Mixed gas liquefaction test system and test method
By using a high and low temperature adjustable test chamber and a gas sealed tank in the mixed gas liquefaction test system, combined with temperature and air pressure sensors, and adopting a stepwise temperature reduction method, the problem of large errors in mixed gas liquefaction test results was solved, and an efficient and accurate test was achieved. The liquefaction temperature measurement and test process is simplified.
Patent Information
- Application Number
- CN202410744376.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2024-10-08
AI Technical Summary
The existing mixed gas liquefaction test method has the problems of large test result error, complex equipment and high cost, especially when testing the pressure resistance performance at different temperatures.
A system combining high and low temperature adjustable test chambers and gas sealed tanks is used to collect data in real time through temperature sensors and air pressure sensors. The stepwise temperature reduction method is used to measure the liquefaction temperature of the mixed gas, and combined with data analysis to improve test accuracy.
It achieves high-precision measurement of the liquefaction temperature of the mixed gas, simplifies the test process, reduces the cost, and improves the test efficiency and the accuracy of the results.
Smart Images

Figure CN118746593A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of insulating gas characteristic detection, and in particular relates to a mixed gas liquefaction test system and a test method. Background Art
[0002] With the increasing awareness of environmental protection in countries around the world and the increasing attention paid to issues such as global warming, there is an increasing call for SF6, which is listed as one of the six major greenhouse gases in the power industry, to be replaced by other gases. The domestic power industry has carried out a lot of research on gases to replace SF6. These gases, such as C4F7N gas, have twice the insulation performance of SF6. However, the liquefaction temperature of pure C4F7N gas is as high as -4.7℃, which is the main factor affecting its application. Although mixing C4F7N with gases such as CO2 will reduce the insulation performance of the gas to a certain extent, it can effectively reduce the liquefaction temperature of the mixed gas and achieve the goal of engineering application. The ratio of C4F7N to CO2 in the mixed gas has become an important parameter. If the proportion of C4F7N is too high, the gas is easy to liquefy, and if it is too low, the insulation capacity is insufficient. Therefore, the study of the relationship between the mixing ratio and the liquefaction temperature in the mixed gas has become an important direction.
[0003] At present, the performance test of mixed gas is to test the pressure resistance of mixed gas of the same proportion at different temperatures. Specifically, the mixed gas is adjusted to the required temperature value and then subjected to the pressure resistance test. After the test is completed, it is necessary to wait for the electrolytic gas to recover before the pressure resistance test at the next temperature value can be carried out. This test method not only has complex test equipment and high cost, but also has a long test cycle and large error in the test results. Summary of the invention
[0004] The purpose of the present invention is to provide a mixed gas liquefaction test system and test method to solve the problem of large error in test results.
[0005] A mixed gas liquefaction test system of the present invention is implemented as follows:
[0006] A mixed gas liquefaction test system, comprising:
[0007] High and low temperature adjustable test chamber, used to provide the operating environment temperature of the simulated application mixed gas;
[0008] Gas sealed tank, which is placed in a high and low temperature adjustable test chamber and is used to store mixed gas;
[0009] The data collector is placed outside the high and low temperature adjustable test box and is used to collect and record the temperature and pressure of the mixed gas in the gas sealing tank in real time.
[0010] Furthermore, the gas sealing tank is provided with a temperature collection port, and a temperature sensor is installed in the temperature collection port.
[0011] Furthermore, the temperature sensor is connected to a temperature data acquisition line of a data collector passing through the high and low temperature adjustable test box.
[0012] Furthermore, the temperature collection port includes a temperature collection port I located in the middle of the gas sealing tank, and a temperature collection port II near both ends of the gas sealing tank, and the temperature collection port I is located on the opposite side of the temperature collection port II.
[0013] Furthermore, the gas sealing tank is connected with a conducting pipe passing through the high and low temperature adjustable test box, an air pressure sensor is installed at the outer end of the conducting pipe, and the air pressure sensor is connected to the air pressure data acquisition line of the data collector.
[0014] Furthermore, a through hole is provided on one side of the high and low temperature adjustable test box, and a sealing plug with a slit is installed in the through hole.
[0015] Furthermore, a one-way valve is installed on the gas sealing tank.
[0016] Secondly, the present invention also provides a test method for a mixed gas liquefaction test system, which is characterized by comprising the following steps:
[0017] Step S1: Determine the initial set temperature value, initial set pressure value and test temperature range of the mixed gas;
[0018] Step S2: Filling the gas sealed tank with mixed gas to make the gas pressure value in the gas sealed tank higher than the initial set pressure value during the test;
[0019] Step S3: placing the gas sealed tank filled with the mixed gas in a high and low temperature adjustable test box, and connecting the signal lines of the temperature sensor and the air pressure sensor to the data acquisition device;
[0020] Step S4: adjusting the temperature in the high and low temperature adjustable test box to the initial set temperature value during the test, and keeping the temperature until the temperature in the gas sealing tank reaches the initial set temperature value;
[0021] Step S5: exhausting part of the mixed gas in the gas sealed tank to make the gas pressure in the gas sealed tank equal to the initial set pressure value;
[0022] Step S6: lowering the temperature in the high and low temperature adjustable test box to reach the starting temperature value of the test temperature range, and then lowering the temperature in the high and low temperature adjustable test box in a step-by-step manner, and the data collector collects and records the temperature and air pressure data in the gas sealed tank in real time;
[0023] Step S7: After the entire test temperature range test is completed, the temperature and pressure data are sorted out, and the law of the mixed gas pressure value changing with the temperature is analyzed to obtain the liquefaction temperature value of the mixed gas.
[0024] Furthermore, in step S6, the stepwise temperature reduction adopted by the high and low temperature adjustable test box is performed, that is, the temperature keeping and temperature reducing operations are repeated alternately;
[0025] The cooling value of each step temperature reduction is equal.
[0026] Furthermore, steps S1-S7 are repeated, and in the process of repeated tests, the temperature reduction value of the single temperature reduction in step S6 and the test temperature range can be narrowed according to the results of the previous test, so as to narrow the range of the liquefaction temperature of the mixed gas in the test results to obtain a more accurate liquefaction temperature.
[0027] Furthermore, after completing a single test of steps S1-S7, the temperature of the high and low temperature adjustable test box is adjusted up to the initial set temperature value, and the validity of the test data is determined by comparing the real-time air pressure value at this temperature with the initial set air pressure value.
[0028] Furthermore, after the temperature of the high and low temperature adjustable test box is adjusted to the initial set temperature value, it is necessary to keep the temperature until the temperature of the mixed gas at each location in the gas sealing tank reaches the initial set temperature value, and the collected air pressure value can be compared with the initial set air pressure value;
[0029] If the difference between the air pressure value and the initial set air pressure value is within the air pressure error range, the test data is valid, otherwise it is invalid;
[0030] The air pressure error range is ±0.5kpa.
[0031] After adopting the above technical solution, the present invention has the following beneficial effects:
[0032] (1) The present invention adopts a step-by-step temperature reduction method to measure the real-time change of the gas pressure value of the mixed gas in the gas sealed tank at different temperatures. By analyzing the temperature-pressure change law of the mixed gas, the liquefaction temperature value of the mixed gas with high accuracy can be obtained. This test method is not only easy to operate and efficient, but also has high test results accuracy.
[0033] (2) The test system of the present invention has a simple overall structure and adopts a universal high and low temperature adjustable test chamber to provide a reliable test temperature environment. The temperature adjustment is convenient and accurate, which effectively reduces the test cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0035] Figure 1 is a schematic diagram of a mixed gas liquefaction test system according to a preferred embodiment of the present invention;
[0036] Figure 2 is a schematic diagram of a mixed gas liquefaction test system according to a preferred embodiment of the present invention;
[0037] Figure 3 is a structural diagram of a gas sealing tank portion of a mixed gas liquefaction test system according to a preferred embodiment of the present invention;
[0038] Figure 4 is a structural diagram of a gas sealing tank portion of a mixed gas liquefaction test system according to a preferred embodiment of the present invention;
[0039] Figure 5 It is a structural diagram of the data acquisition part of the mixed gas liquefaction test system of the preferred embodiment of the present invention;
[0040] Figure 6 is a temperature-time curve diagram of the initial test in the preferred embodiment of the present invention;
[0041] Figure 7 is a temperature-pressure curve diagram of the initial test in the preferred embodiment of the present invention;
[0042] Figure 8 is a temperature-time curve diagram of a secondary test in a preferred embodiment of the present invention;
[0043] Fig. 9 is a temperature-pressure curve diagram of a secondary test in a preferred embodiment of the present invention;
[0044] In the figure: high and low temperature adjustable test box 1, gas sealing tank 2, data collector 3, box door 4, temperature collection port 5, temperature sensor 6, sealing flange I 7, sealing joint I 8, temperature data collection line 9, conducting tube 10, air pressure sensor 11, air pressure data collection line 12, sealing flange II 13, sealing joint II 14, through hole 15, sealing plug 16, one-way valve 17, support frame 18. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] like Figure 1-5 As shown, a mixed gas liquefaction test system includes a high and low temperature adjustable test box 1, a gas sealed tank 2 and a data collector 3. The high and low temperature adjustable test box 1 is used to provide an operating environment temperature for simulating the application of the mixed gas; the gas sealed tank 2 is placed in the high and low temperature adjustable test box 1 to store the mixed gas; the data collector 3 is placed outside the high and low temperature adjustable test box 1 to collect and record the temperature and pressure of the mixed gas in the gas sealed tank 2 in real time.
[0048] The high and low temperature adjustable test box 1 can be a general test box that can accommodate a gas sealed tank 2 of corresponding specifications and can achieve controllable temperature adjustment.
[0049] In this embodiment, a box door 4 is provided on one side of the high and low temperature adjustable test box 1 to facilitate placing the gas sealing tank 2 into the box.
[0050] Preferably, a support frame 18 is provided at the bottom of the gas-tight tank 2 to ensure the stability of the gas-tight tank 18 .
[0051] In order to detect the real-time temperature of the mixed gas in the gas sealed tank 2 , the gas sealed tank 2 is provided with a temperature collection port 5 , and a temperature sensor 6 is installed in the temperature collection port 5 .
[0052] Specifically, a sealing flange Ⅰ7 is provided on the temperature collection port 5, and a sealing joint Ⅰ8 is installed on the temperature sensor 6. When the temperature sensor 6 is assembled on the corresponding temperature collection port 5, the probe of the temperature sensor 6 extends into the gas sealing tank 2, and the sealing joint Ⅰ8 cooperates with the sealing flange Ⅰ7, which effectively ensures the sealing performance at the temperature collection port 5 and improves the accuracy of the test data.
[0053] Among them, a sealing ring I is arranged on the end face of the sealing joint I8, and the sealing joint I8 is connected to the sealing flange I7 through a thread, and the sealing ring I can ensure the sealing between the two.
[0054] In order to connect the temperature sensor 6 to the data collector 3 , the temperature sensor 6 is connected to a temperature data collection line 9 of the data collector 3 passing through the high and low temperature adjustable test box 1 .
[0055] The temperature data acquisition line 9 of the data acquisition device 3 penetrates into the high and low temperature adjustable test box 1 and is connected to the signal line of the temperature sensor 6 so that the temperature of the mixed gas in the gas sealing tank 2 can be collected in real time by the data acquisition device 3 .
[0056] Specifically, a male connector I is provided at the end of the signal line of the temperature sensor 6 , which is plugged into a female connector I at the end of the temperature data acquisition line 9 to achieve connection between the temperature sensor 6 and the data collector 3 .
[0057] During the test, in order to ensure that the temperature of the mixed gas at various locations in the gas sealed tank 2 is consistent, the temperature collection port 5 includes a temperature collection port I located in the middle of the gas sealed tank 2, and a temperature collection port II near the two ends of the gas sealed tank 2, and the temperature collection port I is located on the opposite side of the temperature collection port II.
[0058] When data is selected after the test, the higher the temperature consistency of the mixed gas at various locations in the gas-sealed tank 2, the more accurate the corresponding air pressure value will be. The temperature sensor 6 is installed at different locations of the gas-sealed tank 2 to collect the temperature of the mixed gas at different locations in the gas-sealed tank 2 to ensure the consistency of the temperature of the mixed gas at various locations in the gas-sealed tank 2 when the air pressure value is selected, thereby effectively improving the accuracy of the test data.
[0059] At present, the air pressure sensor 11 cannot be used in an environment below -60°C, that is, in this temperature environment, the measurement accuracy of the air pressure sensor 11 will be greatly affected. In order to solve this problem, the gas sealing tank 2 is connected with a conducting tube 10 that passes through the high and low temperature adjustable test box 1, and the outer end of the conducting tube 10 is installed with the air pressure sensor 11. The air pressure sensor 11 is connected to the air pressure data acquisition line 12 of the data collector 3.
[0060] Specifically, one end of the conducting tube 10, i.e., the inner end, is fixedly connected to the gas sealing tank 2, and a method such as welding can be used to ensure the sealing of the connection between the conducting tube 10 and the gas sealing tank 2. The other end, i.e., the outer end, of the conducting tube 10 is installed with a sealing flange II 13, and the air pressure sensor 11 is installed with a sealing joint II 14. After the probe of the air pressure sensor 11 is inserted into the conducting tube 10, the sealing joint II 14 cooperates with the sealing flange II 13 to ensure the sealing of the connection between the air pressure sensor 11 and the conducting tube 10, thereby improving the accuracy of the experimental data.
[0061] Among them, a sealing ring II is arranged on the end face of the sealing joint II 14, and the sealing joint II 14 is connected to the sealing flange II 13 through threads, and the sealing ring II can effectively ensure the sealing between the two.
[0062] The signal line of the air pressure sensor 11 is connected to the air pressure data acquisition line 12 .
[0063] Specifically, a male connector II is provided at the end of the signal line of the air pressure sensor 11 , which is connected to the female connector II at the end of the air pressure data acquisition line 12 to achieve the connection between the air pressure sensor 11 and the data collector 3 .
[0064] In addition, the ends of the temperature data acquisition line 9 and the air pressure data acquisition line 12 connected to the data collector 3 are respectively provided with plug-in terminals, and the plug-in terminals are connected to the corresponding wiring terminals of the data collector 3.
[0065] The present invention adopts a method of externalizing the air pressure sensor 11 , that is, arranging it outside the high and low temperature adjustable test box 1 , thereby effectively ensuring the measurement accuracy of the air pressure sensor 11 and improving the accuracy of the test data.
[0066] In order to facilitate the wire passing and ensure the insulation effect of the high and low temperature adjustable test box 1, and reduce the influence of the external ambient temperature on the temperature inside the box, a through hole 15 is provided on one side of the high and low temperature adjustable test box 1, and a sealing plug 16 with a hole is installed in the through hole 15.
[0067] Specifically, the air pressure data collection line 12, the temperature data collection line 9 and the conducting tube 10 all pass through the slits.
[0068] In order to facilitate the filling of the gas sealed tank 2 or the discharge of the gas in the gas sealed tank 2 , a one-way valve 17 is installed on the gas sealed tank 2 .
[0069] Specifically, the gas sealing tank 2 is provided with two gas ports, and a one-way valve 17 is installed on each gas port.
[0070] One gas port can be used to fill the gas sealed tank 2 with gas, and the other is used to discharge the gas in the gas sealed tank 2.
[0071] Furthermore, the provision of two gas ports can ensure that the gas in the gas-tight tank 2 can circulate when the gas is replaced, thereby preventing the test gas from the previous test from being retained in the gas-tight tank 2 and affecting the results of subsequent tests. Therefore, preferably, the two gas ports are respectively provided on both sides of the gas-tight tank 2, which is more conducive to the flow of gas.
[0072] In order to ensure the sealing of the one-way valve 17, a sealing flange I7 is also installed on each gas port, and the one-way valve 17I cooperates with the sealing flange I7 on the gas port.
[0073] Based on the above test system, the present invention also provides a test method for a mixed gas liquefaction test system, comprising the following steps:
[0074] Step S1: Determine the initial set temperature value, initial set pressure value and test temperature range of the mixed gas.
[0075] Among them, the initial set temperature value can be selected according to the laboratory ambient temperature, which makes the operation more convenient.
[0076] Since the mixing accuracy and gas purity of the mixed gas will affect the liquefaction temperature of the mixed gas, there must be a deviation between the actual liquefaction temperature and the theoretical liquefaction temperature. The present invention is used to obtain the actual liquefaction temperature of the mixed gas.
[0077] By testing the temperature range, the starting temperature and end temperature can be determined.
[0078] Before the initial test, the estimated value of the theoretical liquefaction temperature can be calculated, and then the estimated value of the theoretical liquefaction temperature is taken as the intermediate temperature point to expand the temperature range, that is, the test temperature range.
[0079] Step S2: Fill the gas sealed tank 2 with mixed gas to make the gas pressure value in the gas sealed tank 2 higher than the initial set pressure value during the test.
[0080] Preferably, in this step, after the mixed gas is filled, the pressure difference between the actual pressure value in the gas sealing tank 2 and the initial set pressure value is in the range of 8 to 12 kPa.
[0081] Step S3: placing the gas sealed tank 2 filled with the mixed gas in the high and low temperature adjustable test box 1 , and connecting the signal lines of the temperature sensor 6 and the air pressure sensor 11 to the data collector 3 .
[0082] Specifically, the high and low temperature adjustable test box 1 is provided with a box door 4 to facilitate the placement of the gas sealing tank 2 .
[0083] Step S4: adjusting the temperature in the high and low temperature adjustable test box 1 to the initial set temperature value during the test, and keeping the temperature until the temperature in the gas sealing tank 2 reaches the initial set temperature value.
[0084] During the test, it takes a certain amount of time for the temperature in the high and low temperature adjustable test box 1 to change, that is, the time period from the beginning of adjusting the temperature of the high and low temperature adjustable test box until the temperature of the high and low temperature adjustable test box reaches the set temperature value. In this step, this time period is called the initial temperature adjustment time.
[0085] During the test, the initial temperature adjustment time of the high and low temperature adjustable test chamber can be set by yourself.
[0086] In this step, the purpose of insulation is to ensure that the temperature of the mixed gas in each place in the gas sealing tank 2 is consistent and reaches the initial set temperature value, that is, the temperatures collected by the three temperature sensors 6 are all the initial set temperature values, and this insulation period is called the initial insulation time.
[0087] Step S5: exhaust part of the mixed gas in the gas sealed tank 2 to make the gas pressure in the gas sealed tank 2 equal to the initial set pressure value.
[0088] Due to the influence of the external environment and the accuracy of the inflation equipment itself, there will be a certain deviation between the actual air pressure and the theoretical air pressure.
[0089] Therefore, in the present invention, it is necessary to first fill the gas sealing tank 2 with a mixed gas with a pressure value higher than the initial set pressure value, and then discharge the excess mixed gas after the mixed gas temperature reaches the initial set temperature value, to ensure that the actual air pressure during the test is consistent with the theoretical initial set pressure value, that is, this method can set the initial set pressure value more accurately, avoid the problem of inaccurate data due to air pressure deviation, and ensure the accuracy of the test.
[0090] Step S6: Lower the temperature in the high and low temperature adjustable test box 1 to reach the starting temperature value of the test temperature range, and then lower the temperature in the high and low temperature adjustable test box 1 in a step-by-step manner. The data collector 3 collects and records the temperature and air pressure data in the gas sealing tank 2 in real time.
[0091] In this step, the temperature of the high and low temperature adjustable test box 1 is lowered in a stepwise manner, that is, the operation of heat preservation and temperature reduction is repeated alternately.
[0092] Specifically, when the temperature in the high and low temperature adjustable test box 1 reaches the starting temperature value of the test temperature position, it is kept warm until the temperature of the mixed gas in the gas sealed tank 2 is consistent and reaches the starting temperature value, and then the temperature is lowered, that is, the temperature in the high and low temperature adjustable test box 1 is adjusted to the next test temperature value, and when the temperature in the high and low temperature adjustable test box 1 reaches the next test temperature value, it is kept warm again until the temperature of the mixed gas in the gas sealed tank 2 is consistent and reaches the next test temperature value. In this way, the warming, cooling, and warming operations are alternately performed until the end temperature value of the test temperature range is completed and the warming is ended.
[0093] In this step, the temperature reduction value of each step-by-step temperature reduction is equal to ensure the validity of the test results. Therefore, before performing this step, the temperature reduction value of the step-by-step temperature reduction needs to be set in advance.
[0094] Taking the cooling value of A℃ as an example, the difference between the starting temperature value of the test temperature range, that is, the initial test temperature and the estimated value of the theoretical liquefaction temperature or the liquefaction temperature value obtained in the last test, ranges from 4A to 8A, and the difference between the end temperature value of the test temperature range and the estimated value of the theoretical liquefaction temperature or the liquefaction temperature value obtained in the last test ranges from -4A to -8A.
[0095] In this step, the time period from adjusting the temperature of the high and low temperature adjustable test box 1 to the next test temperature value until the temperature in the high and low temperature adjustable test box 1 reaches the next test temperature value is the test temperature adjustment time. The test temperature adjustment time can be set by adjusting the high and low temperature adjustable test box 1. In this embodiment, the test temperature adjustment time for each temperature adjustment is set to be equal to facilitate data recording and sorting.
[0096] At the end of each heat preservation, the temperatures collected by the three temperature sensors 6 are the same and are the corresponding test temperature values, that is, the temperature of the mixed gas at various locations in the gas sealing tank 2 is consistent and reaches the corresponding test temperature value.
[0097] In this step, the insulation time is the test insulation time, which can be selected from the actual insulation time after each temperature reduction, that is, each time the temperature in the high and low temperature adjustable test box 1 reaches the next test temperature value, until the temperature of the mixed gas at each location in the gas sealing tank 2 collected by each temperature sensor 6 reaches the next test temperature value.
[0098] During the step-by-step temperature reduction process, the test insulation time can use the actual insulation time, which can effectively shorten the test time and improve the test efficiency. However, during the test of this embodiment, a certain time will be extended on the basis of the actual insulation time as the test insulation time, so as to ensure the reliability of the test data.
[0099] Preferably, in order to facilitate the test operation, the insulation time for each test in a single test process is equal, and the selection of the test insulation time can ensure that the temperature of the mixed gas at various locations in the gas sealing tank 2 is consistent and reaches the corresponding test temperature value after each temperature reduction.
[0100] For the selection of the same test insulation time, at least one test can be done separately before the test. When the cooling value is determined, the time range from the time when the temperature of the high and low temperature adjustable test box reaches the test temperature value until the mixed gas at various locations in the gas sealing tank reaches the test temperature value, a single test can extend a certain time as the test insulation time on the basis of this time range, and multiple tests can extend a certain time on the basis of the longest time range as the test insulation time to ensure the reliability of the test data.
[0101] For step S4, the selection of the initial holding time may refer to the method of testing the holding time.
[0102] In addition, after each test, the data collector 3 can also test whether the temperature collection is appropriate for the test insulation time to ensure the accuracy of the test data.
[0103] For example, when each test insulation time ends, if the temperatures detected by the three temperature sensors 6 are all the corresponding test temperature values, it indicates that the test insulation time selection of this test process is appropriate. At the same time, this test data can also provide a basis for the selection of the test insulation time in subsequent tests, such as shortening or extending. The same is true for the selection of the initial insulation time.
[0104] Therefore, before performing step S4, it is necessary to first determine the initial insulation time and the initial temperature adjustment time; similarly, before performing step S6, it is necessary to first determine the test insulation time and the test temperature adjustment time.
[0105] In step S6, with the same test heat preservation time, the same test temperature adjustment time and the same temperature drop value, the temperature-time curve formed in the entire test temperature range is a smoothly descending step shape.
[0106] Step S7: After the entire test temperature range test is completed, the temperature and pressure data are sorted out, and the law of the mixed gas pressure value changing with the temperature is analyzed to obtain the liquefaction temperature value of the mixed gas.
[0107] Specifically, during the test, the data collector 3 collects the temperature and pressure of the mixed gas in the gas sealed tank 2 in real time, and the collected test data are set in groups, that is, a group of data includes three temperature values and one pressure value. The interval of the collection time can be set or adjusted in advance.
[0108] Among them, when the temperature values collected by the three temperature sensors 6 are the same and are the corresponding test temperature values, the air pressure value collected at this time is the effective air pressure value, and the air pressure value can accurately reflect the actual air pressure value of the mixed gas at this test temperature value. According to this requirement, at least one set of test data is selected at each test temperature value.
[0109] Preferably, when selecting test data corresponding to each test temperature value, a group of test data at the end of the test insulation time can be selected, that is, the temperature value and air pressure value corresponding to this group of test data are selected. Compared with other time points, at this time point, the temperature consistency of the mixed gas in the gas sealing tank 2 is higher and the air pressure value is more accurate.
[0110] In addition, all effective air pressure values at various test temperature values may be selected and their average values may be taken, so as to draw a corresponding curve graph with the average value and the corresponding test temperature value.
[0111] The ideal gas state equation is pV=nRT, where p is the gas pressure, V is the volume of the mixed gas, which is the volume of the gas sealed tank 2 here, T is the temperature, n is the amount of gas, and R is the molar gas constant.
[0112] During the test, R and n will not change, and V will also remain fixed. The temperature T and air pressure p will form a directly proportional linear relationship, that is, when the temperature T rises, the air pressure p will also rise, and when the temperature T drops, the air pressure p will also drop.
[0113] With temperature as the horizontal axis and air pressure as the vertical axis, the selected multiple groups of test data can be formed into a temperature-air pressure curve graph. If an inflection point appears in the curve graph, that is, the air pressure p drops suddenly, the linear relationship changes, indicating that the mixed gas is liquefied, and the temperature corresponding to the inflection point is the liquefaction temperature.
[0114] Repeat steps S1-S7, and in the process of repeated tests, the temperature reduction value of the single temperature reduction in step S6 and the test temperature range can be narrowed according to the results of the previous test, which can narrow the temperature range of the liquefaction temperature of the mixed gas in the test results to obtain a more accurate liquefaction temperature.
[0115] During the secondary test, the temperature reduction value and the test temperature range are reduced to obtain the temperature-pressure curve of the secondary test. At this time, the temperature range where the inflection point is located can be reduced, which is more conducive to determining the specific position of the inflection point and improving the accuracy of the obtained mixed gas liquefaction temperature.
[0116] After each single test is completed, if it is necessary to directly use the results of this test, an approximate value can be selected in the liquefaction temperature range as the specific liquefaction temperature value; if further tests are required, the liquefaction temperature range obtained in this test can provide a basis for the next test, that is, appropriately narrow the cooling value and the test temperature range during the next test.
[0117] The more times the test is repeated, the smaller the selected temperature drop value and the test temperature range are, and the more accurate the liquefaction temperature value obtained is.
[0118] In order to verify the validity of the test data, after completing a single test of steps S1-S7, the temperature of the high and low temperature adjustable test box 1 is adjusted up to the initial set temperature value, and the validity of the test data is determined by comparing the real-time air pressure value at this temperature with the initial set air pressure value.
[0119] Before performing the above operations, it is necessary to first determine the recovery temperature adjustment time, that is, the time period for the high and low temperature adjustable test chamber 1 to increase the temperature from the end temperature value of the test temperature range to the initial set temperature value, and determine the recovery insulation time, that is, the time period from the temperature of the high and low temperature adjustable test chamber 1 reaching the initial set temperature value to the temperature of the mixed gas at various locations in the gas sealing tank 2 being consistent and reaching the initial set temperature value.
[0120] The temperature adjustment time can be set by adjusting the high and low temperature adjustable test box 1. The selection of the temperature adjustment time can refer to the method of testing the temperature adjustment time.
[0121] After the temperature of the high and low temperature adjustable test box 1 is adjusted to the initial set temperature value, it is necessary to keep it warm until the temperature of the mixed gas at various locations in the gas sealing tank 2 reaches the initial set temperature value, and the collected air pressure value can be compared with the initial set air pressure value.
[0122] If the difference between the air pressure value and the initial set air pressure value is within the air pressure error range, the test data is valid, otherwise it is invalid.
[0123] Among them, the air pressure error range is ±0.5kpa.
[0124] Preferably, the air pressure error range is ±0.1 kPa, which can effectively improve the accuracy of the test data.
[0125] Specifically, when the temperature of the mixed gas in each place in the gas sealed tank 2 rises back to the initial set temperature value again, if the air pressure value in the gas sealed tank 2 is equal to the initial set air pressure value at this time, it indicates that there is no gas leakage in the gas sealed tank 2, and the data of this test is accurate and reliable; if the air pressure value in the gas sealed tank 2 is less than the initial set air pressure value at this time, and the difference exceeds the air pressure error range, it indicates that the gas sealed tank 2 has leaked during the test, and the data of this test is invalid and cannot be used.
[0126] Example
[0127] like Figure 6-9 As shown, taking the mixed gas of C4F7N / CO2 as an example, the volume proportion of C4F7N is 20%.
[0128] During the initial test, various parameters were set, namely, the initial temperature setting value was 20°C, the initial pressure setting value was 150kpa, the initial heat preservation time was 240min, the initial temperature adjustment time was 240min, the test temperature range was -24°C to -48°C, the cooling value was 3°C, the test heat preservation time was 240min, the test temperature adjustment time was 10min, the recovery temperature adjustment time was 230min, and the recovery heat preservation time was 240min. At the same time, after calculation, the theoretical liquefaction temperature of the mixed gas was estimated to be 36°C.
[0129] The initial set temperature value is selected as 20°C. Firstly, this temperature is the standard temperature value of the laboratory. Secondly, this temperature is closer to the ambient temperature in the laboratory during the test, which is more convenient to operate.
[0130] First, fill the gas sealed tank 2 with the above-mentioned mixed gas until the air pressure reaches 160kpa, then place the gas sealed tank 2 in the high and low temperature adjustable test box 1, and connect the temperature sensor 6 and the air pressure sensor 11. After closing the door 4 of the high and low temperature adjustable test box 1, adjust its temperature to 20°C and keep it warm for 240 minutes (i.e., the initial insulation time) to ensure that the temperature of the mixed gas everywhere in the gas sealed tank 2 reaches 20°C (i.e., the initial set temperature value). At this time, discharge part of the mixed gas in the gas sealed tank 2 until the air pressure in the gas sealed tank 2 reaches 150kpa (i.e., the initial set pressure value).
[0131] At this time, adjust the temperature of the high and low temperature adjustable test chamber 1, that is, adjust the temperature to the starting temperature value of the test temperature range -24°C, and the temperature adjustment time used is 240 minutes (that is, the initial temperature adjustment time). This time, a longer temperature adjustment time is used to avoid large temperature changes in a short period of time and affect the service life of the high and low temperature adjustable test chamber 1.
[0132] Then enter the formal test step of the test temperature range, that is, keep the temperature of the high and low temperature adjustable test box 1 at -24°C for 240 minutes (i.e. the test insulation time), and then lower the temperature by 3°C (i.e. the cooling value), that is, adjust the temperature in the high and low temperature adjustable test box 1 to -27°C, and the temperature adjustment time is 10 minutes (i.e. the test temperature adjustment time), and then keep warm for 240 minutes, so that the temperature of the mixed gas in various places in the gas sealing tank 2 reaches -27°C.
[0133] Subsequently, the temperature is lowered stepwise by 3°C, 10min of test cooling time and 240min of test heat preservation time until the temperature in the high and low temperature adjustable test box 1 reaches -48°C and is kept at this temperature for 240min. At each test temperature value, the data collector 3 can collect and obtain multiple groups of test data, each group of test data includes three temperature values collected by three temperature sensors 6 and an air pressure value collected by an air pressure sensor 11.
[0134] After the -48℃ insulation time is over, the temperature of the high and low temperature adjustable test box 1 is raised to the initial set temperature value, i.e., 20℃. The temperature adjustment time is 230min (i.e., the recovery temperature adjustment time). After the temperature of the high and low temperature adjustable test box 1 is completed, it is kept warm for 240min (i.e., the recovery insulation time) to ensure that the temperature of the mixed gas in each part of the gas sealed tank is consistent and reaches 20℃. When the temperature of the mixed gas is raised to 20℃ again, the air pressure value in the gas sealed tank 2 is 150.1kpa, and the difference from the initial set air pressure value of 150kpa is 0.1kpa, which is within the allowable air pressure error range, thus indicating that the test data of this test is valid.
[0135] During the whole test process, the data collector 3 collects the temperature and pressure of the mixed gas in the gas sealing tank 2 in real time. The time interval for data collection is 2 minutes. The test temperature range is -24℃~-48℃. The specific test data are shown in Table 1.
[0136] Table 1: Test data selected from -24℃~-48℃ in the initial test
[0137]
[0138]
[0139] In the test data in Table 1, the air pressure value is the average value of multiple valid air pressure values corresponding to the temperature value. According to the test data in Table 1, a curve is drawn with temperature as the horizontal axis and air pressure as the vertical axis. The temperature at the inflection point is the liquefaction temperature.
[0140] like Figure 7 As shown in the figure, in this test, the inflection point appears at -33℃~-39℃, at this time, the middle value of this range, i.e. -36℃, can be selected, that is, the liquefaction temperature value of the mixed gas in this test is about -36℃. On this basis, a second test is conducted.
[0141] A secondary test was carried out on the basis of the initial test, and various parameters were set, namely, the initial set temperature value was 20℃, the initial set air pressure value was 150kpa, the initial insulation time was 240min, the initial temperature adjustment time was 180min, the test temperature range was -34℃~-38℃, the cooling value was 0.5℃, the test insulation time was 240min, the test temperature adjustment time was 10min, the recovery temperature adjustment time was 200min, and the recovery insulation time was 240min.
[0142] During the secondary test, the same initial set temperature value and initial set air pressure value as those used in the initial test are selected. The same system can be used directly after the initial test to simplify the secondary test process.
[0143] The temperature of the high and low temperature adjustable test box 1 is adjusted, that is, the temperature is adjusted down from 20°C (ie, the initial set temperature value) to the starting temperature value of the test temperature range -34°C, and the temperature adjustment time used is 180 minutes (ie, the initial temperature adjustment time).
[0144] Then enter the formal test step of the test temperature range, that is, keep the temperature of the high and low temperature adjustable test box 1 at -34℃ for 240min (i.e. the test insulation time), and then lower the temperature by 0.5℃ (i.e. the cooling value), that is, adjust the temperature in the high and low temperature adjustable test box 1 to -34.5℃, the temperature adjustment time is 10min (i.e. the test temperature adjustment time), and then keep warm for 240min, so that the temperature of the mixed gas in various places in the gas sealing tank 2 reaches -34.5℃.
[0145] Subsequently, the temperature is lowered stepwise by 0.5°C, 10min of test cooling time, and 240min of test heat preservation time until the temperature in the high and low temperature adjustable test box 1 reaches -38°C and is kept at this temperature for 240min. At each test temperature value, the data collector 3 can collect and obtain multiple groups of test data, each group of test data includes three temperature values collected by three temperature sensors 6 and an air pressure value collected by an air pressure sensor 11.
[0146] After the -38℃ insulation time is over, the temperature of the high and low temperature adjustable test box 1 is raised to the initial set temperature value, i.e., 20℃. The temperature adjustment time is 200min (i.e., the recovery temperature adjustment time). After the temperature of the high and low temperature adjustable test box 1 is completed, it is kept warm for 240min (i.e., the recovery insulation time) to ensure that the temperature of the mixed gas in each part of the gas sealed tank is consistent and reaches 20℃. When the temperature of the mixed gas is raised to 20℃ again, the air pressure value in the gas sealed tank 2 is 150.1kpa, and the difference from the initial set air pressure value of 150kpa is 0.1kpa, which is within the allowable air pressure error range, thus indicating that the test data of this test is valid.
[0147] During the whole test process, the data collector 3 collects the temperature and pressure values of the mixed gas in the gas sealing tank 2 in real time. The time interval for data collection is 2 minutes. The test temperature range is -34℃~-38℃. The specific test data are shown in Table 2.
[0148] Table 2: Test data selected at -34℃~-38℃ in the secondary test
[0149] Temperature value (℃) Air pressure value (kpa) Pressure difference between front and rear(kpa) -34 121.9 -34.5 121.6 0.3 -35 121.3 0.3 -35.5 121.0 0.3 -36 120.7 0.3 -36.5 120.2 0.5 -37 119.4 0.8 -37.5 118.6 0.8 -38 117.7 0.8
[0150] In the test data in Table 2, the air pressure value is the average value of multiple valid air pressure values corresponding to the temperature value. According to the test data in Table 1, a curve is drawn with temperature as the horizontal axis and air pressure as the vertical axis. The temperature at the inflection point is the liquefaction temperature.
[0151] like Fig. 9As shown, in this test, the inflection point appears between -35.5℃ and -36.5℃, so the middle value, i.e. -36℃, can be selected, that is, the liquefaction temperature value of the mixed gas in this test is about -36℃.
[0152] The test of this embodiment was conducted twice. Although the liquefaction temperature values determined twice were the same, the second test improved the accuracy of the liquefaction temperature value compared to the initial test. If a more accurate liquefaction temperature value is required, the test can be increased and the set temperature drop value can be gradually reduced in subsequent tests.
[0153] The present invention utilizes a test system with a simple structure and low cost, and obtains the liquefaction temperature of the mixed gas by collecting the gas pressure value of the mixed gas in a sealed environment at different temperatures. The test process is simple, efficient, and the test result is highly accurate.
[0154] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A mixed gas liquefaction test system, characterized in that: include A high and low temperature adjustable test chamber (1) is used to provide an operating environment temperature for simulating the application of mixed gas; A gas sealed tank (2), which is placed in the high and low temperature adjustable test box (1) and is used to store the mixed gas; The data collector (3) is placed outside the high and low temperature adjustable test box (1) and is used to collect and record the temperature and pressure of the mixed gas in the gas sealing tank (2) in real time.
2. The mixed gas liquefaction test system according to claim 1, characterized in that: The gas sealing tank (2) is provided with a temperature collection port (5), and a temperature sensor (6) is installed in the temperature collection port (5).
3. The mixed gas liquefaction test system according to claim 2, characterized in that: The temperature sensor (6) is connected to a temperature data acquisition line (9) of a data acquisition device (3) passing through the high and low temperature adjustable test box (1).
4. The mixed gas liquefaction test system according to claim 2, characterized in that: The temperature collection port (5) comprises a temperature collection port I located in the middle of the gas sealing tank (2), and a temperature collection port II located near the two ends of the gas sealing tank (2), and the temperature collection port I is located on the opposite side of the temperature collection port II.
5. The mixed gas liquefaction test system according to claim 1, characterized in that: The gas sealing tank (2) is connected to a conducting tube (10) extending from the high and low temperature adjustable test box (1), an air pressure sensor (11) is installed at the outer end of the conducting tube (10), and the air pressure sensor (11) is connected to an air pressure data acquisition line (12) of the data acquisition device (3).
6. The mixed gas liquefaction test system according to claim 1, characterized in that: A through hole (15) is provided on one side of the high and low temperature adjustable test box (1), and a sealing plug (16) with a hole is installed in the through hole (15).
7. The mixed gas liquefaction test system according to claim 1, characterized in that: A one-way valve (17) is installed on the gas sealing tank (2).
8. A test method for a mixed gas liquefaction test system according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step S1: Determine the initial set temperature value, initial set pressure value and test temperature range of the mixed gas; Step S2: Filling the gas sealed tank (2) with mixed gas so that the gas pressure value in the gas sealed tank (2) is higher than the initial set pressure value during the test; Step S3: placing the gas sealed tank (2) filled with the mixed gas in a high and low temperature adjustable test box (1), and connecting the signal lines of the temperature sensor (6) and the air pressure sensor (11) to the data acquisition device (3); Step S4: adjusting the temperature in the high and low temperature adjustable test box (1) to the initial set temperature value during the test, and keeping the temperature until the temperature in the gas sealed tank (2) reaches the initial set temperature value; Step S5: exhausting part of the mixed gas in the gas sealed tank (2) so that the gas pressure in the gas sealed tank (2) is equal to the initial set gas pressure value; Step S6: lowering the temperature in the high and low temperature adjustable test box (1) to reach the starting temperature value of the test temperature range, and then lowering the temperature in the high and low temperature adjustable test box (1) in a step-by-step manner, and the data collector (3) collects and records the temperature and air pressure data in the gas sealed tank (2) in real time; Step S7: After the entire test temperature range test is completed, the temperature and pressure data are sorted out, and the law of the mixed gas pressure value changing with the temperature is analyzed to obtain the liquefaction temperature value of the mixed gas.
9. The test method of the mixed gas liquefaction test system according to claim 8, characterized in that: In step S6, the stepwise temperature adjustment of the high and low temperature adjustable test box (1) is performed, that is, the temperature keeping and temperature lowering operations are repeated alternately; The cooling value of each step temperature reduction is equal.
10. The test method of the mixed gas liquefaction test system according to claim 8, characterized in that: Repeat steps S1-S7, and in the process of repeated tests, the temperature reduction value of the single temperature reduction in step S6 and the test temperature range can be narrowed according to the results of the previous test, which can narrow the range of the liquefaction temperature of the mixed gas in the test results to obtain a more accurate liquefaction temperature.
11. The test method of the mixed gas liquefaction test system according to claim 8, characterized in that: After completing a single test of steps S1-S7, the temperature of the high and low temperature adjustable test box (1) is adjusted upward to the initial set temperature value, and the validity of the test data is determined by comparing the real-time air pressure value at this temperature with the initial set air pressure value.
12. The test method of the mixed gas liquefaction test system according to claim 11, characterized in that: After the temperature of the high and low temperature adjustable test box (1) is adjusted to the initial set temperature value, it is necessary to keep the temperature until the temperature of the mixed gas at each location in the gas sealing tank (2) reaches the initial set temperature value, and the collected air pressure value can be compared with the initial set air pressure value; If the difference between the air pressure value and the initial set air pressure value is within the air pressure error range, the test data is valid, otherwise it is invalid; The air pressure error range is ±0.5kpa.
