A building curtain wall installation and splicing structure

By using a combination of splicing boxes, plug-in boards and splicing blocks in the architectural curtain wall installation structure, and using locking mechanisms and transmissions, the problems of poor connection effect and many screws in the existing technology are solved, and the installation is improved Stability and construction efficiency.

CN118756869BActive Publication Date: 2024-12-06TIANJIN DONGFANG HAICHUAN DOOR WINDOW & CURTAIN WALL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411244148.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-06
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The connection effect of the splicing structure of the splicing structure of the existing building curtain wall is poor, and a large number of disassembly and assembly screws are required, which seriously affects the construction efficiency.

Method used

The splicing mechanism including mullets, horizontal frames, plug-in boards, splicing blocks and embedded components is adopted. Through the disassembly connection of splicing box and partition board, the locking mechanism and transmission parts are used to achieve the fixing of the plug-in board, and the mullet and The stability and connection tightness of the horizontal frame reduce the use of screws.

Benefits of technology

The installation stability of mullions and horizontal frames is improved, the use of screws is reduced, construction efficiency is improved, and the problems of poor connection effect and many screws in the prior art are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756869B_ABST
    Figure CN118756869B_ABST
Patent Text Reader

Abstract

The present invention is applicable to the technical field of curtain wall installation, and provides a building curtain wall installation splicing structure, comprising: a vertical frame and a horizontal frame, both of which are provided with a limiting groove for placing the curtain wall; a plug-in board, at least one group of plug-in boards is arranged on the vertical frame, and a second fixing hole is also arranged on the plug-in board; a splicing block, at least one group of splicing blocks is arranged on the horizontal frame, and a second connecting hole is arranged on the splicing block; a splicing mechanism, the splicing mechanism comprises a splicing component and a pre-embedded component pre-buried in the concrete structure of the exterior wall, the splicing component comprises a splicing box and a partition plate, the splicing box also has two groups of cavities, and locking mechanisms are arranged in the two groups of cavities. The present invention avoids the problem that most of the existing installation splicing structures are relatively traditional, the connection effect of the horizontal frame and the vertical frame is poor, and more screws need to be disassembled and assembled, which seriously affects the construction efficiency through the coordinated arrangement of the plug-in board, the splicing block and the splicing mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain wall installation, in particular to a building curtain wall installation splicing structure. Background Art

[0002] The building curtain wall is a building external protective structure or decorative structure that does not bear the load and function of the main structure. It has the characteristics of light weight, flexible design and strong earthquake resistance. As an important part of modern architecture, the building curtain wall is widely used in large and high-rise buildings. It not only plays a protective and decorative role, but also has an important impact on the overall performance of the building. The building curtain wall is composed of panels and supporting structure systems, which can have a certain displacement capacity relative to the main structure or a certain deformation capacity itself.

[0003] Most of the existing installation splicing structures are relatively traditional, with poor connection effects on the horizontal frame and the vertical frame, and many screws need to be disassembled and assembled, which seriously affects the construction efficiency. Therefore, in view of the above situation, it is urgent to provide a building curtain wall installation splicing structure to overcome the shortcomings in current practical applications. Summary of the invention

[0004] The object of the present invention is to provide a building curtain wall installation splicing structure, aiming to solve the problems in the above-mentioned background technology.

[0005] The present invention is implemented in this way: a building curtain wall installation splicing structure, comprising:

[0006] Vertical frames and horizontal frames, each of which is provided with a limiting groove for placing the curtain wall;

[0007] A plug-in board, wherein at least one group of the plug-in boards is arranged on the vertical frame, and a second fixing hole is also opened on the plug-in board;

[0008] Splicing blocks, at least one group of which is arranged on the transverse frame, and a second connecting hole is opened on the splicing block;

[0009] A splicing mechanism for splicing vertical frames and horizontal frames together, the splicing mechanism includes a splicing component and an embedded component pre-buried in the concrete structure of the exterior wall, the splicing component includes a splicing box and a partition plate, the splicing box and the embedded component are detachably connected, the partition plate is fixedly installed in the splicing box, and the splicing box also has a first connecting hole for accommodating a plug-in plate, the side of the splicing box is also provided with a splicing plate slidably connected to the second connecting hole, and the splicing box also has two groups of cavities, and both groups of cavities are provided with locking mechanisms for fixing the plug-in plates.

[0010] As a further solution of the present invention: the splicing plate and the plug-in plate are both T-shaped structures.

[0011] As a further solution of the present invention: the locking mechanism includes a locking component, a clamping component and a plug-in drive component for driving the locking component to work, and the clamping component is connected to the locking component.

[0012] As a further solution of the present invention: the locking assembly comprises:

[0013] A threaded rod, the threaded rod being rotatably mounted in the cavity of the splicing box;

[0014] Guide rods, wherein a plurality of guide rods are fixedly installed in the cavity of the splicing box;

[0015] A translation frame slidably mounted on the guide rod, wherein the translation frame is provided with an internal threaded hole threadedly connected to the threaded rod;

[0016] And fixing pins are fixedly installed on both sides of the translation frame, and a first fixing hole for the fixing pin to pass through is opened on the side wall of the cavity in the splicing box.

[0017] As a further solution of the present invention: the clamping assembly comprises:

[0018] A plug-in hole, which is slidably mounted on the side wall of the cavity of the splicing box, and the locking component is also connected to a control component for pushing the plug-in hole to move;

[0019] A second spring for elastically supporting the plug hole, wherein the second spring is fixedly installed in the cavity of the splicing box;

[0020] And a pressing plate for pressing the plug board, wherein the pressing plate is fixedly installed at two ends of the plug hole.

[0021] As a further solution of the present invention: the plug hole is a U-shaped structure, and a guide groove for cooperating with the control component is also provided on the plug hole.

[0022] As a further solution of the present invention: the control component includes:

[0023] A linkage block, wherein the linkage block is slidably connected to the guide rod, and a roller is rotatably mounted on the linkage block;

[0024] A linkage rod is slidably mounted on the translation frame, the linkage block is provided with a through hole for the linkage rod to pass through, and the linkage rod and the linkage block are slidably connected, and circular plates are provided at both ends of the linkage rod;

[0025] And a first spring for pushing the linkage rod to move to a side away from the linkage block, wherein the first spring is sleeved on the linkage rod.

[0026] As a further solution of the present invention: the plug-in drive assembly includes:

[0027] A rotating shaft, which is rotatably mounted in the cavity of the splicing box, and a gear is fixedly mounted on the rotating shaft, and a rectangular hole for the gear to pass through is opened on the cavity of the splicing box;

[0028] A transmission member, which is used to connect the rotating shaft and the threaded rod;

[0029] And a rack for driving the gear to rotate, wherein the rack is fixedly installed in the splicing block.

[0030] As a further solution of the present invention: the embedded component includes an embedded plate pre-buried in the exterior wall concrete, a connecting plate is fixedly installed on the embedded plate, and a plurality of groups of plug-in holes are provided on the connecting plate, and a plurality of groups of plug-in blocks for use with the plug-in holes are fixedly installed on the splicing box, and the plug-in blocks are T-shaped structures.

[0031] As a further solution of the present invention: a limiting plate for blocking the splicing blocks is fixedly installed on the bottom of the splicing plate.

[0032] Compared with the prior art, the present invention has the following beneficial effects: the splicing box can be fixed by using the embedded components, the connection between the vertical frame and the splicing box can be achieved by inserting the plug-in board into the first connecting hole, the connection between the horizontal frame and the splicing box can be achieved by sleeve-mounting the splicing block on the splicing board, and the splicing block can also drive the locking mechanism to work during the sleeve-mounting process, and the plug-in board can be further fixed by using the locking mechanism to improve the stability of the vertical frame during installation, and the horizontal frame can achieve a tight connection between the splicing block and the splicing board under the action of its own gravity and the gravity of the curtain wall to avoid falling off; in the actual installation process, the splicing box and the vertical frame can be stacked and installed in sequence, and the horizontal frame can be installed after installing multiple groups of vertical frames; wherein the horizontal frame located at the top can achieve a tight connection between the splicing block and the splicing board with the help of tools such as glue during the construction process; through the coordinated arrangement of the plug-in board, the splicing block and the splicing mechanism, the existing installation splicing structure is mostly relatively traditional, the connection effect between the horizontal frame and the vertical frame is poor, and more screws need to be disassembled and assembled, which seriously affects the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a structural schematic diagram of the present invention.

[0034] Figure 2 It is a schematic diagram of the structure of the splicing components and the embedded components in the present invention.

[0035] Figure 3 It is a schematic diagram of the structure of the present invention when the splicing components and the embedded components are separated.

[0036] Figure 4 for Figure 3Schematic diagram of the right side cross-sectional structure.

[0037] Figure 5 It is a schematic diagram of the structure of the locking component in the present invention.

[0038] Figure 6 It is a structural schematic diagram of the clamping assembly in the present invention.

[0039] Figure 7 It is a structural schematic diagram of the vertical frame in the present invention.

[0040] Figure 8 It is a structural schematic diagram of the horizontal frame in the present invention.

[0041] In the accompanying drawings: 1-vertical frame, 2-horizontal frame, 3-limiting groove, 4-embedded plate, 5-splicing box, 6-connecting plate, 7-splicing plate, 8-limiting plate, 9-partition plate, 10-pressing plate, 11-first connecting hole, 12-gear, 13-plug-in block, 14-plug-in hole, 15-threaded rod, 16-guide rod, 17-linkage block, 18-rotating shaft, 19-transmission member, 20-translational frame, 21-first fixing hole, 22-fixing pin, 23-linkage rod, 24-first spring, 25-roller, 26-guide groove, 27-second spring, 28-plug-in plate, 29-second fixing hole, 30-splicing block, 31-rack, 32-second connecting hole. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. The specific implementation of the present invention is described in detail below in combination with specific embodiments.

[0043] See also Figure 1-Figure 8 , an embodiment of the present invention provides a building curtain wall installation splicing structure, the building curtain wall installation splicing structure comprising:

[0044] A vertical frame 1 and a horizontal frame 2, each of which is provided with a limiting groove 3 for placing a curtain wall;

[0045] A plug-in board 28, wherein at least one group of the plug-in boards 28 is provided on the vertical frame 1, and a second fixing hole 29 is also provided on the plug-in board 28;

[0046] Splicing blocks 30, at least one group of the splicing blocks 30 is disposed on the transverse frame 2, and a second connecting hole 32 is opened on the splicing block 30;

[0047] A splicing mechanism for splicing a vertical frame 1 and a horizontal frame 2 together, the splicing mechanism includes a splicing component and an embedded component pre-buried in the concrete structure of the exterior wall, the splicing component includes a splicing box 5 and a partition plate 9, the splicing box 5 and the embedded component are detachably connected, the partition plate 9 is fixedly installed in the splicing box 5, and the splicing box 5 also has a first connecting hole 11 for accommodating a plug-in plate 28, the side of the splicing box 5 is also provided with a splicing plate 7 slidably connected to the second connecting hole 32, and the splicing box 5 also has two groups of cavities, and both groups of cavities are provided with locking mechanisms for fixing the plug-in plate 28.

[0048] In the embodiment of the present invention, the curtain wall can be a glass curtain wall, which is not specifically limited here; the splicing box 5 can be fixed by using the embedded components, and the connection between the vertical frame 1 and the splicing box 5 can be realized by inserting the plug-in board 28 into the first connecting hole 11, and the connection between the horizontal frame 2 and the splicing box 5 can be realized by sleeve-mounting the splicing block 30 on the splicing board 7, and the splicing block 30 can also drive the locking mechanism to work during the sleeve-mounting process, and the plug-in board 28 can be further fixed by the locking mechanism, thereby improving the stability of the vertical frame 1 during installation, and the horizontal frame 2 can be under the action of its own gravity and the gravity of the curtain wall. A tight connection between the splicing block 30 and the splicing board 7 is achieved to avoid falling off; in the actual installation process, the splicing box 5 and the vertical frame 1 can be stacked and installed in sequence, and the horizontal frame 2 can be installed after installing multiple sets of vertical frames 1; the horizontal frame 2 located at the top can be tightly connected with the splicing block 30 and the splicing board 7 with the help of tools such as glue during the construction process; compared with the prior art, the present invention avoids the problem that most of the existing installation splicing structures are relatively traditional, the connection effect between the horizontal frame 2 and the vertical frame 1 is poor, and more screws need to be disassembled and assembled, which seriously affects the construction efficiency.

[0049] In one embodiment of the present invention, see Figure 1-Figure 8 , the splicing plate 7 and the plug-in plate 28 are both T-shaped structures;

[0050] The locking mechanism comprises a locking assembly, a clamping assembly and a plug-in drive assembly for driving the locking assembly to work, and the clamping assembly is connected to the locking assembly;

[0051] The locking assembly comprises:

[0052] A threaded rod 15, wherein the threaded rod 15 is rotatably mounted in the cavity of the splicing box 5;

[0053] Guide rods 16, wherein a plurality of guide rods 16 are fixedly installed in the cavity of the splicing box 5;

[0054] A translation frame 20 slidably mounted on the guide rod 16, wherein the translation frame 20 is provided with an internal threaded hole threadedly connected to the threaded rod 15;

[0055] and fixing pins 22 fixedly mounted on both sides of the translation frame 20, and a first fixing hole 21 for the fixing pins 22 to penetrate is provided on the side wall of the cavity in the splicing box 5;

[0056] The clamping assembly comprises:

[0057] The plug hole 14 is slidably mounted on the side wall of the cavity of the splicing box 5, and the locking component is also connected to a control component for pushing the plug hole 14 to move;

[0058] A second spring 27 for elastically supporting the plug hole 14, wherein the second spring 27 is fixedly installed in the cavity of the splicing box 5;

[0059] and a pressing plate 10 for pressing the plug board 28, wherein the pressing plate 10 is fixedly mounted at both ends of the plug hole 14;

[0060] The plug hole 14 is a U-shaped structure, and a guide groove 26 for cooperating with the control component is also provided on the plug hole 14;

[0061] The control component comprises:

[0062] A linkage block 17, wherein the linkage block 17 is slidably connected to the guide rod 16, and a roller 25 is rotatably mounted on the linkage block 17;

[0063] A linkage rod 23 slidably mounted on the translation frame 20, wherein the linkage block 17 is provided with a through hole for the linkage rod 23 to pass through, and the linkage rod 23 is slidably connected to the linkage block 17, and circular plates are provided at both ends of the linkage rod 23;

[0064] and a first spring 24 for pushing the linkage rod 23 to move to a side away from the linkage block 17, wherein the first spring 24 is sleeved on the linkage rod 23;

[0065] The plug-in drive assembly comprises:

[0066] A rotating shaft 18, wherein the rotating shaft 18 is rotatably mounted in the cavity of the splicing box 5, and a gear 12 is fixedly mounted on the rotating shaft 18, and a rectangular hole for the gear 12 to penetrate is opened on the cavity of the splicing box 5;

[0067] A transmission member 19, the transmission member 19 is used to connect the rotating shaft 18 and the threaded rod 15;

[0068] And a rack 31 for driving the gear 12 to rotate, wherein the rack 31 is fixedly installed in the splicing block 30 .

[0069] In this embodiment, after the plug-in board 28 is inserted into the first connecting hole 11, the second fixing hole 29 can be aligned with the first fixing hole 21, and then the splicing block 30 is sleeved on the splicing board 7. During the downward movement of the splicing block 30, the rack 31 can drive the gear 12 to rotate, and the transmission member 19 can make the threaded rod 15 rotate along the rotating shaft 18. The rotating threaded rod 15 will drive the translation frame 20 to slide on the guide rod 16 toward the first fixing hole 21, so that the fixing pin 22 can penetrate the first fixing hole 21 and extend into the second fixing hole 29, so as to fix the plug-in board 28. In addition, during the movement of the translation frame 20 on the guide rod 16, the translation frame 20 can push the second fixing hole 29. A spring 24 moves, and the first spring 24 can be used to push the linkage rod 23 and the linkage block 17 to move. When the roller 25 contacts the guide groove 26, the resistance to the movement of the linkage block 17 increases, so that the first spring 24 is compressed. At the same time, the pressing action of the roller 25 can push the plug-in hole 14 box pressing plate 10 to move, and then drive the pressing plate 10 to press onto the plug-in plate 28. Through the setting of the first spring 24, the linkage block 17 can have a certain buffer space, which can avoid the problem of the translation frame 20 being unable to move after the pressing plate 10 is pressed onto the plug-in plate 28; wherein the transmission member 19 can adopt a combined structure of a pulley and a transmission belt, or a chain transmission structure.

[0070] In one embodiment of the present invention, see Figure 1-Figure 8 The embedded component includes an embedded plate 4 pre-buried in the exterior wall concrete, a connecting plate 6 is fixedly installed on the embedded plate 4, and a plurality of groups of plug-in holes 14 are provided on the connecting plate 6, a plurality of groups of plug-in blocks 13 for use with the plug-in holes 14 are fixedly installed on the splicing box 5, and the plug-in blocks 13 are T-shaped structures; wherein the opening at the top of the plug-in hole 14 is larger than the opening at the bottom of the plug-in hole 14.

[0071] In this embodiment, during the construction stage, the embedded plate 4 is first embedded in the concrete of the exterior wall. During installation, the plug-in block 13 can be inserted into the plug-in hole 14 from the top of the plug-in hole 14, and then the splicing box 5 is pressed downward to make the plug-in block 13 slide in the plug-in hole 14. The plug-in block 13 can be inserted into the plug-in hole 14, thereby realizing the connection between the splicing box 5 and the connecting plate 6.

[0072] In one embodiment of the present invention, see Figure 1-Figure 8 A limiting plate 8 for blocking the splicing block 30 is also fixedly installed at the bottom of the splicing plate 7.

[0073] In this embodiment, during the installation of the transverse frame 2, the limiting plate 8 can be used to limit the splicing block 30 to prevent the splicing block 30 from sliding off the bottom of the splicing plate 7, thereby improving the safety performance of the splicing structure installation.

[0074] In the present invention, unless otherwise clearly specified and limited, the terms "slide", "rotate", "fix", "have" and the like should be understood in a broad sense, for example, it can be a welding connection, a bolt connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0075] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A building curtain wall installation splicing structure, comprising a vertical frame and a horizontal frame, wherein the vertical frame and the horizontal frame are both provided with a limiting groove for placing the curtain wall. It is characterized in that Also includes: A plug-in board, wherein at least one group of the plug-in boards is arranged on the vertical frame, and a second fixing hole is also opened on the plug-in board; Splicing blocks, at least one group of which is arranged on the transverse frame, and a second connecting hole is opened on the splicing block; A splicing mechanism for splicing a vertical frame and a horizontal frame together, the splicing mechanism comprising a splicing assembly and an embedded assembly pre-buried in the concrete structure of the exterior wall, the splicing assembly comprising a splicing box and a partition plate, the splicing box and the embedded assembly are detachably connected, the partition plate is fixedly installed in the splicing box, and the splicing box also has a first connecting hole for accommodating a plug-in board, the side of the splicing box is also provided with a splicing board slidably connected to the second connecting hole, and the splicing box also has two groups of cavities, and both groups of cavities are provided with locking mechanisms for fixing the plug-in boards; The locking mechanism comprises a locking assembly, a clamping assembly and a plug-in drive assembly for driving the locking assembly to work, and the clamping assembly is connected to the locking assembly; The locking assembly comprises: A threaded rod, the threaded rod being rotatably mounted in the cavity of the splicing box; Guide rods, wherein a plurality of guide rods are fixedly installed in the cavity of the splicing box; A translation frame slidably mounted on the guide rod, wherein the translation frame is provided with an internal threaded hole threadedly connected to the threaded rod; and fixing pins fixedly mounted on both sides of the translation frame, and a first fixing hole for the fixing pin to penetrate is provided on the side wall of the cavity in the splicing box; The clamping assembly comprises: A plug-in hole, which is slidably mounted on the side wall of the cavity of the splicing box, and the locking component is also connected to a control component for pushing the plug-in hole to move; A second spring for elastically supporting the plug hole, wherein the second spring is fixedly installed in the cavity of the splicing box; and a pressing plate for pressing the plug board, wherein the pressing plate is fixedly mounted at both ends of the plug hole; The plug hole is a U-shaped structure, and a guide groove for cooperating with the control component is also provided on the plug hole; The control component comprises: A linkage block, wherein the linkage block is slidably connected to the guide rod, and a roller is rotatably mounted on the linkage block; A linkage rod is slidably mounted on the translation frame, the linkage block is provided with a through hole for the linkage rod to pass through, and the linkage rod and the linkage block are slidably connected, and circular plates are provided at both ends of the linkage rod; and a first spring for pushing the linkage rod to move toward a side away from the linkage block, wherein the first spring is sleeved on the linkage rod; The plug-in drive assembly comprises: A rotating shaft, which is rotatably mounted in the cavity of the splicing box, and a gear is fixedly mounted on the rotating shaft, and a rectangular hole for the gear to pass through is opened on the cavity of the splicing box; A transmission member, which is used to connect the rotating shaft and the threaded rod; And a rack for driving the gear to rotate, wherein the rack is fixedly installed in the splicing block.

2. The building curtain wall installation splicing structure according to claim 1, It is characterized in that The splicing plate and the plug-in plate are both T-shaped structures.

3. The building curtain wall installation splicing structure according to claim 1, It is characterized in that The embedded component includes an embedded plate pre-buried in the exterior wall concrete, a connecting plate is fixedly installed on the embedded plate, and a plurality of groups of plug-in holes are provided on the connecting plate, a plurality of groups of plug-in blocks for use with the plug-in holes are fixedly installed on the splicing box, and the plug-in blocks are T-shaped structures.

4. The building curtain wall installation splicing structure according to claim 1, It is characterized in that A limiting plate for blocking the splicing blocks is also fixedly installed on the bottom of the splicing plate.

Citation Information

Patent Citations

  • Building curtain wall assembly and spliced building curtain wall thereof

    CN113027010A

  • Spliced curtain wall for building

    CN215330758U

  • Splicing type curtain wall structure

    CN220336207U

  • Glass curtain wall splicing device

    CN220538990U

  • Method for remodeling curtain wall for improving insulation and soundproofing capabilities and spliced window