One-time pouring construction method for side wall and middle plate formwork-free support of superimposed assembly station

By overlaying and assembling the station side walls and the mid-plate formwork-free bracket, the one-time pouring construction method solves the problems of long construction period and environmental pollution in the existing technology, realizes the formwork-free pouring and efficient construction of the structure, and improves the construction speed and overall quality. sex.

CN118756969APending Publication Date: 2024-10-11CHINA COMMUNICATIONS CONSTRUCTION
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411098571.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing station structure construction method requires a large number of formwork, resulting in long construction period, environmental pollution and noise pollution, and is difficult to adapt to the construction site schedule and achieve green construction requirements.

Method used

The one-time pouring construction method of superimposed and assembled station side walls and mid-board formwork-free brackets is used. The structural components are realized through the assembly of prefabricated frame hollow columns, side walls and U-shaped mid-longitudinal beam prefabricated blocks, combined with the fixation of grouting sleeves and tie rod systems. Formwork-free pouring eliminates horizontal construction joints and improves construction speed and integrity.

Benefits of technology

It achieves the formwork-free effect of structural components, reduces construction time and pollution, improves the integrity and waterproof quality of the structure, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756969A_ABST
    Figure CN118756969A_ABST
Patent Text Reader

Abstract

The invention discloses a one-time pouring construction method for a side wall and middle plate formwork-free support of a superimposed assembly station, and belongs to the technical field of building construction. A prefabricated frame hollow column superimposed prefabricated block, a side wall superimposed prefabricated block and a U-shaped middle longitudinal beam prefabricated block are included; splicing is carried out in sequence; pouring concrete in the core part of the frame column of the frame hollow column laminated precast block and the groove of the U-shaped middle longitudinal beam precast block; superposing the prefabricated blocks on the prefabricated middle plate and splicing; performing primary pouring on the side wall superposed precast blocks and the precast middle plate superposed precast blocks; binding upper-layer steel bars of the prefabricated middle plate superposed prefabricated block and the U-shaped middle longitudinal beam prefabricated block; construction section end formworks of the side wall laminated precast blocks and the precast middle plate laminated precast blocks are installed; and concrete of the side wall laminated precast blocks and the precast middle plate laminated precast blocks is poured. The formwork-free effect of the structural member is achieved, the side wall laminated layer and the middle plate upper layer concrete can achieve the one-time continuous pouring forming effect, the construction speed is increased, and the structural integrity and the waterproof quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a one-time casting construction method for side walls and middle plates of a composite assembly station without formwork brackets. Background Art

[0002] The side walls, columns, bottom plates, middle plates, top plates and other structures of the station structure often adopt the method of on-site formwork, on-site concrete pouring and on-site maintenance. This cast-in-place construction method has the advantages of good integrity, high rigidity and good seismic impact resistance. However, it has obvious disadvantages in adapting to the construction site schedule and green construction requirements. Not only a large number of formworks are required, but also the workload on site is large and the construction period is long. Cast-in-place wet operations will also cause environmental water pollution, noise pollution and air pollution.

[0003] Therefore, there is an urgent need for a construction method for one-time casting of the side walls and middle plates of a composite assembly station without formwork supports. Summary of the invention

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A one-time casting construction method for the side wall and middle plate of a composite assembly station without formwork support comprises the following steps:

[0006] S1, prefabricated frame hollow column composite prefabricated blocks, side wall composite prefabricated blocks and U-shaped middle longitudinal beam prefabricated blocks;

[0007] S11, assembling the composite prefabricated blocks of the frame hollow columns;

[0008] S12, assembling the side wall superimposed prefabricated blocks;

[0009] S13, assembling the U-shaped middle longitudinal beam prefabricated block, and overlapping the U-shaped middle longitudinal beam prefabricated block on the corbel of the composite prefabricated block of the frame hollow column;

[0010] S14, pouring concrete in the groove of the frame column core of the frame hollow column composite prefabricated block and the U-shaped middle longitudinal beam prefabricated block;

[0011] S2, prefabricated middle plate laminated prefabricated blocks;

[0012] S21, assembling the prefabricated middle plate and the prefabricated blocks;

[0013] S3, one-time pouring of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks;

[0014] S31, binding the upper steel bars of the prefabricated middle plate composite prefabricated blocks and the U-shaped middle longitudinal beam prefabricated blocks;

[0015] S32, installing the construction section end formwork of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks;

[0016] S33, pouring concrete of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks.

[0017] Furthermore, the frame hollow column composite prefabricated block carries all the hollow prefabricated steel bars, reserves a cavity, and has a corbel longitudinally arranged on the top, and the height is determined according to the net height of the frame hollow column composite prefabricated block; the side wall composite prefabricated block carries all the side wall steel bars prefabricated on one side, and has a corbel arranged on one side on the top, and the height is determined according to the net height of the side wall; shear pin key holes are reserved longitudinally above the corbels of the side wall composite prefabricated blocks, and are symmetrically arranged with a spacing of 200 to 300 mm; the U-shaped middle longitudinal beam prefabricated block adopts a U-shaped prefabricated form below the middle plate, with a reserved groove in the core and corbels arranged on both horizontal sides of the top.

[0018] Furthermore, the prefabricated middle plate composite prefabricated block is prefabricated on one side with the lower layer of steel bars, and shear pin key holes are reserved on both sides of the prefabricated middle plate composite prefabricated block. The shear pin key holes reserved on the corbels of the side wall composite prefabricated blocks and at both ends of the prefabricated middle plate composite prefabricated blocks are correspondingly arranged and symmetrically arranged with a spacing of 200 to 300 mm.

[0019] Furthermore, in step S11, all the exposed main reinforcements at the bottom of the composite prefabricated blocks of the frame hollow columns are anchored into grouting sleeves for fixation.

[0020] Furthermore, in step S12, it includes:

[0021] S121, fixing the bottom of the side wall composite prefabricated block, and anchoring all the exposed main reinforcements at the bottom of the side wall composite prefabricated block into the grouting sleeve for fixing;

[0022] S122, temporarily fixing the top of the side wall superimposed prefabricated block;

[0023] S123, installing additional reinforcement at the side wall joints of the side wall composite prefabricated blocks.

[0024] Furthermore, in step S122, the top of the side wall composite prefabricated block is temporarily fixed to the enclosure structure by using a tie rod system, and a single block is fixed at two points. One end of the tie rod system is anchored into the enclosure structure, and the other end is provided with a tie ring which is sleeved on the exposed main reinforcement. In step S123, additional transverse reinforcement is installed between the joints of the side wall composite prefabricated blocks and fixed in the reserved tie rings, 15d on both sides of the joints, where d is the diameter of the distribution reinforcement, and the position corresponds to the distribution reinforcement of the side wall composite prefabricated block.

[0025] Furthermore, in step S14, the core of the composite prefabricated block of the frame hollow column and the concrete in the groove of the U-shaped middle longitudinal beam prefabricated block are poured at one time, and the top surface is flush with the top surface of the corbel of the U-shaped middle longitudinal beam prefabricated block, completing the consolidation of the beam and column nodes.

[0026] Furthermore, in step S21, it includes:

[0027] S211, assembling in place, when the prefabricated middle plate composite prefabricated blocks are assembled in place, the main reinforcement of the main reinforcement of the side wall composite prefabricated blocks and the stirrup center distance of the U-shaped middle longitudinal beam prefabricated blocks fall down and are located on the brackets of the side wall composite prefabricated blocks and the U-shaped middle longitudinal beam prefabricated blocks;

[0028] S212, shear pin key installation, the shear pin key holes reserved on the corbels of the side wall composite prefabricated blocks and at both ends of the prefabricated middle plate composite prefabricated blocks are completely corresponding, shear steel rods are installed, and high-strength non-shrinkage grouting material is poured into the holes.

[0029] Furthermore, in step S32, the construction section plugging end formwork of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks are integrated and installed.

[0030] Furthermore, in step S33, the temporary tie rod anchors on the top of the side wall precast blocks are removed, and the concrete of the side wall precast blocks and the precast middle plate precast blocks are poured continuously at one time.

[0031] Beneficial effects:

[0032] The present invention prefabricates hollow station frame columns, U-shaped middle longitudinal beams, and single-sided overlapping prefabrication of side walls and middle plates, so as to achieve the effect of template-free structural components. The weight of a single component does not exceed 10 tons and is hoisted by conventional equipment. The bottoms of the hollow frame columns and side wall prefabricated blocks are anchored into grouting sleeves for fixation, and the tops of the side wall prefabricated blocks are temporarily fixed by a pull rod system. The U-shaped middle longitudinal beam prefabricated blocks are placed on the corbels of the hollow frame columns, and the middle plate prefabricated blocks are placed on the side walls and middle longitudinal beam prefabricated corbels on both sides and are fixed by shear pins and keys, so as to achieve the effect of bracket-free side surface of the side wall and the bottom of the middle plate. The shaping templates are installed at the ends of the construction sections of the side walls and the middle plates, and the overlapping layers of the side walls and the upper concrete of the middle plates can achieve a one-time continuous pouring and molding effect, which can eliminate the setting of a horizontal construction joint, speed up the construction speed, and enhance the structural integrity and waterproof quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the construction process of one-time casting of the side wall and the middle plate of the composite assembly station without formwork support of the present invention;

[0034] Figure 2 This is a schematic diagram of the structure of the frame hollow column superimposed prefabricated block of the present invention;

[0035] Figure 3The top view of the hollow column prefabricated block structure of the present invention is shown in FIG. Figure 1 ;

[0036] Figure 4 The top view of the hollow column prefabricated block structure of the present invention is shown in FIG. Figure 2 ;

[0037] Figure 5 It is a physical schematic diagram of the frame hollow column superimposed prefabricated block structure of the present invention;

[0038] Figure 6 It is a schematic top view of the side wall superimposed prefabricated block of the present invention;

[0039] Figure 7 It is a schematic front view of the side wall superimposed prefabricated block of the present invention;

[0040] Figure 8 It is a schematic diagram of a left side view of a side wall superimposed prefabricated block of the present invention;

[0041] Fig. 9 This is a schematic diagram of a side wall superimposed prefabricated block of the present invention;

[0042] Fig.10 It is a schematic front view of a U-shaped middle longitudinal beam prefabricated block of the present invention;

[0043] Fig.11 This is a schematic diagram of a U-shaped middle longitudinal beam prefabricated block of the present invention;

[0044] Fig.12 This is a schematic diagram of the assembly of the prefabricated blocks of the frame hollow column of the present invention. Figure 1 ;

[0045] Fig.13 This is a schematic diagram of the assembly of the prefabricated blocks of the frame hollow column of the present invention. Figure 2 ;

[0046] Fig.14 This is a schematic diagram of the assembly of the prefabricated blocks of the frame hollow column of the present invention. Figure 3 ;

[0047] Fig.15 This is a schematic diagram of the bottom fixing of the side wall superimposed prefabricated blocks of the present invention;

[0048] Fig.16 This is a schematic diagram of the actual object of assembling the bottom of the side wall superimposed prefabricated blocks of the present invention;

[0049] Fig.17 Schematic diagram of the top fixing of the side wall superimposed prefabricated blocks of the present invention Figure 1 ;

[0050] Fig.18Schematic diagram of the top fixing of the side wall superimposed prefabricated blocks of the present invention Figure 2 ;

[0051] Fig.19 Schematic diagram of the top fixing of the side wall superimposed prefabricated blocks of the present invention Figure 3 ;

[0052] Fig. 20 It is a schematic diagram of the installation of additional reinforcement for the assembling seams of the side wall superimposed prefabricated blocks of the present invention;

[0053] Fig.21 This is a schematic diagram of the installation of additional reinforcement for the assembly seams of the side wall composite prefabricated blocks of the present invention;

[0054] Fig. 22 Schematic diagram of assembling the U-shaped longitudinal beam prefabricated block of the present invention Figure 1 ;

[0055] Fig.23 Schematic diagram of assembling the U-shaped longitudinal beam prefabricated block of the present invention Figure 2 ;

[0056] Fig.24 This is a diagram showing the assembly of the U-shaped longitudinal beam prefabricated block of the present invention. Figure 1 ;

[0057] Fig.25 This is a diagram showing the assembly of the U-shaped longitudinal beam prefabricated block of the present invention. Figure 2 ;

[0058] Fig.26 This is a diagram showing the assembly of the U-shaped longitudinal beam prefabricated block of the present invention. Figure 3 ;

[0059] Fig. 27 It is a schematic diagram of pouring concrete at the beam-column joint of the present invention;

[0060] Fig.28 It is a schematic front view of the prefabricated middle plate laminated prefabricated block of the present invention;

[0061] Fig.29 It is a schematic diagram of a top view of a prefabricated middle plate laminated prefabricated block of the present invention;

[0062] Fig.30 It is a schematic diagram of a left side view of a prefabricated middle plate laminated prefabricated block of the present invention;

[0063] Fig.31 This is a schematic diagram of a prefabricated middle plate laminated prefabricated block of the present invention;

[0064] Fig.32 It is a schematic diagram of the spatial relationship between the exposed main reinforcement of the side wall superimposed prefabricated block and the prefabricated middle plate superimposed prefabricated block of the present invention;

[0065] Fig.33 The physical diagram of the spatial relationship between the exposed main reinforcement of the side wall composite prefabricated block and the prefabricated middle plate composite prefabricated block of the present invention is shown in FIG. Figure 1 ;

[0066] Fig.34 The physical diagram of the spatial relationship between the exposed main reinforcement of the side wall composite prefabricated block and the prefabricated middle plate composite prefabricated block of the present invention is shown in FIG. Figure 2 ;

[0067] Fig.35 The physical diagram of the spatial relationship between the exposed main reinforcement of the side wall composite prefabricated block and the prefabricated middle plate composite prefabricated block of the present invention is shown in FIG. Figure 3 ;

[0068] Fig.36 This is a schematic diagram of positioning the prefabricated middle plate composite prefabricated block using shear pin keys of the present invention;

[0069] Fig.37 It is a schematic diagram of the overall binding of the upper steel bars of the prefabricated middle plate superimposed prefabricated block and the U-shaped middle longitudinal beam prefabricated block of the present invention;

[0070] Fig.38 The schematic diagram of the installation of the plug template for the construction section of the side wall superimposed prefabricated block and the prefabricated middle plate superimposed prefabricated block of the present invention is shown in FIG. Figure 1 ;

[0071] Fig.39 The schematic diagram of the installation of the plug template for the construction section of the side wall superimposed prefabricated block and the prefabricated middle plate superimposed prefabricated block of the present invention is shown in FIG. Figure 2 ;

[0072] Fig.40 The schematic diagram of the installation of the plug template for the construction section of the side wall superimposed prefabricated block and the prefabricated middle plate superimposed prefabricated block of the present invention is shown in FIG. Figure 3 ;

[0073] Fig.41 The concrete integral pouring diagram of the present invention is shown in FIG. Figure 1 ;

[0074] Fig.42 The concrete integral pouring diagram of the present invention is shown in FIG. Figure 2 .

[0075] Among them, 1. Prefabricated blocks of hollow column of frame; 2. Grouting sleeve; 3. Prefabricated blocks of side wall; 4. Prefabricated blocks of U-shaped middle longitudinal beam; 5. Prefabricated middle plate prefabricated blocks; 6. Corbel of prefabricated blocks of hollow column of frame; 7. Keyhole of shear pin; 8. Pull rod; 9. Anchor section; 10. Pull ring section; 11. Middle threaded connection section; 12. Additional reinforcement; 13. Joint; 14. Tie ring. DETAILED DESCRIPTION

[0076] Example 1

[0077] refer to Figure 1-Figure 42 A one-time casting construction method for the side wall and middle plate of a composite assembly station without formwork support comprises the following steps:

[0078] S1, prefabricated frame hollow column composite prefabricated block 1, side wall composite prefabricated block 3 and U-shaped middle longitudinal beam prefabricated block 4;

[0079] S11, assembling the frame hollow column composite prefabricated blocks 1;

[0080] S12, assembling the side wall superimposed prefabricated blocks 3;

[0081] S13, assembling the U-shaped middle longitudinal beam prefabricated block 4, and overlapping the U-shaped middle longitudinal beam prefabricated block 4 on the corbel 6 of the frame hollow column composite prefabricated block;

[0082] S14, pouring concrete in the groove of the frame column core of the frame hollow column composite prefabricated block 1 and the U-shaped middle longitudinal beam prefabricated block 4;

[0083] S2, prefabricated middle plate superimposed prefabricated block 5;

[0084] S21, assembling the prefabricated middle plate and the prefabricated blocks 5;

[0085] S3, one-time pouring of the side wall composite prefabricated block 3 and the prefabricated middle plate composite prefabricated block 5;

[0086] S31, tying the upper steel bars of the prefabricated middle plate composite prefabricated block 5 and the U-shaped middle longitudinal beam prefabricated block 4;

[0087] S32, installation of construction section end formwork of the side wall composite prefabricated block 3 and the prefabricated middle plate composite prefabricated block 5;

[0088] S33, pouring concrete of the side wall composite prefabricated blocks 3 and the prefabricated middle plate composite prefabricated blocks 5.

[0089] The present invention prefabricates hollow station frame columns, U-shaped middle longitudinal beams, and single-sided overlapping prefabrication of side walls and middle plates, so as to achieve the effect of template-free structural components. The weight of a single component does not exceed 10 tons and is hoisted by conventional equipment. The bottoms of the hollow frame columns and side wall prefabricated blocks are anchored into grouting sleeves for fixation, and the tops of the side wall prefabricated blocks are temporarily fixed by a pull rod system. The U-shaped middle longitudinal beam prefabricated blocks are placed on the corbels of the hollow frame columns, and the middle plate prefabricated blocks are placed on the side walls and middle longitudinal beam prefabricated corbels on both sides and are fixed by shear pins and keys, so as to achieve the effect of bracket-free side surface of the side wall and the bottom of the middle plate. The shaping templates are installed at the ends of the construction sections of the side walls and the middle plates, and the overlapping layers of the side walls and the upper concrete of the middle plates can achieve a one-time continuous pouring and molding effect, which can eliminate the setting of a horizontal construction joint, speed up the construction speed, and enhance the structural integrity and waterproof quality.

[0090] Example 2

[0091] In order to improve practicality, this embodiment makes further arrangements based on the embodiment.

[0092] In this embodiment, the frame hollow column composite prefabricated block 1 carries all the hollow steel bars, a cavity is reserved, and a corbel is longitudinally arranged on the top, and the height is determined according to the net height of the frame hollow column composite prefabricated block 1.

[0093] Preferably, a 500*600mm cavity is reserved, the minimum wall thickness is prefabricated to 150mm, a 200*200mm corbel is set longitudinally on the top, the weight of a single component does not exceed 10t, and conventional equipment is used for hoisting. The prefabricated block of the frame hollow column is composed of column main reinforcement, column stirrups, reinforcement, longitudinal corbel, and concrete prefabricated block.

[0094] In this embodiment, the prefabricated concrete part of the frame hollow column also serves as the formwork, replacing the traditional frame column ring formwork system.

[0095] In this embodiment, the side wall composite prefabricated block 3 carries all the side wall steel bars and is prefabricated on one side. A corbel is provided on one side of the top, and its height is determined according to the net height of the side wall. Shear pin key holes 7 are reserved longitudinally above the corbel of the side wall composite prefabricated block 3, and are symmetrically arranged with a spacing of 200 to 300 mm.

[0096] Preferably, the precast concrete is 150mm thick and 1945mm wide. A 150*200mm corbel is provided on one side of the top. The height is determined by the net height of the side wall. The weight of a single component does not exceed 10t. Conventional equipment is used for lifting. Φ50mm shear pin key holes are reserved longitudinally above the precast corbels of the side walls. The holes are symmetrically arranged with a spacing of 200 to 300mm and a hole depth of 150mm.

[0097] In this embodiment, the side wall composite prefabricated block is composed of upper chord reinforcement, lower chord reinforcement, K-shaped reinforcement, inner and outer layer distribution reinforcement, tie rings, corbels, and concrete prefabricated blocks.

[0098] In this embodiment, the precast concrete part of the side wall also serves as a formwork, replacing the traditional side wall large formwork system.

[0099] In this embodiment, the U-shaped middle longitudinal beam prefabricated block 4 is prefabricated in a U-shaped form below the middle plate, a reserved groove is provided in the core, and corbels are provided on both lateral sides of the top.

[0100] Preferably, the core is provided with a 350*600mm reserved groove, the precast concrete wall thickness is not less than 200mm, the precast height is 600mm, 200*200mm brackets are provided on both sides of the top, the weight of a single component does not exceed 10t, and conventional equipment is used for hoisting. The U-shaped middle longitudinal beam precast block is composed of longitudinal main reinforcement, beam stirrups, brackets, and concrete precast blocks.

[0101] In this embodiment, the precast concrete part of the U-shaped longitudinal beam also serves as a formwork, replacing the complicated formwork system of the traditional longitudinal beam.

[0102] The station prefabricated frame hollow column superimposed prefabricated blocks 1, U-shaped middle longitudinal beam prefabricated blocks 4, and side wall superimposed prefabricated blocks 3 of the present invention all have corbels on the tops, the bottoms of the frame hollow columns and side wall prefabricated blocks are anchored into grouting sleeves for fixation, and the tops of the side wall prefabricated blocks are temporarily fixed with tie rods, the U-shaped middle longitudinal beam prefabricated blocks are placed on the corbels of the frame hollow columns, and the precast concrete of the side wall back surface, frame columns and middle longitudinal beam outer skins also serve as templates, thereby achieving a template-free effect for structural components.

[0103] In this embodiment, in step S11, all the exposed main reinforcements at the bottom of the frame hollow column composite prefabricated block 1 are anchored into the grouting sleeve 2 for fixation.

[0104] In this embodiment, the frame hollow column composite prefabricated blocks 1 are assembled by conventional equipment such as gantry cranes.

[0105] In this embodiment, step S12 includes:

[0106] S121, fix the bottom of the side wall composite prefabricated block 3, and anchor all the exposed main reinforcements at the bottom of the side wall composite prefabricated block 3 into the grouting sleeve 2 for fixation;

[0107] In this embodiment, the side wall composite prefabricated blocks 3 are assembled by conventional equipment such as a gantry crane, and all the exposed main reinforcements at the bottom are anchored into the grouting sleeves 2 for fixation.

[0108] S122, temporarily fixing the top of the side wall composite prefabricated block 3;

[0109] In this embodiment, in step S122, the top of the side wall composite prefabricated block 3 is temporarily fixed to the enclosure structure using a tie rod 8 system. A single block is fixed at two points. One end of the tie rod 8 system is anchored into the enclosure structure, and the other end is provided with a pull ring that is sleeved on the exposed main reinforcement.

[0110] In this embodiment, the pull rod system is composed of an anchoring section 9 , a pull ring section 10 , and an intermediate threaded connection section 11 .

[0111] Construction sequence: after the foundation pit is excavated to the design elevation of the tie rod 8, the tie rod anchor holes are drilled; after the side wall composite prefabricated blocks 3 are in place, the anchor sections 9 are installed in sequence, and the pull ring sections 10 are inserted, and threaded connections are used in the middle.

[0112] S123, installing additional reinforcement 12 at the side wall joints 13 of the side wall composite prefabricated blocks 3.

[0113] In this embodiment, transverse additional reinforcement 12 is installed between the joints 13 of the side wall composite prefabricated blocks 3 and fixed in the reserved tie ring, with 15d (d is the diameter of the distribution reinforcement) on both sides of the joints 13, and a vertical spacing of 150mm, corresponding to the position of the prefabricated side wall distribution reinforcement.

[0114] In this embodiment, in step S13, the U-shaped middle longitudinal beam prefabricated block is hoisted and overlapped on the prefabricated corbel of the frame column, the main reinforcement between the beam ends is connected using positive and negative wire steel bar connectors, the beam-column node stirrups are installed, and the lateral fixed steel formwork is installed.

[0115] In this embodiment, in step S14, the core of the frame hollow column composite prefabricated block 1 and the concrete in the groove of the U-shaped middle longitudinal beam prefabricated block 4 are poured at one time, and the top surface is flush with the top surface of the corbel of the U-shaped middle longitudinal beam prefabricated block 4, completing the consolidation of the beam and column nodes.

[0116] In this embodiment, the prefabricated middle plate composite prefabricated block 5 is prefabricated on one side with the lower layer of steel bars, and shear pin key holes 7 are reserved on both sides of the prefabricated middle plate composite prefabricated block 5. The shear pin key holes 7 reserved on the corbels of the side wall composite prefabricated blocks 3 and at both ends of the prefabricated middle plate composite prefabricated blocks 5 are correspondingly arranged and symmetrically arranged with a spacing of 200 to 300 mm.

[0117] Preferably, the prefabricated middle plate composite prefabricated block 5 carries the lower layer of steel bars and is prefabricated on one side. The prefabricated concrete is 200 mm thick and 1945 mm wide. Φ50 mm shear pin key holes are reserved on both sides of the middle plate prefabricated block and are symmetrically arranged with a spacing of 200 to 300 mm.

[0118] The prefabricated middle plate composite prefabricated block is composed of upper chord reinforcement, lower chord reinforcement, K-type reinforcement, lower layer distribution reinforcement and concrete prefabricated block.

[0119] The precast concrete part of the bottom surface of the middle plate also serves as the formwork, replacing the traditional large formwork system of the side walls.

[0120] The prefabricated middle plate of the present invention is overlapped with the prefabricated blocks, and both sides are placed on the prefabricated corbels of the side walls and the middle longitudinal beam, and are fixed with shear pins to achieve the effect of no need for a bottom bracket; the prefabricated concrete on the bottom surface of the middle plate also serves as a template to achieve the effect of no need for a template on the bottom of the middle plate.

[0121] The bottom of the side wall composite prefabricated block of the present invention is anchored by a grouting sleeve and the top is fixed by a shear pin key, thereby achieving the effect of prefabricated side wall lateral formwork-free support; the shaping formwork is installed at the end of the side wall and middle plate construction section to form a complete set of technology for one-time continuous pouring of the side wall composite layer and the middle plate upper layer concrete.

[0122] In this embodiment, step S21 includes:

[0123] S211, assembling in place, when the prefabricated middle plate composite prefabricated block 5 is assembled in place, the main reinforcement falls at the center distance of the main reinforcement of the side wall composite prefabricated block 3 and the stirrup of the U-shaped middle longitudinal beam prefabricated block 4, and is located on the brackets of the side wall composite prefabricated block 3 and the U-shaped middle longitudinal beam prefabricated block 4;

[0124] Preferably, the spacing between the exposed stirrups at both ends of the middle plate prefabricated block, the exposed main reinforcement at the top of the side wall prefabricated block is 150mm. When the middle plate prefabricated block is assembled in place, the main reinforcement falls at the center distance (75mm) between the side wall main reinforcement and the middle longitudinal beam stirrups, and is located on the prefabricated corbels of the side walls and the middle longitudinal beams.

[0125] S212, shear pin key installation, the shear pin key holes 7 reserved on the corbels of the side wall composite prefabricated blocks 3 and at both ends of the prefabricated middle plate composite prefabricated blocks 5 are completely corresponding, shear steel rods are installed, and high-strength non-shrinkage grouting material is poured into the holes.

[0126] In this embodiment, the shear pin key holes reserved on the corbels of the side wall composite prefabricated blocks 3 and at both ends of the prefabricated middle plate composite prefabricated blocks 5 are completely corresponding, Φ30mm shear steel rods are installed, and high-strength non-shrinkage grouting material is poured into the holes. After the grouting material reaches the strength, a stable connection system of the side wall, middle plate and middle longitudinal beam is completed to resist the lateral pressure of the concrete pouring of the side wall core.

[0127] In this embodiment, in step S31, the upper steel bars of the prefabricated middle plate composite prefabricated blocks and the U-shaped middle longitudinal beam prefabricated blocks are integrally tied to ensure that the negative bending moment force bars of the support are connected, the connection is reliable, and the force is clear.

[0128] In this embodiment, in step S32, the construction section plugging end templates of the side wall composite prefabricated blocks 3 and the prefabricated middle plate composite prefabricated blocks are integrated and installed to ensure the overall reliable connection.

[0129] In this embodiment, in step S33, the temporary tie rod anchors on the top of the side wall are removed, and the concrete of the side wall and the middle plate composite layer is poured continuously at one time, thereby reducing the horizontal construction joint set at the bottom of the side wall and the middle plate in the traditional process, and the structural integrity is stronger and the waterproof quality is better.

[0130] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Therefore, any slight modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A one-time casting construction method for the side wall and middle plate of a composite assembly station without formwork support, characterized in that: The following steps are involved: S1, prefabricated frame hollow column composite prefabricated blocks, side wall composite prefabricated blocks and U-shaped middle longitudinal beam prefabricated blocks; S11, assembling the composite prefabricated blocks of the frame hollow columns; S12, assembling the side wall superimposed prefabricated blocks; S13, assembling the U-shaped middle longitudinal beam prefabricated block, and overlapping the U-shaped middle longitudinal beam prefabricated block on the corbel of the composite prefabricated block of the frame hollow column; S14, pouring concrete in the groove of the frame column core of the frame hollow column composite prefabricated block and the U-shaped middle longitudinal beam prefabricated block; S2, prefabricated middle plate laminated prefabricated blocks; S21, assembling the prefabricated middle plate and the prefabricated blocks; S3, one-time pouring of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks; S31, binding the upper steel bars of the prefabricated middle plate composite prefabricated blocks and the U-shaped middle longitudinal beam prefabricated blocks; S32, installing the construction section end formwork of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks; S33, pouring concrete of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks.

2. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 1 is characterized in that: The frame hollow column composite prefabricated block carries all the hollow steel bars, reserves a cavity, and has a corbel longitudinally arranged on the top, and the height is determined according to the net height of the frame hollow column composite prefabricated block; the side wall composite prefabricated block carries all the side wall steel bars prefabricated on one side, and has a corbel arranged on one side on the top, and the height is determined according to the net height of the side wall; shear pin key holes are reserved longitudinally above the corbels of the side wall composite prefabricated blocks, and are symmetrically arranged with a spacing of 200 to 300 mm; the U-shaped middle longitudinal beam prefabricated block adopts a U-shaped prefabrication form below the middle plate, with a reserved groove in the core and corbels arranged on both sides of the top.

3. The one-time casting construction method of the side wall and middle plate of the composite assembly station without formwork support according to claim 2 is characterized in that: The prefabricated middle plate composite prefabricated block is prefabricated on one side with the lower layer of steel bars, and shear pin key holes are reserved on both sides of the prefabricated middle plate composite prefabricated block. The shear pin key holes reserved on the corbels of the side wall composite prefabricated blocks and at both ends of the prefabricated middle plate composite prefabricated blocks are correspondingly arranged and symmetrically arranged with a spacing of 200 to 300 mm.

4. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 1 is characterized in that: In step S11, all exposed main reinforcements at the bottom of the composite prefabricated blocks of the frame hollow columns are anchored into grouting sleeves for fixation.

5. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 1 is characterized in that: In step S12, it includes: S121, fixing the bottom of the side wall composite prefabricated block, and anchoring all the exposed main reinforcements at the bottom of the side wall composite prefabricated block into the grouting sleeve for fixing; S122, temporarily fixing the top of the side wall superimposed prefabricated block; S123, installing additional reinforcement at the side wall joints of the side wall composite prefabricated blocks.

6. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 2 is characterized in that: In step S122, the top of the side wall composite prefabricated block is temporarily fixed to the enclosure structure by using a tie rod system, and a single block is fixed at two points. One end of the tie rod system is anchored into the enclosure structure, and the other end is provided with a tie ring that is sleeved on the exposed main reinforcement. In step S123, additional transverse reinforcement is installed between the joints of the side wall composite prefabricated blocks and fixed in the reserved tie rings, 15d on each side of the joints, where d is the diameter of the distribution reinforcement, and the position corresponds to the distribution reinforcement of the side wall composite prefabricated block.

7. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 2 is characterized in that: In step S14, the core of the composite prefabricated block of the frame hollow column and the concrete in the groove of the U-shaped middle longitudinal beam prefabricated block are poured at one time, and the top surface is flush with the top surface of the corbel of the U-shaped middle longitudinal beam prefabricated block, completing the consolidation of the beam and column nodes.

8. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 2 is characterized in that: In step S21, it includes: S211, assembling in place, when the prefabricated middle plate composite prefabricated blocks are assembled in place, the main reinforcement of the main reinforcement of the side wall composite prefabricated blocks and the stirrup center distance of the U-shaped middle longitudinal beam prefabricated blocks fall down and are located on the brackets of the side wall composite prefabricated blocks and the U-shaped middle longitudinal beam prefabricated blocks; S212, shear pin key installation, the shear pin key holes reserved on the corbels of the side wall composite prefabricated blocks and at both ends of the prefabricated middle plate composite prefabricated blocks are completely corresponding, shear steel rods are installed, and high-strength non-shrinkage grouting material is poured into the holes.

9. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 3 is characterized in that: In step S32, the construction section plugging end formwork of the side wall composite prefabricated blocks and the prefabricated middle plate composite prefabricated blocks are integrated and installed.

10. The one-time casting construction method for the side wall and middle plate of the composite assembly station without formwork support according to claim 3 is characterized in that: In step S33, the temporary tie rod anchors on the tops of the side wall precast blocks are removed, and the concrete of the side wall precast blocks and the precast middle plate precast blocks are poured continuously at one time.

Citation Information

Patent Citations

  • Superposed assembly type structure subway station and assembly construction method thereof

    CN111456088A

  • Subway station construction method

    CN117188518A

  • Prefabricated reinforced concrete beam structural system of underground station

    CN216108617U