Socket type pier connecting device and construction method thereof
By designing replaceable energy-consuming components and high-strength non-shrinkage grouting materials in the bridge pier connection device, combined with the waterproof layer, the problem of damage and corrosion of the bridge pier energy-dissipation device during earthquakes is solved, and the seismic durability and service life of the bridge are improved.
Patent Information
- Application Number
- CN202411015696.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-08
AI Technical Summary
Existing energy-dissipating devices on bridge piers are easily damaged during earthquakes and difficult to replace. Long-term exposure to air causes corrosion and reduces the durability of the bridge.
A socket-type bridge pier connection device is designed, which includes a bridge pier, a cap platform and replaceable energy-consuming components. Bellows and sleeves are installed on the outside of the socket section of the bridge pier. The energy-consuming components are equipped with a shock-absorbing layer and replaceable components. The bridge pier and High-strength non-shrinkage grouting material is filled between the supporting platforms, the waterproof layer prevents rust, and the shock-absorbing layer is fixed with high-strength adhesive.
It improves the repairability and durability of energy-consuming devices, reduces damage to bridge piers caused by earthquake shocks, prevents corrosion, extends service life, and quickly repairs structural functions.
Smart Images

Figure CN118745698A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridges, and in particular to a socket-and-spigot type pier connection device and a construction method thereof. Background Art
[0002] Current structural earthquake resistance has shifted from structural earthquake resistance and shock absorption based on life safety to rapid repair of structural functions after an earthquake, which has put forward new requirements for the durability of bridges.
[0003] Although some existing studies choose to install energy dissipation devices at the bottom of the bridge piers, when an earthquake occurs, the energy generated by the earthquake is consumed by the energy dissipation devices, for example: CN114908661A discloses a rubber energy-absorbing self-resetting socket-type bridge pier connection structure, including a bridge pier, a cap, a high-strength steel strand and an energy-absorbing component; the energy-absorbing component includes a steel sleeve sleeved on the buried section of the bridge pier, a steel plate arranged on the inner side of the socket hole and a steel bottom plate arranged at the bottom of the steel sleeve and the steel plate, and lead cores and rubber are alternately arranged between the steel plate and the steel sleeve. Existing energy dissipation devices are usually easily damaged in earthquakes and are not easy to replace; in addition, the energy dissipation device will rust when exposed to air for a long time, and the rust of the energy dissipation device will reduce the durability of the bridge, which reduces the efficiency of the bridge. Summary of the invention
[0004] In view of the deficiencies in the prior art, the object of the present invention is to provide a socket-and-spigot type pier connection device and a construction method thereof, which can improve the repairability of the energy dissipation device and solve the corrosion problem of the energy dissipation device.
[0005] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0006] In the first aspect, an embodiment of the present invention provides a socket-and-spigot type pier connection device, comprising a pier, a cap and an energy-absorbing component, wherein the cap is provided with a socket hole matched with a socket section of the pier, a bellows is installed in the socket hole, a plurality of vertical steel bars extend from the end surface of the socket section of the pier, and the vertical steel bars are plugged into the bellows; a sleeve is installed on the outer side of the socket section of the pier, the energy-absorbing component comprises a shock-absorbing layer and a replaceable energy-absorbing component, and the shock-absorbing layer is arranged between the pier and the sleeve; a plurality of grooves are provided on the inner wall of the socket hole, and replaceable energy-absorbing components are arranged in the grooves so that they are distributed between the sleeve and the cap.
[0007] As a further implementation method, the replaceable energy-consuming component includes a first base, a second base, an elastic component and a fixing member, the first base is detachably connected to the sleeve, a number of elastic components are connected between the first base and the second base, and the first base and the second base are respectively connected to a number of fixing members.
[0008] As a further implementation method, the elastic component includes a fixing rod and a spring. The first base is provided with a hole for moving the fixing rod. The spring is sleeved on the outside of the fixing rod, and one end of the spring is connected to the first pad and the other end is connected to the second pad. The fixing rod passes through the first pad and cooperates with the hole.
[0009] As a further implementation, the hole diameter is smaller than the transverse dimension of the first pad, and the hole diameter is larger than the fixing rod diameter.
[0010] As a further implementation, the fixing component includes a threaded sleeve, a screw and a positioning nut. The screw is threadably matched with the threaded sleeve, and the positioning nut is rotated to be installed along the axial direction of the screw.
[0011] As a further implementation method, the length of the vertical steel bar is shorter than the length of the corrugated pipe, and the corrugated pipe is filled with a set volume of high-strength non-shrinkage grouting material.
[0012] As a further implementation, the sleeve is formed by butting two arc-shaped plates, and a flexible gasket is provided at the butt joint of the arc-shaped plates.
[0013] As a further implementation method, a high-strength adhesive is sprayed on the surface of the socket section of the pier to fix the shock-absorbing layer; the height of the shock-absorbing layer is the same as the height of the sleeve.
[0014] As a further implementation method, a waterproof layer is further provided on the interface between the abutment and the pier, and the waterproof layer has a set slope.
[0015] In a second aspect, an embodiment of the present invention further provides a construction method of a socket-type pier connection device, comprising:
[0016] Spray high-strength adhesive on the surface of the pier socket section to bond the shock-absorbing layer;
[0017] Install the sleeve on the socket section of the pier;
[0018] Fill the corrugated pipe with a set volume of high-strength non-shrinkage grouting material, hoist the bridge pier, and install the vertical steel bars corresponding to the corrugated pipe in the cap;
[0019] Install the replaceable energy-absorbing component so that it is fixed in the groove of the base;
[0020] Install a waterproof layer between the pier and the abutment.
[0021] The beneficial effects of the present invention are as follows:
[0022] The shock-absorbing layer and replaceable energy-absorbing components of the present invention have good deformation performance and energy-absorbing capacity. When the bridge pier is impacted and vibrates due to earthquakes and other reasons, it can avoid excessive slippage between the bridge pier and the sleeve, so that the replaceable energy-absorbing components can consume energy for the bridge pier in time, avoiding damage to the bridge pier and the replaceable energy-absorbing components due to excessive instantaneous impact. At the same time, the shock-absorbing layer itself has a certain elasticity, which can further enhance the energy-absorbing capacity. The selection of the material properties of each component makes the damaged part of the energy-absorbing device under the action of an earthquake mainly concentrated on the replaceable energy-absorbing component, while the performance of other components remains intact. After the earthquake, by replacing the energy-absorbing device, the structural function can be quickly repaired, reducing the earthquake loss and improving the durability of the bridge.
[0023] The energy dissipation device of the present invention is located in the socket hole of the support platform and is waterproofed. Compared with other external energy dissipation devices, it has the characteristics of corrosion resistance, convenient installation and long service life.
[0024] The bridge pier of the present invention cooperates with the corrugated pipe in the abutment through the vertical steel bars, so that the vertical steel bars provide restoring force for the bridge pier, reduce residual deformation, and ensure that the bridge pier will not slide out under the action of an earthquake; and the corrugated pipe is filled with a set volume of high-strength non-shrinkage grouting material, that is, the method of advance grouting is adopted to tightly connect the bridge pier and the abutment. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0026] Figure 1 is a schematic diagram of a bridge pier and a cap before being plugged in according to one or more embodiments of the present invention;
[0027] Figure 2 is a schematic diagram of a bridge pier and a cap after being plugged in according to one or more embodiments of the present invention;
[0028] Figure 3 is a top view of the installation of a replaceable energy-consuming component according to one or more embodiments of the present invention;
[0029] Figure 4 is a top view of a platform according to one or more embodiments of the present invention;
[0030] Figure 5 is a schematic diagram of the structure of a replaceable energy-consuming component according to one or more embodiments of the present invention;
[0031] Among them, 1-bridge pier, 2-cap, 3-sleeve, 4-replaceable energy-absorbing component, 5-corrugated pipe, 6-vertical steel bar, 7-shock-absorbing layer, 8-fixed support, 9-first base, 10-fixed rod, 11-first pad, 12-spring, 13-second pad, 14-second base, 15-connecting support, 16-bolt, 17-threaded sleeve, 18-positioning nut, 19-screw, 20-hole, 21-waterproof layer. DETAILED DESCRIPTION
[0032] Embodiment 1:
[0033] This embodiment provides a socket-type pier connection device, such as Figure 1 and Figure 2 As shown, it includes a pier 1, a cap 2 and an energy-absorbing component. The cap 2 is provided with a socket for plugging into the pier 1. The matching section between the pier 1 and the socket is the socket section. The energy-absorbing component is installed on the socket section of the pier 1.
[0034] Taking the actual installation state of the bridge pier 1 as a reference, multiple vertical steel bars extend from the bottom surface of the bridge pier 1, and multiple corrugated pipes 5 are arranged in the socket of the cap 2. The corrugated pipes 5 correspond to the vertical steel bars 6 one by one, that is, the number and distribution form of the two are the same. When the bridge pier 1 and the cap 2 are plugged in, the vertical steel bars 6 are inserted into the corrugated pipes 5. Figure 4 As shown, a plurality of bellows 5 are distributed in the socket in an annular shape.
[0035] The length of the vertical steel bar 6 is slightly smaller than that of the corrugated pipe 5. The socket section of the pier 1 is buried in the socket hole of the abutment 2 and is connected to the corrugated pipe 5 of the abutment 2 through the vertical steel bar 6, so that the vertical steel bar 6 provides restoring force for the pier 1, reduces residual deformation, and ensures that the pier 1 will not slide out under the action of an earthquake.
[0036] Since the pier 1 is a socket-type structure, if a grouting hole is set, the grouting hole will be located in the socket section, and grouting cannot be performed through the grouting hole. Therefore, this embodiment adopts a method of advance grouting: the corrugated pipe 5 is set in the base 2, and the corrugated pipe 5 is filled with 1 / 3 volume of high-strength non-shrinkage cement slurry. During installation, under the action of gravity, the vertical steel bars 6 squeeze the excess high-strength non-shrinkage cement slurry out of the corrugated pipe 5, ensuring that the high-strength non-shrinkage cement slurry in the corrugated pipe 5 is uniform and dense.
[0037] The energy-consuming component includes a shock-absorbing layer 7 and a replaceable energy-consuming component 4, such as Figure 1-Figure 3 As shown, the shock-absorbing layer 7 is arranged between the pier 1 and the sleeve 3, and the replaceable energy-absorbing components 4 are arranged outside the sleeve 3 and are evenly distributed to achieve balanced energy consumption.
[0038] In this embodiment, the shock-absorbing layer 7 is made of rubber material, which has good deformation performance and energy absorption capacity; after the socket section of the pier 1 is cleaned, a high-strength adhesive is sprayed on the surface to bond the shock-absorbing layer 7; the height of the shock-absorbing layer 7 is the same as that of the sleeve 3, so that the entire socket section has shock-absorbing and energy absorption capabilities.
[0039] In order to facilitate disassembly and assembly, the sleeve 3 of this embodiment is composed of two detachable parts, such as Figure 1 and Figure 3 As shown, the sleeve 3 includes two arc-shaped plates, which are butted together to form a complete circular surface for clamping the bridge pier 1; the butt joint of the two arc-shaped plates has an overhanging portion, which is provided with bolt holes, and the butt joint of the two arc-shaped plates is connected by high-strength bolts.
[0040] A flexible gasket (such as a rubber gasket) is arranged at the joint of the two arc-shaped plates to adjust the tightness of the sleeve 3, so that the sleeve 3 is tightly combined with the shock-absorbing layer 7; when the pier 1 is impacted and vibrates due to an earthquake or other reasons, it can avoid excessive slippage between the pier 1 and the sleeve 3, so that the replaceable energy-absorbing component 4 can consume energy for the pier 1 in time, avoiding damage to the pier 1 and the replaceable energy-absorbing component 4 due to excessive instantaneous impact. At the same time, the shock-absorbing layer 7 itself has a certain elasticity, which can further enhance the energy-absorbing capacity.
[0041] Since the replaceable energy-consuming component 4 is connected to the outside of the sleeve 3, the inner wall of the socket hole of the support platform 2 is provided with a groove for accommodating the replaceable energy-consuming component 4. Figure 5 As shown, the replaceable energy-absorbing component includes a first base 9, a second base 14, an elastic component and a fixing member. A plurality of elastic components are connected between the first base 9 and the second base 14 to absorb energy, wherein the specific number of the elastic components is set according to actual requirements. In order to cooperate with the socket, the first base 9 and the second base 14 are respectively connected to a plurality of fixing members.
[0042] The first base 9 is fixedly connected to the outer wall of the sleeve. In this embodiment, a fixed support is welded on the outer side of the sleeve. The fixed support is slightly larger than the first base 9. The first base 9 is connected to the fixed support via a plurality of fixing members on its circumference. The second base 14 is also connected to a plurality of fixing members on its circumference. The second base 14 is also connected to a plurality of fixing members on its axial side. The second base 14 is connected to the groove of the platform via the fixing members on its axial side and circumference.
[0043] The fixing component includes a connecting support 15, a threaded sleeve 17, a screw 19 and a positioning nut 18. One end of the threaded sleeve 17 is fixed to the connecting support 15. The threaded sleeve 17 and the connecting support 15 can be connected by thread, that is, the outer side of the threaded sleeve 17 is provided with an external thread, and the connecting support 15 is provided with an internal thread; the connecting support 15 is connected to the corresponding first base 9 or second base 14 by a bolt 16, and the positioning nut 18 is arranged along the axial direction of the screw 19, and the screw 19 and the threaded sleeve 17 are matched by threads. The screw 19 is extended and shortened relative to the threaded sleeve 17 by rotating it, and the length is locked by the positioning nut 18 to ensure that the replaceable energy-consuming component is fixed in the groove of the base.
[0044] The elastic component is arranged along the radial direction of the sleeve, and the elastic component includes a spring 12, a fixing rod 10, a first pad 11 and a second pad 13. Figure 5 The shown direction is for reference only. A fixing component is connected to the top surface of the second base 14. One end of the fixing rod 10 is fixedly connected to the bottom surface of the second base 14. The spring 12 is sleeved on the outside of the fixing rod 10. One end of the spring 12 is connected to the first pad 11, and the other end is connected to the second pad 13. The spring 12 is constrained by the first pad 11 and the second pad 13, wherein the second pad 13 is in contact with the bottom surface of the second base 14.
[0045] In this embodiment, the first pad 11 and the second pad 13 are both provided with through holes for the fixing rod 10 to pass through. The shapes of the first pad 11 and the second pad 13 can be circular, square or other shapes, which can be specifically set according to actual installation requirements.
[0046] The first base 9 is provided with a hole 20, and the other end of the fixing rod 10 is inserted into the hole 20. The diameter of the hole 20 is slightly larger than the diameter of the fixing rod 10, and the diameter of the hole 20 is smaller than the lateral dimension of the first pad 11, so as to ensure that the fixing rod 10 moves in the hole 20 of the first base 9, so that the deformation of the spring 12 in the radial direction of the sleeve needs to follow the movement of the first base 9 to be realized.
[0047] A waterproof layer 21 is also provided between the pier 1 and the cap 2. Figure 2 As shown, after the pier 1 and the abutment 2 are plugged in, the waterproof layer 21 is arranged at the junction between the top surface of the abutment 2 and the pier 1; the waterproof layer 21 has a certain slope to facilitate drainage.
[0048] When an earthquake occurs, the bridge pier 1 undergoes plastic deformation, which in turn squeezes the shock-absorbing layer 7, causing the positional relationship of the sleeve 3 to change, causing the first base 9 to be squeezed and deformed, which in turn drives the spring 12 to deform together. The energy input by the earthquake is consumed through the plastic deformation of the shock-absorbing layer 7 and the elastic deformation of the spring 12, which plays an energy-consuming and shock-absorbing role, thereby improving the seismic safety of the bridge pier. Therefore, the ability of the shock-absorbing layer 7 to produce plastic deformation and the degree of elastic deformation of the spring 12 jointly determine the effect of its energy-consuming and shock-absorbing role on the bridge pier 1.
[0049] The shock-absorbing layer 7 and the replaceable energy-absorbing component 4 of this embodiment have good deformation performance and energy-absorbing capacity; however, after the earthquake, the excessive residual displacement of the pier 1 will affect the normal use of the bridge. Therefore, the spring 12 in the replaceable energy-absorbing component 4 can enhance the post-earthquake recovery force of the pier 1 through its own reset tendency after elastic deformation, reduce the residual displacement of the pier 1 after the earthquake, and improve the earthquake resistance of the bridge. The selection of the material properties of each component makes the damage part of the energy-absorbing device under the action of the earthquake mainly concentrated on the replaceable energy-absorbing component, while the performance of other components is still intact. After the earthquake, by replacing the energy-absorbing device, the structural function can be quickly repaired, reducing the earthquake loss and improving the durability of the bridge.
[0050] Embodiment 2:
[0051] This embodiment provides a construction method for a spigot-and-socket bridge pier connection device. The spigot-and-socket bridge pier connection device is as described in the first embodiment and specifically comprises the following steps:
[0052] Step (1): tying the reinforcement cage of the pier 1, connecting the main reinforcement of the pier 1 with the vertical reinforcement 6, supporting the formwork, pouring concrete, and curing;
[0053] Step (2): installing the corrugated pipe 5 in the socket section of the cap 2, reserving a groove on the cap 2 for placing the replaceable energy-absorbing component 4, supporting the formwork, pouring concrete, and maintaining;
[0054] Step (3): prefabricate the sleeve 3, weld a connecting support 15 on the outside of the sleeve 3, and the connecting support 15 is provided with bolt holes; weld a fixing support 8 for fixing the replaceable energy-absorbing component 4 on the outside of the sleeve 3;
[0055] Step (4): spray high-strength adhesive on the surface of the socket section of the pier 1 to bond the shock-absorbing layer 7;
[0056] Step (5): Connect the sleeve 3, butt the two arc plates together, set a rubber gasket at the butt joint of the two arc plates to adjust the tightness of the sleeve 3, and connect the two arc plates with high-strength bolts so that the sleeve 3 is tightly combined with the shock-absorbing layer 7;
[0057] Step (6): The threaded sleeve 17 is welded to the connecting support 15, and the fixed component is connected to the energy-absorbing component through the connecting support 15 and the bolt 16; the fixed rod 10 is welded to the second base 14, the fixed rod 10 is installed with the second pad 13, the spring 12 is sleeved on the fixed rod 10, and the first pad 11 is installed;
[0058] Step (7): 1 / 3 of the volume of the corrugated pipe 5 is filled with high-strength non-shrinkage cement slurry, the bridge pier 1 is hoisted, and the vertical steel bars 6 extending from the bottom of the bridge pier 1 are installed corresponding to the corrugated pipe 5 in the cap 2. At the same time, the sleeve 3 is used to fix the fixed support 8 of the replaceable energy-absorbing component 4 and is installed corresponding to the groove of the cap 2, completing the assembly of the bridge pier 1 and the cap 2;
[0059] Step (8): fix the first base 9 on the fixed support 8 of the sleeve 3, install the replaceable energy dissipation component 4, rotate the screw 19 to extend and shorten the length, rotate the positioning nut 18 to lock the length, and ensure that the replaceable energy dissipation component 4 is fixed in the groove of the base 2;
[0060] Step (9): Install a waterproof layer 21 between the pier 1 and the sleeve 2.
[0061] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A socket-and-spigot type pier connection device, It is characterized in that It includes a pier, a cap and an energy-absorbing component. The cap is provided with a socket hole matched with the socket section of the pier, a corrugated pipe is installed in the socket hole, a plurality of vertical steel bars extend from the end surface of the socket section of the pier, and the vertical steel bars are plugged into the corrugated pipe; a sleeve is installed on the outer side of the socket section of the pier, and the energy-absorbing component includes a shock-absorbing layer and a replaceable energy-absorbing component, and the shock-absorbing layer is arranged between the pier and the sleeve; a plurality of grooves are provided on the inner wall of the socket hole, and replaceable energy-absorbing components are arranged in the grooves so that they are distributed between the sleeve and the cap.
2. A socket-and-spigot type pier connection device according to claim 1, It is characterized in that The replaceable energy-consuming component includes a first base, a second base, an elastic component and a fixing member. The first base is detachably connected to the sleeve, a plurality of elastic components are connected between the first base and the second base, and the first base and the second base are respectively connected to a plurality of fixing members.
3. A socket-and-spigot type pier connection device according to claim 2, It is characterized in that The elastic component includes a fixing rod and a spring. The first base is provided with a hole for the fixing rod to move. The spring is sleeved on the outside of the fixing rod, and one end of the spring is connected to the first pad, and the other end is connected to the second pad. The fixing rod passes through the first pad and cooperates with the hole.
4. A socket-and-spigot type pier connection device according to claim 3, It is characterized in that The hole diameter is smaller than the transverse dimension of the first pad, and the hole diameter is larger than the fixing rod diameter.
5. A socket-and-spigot type pier connection device according to claim 2, It is characterized in that The fixing component comprises a threaded sleeve, a screw rod and a positioning nut. The screw rod is threadably matched with the threaded sleeve, and the positioning nut is rotated and installed along the axial direction of the screw rod.
6. A socket-and-spigot type pier connection device according to claim 1, It is characterized in that The length of the vertical steel bar is shorter than that of the corrugated pipe, and the corrugated pipe is filled with a set volume of high-strength non-shrinkage grouting material.
7. The socket-and-spigot type pier connection device according to claim 1, It is characterized in that The sleeve is formed by butting two arc-shaped plates, and a flexible gasket is provided at the butt joint of the arc-shaped plates.
8. The socket-and-spigot type pier connection device according to claim 1, It is characterized in that The surface of the socket section of the pier is sprayed with high-strength adhesive to fix the shock-absorbing layer; the height of the shock-absorbing layer is the same as the height of the sleeve.
9. The socket-and-spigot type pier connection device according to claim 1, It is characterized in that The connection surface between the abutment and the pier is also provided with a waterproof layer, and the waterproof layer has a set slope.
10. A construction method for a spigot-and-socket type pier connection device according to any one of claims 1 to 9, It is characterized in that include: Spray high-strength adhesive on the surface of the pier socket section to bond the shock-absorbing layer; Install the sleeve on the socket section of the pier; Fill the corrugated pipe with a set volume of high-strength non-shrinkage grouting material, hoist the bridge pier, and install the vertical steel bars corresponding to the corrugated pipe in the cap; Install the replaceable energy-absorbing component so that it is fixed in the groove of the base; Install a waterproof layer between the pier and the abutment.