High pier column and bent cap integrated construction device and construction method thereof
By using holding components and transmission components in the integrated construction device of high pier columns and cap beams, the existing problems of increased cost and low lifting efficiency of embedded bolts in pier columns are solved, and efficient piers and cap beams are realized. Beam construction.
Patent Information
- Application Number
- CN202411000549.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing construction method of high bridge piers, bolts need to be embedded in the pier columns to support the formwork, which increases the construction cost and the jacking efficiency is low. Especially during the construction of high bridge piers, the bolt interference problem is serious and affects the construction efficiency.
The integrated construction device of high pier columns and cover beams is adopted, and the climbing frame and pier columns are fixed by setting the clinging components, which avoids the need to embed bolts in the pier columns. The combined structure of the lifting frame and the support frame is used for lifting, improving the The construction efficiency is improved, and the synchronous movement of multiple holding arms is realized through the transmission assembly.
It reduces the construction cost, improves the lifting efficiency of the climbing frame, avoids the interference of bolts on the movement, and achieves efficient construction of pier columns and cap beams.
Smart Images

Figure CN118756584A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge construction, and in particular to a high pier column and cap beam integrated construction device and a construction method thereof. Background Art
[0002] The construction of piers and cap beams for highway bridges and railway bridges is one of the main contents of bridge construction. The height of piers ranges from a few meters to tens of meters, hundreds of meters, and even hundreds of meters. The construction of high piers and cap beams is high-altitude work, which is one of the difficulties in bridge construction.
[0003] At present, the mainstream construction methods for high bridge piers include layered formwork construction and layered climbing formwork construction. When the height of the pier is not too high, the layered formwork construction technology is often used. First, a scaffolding platform or a fixed formwork platform is set up, and a ground truck crane or crawler crane is used to set up the scaffolding, lift the steel bars and assemble and disassemble the formwork. The concrete is pumped into the formwork by a truck pump. When the pier is higher, the tall scaffolding process and the formwork construction technology are not applicable. Usually, the hydraulic climbing formwork technology is used. The construction platform and the formwork are integrated, and bolts are embedded in the pier body to anchor the jacking guide groove and the formwork platform. The formwork platform is lifted by a hydraulic rod, and a tower crane is set up next to the pier to lift the steel bars. The concrete is lifted into the formwork by the tower crane bucket or pumped into the formwork by a ground pump.
[0004] Embedding bolts in the pier to support the formwork platform will not only increase the construction cost, but also reduce the jacking efficiency because of the need to avoid interference between the bolts during jacking. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide an integrated construction device for high piers and cap beams and a construction method thereof. A clamping assembly is provided to fix the climbing frame to the pier. During construction, there is no need to embed bolts in the pier, thereby reducing the construction cost. During jacking, no bolts interfere with the movement of the climbing frame, thereby greatly improving the jacking efficiency of the climbing frame.
[0006] The objective of the present invention is achieved through the following technical solutions: An integrated construction device for high pier columns and cap beams, comprising a support frame, a climbing frame and a lifting frame; The support frame is arranged outside the climbing frame and is detachably connected to the climbing frame, and a movable template for pier column forming is provided on the support frame; The lifting frame is arranged on the top of the supporting frame, and a lifting mechanism is arranged on the lifting frame; The climbing frame is arranged outside the pier column and is used to drive the supporting frame and the lifting frame to rise along the pier column; The climbing frame comprises a lifting frame, a first fixing frame and a second fixing frame which are arranged in sequence from top to bottom, the lifting frame is detachably connected to the supporting frame, the first fixing frame and the second fixing frame are an integrated structure, and the second fixing frame is connected to the lifting frame through a telescopic member; The jacking frame, the first fixing frame and the second fixing frame are uniformly provided with a plurality of clamping components for clamping the pier columns along their circumferences.
[0007] Furthermore, the telescopic member includes a first oil cylinder, the first fixed frame and the second fixed frame are connected as a whole through a cylinder body of the first oil cylinder, and a piston end of the first oil cylinder is connected to the jacking frame.
[0008] Furthermore, the lifting frame is provided with rails along its length direction, and the lifting mechanism is arranged on the rails.
[0009] Further, the clamping assembly includes a mounting plate and a clamping arm, the mounting plate is fixedly arranged on the jacking frame, the first fixed frame or the second fixed frame, the clamping arm is connected to the mounting plate through a rocker, and a driving member for driving the clamping arm to swing is provided on the mounting plate; When the clamping arm swings, it extends into the inner side of the lifting frame, the first fixed frame or the second fixed frame to clamp the pier column, or is retracted and hidden on the lifting frame, the first fixed frame or the second fixed frame to release the pier column.
[0010] Further, the clamping arm is hinged to the mounting plate through two rockers, the mounting plate is provided with a driving groove, a driving block is slidably provided in the driving groove, and the driving block is drivingly connected to the driving member; The driving block is hinged to the clasping arm via a first telescopic rod.
[0011] Furthermore, the driving member comprises a second oil cylinder, a cylinder body of the second oil cylinder is arranged on the mounting plate, and a piston end of the second oil cylinder is connected to the driving block through an ear plate.
[0012] Furthermore, transmission components are provided at the four corners of the jacking frame, and one driving member is provided. The transmission component is transmission-connected with the plurality of clamping arms. When the driving member drives the clamping arm to move, the remaining clamping arms on the jacking frame are driven to move synchronously through the transmission component.
[0013] Further, the transmission assembly includes a rotating seat and a rotating disk, the rotating seat is connected to the lifting frame, and the rotating disk is rotatably connected to the rotating seat; Two adjacent rotating disks are connected via a connecting rod, and the driving member is drivingly connected to one of the rotating disks; The clamping arm is hinged to the connecting rod through two rocking rods, and the rocking rod is also hinged to the connecting plate through a second telescopic rod.
[0014] Furthermore, the first fixed frame includes two cross bars and two longitudinal bars, and the two cross bars and the two longitudinal bars are connected end to end to form a square frame structure; a U-shaped connecting frame is provided at the bottom of the cross bar, and the longitudinal bar is slidably arranged in the connecting frame, and the longitudinal bar is perpendicular to the cross bar; The clamping assembly includes a plurality of first tie rods and a plurality of second tie rods, wherein the first ends of the first tie rods are arranged on one of the cross bars through an oil cylinder, and the second ends of the first tie rods pass through another cross bar and are tightened on the side of the cross bar through a pad; The first end of the second pull rod is arranged on one of the longitudinal rods through an oil cylinder, and the second end of the second pull rod passes through the other longitudinal rod and is tightened on the side of the longitudinal rod through a pad.
[0015] A construction method based on a high pier column and cap beam integrated construction device comprises the following steps: Step 1: Cast the first layer of piers. After the first layer of piers is formed, set up climbing frames, support frames and lifting frames from the inside to the outside; Step 2: Cast the second layer of piers through the formwork on the support frame; Step 3: Use the climbing frame to drive the support frame and the lifting frame to move as a whole to the second-layer pier column, and start pouring the third-layer pier column; repeat steps 2 and 3 until the pier column height meets the requirements; Step 4: After the pier column is poured, the cap beam template is lifted by the lifting mechanism and set on the top of the pier column; Step 5: After the cap beam formwork is completed, the cap beam pouring begins; Step 6. After the cap beam is cast, remove the formwork and use the climbing frame to drive the supporting frame and lifting frame downward; the climbing frame, supporting frame and lifting frame are removed after they are lowered to the ground.
[0016] The beneficial effects of the present invention are: 1) The present invention achieves the fixation of the climbing frame and the pier column by arranging a clamping assembly. There is no need to embed bolts in the pier column during construction, which reduces the construction cost. During jacking, there are no bolts to interfere with the movement of the climbing frame, which greatly improves the jacking efficiency of the climbing frame.
[0017] 2) By setting up a transmission assembly, a single driving member can drive multiple clamping arms to move synchronously, thereby eliminating the driving member and ensuring the synchronous movement of multiple clamping arms. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a front view of the high pier column and cap beam integrated construction device in the embodiment of the present invention; Figure 2 It is a side view of the integrated construction device of high pier column and cap beam; Figure 3 It is a top view of the integrated construction device of high pier column and cap beam; Figure 4for Figure 3 An enlarged schematic diagram of the local A in the middle; Figure 5 A perspective view of the holding assembly; Figure 6 This is the front view of the climbing frame; Figure 7 This is a side view of the climbing frame; Figure 8 This is a diagram showing the use status of the integrated construction device for high pier columns and cap beams when pouring cap beams; Fig. 9 A top view of the support frame and the climbing frame in Example 2 of the present invention; Fig.10 A top view of the climbing frame in Embodiment 2 of the present invention; Fig.11 Fig.10 An enlarged schematic diagram of the local B in the middle; Fig.12 Fig.10 An enlarged schematic diagram of the local C in the middle; Fig.13 for Figure 6 An enlarged schematic diagram of the local D in the middle; Fig.14 is a top view of the first fixing frame in the third embodiment; In the figure, 1, support frame; 2, climbing frame; 3, lifting frame; 4, movable formwork; 5, lifting frame; 6, first fixed frame; 7, second fixed frame; 8, clamping assembly; 9, telescopic member; 10, mounting plate; 11, clamping arm; 12, rocker; 13, driving member; 14, driving slot; 15, driving block; 16, first telescopic rod; 17, rotating seat; 18, rotating disk; 19, connecting rod; 20, second telescopic rod; 21, lifting mechanism; 22, cross bar; 23, longitudinal bar; 24, connecting frame; 25, first pull rod; 26, second pull rod; 27, oil cylinder; 28, pad. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1-Figure 12 , the present invention provides a technical solution: Embodiment 1: like Figure 1-Figure 8 As shown, a high pier column and cap beam integrated construction device comprises a support frame 1, a climbing frame 2 and a lifting frame 3; The support frame 1 is arranged outside the climbing frame 2 and is detachably connected to the climbing frame 2. The support frame 1 is provided with a movable template 4 for pier column forming; The lifting frame 3 is arranged on the top of the supporting frame 1, and a lifting mechanism 21 is arranged on the lifting frame 3; The climbing frame 2 is arranged outside the pier column and is used to drive the supporting frame 1 and the lifting frame 3 to rise along the pier column; The climbing frame 2 includes a lifting frame 5, a first fixed frame 6 and a second fixed frame 7 which are arranged in sequence from top to bottom. The lifting frame 5 is detachably connected to the support frame 1. The first fixed frame 6 and the second fixed frame 7 are an integrated structure. The second fixed frame 7 is connected to the lifting frame 5 through a telescopic member 9. The lifting frame 5 is composed of four I-beams, and the two ends of the four I-beams extend outward to form a connecting part. The support frame 1 is connected to the lifting frame 5 through bolts and the connecting part.
[0021] The lifting frame 5, the first fixing frame 6 and the second fixing frame 7 are uniformly provided with a plurality of clamping components 8 for clamping the pier columns along their circumferences.
[0022] The telescopic member 9 includes a first oil cylinder, the first fixed frame 6 and the second fixed frame 7 are connected as a whole through the cylinder body of the first oil cylinder, and the piston end of the first oil cylinder is connected to the jacking frame 5.
[0023] The lifting frame 3 is provided with rails along its length direction, and the lifting mechanism 21 is arranged on the rails (wherein the lifting mechanism 21 can be but is not limited to a winch).
[0024] The clamping assembly 8 includes a mounting plate 10 and a clamping arm 11. The mounting plate 10 is fixedly arranged on the lifting frame 5, the first fixed frame 6 or the second fixed frame 7. The clamping arm 11 is connected to the mounting plate 10 through a rocker 12. The mounting plate 10 is provided with a driving member 13 for driving the clamping arm 11 to swing. When the clamping arm 11 swings, it extends into the inner side of the lifting frame 5, the first fixed frame 6 or the second fixed frame 7 to clamp the pier column, or is retracted and hidden on the lifting frame 5, the first fixed frame 6 or the second fixed frame 7 to release the pier column.
[0025] The clamping arm 11 is hinged to the mounting plate 10 through two rocking arms 12 (the two ends of the two rocking arms 12 are hinged to the clamping arm 11 and the mounting plate 10 respectively), and a driving groove 14 is provided on the mounting plate 10, and a driving block 15 is slidably provided in the driving groove 14, and the driving block 15 is drivingly connected to the driving member 13; The driving block 15 is hinged to the clasping arm 11 via a first telescopic rod 16 .
[0026] The driving member 13 comprises a second oil cylinder, a cylinder body of the second oil cylinder is arranged on the mounting plate 10, and a piston end of the second oil cylinder is connected to the driving block 15 through an ear plate.
[0027] Among them, 1. The movable template 4 is used for pier column forming, which includes an inner template and an outer template. The specific structure is based on the existing foundation, as shown in the attached figure, and no further description is given here; the movable template 4 is installed in the middle of the support frame 1 through a cylinder or an oil cylinder, and the movable template is convenient for closing the mold to form a mold cavity when pouring the pier column; the mold is opened and separated when the pier column is formed. 2. The movable template 4 is located above the jacking frame 5.
[0028] Working principle: (1) First, cast the first layer of piers. Since the height of the first layer of piers is low, the mold can be set up without climbing frame 2 or scaffolding. After the first layer of piers is cast, the climbing frame 2, support frame 1 and lifting frame 3 are assembled based on the first layer of piers. Specifically, the climbing frame 2 is set outside the first layer of piers, and the climbing frame 2 is clamped and released with the piers by the clamping assembly 8.
[0029] After the climbing frame 2 is installed, connect the supporting frame 1 to the outside of the climbing frame 2, and then install the lifting frame 3 and the lifting assembly in sequence.
[0030] (2) Casting of high-level (second, third, ... Nth) piers: The movable formwork 4 is closed to form a molding cavity for the second-layer piers, and then casting can be performed. After the second-layer piers are formed, the mold is opened. After the mold is opened, the climbing frame 2 drives the device to move as a whole to the second-layer piers, and the third-layer piers are cast based on the second-layer piers, and this is repeated until the pier height meets the requirements.
[0031] (3) After the pier column is cast, the cap beam template is lifted to the top of the pier column by the lifting mechanism 21, and the cap beam template is erected on the top of the pier column. After the cap beam template is erected, the cap beam is cast.
[0032] (4) After the cap beam is cast, the cap beam template is transported to the ground through the lifting mechanism 21; then the lifting frame 3 and the support frame 1 are driven downward to the ground through the climbing frame 2. After the climbing frame 2, the support frame 1 and the lifting frame 3 are lowered to the ground, the frame can be dismantled, and the construction is completed after the dismantling is completed.
[0033] The lifting process of the climbing frame 2 is as follows: the piston rod of the first oil cylinder extends, thereby lifting the lifting frame 5 upward; the support frame 1 and the lifting frame 3 connected to the lifting frame 5 rise synchronously. In this process, the first fixed frame 6 and the second fixed frame 7 are tightly clamped on the pier column to provide support for the support frame 1 and the lifting frame 3. After the lifting is completed, the clamping assembly 8 on the lifting frame 5 is simultaneously clamped on the pier column to increase the supporting force.
[0034] When the next lifting is needed, the clamping components 8 on the first fixed frame 6 and the second fixed frame 7 are released, and the clamping components 8 on the lifting frame 5 are clamped; then the first oil cylinder is actuated, and when its piston rod is reset, the cylinder body moves upward, thereby driving the first fixed frame 6 and the second fixed frame 7 upward. After the first fixed frame 6 and the second fixed frame 7 move up and down, the clamping components 8 of the first fixed frame 6 and the second fixed frame 7 are clamped, and the clamping components 8 of the lifting frame 5 are released, and the aforementioned lifting action can be repeated.
[0035] Among them, there are at least four clamping components 8, which are evenly distributed along the circumference of the lifting frame 5, the first fixed frame 6 or the second fixed frame 7, that is, a clamping component 8 is set on each side of the lifting frame 5, the first fixed frame 6 or the second fixed frame 7.
[0036] Here, the jacking frame 5 is taken as an example for explanation: when clamping, the second oil cylinder is activated, and its piston rod is extended, driving the driving block 15 to move along the driving groove 14. When the driving block 15 moves, the clamping arm 11 is driven to move through the first telescopic rod 16. When the clamping arm 11 moves, its end face protrudes to the inner side of the jacking frame 5 and abuts against the pier column. As the pressure oil of the second oil cylinder is supplied, the pressure between the clamping arm 11 and the pier column increases, so that the clamping arm 11 can be firmly clamped on the pier column.
[0037] The four second oil cylinders simultaneously drive the four clamping arms 11 to move, thereby ensuring the clamping effect. When the pier column needs to be released, the second oil cylinders can be reset.
[0038] The present invention achieves the fixation of the climbing frame 2 and the pier column by providing a clamping assembly 8. There is no need to embed bolts in the pier column during construction, which reduces the construction cost. During jacking, no bolts interfere with the movement of the climbing frame 2, which greatly improves the jacking efficiency of the climbing frame 2.
[0039] Embodiment 2: like Figure 1-Figure 3 , Figure 8 , Figure 9-12 As shown, the difference between this embodiment and embodiment 1 is that transmission components are provided at the four corners of the jacking frame 5, and one driving member 13 is provided. The transmission component is transmission-connected with the plurality of clamping arms 11, and when the driving member 13 drives the clamping arms 11 to move, the remaining clamping arms 11 on the jacking frame 5 are driven to move synchronously through the transmission component.
[0040] The transmission assembly includes a rotating seat 17 and a rotating disk 18, wherein the rotating seat 17 is connected to the lifting frame 5, and the rotating disk 18 is rotatably connected to the rotating seat 17; Two adjacent rotating disks 18 are connected via a connecting rod 19 (wherein the connecting rod 19 is hinged to the rotating disk 18), and the driving member 13 is in transmission connection with one of the rotating disks 18; The clasping arm 11 is hinged to the connecting rod 19 via two rocking arms 12 , and the rocking arm 12 is further hinged to the connecting plate via a second telescopic rod 20 .
[0041] With such an arrangement, only one driving member 13 is needed to complete the synchronous control and drive of the four clamping arms 11. Specifically, when the clamping assembly 8 needs to clamp or release the pier, the driving member 13 is actuated, and the driving member 13 drives the connecting rod 19 to move through the rotating disk 18, and the multiple rotating disks 18 are transmitted through the connecting rod 19; when the connecting rod 19 moves, the clamping arm 11 is driven to move through the rocker 12. The action process is the same as that in Example 2 and will not be repeated here.
[0042] By providing a transmission assembly, a single driving member 13 can drive multiple clamping arms 11 to move synchronously, thereby eliminating the driving member 13 and ensuring the synchronous movement of multiple clamping arms 11.
[0043] Embodiment 3: like Figure 6 , Fig.13 and Fig.14 As shown, the difference between this embodiment and embodiment 2 is that the first fixed frame 6 includes two cross bars 22 and two longitudinal bars 23, and the two cross bars 22 and the two longitudinal bars 23 are connected end to end to form a square frame structure; a U-shaped connecting frame 24 is provided at the bottom of the cross bar 22, and the longitudinal bars 23 are slidably arranged in the connecting frame 24, and the longitudinal bars 23 are perpendicular to the cross bar 22; The clamping assembly 8 includes a plurality of first tie rods 25 and a plurality of second tie rods 26. The first ends of the first tie rods 25 are arranged on one of the cross bars 22 through a cylinder 27. The second ends of the first tie rods 25 pass through another cross bar 22 and are tightened on the side of the cross bar 22 through a pad 28. The first end of the second pull rod 26 is disposed on one of the longitudinal rods 23 via an oil cylinder 27 , and the second end of the second pull rod 26 passes through the other longitudinal rod 23 and is tightened on the side of the longitudinal rod 23 via a pad 28 .
[0044] Among them, 1. The square frame and the first tie rod 25 and the second tie rod 26 form a hoop for holding the pier column. 2. The cross bar 22 and the longitudinal bar 23 have the same structure, both consisting of two channel steels, and a driving gap for installing the oil cylinder 27 is provided between the two channel steels. The two sides of the channel steels are welded and fixed together by rib plates. 3. The longitudinal bar 23 can move in the connection frame 24 in a direction perpendicular to the cross bar 22 and parallel to the cross bar 22 (the width of the connection frame 24 is greater than the width of the longitudinal bar 23).
[0045] Working principle: When the pier column needs to be held tightly, the oil cylinder 27 is started at the same time, and the oil cylinder 27 pulls the first pull rod 25 / the second pull rod 26, and the pull rod pulls the two cross bars 22 / the longitudinal bars 23 through the pad 28, so that the size of the square frame formed by the two cross bars 22 and the two longitudinal bars 23 is reduced to fit the pier column. Then, the oil cylinder 27 is continued to operate, and the rectangular frame can be held tightly on the pier column. The holding principle of the jacking frame, the second fixed frame and the first fixed frame is the same, which will not be repeated here.
[0046] The lifting process of the climbing frame 2 is as follows: the piston rod of the first oil cylinder extends, thereby lifting the lifting frame 5 upward; the support frame 1 and the lifting frame 3 connected to the lifting frame 5 rise synchronously. In this process, the clamp formed by the first fixed frame 6 and the second fixed frame 7 clamps tightly on the pier column to provide support for the support frame 1 and the lifting frame 3. When the lifting is completed, the clamp formed by the lifting frame 5 clamps tightly on the pier column to increase the supporting force.
[0047] Embodiment 4: A construction method based on a high pier column and cap beam integrated construction device comprises the following steps: Step 1: Cast the first layer of piers. After the first layer of piers is formed, a climbing frame 2, a supporting frame 1 and a lifting frame 3 are set up from the inside to the outside; Step 2: Cast the second layer of piers through the formwork on the support frame 1; Step 3: Use the climbing frame 2 to drive the support frame 1 and the lifting frame 3 to move to the second-layer pier column as a whole, and start pouring the third-layer pier column; repeat steps 2 and 3 until the pier column height meets the requirements; Step 4: After the pier column is poured, the cap beam template is lifted by the lifting mechanism 21 and set on the top of the pier column; Step 5: After the cap beam formwork is completed, the cap beam pouring begins; Step six, after the cap beam is cast, remove the formwork, and drive the support frame 1 and the lifting frame 3 downward through the climbing frame 2; the climbing frame 2, the support frame 1, and the lifting frame 3 are removed after they descend to the ground. The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as an exclusion of other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the related field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.
Claims
1. A high pier column and cap beam integrated construction device, characterized in that: Including support frame, climbing frame and lifting frame; The support frame is arranged outside the climbing frame and is detachably connected to the climbing frame, and a movable template for pier column forming is provided on the support frame; The lifting frame is arranged on the top of the supporting frame, and a lifting mechanism is arranged on the lifting frame; The climbing frame is arranged outside the pier column and is used to drive the supporting frame and the lifting frame to rise along the pier column; The climbing frame comprises a lifting frame, a first fixing frame and a second fixing frame which are arranged in sequence from top to bottom, the lifting frame is detachably connected to the supporting frame, the first fixing frame and the second fixing frame are an integrated structure, and the second fixing frame is connected to the lifting frame through a telescopic member; The jacking frame, the first fixing frame and the second fixing frame are uniformly provided with a plurality of clamping components for clamping the pier columns along their circumferences.
2. The high pier column and cap beam integrated construction device according to claim 1 is characterized in that: The telescopic member comprises a first oil cylinder, the first fixed frame and the second fixed frame are connected as a whole through a cylinder body of the first oil cylinder, and a piston end of the first oil cylinder is connected to the lifting frame.
3. The high pier column and cap beam integrated construction device according to claim 1 is characterized in that: The lifting frame is provided with rails along its length direction, and the lifting mechanism is arranged on the rails.
4. The high pier column and cap beam integrated construction device according to claim 1, characterized in that: The clamping assembly comprises a mounting plate and a clamping arm, wherein the mounting plate is fixedly arranged on the lifting frame, the first fixing frame or the second fixing frame, the clamping arm is connected to the mounting plate via a rocker, and a driving member for driving the clamping arm to swing is arranged on the mounting plate; When the clamping arm swings, it extends into the inner side of the lifting frame, the first fixed frame or the second fixed frame to clamp the pier column, or is retracted and hidden on the lifting frame, the first fixed frame or the second fixed frame to release the pier column.
5. The high pier column and cap beam integrated construction device according to claim 4 is characterized in that: The clamping arm is hinged to the mounting plate through two rockers, the mounting plate is provided with a driving groove, a driving block is slidably provided in the driving groove, and the driving block is drivingly connected to the driving member; The driving block is hinged to the clasping arm via a first telescopic rod.
6. The high pier column and cap beam integrated construction device according to claim 5, characterized in that: The driving member comprises a second oil cylinder, a cylinder body of the second oil cylinder is arranged on a mounting plate, and a piston end of the second oil cylinder is connected to the driving block through an ear plate.
7. The high pier column and cap beam integrated construction device according to claim 4 is characterized in that: Transmission components are provided at the four corners of the lifting frame, and one driving member is provided. The transmission component is transmission-connected with a plurality of the clamping arms. When the driving member drives the clamping arm to move, the remaining clamping arms on the lifting frame are driven to move synchronously through the transmission component.
8. The high pier column and cap beam integrated construction device according to claim 7 is characterized in that: The transmission assembly includes a rotating seat and a rotating disk, the rotating seat is connected to the lifting frame, and the rotating disk is rotatably connected to the rotating seat; Two adjacent rotating disks are connected via a connecting rod, and the driving member is drivingly connected to one of the rotating disks; The clamping arm is hinged to the connecting rod through two rocking rods, and the rocking rod is also hinged to the connecting plate through a second telescopic rod.
9. The high pier column and cap beam integrated construction device according to claim 1, characterized in that: The first fixed frame includes two cross bars and two longitudinal bars, and the two cross bars and the two longitudinal bars are connected end to end to form a square frame structure; a U-shaped connecting frame is provided at the bottom of the cross bar, and the longitudinal bar is slidably arranged in the connecting frame, and the longitudinal bar is perpendicular to the cross bar; The clamping assembly includes a plurality of first tie rods and a plurality of second tie rods, wherein the first ends of the first tie rods are arranged on one of the cross bars through an oil cylinder, and the second ends of the first tie rods pass through another cross bar and are tightened on the side of the cross bar through a pad; The first end of the second pull rod is arranged on one of the longitudinal rods through an oil cylinder, and the second end of the second pull rod passes through the other longitudinal rod and is tightened on the side of the longitudinal rod through a pad.
10. A construction method based on the high pier column and cap beam integrated construction device according to any one of claims 1 to 8, characterized in that: The steps include: Step 1: Cast the first layer of piers. After the first layer of piers is formed, set up climbing frames, support frames and lifting frames from the inside to the outside; Step 2: Cast the second layer of piers through the formwork on the support frame; Step 3: Use the climbing frame to drive the support frame and the lifting frame to move as a whole to the second-layer pier column, and start pouring the third-layer pier column; repeat steps 2 and 3 until the pier column height meets the requirements; Step 4: After the pier column is poured, the cap beam template is lifted by the lifting mechanism and set on the top of the pier column; Step 5: After the cap beam formwork is completed, the cap beam pouring begins; Step 6. After the cap beam is cast, remove the formwork and use the climbing frame to drive the supporting frame and lifting frame downward; the climbing frame, supporting frame and lifting frame are removed after they are lowered to the ground.
Citation Information
Cited By
Construction method for pier column and bent cap of bridge
CN120797559A
Construction method of pier column and bent cap of bridge
CN120797559B
Pier column capping beam construction device
CN120867203A
Square hoop lifting device
CN120945800A