Sintering molding process for preparing metal semi-finished product by using metal powder

By using an adjustable screening mechanism and vortex tube pre-drying technology in metal powder screening equipment, the problems of low screening efficiency and frequent screen replacement in the existing technology are solved, and efficient screening and screening of metal powders are achieved. Improved fluidity, suitable for sintering processes.

CN118751925APending Publication Date: 2024-10-11ANHUI LANXESS ENVIRONMENTAL ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410845684.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing metal powder screening equipment has inconveniences in selecting the screen aperture. If it is too large, small particles will be missed, and if it is too small, it will be blocked, resulting in low screening efficiency and frequent screen replacement, which affects process efficiency.

Method used

A sintering molding process is designed, which uses an adjustable screening mechanism to screen out metal powders of different particle sizes by adjusting the position and vibration frequency between sieve plates, and uses a vortex tube for pre-drying to improve the fluidity of the powder. and screening efficiency.

Benefits of technology

It achieves efficient screening of metal powder, improves screening stability and efficiency, reduces agglomeration, enhances the fluidity of the powder, and is suitable for subsequent processing and sintering processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118751925A_ABST
    Figure CN118751925A_ABST
Patent Text Reader

Abstract

The invention provides a sinter molding process for preparing a metal semi-finished product by using metal powder, belongs to the technical field of metal powder processing, and solves the problem that a screen is inconvenient to replace in the prior art. The sinter molding process for preparing the metal semi-finished product through the metal powder comprises the following steps that S1, material screening is conducted, specifically, appropriate metal powder is selected, screening and grinding are conducted through screening equipment according to needs, and it is guaranteed that the particle size and the shape of the powder meet the process requirements; s2, injection molding: uniformly mixing metal powder and an organic binder according to a certain proportion in injection molding equipment, and injecting the feed into a mold to form a molded blank; s3, degreasing is conducted, specifically, the binder in the formed blank is decomposed and volatilized in a heating mode, and the binder in the formed blank is removed in advance; and S4, sintering is conducted, specifically, the formed blank enters sintering equipment to be sintered, and a compact semi-finished product is formed. The metal powder screening device has the advantage of being capable of efficiently screening metal powder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of metal powder processing, and relates to a sintering molding process for metal semi-finished products, in particular to a sintering molding process for preparing metal semi-finished products by using metal powder. Background Art

[0002] The sintering process of metal powder to prepare metal semi-finished products is an important manufacturing technology, which is widely used in the manufacture of high-strength, high-density and complex-shaped parts. This process mainly includes powder preparation, injection molding, sintering and post-processing.

[0003] The powder preparation stage mainly produces metal powders through mechanical crushing and other methods. These powders are finely screened and mixed to ensure the uniformity and purity of the powders to meet the needs of subsequent processes. In the metal powder injection molding stage, the metal powder is mixed with an organic binder to form a uniform feed, which is then injected into the mold at a certain temperature and pressure, and the binder is decomposed and sintered by heating.

[0004] Sintering is a key step in the process of preparing metal semi-finished products from metal powder. The pressed body is placed in a closed furnace with a reducing atmosphere for sintering, and the sintering temperature is generally controlled at 2 / 3 to 3 / 4 times the melting point of the base metal. During the sintering process, the powder body undergoes a series of physical and chemical changes, such as evaporation of water, elimination of stress, material migration between particles, recrystallization, etc., which increase the crystal contact surface between particles and shrink or even eliminate the pores. These changes make the powder particles closely combined to form a dense body or product. The post-processing stage further improves the performance and quality of the sintered body or product through heat treatment, surface treatment and other methods.

[0005] After searching, for example, Chinese patent documents disclose a powder sintering device and cleaning method with a cleaning function [Application number: CN202311395796.0; Publication number: CN117340285A]. The scheme includes a sintering machine body, an operating door arranged on the sintering machine body, a laser generator arranged at the top of the inner cavity of the sintering machine body, and a powder spreading unit arranged in the sintering machine body; it also includes a pair of inclined platforms, a lifting sintering platform, a negative pressure adsorption unit, at least five blocking units, five lifting adjustment structures, a rotary drive unit, a powder moving screening unit, and a reciprocating transmission unit; a pair of inclined platforms are symmetrically fixed on both sides of the inner wall of the sintering machine body; and the lifting sintering platform is set between the pair of inclined platforms.

[0006] This solution has some inconveniences in the screening process of metal powder raw materials. If the aperture of the screen is too large, smaller particles are likely to leak through; if it is too small, it may be blocked and particles cannot flow through. In the screening process, it is necessary to select a suitable screen according to actual needs and regularly check whether the apertures of the screens correspond to each other to ensure the screening effect. If the screen needs to be replaced every time filtering is performed, it will be time-consuming and labor-intensive, which will affect the screening efficiency of the metal powder. Summary of the invention

[0007] The purpose of the present invention is to address the above-mentioned problems in the existing technology and to propose a sintering molding process for preparing metal semi-finished products using metal powder. The technical problem to be solved by the sintering molding process for preparing metal semi-finished products using metal powder is: how to achieve efficient screening of metal powder.

[0008] The purpose of the present invention can be achieved by the following technical solutions: A sintering molding process for preparing a metal semi-finished product using metal powder comprises the following steps: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

[0009] In the step S1, the metal powder has a particle size of 60 μm.

[0010] In the step S3, the heating temperature is 200-300°C, and in the step S4, the sintering time is 2-4 hours.

[0011] In the step S4, the sintering temperature of the sintering equipment is 1330-1380° C., and the sintering time is 2 hours.

[0012] The equipment used in steps S1-S4 is a sintering equipment for preparing metal semi-finished products using metal powder, and the sintering equipment for preparing metal semi-finished products using metal powder includes a screening box, an injection molding box and a sintering furnace, the upper end of the screening box is rotatably mounted with a bottom plate, the two ends of the bottom plate are inserted and rotatably mounted on the upper end of the screening box through connecting shafts, the upper end of the bottom plate is provided with a screening mechanism, the side of the screening box is provided with a recovery port, the interior of the recovery port is provided with a recovery mechanism, the inner bottom of the injection molding box is fixedly mounted with a first horizontal plate, the upper end of the first horizontal plate is slidably mounted with a second horizontal plate, the upper end of the second horizontal plate is slidably mounted with a third horizontal plate, the upper end of the third horizontal plate is provided with a placement rack, and the interior of the injection molding box is provided with an injection molding mechanism, A guide belt for transporting the placement rack is provided on the side of the injection molding box, a side groove is provided on the inner wall of the sintering furnace, and a rotating shaft is rotatably installed at the upper and lower ends of the side groove, a sixth motor is fixedly installed inside the sintering furnace, and the output end of the sixth motor extends to the inside of the side groove and is fixedly connected to the rotating shaft at the upper end, sprockets are fixedly installed on the outside of the two rotating shafts, and the two sprockets are connected by chain transmission, and a plurality of clamping rods are fixedly installed on the side of the chain, and a docking mechanism is provided between the clamping rod and the first cross plate, and a feed port cooperating with the placement rack is also provided at the lower end of the sintering furnace, a sealing plate is installed inside the feed port, and a plurality of storage grooves are evenly spaced at the upper end of the feed port, and a locking mechanism is provided inside the storage groove.

[0013] The working principle of the present invention is: the size of the sieve holes is adjusted through the screening mechanism, so that metal powder with a smaller aperture can be screened out for subsequent processing; the material left after screening is poured out through the recovery mechanism to make it flow out of the screening box for subsequent recycling processing; the molding blank is formed under a certain temperature and pressure through the injection molding mechanism; the molding blank inside the placement rack is sent to the sintering furnace for sintering through the docking mechanism; and the stability of the placement rack is maintained by the locking mechanism.

[0014] The screening mechanism includes a first sieve plate fixedly mounted on the upper end of a bottom plate, a second sieve plate is slidably mounted on the upper end of the first sieve plate, a plurality of sieve holes of the same size are evenly spaced inside the first sieve plate and the second sieve plate, a first motor is fixedly mounted inside the first sieve plate, a first transmission gear is fixedly mounted on the output end of the first motor, a rack is fixedly mounted on the middle part of the second sieve plate, the rack is meshed with the first transmission gear, limiting grooves are provided at both ends of the first sieve plate, limiting blocks are fixedly mounted at both ends of the second sieve plate, the limiting blocks are slidably mounted inside the limiting grooves, fourth electric telescopic rods are also mounted on the left and right ends of the second sieve plate, a strip plate is fixedly mounted on the output end of the fourth electric telescopic rod, a first rectangular cavity is provided inside the screening box, and an adjustment mechanism is provided inside the first rectangular cavity.

[0015] With the above structure, when screening metal powder materials, the metal powder is poured onto the upper end of the second sieve plate. When adjusting the first sieve plate and the second sieve plate, the first motor located inside the first sieve plate can be started, and then the first motor will drive the first transmission gear to rotate, and then the first transmission gear will drive the second sieve plate to move through the rack, thereby adjusting the positional relationship between the first sieve plate and the second sieve plate. When the two are completely overlapped, the aperture of the sieve hole is the largest. When the two are staggered from each other, the overlapping area of ​​the sieve holes inside the two will become smaller, so that metal powder with a smaller aperture can be screened out, which is convenient for subsequent processing. The limit block at the bottom of the second sieve plate can prevent the first sieve plate and the second sieve plate from detaching from each other, thereby improving the stability of the screening process.

[0016] The adjusting mechanism includes a second motor fixedly installed on the upper end of the screening box, the left end of the connecting shaft extends into the interior of the first rectangular cavity and is fixedly installed with the first conical column gear, the output end of the second motor extends into the interior of the first rectangular cavity and is fixedly installed with the second conical column gear, the interior of the screening box is also fixedly installed with the first electric telescopic rod, the output end of the first electric telescopic rod is fixedly installed with the first transmission rod, the end of the first transmission rod extends into the interior of the first rectangular cavity and is rotatably installed with the second transmission gear, the first conical column gear and the second conical column gear are connected through the second transmission gear, the interior of the connecting shaft is hollow, a connecting pipe is inserted into the interior of the connecting shaft, a transition chamber is opened in the interior of the bottom plate, the front end of the connecting pipe extends to the interior of the transition chamber and is provided with a plurality of air outlets at equal intervals, and a vortex tube is arranged on the outside of the screening box, and the hot end of the vortex tube is connected with the interior of the connecting pipe.

[0017] With the above structure, after the first sieve plate and the second sieve plate are adjusted, the second motor can be started to drive the second conical column gear to rotate, and then the first conical column gear and the connecting shaft can be driven to rotate through the second motor. The second motor reciprocates, and then drives the connecting shaft to reciprocate, thereby generating a vibration effect to achieve screening of metal powder materials. At the same time, the strip plates will block both sides of the second sieve plate to prevent metal powder materials from leaking out of the second sieve plate during the screening process. The first transmission rod is driven to move by the first electric telescopic rod, thereby driving the second transmission gear to move, and then the connecting shaft can be changed. The rotation speed of the shaft, the first sieve plate and the second sieve plate can be adjusted to screen out metal powder materials with different particle sizes. Metal powder materials with different particle sizes have different natural frequencies. By changing the rotation speed of the connecting shaft, the vibration frequency of the first sieve plate and the second sieve plate can be adjusted, and then the best screening effect can be achieved according to the characteristics of the powder after screening. Hot air is sprayed into the vortex tube and multiple air outlets to pre-dry the metal powder. The dried metal powder will flow to the bottom of the screen box. Pre-drying the metal powder can reduce agglomeration, improve the fluidity of the powder, and improve the screening effect and efficiency.

[0018] The recovery mechanism includes a stepper motor fixedly mounted on the side wall of a screening box, a second rectangular cavity is also provided inside the screening box, the right end of the connecting shaft extends into the second rectangular cavity and is rotatably mounted with a first transmission wheel, a guide rod is fixedly mounted on the output end of the stepper motor, a baffle is fixedly mounted on the outside of the guide rod, a second transmission wheel is fixedly mounted near the end of the guide rod, the second transmission wheel is connected to the first transmission wheel in reverse transmission via a transmission belt, a second electric telescopic rod is fixedly mounted in the area of ​​the second rectangular cavity inside the connecting shaft, a second transmission rod is fixedly mounted on the output end of the second electric telescopic rod, and a plurality of slots cooperating with the second transmission rod are axially equidistantly provided on the inner wall of the first transmission wheel.

[0019] By adopting the above structure, after screening is completed, the stepper motor on the side wall of the screening box is started, and the second transmission wheel is driven to rotate by the stepper motor, and the second electric telescopic rod inside the connecting shaft is started at the same time. The second electric telescopic rod inserts the second transmission rod into the inside of any one of the card slots, so as to fix the first transmission wheel and the connecting shaft, and then drive the first transmission wheel to rotate in the opposite direction through the transmission belt, and then drive the connecting shaft to rotate in the opposite direction. When the second motor drives the first screen plate and the second screen plate to vibrate, the second transmission rod is pulled out from the inside of the card slot, and no more transmission is performed between the connecting shaft and the first transmission wheel, so as to ensure the normal screening. The second transmission wheel drives the guide rod and the baffle to rotate toward the inside of the screening box, and the first transmission wheel drives the first screen plate and the second screen plate to rotate toward the position of the recovery port, thereby dumping the material left after screening to the upper end of the baffle, and flowing out of the screening box through the obstruction of the baffle, so as to facilitate subsequent recycling.

[0020] The injection molding mechanism includes an injection molding machine fixedly installed on the top of the injection molding box, a material guide pipe is fixedly installed on the bottom of the screening box, a third motor is fixedly installed on one end of the material guide pipe, a conveying rod is fixedly installed on the output end of the third motor, the conveying rod extends to the interior of the material guide pipe and is fixedly installed with a spiral conveying blade, a material discharge port is also opened at the upper end of the material guide pipe, the right end of the material guide pipe extends to the interior of the injection molding box and is connected to the injection molding machine, and two hot air ducts are symmetrically arranged on the inner wall of the injection molding box.

[0021] With the above structure, after screening is completed, the metal powder enters the interior of the guide tube through the discharge port, and the conveying rod inside the guide tube is driven to rotate by the third motor, thereby driving the spiral conveying blade to rotate. Then, the metal powder inside the guide tube can be fed into the injection molding machine inside the injection molding box. In the injection molding machine, the metal powder is mixed with an organic binder to form a uniform feed, and then the feed is injected into the mold inside the placement rack at a certain temperature and pressure to form a molded blank. The hot air duct is then started to blow air to the placement rack, thereby heating and degreasing the workpiece to remove all the binder in the molded blank. The degreased blank will enter the sintering furnace for sintering.

[0022] The docking mechanism includes a first strip groove opened in the first transverse plate, a fourth motor is fixedly installed on the right end of the first transverse plate, a first screw is fixedly installed on the output end of the fourth motor, the left end of the first screw extends to the inside of the first strip groove, a mounting groove is opened at the bottom of the second transverse plate, a first fixing block is fixedly installed on the left end of the mounting groove, a first nut is fixedly installed inside the first fixing block, the first nut is spirally driven and installed on the outside of the first screw, a sliding rod is fixedly installed inside the mounting groove, a resist block is slidably installed on the outside of the sliding rod, the resist block is fixedly installed on the right end of the first transverse plate, an equipment cavity is opened inside the resist block, a conductor plate is slidably installed inside the equipment cavity, a touch rod is fixedly installed on the left end of the conductor plate, and the end of the touch rod passes through the device The gear train is an electric starter gear and a support frame, and the electric starter gear is an electric starter gear. The electric starter gear is an electric starter gear of the electric starter gear. The electric starter gear is an electric starter gear of the electric starter gear. The electric starter gear is an electric starter gear of the electric starter gear. The electric starter gear is an electric starter gear of the electric starter gear.

[0023] With the above structure, after the degreasing of the formed blank inside the placement rack is completed, the fourth motor at the right end of the first horizontal plate is started, and the first screw inside the first strip groove is driven to rotate by the fourth motor, and then the second horizontal plate at the upper end of the first fixed block is driven to move through the first nut. When the first fixed block contacts the contact rod, it will push the conductor plate to move. When the conductor plate contacts the two contacts, the fifth motor will be started, and then the fifth motor will drive the second screw to rotate, and then the second screw will drive the second fixed block and the fourth horizontal plate to move through the second nut, thereby driving the placement rack to move and transport the placement rack to the inside of the sintering furnace. During the sintering process, the binder in the formed blank will be further removed, so that the metal semi-finished product can achieve higher density and strength.

[0024] The limiting mechanism includes a third electric telescopic rod fixedly mounted on the end of the clamping rod, a clamping plate fixedly mounted on the output end of the third electric telescopic rod, an inclined groove is provided inside the hook, and the inner wall of the inclined groove is elastically connected to the end of the clamping rod through a second spring.

[0025] By adopting the above structure, after the placement rack is transported to the inside of the sintering furnace, the hanging ring will be hung on the upper end of the card rod, and then the third electric telescopic rod will be started to push the card plate to move, and then the card plate will overcome the elastic force of the second spring to push the hook to rotate and keep the hook stable, and then the placement rack will be hung on the upper end of the chain and moved to the upper end of the sintering furnace driven by the chain. When taking out the placement rack, the third electric telescopic rod and the card plate will be retracted, and then the hook will rotate under the elastic force of the second spring to facilitate the retraction of the placement rack.

[0026] The locking mechanism comprises a rotating plate rotatably mounted inside the receiving slot, a fourth electric telescopic rod is fixedly mounted inside the receiving slot, and a limiting plate is fixedly mounted on the output end of the fourth electric telescopic rod.

[0027] With the above structure, during the upward movement of the placement rack, the left end of the placement rack will push the rotating plate inside the storage slot to rotate. After the placement rack passes over the rotating plate, the fourth electric telescopic rod inside the storage slot is started, and the limit plate is driven to move by the fourth electric telescopic rod, thereby pushing the rotating plate to rotate, thereby supporting the rotating plate and keeping the rotating plate level. The rotating plate can support the left end of the placement rack, thereby reducing the pressure on the chain and maintaining the stability of the placement rack.

[0028] Compared with the prior art, the present invention has the following advantages: 1. When screening metal powder materials, pour the metal powder on the upper end of the second sieve plate. When adjusting the first sieve plate and the second sieve plate, the first motor located inside the first sieve plate can be started, and then the first motor will drive the first transmission gear to rotate, and then the first transmission gear will drive the second sieve plate to move through the rack, thereby adjusting the positional relationship between the first sieve plate and the second sieve plate. When the two are completely overlapped, the aperture of the sieve hole is the largest. When the two are staggered, the overlapping area of ​​the sieve holes inside the two will become smaller, so that metal powder with a smaller aperture can be screened out, which is convenient for subsequent processing. The limit block at the bottom of the second sieve plate can prevent the first sieve plate and the second sieve plate from detaching from each other, thereby improving the stability of the screening process.

[0029] 2. After the first sieve plate and the second sieve plate are adjusted, the second motor can be started to drive the second conical column gear to rotate, and then the first conical column gear and the connecting shaft are driven to rotate through the second transmission gear. The second motor rotates back and forth, thereby driving the connecting shaft to rotate back and forth, thereby generating a vibration effect to achieve screening of metal powder materials. At the same time, the strip plates will block both sides of the second sieve plate to prevent metal powder materials from leaking out of the second sieve plate during the screening process. The first transmission rod is driven to move through the first electric telescopic rod, thereby driving the second transmission gear to move, and then the rotation of the connecting shaft can be changed. Speed, the first sieve plate and the second sieve plate can be adjusted to screen out metal powder materials with different particle sizes. Metal powder materials with different particle sizes have different natural frequencies. By changing the speed of the connecting shaft, the vibration frequency of the first sieve plate and the second sieve plate can be adjusted, and then the best screening effect can be achieved according to the characteristics of the powder after screening. Hot air is sprayed into the vortex tube and multiple air outlets to pre-dry the metal powder. The dried metal powder will flow to the bottom of the screening box. Pre-drying the metal powder can reduce agglomeration, improve the fluidity of the powder, and improve the screening effect and efficiency.

[0030] 3. After the screening is completed, start the stepper motor on the side wall of the screening box, and drive the second transmission wheel to rotate through the stepper motor. At the same time, start the second electric telescopic rod inside the connecting shaft. The second electric telescopic rod inserts the second transmission rod into any one of the slots, so that the first transmission wheel and the connecting shaft can be fixed, and then the first transmission wheel is driven to rotate in the opposite direction through the transmission belt, and then the connecting shaft is driven to rotate in the opposite direction. When the second motor drives the first screen plate and the second screen plate to vibrate, the second transmission rod is pulled out from the inside of the slot, and no transmission is performed between the connecting shaft and the first transmission wheel, so as to ensure the normal screening. The second transmission wheel drives the guide rod and the baffle to rotate toward the inside of the screening box, and the first transmission wheel drives the first screen plate and the second screen plate to rotate toward the position of the recovery port, so that the materials left after screening are dumped to the upper end of the baffle, and flow out of the screening box through the obstruction of the baffle for subsequent recycling.

[0031] 4. After the screening is completed, the metal powder enters the inside of the guide tube through the discharge port, and the conveying rod inside the guide tube is driven to rotate by the third motor, thereby driving the spiral conveying blade to rotate. Then, the metal powder inside the guide tube can be fed into the injection molding machine inside the injection molding box. In the injection molding machine, the metal powder is mixed with an organic binder to form a uniform feed, and then the feed is injected into the mold inside the placement rack at a certain temperature and pressure to form a molded blank. Then, the hot air pipe is started to blow air to the placement rack, thereby heating and degreasing the workpiece to remove all the binders in the molded blank. The degreased blank will enter the sintering furnace for sintering.

[0032] 5. After the degreasing of the formed blank inside the placement rack is completed, the fourth motor at the right end of the first horizontal plate is started, and the first screw inside the first strip groove is driven to rotate by the fourth motor, and then the second horizontal plate at the upper end of the first fixed block is driven to move through the first nut. When the first fixed block contacts the contact rod, it will push the conductor plate to move. When the conductor plate contacts the two contacts, the fifth motor will be started, and then the fifth motor will drive the second screw to rotate, and then the second screw will drive the second fixed block and the fourth horizontal plate to move through the second nut, thereby driving the placement rack to move and transport the placement rack to the inside of the sintering furnace. During the sintering process, the binder in the formed blank will be further removed, so that the metal semi-finished product can achieve higher density and strength.

[0033] 6. After the placement rack is transported to the interior of the sintering furnace, the hanging ring will be hung on the upper end of the card rod, and then the third electric telescopic rod will be started to push the card plate to move, and then the card plate will overcome the elastic force of the second spring to push the hook to rotate and keep the hook stable, and then the placement rack will be hung on the upper end of the chain, and moved to the upper end of the sintering furnace under the drive of the chain. When taking out the placement rack, the third electric telescopic rod and the card plate are retracted, and then the hook will rotate under the elastic force of the second spring to facilitate the retraction of the placement rack. In the process of the placement rack moving upward, the left end of the placement rack will push the rotating plate inside the storage slot to rotate. After the placement rack passes the rotating plate, the fourth electric telescopic rod inside the storage slot is started, and the limit plate is driven to move by the fourth electric telescopic rod, thereby pushing the rotating plate to rotate, thereby supporting the rotating plate and keeping the rotating plate level. The rotating plate can support the left end of the placement rack, thereby reducing the pressure of the chain and keeping the placement rack stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a flow chart of the present invention.

[0035] Figure 2 It is a schematic diagram of the overall structure of the present invention.

[0036] Figure 3 It is the internal structure diagram of the screening box of the present invention.

[0037] Figure 4 yes Figure 3 A magnified view of the structure at A.

[0038] Figure 5 yes Figure 3 Enlarged view of the structure at B.

[0039] Figure 6 It is a bottom plate internal structure diagram of the present invention.

[0040] Figure 7 It is a side structural diagram of the injection molding box of the present invention.

[0041] Figure 8It is a diagram showing the internal structure of the first horizontal plate of the present invention.

[0042] Fig. 9 yes Figure 8 Enlarged view of the structure at location C.

[0043] Fig.10 It is a diagram of the internal structure of the hook of the present invention.

[0044] Fig.11 It is the external structure diagram of the hook of the present invention.

[0045] Fig.12 yes Figure 2 Enlarged view of the structure at D.

[0046] Fig.13 It is a table showing the improvement of sintering efficiency of the present invention.

[0047] In the figure, 1, screening box; 2, injection molding box; 3, sintering furnace; 4, first sieve plate; 5, second sieve plate; 6, first transmission gear; 7, rack; 8, bottom plate; 9, connecting shaft; 10, first rectangular cavity; 11, first conical column gear; 12, second motor; 13, second conical column gear; 14, first electric telescopic rod; 15, first transmission rod; 16, second transmission gear; 17, connecting pipe; 18, transition chamber; 19, air outlet; 20, second rectangular cavity; 21, first transmission wheel; 22, second electric telescopic rod; 23, second transmission rod; 24, slot; 25, transmission belt; 26, recovery port; 27, baffle; 28, second transmission wheel; 29, guide pipe; 30, discharge port; 31, third motor; 32, conveying rod; 33, spiral conveying blade; 34, injection molding machine; 35, hot air pipe; 36, first horizontal plate; 37, second horizontal plate; 38, third horizontal plate; 39, placement rack; 40, first strip groove; 41, fourth motor; 42, first screw; 43, first fixed block; 44, slide bar; 45, block; 46, conductor plate; 47, touch rod; 48, first spring; 49, contact; 50, fifth motor; 51, second strip groove; 52, second screw; 53, second fixed block; 54, hanging ring; 55, rotating shaft; 56, sprocket; 57, chain; 58, clamping rod; 59, third electric telescopic rod; 60, clamping plate; 61, hook; 62, inclined groove; 63, second spring; 64, feed port; 65, storage slot; 66, rotating plate; 67, fourth electric telescopic rod; 68, limit plate; 69, guide belt; 70, strip plate. DETAILED DESCRIPTION

[0048] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

[0049] Embodiment 1: The sintering molding process for preparing a metal semi-finished product using metal powder comprises the following steps: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

[0050] In the step S1, the metal powder has a particle size of 60 μm.

[0051] In the step S3, the heating temperature is 250°C, and in the step S4, the sintering time is 3 hours.

[0052] In the step S4, the sintering temperature of the sintering equipment is 1330° C., and the sintering time is 2 hours.

[0053] The devices used in this embodiment are all currently available devices on the market.

[0054] Embodiment 2 like Figure 1-Figure 13 As shown, the sintering molding process for preparing a metal semi-finished product using metal powder includes the following steps: The following steps are involved: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

[0055] In the step S1, the metal powder has a particle size of 60 μm.

[0056] In the step S3, the heating temperature is 250°C, and in the step S4, the sintering time is 3 hours.

[0057] In the step S4, the sintering temperature of the sintering equipment is 1330° C., and the sintering time is 2 hours.

[0058] The equipment used in steps S1-S4 is a sintering equipment for preparing metal semi-finished products using metal powder, and the sintering equipment for preparing metal semi-finished products using metal powder includes a screening box 1, an injection molding box 2 and a sintering furnace 3. A bottom plate 8 is rotatably installed on the upper end of the screening box 1, and both ends of the bottom plate 8 are inserted and rotatably installed on the upper end of the screening box 1 through a connecting shaft 9, and a screening mechanism is arranged on the upper end of the bottom plate 8. A recovery port 26 is opened on the side of the screening box 1, and a recovery mechanism is arranged inside the recovery port 26. A first horizontal plate 36 is fixedly installed on the inner bottom of the injection molding box 2, and a second horizontal plate 37 is slidably installed on the upper end of the first horizontal plate 36, and a third horizontal plate 38 is slidably installed on the upper end of the second horizontal plate 37. A placement rack 39 is installed on the upper end of the third horizontal plate 38, and an injection molding mechanism is arranged inside the injection molding box 2. 2 is provided with a guide belt 69 for transporting the placement rack 39, the inner wall of the sintering furnace 3 is provided with a side groove, and the upper and lower ends of the side groove are rotatably installed with a rotating shaft 55, the inside of the sintering furnace 3 is fixedly installed with a sixth motor, the output end of the sixth motor extends to the inside of the side groove and is fixedly connected to the rotating shaft 55 at the upper end, and the outsides of the two rotating shafts 55 are fixedly installed with sprockets 56, and the two sprockets 56 are connected by a chain 57 for transmission, and a plurality of clamping rods 58 are fixedly installed on the side of the chain 57, and a docking mechanism is provided between the clamping rods 58 and the first cross plate 36, and a feeding port 64 cooperating with the placement rack 39 is also provided at the lower end of the sintering furnace 3, and a sealing plate is installed inside the feeding port 64, and a plurality of receiving grooves 65 are evenly spaced at the upper end of the feeding port 64, and a locking mechanism is provided inside the receiving grooves 65.

[0059] The screening mechanism includes a first sieve plate 4 fixedly installed on the upper end of the bottom plate 8, a second sieve plate 5 is slidably installed on the upper end of the first sieve plate 4, a plurality of sieve holes of the same size are evenly spaced inside the first sieve plate 4 and the second sieve plate 5, a first motor is fixedly installed inside the first sieve plate 4, a first transmission gear 6 is fixedly installed on the output end of the first motor, a rack 7 is fixedly installed in the middle of the second sieve plate 5, the rack 7 is meshed with the first transmission gear 6, both ends of the first sieve plate 4 are provided with limiting grooves, both ends of the second sieve plate 5 are fixedly installed with limiting blocks, the limiting blocks are slidably installed inside the limiting grooves, fourth electric telescopic rods are also installed on the left and right ends of the second sieve plate 5, a strip plate 70 is fixedly installed on the output end of the fourth electric telescopic rod, a first rectangular cavity 10 is opened inside the screening box 1, and an adjustment mechanism is arranged inside the first rectangular cavity 10.

[0060] In this embodiment, when screening the metal powder material, the metal powder is poured on the upper end of the second sieve plate 5. When adjusting the first sieve plate 4 and the second sieve plate 5, the first motor located inside the first sieve plate 4 can be started, and then the first motor will drive the first transmission gear 6 to rotate, and then the first transmission gear 6 will drive the second sieve plate 5 to move through the rack 7, thereby adjusting the positional relationship between the first sieve plate 4 and the second sieve plate 5. When the two are completely overlapped, the aperture of the sieve hole is the largest. When the two are staggered from each other, the overlapping area of ​​the sieve holes inside the two will become smaller, so that metal powder with a smaller aperture can be screened out, which is convenient for subsequent processing. The limit block at the bottom of the second sieve plate 5 can prevent the first sieve plate 4 and the second sieve plate 5 from detaching from each other, thereby improving the stability of the screening process.

[0061] The adjusting mechanism includes a second motor 12 fixedly mounted on the upper end of the screening box 1, the left end of the connecting shaft 9 extends to the interior of the first rectangular cavity 10 and is fixedly mounted with a first conical column gear 11, the output end of the second motor 12 extends to the interior of the first rectangular cavity 10 and is fixedly mounted with a second conical column gear 13, a first electric telescopic rod 14 is also fixedly mounted inside the screening box 1, a first transmission rod 15 is fixedly mounted on the output end of the first electric telescopic rod 14, an end of the first transmission rod 15 extends to the interior of the first rectangular cavity 10 and is rotatably mounted with a second transmission gear 16, the first conical column gear 11 and the second conical column gear 13 are connected by the second transmission gear 16, the interior of the connecting shaft 9 is hollow, a connecting pipe 17 is inserted into the interior of the connecting shaft 9, a transition chamber 18 is opened inside the bottom plate 8, the front end of the connecting pipe 17 extends to the interior of the transition chamber 18 and is provided with a plurality of air outlets 19 at equal intervals, a vortex tube is arranged outside the screening box 1, and the hot end of the vortex tube is connected to the interior of the connecting pipe 17.

[0062] In this embodiment, after the first sieve plate 4 and the second sieve plate 5 are adjusted, the second motor 12 can be started, and the strip plate 70 can be lifted up by the fourth electric telescopic rod. The second motor 12 drives the second conical column gear 13 to rotate, and then the second transmission gear 16 drives the first conical column gear 11 and the connecting shaft 9 to rotate. The second motor 12 reciprocates, thereby driving the connecting shaft 9 to reciprocate, thereby generating a vibration effect, and realizing the screening of the metal powder material. At the same time, the strip plate 70 will block the two sides of the second sieve plate 5, so as to prevent the metal powder material from leaking out of the second sieve plate 5 during the screening process. The first transmission rod 15 is driven to move by the first electric telescopic rod 14, thereby driving the second transmission gear The moving gear 16 moves, and then the rotation speed of the connecting shaft 9 can be changed. The first sieve plate 4 and the second sieve plate 5 can be adjusted to screen out metal powder materials with different particle sizes. Metal powder materials with different particle sizes have different natural frequencies. By changing the rotation speed of the connecting shaft 9, the vibration frequency of the first sieve plate 4 and the second sieve plate 5 is adjusted, and then the best screening effect can be achieved according to the characteristics of the powder after screening. Hot air is sprayed into the inside of the vortex tube 17 and multiple air outlets 19 to pre-dry the metal powder. The dried metal powder will flow to the bottom of the screening box 1. Pre-drying the metal powder can reduce agglomeration, improve the fluidity of the powder, and improve the screening effect and screening efficiency.

[0063] The recovery mechanism includes a stepper motor fixedly mounted on the side wall of the screening box 1. A second rectangular cavity 20 is also provided inside the screening box 1. The right end of the connecting shaft 9 extends into the second rectangular cavity 20 and is rotatably mounted with a first transmission wheel 21. A guide rod is fixedly mounted on the output end of the stepper motor, a baffle 27 is fixedly mounted on the outside of the guide rod, a second transmission wheel 28 is fixedly mounted near the end of the guide rod, and the second transmission wheel 28 is connected to the first transmission wheel 21 in reverse transmission through a transmission belt 25. A second electric telescopic rod 22 is fixedly mounted inside the connecting shaft 9 in the area of ​​the second rectangular cavity 20, a second transmission rod 23 is fixedly mounted on the output end of the second electric telescopic rod 22, and a plurality of slots 24 cooperating with the second transmission rod 23 are axially evenly spaced on the inner wall of the first transmission wheel 21.

[0064] In this embodiment, after screening is completed, the stepper motor on the side wall of the screening box 1 is started, and the second transmission wheel 28 is driven to rotate by the stepper motor, and the second electric telescopic rod 22 inside the connecting shaft 9 is started at the same time. The second electric telescopic rod 22 inserts the second transmission rod 23 into any one of the slots 24, so that the first transmission wheel 21 and the connecting shaft 9 can be fixed, and then the first transmission wheel 21 is driven to rotate in the opposite direction by the transmission belt 25, and then the connecting shaft 9 is driven to rotate in the opposite direction. When the second motor 12 drives the first sieve plate 4 and the second sieve plate 5 to vibrate, the second transmission rod 23 is pulled out from the inside of the slot 24, and no transmission is performed between the connecting shaft 9 and the first transmission wheel 21, so that the normal screening can be ensured. The second transmission wheel 28 drives the guide rod and the baffle 27 to rotate toward the inside of the screening box 1, and the first transmission wheel 21 drives the first sieve plate 4 and the second sieve plate 5 to rotate toward the position of the recovery port 26, so that the material left after screening is poured toward the upper end of the baffle 27, and flows out of the screening box 1 through the obstruction of the baffle 27, so as to facilitate subsequent recycling.

[0065] The injection molding mechanism includes an injection molding machine 34 fixedly installed on the top of the injection molding box 2, a material guide pipe 29 is fixedly installed on the bottom of the screening box 1, a third motor 31 is fixedly installed on one end of the material guide pipe 29, a conveying rod 32 is fixedly installed on the output end of the third motor 31, the conveying rod 32 extends to the inside of the material guide pipe 29 and is fixedly installed with a spiral conveying blade 33, a material discharge port 30 is also opened at the upper end of the material guide pipe 29, the right end of the material guide pipe 29 extends to the inside of the injection molding box 2 and is connected to the injection molding machine 34, and two hot air ducts 35 are symmetrically arranged on the inner wall of the injection molding box 2.

[0066] In this embodiment, after the screening is completed, the metal powder enters the interior of the guide tube 29 through the discharge port 30, and the conveying rod 32 inside the guide tube 29 is driven to rotate by the third motor 31, thereby driving the spiral conveying blade 33 to rotate, and then the metal powder inside the guide tube 29 can be sent to the injection molding machine 34 inside the injection molding box 2. In the injection molding machine 34, the metal powder is mixed with an organic binder to form a uniform feed, and then the feed is injected into the mold inside the placement rack 39 at a certain temperature and pressure to form a molded blank, and then the hot air pipe 35 is started to blow the placement rack 39, thereby heating and degreasing the workpiece to remove all the binder in the molded blank. The degreased blank will enter the sintering furnace 3 for sintering.

[0067] The docking mechanism includes a first strip groove 40 opened in the first transverse plate 36, a fourth motor 41 is fixedly installed on the right end of the first transverse plate 36, a first screw 42 is fixedly installed on the output end of the fourth motor 41, and the left end of the first screw 42 extends to the inside of the first strip groove 40, and a device groove is opened at the bottom of the second transverse plate 37, a first fixed block 43 is fixedly installed on the left end of the device groove, a first nut is fixedly installed inside the first fixed block 43, and the first nut is spirally installed on the outside of the first screw 42, a sliding rod 44 is fixedly installed inside the device groove, and a stop block 45 is slidably installed outside the sliding rod 44, and the stop block 45 is fixedly installed on the right end of the first transverse plate 36, and an equipment cavity is opened inside the stop block 45, and a conductor plate 46 is slidably installed inside the equipment cavity, and a contact rod 47 is fixedly installed on the left end of the conductor plate 46, and the end of the contact rod 47 passes through the equipment cavity and Extending to the interior of the device slot, the right end of the conductor plate 46 is elastically connected to the inner wall of the equipment cavity through the first spring 48, and two contacts 49 are fixedly installed on the right end of the equipment cavity. A second strip groove 51 is opened at the upper end of the second cross plate 37, and a fifth motor 50 is fixedly installed on the right end of the second cross plate 37. Both contacts 49 are electrically connected to the fifth motor 50. A second screw 52 is fixedly installed on the output end of the fifth motor 50, and the left end of the second screw 52 extends to the interior of the second strip groove 51. A second fixed block 53 is fixedly installed on the bottom of the third cross plate 38, and a second nut is fixedly installed inside the second fixed block 53. The second nut is spirally driven and installed on the outside of the second screw 52. A hanging ring 54 is fixedly installed on the right end of the placement frame 39, and a hook 61 cooperating with the hanging ring 54 is rotatably installed on the end of the clamping rod 58, and a limiting mechanism is provided at the end of the clamping rod 58.

[0068] In this embodiment, after the degreasing of the formed blank inside the placement rack 39 is completed, the fourth motor 41 at the right end of the first horizontal plate 36 is started, and the first screw 42 inside the first strip groove 40 is driven to rotate by the fourth motor 41, and then the second horizontal plate 37 at the upper end of the first fixed block 43 is driven to move through the first nut. When the first fixed block 43 contacts the contact rod 47, it will push the conductor plate 46 to move. When the conductor plate 46 contacts the two contacts 49, the fifth motor 50 will be started, and then the fifth motor 50 will drive the second screw 52 to rotate, and then the second screw 52 will drive the second fixed block 53 and the fourth horizontal plate 38 to move through the second nut, thereby driving the placement rack 39 to move, and transporting the placement rack 39 to the inside of the sintering furnace 3. During the sintering process, the binder in the formed blank will be further removed, so that the metal semi-finished product can achieve higher density and strength.

[0069] The limiting mechanism includes a third electric telescopic rod 59 fixedly mounted on the end of the clamping rod 58, a clamping plate 60 is fixedly mounted on the output end of the third electric telescopic rod 59, an inclined groove 62 is provided inside the hook 61, and the inner wall of the inclined groove 62 is elastically connected to the end of the clamping rod 58 via a second spring 63.

[0070] In this embodiment, after the placement rack 39 is transported to the interior of the sintering furnace 3, the hanging ring 54 will be hung on the upper end of the card rod 58, and then the third electric telescopic rod 59 will be started to push the card plate 60 to move, and then the card plate 60 will overcome the elastic force of the second spring 63 to push the hook 61 to rotate and keep the hook 61 stable, and then the placement rack 39 will be hung on the upper end of the chain 57, and moved to the upper end of the sintering furnace 3 under the drive of the chain 57. When taking out the placement rack 39, the third electric telescopic rod 59 and the card plate 60 will be retracted, and then the hook 61 will rotate under the elastic force of the second spring 63 to facilitate the retraction of the placement rack 39.

[0071] The locking mechanism includes a rotating plate 66 rotatably mounted inside the storage slot 65 , a fourth electric telescopic rod 67 is fixedly mounted inside the storage slot 65 , and a limit plate 68 is fixedly mounted on the output end of the fourth electric telescopic rod 67 .

[0072] In this embodiment, during the upward movement of the placement rack 39, the left end of the placement rack 39 will push the rotating plate 66 inside the storage slot 65 to rotate. After the placement rack 39 passes over the rotating plate 66, the fourth electric telescopic rod 67 inside the storage slot 65 is started, and the limit plate 68 is driven to move by the fourth electric telescopic rod 67, thereby pushing the rotating plate 66 to rotate, thereby supporting the rotating plate 66 and keeping the rotating plate 66 horizontal. The rotating plate 66 can support the left end of the placement rack 39, thereby reducing the pressure on the chain 57 and maintaining the stability of the placement rack 39.

[0073] Embodiment three: The sintering molding process for preparing a metal semi-finished product using metal powder comprises the following steps: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

[0074] In the step S1, the metal powder has a particle size of 60 μm.

[0075] In the step S3, the heating temperature is 200°C, and in the step S4, the sintering time is 4 hours.

[0076] In the step S4, the sintering temperature of the sintering equipment is 1380° C., and the sintering time is 2 hours.

[0077] The equipment used in the sintering molding process of preparing metal semi-finished products using metal powder in this embodiment is the same as the equipment used in the second embodiment, and the difference lies in the different process conditions.

[0078] Embodiment 4:

[0079] The sintering molding process for preparing a metal semi-finished product using metal powder comprises the following steps: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

[0080] In the step S1, the metal powder has a particle size of 60 μm.

[0081] In the step S3, the heating temperature is 300°C, and in the step S4, the sintering time is 2 hours.

[0082] In the step S4, the sintering temperature of the sintering equipment is 1380° C., and the sintering time is 2 hours.

[0083] The equipment used in the sintering molding process of preparing metal semi-finished products using metal powder in this embodiment is the same as the equipment used in the second embodiment, and the difference lies in the different process conditions.

[0084] Experimental example: According to GB / T3656-2017, the sintering efficiency of Examples 1 to 4 was tested, and compared with the existing sintering method with incomplete screening, and the improvement efficiency was measured. In Examples 1 to 4 of the present application, after the metal powder was screened, the same number of metal pieces were taken in each group of examples, and the strength of the sintered formed metal pieces was tested, and compared with the metal pieces that were not carefully screened. The measured results are shown in the following table:

[0085] According to the data in the above table, it can be seen that only the sintering equipment S1 to S4 in Example 1 and Example 2 are different, and the pressure-bearing capacity of the metal parts in Example 2 is significantly stronger than that in Example 1. Therefore, the use of the sintering equipment for preparing metal semi-finished products using metal powder in the present invention can improve the pressure-bearing performance of the metal parts.

[0086] Compared with Example 2, Example 3 and Example 4 only have different processing conditions, and the equipment used in the processing steps are the same. The strength of the metal parts in Example 3 and Example 4 is weaker than that in Example 2. It can be seen that different processing conditions will also affect the strength of metal parts.

[0087] The working principle of the present invention is as follows: when screening metal powder materials, the metal powder is poured onto the upper end of the second sieve plate 5. When adjusting the first sieve plate 4 and the second sieve plate 5, the first motor located inside the first sieve plate 4 can be started, and then the first motor will drive the first transmission gear 6 to rotate, and then the first transmission gear 6 will drive the second sieve plate 5 to move through the rack 7, thereby adjusting the positional relationship between the first sieve plate 4 and the second sieve plate 5. When the two are completely overlapped, the aperture of the sieve hole is the largest. When the two are staggered from each other, the overlapping area of ​​the sieve holes inside the two will become smaller, so that metal powder with a smaller aperture can be screened out for subsequent processing. The limit block at the bottom of the second sieve plate 5 can prevent the first sieve plate 4 and the second sieve plate 5 from being overlapped. The two sieve plates 5 are disengaged from each other, thereby improving the stability of the screening process. After the first sieve plate 4 and the second sieve plate 5 are adjusted, the second motor 12 can be started, and the second conical column gear 13 is driven to rotate by the second motor 12, and then the first conical column gear 11 and the connecting shaft 9 are driven to rotate by the second transmission gear 16. The second motor 12 reciprocates, thereby driving the connecting shaft 9 to reciprocate, thereby generating a vibration effect, and realizing the screening of the metal powder material. The first transmission rod 15 is driven to move by the first electric telescopic rod 14, thereby driving the second transmission gear 16 to move, and then the speed of the connecting shaft 9 can be changed. The first sieve plate 4 and the second sieve plate 5 can be adjusted to screen out metal powder materials of different particle sizes, and metal powder materials of different particle sizes can be screened out. The materials have different natural frequencies. By changing the rotation speed of the connecting shaft 9, the vibration frequencies of the first sieve plate 4 and the second sieve plate 5 are adjusted, and then the best screening effect can be achieved according to the characteristics of the powder after screening. Hot air is sprayed into the vortex tube 17 and the multiple air outlets 19 to pre-dry the metal powder. The dried metal powder will flow to the bottom of the screening box 1. Pre-drying the metal powder can reduce agglomeration, improve the fluidity of the powder, and improve the screening effect and screening efficiency. After the screening is completed, the stepper motor on the side wall of the screening box 1 is started, and the second transmission wheel 28 is driven to rotate by the stepper motor. At the same time, the second electric telescopic rod 22 inside the connecting shaft 9 is started, and the second electric telescopic rod 22 inserts the second transmission rod 23 into any By inserting the inside of a card slot 24, the first transmission wheel 21 and the connecting shaft 9 can be fixed, and then the first transmission wheel 21 can be driven to rotate in the opposite direction through the transmission belt 25, and then the connecting shaft 9 can be driven to rotate in the opposite direction. When the second motor 12 drives the first screen plate 4 and the second screen plate 5 to vibrate, the second transmission rod 23 is pulled out from the inside of the card slot 24, and no more transmission is performed between the connecting shaft 9 and the first transmission wheel 21, so that the normal screening can be ensured. The second transmission wheel 28 drives the guide rod and the baffle plate 27 to rotate toward the inside of the screening box 1, and the first transmission wheel 21 drives the first screen plate 4 and the second screen plate 5 to rotate toward the position of the recovery port 26, so that the materials left after screening are dumped toward the upper end of the baffle plate 27, and flow out of the screening box 1 through the obstruction of the baffle plate 27.In order to facilitate subsequent recycling, after the screening is completed, the metal powder enters the interior of the guide tube 29 through the discharge port 30, and the conveying rod 32 inside the guide tube 29 is driven to rotate by the third motor 31, thereby driving the spiral conveying blade 33 to rotate, and then the metal powder inside the guide tube 29 can be sent to the injection molding machine 34 inside the injection molding box 2. In the injection molding machine 34, the metal powder is mixed with the organic binder to form a uniform feed, and then the feed is injected into the mold inside the placement rack 39 at a certain temperature and pressure to form a molded blank, and then the hot air pipe 35 is started to blow air to the placement rack 39, thereby heating and degreasing the workpiece, and completely removing the binder in the molded blank. The degreased blank will enter the sintering furnace 3 for sintering. After the degreasing of the formed blank inside the placement rack 39 is completed, the fourth motor 41 at the right end of the first horizontal plate 36 is started, and the first screw 42 inside the first strip groove 40 is driven to rotate by the fourth motor 41, and then the second horizontal plate 37 at the upper end of the first fixed block 43 is driven to move through the first nut. When the first fixed block 43 contacts the contact rod 47, it will push the conductor plate 46 to move. When the conductor plate 46 contacts the two contacts 49, the fifth motor 50 will be started, and then the fifth motor 50 will drive the second screw 52 to rotate, and then the second screw 52 will drive the second fixed block 53 and the fourth horizontal plate 36 through the second nut. 38 moves, thereby driving the placement rack 39 to move, and transporting the placement rack 39 to the inside of the sintering furnace 3. During the sintering process, the binder in the molded blank will be further removed, so that the metal semi-finished product can reach a higher density and strength. After the placement rack 39 is transported to the inside of the sintering furnace 3, the hanging ring 54 will be hung on the upper end of the clamping rod 58, and then the third electric telescopic rod 59 will be started to push the clamping plate 60 to move, and then the clamping plate 60 will overcome the elastic force of the second spring 63 to push the hook 61 to rotate, and keep the hook 61 stable, so as to hang the placement rack 39 on the upper end of the chain 57, and move to the upper end of the sintering furnace 3 under the drive of the chain 57. When the placement rack 39 is taken out When the third electric telescopic rod 59 and the card plate 60 are retracted, the hook 61 will then rotate under the elastic force of the second spring 63 to facilitate the retraction of the placement rack 39. During the upward movement of the placement rack 39, the left end of the placement rack 39 will push the rotating plate 66 inside the storage slot 65 to rotate. After the placement rack 39 passes over the rotating plate 66, the fourth electric telescopic rod 67 inside the storage slot 65 is started, and the limiting plate 68 is driven to move by the fourth electric telescopic rod 67, thereby pushing the rotating plate 66 to rotate, thereby supporting the rotating plate 66 and keeping the rotating plate 66 horizontal. The rotating plate 66 can support the left end of the placement rack 39, thereby reducing the pressure of the chain 57 and maintaining the stability of the placement rack 39.

[0088] In summary, the size of the sieve holes is adjusted through the screening mechanism, so that metal powder with smaller pore sizes can be screened out for subsequent processing. The material remaining after screening is poured out through the recovery mechanism to make it flow out of the screening box 1 for subsequent recycling. The injection molding mechanism forms a molded blank under a certain temperature and pressure, and the docking mechanism sends the molded blank inside the placement rack 39 into the sintering furnace 3 for sintering, and the locking mechanism keeps the placement rack 39 stable.

[0089] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A sintering molding process for preparing a metal semi-finished product using metal powder, characterized in that: The following steps are involved: S1. Screening: Select appropriate metal powder and screen and grind it through screening equipment as needed to ensure that the particle size and shape of the powder meet the process requirements; S2. Injection molding: Mix metal powder and organic binder in a certain proportion in an injection molding device, and then inject the feed into a mold to form a molded blank; S3, degreasing: decomposing and volatilizing the binder in the molded blank by heating, and removing the binder in the molded blank in advance; S4, sintering: The formed blank enters the sintering equipment for sintering to form a dense semi-finished product.

2. A sintering molding process for preparing a metal semi-finished product using metal powder according to claim 1, characterized in that: In the step S1, the metal powder has a particle size of 60 μm.

3. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 1, characterized in that: In the step S3, the heating temperature is 200-300°C, and in the step S4, the sintering time is 2-4 hours.

4. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 1, characterized in that: In the step S4, the sintering temperature of the sintering equipment is 1330-1380° C., and the sintering time is 2 hours.

5. A sintering molding process for preparing a metal semi-finished product using metal powder according to any one of claims 1 to 4, characterized in that: The equipment used in the steps S1-S4 is a sintering device for preparing a metal semi-finished product using metal powder. The sintering device for preparing a metal semi-finished product using metal powder comprises a screening box (1), an injection molding box (2) and a sintering furnace (3). A bottom plate (8) is rotatably mounted on the upper end of the screening box (1). Both ends of the bottom plate (8) are inserted and rotatably mounted on the upper end of the screening box (1) through a connecting shaft (9). A screening mechanism is arranged on the upper end of the bottom plate (8). A recovery port (26) is provided on the side of the screening box (1). A recovery mechanism is arranged inside the recovery port (26). A first horizontal plate (36) is fixedly mounted on the inner bottom of the injection molding box (2). A second horizontal plate (37) is slidably mounted on the upper end of the first horizontal plate (36). A third horizontal plate (38) is slidably mounted on the upper end of the second horizontal plate (37). A placement rack (39) is arranged on the upper end of the third horizontal plate (38). An injection molding mechanism is arranged inside the injection molding box (2). 2) is provided with a guide belt (69) for transporting the placement rack (39), the inner wall of the sintering furnace (3) is provided with a side groove, the upper and lower ends of the side groove are rotatably mounted with a rotating shaft (55), the inside of the sintering furnace (3) is fixedly mounted with a sixth motor, the output end of the sixth motor extends to the inside of the side groove and is fixedly connected to the rotating shaft (55) at the upper end, the outside of the two rotating shafts (55) are fixedly mounted with sprockets (56), and the two sprockets (56) are connected by The sintering furnace (3) is connected to the sintering furnace (3) by a chain (57), a plurality of clamping rods (58) are fixedly mounted on the side of the chain (57), a docking mechanism is arranged between the clamping rods (58) and the first horizontal plate (36), a feed port (64) cooperating with the placement rack (39) is also provided at the lower end of the sintering furnace (3), a sealing plate is installed inside the feed port (64), a plurality of storage grooves (65) are evenly spaced at the upper end of the feed port (64), and a locking mechanism is arranged inside the storage grooves (65).

6. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 5, characterized in that: The screening mechanism comprises a first screen plate (4) fixedly mounted on the upper end of a bottom plate (8), a second screen plate (5) being slidably mounted on the upper end of the first screen plate (4), a plurality of screen holes of the same size being evenly spaced inside the first screen plate (4) and the second screen plate (5), a first motor being fixedly mounted inside the first screen plate (4), a first transmission gear (6) being fixedly mounted on the output end of the first motor, a rack (7) being fixedly mounted on the middle part of the second screen plate (5), the rack (7) being meshed with the first transmission gear (6), limiting grooves being provided at both ends of the first screen plate (4), limiting blocks being fixedly mounted at both ends of the second screen plate (5), the limiting blocks being slidably mounted inside the limiting grooves, fourth electric telescopic rods being further mounted on the left and right ends of the second screen plate (5), a strip plate (70) being fixedly mounted on the output end of the fourth electric telescopic rod, a first rectangular cavity (10) being provided inside the screening material box (1), and an adjustment mechanism being provided inside the first rectangular cavity (10).

7. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 6, characterized in that: The adjustment mechanism comprises a second motor (12) fixedly mounted on the upper end of the screening box (1); the left end of the connecting shaft (9) extends into the interior of the first rectangular cavity (10) and is fixedly mounted with a first conical column gear (11); the output end of the second motor (12) extends into the interior of the first rectangular cavity (10) and is fixedly mounted with a second conical column gear (13); a first electric telescopic rod (14) is also fixedly mounted inside the screening box (1); a first transmission rod (15) is fixedly mounted at the output end of the first electric telescopic rod (14); an end of the first transmission rod (15) extends into the interior of the first rectangular cavity (10); A second transmission gear (16) is rotatably mounted inside the sieving box (10); the first conical column gear (11) and the second conical column gear (13) are transmission-connected via the second transmission gear (16); the interior of the connecting shaft (9) is hollow; a connecting pipe (17) is inserted into the interior of the connecting shaft (9); a transition chamber (18) is provided inside the bottom plate (8); a front end of the connecting pipe (17) extends to the interior of the transition chamber (18) and is provided with a plurality of air outlets (19) at equal intervals; a vortex tube is provided outside the screening box (1); a hot end of the vortex tube is communicated with the interior of the connecting pipe (17).

8. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 7, characterized in that: The recovery mechanism comprises a stepper motor fixedly mounted on the side wall of the screening box (1); a second rectangular cavity (20) is further provided inside the screening box (1); the right end of the connecting shaft (9) extends into the inside of the second rectangular cavity (20) and is rotatably mounted with a first transmission wheel (21); a guide rod is fixedly mounted on the output end of the stepper motor; a baffle (27) is fixedly mounted on the outside of the guide rod; a second transmission wheel (28) is fixedly mounted near the end of the guide rod; the second transmission wheel (28) and the first transmission wheel (21) are connected in reverse transmission via a transmission belt (25); a second electric telescopic rod (22) is fixedly mounted inside the connecting shaft (9) in the area of ​​the second rectangular cavity (20); a second transmission rod (23) is fixedly mounted on the output end of the second electric telescopic rod (22); and a plurality of slots (24) cooperating with the second transmission rod (23) are axially equidistantly provided on the inner wall of the first transmission wheel (21).

9. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 8, characterized in that: The injection molding mechanism comprises an injection molding machine (34) fixedly mounted on the top of the injection molding box (2); a material guide pipe (29) is fixedly mounted on the bottom of the screening box (1); a third motor (31) is fixedly mounted on one end of the material guide pipe (29); a conveying rod (32) is fixedly mounted on the output end of the third motor (31); the conveying rod (32) extends into the interior of the material guide pipe (29) and is fixedly mounted with a spiral conveying blade (33); a material discharge port (30) is also provided at the upper end of the material guide pipe (29); the right end of the material guide pipe (29) extends into the interior of the injection molding box (2) and is connected to the injection molding machine (34); and two hot air pipes (35) are symmetrically arranged on the inner wall of the injection molding box (2).

10. The sintering molding process for preparing a metal semi-finished product using metal powder according to claim 9, characterized in that: The docking mechanism comprises a first strip groove (40) formed inside the first transverse plate (36); a fourth motor (41) is fixedly mounted on the right end of the first transverse plate (36); a first screw rod (42) is fixedly mounted on the output end of the fourth motor (41); the left end of the first screw rod (42) extends into the interior of the first strip groove (40); a device groove is formed at the bottom of the second transverse plate (37); a first fixing block (43) is fixedly mounted on the left end of the device groove; and a first fixing block (43) is fixedly mounted inside the first fixing block (43). A first nut is spirally mounted on the outside of the first screw rod (42); a slide rod (44) is fixedly mounted inside the device groove; a stopper (45) is slidably mounted outside the slide rod (44); the stopper (45) is fixedly mounted on the right end of the first cross plate (36); a device cavity is provided inside the stopper (45); a conductor plate (46) is slidably mounted inside the device cavity; a contact rod (47) is fixedly mounted on the left end of the conductor plate (46); an end of the contact rod (47) passes through the device cavity and extends to the interior of the device slot, the right end of the conductor plate (46) is elastically connected to the inner wall of the device cavity through a first spring (48), two contacts (49) are fixedly installed on the right end of the device cavity, a second strip groove (51) is opened at the upper end of the second transverse plate (37), a fifth motor (50) is fixedly installed on the right end of the second transverse plate (37), both of the two contacts (49) are electrically connected to the fifth motor (50), a second screw (52) is fixedly installed at the output end of the fifth motor (50), and the second The left end of the screw rod (52) extends to the inside of the second strip groove (51); a second fixing block (53) is fixedly installed at the bottom of the third horizontal plate (38); a second nut is fixedly installed inside the second fixing block (53); the second nut is spirally installed on the outside of the second screw rod (52); a hanging ring (54) is fixedly installed at the right end of the placement frame (39); a hook (61) that cooperates with the hanging ring (54) is rotatably installed at the end of the clamping rod (58); and a limiting mechanism is provided at the end of the clamping rod (58); The limiting mechanism comprises a third electric telescopic rod (59) fixedly mounted on the end of the clamping rod (58); a clamping plate (60) is fixedly mounted on the output end of the third electric telescopic rod (59); an inclined groove (62) is provided inside the hook (61); and an inner wall of the inclined groove (62) is elastically connected to the end of the clamping rod (58) via a second spring (63); The locking mechanism comprises a rotating plate (66) rotatably mounted inside the storage slot (65), a fourth electric telescopic rod (67) is fixedly mounted inside the storage slot (65), and a limit plate (68) is fixedly mounted on the output end of the fourth electric telescopic rod (67).