Method and device for evaluating service life of worm shaft of nuclear power station and electronic equipment
By obtaining the processing information of the worm shaft and motor usage data, and calculating its life assessment results, the problem of inaccurate assessment in the existing technology is solved, and the accuracy and safety of the life assessment of the worm shaft in nuclear power plants are improved.
Patent Information
- Application Number
- CN202410852735.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-11
AI Technical Summary
In the existing technology, the service life assessment of the worm shaft relies on simulation data and human experience, which results in inaccurate assessment and affects the safety of nuclear power plants.
By obtaining the processing information of the worm shaft, the number of cycles can be determined, and the actual number of uses is determined based on the corresponding motor, and the life assessment results are calculated by combining the two to improve the accuracy of the assessment.
The worm shaft life assessment based on real data is realized, avoiding the inaccuracies of simulation data and human experience, and improving the accuracy and safety of the assessment.
Smart Images

Figure CN118758593A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of worm shafts in nuclear power plants, and in particular, relates to a method, device, electronic device and computer-readable storage medium for evaluating the service life of a worm shaft in a nuclear power plant. Background Art
[0002] Worm shafts are widely used in transmission devices in nuclear power plants. Incorrect assessment of their service life will affect the safety of nuclear power plants. For example, the circulating water filtration system in a nuclear power plant filters seawater and then provides cooling water for the nuclear power unit to ensure the normal operation of the nuclear power unit. When the motor of the circulating water filtration system is working, the driving device (including worm shafts, turbines and other transmission devices) drives the rotating filter to rotate, thereby filtering out dirt in the seawater. When the worm shaft reaches its service life but is not replaced in time, it will affect the normal operation of the nuclear power unit and may even cause a nuclear safety accident.
[0003] At present, the life assessment of the worm shaft is mainly carried out through simulation experiments or human experience estimation, but these methods mainly rely on simulation data or human subjective experience, resulting in inaccurate life assessment of the worm shaft. Summary of the invention
[0004] The embodiments of the present application provide a method, device, electronic device and computer-readable storage medium for evaluating the service life of a worm shaft in a nuclear power plant, which can improve the accuracy of the evaluation of the service life of the worm shaft.
[0005] In a first aspect, an embodiment of the present application provides a method for evaluating the service life of a worm shaft of a nuclear power plant, comprising:
[0006] Obtaining processing information of the worm shaft to be tested;
[0007] Determining the number of cycles of the worm shaft to be detected according to the processing information, wherein the number of cycles is used to indicate the service life of the worm shaft to be detected;
[0008] The actual usage times of the worm shaft to be detected are determined according to the motor corresponding to the worm shaft to be detected, and the life evaluation result of the worm shaft to be detected is obtained by using the actual usage times and the cycle times.
[0009] In a second aspect, an embodiment of the present application provides a device for evaluating the service life of a worm shaft of a nuclear power plant, comprising:
[0010] A processing information acquisition module is used to acquire processing information of the worm shaft to be detected;
[0011] A cycle number determination module, used to determine the number of cycles of the worm shaft to be detected according to the processing information, wherein the number of cycles is used to indicate the service life of the worm shaft to be detected;
[0012] The life evaluation module is used to determine the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected, and obtain the life evaluation result of the worm shaft to be detected by using the actual usage times and the cycle times.
[0013] In a third aspect, an embodiment of the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor, when executing the computer program, implements the steps of the method for evaluating the service life of a worm shaft of a nuclear power plant as described in the first aspect above.
[0014] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for evaluating the service life of a worm shaft of a nuclear power plant described in the first aspect above are implemented.
[0015] In a fifth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the method for evaluating the service life of a worm shaft of a nuclear power plant as described in any one of the first aspects above.
[0016] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0017] In an embodiment of the present application, the number of possible cycles of the worm shaft to be detected is determined by the processing information of the worm shaft to be detected, and the actual number of uses of the worm shaft to be detected is determined according to the motor corresponding to the worm shaft to be detected; since the above-mentioned number of possible cycles is used to indicate the service life of the worm shaft to be detected, and the above-mentioned actual number of uses is real data in a real scenario determined by the worm shaft to be detected and its corresponding motor, it means that when evaluating the service life of the worm shaft, a service life analysis can be performed based on the service life and real data at the same time, thereby avoiding the inaccuracy of simulation data and human subjective experience, and thus the accuracy of the worm shaft service life evaluation can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 It is a flow chart of a method for evaluating the service life of a worm shaft of a nuclear power plant provided in one embodiment of the present application;
[0020] Figure 2 It is a schematic diagram of the structure of a device for evaluating the service life of a worm shaft of a nuclear power plant provided in an embodiment of the present application;
[0021] Figure 3 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0022] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0023] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0024] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0025] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0026] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0027] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0028] The worm shaft in a nuclear power plant is used to transmit the power and torque output by the motor, so that the power and torque can be smoothly transmitted to the required nuclear power equipment, thereby ensuring the normal operation of the nuclear power equipment. Among them, the failure of the worm shaft will directly affect the corresponding nuclear power equipment, causing the nuclear power equipment to fail to operate normally, and may even cause a nuclear power plant accident.
[0029] For example, when the motor of the circulating water filtration system (including low-speed motors, medium-speed motors and high-speed motors) is working, the driving device (including worm shafts, turbines and other transmission devices) drives the rotating filter to rotate, thereby filtering out dirt in the seawater. During normal operation, the rotating filter is driven by a low-speed motor. When the liquid level data measured by the rotating filter level measuring device reaches a certain value, the medium and high-speed motors will be started to increase the flushing effect and reduce the pressure difference of the rotating filter. If the worm shaft fails, the low-speed motor will not be able to stop, the rotating filter will not be able to switch to the medium and high-speed motors, and the rotating filter will not be able to filter seawater normally, which may affect the normal operation of the nuclear power unit. Therefore, accurate assessment of the service life of the worm shaft can reduce the possibility of worm shaft failure and improve the safety of nuclear power plants.
[0030] At present, the life assessment of worm shafts is mainly carried out through simulation experiments or human experience estimation. However, the simulation data may deviate from the actual situation, resulting in inaccurate life assessment of the worm shaft. At the same time, human experience estimation lacks scientific basis and cannot objectively and accurately assess the life of the worm shaft.
[0031] In order to improve the accuracy of the evaluation of the service life of the worm shaft of a nuclear power plant, the present application provides a method for evaluating the service life of the worm shaft of a nuclear power plant. In the evaluation method, by obtaining the processing information of the worm shaft to be detected, the number of cycles of the worm shaft to be detected is determined according to the processing information, and then the actual number of times the worm shaft to be detected is determined according to the motor corresponding to the worm shaft to be detected, and finally the actual number of times used and the above number of cycles are used to obtain the life evaluation result of the worm shaft to be detected.
[0032] Figure 1A schematic flow chart of a method for evaluating the service life of a worm shaft of a nuclear power plant provided in an embodiment of the present application is shown, and is described in detail as follows:
[0033] S11, obtaining processing information of the worm shaft to be inspected.
[0034] The above-mentioned worm shaft to be tested refers to a worm shaft that needs to be evaluated for life, for example, a new worm shaft to be installed or an old worm shaft that needs to be repaired. The above-mentioned processing information refers to information reflecting the appearance, structure, function and / or processing characteristics of the worm shaft to be tested, and the above-mentioned processing information may include one or more of model information, shape information, size information, material information, processing technology, etc. In addition, since the worm shaft is usually used in conjunction with components, the above-mentioned processing information may also include part information of the components corresponding to the worm shaft to be tested. For example, part information of the motor, turbine, gear, etc. corresponding to the worm shaft to be tested.
[0035] Specifically, for the worm shaft to be tested, the above processing information can be obtained according to one or more of the design documents, engineering drawings, worm shaft database, worm shaft specification information, etc. corresponding to the worm shaft to be tested. Alternatively, since the worm shaft to be tested may be worn due to use, the processing information can also be obtained by rubbing.
[0036] For example, for a worm shaft A to be repaired, its chamfer size can be obtained by rubbing. First, a template (assuming it is a metal block) can be selected, and a hole that precisely matches the chamfer shape can be cut on the template so that the chamfer can fit into it; then the selected template is placed on the measured chamfer of the worm shaft A, and the shape of the template is ensured to be completely matched with the shape of the chamfer by continuous fine-tuning; finally, when the template and the chamfer are completely matched, the chamfer size corresponding to the template is recorded.
[0037] S12. Determine the number of cycles of the worm shaft to be detected according to the processing information, wherein the number of cycles is used to indicate the service life of the worm shaft to be detected.
[0038] The above-mentioned number of cycles refers to the number of cycles of the worm shaft to be tested under specific stress conditions (such as cyclic loads under different stress levels), which can be used to indicate the service life of the worm shaft to be tested under the corresponding specific stress conditions.
[0039] Specifically, the above processing information can be used to perform simulation experiments under different stress conditions on the worm shaft to be tested, and the number of cycles of the worm shaft to be tested can be determined based on the results of the simulation experiments. Optionally, first, the above processing information can be used to perform simulation modeling on the worm shaft to be tested to obtain a simulation model; then, the simulation model can be subjected to cyclic loads under different stress levels through simulation software (such as Ncode simulation software) to obtain the corresponding number of cycles. Alternatively, the number of cycles of the worm shaft to be tested can be determined by comparing the similarity between the above processing information and the historical usage data of the same model of worm shaft (including processing information, service life, operating data, etc.).
[0040] It should be noted that when the number of cycles is obtained through simulation experiments, different stress conditions can result in different number of cycles. When evaluating the service life, the minimum or maximum number of cycles can be selected according to the actual situation. Of course, the service life can also be evaluated by determining the average number of cycles, which is not limited here.
[0041] S13, determining the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected, and obtaining the life evaluation result of the worm shaft to be detected by using the actual usage times and the cycle times.
[0042] The actual number of times used refers to the number of times the worm shaft to be tested is used under the actual load conditions of the motor. The life assessment result may include the remaining service life and the corresponding service life recommendation.
[0043] Specifically, since the worm shaft serves as the transmission device of the motor, the use of the worm shaft to be tested is closely related to the use process of its corresponding motor. For the new worm shaft to be tested to be installed, the actual number of uses of the same model of worm shaft per year can be calculated, and then the remaining service life can be obtained by dividing the number of cycles by the actual number of uses; for the old worm shaft to be tested under repair, the actual number of uses of the worm shaft to be tested can be calculated, and then the remaining service life can be obtained by dividing the number of cycles by the actual number of uses and then subtracting the years of use. Optionally, the above-mentioned life assessment result can also include the percentage of the remaining service life, and then make service life recommendations based on the relationship between the percentage and the preset life threshold. For example, if the percentage of the remaining service life is greater than 90%, it is prompted that it can be used normally; if the percentage of the remaining service life is less than 10%, it is prompted that it cannot be used normally.
[0044] In an embodiment of the present application, the number of possible cycles of the worm shaft to be detected is determined by the processing information of the worm shaft to be detected, and the actual number of uses of the worm shaft to be detected is determined according to the motor corresponding to the worm shaft to be detected; since the above-mentioned number of possible cycles is used to indicate the service life of the worm shaft to be detected, and the above-mentioned actual number of uses is real data in a real scenario determined by the worm shaft to be detected and its corresponding motor, it means that when evaluating the service life of the worm shaft, a service life analysis can be performed based on the service life and real data at the same time, thereby avoiding the inaccuracy of simulation data and human subjective experience, and thus the accuracy of the worm shaft service life evaluation can be improved.
[0045] In some embodiments, determining the number of cycles of the worm shaft to be inspected according to the processing information includes:
[0046] Obtaining a life simulation result of the worm shaft to be tested according to the processing information; the life simulation result includes the service life of the worm shaft to be tested under different stress states;
[0047] The maximum number of cycles of the worm shaft to be tested is determined based on the life simulation results.
[0048] In the case where the number of cycles of the worm shaft to be tested is determined by simulation experiments, the life simulation result may include a life simulation curve. The life simulation curve may be a stress-life curve (SN curve), which is a curve segment showing the fatigue life of the worm shaft to be tested under different stress levels, and its horizontal axis usually represents the stress level of the cyclic load (usually the maximum stress), and the vertical axis represents the life of the material (usually the number of cycles or the cycle time). Similarly, the life simulation curve may also be a strain-life curve (EN curve), etc., which is not limited here.
[0049] Specifically, when using the above-mentioned processing information to perform life simulation, after obtaining the simulation model through the processing information, the boundary conditions are then constructed according to the above-mentioned processing information, so that the preset simulation software simulates the constructed simulation model based on the boundary conditions to obtain the above-mentioned life simulation result (assuming it is an SN curve). According to the horizontal coordinate of the SN curve, the maximum number of cycles of the above-mentioned worm shaft to be tested can be accurately determined.
[0050] The above boundary conditions refer to the constraints or restrictions imposed on the simulation model during the simulation experiment, which are used to simulate the actual working conditions of the worm shaft to be tested. The above boundary conditions may include degree of freedom constraints, frequency calculation range, stress distribution range, material properties, etc.
[0051] For example, assuming that the simulation is performed through Ncode simulation software, the above boundary conditions may include: constraining all degrees of freedom of the motor base in the simulation model, the frequency calculation range is 0-400 Hz, the stress distribution range is the cumulative value of 0-400 Hz, etc.
[0052] In some embodiments, the life simulation result of the worm shaft to be tested is obtained according to the processing information, including:
[0053] Obtaining a first life simulation curve of the worm shaft to be detected according to the material information in the processing information; the first life simulation curve is used to indicate the service life of the material corresponding to the worm shaft to be detected under different stress states;
[0054] The second life simulation curve is obtained by using the above-mentioned first life simulation curve, the above-mentioned processing information, and a preset stress load method, and the above-mentioned second life simulation curve is determined as the above-mentioned life simulation result; the above-mentioned second life simulation curve is used to indicate the service life of the above-mentioned worm shaft to be tested under different stress states.
[0055] The material information may include one or more of material type, material properties, material surface roughness, material surface treatment coefficient, etc. The preset stress load mode may include load intensity, load vibration mode, load direction, etc.
[0056] Specifically, since worm shafts made of different materials can withstand different load capacities, the material strength can be determined based on the material information of the worm shaft to be tested, and the first life simulation curve of the material corresponding to the worm shaft to be tested can be fitted according to the above material strength, wherein the above material strength includes tensile strength and yield strength; then, based on the above first life simulation curve, the material information in the above processing information, and the preset stress load method, a second life simulation curve, that is, the above life simulation result, is fitted.
[0057] It should be noted that the yield strength refers to the strength value of the material when it undergoes yield deformation, and the tensile strength refers to the maximum strength value of the material before it breaks. The second life simulation curve can be corrected for average stress during fitting to improve the accuracy of life simulation.
[0058] For example, assuming that a life simulation curve (assuming an SN curve) is obtained through the Ncode simulation software, first, the yield strength (assuming 880 MPa) and tensile strength (assuming 1030 MPa) are determined based on the material type of the worm shaft to be tested, and the Ncode simulation software fits the material SN curve (that is, the above-mentioned first life simulation curve); then the material surface roughness (assuming smooth), surface treatment coefficient (assuming 1.033), material type and other material information are assigned to the worm shaft to be tested; then the Ncode simulation software performs stress loading according to the above-mentioned material SN curve, the material information of the above-mentioned worm shaft to be tested, and the preset stress load mode (assuming the load vibration mode is a constant amplitude and the load direction is the XYZ direction), and finally uses the Goodman method to perform average stress correction, thereby considering the stress gradient and obtaining the SN curve of the worm shaft (that is, the above-mentioned second life simulation curve).
[0059] In an embodiment of the present application, the first life simulation curve of the worm shaft to be tested is first obtained through the material information in the processing information, and then simulation constraints are performed through the first life simulation curve, the processing information, and a preset stress load method to obtain a more accurate second life simulation curve.
[0060] In some embodiments, determining the maximum number of cycles of the worm shaft to be tested according to the life simulation result includes:
[0061] Acquire the actual operation condition of the worm shaft to be detected; the actual operation condition at least includes the actual stress condition of the worm shaft to be detected;
[0062] Using the actual operation conditions, the second life simulation curve is corrected to obtain a corrected life simulation curve;
[0063] The maximum number of cycles of the worm shaft to be tested is determined according to the modified life simulation curve.
[0064] Specifically, the corresponding actual operation conditions can be obtained from the historical usage data of the worm shaft to be tested (or a worm shaft of the same model). At the same time, in order to improve the authenticity of the simulation experiment, the above-mentioned actual operation conditions at least include the actual stress conditions of the worm shaft to be tested, wherein the actual stress conditions include but are not limited to: actual stress direction, actual stress magnitude, etc. Optionally, the above-mentioned actual operation conditions may also include actual vibration effects, for example, the vibration effects caused by other components on the worm shaft to be tested.
[0065] In the embodiment of the present application, since the life simulation results may not reflect the actual scenario, the above-mentioned second life simulation curve can be corrected according to the actual operating conditions to obtain a corrected life simulation curve that is more in line with the actual working scenario of the above-mentioned worm shaft to be tested, and then the maximum number of cycles of the worm shaft to be tested is determined from the corrected life simulation curve, thereby improving the accuracy of determining the number of cycles of the worm shaft to be tested.
[0066] In some embodiments, the above-mentioned determining the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected includes:
[0067] Matching the motor based on the processing information of the worm shaft to be detected;
[0068] The actual usage times of the worm shaft to be detected are obtained according to the matched rotation speed and working time of the motor.
[0069] Specifically, the motor used for the worm shaft to be detected in the real scene can be matched according to the model information, size information, etc. in the above processing information. For the matched motor, the actual number of times the worm shaft to be detected is used can be determined by multiplying the motor's speed and working time within a certain period of time. Among them, the above speed and working time can be the historical average speed and average working time of the matched motor. In addition, the actual number of times used can also be determined based on the maximum or minimum speed, maximum or minimum working time of the above motor, which is not limited here.
[0070] For example, according to the model information of the worm shaft A to be tested, it is matched to the medium-high speed motor A. The average motor speed of the medium-high speed motor A in the past two years is 2930 rpm, and the average working time is 242 hours. The product of the two can be used as the actual number of times the worm shaft A to be tested is used.
[0071] In an embodiment of the present application, the actual number of uses is obtained by the rotational speed and working time of the motor matched to the worm shaft to be detected, which means that the determination of the actual number of uses takes into account the actual usage scenarios of the worm shaft to be detected, thereby improving the accuracy and authenticity of the actual number of uses of the above-mentioned worm shaft to be detected.
[0072] In some embodiments, since the stresses that the worm shafts to be tested with different chamfer sizes can withstand are different, it means that the service life of the worm shaft will be affected by the chamfer size, that is, the service life of the worm shafts to be tested with different chamfer sizes is different. In the case where the above-mentioned processing information includes the chamfer size, the above-mentioned determination of the number of cycles of the above-mentioned worm shaft to be tested according to the above-mentioned processing information includes:
[0073] According to the chamfer size, a pre-built fatigue database is matched to obtain a target number of cycles; the fatigue database includes a corresponding relationship between the chamfer size and the number of cycles;
[0074] The target number of cycles that is matched is used to determine the possible number of cycles of the worm shaft to be inspected.
[0075] The above-mentioned pre-constructed fatigue database can be constructed through the historical usage data of worm shafts with different chamfer sizes; or, it can be constructed by conducting simulation experiments on worm shafts with different chamfer sizes. The above-mentioned correspondence relationship can include a one-to-one relationship or a one-to-many relationship. For example, a worm shaft with a chamfer size corresponds to one possible cycle number; a worm shaft with a chamfer size corresponds to multiple possible cycle numbers (such as the maximum possible cycle number, the minimum possible cycle number, etc.). In addition, the above-mentioned pre-constructed fatigue database can also include processing information of worm shafts with different chamfer sizes, including but not limited to model information, shape information, size information, material information, processing technology, etc.
[0076] Specifically, when the target number of cycles is obtained by matching the chamfer size of the worm shaft to be detected with a pre-constructed fatigue database, if a worm shaft with the same chamfer size is matched in the fatigue database, the number of possible cycles corresponding to the matched worm shaft can be directly used as the above-mentioned target number of cycles; if a worm shaft with the same chamfer size is not matched in the fatigue database, a chamfer size threshold range can be constructed according to the chamfer size of the worm shaft to be detected, and then matching is performed using the constructed chamfer size threshold range, and the number of possible cycles corresponding to one or more matched worm shafts or the average number of possible cycles can be used as the above-mentioned target number of cycles.
[0077] For example, assuming that the chamfer size of the worm shaft B to be detected is 1mm, if a worm shaft with a chamfer size of 1mm is matched in the fatigue database, the number of possible cycles corresponding to the matched worm shaft can be directly used as the above-mentioned target number of cycles; if a worm shaft with a chamfer size of 1mm is not matched in the fatigue database, a chamfer size threshold range can be constructed according to the chamfer size of the worm shaft B to be detected (assuming that it is determined based on the chamfer size of the worm shaft B to be detected ±0.2mm, that is, 0.8mm-1.2mm), then the worm shaft with a chamfer size in the range of 0.8mm-1.2mm in the fatigue database can be matched, and when one worm shaft is matched, the corresponding number of possible cycles can be directly determined as the target number of cycles, and when multiple worm shafts are matched, the average value of the corresponding number of possible cycles can be determined as the target number of cycles.
[0078] In the embodiment of the present application, since the above-mentioned pre-constructed fatigue database includes the correspondence between the chamfer size and the number of cycles, it means that for any worm shaft to be tested, the pre-constructed fatigue database can be directly matched according to the chamfer size of the worm shaft to be tested to obtain the target number of cycles, thereby improving the efficiency of service life assessment of the worm shaft to be tested.
[0079] In another optional embodiment of the present application, since the use of the worm shaft often takes a long time, the historical use data of the worm shaft with different chamfer sizes may not be rich enough, that is, it may be difficult to build an accurate fatigue database based on the historical use data of the worm shaft. Therefore, before matching the pre-built fatigue database according to the chamfer size, the following method is further included:
[0080] Acquire worm shaft information of worm shafts with different chamfer sizes; the worm shaft information includes processing information of the worm shaft;
[0081] For each chamfer size of the worm shaft, life simulation is performed according to the corresponding worm shaft information to obtain the number of cycles of the worm shaft;
[0082] The fatigue database is obtained by summarizing the worm shafts with different chamfer sizes and the corresponding number of cycles of the worm shafts.
[0083] Specifically, after obtaining the worm shaft information of worm shafts with different chamfer sizes, for each worm shaft with each chamfer size, life simulation can be performed according to the corresponding worm shaft information to obtain a life simulation curve of the worm shaft with the chamfer size (for example, an SN curve), and then the number of cycles of the worm shaft with the chamfer size is obtained according to the above life simulation curve, and finally the corresponding relationship between the worm shafts with different chamfer sizes and the number of cycles corresponding to the above worm shaft is constructed to obtain the above fatigue database. The process of constructing the above life simulation curve and obtaining the number of cycles according to the life simulation curve is similar to that in the above embodiment and will not be repeated here.
[0084] It should also be noted that, since life simulation is difficult to completely cover worm shafts of all chamfer sizes, after summarizing worm shafts of different chamfer sizes and the corresponding number of cycles of the worm shafts, data fitting can be continued to obtain a chamfer size-number of cycles curve, so that the above-mentioned pre-constructed fatigue database can include more chamfer sizes and the number of cycles corresponding to the chamfer sizes, which can improve the richness of the data in the above-mentioned fatigue database and enable the worm shaft to be tested to be more accurately matched to the data in the above-mentioned pre-constructed fatigue database.
[0085] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0086] Corresponding to the evaluation method of the service life of the worm shaft of a nuclear power plant described in the above embodiment, Figure 2 A schematic diagram of the structure of a device for evaluating the service life of a worm shaft in a nuclear power plant provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0087] Reference Figure 2 The device may be a device 21 for evaluating the service life of a worm shaft in a nuclear power plant. The device 21 for evaluating the service life of a worm shaft in a nuclear power plant may include a processing information acquisition module 211, a cycle number determination module 212 and a life evaluation module 213.
[0088] Reference Figure 2 The evaluation device 21 for the service life of the worm shaft of a nuclear power plant comprises:
[0089] The processing information acquisition module 211 is used to acquire the processing information of the worm shaft to be detected;
[0090] The cycle number determination module 212 is used to determine the cycle number of the worm shaft to be detected according to the processing information, wherein the cycle number is used to indicate the service life of the worm shaft to be detected;
[0091] The life assessment module 213 is used to determine the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected, and obtain the life assessment result of the worm shaft to be detected by using the actual usage times and the cycle times.
[0092] In some embodiments, when the cycle number determination module 212 determines the number of cycles of the worm shaft to be inspected according to the processing information, it includes:
[0093] Obtaining a life simulation result of the worm shaft to be tested according to the processing information; the life simulation result includes the service life of the worm shaft to be tested under different stress states;
[0094] The maximum number of cycles of the worm shaft to be tested is determined based on the life simulation results.
[0095] In some embodiments, when the cycle number determination module 212 obtains the life simulation result of the worm shaft to be detected according to the processing information, it includes:
[0096] Obtaining a first life simulation curve of the worm shaft to be detected according to the material information in the processing information; the first life simulation curve is used to indicate the service life of the material corresponding to the worm shaft to be detected under different stress states;
[0097] The second life simulation curve is obtained by using the above-mentioned first life simulation curve, the above-mentioned processing information, and a preset stress load method, and the above-mentioned second life simulation curve is determined as the above-mentioned life simulation result; the above-mentioned second life simulation curve is used to indicate the service life of the above-mentioned worm shaft to be tested under different stress states.
[0098] In some embodiments, when the cycle number determination module 212 determines the maximum number of cycles of the worm shaft to be detected according to the life simulation result, it includes:
[0099] Acquire the actual operation condition of the worm shaft to be detected; the actual operation condition at least includes the actual stress condition of the worm shaft to be detected;
[0100] Using the actual operation conditions, the second life simulation curve is corrected to obtain a corrected life simulation curve;
[0101] The maximum number of cycles of the worm shaft to be tested is determined according to the modified life simulation curve.
[0102] In some embodiments, when the life assessment module 213 determines the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected, it includes:
[0103] Matching the motor based on the processing information of the worm shaft to be detected;
[0104] The actual usage times of the worm shaft to be detected are obtained according to the matched rotation speed and working time of the motor.
[0105] In some embodiments, since the stresses that the worm shafts to be detected with different chamfer sizes can withstand are different, it means that the service life of the worm shaft will be affected by the chamfer size, that is, the service life of the worm shafts to be detected with different chamfer sizes is different. In the case where the above-mentioned processing information includes the chamfer size, the above-mentioned cycle number determination module 212, when determining the number of cycles of the above-mentioned worm shaft to be detected according to the above-mentioned processing information, further includes:
[0106] According to the chamfer size, a pre-built fatigue database is matched to obtain a target number of cycles; the fatigue database includes a corresponding relationship between the chamfer size and the number of cycles;
[0107] The target number of cycles that is matched is used to determine the possible number of cycles of the worm shaft to be inspected.
[0108] In another optional embodiment of the present application, since the use of the worm shaft often takes a long time, the historical use data of the worm shaft with different chamfer sizes may not be rich enough, that is, it may be difficult to build an accurate fatigue database based on the historical use data of the worm shaft. Therefore, the evaluation device 21 for the service life of the worm shaft of the nuclear power plant further includes a database construction module. The database construction module is used before the fatigue database pre-built according to the chamfer size matching is included:
[0109] Acquire worm shaft information of worm shafts with different chamfer sizes; the worm shaft information includes processing information of the worm shaft;
[0110] For each chamfer size of the worm shaft, life simulation is performed according to the corresponding worm shaft information to obtain the number of cycles of the worm shaft;
[0111] The fatigue database is obtained by summarizing the worm shafts with different chamfer sizes and the corresponding number of cycles of the worm shafts.
[0112] It should be noted that the information interaction, execution process, etc. between the devices / units are based on the same concept as the method embodiments of the present application. Their specific functions and technical effects can be found in the method embodiment section and will not be repeated here.
[0113] Figure 3 This is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. Figure 3 As shown, the electronic device 3 of this embodiment includes: at least one processor 30 ( Figure 3 The at least one processor 30 includes a memory 31 and a computer program 32 stored in the memory 31 and executable on the at least one processor 30. When the processor 30 executes the computer program 32, the steps in any of the method embodiments are implemented.
[0114] The electronic device 3 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The electronic device may include, but is not limited to, a processor 30 and a memory 31. Those skilled in the art will appreciate that Figure 3 It is only an example of the electronic device 3 and does not constitute a limitation of the electronic device 3. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the electronic device may also include an input sending device, a network access device, a bus, etc.
[0115] The processor 30 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0116] In some embodiments, the memory 31 may be an internal storage unit of the electronic device 3, such as a hard disk or memory of the electronic device 3. The memory 31 may also be an external storage device of the electronic device 3, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 3. Further, the memory 31 may also include both an internal storage unit of the electronic device 3 and an external storage device. The memory 31 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 31 may also be used to temporarily store data that has been sent or is to be sent.
[0117] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the functional units and modules is used as an example. In practical applications, the function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0118] An embodiment of the present application also provides a network device, which includes: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor implements the steps in any of the method embodiments when executing the computer program.
[0119] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the various method embodiments can be implemented.
[0120] An embodiment of the present application provides a computer program product. When the computer program product runs on an electronic device, the electronic device can implement the steps in the various method embodiments when executing the computer program product.
[0121] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the process in the embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the camera / electronic device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0122] In the embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0123] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0124] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0125] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0126] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for evaluating the service life of a worm shaft in a nuclear power plant, characterized in that: The method comprises: Obtaining processing information of the worm shaft to be tested; Determining the number of cycles of the worm shaft to be detected according to the processing information, wherein the number of cycles is used to indicate the service life of the worm shaft to be detected; The actual usage times of the worm shaft to be detected are determined according to the motor corresponding to the worm shaft to be detected, and the life evaluation result of the worm shaft to be detected is obtained by using the actual usage times and the cycle times.
2. The method for evaluating the service life of a worm shaft in a nuclear power plant according to claim 1, characterized in that: The step of determining the number of cycles of the worm shaft to be detected according to the processing information includes: Obtaining a life simulation result of the worm shaft to be detected according to the processing information; the life simulation result includes the service life of the worm shaft to be detected under different stress states; The maximum number of cycles of the worm shaft to be inspected is determined according to the life simulation result.
3. The method for evaluating the service life of a worm shaft in a nuclear power plant according to claim 2, characterized in that: The obtaining of the life simulation result of the worm shaft to be detected according to the processing information includes: Obtaining a first life simulation curve of the worm shaft to be detected according to the material information in the processing information; the first life simulation curve is used to indicate the service life of the material corresponding to the worm shaft to be detected under different stress states; A second life simulation curve is obtained using the first life simulation curve, the processing information, and a preset stress load method, and the second life simulation curve is determined as the life simulation result; the second life simulation curve is used to indicate the service life of the worm shaft to be tested under different stress states.
4. The method for evaluating the service life of a worm shaft in a nuclear power plant according to claim 3, characterized in that: The determining the maximum number of cycles of the worm shaft to be detected according to the life simulation result includes: Acquire the actual operating condition of the worm shaft to be detected; the actual operating condition at least includes the actual stress condition of the worm shaft to be detected; Using the actual operation condition, the second life simulation curve is corrected to obtain a corrected life simulation curve; The maximum possible number of cycles of the worm shaft to be inspected is determined according to the modified life simulation curve.
5. The method for evaluating the service life of a worm shaft in a nuclear power plant according to any one of claims 1 to 4, characterized in that: The determining the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected includes: Matching a motor based on the processing information of the worm shaft to be detected; The actual usage times of the worm shaft to be detected are obtained according to the matched rotation speed and working time of the motor.
6. The method for evaluating the service life of a worm shaft in a nuclear power plant according to claim 1, characterized in that: In the case where the processing information includes a chamfer size, determining the number of cycles of the worm shaft to be inspected according to the processing information includes: According to the chamfer size, a pre-built fatigue database is matched to obtain a target number of cycles; the fatigue database includes a corresponding relationship between the chamfer size and the number of cycles; The target cycle number that is matched is used to determine the possible cycle number of the worm shaft to be inspected.
7. The method for evaluating the service life of a worm shaft in a nuclear power plant according to claim 6, characterized in that: Before matching the pre-built fatigue database according to the chamfer size, the method further includes: Acquire worm shaft information of worm shafts with different chamfer sizes; the worm shaft information includes processing information of the worm shaft; For each chamfer size of the worm shaft, life simulation is performed according to the corresponding worm shaft information to obtain the number of cycles of the worm shaft; The fatigue database is obtained by summarizing worm shafts with different chamfer sizes and the corresponding number of cycles of the worm shafts.
8. A device for evaluating the service life of a worm shaft in a nuclear power plant, characterized in that: include: A processing information acquisition module is used to acquire processing information of the worm shaft to be detected; A cycle number determination module, used to determine the number of cycles of the worm shaft to be detected according to the processing information, wherein the number of cycles is used to indicate the service life of the worm shaft to be detected; The life evaluation module is used to determine the actual usage times of the worm shaft to be detected according to the motor corresponding to the worm shaft to be detected, and obtain the life evaluation result of the worm shaft to be detected by using the actual usage times and the cycle times.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.