device to switch to point A, and when the power grid is abnormal, the inverter will control the switching device to switch to point B. In order to increase the capacity of the inverter, multiple inverters are usually connected in parallel to supply power to large loads. In order to avoid overload, it is necessary to switch from point A to point B before switching off-grid output; in order to avoid short circuit, it is necessary to stop off-grid output before switching from point B to point A. Figure 1 The structure in the embodiment is difficult to meet the condition of multiple energy storage inverters operating at the same time, which may easily lead to a short circuit. To solve the above problem, this embodiment provides an inverter parallel control method, which is applied to the case where at least two inverters supply power to the load, such as Figure 2 As shown, the method includes:
[0032] S1: Select any one inverter as the inverter master, and the remaining inverters as inverter slaves.
[0033] S2: Network all inverters through the parallel bus.
[0034] Specifically, Figure 3 As shown, this embodiment proposes an inverter system structure, including multiple inverters, and after selecting any one inverter as the inverter master and the remaining inverters as slaves, each inverter slave is connected to the inverter master through a set of parallel buses, and the inverter master is connected to the power grid and the load through a switching device. The inverter master and slaves will be connected and networked through the CAN communication bus in the parallel bus to distinguish the operating data of the master and slaves to prevent information confusion.
[0035] S3: After the inverter is connected to the grid normally, the inverter master detects the grid status in real time. When the grid is abnormal, the inverter master and the inverter slave stop the grid-connected output at the same time, and the inverter switches to the off-grid working mode. The inverter master and the inverter slave supply power to the load.
[0036] Specifically, the inverter host determines the status of the power grid in real time. When the power grid fails, the inverter host outputs an off-grid bus signal to all inverter slaves through the parallel bus. When the inverter host and all inverter slaves detect the off-grid bus signal, the inverter host and all inverter slaves stop the grid-connected output at the same time. After that, the inverter host disconnects the load from the power grid by controlling the switching state of the switching device. All inverters switch to the off-grid working mode at the same time and supply power to the load together, avoiding the problem of overload failure caused by insufficient power provided by one inverter when the load is large.
[0037] S4: When the inverter switches to the off-grid working mode, the inverter host detects the grid status in real time. When the grid changes from an abnormal state to a normal state, the inverter host and the inverter slave stop the off-grid output at the same time, and the inverter switches to the grid-connected working mode. The inverter host, the inverter slave and the grid supply power to the load.
[0038] Specifically, the inverter host determines the status of the power grid in real time. When the power grid resumes normal power supply, the inverter host outputs a grid-connected bus signal to all inverter slaves through the parallel bus. When the inverter host and all inverter slaves detect the grid-connected bus signal, the inverter host and all inverter slaves stop off-grid output at the same time. After that, the inverter host reconnects the load to the power grid by controlling the switching state of the switching device. After all inverters are switched to the grid-connected working mode at the same time and complete the grid-connected self-test, the inverter and the power grid jointly supply power to the load.
[0039] The inverter parallel control method provided by the present invention is that the inverter host can detect the state of the power grid in real time. When the power grid is abnormal, the inverter host controls itself and the inverter slave to stop the grid-connected output first, and then switch to the off-grid working mode; when the power grid returns to normal, the inverter host controls itself and the inverter slave to stop the off-grid output first, and then switch to the grid-connected working mode, which can avoid the situation that the off-grid output is not stopped when the inverter switches to the grid-connected working mode, resulting in a short circuit between multiple inverters, thereby improving the reliability of the inverter. The inverter host of the present invention can flexibly switch the working state of itself and multiple inverter slaves at the same time according to the state of the power grid, so that all inverters are in the off-grid output state or the grid-connected output state at the same time, avoiding the situation that an inverter is insufficient in power and causes an overload fault. Since an inverter host can control multiple inverter slaves at the same time, the power supply system structure is simplified and the working efficiency of the system is improved.
[0040] In some optional embodiments, the process of the inverter host and the inverter slave simultaneously stopping the grid-connected output includes: the inverter host controls the parallel bus in the parallel bus to switch to a waiting-for-conversion state; when the inverter host and the inverter slave both detect the waiting-for-conversion state signal, the inverter host and the inverter slave simultaneously stop the grid-connected output.
[0041] Specifically, refer to Figure 3 , after the inverter is normally connected to the grid, the switch in the switching device is at point A, the grid is connected to the inverter host and the load, and the inverter host detects the grid status in real time by detecting the voltage of the port connected to the grid. When the detected voltage is not within the preset normal voltage range, the inverter host determines that the grid is abnormal. At this time, the inverter host will control the GPIO parallel bus in the parallel bus to switch to the OngridToOffgrid state. When both the inverter host and the inverter slave detect that the state on the GPIO parallel bus is OngridToOffgrid, the inverter host and the inverter slave will stop the grid-connected output at the same time.
[0042] It should be noted that the inverter host can also determine whether the power grid is abnormal by judging whether the detected current is within a preset normal current range and whether the detected frequency is within a preset normal frequency range. The specific judgment means are not limited here.
[0043] In some optional embodiments, the process of switching the inverter to an off-grid operating mode includes: the inverter host disconnects the power grid and the load by controlling the switching state of the switching device; after the inverter host controls the parallel bus in the parallel bus to switch to an off-grid allowing state, the inverter switches to the off-grid operating mode.
[0044] Specifically, refer to Figure 3 When both the inverter host and the inverter slave stop grid-connected output, the inverter host will simultaneously control the switch in the switching device to switch to point B, so that the grid is disconnected from the inverter host port and the load. The inverter host obtains the switching status of the switching device in real time. When the feedback information of the switching device is received, indicating that the switching device has confirmed the switch to point B, the inverter host controls the GPIO parallel bus to switch to the Offgrid state. When both the inverter host and the inverter slave detect that the state on the GPIO parallel bus is Offgrid, it means that off-grid output is allowed at this time. The inverter host and the inverter slave switch to the off-grid working mode at the same time and start to supply power to the load together.
[0045] In some optional embodiments, the process of the inverter host and the inverter slave simultaneously stopping off-grid output includes: the inverter host controls the parallel bus in the parallel bus to switch to a grid-connected state; when the inverter host and the inverter slave both detect the grid-connected state signal, the inverter host and the inverter slave simultaneously stop off-grid output.
[0046] Specifically, refer to Figure 3When the inverter is off-grid, the switch in the switching device is at point B, and the grid is disconnected from the inverter host and the load. The inverter host can determine that the grid has returned to normal by receiving the signal that the grid has returned to normal manually input by the operator or sent remotely. At this time, the inverter host will control the GPIO parallel bus in the parallel bus to switch to the Ongrid state; when the inverter host and the inverter slave both detect that the state on the GPIO parallel bus is Ongrid, the inverter host and the inverter slave will stop off-grid output at the same time.
[0047] In some optional embodiments, the process of switching the inverter to the grid-connected working mode includes: the inverter host connects the power grid and the load by controlling the switching state of the switching device; after the inverter host and the inverter slave simultaneously perform grid-connected self-test startup, the inverter switches to the grid-connected working mode.
[0048] Specifically, refer to Figure 3 , when both the inverter host and the inverter slave stop off-grid output, the inverter host will simultaneously control the switch in the switching device to switch to point A, so that the grid is connected to the inverter host port and the load. The inverter host obtains the switching status of the switching device in real time. When receiving the feedback information from the switching device, indicating that the switching device has confirmed the switch to point A, the inverter host informs each inverter slave of the state of the switching device switching to point A through the CAN communication in the parallel bus. When both the inverter host and the inverter slave receive the information that the switching device switches to point A, it means that grid-connected output is allowed at this time. The inverter host and the inverter slave simultaneously switch to the self-test working mode and perform grid-connected self-test. After the self-test is completed, the inverter master and slave and the grid start to supply power to the load together.
[0049] In some optional embodiments, when the inverter is in standby working mode and the power grid is normal, the process of the inverter being connected to the grid normally includes: after the inverter host controls the switching state of the switching device to connect the power grid to the load, the inverter host and the inverter slave simultaneously connect to the grid for output, and the inverter host, the inverter slave and the power grid supply power to the load.
[0050] Specifically, refer to Figure 3 , all inverters are in standby working mode after networking, and the inverter host detects the grid status in real time. When the grid is normal, all inverters need to be connected to the grid. At this time, the inverter host sends a control signal through the communication line connected to the switching device, so that the switch in the switching device is switched to point A, and the switching status of the switching device is obtained in real time. When the inverter host receives feedback information from the switching device, indicating that the switching device has confirmed the switch to point A, the inverter host will set its port connected to the GPIO parallel bus in the parallel bus to a high level, and at the same time inform each inverter slave of the state of the switching device switching to point A through the CAN communication in the parallel bus.
[0051] Specifically, refer to Figure 3 After receiving the information that the switching device has switched to point A, each inverter slave will set its port connected to the GPIO parallel bus in the parallel bus to a high level. Since both ends of the GPIO parallel bus are at a high level, the state of the parallel bus will become a high level at this time. After the inverter master detects that the parallel bus has become a high level, it will control the GPIO parallel bus to switch to the Ongrid state. When both the inverter master and the inverter slave detect that the state on the GPIO parallel bus is Ongrid, it means that grid-connected output is allowed at this time. The inverter master and the inverter slave switch to the grid-connected working mode at the same time, and start to supply power to the load together with the power grid.
[0052] In some optional embodiments, when all inverters are in standby working mode and the power grid is abnormal, the method further includes: the inverter switches to off-grid working mode, the inverter host and the inverter slave simultaneously start off-grid output, and the inverter host and the inverter slave supply power to the load. The process of switching the inverter to off-grid working mode includes: the inverter host disconnects the power grid from the load by controlling the switch state of the switching device; after the inverter host and the inverter slave simultaneously perform off-grid self-test startup, the inverter switches to off-grid working mode.
[0053] Specifically, refer to Figure 3 , all inverters are in standby working mode after networking, and the inverter host detects the grid status in real time. When the grid is abnormal, all inverters must be started off-grid. At this time, the inverter host sends a control signal through the communication line connected to the switching device, so that the switch in the switching device is switched to point B, and the switching status of the switching device is obtained in real time. When the inverter host receives feedback information from the switching device, indicating that the switching device has confirmed the switch to point B, the inverter host will set its port connected to the GPIO parallel bus in the parallel bus to a low level, and at the same time inform each inverter slave of the state of the switching device switching to point B through the CAN communication in the parallel bus.
[0054] Specifically, refer to Figure 3, after receiving the information that the switching device has switched to point A, each inverter slave will set its port connected to the GPIO parallel bus in the parallel bus to a low level. At this time, each inverter will perform off-grid self-test startup. When the inverter master and inverter slave have completed the self-test startup, they will set their ports connected to the GPIO parallel bus in the parallel bus to a high level. Since both ends of the GPIO parallel bus are high, the state of the parallel bus will become high at this time. After the inverter master detects that the parallel bus has become a high level, it will control the GPIO parallel bus to switch to Offgrid; when the inverter master and inverter slave both detect that the state on the GPIO parallel bus is Offgrid, it means that off-grid output is allowed at this time. The inverter master and inverter slave switch to off-grid working mode at the same time and start to supply power to the load together.
[0055] For example, the GPIO parallel bus state duty cycle is as follows: Figure 4 As shown, in one cycle, when the duty cycle is 1, it indicates that the parallel bus is in a high level state; when the duty cycle is 0, it indicates that the parallel bus is in a low level state. When 0.6≤duty cycle<0.8, it indicates that the GPIO parallel bus is in the Offgrid state; when 0.4≤duty cycle<0.6, it indicates that the GPIO parallel bus is in the OngridToOffgrid state; when 0.2≤duty cycle<0.4, it indicates that the GPIO parallel bus is in the Offgrid state. When 0.8≤duty cycle<1 or 0<duty cycle<0.2, the duty cycle state is invalid.
[0056] Specifically, if Figure 5 As shown in the figure, the inverter parallel process is as follows:
[0057] (1) When all inverters are in standby mode, the inverter host checks the grid status.
[0058] (2) When the power grid is normal in the standby state, the inverter host controls the switch in the switching device to switch to point A.
[0059] (3) After the inverter master and inverter slave jointly perform grid-connected self-check startup, they begin grid-connected operation. When the grid is abnormal, the inverter master controls the switch in the switching device to switch to point B for off-grid operation.
[0060] (4) When the power grid is abnormal in the standby state, the inverter host controls the switch in the switching device to switch to point B.
[0061] (5) After the inverter master and the inverter slave jointly perform off-grid self-check startup, they begin off-grid operation. When the power grid returns to normal, the inverter master controls the switch in the switching device to switch to point A, and then enters step (3).
[0062] In this embodiment, an inverter parallel control device is also provided, which is used to implement the above embodiment and any optional implementation mode, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0063] This embodiment provides an inverter parallel control device, such as Figure 6 As shown, including:
[0064] The selection module 601 is used to select any one inverter as the inverter master and the remaining inverters as the inverter slaves.
[0065] The networking module 602 is used to network all the inverters through a parallel bus.
[0066] The off-grid control module 603 is used for the inverter host to detect the grid status in real time after the inverter is normally connected to the grid. When the grid is abnormal, the inverter host and the inverter slave simultaneously stop the grid-connected output, and the inverter switches to the off-grid working mode. The inverter host and the inverter slave supply power to the load.
[0067] The grid-connected control module 604 is used for the inverter host to detect the grid status in real time when the inverter switches to the off-grid working mode. When the grid changes from an abnormal state to a normal state, the inverter host and the inverter slave simultaneously stop the off-grid output, and the inverter switches to the grid-connected working mode. The inverter host, the inverter slave and the grid supply power to the load.
[0068] The inverter parallel control device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC circuit, a processor and a memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0069] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0070] The embodiment of the present invention also provides a computer device having the above Figure 6 The inverter parallel control device shown.
[0071] See also Figure 7 , Figure 7 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 7As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 7 A processor 10 is taken as an example.
[0072] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0073] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0074] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the use of a computer device based on the presentation of a small program landing page, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0075] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0076] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0077] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0078] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0079] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. An inverter parallel control method, characterized in that: Applicable to the case where at least two inverters supply power to a load, the method comprises: Select any inverter as the inverter master, and the remaining inverters as inverter slaves; Network all inverters through parallel bus; After the inverter is normally connected to the grid, the inverter host detects the grid status in real time. When the grid is abnormal, the inverter host and the inverter slave simultaneously stop the grid-connected output, the inverter switches to the off-grid working mode, and the inverter host and the inverter slave supply power to the load; When the inverter switches to the off-grid working mode, the inverter host detects the grid status in real time. When the grid changes from an abnormal state to a normal state, the inverter host and the inverter slave simultaneously stop the off-grid output, and the inverter switches to the grid-connected working mode. The inverter host, the inverter slave and the grid supply power to the load.
2. The inverter parallel control method according to claim 1, characterized in that: Each of the inverter slaves is connected to the inverter master via a set of parallel buses; The inverter host is connected to the power grid and the load through a switching device.
3. The inverter parallel control method according to claim 2, characterized in that: The process of the inverter master and the inverter slave simultaneously stopping grid-connected output includes: The inverter host controls the parallel bus in the parallel bus to switch to a state to be converted; When both the inverter master and the inverter slave detect the to-be-converted state signal, the inverter master and the inverter slave stop grid-connected output simultaneously.
4. The inverter parallel control method according to claim 3, characterized in that: The process of switching the inverter to the off-grid working mode includes: The inverter host disconnects the power grid from the load by controlling the switch state of the switching device; After the inverter host controls the parallel bus in the parallel bus to switch to the off-grid allowed state, the inverter switches to the off-grid working mode.
5. The inverter parallel control method according to claim 2, characterized in that: The process of the inverter master and the inverter slave simultaneously stopping off-grid output includes: The inverter host controls the parallel bus in the parallel bus to switch to a grid-connection-allowed state; When the inverter master and the inverter slave both detect a grid-connection permission signal, the inverter master and the inverter slave simultaneously stop off-grid output.
6. The inverter parallel control method according to claim 2, characterized in that: The process of switching the inverter to the grid-connected working mode includes: The inverter host connects the power grid to the load by controlling the switch state of the switching device; The process of switching the inverter to the grid-connected working mode after the inverter master and the inverter slave simultaneously perform grid-connected self-test startup.
7. The inverter parallel control method according to claim 2, characterized in that: When the inverter is in a standby working mode and the power grid is normal, the process of the inverter being normally connected to the grid includes: After the inverter host controls the switching state of the switching device to connect the power grid to the load, the inverter host and the inverter slave simultaneously perform grid-connected output, and the inverter host, the inverter slave and the power grid supply power to the load.
8. The inverter parallel control method according to claim 2, characterized in that: When the inverter is in a standby working mode and the power grid is abnormal, the method further includes: The inverter switches to an off-grid working mode, the inverter master and the inverter slave simultaneously start off-grid output, and the inverter master and the inverter slave supply power to the load.
9. The inverter parallel control method according to claim 8, characterized in that: The process of switching the inverter to the off-grid working mode includes: The inverter host disconnects the power grid from the load by controlling the switch state of the switching device; After the inverter master and the inverter slave simultaneously perform off-grid self-check startup, the inverter switches to an off-grid working mode.
10. An inverter parallel control device, characterized in that: include: A selection module is used to select any inverter as the inverter master and the remaining inverters as inverter slaves; Networking module, used to network all inverters through parallel bus; An off-grid control module, which is used for the inverter host to detect the grid status in real time after the inverter is normally connected to the grid. When the grid is abnormal, the inverter host and the inverter slave simultaneously stop the grid-connected output, the inverter switches to the off-grid working mode, and the inverter host and the inverter slave supply power to the load; The grid-connected control module is used for the inverter host to detect the grid status in real time when the inverter switches to the off-grid working mode. When the grid changes from an abnormal state to a normal state, the inverter host and the inverter slave simultaneously stop the off-grid output, the inverter switches to the grid-connected working mode, and the inverter host, the inverter slave and the grid supply power to the load.
11. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the inverter parallel control method according to any one of claims 1 to 9 by executing the computer instructions.
12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the inverter parallel control method according to any one of claims 1 to 9.
Citation Information
Cited By
Multi-objective optimized off-network control method and system for network-building inverter
CN121172995A