Bridge double-door type beam hoisting and replacing method
Through the double-door crane beam replacement method of the bridge, the gap between the bridge piers is used to dismantle the bridge, which solves the problems of traffic interruption and construction difficulty during bridge beam replacement, achieves efficient and safe bridge replacement, and reduces the impact on urban traffic.
Patent Information
- Application Number
- CN202411127050.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-11
AI Technical Summary
During the bridge girder replacement process, traffic interruption has a huge impact on urban traffic, and replacement construction in a busy environment is difficult and has high safety risks.
The bridge double-door crane beam replacement method is adopted. By erecting a door crane on the bridge, tilting the target beam and using the gap between the bridge piers to remove it, it can reduce the occupation of the bridge deck and roads and reduce the impact on traffic.
It achieves efficient dismantling and replacement of bridge beam components without interrupting traffic, reducing the impact on urban traffic and construction difficulty, and reducing safety risks.
Smart Images

Figure CN118756608A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of highway bridges, and in particular to a double-door bridge beam lifting and replacing method. Background Art
[0002] With the development of urban transportation, urban renewal has gradually been put on the agenda. A large number of bridge projects in cities need to be replaced or repaired. However, interrupting traffic has a huge impact on urban traffic, so replacement and repair methods that reduce traffic impact are the first choice for urban traffic renewal. However, it is extremely difficult to replace beam components in a busy environment without interrupting traffic. The resulting safety risks are also relatively large.
[0003] This patent invents a bridge beam replacement method, which can minimize the area occupied by bridge beam replacement and reduce the large amount of occupation of the bridge deck. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the defect in the prior art that traffic interruption during the bridge beam replacement process has a huge impact on urban traffic, and to provide a bridge double-door lifting beam replacement method.
[0005] The present invention solves the above technical problems through the following technical solutions:
[0006] A double-door bridge beam replacement method comprises the following steps:
[0007] S1. Set two gantry cranes on the bridge and at both ends of the target beam respectively;
[0008] S2, using the two gantry cranes to lift the target beam and tilt the target beam so that the second end of the target beam is higher than the first end of the target beam;
[0009] S3, lowering the inclined target beam from between two piers of the bridge and from the gap between two beams on both sides of the target beam.
[0010] In this scheme, the double-gantry crane beam replacement method of the bridge sets up a gantry crane on the bridge, tilts the target beam, and then utilizes the gap between the bridge piers and between the two beams on both sides of the target beam to remove the target beam, thereby achieving the removal of the target beam, thereby eliminating the need to excessively occupy the road under the bridge, reducing the large amount of occupation of the bridge deck, and reducing the impact on urban traffic.
[0011] Preferably, the gantry crane comprises: a gantry, a walking main beam, a hook, a lower support, and a gantry crane tire;
[0012] The walking main beam is connected to the gantry and can move horizontally relative to the gantry, the hook is connected to the walking main beam, the lower support is arranged at the bottom of the gantry, and the gantry crane tires are arranged on both sides of the walking direction of the gantry and can move in the vertical direction relative to the gantry.
[0013] In this solution, the gantry crane tires of the gantry crane can be retracted, so that the gantry crane can be moved when not hoisted, and can be fixed when the gantry crane is hoisted.
[0014] Preferably, the gantry crane further includes a lower crossbeam and a jack, wherein the lower crossbeam is connected to the lower portion of the gantry, and the gantry crane tire is connected to the lower crossbeam through the jack and moves in a vertical direction relative to the lower crossbeam through the jack.
[0015] In this solution, the gantry crane tire is moved up and down by a jack, which is more reliable.
[0016] Preferably, the door crane further comprises two upper cross beams;
[0017] The gantry includes a front frame and a rear frame arranged in the traveling direction of the gantry crane, the two upper crossbeams are connected between the front frame and the rear frame and extend along the traveling direction of the gantry crane, and the two ends of the traveling main beam are respectively arranged on the two upper crossbeams and can move horizontally along the upper crossbeams.
[0018] Preferably, step S1 comprises:
[0019] S11, the two gantry cranes are moved to the two ends of the target beam through the gantry crane tires, and the two vertical support members on both sides of the gantry of the gantry crane are respectively located on the two beams on both sides of the target beam;
[0020] S12. The gantry crane tires of the two gantry cranes move vertically upward until the lower supports abut against two beams on both sides of the target beam.
[0021] In this solution, the gantry crane can be easily moved and fixed by retracting the gantry crane tires.
[0022] Preferably, step S2 comprises:
[0023] S21, using the two gantry cranes to synchronously lift the target beam;
[0024] S22, using the two gantry cranes to horizontally move the target beam along the extension direction of the target beam so that the first end of the target beam passes over the plane boundary of the cap beam of the bridge;
[0025] S23, using the two gantry cranes to tilt the target beam so that the second end of the target beam is higher than the first end of the target beam.
[0026] Preferably, in step S23, one of the gantry cranes lowers the first end of the target beam, and another gantry crane lifts the second end of the target beam.
[0027] Preferably, in step S23, one of the gantry cranes is not operated, and the other gantry crane lifts the second end of the target beam.
[0028] Preferably, in step S23, one of the gantry cranes lowers the first end of the target beam, and the other gantry crane does not operate.
[0029] Preferably, the bridge double-door lifting beam replacement method further comprises the steps of:
[0030] S4. Placing the target beam on a flat-bed beam transport truck under the bridge.
[0031] The positive and progressive effect of the present invention is that the double-gantry crane beam replacement method for the bridge sets up a gantry crane on the bridge, tilts the target beam, and thereby utilizes the gap between the bridge piers and between the two beams on both sides of the target beam to remove the target beam, thereby achieving the removal of the target beam, thereby eliminating the need to excessively occupy the road under the bridge, reducing the large amount of occupation of the bridge deck, and reducing the impact on urban traffic. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 The present invention is a schematic flow chart of a double-door bridge beam replacement method according to an embodiment of the present invention.
[0033] Figure 2 It is a schematic diagram of the front structural view of a door crane according to an embodiment of the present invention.
[0034] Figure 3 It is a schematic diagram of the side structure of a door hanger according to an embodiment of the present invention.
[0035] Figure 4A It is a schematic diagram of the front structural view of the door crane in step 110 according to one embodiment of the present invention.
[0036] Figure 4B It is a schematic diagram of the side structure of the door hanger in step 110 according to one embodiment of the present invention.
[0037] Figure 5A It is a schematic diagram of the front structural view of the door crane in step 120 according to one embodiment of the present invention.
[0038] Figure 5B It is a schematic diagram of the side structure of the door hanger in step 120 according to one embodiment of the present invention.
[0039] Fig. 6AIt is a schematic diagram of the front structural view of the door crane in step 210 according to one embodiment of the present invention.
[0040] Figure 6B It is a schematic diagram of the side structure of the door hanger in step 210 according to one embodiment of the present invention.
[0041] Fig. 7A It is a schematic diagram of the front structural view of the door crane in step 220 according to one embodiment of the present invention.
[0042] Figure 7B It is a schematic diagram of the side structure of the door hanger in step 220 according to one embodiment of the present invention.
[0043] Fig. 8A It is a schematic diagram of the front structural view of the door crane in step 230 according to one embodiment of the present invention.
[0044] Figure 8B It is a schematic diagram of the side view structure of the door hanger in step 230 according to one embodiment of the present invention.
[0045] Fig. 9A It is a schematic diagram of the front structural view of the door crane in step 300 according to one embodiment of the present invention.
[0046] Fig. 9B It is a schematic diagram of the side structural view of the door hanger in step 300 according to one embodiment of the present invention.
[0047] Fig. 10A It is a schematic diagram of the front structural view of the door crane in step 400 according to one embodiment of the present invention.
[0048] Fig. 10B It is a schematic diagram of the side structural view of the door hanger in step 400 according to one embodiment of the present invention.
[0049] Description of reference numerals:
[0050] Door hanger 500
[0051] Door frame 510
[0052] Front rack 511
[0053] Rear rack 512
[0054] Vertical support 513
[0055] Walking beam 520
[0056] Hook 530
[0057] Lower support 540
[0058] Gantry crane tire 550
[0059] Upper beam 560
[0060] Limiting plate 561
[0061] Lower beam 570
[0062] Jack 580
[0063] Wheel beam 590
[0064] Flatbed Beam Truck 700
[0065] Bridge 600
[0066] Target beam 610
[0067] First End 611
[0068] Second end 612
[0069] Pier 620
[0070] Cap beam 630
[0071] Plane Boundary 631 DETAILED DESCRIPTION
[0072] The present invention is further described below by way of embodiments in conjunction with the accompanying drawings, but the present invention is not limited to the scope of the embodiments.
[0073] like Figure 1 As shown, this embodiment provides a bridge double-door hanging beam replacement method, which is used to replace the beams of a bridge 600 such as an elevated bridge erected on a highway. In this embodiment, a box beam is used as an example of a replaced beam for explanation. The present invention is not limited to this, and the method of the present invention is also applicable to the construction of replacing bridge beams with prefabricated components such as plate beams and T-beams as upper structures.
[0074] Alternatively, the method may also be applicable to the construction of a bridge 600 constructed on water.
[0075] like Figure 4A-10B As shown, the bridge double-door lifting beam replacement method includes the following steps:
[0076] Step 100: Two gantry cranes 500 are respectively installed on the bridge 600 and at both ends of the target beam 610.
[0077] like Figure 2-3 As shown, the gantry crane 500 includes: a gantry 510, a walking main beam 520, a hook 530, a lower support 540, and a gantry crane tire 550.
[0078] The walking main beam 520 is connected to the gantry 510 and can move horizontally relative to the gantry 510, the hook 530 is connected to the walking main beam 520, the lower support 540 is arranged at the bottom of the gantry 510, and the gantry crane tires 550 are arranged on both sides of the walking direction X of the gantry 510 and can move in the vertical direction relative to the gantry 510.
[0079] The gantry crane tire 550 of the gantry crane 500 is retractable, so that the gantry crane 500 can be moved when it is not hoisted, and the gantry crane 500 can be fixed when it is hoisted.
[0080] The gantry crane 500 further includes a lower cross beam 570 and a jack 580 . The lower cross beam 570 is connected to the lower portion of the gantry 510 . The gantry crane tire 550 is connected to the lower cross beam 570 via the jack 580 and moves in a vertical direction relative to the lower cross beam 570 via the jack 580 .
[0081] The jack 580 is used to realize the up and down movement of the portal crane tire 550, which is more reliable.
[0082] Alternatively, the gantry crane tire 550 can also be connected to the lower cross beam 570 through other retractable components, such as cylinders, so as to achieve vertical movement of the gantry crane tire 550 relative to the lower cross beam 570. Since the weight of the beam to be hoisted by the gantry crane 500 is relatively large, it is more reliable to use a jack 580.
[0083] The gantry crane 500 further includes a wheel assembly cross beam 590 , through which a plurality of gantry crane tires 550 are assembled, and a jack 580 is connected to the wheel assembly cross beam 590 and a lower cross beam 570 .
[0084] The gantry crane 500 further includes two upper cross beams 560. The gantry frame 510 includes a front frame 511 and a rear frame 512 arranged in the travel direction X of the gantry crane 500, the two upper cross beams 560 are connected between the front frame 511 and the rear frame 512, and extend along the travel direction X of the gantry crane 500, and the two ends of the travel main beam 520 are respectively arranged on the two upper cross beams 560, and can move horizontally along the upper cross beams 560.
[0085] Pulleys and drives are provided at both ends of the walking main beam 520, and a track is provided on the upper cross beam 560. The pulleys cooperate with the track, so that the walking main beam 520 can move horizontally along the extension direction of the upper cross beam 560, driving the hook 530 to move in the walking direction X of the gantry crane 500.
[0086] The hook 530 is connected to the walking main beam 520 and can be moved vertically by contracting the rope connected to the hook 530 to lift or lower the hoisted object.
[0087] Limiting plates 561 are also provided at both ends of the upper cross beam 560 to prevent the walking main beam 520 from moving excessively on the upper cross beam 560 .
[0088] Although this embodiment provides a specific door crane 500 to implement the operation of step 100, the present invention is not limited thereto, and those skilled in the art may also use the existing door crane 500 to implement the operation of step 100 as needed.
[0089] Step 100 includes:
[0090] Step 110: The two gantry cranes 500 are moved to the two ends of the target beam 610 through the gantry crane tires 550, and the two vertical support members 513 on both sides of the gantry 510 of the gantry crane 500 are respectively located on the two beams on both sides of the target beam 610;
[0091] Step 120 : The gantry crane tires 550 of the two gantry cranes 500 move vertically upward until the lower supports 540 abut against two beams on both sides of the target beam 610 .
[0092] By extending and retracting the gantry crane tire 550 of the gantry crane 500, the gantry crane 500 can be easily moved and fixed.
[0093] Step 200 : using two gantry cranes 500 , hoisting the target beam 610 and tilting the target beam 610 so that the second end 612 of the target beam 610 is higher than the first end 611 of the target beam 610 .
[0094] Specifically, step 200 includes:
[0095] Step 210: Using two gantry cranes 500, synchronously lifting the target beam 610;
[0096] Step 220: using two gantry cranes 500, horizontally moving the target beam 610 along the extension direction of the target beam 610 so that the first end 611 of the target beam 610 passes over the plane boundary 631 of the cap beam 630 of the bridge 600;
[0097] Step 230 : using two gantry cranes 500 , the target beam 610 is tilted so that the second end 612 of the target beam 610 is higher than the first end 611 of the target beam 610 .
[0098] First, lift the target beam 610, and then perform translation and tilt operations to avoid collision between the beam and other planes or components.
[0099] In step 230 , one gantry crane 500 lowers the first end 611 of the target beam 610 , and another gantry crane 500 lifts the second end 612 of the target beam 610 .
[0100] In other embodiments, it may also be:
[0101] In step 230 , one gantry crane 500 is not operated, and the other gantry crane 500 lifts the second end 612 of the target beam 610 .
[0102] Alternatively, in step 230, one gantry crane 500 lowers the first end 611 of the target beam 610, and the other gantry crane 500 does not operate.
[0103] Step 300 : lowering the inclined target beam 610 from the gap between two piers 620 of the bridge 600 and between two beams on both sides of the target beam 610 .
[0104] During the lowering process, if there is a possibility of collision, the beam should be appropriately translated to avoid collision.
[0105] Step 400 : placing the target beam 610 on a flatbed beam truck 700 below the bridge 600 .
[0106] If the method is applied to the replacement of beams of a bridge 600 on the water, a beam transporting vessel is arranged under the bridge 600 to receive and transport the beams.
[0107] The double-gantry bridge beam replacement method sets up a gantry crane 500 on the bridge 600, tilts the target beam 610, and uses the gap between the piers 620 of the bridge 600 and between the two beams on both sides of the target beam 610 to remove the target beam 610, thereby eliminating the need to excessively occupy the road below the bridge 600, reducing the large amount of occupation of the bridge deck, and reducing the impact on urban traffic.
[0108] This embodiment only provides a method for replacing an old beam, but those skilled in the art should understand that the installation of a new beam can be performed by performing the above method in reverse order of steps 400 to 200.
[0109] In the description of the present invention, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0110] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that this is only for illustration and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A double-door bridge beam replacement method, characterized in that: It includes the following steps: S1. Set two gantry cranes on the bridge and at both ends of the target beam respectively; S2, using the two gantry cranes to lift the target beam and tilt the target beam so that the second end of the target beam is higher than the first end of the target beam; S3, lowering the inclined target beam from between two piers of the bridge and from the gap between two beams on both sides of the target beam.
2. The double-door bridge beam replacement method according to claim 1, characterized in that: The gantry crane comprises: a gantry, a walking main beam, a hook, a lower support, and a gantry crane tire; The walking main beam is connected to the gantry and can move horizontally relative to the gantry, the hook is connected to the walking main beam, the lower support is arranged at the bottom of the gantry, and the gantry crane tires are arranged on both sides of the walking direction of the gantry and can move in the vertical direction relative to the gantry.
3. The double-door bridge beam replacement method according to claim 2, characterized in that: The gantry crane also includes a lower crossbeam and a jack, wherein the lower crossbeam is connected to the lower portion of the gantry, and the gantry crane tire is connected to the lower crossbeam through the jack and moves in a vertical direction relative to the lower crossbeam through the jack.
4. The bridge double-door hanging beam replacement method according to claim 2, characterized in that: The door crane also includes two upper cross beams; The gantry includes a front frame and a rear frame arranged in the traveling direction of the gantry crane, the two upper crossbeams are connected between the front frame and the rear frame and extend along the traveling direction of the gantry crane, and the two ends of the traveling main beam are respectively arranged on the two upper crossbeams and can move horizontally along the upper crossbeams.
5. The double-door bridge beam replacement method according to claim 2, characterized in that: Step S1 includes: S11, the two gantry cranes are moved to the two ends of the target beam through the gantry crane tires, and the two vertical support members on both sides of the gantry of the gantry crane are respectively located on the two beams on both sides of the target beam; S12. The gantry crane tires of the two gantry cranes move vertically upward until the lower supports abut against two beams on both sides of the target beam.
6. The bridge double-door hanging beam replacement method according to claim 1, characterized in that: Step S2 includes: S21, using the two gantry cranes to synchronously lift the target beam; S22, using the two gantry cranes to horizontally move the target beam along the extension direction of the target beam so that the first end of the target beam passes over the plane boundary of the cap beam of the bridge; S23, using the two gantry cranes to tilt the target beam so that the second end of the target beam is higher than the first end of the target beam.
7. The double-door bridge beam replacement method according to claim 6, characterized in that: In step S23, one of the gantry cranes lowers the first end of the target beam, and the other gantry crane lifts the second end of the target beam.
8. The double-door bridge beam replacement method according to claim 6, characterized in that: In step S23, one of the gantry cranes is not operated, and the other gantry crane lifts the second end of the target beam.
9. The bridge double-door hanging beam replacement method according to claim 6, characterized in that: In step S23, one of the gantry cranes lowers the first end of the target beam, and the other gantry crane does not operate.
10. The double-door bridge beam replacement method according to claim 1, characterized in that: The bridge double-door hanging beam replacement method also includes the steps of: S4. Placing the target beam on a flat-bed beam transport truck under the bridge.