Intelligent building construction method and system, readable storage medium and computer

By constructing a building construction model and indicator matrix, and conducting a comprehensive evaluation based on cost factors, we solve the problem of traditional building construction relying on manual review and decision-making, realize intelligent construction of buildings, and reduce resource costs and construction schedules.

CN118747441AInactive Publication Date: 2024-10-08HAINAN VOCATIONAL COLLEGE OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410964550.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional building construction models rely on manual review and decision-making, resulting in high resource costs and decision-making errors, which increase the construction period and cost.

Method used

By obtaining building construction parameters, constructing a construction model, performing index matrix construction and feature processing, and conducting comprehensive evaluation combined with cost factors, intelligent construction of buildings can be achieved and manual errors can be avoided.

Benefits of technology

It realizes intelligent decision-making in building construction, reduces resource costs, improves construction efficiency and accuracy, and avoids the disadvantages of manual decision-making.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747441A_ABST
    Figure CN118747441A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent building construction method and system, a readable storage medium and a computer, and the method comprises the steps: obtaining construction parameters of a to-be-constructed building, and constructing a construction model of the to-be-constructed building based on the construction parameters; building indexes are built for the building model, and an index matrix is built for the built building indexes; performing feature processing on the index matrix, and performing weight configuration based on a feature processing result to obtain feature evaluation data corresponding to the index matrix; collecting cost factors in each stage in the building construction process, and performing stage evaluation on each stage in the building construction process based on each cost factor to obtain stage evaluation data corresponding to each stage; and performing combined evaluation screening on the evaluation data of each stage and the feature evaluation data, evaluating the comprehensive grade of the construction model based on a combined evaluation screening result, and if the comprehensive grade is not lower than a preset grade, performing intelligent construction on the to-be-constructed building based on the construction parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent construction technology, and in particular to a building intelligent construction method, system, readable storage medium and computer. Background Art

[0002] With the improvement of people's living standards and the rapid development of the economy, industrialization and urbanization are also growing. As a pioneering industry of industrialization and urbanization, the construction industry is also gradually increasing in number.

[0003] The traditional construction model is to manually review various construction parameters of the building during project planning and project operation, and make judgments based on the corresponding construction parameters to ensure that engineering and technical personnel make correct construction decisions and decision-making responses to the building information. However, manual review and manual judgment require practitioners to have a lot of construction knowledge, which greatly increases the cost of personnel resources. In addition, manual review and manual decision-making have drawbacks in decision-making. A mistake made by practitioners will lead to increased construction time and cost. Summary of the invention

[0004] Based on this, the purpose of the present invention is to provide a building intelligent construction method, system, readable storage medium and computer to at least solve the deficiencies in the above-mentioned technology.

[0005] The present invention provides a building intelligent construction method, comprising: Acquiring construction parameters of the building to be constructed, and constructing a construction model of the building to be constructed based on the construction parameters; constructing construction indicators for the construction model, and constructing an indicator matrix with the constructed construction indicators; Performing feature processing on the indicator matrix, and performing weight configuration based on the feature processing result, so as to obtain feature evaluation data corresponding to the indicator matrix; Collecting cost factors at each stage of the building construction process, and performing stage evaluation on each stage of the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; The evaluation data of each stage and the characteristic evaluation data are combined for evaluation and screening, and the comprehensive level of the construction model is evaluated based on the combined evaluation and screening results. If the comprehensive level is not lower than the preset level, the building to be constructed is intelligently constructed based on the construction parameters.

[0006] Furthermore, the step of obtaining construction parameters of the building to be constructed and constructing a construction model of the building to be constructed based on the construction parameters includes: Acquire construction parameters of the building to be constructed, split the construction parameters according to the construction stages, and construct a construction process based on the split results; The building to be constructed is modeled according to the construction process and the splitting result to obtain a corresponding construction model.

[0007] Furthermore, the step of constructing construction indicators for the construction model and constructing an indicator matrix from the constructed construction indicators includes: Objectively evaluating the construction model, calculating the importance of the objective evaluation results, and sorting the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; Construction indicators are constructed based on the evaluation ranking table, and an indicator matrix is ​​constructed according to the constructed construction indicators.

[0008] Furthermore, the step of performing feature processing on the indicator matrix and configuring weights based on the feature processing results to obtain feature evaluation data corresponding to the indicator matrix includes: Performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; Performing weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; The eigenvector of the maximum eigenvalue and its corresponding weight value are verified for consistency. If the consistency verification result meets the preset verification requirements, corresponding feature evaluation data is generated based on the indicator matrix.

[0009] The present invention also provides a building intelligent construction system, comprising: A model building module, used for acquiring construction parameters of the building to be built, and building a construction model of the building to be built based on the construction parameters; A matrix construction module, used to construct construction indicators for the construction model and construct an indicator matrix of the constructed construction indicators; A feature processing module, used to perform feature processing on the indicator matrix and perform weight configuration based on the feature processing result to obtain feature evaluation data corresponding to the indicator matrix; The stage evaluation module is used to collect cost factors at each stage in the building construction process, and to perform stage evaluation on each stage in the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; The intelligent construction module is used to combine the evaluation data of each stage and the characteristic evaluation data for evaluation and screening, and evaluate the comprehensive level of the construction model based on the combined evaluation and screening results. If the comprehensive level is not lower than the preset level, the building to be constructed is intelligently constructed based on the construction parameters.

[0010] Furthermore, the model building module includes: A process construction unit, used for obtaining construction parameters of the building to be constructed, splitting the construction parameters according to the construction stages, and constructing a construction process based on the splitting results; A model building unit is used to build a model of the building to be built according to the construction process and the splitting result to obtain a corresponding construction model.

[0011] Furthermore, the matrix building module includes: An objective evaluation unit, used to objectively evaluate the construction model, calculate the importance of the objective evaluation results, and sort the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; The matrix construction unit is used to construct construction indicators based on the evaluation ranking table, and to construct an indicator matrix according to the constructed construction indicators.

[0012] Furthermore, the feature processing module includes: A feature processing unit, used for performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; A weight configuration unit, used to perform weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; The data verification unit is used to perform consistency verification on the eigenvector of the maximum eigenvalue and its corresponding weight value, and if the consistency verification result meets the preset verification requirements, generate corresponding feature evaluation data based on the indicator matrix.

[0013] The present invention also provides a readable storage medium on which a computer program is stored, and when the program is executed by a processor, the above-mentioned intelligent building construction method is implemented.

[0014] The present invention also proposes a computer, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned intelligent building construction method when executing the computer program.

[0015] The intelligent building construction method, system, readable storage medium and computer of the present invention construct a construction model according to the construction parameters of the building to be constructed, and construct indicators for the construction model to obtain an indicator matrix, perform feature processing on the indicator matrix, and configure weights based on the feature processing results to obtain feature evaluation data, use the evaluation data to achieve rapid verification of the model, and use the model to achieve intelligent construction of the building to avoid errors caused by human factors; collect cost factors at each stage in the building construction process, and perform stage evaluation on each stage according to the cost factors to obtain stage evaluation data, use the stage evaluation data and the feature evaluation data to conduct a comprehensive grade assessment of the construction model, and use the two evaluation data to conduct a comprehensive evaluation of the construction model, so as to formulate the best construction method, and realize the intelligent construction of the building to be constructed through the construction method. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A flowchart of a building intelligent construction method in a first embodiment of the present invention; Figure 2 for Figure 1 Detailed flow chart of step S101; Figure 3 for Figure 1 Detailed flowchart of step S102; Figure 4 for Figure 1 Detailed flow chart of step S103; Figure 5 A structural block diagram of a building intelligent construction system in a second embodiment of the present invention; Figure 6 FIG. 4 is a structural block diagram of a computer in a third embodiment of the present invention.

[0017] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0018] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0019] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0020] Embodiment 1 See also Figure 1 , which shows a building intelligent construction method in a first embodiment of the present invention, and the method specifically includes steps S101 to S105: S101, obtaining construction parameters of a building to be constructed, and constructing a construction model of the building to be constructed based on the construction parameters; For further information, see Figure 2 , the step S101 specifically includes steps S1011~S1012: S1011, obtaining construction parameters of the building to be constructed, splitting the construction parameters according to the construction stages, and constructing a construction process based on the splitting results; S1012: constructing a model of the building to be constructed according to the construction process and the splitting result to obtain a corresponding construction model.

[0021] In the specific implementation, the construction task of the building to be constructed is obtained, and the construction parameters related to the building in the construction task are obtained, wherein the construction parameters include the relevant parameters required for the construction of the building, such as: floor height, building materials, material properties, etc. The above-obtained construction parameters are split based on the construction stage of the building to be constructed so that each construction parameter corresponds to the construction stage, and the construction process is constructed using the split results.

[0022] Specifically, a model of the building to be constructed is constructed based on the construction process and the above-mentioned splitting results. The model is constructed according to the construction process and the splitting results, and each process is matched with the parameters in the corresponding splitting results, so as to obtain the construction model of the building to be constructed.

[0023] S102, constructing construction indicators for the construction model, and constructing an indicator matrix with the constructed construction indicators; For further information, see Figure 3 , the step S102 specifically includes steps S1021~S1022: S1021, objectively evaluating the construction model, calculating the importance of the objective evaluation results, and sorting the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; S1022: constructing construction indicators based on the evaluation ranking table, and constructing an indicator matrix according to the constructed construction indicators.

[0024] In the specific implementation, the construction practitioners use their own experience accumulation and professional knowledge to objectively evaluate the construction model, including the construction cost evaluation and the construction process evaluation of the construction model. The importance of the evaluation opinions of the evaluators on the model is calculated, and the objective evaluation results are sorted according to the calculated importance to obtain a corresponding evaluation ranking table, wherein the evaluation ranking table includes the scores of various evaluation opinions of the evaluators on the model; Specifically, the construction index is constructed based on the evaluation ranking table obtained above, the evaluation ranking table is defined in order to construct the corresponding construction index, and the importance of each construction index in the evaluation ranking table is defined as the importance of the elements in the same level. , the constructed indicator matrix is: .

[0025] S103, performing feature processing on the indicator matrix, and performing weight configuration based on the feature processing result to obtain feature evaluation data corresponding to the indicator matrix; For further information, see Figure 4 , the step S103 specifically includes steps S1031 to S1033: S1031, performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; S1032, performing weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; S1033, performing consistency verification on the eigenvector of the maximum eigenvalue and its corresponding weight value, and if the consistency verification result meets the preset verification requirements, generating corresponding feature evaluation data based on the indicator matrix.

[0026] In the specific implementation, the indicator matrix obtained above is subjected to feature processing, the product of each row element in the indicator matrix is ​​calculated, and the nth root of the product is calculated, so as to obtain the maximum eigenvalue of the indicator matrix; Specifically, a weight is configured for the maximum eigenvalue of the indicator matrix, and corresponding normalization is performed to obtain the eigenvector corresponding to the maximum eigenvalue. The consistency is verified by calculating the weight value of the eigenvector and the eigenvector. The order of the indicator matrix is ​​used as a standard to measure the consistency requirements, and a mapping table of different matrix orders and consistency values ​​is created. When the consistency value queried through the mapping table is greater than a preset threshold (in this embodiment, the preset threshold is 0.1), it means that the indicator matrix needs to be corrected, and the corresponding indicator matrix is ​​reconstructed and consistency verification is performed until the verification result meets the requirements, and the corresponding feature evaluation data is generated according to the indicator matrix.

[0027] S104, collecting cost factors at each stage in the building construction process, and performing stage evaluation on each stage in the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; In the specific implementation, the cost factors of each construction stage in the construction process of the building to be constructed are collected, wherein each construction stage includes the pre-construction stage, the construction preparation stage, the construction implementation stage and the acceptance stage, and the cost factors include economic cost, labor cost and technical cost, and a stage evaluation is performed on each stage of the building construction process based on each cost factor. For example: the economic data of the building to be constructed in the pre-construction stage is obtained, and the pre-construction stage is evaluated according to the economic data to obtain corresponding stage evaluation data. If the stage evaluation result does not meet the preset evaluation requirements, it means that the economic cost of the pre-construction stage is high, and the economic cost needs to be recalculated and planned. The preset evaluation requirements are the evaluation requirements of the corresponding evaluators for each construction stage of the building to be constructed.

[0028] S105, combining the evaluation data of each stage and the characteristic evaluation data for evaluation and screening, and evaluating the comprehensive level of the construction model based on the combined evaluation and screening results; if the comprehensive level is not lower than the preset level, intelligently constructing the building to be constructed based on the construction parameters.

[0029] In specific implementation, the evaluation data of each stage and the characteristic evaluation data obtained above are combined for evaluation and screening, the evaluation data of each stage and the characteristic evaluation data are dimensionless processed, and divided into positive evaluation scores, negative evaluation scores and moderate evaluation scores, wherein the larger the value of the positive evaluation score is, the higher the score of the corresponding evaluation data is; the larger the value of the negative evaluation score is, the lower the score of the corresponding evaluation data is; the moderate evaluation score has little effect on the score of the corresponding evaluation data, and the impact is usually not considered.

[0030] Specifically, the above-mentioned combined evaluation and screening results are used to conduct a comprehensive grade assessment on the construction model constructed above, and the comprehensive grade is compared based on the manual score of the construction model by practitioners as a reference (preset grade). If the comprehensive grade is not lower than the manual score, it means that the construction parameters corresponding to the construction model meet the requirements, and intelligent construction is carried out on the building to be constructed based on the construction parameters.

[0031] In summary, the intelligent building construction method in the above-mentioned embodiment of the present invention constructs a construction model according to the construction parameters of the building to be constructed, and constructs indicators for the construction model to obtain an indicator matrix, performs feature processing on the indicator matrix, and performs weight configuration based on the feature processing results to obtain feature evaluation data, and uses the evaluation data to realize rapid verification of the model, and uses the model to realize intelligent construction of the building to avoid errors caused by human factors; collects cost factors at various stages in the building construction process, and performs stage evaluation on each stage according to the cost factors to obtain stage evaluation data, uses the stage evaluation data and the feature evaluation data to conduct a comprehensive grade evaluation on the construction model, and uses the two evaluation data to conduct a comprehensive evaluation on the construction model, so as to formulate the best construction method, and realize the intelligent construction of the building to be constructed through the construction method.

[0032] Embodiment 2 Another aspect of the present invention is to provide a building intelligent construction system. Figure 5 , which shows a building intelligent construction system in a second embodiment of the present invention, the system comprises: A model building module 11 is used to obtain construction parameters of the building to be built, and build a construction model of the building to be built based on the construction parameters; Furthermore, the model building module 11 includes: A process construction unit, used for obtaining construction parameters of the building to be constructed, splitting the construction parameters according to the construction stages, and constructing a construction process based on the splitting results; A model building unit is used to build a model of the building to be built according to the construction process and the splitting result to obtain a corresponding construction model.

[0033] A matrix construction module 12 is used to construct construction indicators for the construction model and construct an indicator matrix of the constructed construction indicators; Furthermore, the matrix construction module 12 includes: An objective evaluation unit, used to objectively evaluate the construction model, calculate the importance of the objective evaluation results, and sort the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; The matrix construction unit is used to construct construction indicators based on the evaluation ranking table, and to construct an indicator matrix according to the constructed construction indicators.

[0034] A feature processing module 13 is used to perform feature processing on the indicator matrix and perform weight configuration based on the feature processing result to obtain feature evaluation data corresponding to the indicator matrix; Furthermore, the feature processing module 13 includes: A feature processing unit, used for performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; A weight configuration unit, used to perform weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; The data verification unit is used to perform consistency verification on the eigenvector of the maximum eigenvalue and its corresponding weight value, and if the consistency verification result meets the preset verification requirements, generate corresponding feature evaluation data based on the indicator matrix.

[0035] The stage evaluation module 14 is used to collect cost factors at each stage in the building construction process, and to perform stage evaluation on each stage in the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; The intelligent construction module 15 is used to combine the evaluation data of each stage and the characteristic evaluation data for evaluation and screening, and evaluate the comprehensive level of the construction model based on the combined evaluation and screening results. If the comprehensive level is not lower than the preset level, the building to be constructed is intelligently constructed based on the construction parameters.

[0036] The functions or operation steps implemented when the above modules and units are executed are generally the same as those in the above method embodiments, and will not be repeated here.

[0037] The building intelligent construction system provided in the embodiment of the present invention has the same implementation principle and technical effects as those of the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the system embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.

[0038] Embodiment 3 The present invention also provides a computer, see Figure 6 , shown is a computer in the third embodiment of the present invention, including a memory 10, a processor 20, and a computer program 30 stored in the memory 10 and executable on the processor 20. When the processor 20 executes the computer program 30, the above-mentioned intelligent building construction method is implemented.

[0039] The memory 10 includes at least one type of readable storage medium, which includes a flash memory, a hard disk, a multimedia card, a card-type memory (e.g., an SD or DX memory, etc.), a magnetic memory, a magnetic disk, an optical disk, etc. In some embodiments, the memory 10 may be an internal storage unit of a computer, such as a hard disk of the computer. In other embodiments, the memory 10 may also be an external storage device, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card, etc. Further, the memory 10 may also include both an internal storage unit of the computer and an external storage device. The memory 10 may be used not only to store application software and various types of data installed in the computer, but also to temporarily store data that has been output or is to be output.

[0040] Among them, in some embodiments, the processor 20 can be an electronic control unit (Electronic Control Unit, abbreviated as ECU, also known as a vehicle computer), a central processing unit (Central Processing Unit, CPU), a controller, a microcontroller, a microprocessor or other data processing chip, used to run the program code stored in the memory 10 or process data, such as executing access restriction programs, etc.

[0041] It should be pointed out that Figure 6 The structure shown does not constitute a limitation on the computer. In other embodiments, the computer may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.

[0042] The embodiment of the present invention further provides a readable storage medium having a computer program stored thereon, which implements the above-mentioned intelligent building construction method when executed by a processor.

[0043] Those skilled in the art will appreciate that the logic and / or steps represented in the flowchart or otherwise described herein, for example, may be considered as an ordered list of executable instructions for implementing logical functions, and may be specifically implemented in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For purposes of this specification, "computer-readable medium" may be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0044] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0045] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or a combination thereof: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0046] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0047] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A building intelligent construction method, characterized in that: include: Acquiring construction parameters of the building to be constructed, and constructing a construction model of the building to be constructed based on the construction parameters; constructing construction indicators for the construction model, and constructing an indicator matrix with the constructed construction indicators; Performing feature processing on the indicator matrix, and performing weight configuration based on the feature processing result, so as to obtain feature evaluation data corresponding to the indicator matrix; Collecting cost factors at each stage of the building construction process, and performing stage evaluation on each stage of the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; The evaluation data of each stage and the characteristic evaluation data are combined for evaluation and screening, and the comprehensive level of the construction model is evaluated based on the combined evaluation and screening results. If the comprehensive level is not lower than the preset level, the building to be constructed is intelligently constructed based on the construction parameters.

2. The intelligent building construction method according to claim 1, characterized in that: The steps of obtaining construction parameters of a building to be constructed and constructing a construction model of the building to be constructed based on the construction parameters include: Acquire construction parameters of the building to be constructed, split the construction parameters according to the construction stages, and construct a construction process based on the split results; The building to be constructed is modeled according to the construction process and the splitting result to obtain a corresponding construction model.

3. The intelligent building construction method according to claim 1, characterized in that: The steps of constructing construction indicators for the construction model and constructing an indicator matrix with the constructed construction indicators include: Objectively evaluating the construction model, calculating the importance of the objective evaluation results, and sorting the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; Construction indicators are constructed based on the evaluation ranking table, and an indicator matrix is ​​constructed according to the constructed construction indicators.

4. The intelligent building construction method according to claim 1, characterized in that: The steps of performing feature processing on the indicator matrix and configuring weights based on the feature processing results to obtain feature evaluation data corresponding to the indicator matrix include: Performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; Performing weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; The eigenvector of the maximum eigenvalue and its corresponding weight value are verified for consistency. If the consistency verification result meets the preset verification requirements, corresponding feature evaluation data is generated based on the indicator matrix.

5. A building intelligent construction system, characterized in that: include: A model building module, used for acquiring construction parameters of the building to be built, and building a construction model of the building to be built based on the construction parameters; A matrix construction module, used to construct construction indicators for the construction model and construct an indicator matrix of the constructed construction indicators; A feature processing module, used to perform feature processing on the indicator matrix and perform weight configuration based on the feature processing result to obtain feature evaluation data corresponding to the indicator matrix; The stage evaluation module is used to collect cost factors at each stage in the building construction process, and to perform stage evaluation on each stage in the building construction process based on each cost factor, so as to obtain stage evaluation data corresponding to each stage; The intelligent construction module is used to combine the evaluation data of each stage and the characteristic evaluation data for evaluation and screening, and evaluate the comprehensive level of the construction model based on the combined evaluation and screening results. If the comprehensive level is not lower than the preset level, the building to be constructed is intelligently constructed based on the construction parameters.

6. The building intelligent construction system according to claim 5, characterized in that: The model building module includes: A process construction unit, used for obtaining construction parameters of the building to be constructed, splitting the construction parameters according to the construction stages, and constructing a construction process based on the splitting results; A model building unit is used to build a model of the building to be built according to the construction process and the splitting result to obtain a corresponding construction model.

7. The building intelligent construction system according to claim 5, characterized in that: The matrix building module includes: An objective evaluation unit, used to objectively evaluate the construction model, calculate the importance of the objective evaluation results, and sort the objective evaluation results according to the importance to obtain a corresponding evaluation sorting table; The matrix construction unit is used to construct construction indicators based on the evaluation ranking table, and to construct an indicator matrix according to the constructed construction indicators.

8. The building intelligent construction system according to claim 5, characterized in that: The feature processing module comprises: A feature processing unit, used for performing feature processing on the indicator matrix to calculate the maximum eigenvalue of the indicator matrix; A weight configuration unit, used to perform weight configuration on the maximum eigenvalue to obtain an eigenvector of the maximum eigenvalue and a corresponding weight value thereof; The data verification unit is used to perform consistency verification on the eigenvector of the maximum eigenvalue and its corresponding weight value, and if the consistency verification result meets the preset verification requirements, generate corresponding feature evaluation data based on the indicator matrix.

9. A readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the building intelligent construction method as described in any one of claims 1 to 4 is implemented.

10. A computer comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the building intelligent construction method as described in any one of claims 1 to 4 is implemented.