Thermal insulation wall without removing formwork and construction method thereof

By using the construction method of disassembly-free formwork in building insulation walls, the triangular tension structure of pulling joint protrusions, pulling joint plates and steel cages is used to solve the problems of low construction efficiency and thermal bridges in the existing technology, and the insulation wall is improved The thermal insulation performance and construction efficiency of the body.

CN118756858BActive Publication Date: 2024-11-19CCCC THIRD HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411245563.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-19
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The construction efficiency of existing building insulation walls is low and it is easy to form thermal bridges, resulting in a decrease in insulation performance, and the insulation layer is prone to fall off when no connecting parts are installed.

Method used

The construction method of free disassembly formwork is adopted. By setting the pulling projection and the pulling board on the insulation board, combining the tensioning steel bars to build a triangular tension structure, fix the insulation board, and fill the steel cage between the insulation boards to avoid supporting the formwork. Use of

Benefits of technology

It significantly improves the insulation effect and construction efficiency of the insulation wall, avoids the formation of thermal bridges, and ensures the stability and anti-falling of the insulation layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756858B_ABST
    Figure CN118756858B_ABST
Patent Text Reader

Abstract

The present invention discloses an insulation wall without disassembly formwork, which belongs to the field of building insulation wall, including: a pair of insulation boards, a plurality of pull-connection protrusions are arranged on the insulation boards at intervals, two pull-connection protrusions are connected by a pull-connection board, the pull-connection protrusions include a pull-connection rod and a clamp, and the pull-connection board includes a clamp and a cross plate; a protective connection layer, which is arranged on the insulation board; a steel cage, which is filled between a pair of insulation boards, a pair of tensioning steel bars are arranged under each pull-connection board, and the cross plate and the pair of tensioning steel bars are fastened and fixed to form a triangular tension structure; a concrete layer. It has the beneficial effects of enhancing the stability of the insulation board, avoiding the formation of a bridge, and eliminating the need for supporting formwork. A construction method is provided, including: S1, fixing the insulation boards on both sides by temporary diagonal braces; S2, applying a mortar protective layer, and fixing the alkali-resistant glass fiber mesh cloth after consolidation; S3, completing the construction and connection of the steel cage; S4, pouring concrete. It has the beneficial effects of improving the insulation effect and eliminating the need for supporting formwork.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building thermal insulation walls, and more specifically, to a thermal insulation wall without requiring disassembly of formwork and a construction method thereof. Background Art

[0002] Existing buildings often use building insulation walls to achieve insulation. Existing insulation walls usually use pre-supported formwork, pour concrete in the formwork, remove the formwork after reaching a certain strength, and then fix the insulation layer to the concrete wall through through-screws and coating. Due to the need to support and remove the formwork, the construction efficiency is low. Due to the provision of connecting parts such as through-screws, thermal bridges are formed, reducing the insulation performance of the wall. When connecting parts such as through-screws are not provided and simply coated, it is easy to cause the insulation layer to fall off. Summary of the invention

[0003] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0004] In order to achieve these purposes and other advantages according to the present invention, a thermal insulation wall without removing formwork is provided, comprising:

[0005] A pair of insulation boards, the pair of insulation boards are parallel and arranged opposite to each other at intervals, a plurality of pull-connecting protrusions are arranged at intervals on the opposite side walls of the insulation boards, two pull-connecting protrusions arranged opposite to each other on a pair of insulation boards are connected by a pull-connecting plate, the materials of the pull-connecting protrusions and the pull-connecting plates are the same as those of the insulation boards, wherein the pull-connecting protrusions include a pull-connecting rod integrally formed with the insulation boards and a clamping head integrally formed with the pull-connecting rod, the longitudinal cross-section of the pull-connecting rod is a trapezoid with a small upper part and a large lower part, the pull-connecting plate includes a clamping plate detachably clamped on the connecting rod and a horizontal plate integrally formed with the clamping plate, the clamping plate is provided with a clamping port adapted to the shape of the pull-connecting rod, and the opposite side walls of a pair of clamping plates abut against the side walls of the corresponding two clamping heads;

[0006] A protective connection layer, which is arranged on the side walls facing each other of the insulation board;

[0007] A steel cage, both sides of which are non-contact filled in the cavity formed between a pair of insulation boards, the steel cage is located below each tie board and is provided with a pair of tensioning steel bars along the width direction of the insulation wall, wherein the horizontal plate of the corresponding tie board is fastened and fixed with a pair of tensioning steel bars by iron wire to form a triangular tension structure;

[0008] The concrete layer is formed by pouring concrete into a cavity formed between a pair of insulation boards and then consolidating the concrete.

[0009] Preferably, the multiple tensioning bosses on the insulation board are arranged in a triangle, a pair of tensioning steel bars are located on the corresponding side lines of the triangle, and are located in the middle of the side lines, and the horizontal plates on the tensioning bosses forming the same triangle are tied and fixed by the tensioning steel bars corresponding to the iron wire.

[0010] Preferably, the longitudinal section of the cross plate is convex, and the bottom of the cross plate between two opposite clamps is integrally formed with reinforcing ribs, and the longitudinal section of the cross plate and the reinforcing ribs between the two opposite clamps forms a "cross" shape.

[0011] Preferably, the protective connecting layer includes a mortar protective layer arranged on the inner side wall of the insulation board and an alkali-resistant glass fiber mesh cloth arranged on the mortar protective layer.

[0012] Preferably, it also includes a decorative panel, which is arranged on the outer side wall of one of the insulation boards.

[0013] Preferably, the insulation board is a rock wool cement composite insulation board or a ceramic insulation integrated board, and the insulation board is 60-100 cm long, 50-80 cm wide, and 5-8 cm thick.

[0014] Preferably, the longitudinal cross-section of the connecting rod is an isosceles trapezoid, with a base angle of 60° and a base length of 5 to 10 cm. The length of the connecting rod is 5 to 8 cm. The connecting boss is cylindrical in shape, with a diameter of 5 to 8 cm and a thickness of 2 to 3 cm.

[0015] Preferably, the width of the transverse plate is 10-15 cm, the longitudinal thickness excluding the reinforcing ribs is 6-8 cm, and the longitudinal thickness of the reinforcing ribs is 3-5 cm.

[0016] Provided is a construction method for a thermal insulation wall without removing formwork, comprising the following steps:

[0017] S1. Fix the insulation boards on both sides by temporary diagonal braces according to the designed position. The two opposite insulation boards are staggered along the length direction of the insulation wall. At least one row of pull-joint protrusions is reserved in a staggered state, and the remaining pull-joint protrusions are in a horizontally facing state. They are spliced ​​in sequence until the designed length of the insulation wall is met. The insulation boards at both ends of the insulation wall are aligned by cutting or prefabricating insulation boards with matching sizes.

[0018] S2. Apply a mortar protective layer on the inner wall of the insulation board. When the mortar protective layer reaches a certain strength, apply a binder to fix the alkali-resistant glass fiber mesh cloth on the mortar protective layer;

[0019] S3. Use vertical and transverse steel bars to overlap and anchor the reserved steel bars of the foundation at the designed position, and at the same time, tie the tension steel bars to the transverse steel bars with iron wires, and connect the tensioning plates to the corresponding tensioning bosses to complete the construction and connection of the steel cage;

[0020] S4. Pour concrete into the cavity formed by the two insulation boards and vibrate with a vibrator. When the concrete layer reaches a certain strength, remove the temporary diagonal brace to complete the construction of the insulation wall.

[0021] Preferably, the method further includes step S5, in which the decorative panel is installed on the insulation board located on the outer side.

[0022] The present invention has at least the following beneficial effects:

[0023] First, a pair of insulation boards are tightened by setting a tensioning protrusion and a tensioning plate, and then tensioning steel bars are set to bind the tensioning plates, and a triangular tension structure is constructed. This can significantly enhance the fixing stability of the insulation boards and prevent them from falling off, and will not form thermal bridges. When the indoor or outdoor temperature is too high, heat transfer between the internal and external environments will not be achieved through the thermal bridge, thereby significantly improving the thermal insulation effect of the insulation wall.

[0024] Second, by tightening and clamping the connecting head and the connecting plate, and constructing a triangular tensile structure between the connecting plate and the tensioning steel bar, the insulation board has sufficient tensile resistance and can complete the pouring of the concrete layer without the need for additional support formwork, eliminating the construction steps of supporting and disassembling the formwork, and significantly improving the construction efficiency of the insulation wall.

[0025] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A longitudinal cross-sectional schematic diagram of the thermal insulation wall according to one of the technical solutions of the present invention;

[0027] Figure 2 A schematic diagram of a triangular tension structure of one of the technical solutions of the present invention;

[0028] Figure 3 A detailed view of the tie plate according to one of the technical solutions of the present invention;

[0029] Figure 4 A detailed view of a pull-joint protrusion according to one of the technical solutions of the present invention;

[0030] Figure 5 A schematic diagram of the clamping connection between the pull-connection plate and the pull-connection protrusion according to one of the technical solutions of the present invention;

[0031] Figure 6 This is a schematic diagram of the splicing of two insulation boards according to one of the technical solutions of the present invention.

[0032] The explanations of the drawings in the specification are as follows: decorative panel 1, insulation board 2, mortar protective layer 3, alkali-resistant glass fiber mesh cloth 4, steel cage 5, concrete layer 6, connecting boss 11, connecting plate 12, connecting rod 13, clamp 14, clamp plate 15, cross plate 16, bayonet 17, tensioning steel bar 18, reinforcing rib 19. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0034] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the orientation or positional relationship indicated by the terms is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0035] like Figures 1 to 6 As shown, the present invention provides a thermal insulation wall without removing the formwork, comprising:

[0036] A pair of insulation boards 2, a pair of insulation boards 2 are parallel and spaced relative to each other, a plurality of pull-connecting protrusions 11 are spaced apart on the opposite side walls of the insulation boards 2, two pull-connecting protrusions 11 arranged opposite to each other on the pair of insulation boards 2 are connected by a pull-connecting plate 12, the materials of the pull-connecting protrusions 11 and the pull-connecting plate 12 are the same as those of the insulation boards 2, wherein the pull-connecting protrusions 11 include a pull-connecting rod 13 integrally formed with the insulation boards 2 and a clamping head 14 integrally formed with the pull-connecting rod 13, The longitudinal cross-section of the connecting rod 13 is a trapezoid that is small at the top and large at the bottom. The connecting plate 12 includes a clamping plate 15 that is detachably clamped on the connecting rod and a horizontal plate 16 that is integrally formed with the clamping plate 15. The clamping plate 15 is provided with a bayonet 17 that is adapted to the shape of the connecting rod 13. A pair of facing side walls of the clamping plates 15 abut against the side walls of the corresponding two clamping heads 14. By arranging the connecting boss 11 and the connecting plate 12, a pair of insulation boards 2 can be tightened, thereby strengthening and fixing the insulation boards 2.

[0037] The protective connection layer is arranged on the side walls facing the insulation board 2; when pouring concrete, the concrete is easy to damage the insulation board, so the protective connection layer is arranged to protect the insulation board 2. The surface of the pull-joint protrusion 11 and the connection plate can be pre-coated with an adhesive, and the connection plate is connected to the pull-joint protrusion 11 by snap connection after the adhesive dries. The adhesive here is used to protect the pull-joint protrusion 11 and the connection plate from being damaged by the subsequently poured concrete.

[0038] The steel cage 5 has two sides that are non-contact filled in the cavity formed between a pair of insulation boards 2, that is, there is a gap between the two sides of the steel cage 5 and the side walls of the insulation board 2. The steel cage 5 is located below each tie plate 12 and is provided with a pair of tensioning steel bars 18 along the width direction of the insulation wall, wherein the horizontal plate 16 of the corresponding tie plate 12 is fastened and fixed with a pair of tensioning steel bars 18 by iron wire to form a triangular tension structure; the steel cage 5 is built in the cavity and plays the main supporting role of the wall. By setting the tensioning steel bars 18 to bind the tie plate 12 and constructing it into a triangular tension structure, the fixing stability of the insulation board 2 can be significantly enhanced to avoid falling off, and no thermal bridge will be formed. When the indoor or outdoor temperature is too high, the heat transfer between the internal and external environments will not be achieved through the thermal bridge, thereby significantly improving the thermal insulation effect of the insulation wall.

[0039] The concrete layer 6 is formed by pouring concrete into a cavity formed between a pair of insulation boards 2 and then consolidating the concrete.

[0040] In the above technical solution, a pair of insulation boards 2 are tightened by setting a pull-joint protrusion 11 and a pull-joint plate 12, and then a tensioning steel bar 18 is set to bind the pull-joint plate 12, and a triangular tension structure is constructed, which can significantly enhance the fixing stability of the insulation board 2, avoid falling off, and will not form a thermal bridge. When the indoor or outdoor temperature is too high, the heat transfer between the internal and external environments will not be achieved through the thermal bridge, thereby significantly improving the thermal insulation effect of the insulation wall. Through the tightening and clamping of the pull-joint protrusion 11 and the pull-joint plate 12, and the tension of the pull-joint plate 12 and the tensioning steel bar 18 to form a triangular tension structure, the insulation board 2 has sufficient tensile strength, and the pouring construction of the concrete layer 6 can be completed without the need for additional support formwork, eliminating the construction steps of supporting and disassembling the formwork, and significantly improving the construction efficiency of the insulation wall.

[0041] In another technical solution, the multiple tensioning protrusions 11 on the insulation board 2 are arranged in a triangle, a pair of tensioning steel bars 18 are located on the corresponding side lines of the triangle, and are located in the middle position of the side lines, and the horizontal plates 16 on the tensioning protrusions 11 constituting the same triangle are fastened and fixed by the tensioning steel bars 18 corresponding to the iron wire.

[0042] In the above technical scheme, not only the fixing of the pulling protrusion 11 and the pulling plate 12 themselves forms a triangular pulling structure, but also three adjacent groups of pulling protrusions 11 and the pulling plate 12 on the insulation board 2 can form a triangular pulling structure, and multiple groups of triangular prism-shaped pulling structures can be formed on a pair of insulation boards 2, so that the entire insulation board 2 is restrained by each other to form a whole, which significantly improves the fixing effect of the insulation board 2 and avoids falling off.

[0043] In another technical solution, the longitudinal cross-section of the cross plate 16 is in a convex shape, and a reinforcing rib 19 is integrally formed at the bottom of the cross plate 16 located between two opposite clamps 14. The longitudinal cross-section of the cross plate 16 and the reinforcing rib 19 between the two opposite clamps 14 forms a cross shape.

[0044] In the above technical solution, the transverse plate 16 is provided with a "convex" shape and a reinforcing rib 19, so that the anti-fracture ability of the transverse plate 16 can be enhanced. The length of the reinforcing rib 19 can be set so that its two ends are in contact with the side walls facing the two clamps 14, and the reinforcing rib 19 can play a role in preventing the insulation board 2 from tilting toward each other. Alternatively, when the concrete layer 6 is filled between the reinforcing rib 19 and the clamp 14, the role of preventing the insulation board 2 from tilting toward each other can be formed.

[0045] In another technical solution, the protective connection layer includes a mortar protective layer 3 provided on the inner wall of the insulation board 2 and an alkali-resistant glass fiber mesh cloth 4 provided on the mortar protective layer 3. The mortar protective layer 3 is set to 0.5-1.5 cm, which is not only used to protect the insulation board 2, but also used for fixed connection with concrete. The alkali-resistant glass fiber mesh cloth 4 can enhance the connection and fixing effect between the mortar protective layer 3 and the concrete layer 6.

[0046] In another technical solution, a decorative panel 1 is further included, which is arranged on the outer side wall of one of the surface insulation boards 2. When decoration is required, the decorative panel 1 can be selected and arranged for decoration as needed, which will not affect the overall insulation effect.

[0047] Specifically, the insulation board 2 is a rock wool cement composite insulation board 2 or a ceramic insulation integrated board, and the insulation board 2 is 60-100 cm long, 50-80 cm wide, and 5-8 cm thick, which has excellent fire prevention and heat preservation effects.

[0048] Specifically, the longitudinal section of the tie rod 13 is an isosceles trapezoid, with a base angle of 60° and a base length of 5 to 10 cm. The length of the tie rod 13 is 5 to 8 cm. The tie protrusion 11 is cylindrical, with a diameter of 5 to 8 cm and a thickness of 2 to 3 cm. The width of the horizontal plate 16 is 10 to 15 cm, and the longitudinal thickness is 6 to 8 cm without the reinforcing rib 19. The longitudinal thickness of the reinforcing rib 19 is 3 to 5 cm. By setting the above dimensions, it can be ensured that the strength of the tie rod 13 and the tie protrusion 11 meets the construction requirements.

[0049] Provided is a construction method for a thermal insulation wall without removing formwork, comprising the following steps:

[0050] S1. Fix the insulation boards 2 on both sides by temporary diagonal braces according to the designed position. The two opposite insulation boards 2 are staggered along the length direction of the insulation wall. At least one row of pull-joint protrusions 11 is reserved in a staggered state, and the remaining pull-joint protrusions 11 are in a horizontally facing state. They are spliced ​​in sequence until the designed length of the insulation wall is met. The insulation boards 2 at both ends of the insulation wall are aligned by cutting or prefabricating insulation boards 2 of matching sizes. Through staggered splicing, the splicing seams of the opposite insulation boards 2 can be staggered, thereby improving the insulation effect.

[0051] S2, applying a mortar protective layer 3 on the inner wall of the insulation board 2, and when the mortar protective layer 3 reaches a certain strength, applying an adhesive to fix the alkali-resistant glass fiber mesh cloth 4 on the mortar protective layer 3;

[0052] S3, using vertical and transverse steel bars to overlap and anchor the reserved steel bars of the foundation at the designed position, and at the same time, tying the tension steel bars 18 to the transverse steel bars by wire, and clamping the tensioning plate 12 to the corresponding tensioning protrusion 11, to complete the construction and connection of the steel cage 5;

[0053] S4, pouring concrete into the cavity formed by the two insulation boards 2, vibrating with a vibrator, and when the concrete layer 6 reaches a certain strength, removing the temporary diagonal brace to complete the construction of the insulation wall;

[0054] S5. If the exterior wall needs to be decorated, the decorative panel 1 can be installed on the insulation board 2 located on the outside side.

[0055] In the above technical solution, the splicing seams of the relative insulation boards 2 can be staggered by staggered splicing, thereby improving the insulation effect. By tightening and clamping the pull-joint protrusion 11 and the pull-joint plate 12, and the pull-joint plate 12 and the tensioning steel bar 18 to form a triangular tension structure, the insulation board 2 has sufficient tensile strength, and no additional support formwork is required to complete the pouring construction of the concrete layer 6, eliminating the construction steps of supporting and disassembling the formwork, and significantly improving the construction efficiency of the insulation wall.

[0056] By setting a pulling protrusion 11 and a pulling plate 12 to tighten a pair of insulation boards 2, and then setting a tensioning steel bar 18 to bind the pulling plate 12, and constructing a triangular tension structure, the fixing stability of the insulation board 2 can be significantly enhanced to avoid falling off, and no thermal bridge will be formed. When the indoor or outdoor temperature is too high, heat transfer between the internal and external environments will not be achieved through the thermal bridge, thereby significantly improving the thermal insulation effect of the insulation wall.

[0057] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. The thermal insulation wall without removing the formwork is characterized by: include: A pair of insulation boards, the pair of insulation boards are parallel and arranged opposite to each other at intervals, a plurality of pull-connecting protrusions are arranged on the opposite side walls of the insulation boards at intervals, two pull-connecting protrusions arranged opposite to each other on a pair of insulation boards are connected through a pull-connecting plate, the materials of the pull-connecting protrusions and the pull-connecting plates are the same as those of the insulation boards, wherein the pull-connecting protrusions include a pull-connecting rod integrally formed with the insulation boards and a clamping head integrally formed with the pull-connecting rod, the longitudinal cross-section of the pull-connecting rod is a trapezoid with a small upper part and a large lower part, the pull-connecting plate includes a clamping plate detachably clamped on the pull-connecting rod and a horizontal plate integrally formed with the clamping plate, the clamping plate is provided with a clamping port adapted to the shape of the pull-connecting rod, and the opposite side walls of a pair of clamping plates abut against the side walls of the corresponding two clamping heads; A protective connection layer, which is arranged on the side walls facing each other of the insulation board; A steel cage, both sides of which are non-contact filled in the cavity formed between a pair of insulation boards, the steel cage is located below each tie board and is provided with a pair of tensioning steel bars along the width direction of the insulation wall, wherein the horizontal plate of the corresponding tie board is fastened and fixed with a pair of tensioning steel bars by iron wire to form a triangular tension structure; A concrete layer is formed by pouring concrete into a cavity formed between a pair of insulation boards and then consolidating the concrete; The plurality of pull-joint protrusions on the insulation board are arranged in a triangle, a pair of tensioning steel bars are located on the corresponding side lines of the triangle and in the middle of the side lines, and the horizontal plates on the pull-joint protrusions forming the same triangle are fastened and fixed by the tensioning steel bars corresponding to the iron wires; The longitudinal section of the horizontal plate is in a "convex" shape, and the bottom of the horizontal plate between the two opposite clamps is integrally formed with a reinforcing rib, and the longitudinal section of the horizontal plate and the reinforcing rib between the two opposite clamps forms a "cross" shape; The protective connection layer comprises a mortar protective layer arranged on the inner side wall of the thermal insulation board and an alkali-resistant glass fiber mesh cloth arranged on the mortar protective layer.

2. The thermal insulation wall without disassembly formwork according to claim 1, characterized in that: It also includes a decorative panel, which is arranged on the outer side wall of one of the surface insulation boards.

3. The thermal insulation wall without disassembly formwork according to claim 1, characterized in that: The insulation board is a rock wool cement composite insulation board or a ceramic insulation integrated board. The insulation board is 60-100 cm long, 50-80 cm wide and 5-8 cm thick.

4. The thermal insulation wall without disassembly formwork according to claim 1, characterized in that: The longitudinal section of the tie rod is an isosceles trapezoid, with a base angle of 60° and a base length of 5 to 10 cm. The length of the tie rod is 5 to 8 cm. The tie boss is cylindrical in shape, with a diameter of 5 to 8 cm and a thickness of 2 to 3 cm.

5. The thermal insulation wall without disassembly formwork according to claim 3, characterized in that: The width of the transverse plate is 10-15 cm, and the longitudinal thickness excluding the reinforcing ribs is 6-8 cm. The longitudinal thickness of the reinforcing ribs is 3-5 cm.

6. The construction method of the thermal insulation wall without disassembly formwork according to any one of claims 1 to 5, characterized in that: The following steps are involved: S1. Fix the insulation boards on both sides by temporary diagonal braces according to the designed position. The two opposite insulation boards are staggered along the length direction of the insulation wall. At least one row of pull-joint protrusions is reserved in a staggered state, and the remaining pull-joint protrusions are in a horizontally facing state. They are spliced ​​in sequence until the designed length of the insulation wall is met. The insulation boards at both ends of the insulation wall are aligned by cutting or prefabricating insulation boards with matching sizes. S2. Apply a mortar protective layer on the inner wall of the insulation board. When the mortar protective layer reaches a certain strength, apply a binder to fix the alkali-resistant glass fiber mesh cloth on the mortar protective layer; S3. Use vertical and transverse steel bars to overlap and anchor the reserved steel bars of the foundation at the designed position, and at the same time, tie the tension steel bars to the transverse steel bars with iron wires, and connect the tensioning plates to the corresponding tensioning bosses to complete the construction and connection of the steel cage; S4. Pour concrete into the cavity formed by the two insulation boards and vibrate with a vibrator. When the concrete layer reaches a certain strength, remove the temporary diagonal brace to complete the construction of the insulation wall.

7. The construction method of the thermal insulation wall without removing the formwork according to claim 6, characterized in that: The method also includes step S5, in which the decorative panel is installed on the insulation board located on the outer side.