Tower building machine jacking formwork and installation method thereof

By designing the Bailey frame, guide rails and crane in the jacking formwork of the tower-building machine, the problems of large installation space and inconvenient disassembly and assembly of the jacking formwork in the existing technology are solved, and a more efficient installation process is achieved.

CN118756580APending Publication Date: 2024-10-11GUIZHOU INVESTMENT & CONSTR CO LTD OF CHINA CONSTR FOURTH ENG BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410933772.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

During the installation process of the jacking formwork of the tower-building machine, the existing technology requires a larger space and a higher height tower column. The tower crane cannot meet the lifting requirements of the Bailey frame, resulting in inconvenient disassembly and assembly of the jacking formwork. .

Method used

A tower-building machine jacking formwork including a bailey frame, guide rails and a crane is designed. By arranging guide rails and cranes on the bailey frame, the space required for the installation operation is reduced, and through positioning rods, assembly rods and The clamp improves the stability and efficiency of assembly, and uses the translation base, rotation base and oil cylinder to realize flexible adjustment of the cantilever to meet installation needs under different working conditions.

Benefits of technology

It improves the installation efficiency of the jacking formwork of the tower building machine, reduces space occupation, facilitates the disassembly and assembly of the jacking formwork, and improves installation convenience and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756580A_ABST
    Figure CN118756580A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tower cranes, and provides a tower crane jacking formwork and a mounting method thereof.The tower crane jacking formwork comprises a bailey truss, a guide rail and a crane, the bailey truss comprises multiple bailey pieces, and every two adjacent bailey pieces are detachably and fixedly connected; the guide rail is fixedly arranged on the top side of the bailey piece located in the middle of the bailey truss. The crane is arranged on the guide rail in a sliding mode and used for hoisting and installing the beret pieces. The guide rail and the crane are arranged on the bailey truss, so that the space occupied by the installation operation of the jacking formwork of the tower building machine can be reduced, the jacking formwork can be disassembled and assembled in the climbing process of the tower building machine, the disassembling and assembling operation of the jacking formwork of the tower building machine is more convenient, and the installation efficiency of the jacking formwork of the tower building machine is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tower building machines, in particular to a jacking formwork frame of a tower building machine and an installation method thereof. Background Art

[0002] A tower-building crane is an intelligent construction equipment used in the construction of bridge towers. It is mainly composed of a jacking formwork, a climbing mechanism, a hanging mechanism and a construction formwork. Using a tower-building crane to build towers can not only make the originally complex construction process interconnected and orderly, but also reduce labor input and improve the construction efficiency of towers.

[0003] The invention patent with the patent publication number CN107630583A discloses a construction method of a steel pipe truss with a Bailey frame, which includes the following steps: a. When assembling the lifting platform, assemble the lower chord truss and the hub tube at the same time; b. After the double-layer truss is erected, the steel pipe is used at an angle with the silo wall from the silo wall; c. The Bailey frame on the top of the silo is hoisted by a tower crane combined with a car crane; d. After the Bailey frame is installed, the channel steel is perforated and placed on the Bailey frame; e. After the Bailey frame on the top of the warehouse is hoisted, the truss is hoisted down as a whole to complete the construction of the Bailey frame hoisted steel pipe truss. The construction method of the steel pipe truss with a Bailey frame has the advantages of simple structure of the Bailey frame device, convenient manufacture and transportation, quick erection, large load capacity, strong practicality, round steel hanging rods for the Bailey frame to ensure the safety of the entire support system, low safety risk, less labor required for Bailey frame assembly, hoisting and overall hoisting of the truss, and reduced engineering costs.

[0004] The above technical solution utilizes a combination of a tower crane and a truck crane to hoist the Bailey frame. However, when installing the jacking formwork of the tower crane, the tower crane needs to be set on one side of the tower crane, resulting in the installation operation of the jacking formwork requiring a large space. At the same time, during the lifting process of the tower crane, the jacking formwork of the tower crane usually needs to be disassembled and assembled to adapt to the construction of special-shaped tower columns. When the height of the tower crane is high, the tower crane on the ground cannot meet the lifting requirements of the Bailey frame, resulting in the inconvenience of disassembly and assembly of the jacking formwork of the tower crane. Summary of the invention

[0005] In view of this, the present invention proposes a tower-building machine jacking formwork frame and an installation method thereof, which can facilitate the hoisting of the Bailey frame and improve the installation efficiency of the tower-building machine jacking formwork frame.

[0006] The technical solution of the present invention is implemented as follows: On the one hand, the present invention provides a tower construction machine jacking formwork frame, including a Bailey frame, a guide rail and a crane, wherein:

[0007] The Bailey frame includes a Bailey sheet, a plurality of Bailey sheets are provided, and two adjacent Bailey sheets are detachably fixedly connected;

[0008] The guide rail is fixedly arranged on the top side of the Bailey sheet located in the middle position of the Bailey frame;

[0009] The crane is slidably arranged on the guide rail and is used for hoisting and installing the Bailey plate.

[0010] On the basis of the above technical solution, preferably, the Bailey sheet includes a frame and a plurality of tenons, wherein:

[0011] One end of the frame is provided with a plurality of fixing grooves;

[0012] The tenon is integrally formed at one end of the frame away from the fixing groove, the tenon on one frame is snap-fitted with the fixing groove on the adjacent frame and fixedly connected by bolts, and the tenon corresponds to the fixing groove one by one.

[0013] More preferably, the Bailey sheet further includes a positioning rod and an assembly rod, wherein:

[0014] A positioning groove is provided on one side of the frame body, and the positioning rod is fixedly arranged on one side of the frame body, and the positioning rod is a round rod-shaped structure;

[0015] The assembly rod is fixedly arranged at one end of the frame away from the tenon, and the assembly rod on one frame is slidably arranged in the positioning groove on the adjacent frame and abuts against the side of the positioning rod on the adjacent frame close to the frame.

[0016] More preferably, the distance from the end of the assembly rod away from the frame to the end of the frame away from the tenon is greater than the distance from the positioning rod to the end of the tenon away from the frame.

[0017] More preferably, the Bailey plate further includes a limiting rod, which is fixedly disposed in the positioning groove, and a limiting groove is provided at one end of the assembly rod away from the frame, and the limiting rod is slidably connected to the limiting groove.

[0018] On the basis of the above technical solution, preferably, the crane includes a translation seat, a rotation seat, a cantilever, a winding machine, a lifting rope and a clamp, wherein:

[0019] The translation seat is slidably arranged on the guide rail;

[0020] The rotating seat is rotatably arranged on the translation seat;

[0021] The cantilever and the winding machine are both fixedly arranged on the rotating seat;

[0022] The suspension rope is slidably arranged at one end of the cantilever away from the rotating seat, and one end of the suspension rope is wound around the winding machine;

[0023] The clamp is fixedly arranged at one end of the suspension rope away from the winding machine.

[0024] More preferably, the clamp comprises a connecting plate, two L-shaped grab plates, two linkage rods and a connecting rod, wherein:

[0025] The two L-shaped grab plates are arranged opposite to each other on both sides of the connecting plate and are rotatably connected thereto;

[0026] The two linkage rods are rotatably arranged on the two L-shaped grab plates and are located above the connecting plate, and one end of the linkage rod away from the L-shaped grab plate is located below one end of the linkage rod close to the L-shaped grab plate;

[0027] The connecting rod is rotatably arranged between the two linkage rods and is fixedly connected to the suspension rope.

[0028] More preferably, the guide rail includes a bottom plate and two I-shaped rails, and the translation seat includes a first seat body, a roller and a first motor, wherein:

[0029] The bottom plate is fixedly arranged on the Bailey sheet;

[0030] The I-shaped rail is fixedly arranged on the bottom plate, and the two I-shaped rails are arranged in parallel and at intervals;

[0031] The roller is rotatably arranged on the first seat body and is rollingly connected with the I-shaped rail, and each I-shaped rail is provided with a plurality of the rollers;

[0032] The first motor is fixedly disposed on the first seat, and an output end of the first motor is coaxially fixedly connected to one of the rollers.

[0033] More preferably, the translation seat further comprises a second motor and a first gear, and the rotating seat comprises a second seat body, a second gear and a cylinder, wherein:

[0034] The second motor is fixedly arranged on the first seat;

[0035] The first gear is coaxially fixed on the output end of the second motor;

[0036] The second seat body is rotatably disposed on the first seat body;

[0037] The second gear is fixedly disposed on the second seat body and meshes with the first gear;

[0038] The oil cylinder is rotatably arranged on the second seat body, and one end of the cantilever is rotatably connected to the second seat body and the output end of the oil cylinder respectively.

[0039] In a second aspect, the present invention provides a method for installing a tower construction machine jacking formwork, comprising the following steps:

[0040] S1, pouring the foundation base of the tower column and installing the climbing mechanism of the tower construction crane on the side wall of the foundation base of the tower column;

[0041] S2, installing the Bailey plate above the climbing mechanism, completing the assembly of the middle section of the Bailey frame, and sequentially installing the guide rail and the crane on the upper side of the terminal position of the Bailey frame;

[0042] S3, using the crane to lift the Bailey plate to be installed, so that the end of the assembly rod to be installed away from the frame is inserted into the positioning groove of the installed frame and is located between the installed frame and the positioning rod on one side thereof;

[0043] S4, using the crane to rotate and move the angle of the Bailey plate to be installed, so that the assembly rod on the frame to be installed is inserted into the positioning groove of the installed frame, and the tenon on the frame to be installed is inserted into the fixing groove of the installed frame, and the tenon and the fixing groove are fixedly connected by bolts, and then the crane is separated from the Bailey plate to be installed;

[0044] S5, repeat S3-S4 until the installation of the Bailey frame is completed.

[0045] The tower erection machine jacking formwork and the installation method thereof of the present invention have the following beneficial effects compared with the prior art:

[0046] (1) By arranging the guide rails and the crane on the Bailey frame, not only can the space required for the installation operation of the jacking formwork of the tower building crane be reduced, but the jacking formwork can also be disassembled and assembled during the climbing process of the tower building crane, making the disassembly and assembly operation of the jacking formwork of the tower building crane more convenient, thereby improving the installation efficiency of the jacking formwork of the tower building crane;

[0047] (2) By setting the positioning rod and the assembly rod, two adjacent Bailey plates can be assembled quickly and accurately. By setting the connecting plate, the L-shaped grab plate and the linkage rod, the clamping stability of the Bailey plate can be improved. (3) By setting the translation seat, the rotation seat and the winding machine, the clamp can be moved to the installation position of the Bailey plate to meet the movement requirements of the Bailey plate. By setting the oil cylinder, the cantilever can be set at an angle when the Bailey plate is lifted, and can be set vertically when the crane is idle, thereby freeing up the construction space for the tower column after the tower crane jacking formwork is installed. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0049] Figure 1 A cross-sectional view of a tower construction machine jacking formwork frame and an installation method thereof according to the present invention;

[0050] Figure 2 It is a three-dimensional diagram of the state of the crane hoisting Bailey plate in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0051] Figure 3 It is a three-dimensional diagram of the tower construction machine jacking formwork frame and the installation method thereof when two frames are assembled;

[0052] Figure 4 It is a three-dimensional view of the assembly rod when two frames are assembled in the tower construction machine jacking formwork frame and the installation method thereof of the present invention;

[0053] Figure 5 It is a side view of the tenon in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0054] Figure 6 It is a three-dimensional diagram of the tenon and the fixing groove in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0055] Figure 7 It is a cross-sectional view of the assembly rod in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0056] Figure 8 It is a front view of a fixture in a tower construction machine jacking formwork and an installation method thereof of the present invention;

[0057] Fig. 9 It is a side view of the translation seat in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0058] Fig.10 It is a three-dimensional view of the rotating seat in the tower construction machine jacking formwork and the installation method thereof of the present invention;

[0059] Fig.11 The present invention is a top view of a Bailey frame in a tower construction machine jacking formwork and an installation method thereof.

[0060] Among them: 1. Bailey frame; 11. Bailey plate; 111. frame body; 112. tenon; 113. positioning rod; 114. assembly rod; 115. limit rod; 101. fixing groove; 102. positioning groove; 103. limit groove; 2. guide rail; 21. bottom plate; 22. I-type rail; 3. crane; 31. translation seat; 311. first seat body; 312. roller; 313. first motor; 314. second motor; 315. first gear; 32. rotating seat; 321. second seat body; 322. second gear; 323. oil cylinder; 33. cantilever; 34. winding machine; 35. lifting rope; 36. clamp; 361. connecting plate; 362. L-shaped grab plate; 363. linkage rod; 364. connecting rod. DETAILED DESCRIPTION

[0061] The following will be combined with the specific implementation of the present invention to clearly and completely describe the technical solution in the present invention. Obviously, the described implementation is only a part of the implementation of the present invention, not all of the implementation. Based on the implementation of the present invention, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] like Figure 1 As shown, the tower-building machine includes a jacking formwork, a climbing mechanism, a hanging mechanism and a building template. The jacking formwork is fixedly arranged on the top of the climbing mechanism, the hanging mechanism is fixedly arranged on the end of the lower side of the jacking formwork, and the building template is fixedly arranged on the hanging mechanism. The climbing mechanism is utilized to drive the jacking formwork to be lifted upward, thereby driving the hanging mechanism and the building template to move upward, so as to cast the tower column layer by layer from bottom to top.

[0063] like Figure 1-11 As shown, the tower construction machine jacking formwork frame of the present invention includes a Bailey frame 1, a guide rail 2 and a crane 3.

[0064] The Bailey frame 1 is the main structure of the jacking formwork, which is used to connect with the climbing mechanism and the suspension mechanism. The Bailey frame 1 includes a Bailey sheet 11. A plurality of Bailey sheets 11 are provided, and two adjacent Bailey sheets 11 are detachably fixedly connected. Specifically, Figure 2 As shown, the Bailey frames 1 are arranged in rows, and two adjacent rows of Bailey frames 1 are fixed to form a long strip frame structure with a rectangular cross section. Fig.11 As shown, the long frame structures are then connected in parallel or vertically to finally form a jacking formwork platform.

[0065] The guide rail 2 is used to guide the moving direction of the crane 3 , and the guide rail 2 is fixedly arranged on the top side of the Bailey sheet 11 located in the middle position of the Bailey frame 1 .

[0066] The crane 3 is used for lifting and installing the Bailey piece 11, and the crane 3 is slidably set on the guide rail 2; when the jacking formwork is installed, the Bailey piece 11 in the middle position is hoisted by other lifting devices, and after the guide rail 2 and the crane 3 are installed on the Bailey piece 11 in the middle position, the remaining Bailey pieces 11 are hoisted by the movement of the crane 3; when the jacking formwork is installed, the crane 3 is always located on the Bailey frame 1, which not only does not need to install a tower crane on one side of the tower column and the tower crane, reducing the space occupied by the jacking formwork installation operation, but also allows the crane 3 to rise and fall with the rise and fall of the tower crane, so that the crane 3 can meet the installation requirements of the jacking formwork under different working conditions, thereby improving the installation convenience of the jacking formwork and improving the installation efficiency of the jacking formwork.

[0067] The Bailey plate 11 includes a frame 111, a plurality of tenons 112, a positioning rod 113, an assembly rod 114 and a limiting rod 115, wherein Figure 3 As shown, a plurality of fixing grooves 101 are provided at one end of the frame 111; the tenons 112 are integrally formed at the end of the frame 111 away from the fixing grooves 101, and the tenons 112 on one frame 111 are snap-fitted with the fixing grooves 101 on the adjacent frame 111 and fixedly connected by bolts, thereby realizing a detachable fixed connection of the two Bailey plates 11. Of course, the tenons 112 correspond to the fixing grooves 101 one by one, so that the tenons 112 at corresponding positions are connected to the fixing grooves 101.

[0068] like Figure 4 As shown, a positioning groove 102 is provided on one side of the frame 111, and a positioning rod 113 is fixedly arranged on one side of the frame 111, and the positioning rod 113 is a round rod-shaped structure; an assembly rod 114 is fixedly arranged on one end of the frame 111 away from the tenon 112, and the assembly rod 114 on one frame 111 is slidably arranged in the positioning groove 102 on the adjacent frame 111, and abuts against the side of the positioning rod 113 on the adjacent frame 111 close to the frame 111; as shown Figure 2 As shown, the Bailey plate 11 will rotate at a certain angle during the lifting process, making it difficult to achieve the clamping connection between the tenon 112 and the fixing groove 101. Figure 4 As shown, by setting an assembly rod 114, when two Bailey pieces 11 are assembled, the assembly rod 114 on one Bailey piece 11 is inserted into the positioning groove 102 on the other Bailey piece 11, and the assembly rod 114 is supported by the positioning rod 113, so that the two Bailey pieces 11 can be quickly positioned to speed up the assembly efficiency of the two. At the same time, since the positioning rod 113 is a round rod structure, the distance between it and the frame 111 gradually increases along the direction from the center line of the positioning rod 113 to the tenon 112, so that the assembly rod 114 can be inserted between the positioning rod 113 and the frame 111. Similarly, a chamfer can be set at the end of the assembly rod 114 away from the frame 111 to reduce its outer diameter.

[0069] like Figure 4 As shown, the distance from the end of the assembly rod 114 away from the frame 111 to the end of the frame 111 away from the tenon 112 is greater than the distance from the positioning rod 113 to the end of the tenon 112 away from the frame 111, that is, the length of the assembly rod 114 extending out of the frame 111 is greater than the distance from the end of the tenon 112 extending out of the frame 111 to the positioning rod 113. When the right end of the assembly rod 114 is inserted between the positioning rod 113 and the frame 111, there is still a certain distance between the tenon 112 and the fixing groove 101, so that when the right end of the assembly rod 114 is inserted between the positioning rod 113 and the frame 111, the Bailey piece 11 to be installed can be rotated to make the two Bailey pieces 11 flush with each other, so as to achieve the following by pushing the Bailey piece 11. Figure 6 The assembly effect shown.

[0070] like Figure 5 and Figure 7 As shown, the limiting rod 115 is fixedly arranged in the positioning groove 102, and the limiting groove 103 is opened at one end of the assembly rod 114 away from the frame 111, and the limiting rod 115 is slidably connected with the limiting groove 103. When the assembly rod 114 is inserted into the positioning groove 102, the matching of the limiting rod 115 and the limiting groove 103 is utilized to improve the alignment of the two frames 111.

[0071] like Figure 2 As shown, the crane 3 includes a translation seat 31, a rotating seat 32, a cantilever 33, a winder 34, a suspension rope 35 and a clamp 36, wherein the translation seat 31 is slidably set on the guide rail 2; the rotating seat 32 is rotatably set on the translation seat 31; the cantilever 33 and the winder 34 are both fixedly set on the rotating seat 32, and the winder 34 is a prior art, which is used to reel in and out the suspension rope 35; the suspension rope 35 is slidably set at one end of the cantilever 33 away from the rotating seat 32, and one end of the suspension rope is wound around the winder 34; the clamp 36 is fixedly set at one end of the suspension rope 35 away from the winder 34; the sliding of the translation seat 31, the rotation of the rotating seat 32 and the cantilever 33, and the winding of the suspension rope 35 by the winder 34 can drive the clamp 36 to move in all directions, thereby moving the Bailey plate 11 in all directions.

[0072] like Fig. 9 As shown, the guide rail 2 includes a bottom plate 21 and two I-shaped rails 22. The bottom plate 21 is fixedly arranged on the Bailey plate 11; the I-shaped rails 22 are fixedly arranged on the bottom plate 21, and the two I-shaped rails 22 are arranged in parallel and at intervals to improve their guiding stability.

[0073] like Fig. 9As shown, the translation seat 31 includes a first seat body 311, a roller 312 and a first motor 313, wherein the roller 312 is rotatably set on the first seat body 311 and is rollingly connected to the I-shaped rail 22, and a plurality of rollers 312 are set on each I-shaped rail 22; the first motor 313 is fixedly set on the first seat body 311, and its output end is coaxially fixedly connected to one of the rollers 312. When the first motor 313 is started, the roller 312 connected thereto can be driven to rotate, thereby utilizing the rolling of the roller 312 and the I-shaped rail 22 to drive the translation seat 31 to translate along the direction of the I-shaped rail 22; of course, in order to improve the translation effect of the translation seat 31, multiple first motors 313 can also be set.

[0074] like Fig.10 As shown, the translation seat 31 also includes a second motor 314 and a first gear 315, and the rotating seat 32 includes a second seat body 321, a second gear 322 and a cylinder 323, wherein the second motor 314 is fixedly arranged on the first seat body 311; the first gear 315 is coaxially fixed on the output end of the second motor 314; the second seat body 321 is rotatably arranged on the first seat body 311; the second gear 322 is fixedly arranged on the second seat body 321 and meshes with the first gear 315. When the second motor 314 is started, the first gear 315 can be driven to rotate synchronously, and then the meshing of the first gear 315 and the second gear 322 can be used to drive the second gear 322 to rotate, so that the second seat body 321 can be rotated at a corresponding angle.

[0075] The oil cylinder 323 is rotatably disposed on the second base body 321, and one end of the cantilever 33 is rotatably connected to the second base body 321 and the output end of the oil cylinder 323, respectively. Fig.10 As shown, when the oil cylinder 323 contracts, the cantilever 33 can be driven to rotate, thereby adjusting the inclination angle of the cantilever 33. When the crane 3 is limited, the cantilever 33 can be set in the vertical direction to make room for the construction of the tower column.

[0076] like Figure 8As shown, the clamp 36 includes a connecting plate 361, two L-shaped grab plates 362, two linkage rods 363 and a connecting rod 364, wherein the two L-shaped grab plates 362 are relatively arranged on both sides of the connecting plate 361 and are rotatably connected thereto; the two linkage rods 363 are rotatably arranged on the two L-shaped grab plates 362 and are located above the connecting plate 361, and one end of the linkage rod 363 away from the L-shaped grab plates 362 is located below the end of the linkage rod 363 close to the L-shaped grab plates 362; the connecting rod 364 is rotatably arranged between the two linkage rods 363 and is fixedly connected to the suspension rope 35; when the suspension rope 35 When lifting, the connecting rod 364 can be driven to move upward, thereby driving the end of the linkage rod 363 away from the L-shaped grab plate 362 to move upward, so that the lower end of the L-shaped grab plate 362 rotates toward the direction close to the center line of the clamp 36 to clamp the Bailey plate 11, and then cooperate with the movement of the crane 3 to move the Bailey plate 11; on the contrary, when the Bailey plate 11 is installed and the lifting rope 35 moves downward, the lower end of the L-shaped grab plate 362 rotates toward the direction away from the center line of the clamp 36, so that the clamp 36 is separated from the Bailey plate 11, so as to carry out the lifting of the next Bailey plate 11.

[0077] The method for installing a tower construction machine jacking formwork frame of the present invention comprises the following steps:

[0078] S1, pouring the foundation base of the tower column and installing the climbing mechanism of the tower construction crane on the side wall of the foundation base of the tower column;

[0079] S2, install the Bailey plate 11 above the climbing mechanism, complete the assembly of the middle section of the Bailey frame 1, and install the guide rail 2 and the crane 3 in sequence on the upper side of the terminal position of the Bailey frame 1;

[0080] S3, such as Figure 2-Figure 4 As shown, the Bailey plate 11 to be installed is hoisted by the crane 3, so that the end of the assembly rod 114 to be installed away from the frame 111 is inserted into the positioning groove 102 of the installed frame 111, and is located between the installed frame 111 and the positioning rod 113 on one side thereof;

[0081] S4, using the crane 3 to rotate and move the angle of the Bailey plate 11 to be installed, such as Figure 6 As shown, the assembly rod 114 on the frame 111 to be installed is inserted into the positioning groove 102 of the installed frame 111, the tenon 112 on the frame 111 to be installed is inserted into the fixing groove 101 of the installed frame 111, and the tenon 112 and the fixing groove 101 are fixedly connected by bolts, and then the crane 3 is separated from the Bailey plate 11 to be installed;

[0082] S5, repeat S3-S4 until the installation of the Bailey frame 1 is completed.

[0083] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. The tower construction machine jacking formwork frame is characterized by: It comprises a Bailey frame (1), a guide rail (2) and a crane (3), wherein: The Bailey frame (1) comprises a Bailey sheet (11), a plurality of Bailey sheets (11) are provided, and two adjacent Bailey sheets (11) are detachably fixedly connected; The guide rail (2) is fixedly arranged on the top side of the Bailey sheet (11) located in the middle of the Bailey frame (1); The crane (3) is slidably arranged on the guide rail (2) and is used for hoisting and installing the Bailey plate (11).

2. The tower construction machine jacking formwork according to claim 1, characterized in that: The Bailey plate (11) comprises a frame (111) and a plurality of tenons (112), wherein: One end of the frame (111) is provided with a plurality of fixing grooves (101); The tenon (112) is integrally formed at one end of the frame (111) away from the fixing groove (101); the tenon (112) on one frame (111) is snap-fitted with the fixing groove (101) on the adjacent frame (111) and fixedly connected by bolts; and the tenon (112) corresponds to the fixing groove (101) one by one.

3. The tower construction machine jacking formwork according to claim 2, characterized in that: The Bailey sheet (11) further comprises a positioning rod (113) and an assembly rod (114), wherein: A positioning groove (102) is provided on one side of the frame body (111); the positioning rod (113) is fixedly arranged on one side of the frame body (111); and the positioning rod (113) is a round rod-shaped structure; The assembly rod (114) is fixedly arranged at one end of the frame (111) away from the tenon (112); the assembly rod (114) on one frame (111) is slidably arranged in the positioning groove (102) on the adjacent frame (111) and abuts against the positioning rod (113) on the adjacent frame (111) on a side close to the frame (111).

4. The tower construction machine jacking formwork according to claim 3, characterized in that: The distance from the end of the assembly rod (114) away from the frame (111) to the end of the frame (111) away from the tenon (112) is greater than the distance from the positioning rod (113) to the end of the tenon (112) away from the frame (111).

5. The tower construction machine jacking formwork according to claim 4, characterized in that: The Bailey plate (11) further comprises a limiting rod (115), wherein the limiting rod (115) is fixedly arranged in the positioning groove (102), and a limiting groove (103) is provided at one end of the assembly rod (114) away from the frame (111), and the limiting rod (115) is slidably connected to the limiting groove (103).

6. The tower construction machine jacking formwork according to claim 1, characterized in that: The crane (3) comprises a translation seat (31), a rotation seat (32), a cantilever (33), a winding machine (34), a suspension rope (35) and a clamp (36), wherein: The translation seat (31) is slidably arranged on the guide rail (2); The rotating seat (32) is rotatably arranged on the translation seat (31); The cantilever (33) and the winding machine (34) are both fixedly arranged on the rotating seat (32); The suspension rope (35) is slidably arranged at one end of the cantilever (33) away from the rotating seat (32), and one end of the suspension rope is wound around the winding machine (34); The clamp (36) is fixedly arranged at one end of the suspension rope (35) away from the winding machine (34).

7. The tower construction machine jacking formwork according to claim 6, characterized in that: The clamp (36) comprises a connecting plate (361), two L-shaped grab plates (362), two linkage rods (363) and a connecting rod (364), wherein: The two L-shaped grab plates (362) are arranged opposite to each other on both sides of the connecting plate (361) and are rotatably connected thereto; The two linkage rods (363) are rotatably arranged on the two L-shaped grab plates (362) and are located above the connecting plate (361); one end of the linkage rod (363) away from the L-shaped grab plate (362) is located below one end of the linkage rod (363) close to the L-shaped grab plate (362); The connecting rod (364) is rotatably disposed between the two linkage rods (363) and is fixedly connected to the suspension rope (35).

8. The tower construction machine jacking formwork according to claim 6, characterized in that: The guide rail (2) comprises a bottom plate (21) and two I-shaped rails (22); the translation seat (31) comprises a first seat body (311), a roller (312) and a first motor (313), wherein: The bottom plate (21) is fixedly arranged on the Bailey sheet (11); The I-shaped rail (22) is fixedly arranged on the bottom plate (21), and the two I-shaped rails (22) are arranged in parallel and at intervals; The roller (312) is rotatably arranged on the first seat body (311) and is rollingly connected to the I-shaped rail (22), and each I-shaped rail (22) is provided with a plurality of the rollers (312); The first motor (313) is fixedly arranged on the first seat body (311), and an output end thereof is coaxially fixedly connected to one of the rollers (312).

9. The tower construction machine jacking formwork according to claim 8, characterized in that: The translation seat (31) further comprises a second motor (314) and a first gear (315), and the rotating seat (32) comprises a second seat body (321), a second gear (322) and an oil cylinder (323), wherein: The second motor (314) is fixedly arranged on the first base (311); The first gear (315) is coaxially fixed on the output end of the second motor (314); The second base body (321) is rotatably disposed on the first base body (311); The second gear (322) is fixedly arranged on the second seat body (321) and meshes with the first gear (315); The oil cylinder (323) is rotatably arranged on the second seat body (321), and one end of the cantilever (33) is rotatably connected to the second seat body (321) and the output end of the oil cylinder (323) respectively.

10. The method for installing a tower construction machine jacking formwork according to claim 5, characterized in that: The following steps are involved: S1, pouring the foundation base of the tower column and installing the climbing mechanism of the tower construction crane on the side wall of the foundation base of the tower column; S2, installing the Bailey plate (11) above the climbing mechanism, completing the assembly of the middle section of the Bailey frame (1), and sequentially installing the guide rail (2) and the crane (3) on the upper side of the terminal position of the Bailey frame (1); S3, using the crane (3) to lift the Bailey plate (11) to be installed, so that the end of the assembly rod (114) to be installed away from the frame (111) is inserted into the positioning groove (102) of the installed frame (111) and is located between the installed frame (111) and the positioning rod (113) on one side thereof; S4, using the crane (3) to rotate and move the angle of the Bailey plate (11) to be installed, so that the assembly rod (114) on the frame (111) to be installed is inserted into the positioning groove (102) of the installed frame (111), and the tenon (112) on the frame (111) to be installed is inserted into the fixing groove (101) of the installed frame (111), and the tenon (112) and the fixing groove (101) are fixedly connected by bolts, and then the crane (3) is separated from the Bailey plate (11) to be installed; S5, repeat S3-S4 until the installation of the Bailey frame (1) is completed.