Production equipment control method, system, equipment and medium based on industrial Internet of Things

Through the industrial Internet of Things system, the working rate and status of production equipment is dynamically adjusted, which solves the safety accidents caused by managers' insufficient understanding of production equipment, and improves the safety and stability of the production line.

CN118760106BActive Publication Date: 2024-11-19CHENGDU QINCHUAN IOT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411244689.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-19
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

In automated production lines, managers do not have enough understanding of the control and parameter adjustment of production equipment, which may lead to operations that do not meet the actual conditions and increase the risk of safety accidents.

Method used

Using the industrial Internet of Things production equipment regulation method, the management platform obtains information about production equipment, generates a working equipment set and an idle equipment set, judges the difference between the target working rate and the current rate, and enables idle equipment to improve production efficiency and safety.

Benefits of technology

It improves the safety of equipment operation and reduces the probability of accidents. By dynamically adjusting the working rate and equipment status of the production line, the stability and safety of the production process are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760106B_ABST
    Figure CN118760106B_ABST
Patent Text Reader

Abstract

The present application discloses a production equipment control method, system, equipment and medium based on the industrial Internet of Things, and relates to the technical field of the Internet of Things. The method includes: generating a first equipment set and a second equipment set according to the equipment information; judging whether the target working rate is greater than the current working rate, if so, obtaining the first accumulated working time of the working equipment, and determining the first optimal working rate of each working equipment according to the first accumulated working time; calculating the maximum working rate corresponding to the first equipment set according to the first optimal working rate of each working equipment, and judging whether the target working rate does not exceed the maximum working rate, if not, calculating the rate difference according to the target working rate and the maximum working rate; determining the target idle equipment from the second equipment set according to the rate difference. The present application has the effect of improving the safety of the equipment during operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of the Internet of Things, and in particular to a production equipment control method, system, equipment and medium based on the industrial Internet of Things. Background Art

[0002] An automatic production line is a form of production organization that uses an automated machine system to realize the product process. It is formed on the basis of the further development of the continuous assembly line. Its characteristics are: the production object is automatically transferred from one machine tool to another, and the machine tool automatically performs production, loading and unloading, inspection, etc.; all machines and equipment operate at a unified rhythm, and the production process is highly continuous.

[0003] At present, in automated production, production equipment on the production line is usually controlled and parameters are adjusted by management personnel, and management personnel do not participate in direct operations; therefore, in the process of controlling and adjusting parameters of production equipment, management personnel usually do not have enough understanding of the specific conditions of the production equipment and may make control operations that do not conform to the actual conditions of the production equipment, which may lead to danger and cause safety accidents. Summary of the invention

[0004] In order to improve the safety of equipment during operation, the present application provides a production equipment control method, system, equipment and medium based on industrial Internet of Things.

[0005] In the first aspect, the present application provides a production equipment control method based on the industrial Internet of Things, which adopts the following technical solutions:

[0006] The production equipment control method based on the industrial Internet of Things is applied to the industrial Internet of Things system, wherein the industrial Internet of Things system includes a management platform, a sensor network platform and an object platform which are sequentially connected in communication, wherein the object platform includes a target device group, and the method is executed by the management platform, including:

[0007] Acquire device information of each production device in the target device group, and generate a first device set and a second device set according to the device information; the first device set is a set representing working devices, and the second device set is a set representing idle devices;

[0008] Obtain the current working rate of the target device group and the input target working rate, and determine whether the target working rate is greater than the current working rate. If so, for each working device in the first device set, obtain the first accumulated working time of the working device, and determine the first optimal working rate of each working device according to the first accumulated working time;

[0009] Calculate the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and determine whether the target working rate does not exceed the maximum working rate. If not, calculate the rate difference according to the target working rate and the maximum working rate;

[0010] A target idle device is determined from the second device set according to the rate difference, and a work instruction is sent to the target idle device to enable the target idle device to produce the product.

[0011] By adopting the above technical solution, the equipment information of each production equipment in the target equipment group is obtained, and the first equipment set and the second equipment set are generated according to the equipment information, and then the current working rate of the target equipment group and the input target working rate are obtained, and it is judged whether the target working rate is greater than the current working rate. If the target working rate is greater than the current working rate, then for each working equipment in the first equipment set, the first accumulated working time of the working equipment is obtained, and the first optimal working rate of each working equipment is determined according to the first accumulated working time, and then the maximum working rate corresponding to the first equipment set is calculated according to the first optimal working rate of each working equipment, and it is judged whether the target working rate does not exceed the maximum working rate. If the target working rate exceeds the maximum working rate, the rate difference is calculated according to the target working rate and the maximum working rate, and then the target idle equipment is determined from the second equipment set according to the rate difference, and a work instruction is sent to the target idle equipment to enable the target idle equipment to produce the product; in the above method, when the manager adjusts the working rate of the production line, that is, when the manager inputs the target working rate through the console, the method can determine whether to enable the idle equipment in the target equipment group according to the size of the target working rate, thereby improving the safety of equipment operation and reducing the probability of accidents.

[0012] Optionally, the step of acquiring device information of each production device in the target device group and generating the first device set and the second device set according to the device information includes:

[0013] Acquire device information of each production device in the target device group, wherein the device information includes current working parameters;

[0014] Determine the equipment status of each production equipment according to the current working parameters; the equipment status includes working status and idle status;

[0015] A first equipment set and a second equipment set are generated according to the equipment status of each production equipment.

[0016] By adopting the above technical solution, in order to generate the first equipment set and the second equipment set, the equipment information of each production equipment in the target equipment group is obtained, the equipment information includes the current working parameters, and then the equipment status of each production equipment is determined according to the current working parameters, the equipment status includes the working status and the idle status, and finally the first equipment set and the second equipment set are generated according to the equipment status of each production equipment.

[0017] Optionally, after the step of calculating the maximum working rate corresponding to the first device set according to the optimal working rate of each working device, and judging whether the target working rate does not exceed the maximum working rate, the step further includes:

[0018] If yes, then obtaining the current working rate of each of the working devices, and generating a working rate ratio according to the current working rate;

[0019] Determining the adapted working rate of each working device according to the target working rate and the working rate ratio;

[0020] The adapted working parameters of each working device are determined according to the adapted working rate, and parameter adjustment instructions are generated according to the adapted working parameters to adjust the current working parameters of the working device to the adapted working parameters.

[0021] By adopting the above-mentioned technical scheme, in order to adjust the working rate of each production equipment when the target working rate does not exceed the maximum working rate, when the target working rate does not exceed the maximum working rate, the current working rate of each working equipment is obtained, and a working rate ratio is generated according to the current working rate, and then the adapted working rate of each working equipment is determined according to the target working rate and the working rate ratio, and finally the adapted working parameters of each working equipment are determined according to the adapted working rate, and parameter adjustment instructions are generated according to the adapted working parameters to adjust the current working parameters of the working equipment to the adapted working parameters.

[0022] Optionally, the step of determining a first optimal working rate of each working device according to the first accumulated working time includes:

[0023] For each working device, determining the current aging stage of the working device according to the first accumulated working time and a preset first comparison table; the first comparison table includes a mapping relationship between the accumulated working time of the working device and the aging stage;

[0024] The current aging stage of the working device is matched in a preset second comparison table to obtain a first optimal working rate of the working device; the second comparison table includes a mapping relationship between the aging stage and the optimal working rate.

[0025] By adopting the above technical solution, in order to determine the first optimal working rate of each working device, for each working device, the current aging stage of the working device is determined according to the first cumulative working time and a preset first comparison table, the first comparison table includes a mapping relationship between the cumulative working time of the working device and the aging stage, and then the current aging stage of the working device is matched in the preset second comparison table to obtain the first optimal working rate of the working device, and the second comparison table includes a mapping relationship between the aging stage and the optimal working rate.

[0026] Optionally, the step of determining a target idle device from the second device set according to the rate difference includes:

[0027] For each idle device in the second device set, obtaining a second accumulated working time of the idle device, and determining a current aging stage of the idle device according to the second accumulated working time and the preset first comparison table;

[0028] Matching the current aging stage of the idle device in the preset second comparison table to obtain the second optimal working rate of the idle device;

[0029] Determine the device priority of each idle device according to the second best working rate of each idle device and the rate difference;

[0030] The idle device with the highest device priority is used as the target idle device.

[0031] By adopting the above technical solution, in order to determine the target idle device, for each idle device in the second device set, the second accumulated working time of the idle device is obtained, and the current aging stage of the idle device is determined according to the second accumulated working time and the preset first comparison table, and then the current aging stage of the idle device is matched in the preset second comparison table to obtain the second optimal working rate of the idle device, and then the device priority of each idle device is determined according to the second optimal working rate and the rate difference of each idle device, and the idle device with the highest device priority is used as the target idle device.

[0032] Optionally, the step of determining the device priority of each idle device according to the second best working rate of each idle device and the rate difference includes:

[0033] For each idle device in the second device set, determine whether the second best working rate of the idle device is greater than the rate difference, and if so, put the second best working rate of the idle device into the preset rate set;

[0034] Arrange the values ​​in the preset rate set in ascending order to obtain an ascending rate set;

[0035] The idle devices corresponding to the values ​​in the ascending rate set are assigned device priorities from high to low in sequence.

[0036] By adopting the above technical solution, in order to determine the device priority, for each idle device in the second device set, it is determined whether the second best working rate of the idle device is greater than the rate difference. If the second best working rate of the idle device is greater than the rate difference, the second best working rate of the idle device is placed in a preset rate set, and then the values ​​in the preset rate set are arranged in ascending order to obtain an ascending rate set. Then, the idle devices corresponding to the values ​​in the ascending rate set are assigned device priorities from high to low.

[0037] Optionally, during the process of producing the product, the method further includes:

[0038] For each idle device in the second device set, obtaining the second accumulated working time of the idle device, and determining whether the second accumulated working time is greater than a preset time, and if so, calculating a time difference according to the second accumulated working time and the preset time;

[0039] Maintenance reminder information is generated according to the time difference.

[0040] By adopting the above technical solution, in order to be able to perform maintenance on production equipment in a timely manner, during the production process of products, for each idle device in the second equipment set, the second cumulative working time of the idle device is obtained, and it is determined whether the second cumulative working time is greater than the preset time. If the second cumulative working time is greater than the preset time, the time difference is calculated based on the second cumulative working time and the preset time, and maintenance reminder information is generated based on the time difference.

[0041] In the second aspect, the present application also provides an industrial Internet of Things system, which adopts the following technical solution:

[0042] An industrial Internet of Things system includes a management platform, a sensor network platform and an object platform that are sequentially connected in communication, the object platform includes a target device group, and the management platform is configured with:

[0043] A device set generation module, used to obtain device information of each production device in the target device group, and generate a first device set and a second device set according to the device information; the first device set is a set representing working devices, and the second device set is a set representing idle devices;

[0044] A working rate judgment module, used for obtaining the current working rate of the target device group and the input target working rate, and judging whether the target working rate is greater than the current working rate; if so, for each working device in the first device set, obtaining the first accumulated working time of the working device, and determining the first optimal working rate of each working device according to the first accumulated working time;

[0045] a rate difference generating module, configured to calculate the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and determine whether the target working rate does not exceed the maximum working rate; if not, calculate the rate difference according to the target working rate and the maximum working rate;

[0046] The target idle device determining module is used to determine the target idle device from the second device set according to the rate difference, and send a work instruction to the target idle device to enable the target idle device to produce the product.

[0047] In a third aspect, the present application also provides a computer device, which adopts the following technical solution:

[0048] A computer device comprises a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the method described in the first aspect when executing the computer program.

[0049] In a fourth aspect, the present application further provides a computer-readable storage medium, which adopts the following technical solution:

[0050] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the method described in the first aspect.

[0051] In summary, the present application includes at least the following beneficial technical effects: obtaining equipment information of each production equipment in the target equipment group, and generating a first equipment set and a second equipment set based on the equipment information, and then obtaining the current working rate of the target equipment group and the input target working rate, and judging whether the target working rate is greater than the current working rate; if the target working rate is greater than the current working rate, then for each working equipment in the first equipment set, obtaining the first accumulated working time of the working equipment, and determining the first optimal working rate of each working equipment based on the first accumulated working time; then calculating the maximum working rate corresponding to the first equipment set based on the first optimal working rate of each working equipment, and Determine whether the target working rate does not exceed the maximum working rate. If the target working rate exceeds the maximum working rate, calculate the rate difference based on the target working rate and the maximum working rate, then determine the target idle device from the second device set based on the rate difference, and send a work instruction to the target idle device to enable the target idle device to produce the product; in the above method, when the manager adjusts the working rate of the production line, that is, when the manager inputs the target working rate through the console, the method can determine whether to enable the idle devices in the target device group according to the size of the target working rate, thereby improving the safety of equipment operation and reducing the probability of accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a schematic diagram of the overall process of an embodiment of the present application.

[0053] Figure 2 It is a schematic diagram of the overall structure of one of the application scenarios of the system of an embodiment of the present application.

[0054] Figure 3 It is a schematic diagram of the overall structure of another application scenario of the system of an embodiment of the present application.

[0055] Figure 4 It is a structural block diagram of the computer device of the present application. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-4 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0057] The embodiment of the present application discloses a production equipment control method based on industrial Internet of Things.

[0058] Reference Figure 1The method for controlling production equipment based on the industrial Internet of Things is applied to the industrial Internet of Things system. The industrial Internet of Things system includes a management platform, a sensor network platform and an object platform which are sequentially connected in communication. The object platform includes a target device group. The method is executed by the management platform and includes the following steps:

[0059] Step S11, obtaining device information of each production device in the target device group, and generating a first device set and a second device set according to the device information.

[0060] The first device set is a set of working devices, and the second device set is a set of idle devices.

[0061] It can be understood that working equipment refers to production equipment in a working state, and idle equipment refers to production equipment in an idle state.

[0062] It should be noted that the equipment information of the production equipment includes the equipment model, current working parameters, maximum working parameters, dimensions, manufacturer, production date and other information of the production equipment; in this embodiment, all production equipment in the same target equipment group are production equipment performing the same production operation, and the production equipment in the same target equipment group performs the same production operation on the product.

[0063] Step S12, obtain the current working rate of the target device group and the input target working rate, and determine whether the target working rate is greater than the current working rate. If so, for each working device in the first device set, obtain the first cumulative working time of the working device, and determine the first optimal working rate of each working device based on the first cumulative working time.

[0064] It should be noted that the input target working rate is the working rate that needs to be achieved that is input by the management personnel in the equipment console or the equipment control center. The management personnel can adjust the working rate of the production line according to the actual production progress.

[0065] It can be understood that the first cumulative working time is the cumulative working time of the production equipment before this production. Assuming that a certain production equipment has produced products 3 times before this production, and the 3 working hours are X1, X2, and X3 respectively, then the first cumulative working time of the production equipment is X1+X2+X3.

[0066] Step S13, calculate the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and determine whether the target working rate does not exceed the maximum working rate. If not, calculate the rate difference according to the target working rate and the maximum working rate.

[0067] Step S14, determining a target idle device from the second device set according to the rate difference, and sending a work instruction to the target idle device to enable the target idle device to produce the product.

[0068] In the above implementation, the equipment information of each production equipment in the target equipment group is obtained, and the first equipment set and the second equipment set are generated according to the equipment information, then the current working rate of the target equipment group and the input target working rate are obtained, and it is determined whether the target working rate is greater than the current working rate. If the target working rate is greater than the current working rate, then for each working equipment in the first equipment set, the first accumulated working time of the working equipment is obtained, and the first optimal working rate of each working equipment is determined according to the first accumulated working time. Then, the maximum working rate corresponding to the first equipment set is calculated according to the first optimal working rate of each working equipment, and it is determined whether the target working rate does not exceed the maximum working rate. If the target working rate exceeds the maximum working rate, the rate difference is calculated according to the target working rate and the maximum working rate, and then the target idle equipment is determined from the second equipment set according to the rate difference, and a work instruction is sent to the target idle equipment to enable the target idle equipment to produce the product. In the above method, when the manager adjusts the working rate of the production line, that is, when the manager inputs the target working rate through the console, the method can determine whether to enable the idle equipment in the target equipment group according to the size of the target working rate, thereby improving the safety of equipment operation and reducing the probability of accidents.

[0069] As a further implementation of the production equipment control method, the step of obtaining equipment information of each production equipment in the target equipment group and generating the first equipment set and the second equipment set according to the equipment information includes the following steps:

[0070] Step S21, obtaining the equipment information of each production equipment in the target equipment group.

[0071] The equipment information of the production equipment includes the current working parameters of the production equipment.

[0072] Step S22, determining the equipment status of each production equipment according to the current working parameters.

[0073] The equipment status of the production equipment includes a working status and an idle status.

[0074] Step S23, generating a first equipment set and a second equipment set according to the equipment status of each production equipment.

[0075] In the above implementation, in order to generate the first equipment set and the second equipment set, the equipment information of each production equipment in the target equipment group is obtained, the equipment information includes the current working parameters, and then the equipment status of each production equipment is determined based on the current working parameters, the equipment status includes the working status and the idle status, and finally the first equipment set and the second equipment set are generated based on the equipment status of each production equipment.

[0076] As a further implementation of the production equipment control method, after the step of calculating the maximum working rate corresponding to the first equipment set according to the optimal working rate of each working equipment and judging whether the target working rate does not exceed the maximum working rate, the method further includes the following steps:

[0077] Step S31: If yes, the current working rate of each working device is obtained, and a working rate ratio is generated according to the current working rate.

[0078] Specifically, if the target working rate does not exceed the maximum working rate, the current working rate of each working device is obtained, and a working rate ratio is generated according to the current working rate.

[0079] Step S32: determining the adapted working rate of each working device according to the target working rate and the working rate ratio.

[0080] Step S33, determining the adapted working parameters of each working device according to the adapted working rate, and generating parameter adjustment instructions according to the adapted working parameters to adjust the current working parameters of the working device to the adapted working parameters.

[0081] In the above-mentioned embodiment, in order to adjust the working rate of each production equipment when the target working rate does not exceed the maximum working rate, when the target working rate does not exceed the maximum working rate, the current working rate of each working equipment is obtained, and a working rate ratio is generated according to the current working rate, and then the adapted working rate of each working equipment is determined according to the target working rate and the working rate ratio, and finally the adapted working parameters of each working equipment are determined according to the adapted working rate, and parameter adjustment instructions are generated according to the adapted working parameters to adjust the current working parameters of the working equipment to the adapted working parameters.

[0082] As a further implementation of the production equipment control method, the step of determining the first optimal working rate of each working equipment according to the first accumulated working time includes the following steps:

[0083] Step S41: for each working device, determine the current aging stage of the working device according to the first accumulated working time and a preset first comparison table.

[0084] The first comparison table includes a mapping relationship between the accumulated working hours of the working equipment and the aging stages.

[0085] It should be noted that, in this embodiment, the aging stages include a normal period, an initial aging period, an accelerated aging period, and a scrap period.

[0086] Step S42, matching the current aging stage of the working equipment in a preset second comparison table to obtain a first optimal working rate of the working equipment.

[0087] The second comparison table includes a mapping relationship between the aging stage and the optimal working rate.

[0088] In the above embodiment, in order to determine the first optimal working rate of each working device, for each working device, the current aging stage of the working device is determined according to the first cumulative working time and a preset first comparison table, the first comparison table includes a mapping relationship between the cumulative working time of the working device and the aging stage, and then the current aging stage of the working device is matched in the preset second comparison table to obtain the first optimal working rate of the working device, and the second comparison table includes a mapping relationship between the aging stage and the optimal working rate.

[0089] As a further implementation of the production equipment control method, the step of determining the target idle device from the second device set according to the rate difference includes the following steps:

[0090] Step S51: for each idle device in the second device set, obtain the second accumulated working time of the idle device, and determine the current aging stage of the idle device according to the second accumulated working time and a preset first comparison table.

[0091] Step S52: Match the current aging stage of the idle device in a preset second comparison table to obtain a second optimal working rate of the idle device.

[0092] Step S53: determining the device priority of each idle device according to the second best working rate and the rate difference of each idle device.

[0093] Step S54: taking the idle device with the highest device priority as the target idle device.

[0094] In the above embodiment, in order to determine the target idle device, for each idle device in the second device set, the second cumulative working time of the idle device is obtained, and the current aging stage of the idle device is determined according to the second cumulative working time and the preset first comparison table. Then, the current aging stage of the idle device is matched in the preset second comparison table to obtain the second optimal working rate of the idle device, and then the device priority of each idle device is determined according to the second optimal working rate and the rate difference of each idle device, and the idle device with the highest device priority is used as the target idle device.

[0095] As a further implementation of the production equipment control method, the step of determining the device priority of each idle device according to the second optimal working rate and the rate difference of each idle device includes the following steps:

[0096] Step S61: for each idle device in the second device set, determine whether the second best working rate of the idle device is greater than the rate difference; if so, put the second best working rate of the idle device into the preset rate set.

[0097] Step S62, arranging the values ​​in the preset rate set in ascending order to obtain an ascending rate set.

[0098] Step S63, assigning device priorities from high to low to the idle devices corresponding to the values ​​in the ascending rate set.

[0099] In the above implementation, in order to determine the device priority, for each idle device in the second device set, it is determined whether the second best working rate of the idle device is greater than the rate difference; if the second best working rate of the idle device is greater than the rate difference, the second best working rate of the idle device is placed in a preset rate set, and then the values ​​in the preset rate set are arranged in ascending order to obtain an ascending rate set, and then the idle devices corresponding to the values ​​in the ascending rate set are assigned device priorities from high to low.

[0100] As a further implementation of the production equipment control method, during the production of the product, the production equipment control method further includes the following steps:

[0101] Step S71, for each idle device in the second device set, obtain the second accumulated working time of the idle device, and determine whether the second accumulated working time is greater than the preset time, and if so, calculate the time difference according to the second accumulated working time and the preset time;

[0102] Step S72, generating maintenance reminder information according to the time difference.

[0103] In the above embodiment, in order to be able to perform maintenance on production equipment in a timely manner, during the production process of the product, for each idle device in the second equipment set, the second cumulative working time of the idle device is obtained, and it is determined whether the second cumulative working time is greater than the preset time. If the second cumulative working time is greater than the preset time, the time difference is calculated based on the second cumulative working time and the preset time, and maintenance reminder information is generated based on the time difference.

[0104] The embodiments of the present application also disclose an industrial Internet of Things system.

[0105] refer to Figure 2The industrial Internet of Things system includes a management platform, a sensor network platform and an object platform which are sequentially connected in communication. The object platform includes a target device group. The management platform is configured with:

[0106] The device set generation module is used to obtain the device information of each production device in the target device group, and generate a first device set and a second device set according to the device information; the first device set is a set representing working devices, and the second device set is a set representing idle devices;

[0107] A working rate judgment module is used to obtain the current working rate of the target device group and the input target working rate, and judge whether the target working rate is greater than the current working rate. If so, for each working device in the first device set, obtain the first accumulated working time of the working device, and determine the first optimal working rate of each working device according to the first accumulated working time;

[0108] A rate difference generating module, used for calculating the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and judging whether the target working rate does not exceed the maximum working rate, and if not, calculating the rate difference according to the target working rate and the maximum working rate;

[0109] The target idle device determination module is used to determine the target idle device from the second device set according to the rate difference, and send a work instruction to the target idle device to enable the target idle device to produce the product.

[0110] The overall framework of another application scenario of the industrial Internet of Things system of this application is as follows Figure 3 As shown, it may include a user platform, a service platform, a management platform, a sensor network platform and an object platform that interact in sequence, forming a five-platform architecture based on the industrial Internet of Things. Among them, the service platform is composed of a service master database, multiple service sub-platforms and multiple service sub-databases; the management platform includes a device set generation module, a working rate judgment module, a rate difference generation module and a target idle device determination module, and the management platform can interact with the sensor network platform and the service platform; the sensor network platform may include a sensor master database, multiple sensor sub-platforms and multiple sensor sub-databases, and the sensor network platform may interact with the object platform; the object platform may include a target device group.

[0111] Through the interaction between the various functional platforms of the industrial Internet of Things system based on the above three platforms or five platforms, a complete closed-loop information operation logic is established, ensuring the orderly operation of perception information and control information and realizing intelligent management of equipment.

[0112] The industrial Internet of Things system of the present invention can implement any one of the production equipment control methods based on the industrial Internet of Things, and the specific working process of the industrial Internet of Things system of the present invention can refer to the corresponding process in the above-mentioned production equipment control method based on the industrial Internet of Things.

[0113] The embodiment of the present application also discloses a computer device.

[0114] refer to Figure 4 A computer device includes a memory and a processor, wherein the memory stores a computer program that can be run on the processor, and when the processor executes the computer program, any of the above-mentioned production equipment control methods based on industrial Internet of Things is implemented.

[0115] The embodiment of the present application also discloses a computer-readable storage medium.

[0116] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute any one of the above-mentioned production equipment control methods based on industrial Internet of Things.

[0117] Among them, computer-readable storage media can be any tangible medium that contains or stores a program, which can be used by or in conjunction with an instruction execution system, apparatus or device; the program code contained on the computer-readable medium can be transmitted using any appropriate medium, including but not limited to wireless, wire, optical cable, RF, etc., or any suitable combination of the above.

[0118] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

Claims

1. A production equipment control method based on industrial Internet of Things, characterized in that: Applied to an industrial Internet of Things system, the industrial Internet of Things system includes a management platform, a sensor network platform and an object platform that are sequentially connected in communication, the object platform includes a target device group, and the method is executed by the management platform, including: Acquire device information of each production device in the target device group, and generate a first device set and a second device set according to the device information; the first device set is a set representing working devices, and the second device set is a set representing idle devices; Obtain the current working rate of the target device group and the input target working rate, and determine whether the target working rate is greater than the current working rate. If so, for each working device in the first device set, obtain the first accumulated working time of the working device, and determine the first optimal working rate of each working device according to the first accumulated working time; Calculate the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and determine whether the target working rate does not exceed the maximum working rate. If not, calculate the rate difference according to the target working rate and the maximum working rate; Determine a target idle device from the second device set according to the rate difference, and send a work instruction to the target idle device to enable the target idle device to produce the product; The step of determining the first optimal working rate of each working device according to the first accumulated working time includes: For each working device, determining the current aging stage of the working device according to the first accumulated working time and a preset first comparison table; the first comparison table includes a mapping relationship between the accumulated working time of the working device and the aging stage; Matching the current aging stage of the working device in a preset second comparison table to obtain a first optimal working rate of the working device; the second comparison table includes a mapping relationship between the aging stage and the optimal working rate; The step of determining a target idle device from the second device set according to the rate difference comprises: For each idle device in the second device set, obtaining a second accumulated working time of the idle device, and determining a current aging stage of the idle device according to the second accumulated working time and the preset first comparison table; Matching the current aging stage of the idle device in the preset second comparison table to obtain the second optimal working rate of the idle device; Determine the device priority of each idle device according to the second best working rate of each idle device and the rate difference; The idle device with the highest device priority is used as the target idle device.

2. The production equipment control method based on industrial Internet of Things according to claim 1 is characterized in that: The step of acquiring device information of each production device in the target device group and generating a first device set and a second device set according to the device information includes: Acquire device information of each production device in the target device group, wherein the device information includes current working parameters; Determine the equipment status of each production equipment according to the current working parameters; the equipment status includes working status and idle status; A first equipment set and a second equipment set are generated according to the equipment status of each production equipment.

3. The production equipment control method based on industrial Internet of Things according to claim 1 is characterized in that: After the step of calculating the maximum working rate corresponding to the first device set according to the optimal working rate of each working device, and judging whether the target working rate does not exceed the maximum working rate, the method further includes: If yes, then obtaining the current working rate of each of the working devices, and generating a working rate ratio according to the current working rate; Determining the adapted working rate of each working device according to the target working rate and the working rate ratio; The adapted working parameters of each working device are determined according to the adapted working rate, and parameter adjustment instructions are generated according to the adapted working parameters to adjust the current working parameters of the working device to the adapted working parameters.

4. The production equipment control method based on industrial Internet of Things according to claim 1 is characterized in that: The step of determining the device priority of each idle device according to the second optimal working rate of each idle device and the rate difference comprises: For each idle device in the second device set, determine whether the second best working rate of the idle device is greater than the rate difference, and if so, put the second best working rate of the idle device into the preset rate set; Arrange the values ​​in the preset rate set in ascending order to obtain an ascending rate set; The idle devices corresponding to the values ​​in the ascending rate set are assigned device priorities from high to low in sequence.

5. The production equipment control method based on industrial Internet of Things according to claim 1 is characterized in that: In the process of producing the product, the method further comprises: For each idle device in the second device set, obtaining the second accumulated working time of the idle device, and determining whether the second accumulated working time is greater than a preset time, and if so, calculating a time difference according to the second accumulated working time and the preset time; Maintenance reminder information is generated according to the time difference.

6. Industrial Internet of Things system, characterized by: The invention comprises a management platform, a sensor network platform and an object platform which are communicatively connected in sequence, wherein the object platform comprises a target device group, and the management platform is configured with: A device set generation module, used to obtain device information of each production device in the target device group, and generate a first device set and a second device set according to the device information; the first device set is a set representing working devices, and the second device set is a set representing idle devices; A working rate judgment module, used for obtaining the current working rate of the target device group and the input target working rate, and judging whether the target working rate is greater than the current working rate; if so, for each working device in the first device set, obtaining the first accumulated working time of the working device, and determining the first optimal working rate of each working device according to the first accumulated working time; a rate difference generating module, configured to calculate the maximum working rate corresponding to the first device set according to the first optimal working rate of each working device, and determine whether the target working rate does not exceed the maximum working rate; if not, calculate the rate difference according to the target working rate and the maximum working rate; a target idle device determining module, configured to determine a target idle device from the second device set according to the rate difference, and send a work instruction to the target idle device to enable the target idle device to produce a product; The step of determining the first optimal working rate of each working device according to the first accumulated working time includes: For each working device, determining the current aging stage of the working device according to the first accumulated working time and a preset first comparison table; the first comparison table includes a mapping relationship between the accumulated working time of the working device and the aging stage; Matching the current aging stage of the working device in a preset second comparison table to obtain a first optimal working rate of the working device; the second comparison table includes a mapping relationship between the aging stage and the optimal working rate; The step of determining a target idle device from the second device set according to the rate difference comprises: For each idle device in the second device set, obtaining a second accumulated working time of the idle device, and determining a current aging stage of the idle device according to the second accumulated working time and the preset first comparison table; Matching the current aging stage of the idle device in the preset second comparison table to obtain the second optimal working rate of the idle device; Determine the device priority of each idle device according to the second best working rate of each idle device and the rate difference; The idle device with the highest device priority is used as the target idle device.

7. A computer device, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the method according to any one of claims 1 to 5 when executing the computer program.

8. A computer-readable storage medium, characterized in that: A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 5.