Movable snorkeling trestle for concrete pouring of pier and abutment of wharf and using method
By designing a snorkeling mobile trestle and using a combination of floating supports and power ships, the existing technology problems of high concrete construction costs for underwater structures and severe weather effects have been solved, and low-cost, stable and reliable concrete pouring of dock piers has been achieved. , to adapt to the construction needs of underwater terrain.
Patent Information
- Application Number
- CN202410973399.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-11
AI Technical Summary
The existing cast-in-situ concrete construction method for underwater structures has high costs and a long construction period, and fixed trestles and ferry transportation are greatly affected by weather, making it difficult to adapt to the construction needs of near-shore dock pier concrete.
Design a snorkeling mobile trestle for concrete pouring on wharf piers, including a main trestle and a suspension bridge. The snorkeling steel pipe tripod bracket is used as the foundation and is towed and moved by a powered ship. The floating bracket can be submerged for support. The main bridge and the suspension bridge are supported by a ball. The support is connected to the jacking screw, and the suspension bridge can rotate. It uses exhaust and water inlet to adjust the floating and sinking state to adapt to the underwater terrain.
It achieves low-cost concrete pouring and reduces the impact of weather. The three-legged legs can adapt to the underwater terrain. The trestle is stable and reliable, easy to move, and is suitable for near-shore dock construction.
Smart Images

Figure CN118756583A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of hydraulic engineering construction, and more specifically to a snorkeling mobile trestle for pouring concrete of a wharf pier and a use method thereof. Background Art
[0002] For the cast-in-place concrete construction of underwater structures, the two most commonly used methods are fixed pier method and ferry transportation method. Fixed pier has better adaptability, but the construction period of fixed pier is long, the material consumption is large, and the cost is high; ferry concrete transportation is greatly affected by the weather, and the cost is high, and it is easy to have casting quality problems. Most of the wharf structures are arranged along the coast. For the wharf pier concrete less than 100 meters away from the land, the shore equipment cannot complete the construction, and the cost of using water equipment for construction is high. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a snorkeling mobile trestle for pouring concrete for dock piers and a use method thereof, which has low cost, is less affected by weather when pouring concrete, and has tripod legs that can adapt to underwater terrain.
[0004] The technical solution adopted by the present invention to solve its technical problems is: constructing a snorkeling mobile trestle for pouring concrete of a wharf pier, comprising a main trestle and a suspension bridge, wherein the main trestle and the suspension bridge are connected by a hinge, a foundation is arranged at the lower end of the main trestle, and the foundation is a snorkeling floating bracket. After the floating bracket floats up, the main trestle can be towed and moved by a power ship, and the floating bracket serves as a bearing foundation of the trestle after sinking.
[0005] According to the above scheme, the floating support is a steel pipe tripod support, which includes a column and three legs. The top of the leg is fixedly arranged at the lower end of the column, the bottom end of the leg is forked and arranged on the mud surface line, and a drainage inlet hole is opened at the bottom of the leg.
[0006] According to the above scheme, a ball bearing and a supporting screw are arranged between the main trestle and the floating support. The ball bearing is arranged on the top of the column, and the truss of the main trestle is connected to the column as a whole through the ball bearing. Supporting screws are arranged on both sides of the ball bearing, and the supporting screws are used to adjust the lateral level of the main bridge truss. The nut of the supporting screw is fixedly set on the side wall of the column, and the top of the supporting screw is provided with a steel cap that can rotate around the screw.
[0007] According to the above scheme, the main trestle and the suspension bridge are both connected by steel pipes. After the main trestle and the suspension bridge are connected by a hinge, the suspension bridge can rotate around the hinge. Towers are arranged at both ends of the main trestle. The towers are composed of tower columns and connecting rods. The connecting rods are arranged on the main trestle and are on the same vertical line as the ball bearing. A cable hole is opened on the top of the tower column, and a pulley is installed on the cable hole.
[0008] According to the above scheme, the suspension bridge and the main bridge are connected by cables passing through the cable holes on the top of the tower columns, so as to facilitate the raising and lowering of the suspension bridge; a hand winch is arranged on the main trestle bridge, and the hand winch is connected to the cable.
[0009] The present invention also provides a method for using a snorkeling mobile trestle for pouring concrete for a wharf pier, comprising the following steps:
[0010] S1. According to the water depth and buoyancy requirements, steel pipes and angled welded floating supports are used to fix the trusses of the main trestle and suspension bridge. The main trestle is assembled on land. After assembly, the trestle is hoisted into the water by a crane, and the air pipe of the floating support is closed before entering the water;
[0011] S2. Use a self-propelled vessel to tow the main trestle bridge, so that the main trestle bridge is placed vertically on the shoreline after reaching the predetermined position, open the air pipe, and let the legs of the floating support automatically enter the water and sink. When sinking, keep the support columns of the main trestle bridge in a basically vertical state, which can be maintained by adjusting the exhaust speed of different legs, until the legs of the floating support are completely supported on the bottom mud surface under their own weight, and adjust the lateral level of the main trestle bridge by adjusting the top support screws on both sides of the support;
[0012] S3. By loosening the cables, the suspension bridge on the shore side is placed on the shore, and the suspension bridge on the water side is placed on the pier, and the pouring pipelines on both sides are connected for pouring;
[0013] S4. After a pier is poured, the concrete delivery pipelines on both sides are removed, the suspension bridge is pulled up, and air is supplied to the air pipe with an air compressor to discharge the water in the floating support leg pipe from the drainage hole, so that the floating support drives the trestle to float up, and then it is driven to the next pouring point by a self-propelled boat for positioning.
[0014] The snorkeling mobile trestle for pouring concrete for the wharf pier and the method for using the present invention have the following features:
[0015] Beneficial effects:
[0016] The snorkeling mobile trestle for pouring concrete for the wharf pier of the present invention has low cost, and the pouring of concrete is less affected by the weather. The three-legged legs can adapt to the underwater terrain. The lateral level of the mobile trestle is maintained by adjusting the top supporting screws, and the trestle is floated and sunk by using air intake and drainage, and air exhaust and water intake, so that the trestle is stable and reliable when in use, and floats and moves conveniently when moved. The present invention can be widely promoted in the construction of near-shore docks. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0018] Figure 1 It is a top view of the snorkeling mobile trestle for pouring concrete for the wharf pier of the present invention;
[0019] Figure 2 It is a side view of the snorkeling mobile trestle for pouring concrete for the wharf pier of the present invention;
[0020] Figure 3 It is a front view of a snorkeling mobile trestle for pouring concrete for a wharf pier of the present invention;
[0021] Figure 4 is a bird's-eye view of the floating support of the present invention;
[0022] Figure 5 It is a partial enlarged view of the connection between the tower column and the connecting rod of the present invention;
[0023] In the figure: 1. main trestle, 2. suspension bridge, 3. floating support, 4. column, 5. outrigger, 6. drainage hole, 7. air pipe, 8. ball bearing, 9. top support screw, 10. winch, 11. mud surface line, 12. cable, 13. tower, 14. bridge frame, 15. pulley, 16. pulley shaft, 17. cable hole. DETAILED DESCRIPTION
[0024] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.
[0025] like Figure 1-4 As shown, the snorkeling mobile trestle for pouring concrete for the wharf pier of the present invention utilizes the pile heads cut off during the wharf construction to make a submersible and floatable pipeline channel, which can solve the construction problem of the near-shore pier concrete, utilizes two snorkeling brackets as the basis of the trestle, utilizes compressed air to empty the water in the pipe of the floating bracket 3 to make it float, and is towed to a new position for use by a motor boat, and the suspension bridges 2 on both sides of the main bridge can adapt to the height changes of the shore side and the pier side, and the concrete conveying pipeline is installed on the trestle to convey the concrete on the shore to the pier.
[0026] In a preferred embodiment of the present invention, the floating pier includes a main pier 1 and suspension bridges 2 arranged at both ends of the main pier 1. The foundation at the lower end of the main pier 1 is a snorkeling floating support 3, and the floating support 3 is a steel pipe tripod support. The main pier 1 can be towed and moved by a power ship after the floating support 3 floats up, and can serve as a bearing foundation for the pier after the floating support 3 sinks. The legs 5 of the floating support 3 are tripods, made of steel pipes. The three legs 5 are not connected to each other, and drainage and water inlet holes are opened at the bottom. The columns 4 of the floating support 3 are welded to the legs 5. The steel pipes of the legs 5 are connected to the top of the columns 4 with small steel pipes for inflation and deflation. A ball support 8 is set on the top of the column 4, and the truss of the main bridge is connected to the column 4 as a whole through the ball support 8. The two sides of the ball support 8 are provided with top support screws 9 for adjusting the lateral level of the main bridge truss. The nuts of the top support screws 9 are welded to the side walls of the column 4. The top of the screw is provided with a steel cap that can rotate around the screw. The bottom end of the legs 5 is forked and set at the mud surface line.
[0027] In a preferred embodiment of the present invention, the main trestle 1 and the suspension bridge 2 are welded by steel pipes or other steel sections. The main trestle 1 and the suspension bridge 2 are connected by a winch 10. The suspension bridge 2 can rotate around the winch 10. A tower is provided at one end of the main trestle 1. The tower is composed of a tower column and a connecting rod. A cable hole 17 is opened at the top of the tower column, and a pulley 15 is installed under the cable. In addition to the winch 10, the suspension bridge 2 and the main trestle 1 are connected by a cable 12 passing through the cable hole 17 at the top of the tower column. In order to facilitate the lifting and lowering of the suspension bridge 2, a hand chain hoist or other tensioning equipment is provided on the main bridge, and the hand chain hoist is connected to the cable 12.
[0028] The present invention also provides a method for using a snorkeling mobile trestle for pouring concrete for a wharf pier, comprising the following steps:
[0029] S1. According to the water depth and buoyancy requirements, steel pipes of different diameters and different inclination angles are used to weld the floating support 3, and then the trusses of the main bridge and the suspension bridge 2 are welded. Then, the trestle is assembled on land. After assembly, the trestle is lifted into the water by a crane, and the air pipe 7 of the floating support 3 is closed before entering the water.
[0030] S2. Use a self-propelled vessel to tow the trestle so that it reaches the predetermined position and is placed perpendicular to the shoreline. Open the air pipe 7 to allow the legs 5 of the floating support 3 to automatically take in water and sink. When sinking, the support columns 4 of the trestle should be kept in a basic vertical state, which can be maintained by adjusting the exhaust speed of different legs 5 until the legs 5 of the floating support 3 are completely supported on the bottom mud surface under their own weight. The lateral level of the main bridge of the trestle is adjusted by adjusting the jacking screws 9 on both sides of the support.
[0031] S3. By loosening the cable 12, the suspension bridge 2 on the shore side is placed on the shore, and the suspension bridge 2 on the water side is placed on the pier, and the pouring pipelines on both sides are connected, which can be used for pouring.
[0032] S4. When a pier is poured, the concrete delivery pipelines on both sides are removed, and the suspension bridge 2 is pulled up. The air compressor is used to supply air to the air pipe 7 to discharge the water in the pipe of the floating support 3 leg 5 from the drainage hole 6, so that the floating support 3 drives the trestle to float up, and then it is driven to the next pouring point for positioning by a self-propelled ship.
[0033] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.
Claims
1. A snorkeling mobile trestle for pouring concrete for dock piers. It is characterized in that The invention comprises a main trestle and a suspension bridge, wherein the main trestle and the suspension bridge are connected by a hinge, a foundation is arranged at the lower end of the main trestle, and the foundation is a snorkeling floating bracket. After the floating bracket floats up, the main trestle can be towed and moved by a power vessel, and the floating bracket serves as a bearing foundation of the trestle after sinking.
2. The snorkeling mobile trestle for pouring concrete for the dock pier according to claim 1, It is characterized in that The floating support is a steel pipe tripod support, which includes a column and three legs. The top of the leg is fixedly arranged at the lower end of the column, the bottom end of the leg is forked and arranged on the mud surface line, and a drainage inlet hole is provided at the bottom of the leg.
3. The snorkeling mobile trestle for pouring concrete for the dock pier according to claim 2, It is characterized in that A ball bearing and a supporting screw are arranged between the main trestle and the floating support. The ball bearing is arranged on the top of the column, and the truss of the main trestle is connected to the column as a whole through the ball bearing. Supporting screws are arranged on both sides of the ball bearing, and the supporting screws are used to adjust the lateral level of the main bridge truss. The nut of the supporting screw is fixedly arranged on the side wall of the column, and the top of the supporting screw is provided with a steel cap that can rotate around the screw.
4. The snorkeling mobile trestle for pouring concrete for the dock pier according to claim 3, It is characterized in that The main trestle and the suspension bridge are both connected by steel pipes. After the main trestle and the suspension bridge are connected by a hinge, the suspension bridge can rotate around the hinge. Towers are arranged at both ends of the main trestle. The towers are composed of tower columns and connecting rods. The connecting rods are arranged on the main trestle and are on the same vertical line as the ball bearing. A cable hole is opened on the top of the tower column, and a pulley is installed on the cable hole.
5. A snorkeling mobile trestle for pouring concrete for a wharf pier according to claim 1, It is characterized in that The suspension bridge and the main bridge are connected by cables passing through the cable holes on the top of the tower columns, so as to facilitate the raising and lowering of the suspension bridge; a hand chain hoist is arranged on the main trestle bridge, and the hand chain hoist is connected with the cable.
6. The method for using the snorkeling mobile trestle for pouring concrete for a wharf pier according to claim 1, It is characterized in that The following steps are involved: S1. According to the water depth and buoyancy requirements, steel pipes and angled welded floating supports are used to fix the trusses of the main trestle and suspension bridge. The main trestle is assembled on land. After assembly, the trestle is hoisted into the water by a crane, and the air pipe of the floating support is closed before entering the water; S2. Use a self-propelled vessel to tow the main trestle bridge, so that the main trestle bridge is placed vertically on the shoreline after reaching the predetermined position, open the air pipe, and let the legs of the floating support automatically enter the water and sink. When sinking, keep the support columns of the main trestle bridge in a basically vertical state, which can be maintained by adjusting the exhaust speed of different legs, until the legs of the floating support are completely supported on the bottom mud surface under their own weight, and adjust the lateral level of the main trestle bridge by adjusting the top support screws on both sides of the support; S3. By loosening the cables, the suspension bridge on the shore side is placed on the shore, and the suspension bridge on the water side is placed on the pier, and the pouring pipelines on both sides are connected for pouring; S4. After a pier is poured, the concrete delivery pipelines on both sides are removed, and the suspension bridge is pulled up. The air compressor is used to supply air to the air pipe to discharge the water in the floating support leg pipe from the drainage hole, so that the floating support drives the trestle to float up, and then it is driven to the next pouring point by a self-propelled boat for positioning.