Fabricated medical building shear wall intelligent construction equipment and method
By using slope-structured shear walls and intelligent construction equipment in prefabricated medical buildings, combined with sealing strips and deformed sleeve formwork, the problems of long construction period and poor waterproofing effect are solved, and rapid installation and self-waterproofing effects are achieved.
Patent Information
- Application Number
- CN202411127901.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-11
AI Technical Summary
During the construction process of the shear walls of existing prefabricated medical buildings, due to the lack of rapid installation equipment, the construction period is long, and there are no water-stopping parts on the outer and lower surfaces of the prefabricated shear walls, resulting in poor waterproofing and thermal insulation effects.
A kind of intelligent construction equipment for prefabricated medical building shear walls is designed. It adopts prefabricated shear walls with inclined plane structures on the upper and lower surfaces, combines the upper and lower pulling structures and jacking structures, and uses blocking strips and connecting casings to achieve rapid rotation and installation. Self-waterproofing effect, and the sealing effect of the post-casting belt is improved through the pull bolts and deformation sleeve formwork.
It achieves rapid and precise installation of shear walls, reduces the construction period, forms a dense self-waterproof structure, avoids the use of water-stop structures, improves the sealing effect, and ensures the waterproof performance of concrete.
Smart Images

Figure CN118756972A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a technical field, and in particular to an intelligent construction device and method for shear walls of assembled medical buildings. Background Art
[0002] In order to respond to sudden large-scale public health incidents, hospitals will choose to build semi-permanent medical camps in extremely critical situations for large-scale isolation and treatment of patients. In order to speed up the construction of medical camps, prefabricated concrete components are often used to quickly build the exterior walls of the building.
[0003] Among them, for the construction of prefabricated assembled shear walls, the upper and lower surfaces of the shear walls of the external walls are generally horizontal planes, and no water stop is set during prefabrication, such as CN218176236U, etc., which leads to the filling of mortar after installation, which is easy to cause roughness or separation seams, resulting in poor waterproof and thermal insulation effects. At the same time, compared with the internal wall shear wall, the external wall shear wall has only one side of the support / reference side, which makes it impossible to install the external wall shear wall quickly during installation, lacks fast and accurate installation equipment, and has a long construction period. Summary of the invention
[0004] In order to solve the above technical problems, the inventors have obtained the technical solution of the present invention through practice and summary. The present invention adopts the following technical solution:
[0005] An assembled medical building shear wall intelligent construction equipment comprises a mobile frame, an upper top frame and a lower top frame are arranged on the mobile frame, the upper top frame and the lower top frame are arranged vertically, the upper top frame is used to abut against the bottom surface of the upper floor panel, and the lower top frame is used to abut against the top surface of the floor panel of the current layer, the mobile frame is provided with an upper pulling structure and a lower pulling structure and a top support structure located between the upper pulling structure and the lower pulling structure, the upper pulling structure and the lower pulling structure have the same structure and are respectively connected to the inner wall of the shear wall;
[0006] The top support structure includes an abutment plate, which is used to be connected to the inner wall of the shear wall, an upper top support rod is rotatably installed on the upper side of the abutment plate, a lower top support rod is rotatably installed on the lower side of the abutment plate, and the end of the lower top support rod and the abutment plate can slide vertically relative to each other, and the upper top support rod and the lower top support rod are installed on the upper top frame at one end away from the connecting plate;
[0007] Externally exposed steel bars are reserved around the shear wall, and connecting sleeves are threadedly connected to the externally exposed steel bars. The upper and lower surfaces of the shear wall are both inclined structures, and the inclined structures are arranged obliquely downward from the inside to the outside.
[0008] Preferably, the upper frame includes an upper frame body, on which ear plate 1 and ear plate 2 are installed, and at least two ear plates 1 and 2 are provided on the upper and lower sides, a vertical front threaded push rod is installed on ear plate 1, and a vertical rear threaded push rod is installed on ear plate 2, and universal wheels are installed on the tops of the front threaded push rod and the rear threaded push rod;
[0009] The lower top frame comprises a lower frame body installed on the side of the moving frame, a vertical threaded rod is installed on the lower frame body, and a pressing plate is installed at the bottom of the threaded rod.
[0010] Preferably, the upper pulling structure comprises an upper pulling rope and an upper electric drum, the end of the upper pulling rope is connected to an upper connecting body, the upper connecting body is used to be connected to the middle and upper part of the shear wall, the upper electric drum is installed on the upper frame, a fixed pulley is installed on the upper frame, and one end of the upper pulling rope is installed on the upper electric drum via the fixed pulley;
[0011] The lower pulling structure includes a lower pulling rope and a lower electric drum, one end of the lower pulling rope is connected to a lower connecting body, the lower connecting body is used to be connected to the middle and lower part of the shear wall, the lower electric drum is installed on the lower frame, a fixed pulley is installed on the lower frame, and one end of the lower pulling rope is installed on the lower electric drum via the fixed pulley.
[0012] Preferably, the upper support rod is rotatably mounted on the connecting plate at one end away from the upper frame, and the lower support rod includes a fixed tube and a movable rod, a positioning plate is provided on the side of the fixed tube away from the connecting plate, the positioning plate is installed on the upper frame through bolts, a movable channel is provided on the side of the fixed tube away from the upper frame, a spring is installed in the movable channel, one end of the movable rod is slidably fitted in the movable channel, and a guide block is rotatably mounted on the free end, a vertical slide groove is provided on the connecting plate, and the guide block is slidably fitted in the vertical slide groove.
[0013] Preferably, it also includes a post-cast strip formwork, which includes an inner formwork and an outer formwork. The inner formwork and the outer formwork are fixed on both sides of the post-cast strip by tension bolts. A deformation sleeve is provided on the outer side of the tension bolts. The deformation sleeve includes an end side extrusion portion and a middle side deformation portion. The end side extrusion portion horizontally extrudes the middle side deformation portion, and the middle side deformation portion expands and deforms outward under pressure.
[0014] Preferably, the middle side deformation part includes an upper elastic frame, a lower elastic frame and an elastic diaphragm connected between the upper elastic frame and the lower elastic frame, the upper elastic frame is attached to the tension bolt and is bent and deformed upward under the action of the end side extrusion part, the middle part of the lower elastic frame abuts against the tension bolt, and both ends are below the tension bolt.
[0015] Preferably, a sleeve is installed on the exposed steel bar, the sleeve is arranged perpendicular to the inner template and the outer template, and the sleeve is used as an end extrusion part to move axially relative to the inner template. The end extrusion part is a rigid structure, and an elastic sealing pad is arranged at one end away from the middle deformation part.
[0016] Preferably, the lower part of the upper surface and the lower part of the lower surface of the shear wall are both provided with blocking strips, which are used to block the areas near the outer side where the upper surface and the lower surface of the shear wall are located to prevent mortar leakage;
[0017] The inclination angles of the upper surface and the lower surface of the shear wall are greater than the inclination angles of the lower surface of the upper shear wall and the upper surface of the lower shear wall.
[0018] The construction method of the shear wall of the assembled medical building adopts the above-mentioned construction equipment, and the steps are as follows:
[0019] First, adjust the elevation of the front threaded top rod and the rear threaded top rod so that the universal wheel rests on the bottom surface of the upper floor panel, move the mobile frame to the shear wall storage area, and install it on the inner wall of the shear wall through the upper connector and the lower connector. The upper electric drum and the lower electric drum work at the same time, and the shear wall is lifted by the upper pulling rope and the lower pulling rope until it fits on the side of the connecting plate facing away from the upper frame. At this time, the shear wall is in an inclined state, gradually deviating from the upper frame from top to bottom, and the shear wall in this state can pass through the area to be installed. The upper electric drum and the lower electric drum are locked and paused at the same time.
[0020] Secondly, the mobile frame and the shear wall are moved to the installation area together, and the bottom of the shear wall is suspended outside the installation area until the distance between the rotation node of the upper support rod and the connecting plate and the inner wall of the building wall to be assembled is equal to the vertical distance to the plane where the inner walls of the upper and lower shear walls are located, and the mobile frame is fixed at this position through the pressing plate by adjusting the threaded rod;
[0021] Again, the upper electric drum and the lower electric drum work again at the same time, adjust the posture of the shear wall to be installed until the connecting plate is in a vertical state, adjust the connecting sleeves of the leaking steel bars at the top and bottom of the shear wall, and set a threaded section in the connecting sleeve. The threaded section is used to connect and fix the leaking steel bars around the shear wall. The area where the leaking steel bars on the upper surface and the leaking steel bars on the lower surface are located is the blocking area. At this time, the blocking belt blocks the outer side of the upper surface and the lower surface. The area where the side leaking steel bars are located is the post-casting belt area. Install a steel cage in the post-casting belt area and connect and fix the leaking steel bars. Install a sleeve on the leaking steel bars in the post-casting belt area, and put the end side extrusion part of the deformation sleeve into the sleeve.
[0022] Finally, the inner formwork and the outer formwork are installed at the post-casting strip part, the top of the inner formwork is provided with a pouring port, the pouring port is provided with a gate plate, the gate plate is used to block the pouring port, the lowest position of the pouring port is the top of the blocking area, and is fixed by tension bolts, wherein the tension bolts between the two formworks are sleeved with a deformation sleeve, and the nut pressure end side extrusion parts of the tension bolts are adjusted to be close to each other, so that the upper elastic frame is bent and deformed upward, and the lower elastic frame is deformed upward, and due to the screw of the tension bolt, the deformation height of the upper elastic frame of the middle side deformation part is greater than the deformation height of the lower elastic frame;
[0023] Finally, pour the concrete of the post-cast strip. When the concrete reaches the set strength, remove the tension bolts, inner formwork and outer formwork, install sealing plates on the inside and outside of the post-cast strip, and drill grouting holes obliquely downward on the post-cast strip above the inner sealing plate. The bottom of the grouting hole is located at the top of the middle deformation part, and grouting is injected into the inside to complete the sealing.
[0024] Compared with the past, the present invention makes the following improvements: First, a prefabricated assembled shear wall structure with upper and lower surfaces inclined downward is adopted, and the inclination angle is greater than the angle of the inclined surface of the upper and lower walls. The outer side of the blocking area is blocked by a blocking belt (in a compressed state) to prevent leakage of mortar, and the upper and lower shear walls and the side shear walls are connected and fixed by connecting sleeves. When the blocking area is filled with concrete, it will automatically flow downward to form a dense structure, and the formed structure does not require a water-stop structure, and its water-stop part is omitted. The concrete itself will form a waterproof structure after pouring and solidification. Second, the installation equipment adopts a stable structure of pulling the middle top support up and down, which can achieve a certain angle of inclination, so that the bottom can pass through the lower shear wall, and then it is convenient to realize the rotation installation of the above-mentioned shear wall. After rotation, the blocking belt is pressed to prevent leakage in the upper and lower blocking areas, forming a self-waterproof structure of the blocking area, which is fast in construction, stable in transportation, and high in precision. 3. The post-cast zone area is connected by tension bolts. How to seal the tension bolt area after pouring is a difficult problem. In the past, the holes left by the tension bolts were mostly straight holes. When they were sealed in the later construction, effective waterproofing could not be achieved, and sometimes the internal concrete would fall off. The inventor adopted a deformable sleeve to be put on the tension bolts between the inner and outer formworks. After the inner and outer formworks were installed, the deformable sleeve was compressed to form an arched area with an upward bend in the middle, and the inner area of the arched area was larger than the end area. After grouting, the slurry as a whole has a large inner and small outer structure, and is arranged obliquely downward from the middle to both ends. It is also a waterproof structure in itself, and the sealing effect is better. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The shear wall of the present invention is installed in a completed state;
[0026] Figure 2 for Figure 1A partial enlarged view of the middle A;
[0027] Figure 3 This is a diagram showing a state in which the bottom of the integral structural shear wall of the present invention is suspended by a lower shear wall.
[0028] Figure 4 for Figure 1 Structural diagram of the concrete filling work completed in the sealed area at A.
[0029] Figure 5 It is a top view of the local structure section at the post-cast zone.
[0030] Figure 6 This is the vertical section diagram of the local structure at the post-cast zone.
[0031] Figure 7 It is the axial cross-section of the deformation sleeve.
[0032] Figure 8 It is a vertical cross-section of the deformation sleeve.
[0033] Fig. 9 It is a structural distribution diagram of the front threaded push rod and the rear threaded push rod on the upper frame.
[0034] Fig.10 It is a horizontal cross-sectional view of the abutment plate at the guide block. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0036] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0037] Example 1
[0038] like Figures 1 to 3As shown, an assembled medical building shear wall intelligent construction equipment includes a mobile frame 10, in which an intelligent control system is arranged, which is a commercially available product, and an upper top frame 20 and a lower top frame 30 are arranged on the mobile frame 10, and the upper top frame 20 and the lower top frame 30 are arranged vertically, and the upper top frame 20 is used to abut against the bottom surface of the upper floor panel, and the lower top frame 30 is used to abut against the top surface of the floor panel of the current layer, and the mobile frame 10 is provided with an upper pulling structure and a lower pulling structure and a top support structure located between the upper pulling structure and the lower pulling structure, and the upper pulling structure and the lower pulling structure have the same structure and are respectively connected to the inner wall of the shear wall;
[0039] The top support structure includes an abutment plate 40, which is used to be connected to the inner wall of the shear wall. An upper top support rod 41 is rotatably mounted on the upper side of the abutment plate 40, and a lower top support rod 42 is rotatably mounted on the lower side of the abutment plate 40. The end of the lower top support rod 42 and the abutment plate 40 can slide vertically relative to each other. The upper top support rod 41 and the lower top support rod 42 are mounted on the upper top frame 20 away from one end of the abutment plate 40, and the length of the lower top support rod 42 can be selectively adjusted.
[0040] Externally exposed steel bars 50 are reserved around the shear wall, and connecting sleeves 51 are threadedly connected to the externally exposed steel bars 50. The upper and lower surfaces of the shear wall are both inclined structures, and the inclined structures are arranged obliquely downward from the inside to the outside;
[0041] The lower part of the upper surface and the lower part of the lower surface of the shear wall are both provided with sealing strips 100, which are used to seal the areas where the upper surface and the lower surface of the shear wall are located close to the outer area to prevent leakage of mortar; the inclination angles of the upper surface and the lower surface of the shear wall are greater than the inclination angles of the lower surface of the upper shear wall and the upper surface of the lower shear wall. After installation, the sealing strip 100 is pressed on the lower part of the sealing area close to the outer area to prevent leakage when filling mortar in the sealing area.
[0042] like Figures 1 to 3 , Fig. 9 The upper frame 20 includes an upper frame body, on which an ear plate 21 and an ear plate 22 are installed. The ear plate 21 and the ear plate 22 are each provided with at least two upper and lower parts. A vertical front threaded push rod 23 is installed on the ear plate 1 21, and a vertical rear threaded push rod 24 is installed on the ear plate 22. Universal wheels are installed on the tops of the front threaded push rod 23 and the rear threaded push rod 24; the front threaded push rod 23 and the rear threaded push rod 24 can adjust their heights vertically relative to the ear plate 1 21 and the ear plate 22.
[0043] The lower top frame 30 includes a lower frame body installed on the side of the mobile frame 10 , a vertical threaded rod 31 is installed on the lower frame body, and a pressing plate is installed at the bottom of the threaded rod 31 to fix the mobile frame 10 .
[0044] The upper pulling structure includes an upper pulling rope 25 and an upper electric drum 27. The end of the upper pulling rope 25 is connected to an upper connecting body 26. The upper connecting body 26 is used to be connected to the middle and upper part of the shear wall. The upper electric drum 27 is installed on the upper frame. A fixed pulley is installed on the upper frame. One end of the upper pulling rope 25 is installed on the upper electric drum 27 via the fixed pulley.
[0045] The lower pulling structure includes a lower pulling rope 32 and a lower electric drum 34. One end of the lower pulling rope 32 is connected to a lower connecting body 33. The lower connecting body 33 is used to be connected to the middle and lower part of the shear wall. The lower electric drum 34 is installed on the lower frame. A fixed pulley is installed on the lower frame. One end of the lower pulling rope 32 is installed on the lower electric drum 34 via the fixed pulley.
[0046] The end of the upper support rod 41 away from the upper frame is rotatably installed on the abutment plate 40, and the lower support rod 42 includes a fixed cylinder 421 and a movable rod 422. A positioning plate 423 is provided on the side of the fixed cylinder 421 away from the abutment plate 40, and the positioning plate 423 is installed on the upper frame by bolts. A movable channel is provided on the side of the fixed cylinder 421 away from the upper frame, and a spring 424 is installed in the movable channel. One end of the movable rod 422 is slidably fitted in the movable channel, and a guide block 425 is rotatably installed on the free end. A vertical slide groove is provided on the abutment plate 40, and the guide block 425 is slidably fitted in the vertical slide groove.
[0047] The outward wheels adjusted by the front threaded push rod and the rear threaded push rod are abutted against the bottom surface of the floor panel to prevent the loss of balance during transportation. The mobile frame is moved to the shear wall storage area, and the upper connector and the lower connector are installed at the corresponding positions on the inner wall of the shear wall. The shear wall is lifted by the upper electric reel and the lower electric reel until it abuts against the abutment plate. The shear wall is supported from the inside through the abutment plate to ensure stability during the movement. At this time, it is in an inclined state, that is, it gradually deviates from the upper frame from top to bottom, and the shear wall in this state can pass through the area to be installed. The upper electric reel 27 and the lower electric reel 34 are locked and paused at the same time. The mobile frame 10 and the shear wall are moved to the installation area together, and the bottom of the shear wall is suspended outside through the installation area until the spacing between the rotation node of the upper support rod 41 and the abutment plate 40 and the inner wall of the wall to be assembled is equal to the vertical distance with the plane where the upper and lower shear wall inner walls are located. The mobile frame 10 is fixed at this position by adjusting the threaded rod 31 through the pressure plate. The upper electric drum 27 and the lower electric drum 34 are started simultaneously to drive the upper pulling rope and the lower pulling rope to adjust the shear wall from an inclined state to a vertical state. The sealing belt blocks the outside of its sealing area, and the exposed steel bars between the upper shear wall and the lower shear wall are connected through the connecting sleeve. A sealing plate is installed in the sealing area, and concrete is poured together with the post-cast zone area.
[0048] Example 2
[0049] An intelligent construction equipment for shear walls of assembled medical buildings also includes a post-cast strip template, which includes an inner template 60 and an outer template 70. The inner template 60 and the outer template 70 are connected and fixed on both sides of the post-cast strip by tension bolts 80. A deformation sleeve 90 is provided on the outer side of the tension bolts 80. The deformation sleeve 90 includes an end side extrusion portion 91 and a middle side deformation portion 92. The end side extrusion portion 91 horizontally extrude the middle side deformation portion 92, and the middle side deformation portion 92 expands and deforms outward under pressure.
[0050] The middle side deformation part 92 includes an upper elastic skeleton 921, a lower elastic skeleton 922 and an elastic diaphragm 923 connected between the upper elastic skeleton 921 and the lower elastic skeleton 922. The upper elastic skeleton 921 is attached to the tension bolt 80 and is bent and deformed upward under the action of the end side extrusion part 91. The middle part of the lower elastic skeleton 922 abuts against the tension bolt 80, and both ends are below the tension bolt 80.
[0051] A sleeve 52 is installed on the exposed steel bar 50. The sleeve 52 is arranged perpendicular to the inner template 60 and the outer template 70, and the sleeve 52 is used as an end side extrusion part 91 to move axially relative to the inner template 60. The end side extrusion part 91 is a rigid structure, and an elastic sealing pad is arranged at one end away from the middle side deformation part 92.
[0052] Waterstop steel plates are arranged on the side of the shear wall and the shear wall on the side. The area between the two is the post-cast strip area. The connecting sleeve on the side of the shear wall is connected and fixed to the exposed steel bars of the side shear wall. The inner formwork and the outer formwork are tensioned and fixed by tension bolts. During the tensioning and fixing process, the template squeezes the end extrusion part 91 so that the middle side deformation part 92 is compressed and arched, forming a structure with a thick middle part and thin ends. The concrete of the post-cast strip is poured. After the pouring is completed and reaches a certain strength, the formwork is removed, and holes are drilled obliquely downward on the post-cast strip in the upper area of the deformation sleeve until the bottom is located at the middle top of the deformation sleeve. The hole is sealed by inward grouting to form a sealing area with a large inside and a small outside. An elastic waterstop ring can be arranged on the deformation sleeve. After the deformation of the deformation sleeve, the elastic waterstop ring is arranged facing the waterfront side.
[0053] Example 3
[0054] A method for constructing a shear wall of an assembled medical building, using the construction equipment of the above embodiment, and the steps are as follows:
[0055] First, adjust the elevation of the front threaded top rod 23 and the rear threaded top rod 24 so that the universal wheel abuts against the bottom surface of the upper floor panel, move the mobile frame 10 to the shear wall storage area, and install it on the inner wall of the shear wall through the upper connector 26 and the lower connector 33. The upper electric drum 27 and the lower electric drum 34 work at the same time, and the shear wall is lifted by the upper pulling rope 25 and the lower pulling rope 32 until it fits on the side of the abutment plate 40 facing away from the upper frame body. At this time, the shear wall is in an inclined state, and the shear wall in this state can pass through the area to be installed. The upper electric drum 27 and the lower electric drum 34 are locked and paused at the same time.
[0056] Secondly, the mobile frame 10 and the shear wall are moved to the installation area together, and the bottom of the shear wall is suspended outside the installation area until the distance between the rotation node of the upper support rod 41 and the abutment plate 40 and the inner wall of the building wall to be assembled is equal to the vertical distance to the plane where the upper and lower shear wall inner walls are located, and the mobile frame 10 is fixed at this position through the pressure plate by adjusting the threaded rod 31;
[0057] Again, the upper electric drum 27 and the lower electric drum 34 work again at the same time, adjust the posture of the shear wall to be installed until the abutment plate 40 is in a vertical state, adjust the connecting sleeve 51 of the leaking steel bars 50 at the top and bottom of the shear wall, and the connecting sleeve 51 is provided with a threaded section, which is used to connect and fix the leaking steel bars 50 around the shear wall. The area where the leaking steel bars 50 on the upper surface and the leaking steel bars 50 on the lower surface are located is the blocking area. At this time, the blocking belt 100 blocks the outer side of the upper surface and the lower surface, and the area where the side leaking steel bars 50 are located is the post-casting belt area. A steel cage is installed in the post-casting belt area and connected and fixed to the leaking steel bars 50, and a sleeve 52 is installed on the leaking steel bars 50 in the post-casting belt area, and the end side extrusion portion 91 of the deformation sleeve 90 is sleeved in the sleeve 52;
[0058] Finally, the inner formwork 60 and the outer formwork 70 are installed at the post-casting strip part. A pouring port is provided at the top of the inner formwork 60. A gate is provided at the pouring port. The gate is used to block the pouring port and is fixed by a tension bolt 80. A deformation sleeve 90 is sleeved on the tension bolt 80 between the two formworks. By adjusting the nut pressure end side extrusion parts 91 of the tension bolt 80 to be close to each other, the upper elastic frame 921 is bent and deformed upward, and the lower elastic frame 922 is deformed upward. Due to the screw of the tension bolt 80, the upper elastic frame 921 of the middle side deformation part 92 is arched upward and deformed to a height greater than the deformation height of the lower elastic frame 922.
[0059] Finally, pour the concrete of the post-cast strip. When the concrete reaches the set strength, remove the tension bolts 80, the inner formwork 60 and the outer formwork 70, install sealing plates on the inside and outside of the post-cast strip, and drill grouting holes obliquely downward on the post-cast strip above the inner sealing plate. The bottom of the grouting hole is located at the top of the middle deformation part 92, and grouting is injected into the inside to complete the sealing.
[0060] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. The replacement may be a replacement of a part of the structure, device, method step, or a complete technical solution. Any equivalent replacement or change according to the technical solution and the inventive concept of the present invention shall be covered within the protection scope of the present invention.
Claims
1. An intelligent construction equipment for shear walls of assembled medical buildings, characterized in that: The mobile frame (10) comprises an upper frame (20) and a lower frame (30) which are arranged on the mobile frame (10). The upper frame (20) and the lower frame (30) are both arranged vertically. The upper frame (20) is used to abut against the bottom surface of the upper floor panel, and the lower frame (30) is used to abut against the top surface of the floor panel of the current layer. The mobile frame (10) is provided with an upper pulling structure and a lower pulling structure and a top support structure located between the upper pulling structure and the lower pulling structure. The upper pulling structure and the lower pulling structure have the same structure and are respectively connected to the inner wall of the shear wall. The top support structure comprises an abutment plate (40), the abutment plate (40) is used to be connected to the inner wall of the shear wall, an upper top support rod (41) is rotatably mounted on the upper side of the abutment plate (40), a lower top support rod (42) is rotatably mounted on the lower side of the abutment plate (40), and the end of the lower top support rod (42) and the abutment plate (40) can slide vertically relative to each other, and the upper top support rod (41) and the lower top support rod (42) are mounted on the upper top frame (20) at one end away from the abutment plate (40); Externally exposed steel bars (50) are reserved around the shear wall, and connecting sleeves (51) are threadedly connected to the externally exposed steel bars (50). The upper and lower surfaces of the shear wall are both inclined structures, and the inclined structures are arranged obliquely downward from the inside to the outside.
2. According to claim 1, the intelligent construction equipment for shear walls of assembled medical buildings is characterized in that: The upper frame (20) comprises an upper frame body, and an ear plate 1 (21) and an ear plate 2 (22) are installed on the upper frame (20), and at least two ear plates 1 (21) and 2 (22) are arranged on the upper and lower parts, and a vertical front threaded push rod (23) is installed on the ear plate 1 (21), and a vertical rear threaded push rod (24) is installed on the ear plate 2 (22), and universal wheels are installed on the tops of the front threaded push rod (23) and the rear threaded push rod (24); The lower top frame (30) comprises a lower frame body installed on the side of the mobile frame (10), a vertical threaded rod (31) is installed on the lower frame body, and a pressure plate is installed at the bottom of the threaded rod (31).
3. The intelligent construction equipment for shear walls of assembled medical buildings according to claim 2 is characterized in that: The upper pulling structure comprises an upper pulling rope (25) and an upper electric drum (27); the end of the upper pulling rope (25) is connected to an upper connecting body (26); the upper connecting body (26) is used to be connected to the middle and upper part of the shear wall; the upper electric drum (27) is installed on an upper frame; a fixed pulley is installed on the upper frame; one end of the upper pulling rope (25) is installed on the upper electric drum (27) via the fixed pulley; The lower pulling structure comprises a lower pulling rope (32) and a lower electric drum (34); one end of the lower pulling rope (32) is connected to a lower connecting body (33); the lower connecting body (33) is used to be connected to the middle and lower part of the shear wall; the lower electric drum (34) is mounted on a lower frame; a fixed pulley is mounted on the lower frame; one end of the lower pulling rope (32) is mounted on the lower electric drum (34) via the fixed pulley.
4. The intelligent construction equipment for shear walls of prefabricated medical buildings according to claim 2 is characterized in that: The end of the upper support rod (41) away from the upper frame is rotatably mounted on the abutment plate (40), and the lower support rod (42) includes a fixed tube (421) and a movable rod (422). A positioning plate (423) is provided on the side of the fixed tube (421) away from the abutment plate (40), and the positioning plate (423) is mounted on the upper frame by bolts. A movable channel is provided on the side of the fixed tube (421) away from the upper frame, and a spring (424) is installed in the movable channel. One end of the movable rod (422) is slidably fitted in the movable channel, and a guide block (425) is rotatably mounted on the free end. A vertical slide groove is provided on the abutment plate (40), and the guide block (425) is slidably fitted in the vertical slide groove.
5. The intelligent construction equipment for shear walls of assembled medical buildings according to any one of claims 1 to 4, characterized in that: It also includes a post-cast strip template, which includes an inner template (60) and an outer template (70). The inner template (60) and the outer template (70) are connected and fixed on both sides of the post-cast strip by tension bolts (80). The outer side of the tension bolts (80) is provided with a deformation sleeve (90). The deformation sleeve (90) includes an end side extrusion part (91) and a middle side deformation part (92). The end side extrusion part (91) horizontally extrude the middle side deformation part (92), and the middle side deformation part (92) expands and deforms outward under pressure.
6. The intelligent construction equipment for shear walls of assembled medical buildings according to claim 5 is characterized in that: The middle side deformation part (92) comprises an upper elastic frame (921), a lower elastic frame (922) and an elastic diaphragm (923) connected between the upper elastic frame (921) and the lower elastic frame (922); the upper elastic frame (921) is fitted on the tension bolt (80) and is bent and deformed upward under the action of the end side extrusion part (91); the middle part of the lower elastic frame (922) is in contact with the tension bolt (80), and both ends are below the tension bolt (80).
7. The intelligent construction equipment for shear walls of assembled medical buildings according to claim 5 is characterized in that: A sleeve (52) is installed on the exposed steel bar (50), the sleeve (52) is arranged perpendicular to the inner template (60) and the outer template (70), and the sleeve (52) is used to act as an end side extrusion part (91) to move axially relative to the inner template (60), the end side extrusion part (91) is a rigid structure, and an elastic sealing pad is arranged at one end away from the middle side deformation part (92).
8. The intelligent construction equipment for shear walls of prefabricated medical buildings according to claim 6 is characterized in that: The lower part of the upper surface and the lower part of the lower surface of the shear wall are both provided with a blocking strip (100), and the blocking strip (100) is used to block the area near the outer side where the upper surface and the lower surface of the shear wall are located to prevent mortar leakage; The inclination angles of the upper surface and the lower surface of the shear wall are greater than the inclination angles of the lower surface of the upper shear wall and the upper surface of the lower shear wall.
9. A method for constructing shear walls of assembled medical buildings, using the construction equipment as claimed in claim 8, characterized in that: Here are the steps: First, the elevation of the front threaded top rod (23) and the rear threaded top rod (24) is adjusted so that the universal wheel abuts against the bottom surface of the upper floor panel, and the mobile frame (10) is moved to the shear wall storage area, and installed on the inner wall of the shear wall through the upper connecting body (26) and the lower connecting body (33). The upper electric drum (27) and the lower electric drum (34) work simultaneously, and the shear wall is lifted by the upper pulling rope (25) and the lower pulling rope (32) until it fits on the side of the abutting plate (40) facing away from the upper frame body. At this time, the shear wall is in an inclined state, gradually deviating from the upper frame body from top to bottom, and the shear wall in this state can pass through the area to be installed, and the upper electric drum (27) and the lower electric drum (34) are locked and paused at the same time; Secondly, the movable frame (10) and the shear wall are moved to the installation area together, and the bottom of the shear wall is suspended outside the installation area until the distance between the rotation node of the upper support rod (41) and the abutment plate (40) and the inner wall of the building wall to be assembled is equal to the vertical distance to the plane where the upper and lower shear wall inner walls are located, and the movable frame (10) is fixed at this position through the pressure plate by adjusting the threaded rod (31); Again, the upper electric drum (27) and the lower electric drum (34) work again at the same time to adjust the posture of the shear wall to be installed until the abutment plate (40) is in a vertical state, and the connecting sleeves (51) of the leaking steel bars (50) at the top and bottom of the shear wall are adjusted. A threaded section is arranged in the connecting sleeve (51), and the threaded section is used to connect and fix the leaking steel bars (50) around the shear wall. The area where the leaking steel bars (50) on the upper surface and the leaking steel bars (50) on the lower surface are located is the blocking area. At this time, the blocking belt (100) blocks the outer side of the upper surface and the lower surface. The area where the side leaking steel bars (50) are located is the post-casting belt area. A steel cage is installed in the post-casting belt area and connected and fixed to the leaking steel bars (50). A sleeve (52) is installed on the leaking steel bars (50) in the post-casting belt area, and the end side extrusion portion (91) of the deformation sleeve (90) is sleeved in the sleeve (52); Finally, an inner formwork (60) and an outer formwork (70) are installed at the post-casting strip portion, a pouring port is provided at the top of the inner formwork (60), a gate is provided at the pouring port, the gate is used to block the pouring port, and is fixed by a tension bolt (80), wherein a deformation sleeve (90) is sleeved on the tension bolt (80) located between the two formworks, and the nut pressure end side extrusion parts (91) of the tension bolt (80) are adjusted to be close to each other, so that the upper elastic frame (921) is bent and deformed upward, and the lower elastic frame (922) is deformed upward, and due to the screw of the tension bolt (80), the upper elastic frame (921) of the middle side deformation part (92) is arched upward and deformed to a height greater than the deformation height of the lower elastic frame (922); Finally, pour concrete in the post-cast strip. When the concrete reaches the set strength, remove the tension bolts (80), the inner formwork (60) and the outer formwork (70), install sealing plates on the inner and outer sides of the post-cast strip, and drill grouting holes obliquely downward on the post-cast strip above the inner sealing plate. The bottom of the grouting hole is located at the top of the middle deformation part (92), and grouting is injected into the inside to complete the sealing.
Citation Information
Patent Citations
Fabricated medical building outer wall
CN218176236U