High-rise building self-lifting discharging platform and construction method thereof

Through the design of the self-lifting unloading platform, the main beam, structural beam and drive motor of the platform are used to achieve mechanized lifting, which solves the safety risks and structural non-standard problems during the installation and disassembly of the cantilevered unloading platform, and improves construction efficiency. and safety, suitable for the standardization and mechanization requirements of high-rise buildings.

CN118745824AActive Publication Date: 2024-10-08SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410829347.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-08
Estimated Expiration
2044-06-25

AI Technical Summary

Technical Problem

The cantilevered unloading platform in the construction of existing high-rise buildings requires the assistance of a tower crane during installation and disassembly, which poses safety risks and has non-standard structures, affecting construction efficiency and safety management.

Method used

Design a self-lifting unloading platform that uses a combination of platform main beams, structural beams, guide rails, dual-axis drive motors and traction drums to achieve mechanized lifting and lowering of the platform, reducing the impact on other processes, and through standardized components and safety mechanisms Improve security.

Benefits of technology

It achieves safe and efficient installation and disassembly of the platform, reduces safety risks and construction complexity, improves construction efficiency and safety management levels, and is suitable for the standardization and mechanization needs of high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745824A_ABST
    Figure CN118745824A_ABST
Patent Text Reader

Abstract

The invention relates to a high-rise building self-lifting discharging platform and a construction method thereof.The high-rise building self-lifting discharging platform comprises a platform main beam, three structural beams arranged side by side and a guide rail sliding up and down along one sides of the three structural beams, the lower end of the guide rail is rotationally connected with the platform main beam, the platform main beam is horizontally arranged, and each structural beam is provided with a fixing mechanism; the top of the upper fixing mechanism is provided with a guide rail limiting part, an inhaul cable and a safety cable are arranged between the middle fixing mechanism and the right side of the platform main beam, and the lower fixing mechanism is detachably connected with the left side of the platform main beam. The lower end of the platform main beam is provided with traction winding drums located on the front side and the rear side of the double-shaft driving motor respectively, traction ropes are wound around the traction winding drums, one end of each traction rope is connected with the fixing mechanism on the upper portion, and output shafts at the two ends of the double-shaft driving motor are correspondingly connected with the two traction winding drums respectively. The self-lifting type lifting platform is used, so that the safety of mounting, lifting and dismounting operation is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a self-lifting unloading platform for a high-rise building and a construction method thereof. Background Art

[0002] At present, the unloading platform of high-rise building construction basically uses self-made or stereotyped cantilever unloading platform. The cantilever unloading platform has a simple structure and is easy and quick to install, so it has been used by construction units. However, it also has obvious disadvantages. On the one hand, it needs to be assisted by a tower crane during installation and disassembly, which interacts with other processes and also puts forward higher requirements for safety management. On the other hand, due to its simple structure, it does not require special equipment and technology to make, and can be made on site at any time. It can be specially made by the factory, but the finished product lacks certain standards, and the use of materials and welding are more arbitrary. Its main body safety is also not easy to guarantee, which increases the pressure of on-site safety management and is a prominent part of safety post-production management and safety risks at the construction site. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a self-lifting unloading platform for high-rise buildings and a construction method thereof. The use of a self-lifting lifting platform makes the installation, lifting and disassembly operations safer. At the same time, lifting and lowering do not require the assistance of hoisting equipment, reducing the idle work and safety impact of lifting operations on other processes. At the same time, under the premise of ensuring the standardization and safety of its component production, it can be used in a safer turnover. Therefore, the self-lifting unloading platform is an inevitable choice to replace the traditional unloading platform, which meets the requirements of the development of the construction industry.

[0004] The technical solution adopted by the present invention to solve its technical problems is: to provide a self-lifting and unloading platform for a high-rise building, including a platform main beam, three structural beams arranged in parallel, and a guide rail that slides up and down along one side of the three structural beams, the lower end of the guide rail is rotatably connected to the platform main beam, the platform main beam is horizontally arranged, and a fixing mechanism is installed on each structural beam, the top of the upper fixing mechanism is installed with a guide rail limiter, a cable and a safety cable are arranged between the middle fixing mechanism and the right side of the platform main beam, and the lower fixing mechanism is detachably connected to the left side of the platform main beam, a dual-axis drive motor is installed in the middle of the lower end of the platform main beam, and a traction drum is installed on each of the front and rear sides of the dual-axis drive motor at the lower end of the platform main beam, a traction rope is wound on the traction drum, one end of the traction rope is connected to the upper fixing mechanism, and the output shafts at both ends of the dual-axis drive motor are respectively connected to the two traction drums.

[0005] As a supplement to the technical solution described in the invention, the lower end of the guide rail is hinged to the platform main beam by a rotary hinge.

[0006] As a supplement to the technical solution described in the invention, platform guardrails are installed on both the front and rear sides of the upper end of the platform main beam.

[0007] As a supplement to the technical solution described in the invention, a reel base is installed on each of the front and rear sides of the dual-axis drive motor at the lower end of the platform main beam, and a traction reel is rotatably installed on the outer side of each reel base.

[0008] As a supplement to the technical solution described in the invention, a platform folding limit and a limit bumper are installed on the right side of the upper end of the platform main beam.

[0009] As a supplement to the technical solution described in the invention, a leveling pad is placed between the structural beam and the fixing mechanism, and the structural beam and the fixing mechanism are fixedly connected by anchor bolts.

[0010] As a supplement to the technical solution described in the invention, the left side of the platform main beam is connected and fixed to the lower fixing mechanism through a connecting plate and fastening bolts.

[0011] As a supplement to the technical solution described in the invention, the fixing mechanism includes a support, a guide wheel frame is installed on the support, two guide wheels arranged side by side are installed on the guide wheel frame, and the guide rail is inserted into the two guide wheels and slides up and down along the guide wheels.

[0012] As a supplement to the technical solution described in the invention, a traction rope eyelet and a pull cable eyelet are provided on the support.

[0013] As a supplement to the technical solution described in the invention, a horizontally rotating track limiting flap is installed at the lower end of the support.

[0014] A construction method for a self-lifting unloading platform for a high-rise building, the specific operation steps are as follows:

[0015] Step 1: During the construction of the main structure, anchor bolts are embedded in the structural beams;

[0016] Step 2: Before installing the platform, trim and level the concrete contact surface on the structural beam, then place the leveling pad first, confirm that the leveling pad is flat and in good contact with the structural surface, and then install the fixing mechanism;

[0017] Step 3: During the first installation, use a lifting machine to lift the platform body, i.e. the platform main beam, to the installation location, fix the platform main beam to the corresponding fixing mechanism with a tie plate and fastening bolts, and then install the cable and safety cable;

[0018] Step 4, install the guide rail along the guide wheel into the vertical slideway between the guide wheels and connect it to the platform main beam through a slewing hinge;

[0019] Step 5: When the platform needs to be lifted, proceed as follows;

[0020] Step 5.1, before the platform is lifted, a new fixing mechanism is installed above the original upper fixing mechanism, that is, a new uppermost fixing mechanism is installed, the guide rail at the current top is limited and closed, and the movable fence of the platform is folded up and fixed;

[0021] Step 5.2, start the dual-axis drive motor to drive the traction rope through the drum to flip the platform body up to the guide rail, and then retract the platform to limit the closing to fold the platform and the guide rail to fix;

[0022] Step 5.3, the dual-axis drive motor is paused, the guide rail limit at the current top is opened, and then the dual-axis drive motor is started again to drive the platform body to rise together with the guide rail;

[0023] Step 5.4, when the platform rises to the predetermined position, the track limit flap at the lower end of the corresponding fixing mechanism opens, the platform slightly drops to the accurate position, and the lower end of the guide rail is limitedly supported by the track limit flap;

[0024] Step 5.5, open the platform stowage limit, continue to start the dual-axis drive motor, flip the platform body down to a horizontal position, and then use the connecting plate and fastening bolts to fix the platform main beam to the corresponding fixing mechanism, then install the cable and safety cable, erect the platform's movable guardrail and fix it, and the platform enters the use state;

[0025] Step 5.6, remove the guide rail limiter of the original upper fixing mechanism and install it on the new fixing mechanism, and close the guide rail limiter to fix the guide rail;

[0026] Step 6: When the platform needs to descend, proceed as follows;

[0027] Step 6.1, before the platform is lowered, a new fixing mechanism is installed below the original lower fixing mechanism, that is, a new lowermost fixing mechanism is installed, the guide rail limit at the top of the current guide rail is closed, and the movable fence of the platform is retracted and fixed;

[0028] Step 6.2, start the dual-axis drive motor to drive the traction rope through the drum to flip the platform body up to the guide rail, and then retract the platform to limit the closing to fold the platform and the guide rail to fix;

[0029] Step 6.3, the dual-axis drive motor is paused, the guide rail limit at the current top is opened, and then the dual-axis drive motor is started again to drive the platform body to rise a certain distance along with the guide rail, and the guide rail limit flap of the lower fixing mechanism is closed;

[0030] Step 6.4, start the dual-axis drive motor to run in the opposite direction, the platform descends to the predetermined position, the bottom end of the guide rail contacts the guide rail limit flap on the newly installed fixing mechanism, and the platform stops descending;

[0031] Step 6.5, open the platform stowage limit, continue to start the dual-axis drive motor, flip the platform body down to a horizontal position, and then use the connecting plate and fastening bolts to fix the platform main beam to the newly installed fixing mechanism, then install the cable and safety cable, erect the platform's movable guardrail and fix it, and the platform is ready for use.

[0032] Step 6.6, remove the guide rail limiter of the upper fixing mechanism and install it on the next fixing mechanism, and close the guide rail limiter to fix the guide rail.

[0033] Beneficial effects: The present invention relates to a self-lifting unloading platform for high-rise buildings and a construction method thereof, which has the following advantages:

[0034] 1. Most existing unloading platforms adopt steel beam cantilever type. When installing, lifting equipment is required to lift the whole platform to the use position. The lifting point is often close to the building facade, which has a great safety risk. In addition, there are many anchor bolts for installation in the indoor structure, and the cantilever beam extends into the room for a long time, which has a great impact on the indoor working space. The self-lifting platform of the present invention only has a fixing mechanism on the edge of the structure. Except for the first installation, the lifting action of the platform can realize mechanized self-lifting, thereby reducing the working intensity of the lifting operation and the use of lifting machinery, reducing safety risks, and freeing up indoor working space.

[0035] 2. The fixing mechanism, platform body and driving mechanism of the self-lifting unloading platform of the present invention can all be designed as standard components to realize the mechanization and standardization of the equipment, which is conducive to the standardization of manufacturing, use and supervision, and transforms temporary facilities into standard mechanical products, thereby promoting the standardization and mechanization of construction production. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a front view of the present invention;

[0037] Figure 2 It is a right side view of the platform body of the present invention;

[0038] Figure 3 is a front view of the fixing mechanism of the present invention;

[0039] Figure 4 is a top view of the fixing mechanism of the present invention;

[0040] Figure 5 The present invention Figure 4 Sectional view in the AA direction;

[0041] Figure 6 Schematic diagram of the guide rail limit of the present invention

[0042] Figure 7 is a schematic diagram of the track limit flap of the present invention;

[0043] Figure 8 It is a control schematic diagram of the present invention.

[0044] 1. Structural beam, 2. Anchor bolts, 3. Fixing mechanism, 4. Guide rail, 5. Platform main beam, 6. Traction drum, 7. Swivel hinge, 8. Cable, 9. Safety cable, 10. Platform folding limit, 11. Limit bumper, 12. Traction rope, 13. Dual-axis drive motor, 14. Drum machine base, 15. Drive guard seat, 16. Platform railing, 17. Support, 18. Pull plate, 19. Fastening bolts, 20. Guide rail limit, 21. Guide wheel, 22. Traction rope lifting eye, 23. Leveling pad, 24. Cable lifting eye, 25. Track limit flap, 26. Guide wheel frame. DETAILED DESCRIPTION

[0045] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms fall within the scope limited by the appended claims of the application equally.

[0046] The embodiment of the present invention relates to a self-lifting unloading platform for high-rise buildings and a construction method thereof, such as Figure 1-8 The invention shows that the platform comprises a main beam 5, three structural beams 1 arranged in parallel and a guide rail 4 sliding up and down along one side of the three structural beams 1, the lower end of the guide rail 4 is rotatably connected to the platform main beam 5, the platform main beam 5 is arranged horizontally, a fixing mechanism 3 is installed on each structural beam 1, a guide rail limiter 20 is installed on the top of the upper fixing mechanism 3, a cable 8 and a safety cable 9 are arranged between the middle fixing mechanism 3 and the right side of the platform main beam 5, the lower fixing mechanism 3 is detachably connected to the left side of the platform main beam 5, a dual-axis drive motor 13 is installed in the middle of the lower end of the platform main beam 5, and a traction drum 6 is installed on each of the front and rear sides of the dual-axis drive motor 13 at the lower end of the platform main beam 5, a traction rope 12 is wound around the traction drum 6, one end of the traction rope 12 is connected to the upper fixing mechanism 3, and the output shafts at both ends of the dual-axis drive motor 13 are respectively connected to the two traction drums 6.

[0047] A driving guard seat 15 is installed in the middle of the lower end of the platform main beam 5, and a dual-axis driving motor 13 is fixedly installed inside the driving guard seat 15. The driving guard seat 15 protects the dual-axis driving motor 13 like a protective cover.

[0048] The lower end of the guide rail 4 is hinged to the platform main beam 5 by a swivel hinge 7 .

[0049] Platform guardrails 16 are installed on both the front and rear sides of the upper end of the platform main beam 5.

[0050] The lower end of the platform main beam 5 is located at the front and rear sides of the dual-axis driving motor 13, and a reel machine base 14 is installed on each side. A traction reel 6 is rotatably installed on the outer side of each reel machine base 14.

[0051] A limit collision block 11 and a platform folding limit 10 are installed on the right side of the upper end of the platform main beam 5.

[0052] A leveling pad 23 is placed between the structural beam 1 and the fixing mechanism 3 , and the structural beam 1 and the fixing mechanism 3 are fixedly connected via anchor bolts 2 .

[0053] The left side of the platform main beam 5 is connected and fixed to the lower fixing mechanism 3 through a connecting plate 18 and a fastening bolt 19 .

[0054] The fixing mechanism 3 includes a support 18 , on which a guide wheel frame 26 is mounted. Two guide wheels 21 arranged side by side are mounted on the guide wheel frame 26 . The guide rail 4 is inserted into the two guide wheels 21 and slides up and down along the guide wheels 21 .

[0055] The support 18 is provided with a traction rope eye 22 and a pull cable eye 24 .

[0056] A horizontally rotating track limiting flap 25 is installed at the lower end of the support 18.

[0057] There are generally four sets of standard fixing mechanisms 3, three of which are often used (such as Figure 1 As shown), a set of turnover (used for lifting), the fixing mechanism 3 serves as the platform anchoring mechanism and cable force bearing mechanism during the use of the platform, and as the guide rail guiding mechanism and limiting mechanism when the platform is lifted.

[0058] The driving mechanism is the power mechanism for the platform lifting operation, and is composed of a dual-axis driving motor 13 and a traction drum 6 and a traction rope 12 driven by the motor.

[0059] The guide rail limit 20 and the platform folding limit 10 have the same structure, both of which use a rotatably installed barb structure, but the size of the barb structure is different. The barb structure can be driven by manual rotation or by motor drive.

[0060] A construction method for a self-lifting unloading platform for a high-rise building, the specific operation steps are as follows:

[0061] Step 1: During the construction of the main structure, anchor bolts 2 are pre-embedded on the structural beam 1;

[0062] Step 2: Before installing the platform, trim and level the concrete contact surface on the structural beam 1, then place the leveling pad 23, make sure that the leveling pad 23 is flat and in good contact with the structural surface, and then install the fixing mechanism 3;

[0063] Step 3, when installing for the first time, use a lifting machine to lift the platform body, i.e., the platform main beam 5, to the installation position, fix the platform main beam 5 to the corresponding fixing mechanism 3 with a connecting plate 18 and a fastening bolt 19, and then install the cable 8 and the safety cable 9;

[0064] Step 4: Install the guide rail 4 along the guide wheel 21 into the vertical slideway between the guide wheels and connect it to the platform main beam 5 through the slewing hinge 7. Figure 1 As shown, there are three fixing mechanisms 3;

[0065] Step 5: When the platform needs to be lifted, proceed as follows;

[0066] Step 5.1, before the platform is lifted, a new fixing mechanism 3 is installed above the original upper fixing mechanism 3, that is, a new uppermost fixing mechanism 3 is installed, the guide rail limit 20 at the current top is closed, and the movable fence 16 of the platform is folded up and fixed;

[0067] Step 5.2, start the dual-axis drive motor 13 to drive the traction rope 12 through the reel 6 to flip the platform body up to the guide rail 4, and then the platform is retracted and the limit 10 is closed to fold and fix the platform and the guide rail 4;

[0068] Step 5.3, the dual-axis drive motor 13 is paused, the guide rail limit 20 at the current top is opened, and then the dual-axis drive motor 13 is started again to drive the platform body to rise together with the guide rail 4;

[0069] Step 5.4, when the platform rises to the predetermined position, the track limit flap 25 at the lower end of the corresponding fixing mechanism 3 opens, the platform slightly drops to the accurate position, and the lower end of the guide rail 4 is limitedly supported by the track limit flap 25;

[0070] Step 5.5, open the platform stowage limit 10, the dual-axis drive motor 13 continues to start, the platform body flips down to a horizontal position, and then the platform main beam 5 is fixed to the corresponding fixing mechanism 3 with the connecting plate 18 and the fastening bolt 19, and then the cable 8 and the safety cable 9 are installed, the movable guardrail 16 of the platform is erected and fixed, and the platform enters the use state;

[0071] Step 5.6, remove the guide rail limiter 20 of the original upper fixing mechanism 3 and install it on the new fixing mechanism 3, and close the guide rail limiter 20 to fix the guide rail 4;

[0072] Step 6: When the platform needs to descend, proceed as follows;

[0073] Step 6.1, before the platform is lowered, a new fixing mechanism 3 is installed below the original lower fixing mechanism 3, that is, a new lowermost fixing mechanism 3 is installed, the guide rail limiter 20 at the top of the current guide rail 4 is closed, and the movable fence 16 of the platform is retracted and fixed;

[0074] Step 6.2, start the dual-axis drive motor 13 to drive the traction rope 12 through the reel 6 to flip the platform body up to the guide rail 4, and then the platform is retracted and the limit 10 is closed to fold and fix the platform and the guide rail 4;

[0075] Step 6.3, the dual-axis drive motor 13 is paused, the guide rail limit 20 at the current top is opened, and then the dual-axis drive motor 13 is started again to drive the platform body to rise a certain distance along with the guide rail 4, and the guide rail limit flap 25 of the lower fixing mechanism 3 is closed;

[0076] Step 6.4, start the dual-axis drive motor 13 to run in the reverse direction, the platform descends to the predetermined position, the bottom end of the guide rail 4 contacts the guide rail limit flap 25 on the newly installed fixing mechanism 3, and the platform stops descending;

[0077] Step 6.5, open the platform stowage limit 10, continue to start the dual-axis drive motor 13, flip the platform body down to a horizontal position, and then use the connecting plate 18 and fastening bolts 19 to fix the platform main beam 5 and the newly installed fixing mechanism 3, then install the cable 8 and the safety cable 9, erect the platform's movable guardrail 16 and fix it, and the platform enters the use state.

[0078] Step 6.6, remove the guide rail limiter 20 of the upper fixing mechanism 3 and install it on the next fixing mechanism 3, and close the guide rail limiter 20 to fix the guide rail 4.

[0079] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention. The directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.

[0080] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.

[0081] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of the present invention.

[0082] The above is a detailed introduction to a self-lifting unloading platform for high-rise buildings and a construction method thereof provided by the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for general technical personnel in this field, according to the idea of ​​the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A self-lifting unloading platform for high-rise buildings, Features: The invention comprises a platform main beam (5), three structural beams (1) arranged in parallel, and a guide rail (4) sliding up and down along one side of the three structural beams (1); the lower end of the guide rail (4) is rotatably connected to the platform main beam (5); the platform main beam (5) is arranged horizontally; a fixing mechanism (3) is installed on each structural beam (1); a guide rail limiter (20) is installed on the top of the upper fixing mechanism (3); a cable (8) and a safety cable (9) are arranged between the middle fixing mechanism (3) and the right side of the platform main beam (5); and a lower fixing mechanism (3) is provided on the upper fixing mechanism (3). The fixing mechanism (3) is detachably connected to the left side of the platform main beam (5); a dual-axis drive motor (13) is installed in the middle of the lower end of the platform main beam (5); a traction drum (6) is installed on each of the front and rear sides of the dual-axis drive motor (13) at the lower end of the platform main beam (5); a traction rope (12) is wound around the traction drum (6); one end of the traction rope (12) is connected to the upper fixing mechanism (3); and the output shafts at both ends of the dual-axis drive motor (13) are respectively connected to the two traction drums (6).

2. A high-rise building self-lifting unloading platform according to claim 1, Features: The lower end of the guide rail (4) is hinged to the platform main beam (5) by a slewing hinge (7).

3. A self-lifting unloading platform for high-rise buildings according to claim 1, Features: Platform guardrails (16) are installed on both the front and rear sides of the upper end of the platform main beam (5).

4. A high-rise building self-lifting unloading platform according to claim 1, Features: A platform folding limiter (10) is installed on the right side of the upper end of the platform main beam (5).

5. A high-rise building self-lifting unloading platform according to claim 1, Features: A leveling pad (23) is placed between the structural beam (1) and the fixing mechanism (3), and the structural beam (1) and the fixing mechanism (3) are fixedly connected via anchor bolts (2).

6. A high-rise building self-lifting unloading platform according to claim 1, Features: The left side of the platform main beam (5) is connected and fixed to the lower fixing mechanism (3) via a connecting plate (18) and a fastening bolt (19).

7. A high-rise building self-lifting unloading platform according to claim 1, Features: The fixing mechanism (3) comprises a support (18), a guide wheel frame (26) is mounted on the support (18), two guide wheels (21) arranged side by side are mounted on the guide wheel frame (26), and the guide rail (4) is inserted into the two guide wheels (21) and slides up and down along the guide wheels (21).

8. A high-rise building self-lifting unloading platform according to claim 7, Features: The support (18) is provided with a traction rope lifting ring (22) and a pull cable lifting ring (24).

9. A high-rise building self-lifting unloading platform according to claim 7, Features: A horizontally rotating track limiting flap (25) is installed at the lower end of the support (18).

10. A construction method for a high-rise building self-lifting unloading platform as claimed in claims 1 to 9, wherein the specific operation steps are as follows: Step 1: during the construction of the main structure, anchor bolts (2) are embedded in the structural beam (1); Step 2, before installing the platform, trim and level the concrete contact surface on the structural beam (1), then place the leveling pad (23), confirm that the leveling pad (23) is flat and in good contact with the structural surface, and then install the fixing mechanism (3); Step 3, during the first installation, use a lifting machine to lift the platform body, i.e., the platform main beam (5), to the installation position, use a connecting plate (18) and a fastening bolt (19) to fix the platform main beam (5) to the corresponding fixing mechanism (3), and then install the cable (8) and the safety cable (9); Step 4, install the guide rail (4) along the guide wheel (21) into the vertical slideway between the guide wheels and connect it to the platform main beam (5) through the slewing hinge (7); Step 5: When the platform needs to be lifted, proceed as follows; Step 5.1, before the platform is lifted, a new fixing mechanism (3) is installed above the original upper fixing mechanism (3), that is, a new uppermost fixing mechanism (3) is installed, the guide rail limiter (20) at the current top is closed, and the movable fence (16) of the platform is folded up and fixed; Step 5.2, start the dual-axis drive motor (13) to drive the traction rope (12) through the reel (6) to flip the platform body up to the guide rail (4), and then close the platform retracting limit (10) to fold and fix the platform and the guide rail (4); Step 5.3, the dual-axis drive motor (13) is paused, the guide rail limit (20) at the current top is opened, and then the dual-axis drive motor (13) is started again to drive the platform body to rise together with the guide rail (4); Step 5.4, when the platform rises to the predetermined position, the track limit flap (25) at the lower end of the corresponding fixing mechanism (3) opens, the platform falls slightly to the accurate position, and the lower end of the guide rail (4) is limitedly supported by the track limit flap (25); Step 5.5, open the platform stowage limiter (10), continue to start the dual-axis drive motor (13), flip the platform body down to a horizontal position, and then use the connecting plate (18) and the fastening bolts (19) to fix the platform main beam (5) and the corresponding fixing mechanism (3), then install the cable (8) and the safety cable (9), erect the platform's movable guardrail (16) and fix it, and the platform enters the use state; Step 5.6, remove the guide rail limiter (20) of the original upper fixing mechanism (3) and install it on the new fixing mechanism (3), and close the guide rail limiter (20) to fix the guide rail (4); Step 6: When the platform needs to descend, proceed as follows; Step 6.1, before the platform is lowered, a new fixing mechanism (3) is installed below the original lower fixing mechanism (3), that is, a new lowermost fixing mechanism (3) is installed, the guide rail limiter (20) at the top of the current guide rail (4) is closed, and the movable fence (16) of the platform is folded up and fixed; Step 6.2, start the dual-axis drive motor (13) to drive the traction rope (12) through the reel (6) to flip the platform body up to the guide rail (4), and then close the platform retracting limit (10) to fold and fix the platform and the guide rail (4); Step 6.3, the dual-axis drive motor (13) is paused, the guide rail limit (20) at the current top is opened, and then the dual-axis drive motor (13) is started again to drive the platform body to rise a certain distance along with the guide rail (4), and the guide rail limit flap (25) of the lower fixing mechanism (3) is closed; Step 6.4, start the dual-axis drive motor (13) to run in the reverse direction, the platform descends to the predetermined position, the bottom end of the guide rail (4) contacts the guide rail limit flap (25) on the newly installed fixing mechanism (3), and the platform stops descending; Step 6.4, open the platform stowage limiter (10), continue to start the dual-axis drive motor (13), flip the platform body down to a horizontal position, and then use the connecting plate (18) and fastening bolts (19) to fix the platform main beam (5) and the newly installed fixing mechanism (3), then install the cable (8) and the safety cable (9), erect the platform's movable guardrail (16) and fix it, and the platform enters the use state. Step 6.5, remove the guide rail limiter (20) of the upper fixing mechanism (3) and install it on the next fixing mechanism (3), and close the guide rail limiter (20) to fix the guide rail (4).

Citation Information

Patent Citations

  • Climbing type material platform

    CN106437180A

  • Attached type lifting discharging platform

    CN209585654U

  • Self-adaptive all-steel attached lifting scaffold in slightly inclined building

    CN214302811U

  • Foldable electric lifting discharging platform

    CN218438334U

  • Folding discharging platform capable of being automatically controlled

    CN219100781U