Protective shed frame and construction method

By inserting through-core support rods and lateral columns on the pier top cover beam to form a support plane and building a protective ceiling, the problem of the impact of the protective shed on highway traffic during the construction of the ramp bridge was solved, and the height requirements were met and the traffic impact was reduced. effect.

CN118757003APending Publication Date: 2024-10-11CCCC SECOND PUBLIC BUREAU MENGXING ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411065016.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

During the construction of the ramp bridge, the existing protective shed construction method requires interruption of highway traffic or multiple traffic diversions, which affects traffic efficiency and safety, and the height of the protective shed does not meet the requirements.

Method used

The through-core support rods are used to pass through the pier roof beams and lateral columns to form a support plane, and a protective ceiling is built to prevent the structure from invading the clear area. The diagonal shear brace and water diversion slope design are used to ensure the stability and waterproofing effect of the support structure. , reduce the impact on highways.

Benefits of technology

It is possible to meet the height requirements of the protective shed without interrupting highway traffic, reduce the impact of traffic, and avoid the impact of curb columns on the passage of traffic, improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757003A_ABST
    Figure CN118757003A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ramp bridge construction protection, in particular to a protective shed frame and a construction method.The construction method comprises the steps that a plurality of center-penetrating supporting rods penetrate through a pier top cover beam, and the two ends of each center-penetrating supporting rod extend out of the pier top cover beam to form a left half-range first supporting plane and a right half-range first supporting plane; constructing a mounting foundation on the road shoulder on which the highway passes, and fixing the lateral upright post on the mounting foundation to obtain a second supporting plane; dismantling a middle division zone wave-shaped guardrail in the construction area to obtain a borrowing crossing; a longitudinal main beam and a transverse distribution beam are sequentially constructed on a first supporting plane and a second supporting plane on one side of the pier top cover beam to obtain a mounting framework, and at the moment, vehicles on the construction side are guided, changed and transferred to a road overtaking lane on the other side through a borrowing crossing to pass; a plurality of protection wood boards are installed on the installation framework to obtain a protection plane; paving and fixing a waterproof iron sheet on the protection plane to obtain a waterproof plane; the method has the effect that the requirement for the building height of the protective shed can be met under the condition that the influence on the passing efficiency of the expressway is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ramp bridge construction protection, and in particular to a protection scaffolding and a construction method. Background Art

[0002] The highway interchange ramp bridge is an important part of the highway interchange, which is used to realize the traffic transfer between roads in different directions and at different elevations. This type of bridge is usually located near the intersection or entrance and exit of the highway to achieve smooth vehicle traffic and flexible adjustment of traffic flow. When constructing the ramp bridge, it is usually necessary to cross one of the highways that are already open. In order to reduce the impact of the bridge deck construction on the traffic safety of the highway that is already open, it is necessary to set up a protective shed under the preset position where the ramp bridge crosses the highway that is already open.

[0003] There are mainly the following schemes for building protective sheds in the prior art. Usually, the traffic on the expressway is temporarily interrupted and the shed is directly built on the ground. The shed is opened to traffic after it is built. However, this method has a great impact on the traffic on the expressway. In order to minimize the impact of the ramp bridge construction team on the traffic efficiency and safety of the expressway, there are also the following two construction methods. The first is to set columns on the shoulders and median strips of the expressway to support the protective shed. The second is to set columns on the shoulders and curbs of the expressway to support the protective shed.

[0004] In view of the above-mentioned related technologies, the clearance height will be set after the design of the expressway is completed to improve the safety of expressway traffic. When setting columns on the shoulders and median strips of the expressway to support the protective shed, the height of the protective shed will be limited by the pier top cap beam at the median strip, so that the construction height of the protective shed does not meet the requirements. When setting columns on the shoulders and curbs of the expressway to support the protective shed, in order to ensure two-way traffic, multiple traffic diversions are required during the construction and dismantling of the protective shed, which will have a great impact on the efficiency of expressway traffic. Summary of the invention

[0005] In order to meet the construction height requirements of the protective shed while reducing the impact on the traffic efficiency of the expressway, the present application provides a protective shed and a construction method.

[0006] The present application provides a protective scaffolding and construction method using the following technical solutions: In a first aspect, the present application provides a protective scaffolding construction method.

[0007] A protective scaffolding construction method, comprising: Passing a plurality of through-core support rods through the pier top cap beam, and making both ends of the through-core support rods extend out of the pier top cap beam to form a left and right half first support plane; An installation foundation is constructed on the shoulder of a highway where traffic has already begun, and the lateral columns are fixed on the installation foundation to obtain a second support plane; Remove the corrugated guardrail of the median strip in the construction area to obtain a bypass entrance; The longitudinal main beam and the transverse distribution beam are sequentially constructed on the first supporting plane and the second supporting plane on one side of the pier top cap beam to obtain an installation frame. At this time, vehicles on the construction side are diverted through the detour to the overtaking lane on the other side of the road; A plurality of protective wooden boards are installed on the installation frame to obtain a protective plane; Fixed waterproof iron sheets are laid on the protective plane to obtain a waterproof surface.

[0008] By adopting the above technical solution, a plurality of through-core support rods are passed through the pier top cap beam, and both ends of the through-core support rods are extended out of the pier top cap beam to form the first support plane of the left and right half widths; then, an installation foundation is constructed on the shoulder of the highway that has been used, and the lateral columns are fixed on the installation foundation to obtain the second support plane; then, the corrugated guardrail of the center dividing strip in the construction area is removed to obtain the bypass; then, the longitudinal main beam and the transverse distribution beam are constructed in sequence on the first support plane and the second support plane on one side of the pier top cap beam to obtain the installation skeleton, at which time, the vehicles on the construction side are diverted through the bypass to the overtaking lane of the road on the other side; then, a plurality of protective wooden boards are installed on the installation skeleton to obtain the protective plane ; Finally, fixed waterproof iron sheets are laid on the protection plane to obtain a waterproof plane; the designed protection scaffolding construction method, by passing through the through-core support rod on the pier top cover beam, can be used as the first support plane of the scaffolding structure close to the median strip side, and cooperate with the second support plane formed by multiple lateral columns to raise a support structure with a certain height for the scaffolding structure, so as to avoid the scaffolding structure invading the clearance area of ​​the already passed expressway, and there is no need to interrupt road traffic during the scaffolding construction process, only two diversions are required, which can meet the construction height requirements of the protection shed while reducing the impact on the expressway traffic efficiency, and can also avoid the impact of setting columns at the curb on the detour traffic.

[0009] In a specific possible implementation scheme, a hollow pipe is pre-buried in the pier top cap beam during the pouring construction, and a through hole for the support rod to pass through is formed after pouring.

[0010] By adopting the above technical solution, a through hole for the support rod to pass through can be formed through the hollow pipe during the casting process of the pier top cap beam, thereby avoiding the extra workload caused by drilling in the later stage.

[0011] In a specific possible implementation method, a separation membrane is laid on the shoulder of a trafficked road, and a concrete foundation is constructed on the separation membrane, wherein a pre-embedded steel plate is connected to the concrete foundation via pre-embedded bolts to obtain an installation foundation.

[0012] By adopting the above technical solution, the separation membrane is laid before the construction of the installation foundation, which can facilitate the rapid removal of the installation foundation at a later time.

[0013] In a specific possible implementation scheme, after the lateral columns are connected to the installation foundation, an oblique shear brace is connected between two adjacent lateral columns.

[0014] By adopting the above technical solution, the designed oblique shear brace can make multiple lateral columns form a structural whole, thereby enhancing the structural stability of the lateral columns.

[0015] In a specific feasible implementation scheme, after the corrugated guardrail of the median dividing strip is removed, the surface of the open median dividing strip area is cleaned and compacted, and then concrete is poured to form a pipeline protection layer for temporary vehicle passage.

[0016] By adopting the above technical solution, the possibility of vehicles temporarily passing through the lane crushing the pipelines in the center lane during the construction of the protective scaffolding can be reduced.

[0017] In a specific feasible implementation plan, after the construction of the water-proof iron sheet is completed, a construction fence is installed on the water-proof surface, and a warning light strip is set on the construction fence.

[0018] By adopting the above technical solution, the possibility of construction debris on the horizontal surface falling into the open highway can be further avoided.

[0019] In a second aspect, the present application provides a protective scaffolding.

[0020] A protective scaffolding constructed by the protective scaffolding construction method provided by the first aspect of the present application comprises: A plurality of through-going support rods, both ends of which are arranged through the pier top cap beam, and the through-going support rods are arranged horizontally; A plurality of lateral columns, wherein the lateral columns are connected to the road shoulder and the plurality of lateral columns are arranged along the direction of travel of the road; Two protective ceilings, one end of the protective ceiling is connected to the penetrating support rod, and the other end is connected to the lateral column.

[0021] By adopting the above technical solution, a protective scaffolding is designed, which can provide a supporting structure that meets the clearance height requirements for the protective ceiling by inserting support rods and lateral columns. A protective platform can be formed through the protective ceiling to physically isolate objects with potential falling risks during the construction of the ramp bridge, thereby avoiding affecting the traffic on the highway below.

[0022] In a specific embodiment, the protective roof includes: Two longitudinal main beams, the two longitudinal main beams are respectively connected to a first support plane formed by a plurality of penetrating support rods and a second support plane formed by a plurality of lateral columns; A plurality of transverse distribution beams, wherein both ends of the transverse distribution beams are respectively connected to the two longitudinal main beams, and the plurality of transverse distribution beams are distributed along the long side direction of the longitudinal main beams; A plurality of protective wooden boards, wherein the protective wooden boards are connected to the transverse distribution beam, and the plurality of protective wooden boards form a protective plane; A plurality of anti-leakage iron sheets are connected to the side of the protective wooden board away from the transverse distribution beam, and the plurality of anti-leakage iron sheets form a horizontal isolation plane.

[0023] By adopting the above technical solution, a protective ceiling is designed, in which a mounting frame for installing protective wooden boards can be formed through longitudinal main beams and transverse distribution beams, and a water-insulating surface can be formed through leak-proof iron sheets to prevent the protective wooden boards from being eroded by natural rainwater.

[0024] In a specific possible implementation scheme, the protective plane and the isolation plane are inclined downward from the side close to the through-support rod to the side close to the lateral columns on both sides to form a water guide slope, and the inclination angle of the water guide slope is between 1.5° and 2.5°.

[0025] By adopting the above technical solution, the inclined design and the water separation surface forming the water diversion slope can avoid the possibility of rainwater being retained and accumulated on the water separation surface and crushing the supporting structure.

[0026] In a specific possible implementation mode, at least one oblique shear brace is connected between two adjacent lateral columns.

[0027] By adopting the above technical solution, the designed oblique shear brace can make multiple lateral columns form a structural whole, thereby enhancing the structural stability of the lateral columns.

[0028] In summary, the present application includes at least one of the following beneficial technical effects: 1. The designed protection scaffolding construction method can serve as the first support plane of the scaffolding structure close to the median strip side by passing through the through support rod on the pier top cap beam, and cooperate with the second support plane formed by multiple lateral columns to raise a support structure with a certain height for the scaffolding structure to avoid the scaffolding structure from invading the clear area of ​​the highway that has been passed. In addition, there is no need to interrupt road traffic during the scaffolding construction process, and only two diversions are required. The construction height requirement of the protection shed can be met while reducing the impact on the highway traffic efficiency, and the impact of setting columns at the curb on the detour traffic can be avoided.

[0029] 2. The designed protection scaffolding construction method can form through holes for the support rods to pass through through hollow pipes during the pouring of the pier top cap beam, avoiding the extra workload caused by drilling in the later stage.

[0030] 3. The designed protection scaffolding construction method lays a separation membrane before the installation foundation construction, which can facilitate the rapid dismantling of the installation foundation at a later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the on-site construction situation in the embodiment of the present application.

[0032] Figure 2 It is a schematic diagram of the structure of the protective scaffolding of the embodiment of the present application after support rods are set and penetrated on the pier top cap beam.

[0033] Figure 3 is Figure 2 Schematic diagram of the plane structure after the protective roof is erected on the foundation.

[0034] Figure 4 yes Figure 3 Schematic diagram of the three-dimensional state structure.

[0035] Figure 5 yes Figure 4 Enlarged view of part A in the middle.

[0036] Figure 6 It is a schematic diagram of the overall structure of the protective scaffolding according to the embodiment of the present application.

[0037] Explanation of the reference numerals in the accompanying drawings: 01. Center dividing strip; 02. Pier top cap beam; 1. Insertion of support rods; 2. Installation foundation; 3. Lateral columns; 4. Bored passage; 5. Protective ceiling; 51. Longitudinal main beam; 52. Transverse distribution beam; 53. Protective wooden board; 54. Water-proof iron sheet; 6. Oblique shear brace; 7. Construction fence. DETAILED DESCRIPTION

[0038] The following is combined with Figure 1-6 This application is described in further detail.

[0039] The embodiments of the present application disclose a protective scaffold and a construction method.

[0040] In a first aspect, an embodiment of the present application discloses a protective scaffolding.

[0041] Reference Figure 1 The expressway below the ramp bridge construction site includes a median strip 01 and two-way multi-lane lanes on the left and right sides of the median strip 01. Each lane is a curb, an overtaking lane, a driving lane, an emergency lane and a shoulder from the side close to the median strip 01 to the side far from the median strip 01. The piers for supporting the ramp bridge are cast in the median strip 01, and the pier top cap beam 02 is cast above the piers.

[0042] Reference Figure 2 and Figure 3 A protective scaffolding includes a penetration support rod 1, a lateral column 3 and a protective ceiling 5. The number of the penetration support rods 1 is multiple, and a through hole for the penetration support rod 1 to pass through is opened on the pier top cap beam 02. The through hole can be formed by pre-buried hollow pipes when the pier top cap beam 02 is cast, and can also be formed by drilling later with a punching device. In this embodiment, the through hole is formed by pre-buried hollow pipes when the pier top cap beam 02 is cast, and the penetration support rod 1 is set through the pier top cap beam 02, and both ends of the penetration support rod 1 pass through the pier top cap beam 02, and the penetration support rod 1 is set horizontally.

[0043] Reference Figure 3 and Figure 4 An installation foundation 2 is constructed on the shoulder of the road. The installation foundation 2 is made of cast-in-place concrete, and embedded bolts and embedded steel plates are embedded in the concrete blocks. The lateral columns 3 are connected and fixed to the embedded steel plates through the extended sections of the embedded bolts, and multiple lateral columns 3 are evenly spaced along the traveling direction of the road; there are two protective ceilings 5, and the two protective ceilings 5 ​​are respectively arranged on opposite sides of the through-support rod 1, one end of the protective ceiling 5 is connected to the through-support rod 1, and the other end is connected to the lateral column 3.

[0044] Reference Figure 4 and Figure 5 Furthermore, the protective ceiling 5 includes a longitudinal main beam 51, a transverse distribution beam 52 and a protective wooden board 53. The number of the longitudinal main beams 51 is two, one of the two longitudinal main beams 51 is welded and fixed on a first support plane formed by a plurality of penetrating support rods 1, and the other is welded and fixed on a second support plane formed by a plurality of lateral columns 3, and the long side of the longitudinal main beam 51 is arranged along the travel direction of the highway passing below; in the present application, since the area to be protected is large, the longitudinal main beam 51 is welded by a plurality of branch beams, and a reinforcing steel plate is arranged at the connection between two adjacent branch beams to form an equal strong structure.

[0045] Reference Figure 4 and Figure 5 There are multiple transverse distribution beams 52, both ends of which are respectively welded and fixed to the two longitudinal main beams 51, and the multiple transverse distribution beams 52 are evenly spaced along the long side direction of the longitudinal main beams 51. There are multiple protective wooden boards 53, which are bolted to the transverse distribution beams 52, and the multiple protective wooden boards 53 form a protective plane, which is used to prevent falling objects from affecting the driving safety of vehicles on the highway below during the construction of the ramp bridge.

[0046] Reference Figure 4 and Figure 5In order to prevent rainwater from eroding the protective wooden board 53 and increasing the weight of the protective wooden board 53 after being soaked, the protective ceiling 5 also includes a plurality of leak-proof iron sheets, which are screwed to the side of the protective wooden board 53 away from the transverse distribution beam 52, and the plurality of leak-proof iron sheets form a horizontal isolation plane above the protective plane; since there will be plane undulations in the horizontal plane during construction, in order to prevent rainwater from being retained and accumulated and causing safety hazards, the protective plane and the horizontal isolation plane are inclined downward from the side close to the through-support rod 1 to the side close to the lateral column 3 to form a water guide slope, and the inclination angle of the water guide slope is between 1.5° and 2.5°. In this embodiment, the inclination angle of the water guide slope is preferably 2°.

[0047] Reference Figure 6 In order to enable multiple lateral columns 3 to form a structural entity and enhance the structural stability of the lateral columns 3, at least one oblique shear brace 6 is welded and fixed between two adjacent lateral columns 3; in the present application, the number of oblique shear braces 6 between two adjacent lateral columns 3 can be one, two, or three, as long as the purpose of structural reinforcement can be achieved. In the present embodiment, the number of oblique shear braces 6 between two adjacent lateral columns 3 is one.

[0048] Reference Figure 6 In order to further prevent fallen objects from rolling on the horizontal plane and falling onto the open highway below, two construction fences 7 are fixedly connected to the horizontal plane. The construction fences 7 are arranged perpendicular to the traveling direction of the open road below, and warning light strips are wrapped around the construction fences 7.

[0049] The implementation principle of a protective scaffolding in an embodiment of the present application is as follows: a plurality of through-core support rods are passed through the pier top cap beam 02, and both ends of the through-core support rods are extended out of the pier top cap beam 02 to form a first support plane of left and right half widths; then an installation foundation 2 is constructed on the shoulder of the highway where traffic has already passed, and the lateral columns 3 are fixed on the installation foundation 2 to obtain a second support plane; then the corrugated guardrail of the center dividing strip 01 in the construction area is removed to obtain a bypass 4; subsequently, a longitudinal main beam 51 and a transverse distribution beam 52 are sequentially constructed on the first support plane and the second support plane on one side of the pier top cap beam 02 to obtain an installation skeleton, at which time vehicles on one side of the construction are diverted through the bypass 4 to the overtaking lane of the road on the other side; then a plurality of protective wooden boards 53 are installed on the installation skeleton to obtain a protective plane; finally, a fixed waterproof iron sheet 54 is laid on the protective plane to obtain a water-isolating surface.

[0050] In a second aspect, an embodiment of the present application discloses a protective scaffolding construction method.

[0051] Reference Figure 1-Figure 6 A protective scaffolding construction method is used to construct the protective scaffolding disclosed in the first aspect of the embodiment of the present application, comprising: S1: Pass a plurality of through-core support rods through the pier top cap beam 02, and make both ends of the through-core support rods extend out of the pier top cap beam 02 to form a first support plane with left and right half widths; S2: constructing a mounting base 2 on the shoulder of a highway where traffic has already passed, and fixing the lateral columns 3 on the mounting base 2 to obtain a second supporting plane; S3: Remove the corrugated guardrail of the median strip 01 in the construction area to obtain the passage 4; S4: On the first supporting plane and the second supporting plane on one side of the pier top cap beam 02, the longitudinal main beam 51 and the transverse distribution beam 52 are sequentially constructed to obtain an installation frame. At this time, vehicles on the construction side are diverted through the detour 4 to the overtaking lane on the other side of the road; S5: Install multiple protective wooden boards 53 on the installation frame to obtain a protective plane; S6: A fixed waterproof iron sheet 54 is laid on the protection plane to obtain a waterproof surface, and the waterproof surface is controlled to tilt downward from the side of the pier top cap beam 02 to the side of the shoulder to form a water diversion slope.

[0052] By passing through the through-core support rod on the pier top cap beam 02, it can be used as the first support plane of the scaffolding structure close to the side of the median strip 01, and cooperate with the second support plane formed by multiple lateral columns 3 to raise a support structure with a certain height for the scaffolding structure, so as to avoid the scaffolding structure from invading the clear area of ​​the highway that has been passed. In addition, there is no need to interrupt road traffic during the scaffolding construction process, and only two diversions are required. The height requirements of the protective shed can be met while reducing the impact on the highway traffic efficiency, and the impact of setting columns at the curb on the detour traffic can be avoided.

[0053] Furthermore, in order to form a through hole for the support rod 1 to pass through through a hollow pipe during the pouring process of the pier top cap beam 02 and avoid the extra workload caused by drilling later, the through hole on the pier top cap beam 02 in step S1 for the support rod 1 to pass through is a hollow pipe pre-buried during the pouring construction of the pier top cap beam 02 and is formed after the pouring.

[0054] Furthermore, in order to facilitate the rapid dismantling of the installation base 2 at a later stage, step S2 includes: S21: Construction of installation foundation 2: laying a separation membrane on the shoulder of the existing road, and constructing a concrete foundation on the separation membrane, wherein the concrete foundation is connected with a pre-embedded steel plate by pre-embedded bolts to obtain an installation foundation 2; S22: Installation of the lateral column 3: Connect and fix the lateral column 3 to the embedded steel plate. If the existing road below has a slope, the length of the lateral column 3 is adjusted accordingly.

[0055] Furthermore, in order to enable the plurality of lateral columns 3 to form a structural whole and enhance the structural stability of the lateral columns 3, step S22 specifically includes: S221: Connect and fix the lateral columns 3 to the embedded steel plates until all lateral columns 3 are installed; S222: Weld a diagonal shear brace between two adjacent lateral columns 3.

[0056] Furthermore, in order to reduce the possibility of vehicles temporarily passing through the protective scaffolding crushing the pipelines in the center zone 01 during the construction of the protective scaffold, step S3 specifically includes: S31: Remove the corrugated guardrail of the median strip 01 in the construction area to obtain the passage 4; S32: cleaning and compacting the surface layer of the middle dividing zone 01 of the opening to obtain a compacted layer; S33: pouring concrete on the compacted layer to form a pipeline protection layer for temporary passage of vehicles.

[0057] Furthermore, in order to further avoid the possibility of construction debris on the horizontal plane falling onto the open highway, step S6 also includes step S7: installing a construction fence 7 on the horizontal plane, the construction fence 7 is set perpendicular to the construction direction of the open road below, and a warning light strip is set on the construction fence 7.

[0058] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A protective scaffolding construction method, characterized in that: include: Passing a plurality of through-core support rods through the pier top cap beam (02), and making both ends of the through-core support rods extend out of the pier top cap beam (02) to form left and right half widths of the first support plane; An installation foundation (2) is constructed on the shoulder of a highway where traffic has already begun, and a lateral column (3) is fixed on the installation foundation (2) to obtain a second support plane; The corrugated guardrail of the median strip (01) of the construction area is removed to obtain a bypass (4); A longitudinal main beam (51) and a transverse distribution beam (52) are sequentially constructed on a first supporting plane and a second supporting plane on one side of the pier top cap beam (02) to obtain an installation frame, and vehicles on the construction side are redirected through a detour (4) to pass through the overtaking lane on the other side of the road; Installing a plurality of protective wooden boards (53) on the installation frame to obtain a protective plane; A water-insulating iron sheet (54) is laid and fixed on the protection plane to obtain a water-insulating plane.

2. The protective scaffolding construction method according to claim 1 is characterized in that: The pier top cap beam (02) is pre-buried with a hollow pipe during the pouring construction, and after pouring, a through hole for the support rod (1) to pass through is formed.

3. The protective scaffolding construction method according to claim 1 is characterized in that: A separation membrane is laid on the shoulder of a trafficked road, and a concrete foundation is constructed on the separation membrane, wherein a pre-embedded steel plate is connected to the concrete foundation via pre-embedded bolts to obtain an installation foundation (2).

4. The protective scaffolding construction method according to claim 1 is characterized in that: After the lateral columns (3) are connected to the installation base (2), an oblique shear brace (6) is connected between two adjacent lateral columns (3).

5. The protective scaffolding construction method according to claim 1 is characterized in that: After the corrugated guardrail of the median strip (01) is removed, the surface of the open median strip (01) area is cleaned and compacted, and then concrete is poured to form a pipeline protection layer for temporary vehicle passage.

6. The protective scaffolding construction method according to claim 1 is characterized in that: After the construction of the water-proof iron sheet (54) is completed, a construction fence (7) is installed on the water-proof surface, and a warning light strip is arranged on the construction fence (7).

7. A protective scaffold, characterized in that: The protective scaffolding is constructed by the construction method of any one of claims 1 to 6, comprising: A plurality of penetrating support rods (1), both ends of the penetrating support rods (1) are arranged to pass through the pier top cap beam (02), and the penetrating support rods (1) are arranged horizontally; A plurality of lateral columns (3), wherein the lateral columns (3) are connected to the road shoulder, and the plurality of lateral columns (3) are arranged along the direction of travel of the road; Two protective ceilings (5), one end of the protective ceiling (5) is connected to the penetrating support rod (1), and the other end is connected to the lateral column (3).

8. The protective scaffolding according to claim 7, characterized in that: The protective ceiling (5) comprises: Two longitudinal main beams (51), the two longitudinal main beams (51) are respectively connected to a first support plane formed by a plurality of penetrating support rods (1) and a second support plane formed by a plurality of lateral columns (3); a plurality of transverse distribution beams (52), wherein two ends of the transverse distribution beams (52) are respectively connected to the two longitudinal main beams (51), and the plurality of transverse distribution beams (52) are distributed along the long side direction of the longitudinal main beams (51); A plurality of protective wooden boards (53), wherein the protective wooden boards (53) are connected to the transverse distribution beam (52), and the plurality of protective wooden boards (53) form a protective plane; A plurality of anti-leakage iron sheets are connected to a side of the protective wooden board (53) away from the transverse distribution beam (52), and the plurality of anti-leakage iron sheets form a horizontal isolation plane.

9. The protective scaffolding according to claim 8, characterized in that: The protective plane and the water-isolating plane are arranged to be inclined downward from the side close to the through-support rod (1) to the side close to the lateral columns (3) on both sides to form a water-guiding slope, and the inclination angle of the water-guiding slope is between 1.5° and 2.5°.

10. The protective scaffolding according to claim 8, characterized in that: At least one oblique shear brace (6) is connected between two adjacent lateral columns (3).