A water resources data calculation and analysis method and system

By building a hierarchical structure and topological network in water resource data management, the problems of data clutter and siloed island phenomena are solved, efficient integration and sharing of water resource data are achieved, and management efficiency and decision-making speed are improved.

CN118761517BActive Publication Date: 2024-12-03BEIJING ELITEL INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411245643.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-03
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

Traditional water resource data management faces disordered data, difficulty in processing abnormal data, and lack of effective data integration and analysis tools, which leads to data silos and limits the efficiency and effectiveness of water resource management.

Method used

Using water resource data calculation and analysis methods, the data is converted into target data through configuration processing algorithms and optimization algorithms, and a hierarchical structure and topological network are built, and the solution process is customized according to data characteristics and client needs, and the target data is transmitted in real time to realize the data. efficient integration and sharing.

Benefits of technology

It improves the organization and manageability of data processing, optimizes the logic and efficiency of data flow, ensures the timeliness and targeted data, greatly improves the use value of data and customer operation efficiency, and supports rapid decision-making and response.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761517B_ABST
    Figure CN118761517B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of water resource data processing, and specifically discloses a water resource data calculation and analysis method and system, the steps of which include: configuring a processing algorithm for converting water resource data into target data required by a client, and an optimization algorithm for improving the accuracy of target data; using water resource data, optimization algorithm, processing algorithm and target data as features to sequentially construct hierarchies, and setting nodes in each hierarchy according to the types contained in the features, and using the associations between nodes at different hierarchies as links to construct a topological network; defining a solution process for obtaining target data required by the current client in the topological network; delivering target data to all clients in real time; and having the following advantages: eliminating device false alarms and improving data quality, realizing effective data integration through a hierarchical structure and a topological network, eliminating data island phenomena, supporting cross-system data sharing and analysis, and greatly improving the efficiency of water resource management and the accuracy of decision-making.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water resource data processing, and in particular to a method and system for calculating and analyzing water resource data. Background Art

[0002] Traditional water resource data management faces many problems, including data disorder, abnormal data reported by equipment is difficult to process and distinguish, and customers spend a lot of time and energy in processing this data. In addition, due to the lack of effective data integration and analysis tools, data often exist in isolated islands, making it difficult to achieve cross-system and cross-platform data sharing and analysis, which limits the efficiency and effectiveness of water resource management. The data reported by the equipment may include various noises and errors, such as errors caused by equipment aging, operating errors or external environmental factors. If these problems are not identified and corrected in time, they will directly affect the accuracy of decision-making.

[0003] Therefore, a water resources data calculation and analysis method and system are proposed to solve the above-mentioned problems. Summary of the invention

[0004] The present invention aims to provide a water resources data calculation and analysis method and system to solve or improve at least one of the above-mentioned technical problems.

[0005] In view of this, a first aspect of the present invention is to provide a method for calculating and analyzing water resource data.

[0006] A second aspect of the present invention is to provide a system.

[0007] The first aspect of the present invention provides a method for calculating and analyzing water resource data, comprising the following steps: configuring a processing algorithm for converting the water resource data into target data required by a client, and an optimization algorithm for improving the accuracy of the target data; using the water resource data, the optimization algorithm, the processing algorithm and the target data as features to sequentially construct a hierarchy, and setting nodes in each hierarchy according to the types contained in the features, and using the associations between the nodes at different hierarchies as links to construct a topological network; defining a solution process for obtaining the target data currently required by the client in the topological network according to the types of features corresponding to the water resource data and the types of features corresponding to the target data currently required by the client; binding each of the solution processes to the corresponding client, and delivering the target data to all the clients in real time.

[0008] In any of the above technical solutions, the type of the corresponding feature of the target data includes the type of the corresponding feature of the water resources data and at least one time scale, and the processing algorithm is also used to process the conversion of the target data at different time scales.

[0009] In any of the above technical solutions, the steps of defining a solution process for obtaining the target data currently required by the client in the topology network specifically include: using the water resources data as a judgment medium circulating on the link, and marking at least one probability value for obtaining the judgment medium on each node; using the node with the highest probability value in the same level as the selected node; when there is a selected node in the current level, all the nodes in the next level retain the probability value of obtaining the judgment medium from the selected node; traversing all the levels until each level has a selected node, and forming the solution process through links of all selected nodes and selected nodes between adjacent levels.

[0010] In any of the above technical solutions, the step of marking at least one probability value of obtaining the judgment medium on each of the nodes specifically includes: taking the level corresponding to the water resources data as the input layer of the topological network, and characterizing the type of the water resources data by the type of the feature; obtaining the accuracy of each of the nodes in the input layer converting the water resources data into the feature type corresponding to the current node; in the levels corresponding to the optimization algorithm, the processing algorithm and the target data, obtaining the influence of the node on each of the nodes in the previous adjacent level; and taking the influence and the accuracy as the probability values ​​respectively.

[0011] In any of the above technical solutions, the sum of the probability values ​​of all nodes in the same level selecting nodes in the previous adjacent level to obtain the judgment medium is equal to 1.

[0012] In any of the above technical solutions, each collection end for obtaining water resource data is respectively configured with a topological network, and the optimization algorithm determines whether each type of water resource data and the target data are qualified through the set multiple thresholds; when it is judged to be unqualified, it is marked in the historical database and the unqualified water resource data is blocked in the topological network.

[0013] In any of the above technical solutions, the water resource data is obtained through the collection end, and has the following situations: Situation 1, when the client needs more than one target data at the same time, the target data obtained by the same client with qualified water resources is converted to replace the target data obtained by the same unqualified water resources; Situation 2, when the collection end obtains more than one water resource data at the same time, the qualified water resource data obtained by the same collection end is converted to replace the unqualified water resource data.

[0014] In any of the above technical solutions, all time scales are sorted according to size, and the target data at the smallest time scale is used to generate target data at all other time scales through the processing algorithm; and there are also the following situations: Scenario three, when the same client requires more than one time scale, the unqualified target data is replaced by the conversion of qualified target data at other time scales of the same client.

[0015] In any of the above technical solutions, the solution process for obtaining a single target data includes a node in each of the levels and a link connecting the nodes between adjacent levels.

[0016] The second aspect of the present invention provides a system, including: a data input and processing module, used to collect the water resource data, and configure or select the processing algorithm and the optimization algorithm for processing the water resource data; a hierarchical structure and topological network module, used to construct the hierarchical structure according to the water resource data, the processing algorithm, the optimization algorithm and the type of the target data and related features; a solution process and optimization module, used to map the solution process of data processing in the topological network according to the water resource data and the target data required by the client; a client management and data output module, used to manage the configuration information of the client and process the binding of data and the client, so as to transmit the target data to the bound client in real time; a system monitoring and management module, used to monitor the operating status of the entire system, including data processing efficiency, error rate and resource utilization; and record the system's operation log for fault diagnosis and performance analysis.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] The present invention effectively organizes the data processing flow by sequentially constructing a hierarchical structure with water resource data, optimization algorithms, processing algorithms and target data as features. The nodes are configured in each level according to the characteristics of the data and algorithms. This structured approach makes the data flow clear and traceable, significantly improving the organization and manageability of data processing. Through a structured and hierarchical processing approach, data management becomes more efficient, easy to monitor and maintain, and reduces the time and effort of processing messy data.

[0019] The topological network is constructed by using nodes and links, which provides a clear path for the flow and processing of data. This topological structure not only optimizes the logic and efficiency of data flow, but also simplifies the management of complex relationships between data. In addition, according to the characteristics of the data and the needs of the client, the solution process is customized, and the processed data is transmitted to the client in real time. This strategy ensures the timeliness and pertinence of the data, greatly improving the use value of the data and the operational efficiency of the customer.

[0020] The real-time data transmission mechanism ensures that the client can quickly receive the required data, supporting rapid decision-making and response, especially in application scenarios with extremely high timeliness requirements. The flexible configuration of the topology network and solution process makes it easy to adapt to data processing needs of different scales and types, supporting expansion and functional upgrades.

[0021] Additional aspects and advantages of embodiments according to the present invention will become apparent in the following description or may be learned through practice of embodiments according to the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0023] Figure 1 is a flow chart of the method steps of the present invention;

[0024] Figure 2 A schematic diagram of a threshold setting interface for judging interception according to the present invention;

[0025] Figure 3 A schematic diagram of marking intercepted unqualified data in a historical database according to the present invention;

[0026] Figure 4 It is a curve diagram of the corresponding relationship between water level and quantity of the present invention;

[0027] Figure 5 It is a system logic block diagram of the present invention;

[0028] Figure 6 The figure is a schematic diagram of the structure of an electronic device of the present invention. DETAILED DESCRIPTION

[0029] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0030] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0031] See also Figure 1-Figure 6 , the following describes a water resources data calculation and analysis method and system according to some embodiments of the present invention.

[0032] The embodiment of the first aspect of the present invention provides a method for calculating and analyzing water resource data. In some embodiments of the present invention, Figure 1-Figure 4 As shown, the method includes:

[0033] S101, configuring a processing algorithm for converting water resource data into target data required by the client, and an optimization algorithm for improving the accuracy of the target data.

[0034] Here, the processing algorithm is used to convert the raw data collected from the water resources management system (such as water level, flow, accumulated water volume, etc.) into target data with the format and accuracy requirements specified by the client; the optimization algorithm is used to improve the accuracy and reliability of the target data before and after the conversion, reduce errors in the data conversion process, and provide more accurate water resources management decision support.

[0035] As can be seen from the above, the processing algorithm can extract the necessary raw data fields from the data source. These fields may include timestamps, site identifiers, water levels, flow rates, etc., convert the data from the original measurement units (such as meters, cubic meters / second) to the units required by the client (such as feet, gallons / minute), ensure that the data meets the client's usage standards, map the raw data fields to the corresponding fields in the client's database, including processing differences in field names and formats, perform necessary data aggregation operations according to client requirements, such as calculating the average water volume, maximum / minimum water levels, etc. within a specific time period, and format the processed data into JSON, XML or other formats supported by the client. To facilitate data transmission and integration; the optimization algorithm can identify possible measurement errors or errors in data transmission, and apply statistical methods or correction algorithms to correct them, use techniques such as sliding window averaging or exponential smoothing to reduce random fluctuations in data, improve data stability and predictability, and use time series analysis or machine learning technology to perform trend analysis and future forecasts on data, optimize the use of data in the decision-making process, establish and maintain a set of data quality control standards, regularly evaluate the accuracy of the data processing process to ensure that the client's accuracy requirements are continuously met, and establish a feedback mechanism that allows the client to provide feedback on data accuracy and quality in order to continuously adjust and optimize the algorithm.

[0036] Specifically, the processing algorithm can convert water resource data into target data in the following ways:

[0037] Only the accumulated water volume is used to calculate the hourly and daily water volume:

[0038] When the site has a flow meter and a water meter, it is necessary to calculate the hourly water volume and daily water volume. Input: the accumulated water volume of the flow monitoring table at the water withdrawal monitoring point; output: the daily water volume of the daily water volume information table at the water withdrawal monitoring point, and the hourly water volume of the water withdrawal hourly water volume table.

[0039] Hourly water volume calculation: Hourly water volume refers to the total amount of water passing through the test section of the measuring station within one hour. The specific calculation method is as follows:

[0040] Hourly water volume = the cumulative water volume closest to the whole hour - the cumulative water volume value (the cumulative water volume value of the previous data);

[0041] Among them, the example is: for the hourly water volume at 10 o'clock, take the cumulative water volume closest to the whole hour at 10 o'clock - the cumulative water volume closest to the whole hour at 9 o'clock. If there is no data between 9 o'clock and 10 o'clock, there is no hourly water volume at 10 o'clock. If the subtraction results in a negative value, set the water volume at 10 o'clock to 0.

[0042] Daily water volume calculation: The daily water volume represents the water volume of one day flowing through the metering instrument from 0:00 (excluding) to 24:00 on the same day. The specific calculation method is as follows:

[0043] Daily water volume value = the hourly water volume at 1 o'clock on the same day + the hourly water volume at 1 o'clock on the same day + `````` + the hourly water volume at 0:00 on the next day.

[0044] Only flow rate, calculate hourly water volume and daily water volume:

[0045] When there is a flow meter at the station and no water meter, it is necessary to calculate the hourly water volume and the daily water volume. Input: the intake and drainage flow rate of the flow rate monitoring table of the water intake monitoring point; Output: the cumulative water volume of the flow rate monitoring table of the water intake monitoring point, the daily water volume of the daily water volume information table of the water intake monitoring point, and the hourly water volume of the hourly water volume table of the water intake.

[0046] Hourly water volume calculation: The hourly water volume at the whole hour represents the total water volume passing through the measuring section of the station within one hour. The hourly water volume at the whole hour is calculated by multiplying the flow rate of this data by the time to deduce the water volume value of this time period, and adding up all the water volume values within this hour. The specific calculation method is as follows:

[0047] ① Whole-hour flow rate (m³) = sum(Qn)(0 < n <= 60) / n, the average value of the sum of all flow rates in this time period. For example, the whole-hour flow rate value at 10 o'clock takes the average value of the instantaneous flow rate sum from 9 o'clock to 10 o'clock;

[0048] ② Water volume of the time period (m³) = flow rate × time (s) (the time interval from the previous data). From ① and ②, it can be obtained that:

[0049] Hourly water volume at the whole hour = flow rate (Q1) × time (△t) + flow rate (Q2) × time (△t) + ··· flow rate (Qn) × time (△t);

[0050] Among them, the example is: The hourly water volume at 10 o'clock at the whole hour represents the sum of all water volume values between 9 o'clock and 10 o'clock.

[0051] Daily water volume calculation, the daily water volume represents the water volume of one day flowing through the metering instrument from 0:00 (excluding) to 24:00 on the same day. The specific calculation method is as follows:

[0052] Daily water volume value = hourly water volume at 1:00 on the current day + hourly water volume at 2:00 on the current day + ````` + hourly water volume at 0:00 on the next day.

[0053] Only water level, calculate flow rate, hourly water volume and daily water volume:

[0054] Input: water level in the water intake monitoring point water level monitoring information table, water intake monitoring point water level - flow relationship curve table; Output: intake and drainage flow rate in the water intake monitoring point flow rate monitoring table, daily water volume in the water intake monitoring point daily water volume information table, hourly water volume in the water intake hourly water volume table.

[0055] For flow rate calculation, the relationship curve of water intake water level - flow rate is attached Figure 5 As shown, by looking up the water intake monitoring point water level - flow relationship curve table, according to the measured water level value, find the corresponding flow rate value at the point on the water level - flow relationship curve. If the measured water level value is within the rate - determined value range but there is no corresponding point, directly round off to obtain the rate - determined measured value for flow rate calculation. If the measured water level value is less than the minimum water level - flow rate rate - determined value, calculate with the minimum rate - determined value. If the measured water level value is greater than the maximum water level - flow rate rate - determined value, calculate with the maximum rate - determined value.

[0056] For hourly water volume calculation, the hourly water volume at the whole hour represents the total water volume passing through the measuring section of the measuring station within one - hour period. The hourly volume at the whole hour is calculated by multiplying the flow rate of this data by the time to deduce the water volume value of this time period, and then summing up all the water volume values within this hour. The specific calculation method is as follows:

[0057] ① Hourly flow rate (m³) = sum(Qn)(0 < n <= 60) / n (the average value of the sum of all flow rates in this period. For example, the hourly flow rate value at 10:00 is the average value of the instantaneous flow rates from 9:00 to 10:00;

[0058] ② Water volume of the time period (m³) = flow rate × time (s) (the time interval from the previous data). From ① and ②, we can get:

[0059] Hourly water volume at the whole hour = flow rate (Q1) × time (△t) + flow rate (Q2) × time (△t) + ··· flow rate (Qn) × time (△t);

[0060] Among them, the example is: the hourly water volume at 10:00 represents the sum of all water volume values between 9:00 and 10:00.

[0061] For daily water volume calculation, the daily water volume represents the water volume flowing through the measuring instrument from 0:00 (excluding) to 24:00 on the current day. The specific calculation method is as follows:

[0062] Daily water volume value = hourly water volume at 1:00 on the current day + hourly water volume at 2:00 on the current day + ````` + hourly water volume at 0:00 on the next day.

[0063] S102, water resource data, optimization algorithm, processing algorithm and target data are used as features to construct hierarchies in sequence, and nodes are set in each hierarchy according to the types contained in the features. The types contained in the features exist independently of each other, so that different types of selections can be made in the same hierarchy, and the association relationships between nodes at different hierarchies are used as links to construct a topological network.

[0064] Here, the node types of the data source layer (water resource data) include: cumulative water volume node, which is used to measure and record the total water volume in a specific time period; water flow node, which is used to measure the speed and total flow of water flow, which is key to water resource management and analysis; water level node, which is used to monitor and record the water level height of water bodies, which is used for flood control and reservoir management.

[0065] The node types of the data processing algorithm layer include: time period water volume calculation node, which is used to receive the accumulated water volume, water flow or water level data and calculate the water volume within a specified time period. It can convert the flow or water level change into the accumulated or time period water volume; hourly water volume calculation node, which is used to calculate the hourly water volume from the accumulated water volume, water flow or water level data. Applicable to scenarios where water resource conditions need to be monitored, such as urban water supply systems; daily water volume calculation node, used to convert any form of water data (accumulated water volume, water flow, water level) into daily water volume statistics for daily water resource management and reporting; monthly water volume calculation node, used to process water volume data from different data sources, and provide monthly water volume totals, which is key to long-term water resource planning and consumption analysis; accumulated water volume calculation node, used to accumulate short-term data (such as hourly or daily water volume data) into long-term accumulated water volume, which is suitable for environmental monitoring and project evaluation; water flow calculation node, used to infer water flow from water level or accumulated water volume data, often used in areas without direct flow measurement equipment; water level calculation node, used to infer water level changes based on water flow or accumulated water volume data, which is key to flood warning and reservoir water level management.

[0066] The node types of the optimization algorithm layer include: error correction optimization nodes, which are used to correct systematic errors and random errors in data according to preset models and algorithms; data smoothing optimization nodes, which are used to apply various smoothing techniques (such as sliding average, exponential smoothing) to reduce random fluctuations and noise in data; prediction model optimization nodes, which are used to use statistical and machine learning models to perform trend analysis and future predictions on data; threshold judgment and screening nodes, which are used to screen and classify data according to multiple set thresholds, so as to further process the data in detail or directly alarm.

[0067] The node types of the target data layer include: time period water volume node, which is used to calculate and report the water volume in a specified time period, such as 15 minutes, 1 hour, etc.; hourly water volume node, which is used to report the water volume per hour, which is often used in daily operations and monitoring; daily water volume node, which is used to calculate and provide daily water volume summary, which is key to daily water resources management; monthly water volume node, which is used to summarize monthly water volume data for long-term water resources planning and management; cumulative water volume node, which is used to provide cumulative water volume data within a specific time period for project and environmental assessment; water flow node, which is used to display real-time or historical water flow data, which is key to engineering and safety monitoring; water level node, which is used to provide real-time and historical water level data for early warning systems and reservoir management.

[0068] As can be seen above, the design of the topological network allows the system to process and optimize data in a structured and hierarchical manner, enhancing the maintainability and scalability of the system. Through clear levels and links, the system can more flexibly respond to changes in data processing requirements and achieve more efficient data flow and information feedback. Such a design helps to process large and complex data and helps to improve the overall performance and response speed of the system.

[0069] In any of the above embodiments, the type of the feature corresponding to the target data includes the type of the feature corresponding to the water resources data and at least one time scale, and the processing algorithm is also used to process the conversion of the target data at different time scales.

[0070] In this embodiment, the main function of the target data layer is to generate data outputs related to specific water resource data features (such as water level, water flow, accumulated water volume, etc.), and each output will contain one or more time scales (such as hourly, daily, monthly, etc.). This allows the system to provide data of appropriate granularity for various purposes, thereby meeting the specific needs of different users.

[0071] First, the system will classify the water resources according to their characteristic types. Each type of data (such as water level, water flow, etc.) will be processed separately to ensure the accuracy and effectiveness of data processing; for each type of data, the system will apply different time scale processing methods. For example, if the data needs to be reported on a daily basis, the system will aggregate all data points within a day to calculate the daily average, maximum or sum. This processing depends on the required time scale, which can be hours, days, months or any other defined time period; after time scale processing, the data will be converted into the target format, such as tables, charts or other visualizations. This step usually includes data cleaning, standardization and formatting to ensure that the final output data is both accurate and easy to understand; the system design has the ability to dynamically adjust the time scale of the data based on user input or predetermined settings. For example, a user can choose to switch from daily reports to hourly reports in specific circumstances, and the system will automatically adjust the data processing process to adapt to this change; finally, after all necessary processing and conversion steps, the generated data will be output according to user requirements or system configuration. This may include sending to client devices, storing in databases, or providing data access through network interfaces.

[0072] Specifically, the data processing algorithm layer also has an extended function node. The core function of the data processing algorithm layer is to process and convert water resources data to meet the needs of the target data layer. The extended function places special emphasis on data conversion between different time scales in order to provide appropriate data formats and accuracy for different decision support and reporting needs. The main functions of the extended function node include:

[0073] Time scale aggregation converts short-term data (such as minute or hour data) into long-term data (such as daily, monthly or annual data); for example, calculating daily or monthly water volume from continuous hourly water volume data.

[0074] The time scale can be broken down and reversed, if necessary, to estimate approximate values ​​for shorter time scales from data on longer time scales; for example, deriving hourly water distribution from daily average water volume, which usually involves more complex statistical models and assumptions.

[0075] The time window can be adjusted dynamically to adjust the time window size according to actual application needs, such as adjusting from 15 minutes to 30 minutes for water volume statistics, or more precise adjustments; it can adapt to rapidly changing environmental conditions or monitoring needs.

[0076] It can be seen that using aggregation functions (such as sum, average, maximum, minimum) to merge short-term data records and generate long-term statistical data involves the processing of time series data to ensure time alignment and data integrity; when it is necessary to generate short-term data estimates from long-term data, interpolation methods or statistical models based on historical data are used to distribute estimates, involving mathematical models such as regression analysis, time series analysis or machine learning algorithms; implementing a dynamic data window management system that can dynamically adjust the size of the data window according to user configuration or system indicators. Such a system needs to be able to respond to external input changes in real time and adjust data processing strategies in a timely manner. In this way, the data processing algorithm layer is not just a static data conversion platform, but an advanced data processing engine that can dynamically adapt to different needs and conditions. The purpose of this design is to improve the flexibility and responsiveness of the system and ensure accurate and timely data output under various operating conditions.

[0077] S103, defining a solution process for obtaining the target data required by the current client in the topology network according to the type of the corresponding feature of the water resources data and the type of the corresponding feature of the target data required by the current client.

[0078] Here, a specific data processing flow is customized based on the client's needs. This includes determining the required data type (such as water flow, water level, accumulated water volume, etc.) and time scale (such as hourly, daily, monthly, etc.); selecting the optimal data processing path in the topological network to effectively convert the raw data into the target data required by the client. This involves selecting appropriate nodes and links to ensure the accuracy and efficiency of the data during the conversion process; each selected node performs specific tasks such as data aggregation, format conversion, time scale adjustment, etc. to adapt to the requirements of the target data.

[0079] As can be seen from the above, the data characteristics and time scale requirements of the client request are analyzed first. This step determines the type of data to be processed and the required output format; traverse the topological network to find the most efficient path that can be converted from the original data type to the target data type. This may involve multiple intermediate nodes, each of which performs a specific conversion or processing on the data; dynamically configure the data processing nodes according to the current data status and client needs. For example, if the client requires more frequent data updates, the system may adjust the data aggregation node to process the data more frequently; once the optimal path and node configuration are determined, the system executes the solution process. This includes the extraction, conversion, aggregation and final formatting of the data. Throughout the process, the system monitors the data quality and processing speed to ensure that performance and accuracy standards are met; after processing is completed, the system generates the data format required by the client, which can be direct numerical output, reports or graphical visualizations. The output can also be configured to be automatically sent to the client's system or stored in a database for subsequent access.

[0080] Specifically, the steps of the solution process for obtaining the target data required by the current client are defined in TopNet, including:

[0081] The water resource data is used as a judgment medium circulating on the link, and at least one probability value of obtaining the judgment medium is marked on each node.

[0082] The node with the highest probability value in the same level is selected as the node.

[0083] When there is a selected node in the current level, all nodes in the next level retain the probability value of obtaining the judgment medium from the selected node.

[0084] All levels are traversed until each level has a selected node, and the solution process consists of all selected nodes and links between selected nodes in adjacent levels.

[0085] In view of the above specific description, the role of water resources data in the system goes beyond simply being processed data. It is also used as a medium to evaluate the efficiency and applicability of each processing node. The quality, type, timeliness and other characteristics of the data itself affect the processing probability value of the node; each node is assigned one or more probability values ​​based on its historical efficiency in processing data, resource allocation, response time and other factors. These probability values ​​reflect the suitability and priority of the node when processing a specific type or batch of data. At each level, the most suitable node is selected to process the data based on the probability value of each node. This selection is based on multiple factors such as node performance, compatibility, and resource efficiency. Such a selection mechanism ensures that the data is processed by the best nodes at each level, thereby improving the processing efficiency and data quality of the entire network; selecting the node with the highest probability value also means that the system can dynamically respond to changes in node performance. The probability value of the node is adjusted based on real-time feedback, reflecting the current processing capacity and status of the node. After determining the selected node at the current level, the probability value of the node is used as a benchmark and passed to all nodes in the next level. This ensures that all nodes at the next level can refer to the performance standards of the best nodes at the previous level when processing data; this probability value retention and transmission mechanism provides clear guidance for the flow of data in the network, helping the system maintain the efficiency and consistency of the processing flow. The system checks the nodes at each level layer by layer, calculates or updates the probability value of each node, and selects the best node (the node with the highest probability value) at each level; once the selected nodes at each level are determined, the system connects these nodes through the links between them to form a complete processing flow from data input to output; by selecting the best nodes at each layer, the solution process ensures that the data is converted and transmitted along the most efficient path throughout the processing process.

[0086] It can be seen that when water resource data flows into the network, each node calculates a probability value according to the preset evaluation criteria. This probability value can be based on multiple parameters, such as the processing capacity of the node, data type compatibility, previous processing success rate, etc. This probability value determines the role and importance of the node in the current processing process; nodes with high probability values ​​are considered more suitable for processing current data. Therefore, data is more likely to be sent to these nodes with high probability values ​​for further processing. The probability value can be adjusted dynamically to respond to changes in the real-time performance of the node or changes in the data flow in the network; the system dynamically determines the flow direction of data based on the probability value of the node. Data flows from nodes with high probability to nodes with low probability, or adjusts the flow direction according to network conditions and needs. This probability-based flow control can optimize the processing efficiency and response speed of the entire network; the results of node processing data can be used to adjust its probability value. For example, if a node successfully processes multiple batches of data in succession, its probability value may increase; otherwise, it may decrease. This feedback mechanism ensures that the network self-optimizes and adapts to changing data characteristics and processing requirements.

[0087] In each data processing cycle, the system calculates or updates the probability value of each node. These values ​​are based on the node's performance data, processing history, and success rate associated with a specific type of data. The probability value reflects the adaptability and efficiency of the node in processing specific data under current conditions; the system compares the probability values ​​of all nodes within each level. This comparison may involve simple numerical comparisons or more complex algorithms, which perform comprehensive scoring based on different parameters and weights, and select the node with the highest probability value as the selected node of the level to receive and process data from the previous level or for further data transmission; once the node is selected, the data will be routed to this node. This decision is based on the system's evaluation of the node's performance and the judgment of the node's compatibility with the data. By sending data to the best-performing node, the system optimizes the use of resources, reduces processing delays and potential error rates; after the selected node processes the data, its performance will be fed back to the system, affecting the future probability value of the node. For example, if the node successfully processes the data, its probability value may increase; if the processing fails or is inefficient, its probability value may decrease. This feedback mechanism ensures the self-optimization of the system and can continuously adjust and improve the data processing strategy.

[0088] When a node is selected in its hierarchy, its probability value is regarded as a benchmark for efficiency. This baseline probability value is passed to all nodes in the next level as a component of their initial probability value. This is not just a simple copy of the probability value, but using this value as one of the factors affecting the initial probability state of the nodes in the next level; although the nodes in the next level inherit the probability values ​​of the selected nodes in the previous level, they will also dynamically adjust according to their own performance and the actual situation of processing data. This means that the inherited probability value provides a starting point, and the actual operating performance will further adjust this probability; the system decides how to route data between nodes based on the comprehensive probability value of the nodes. If the comprehensive probability value of a node is higher than that of other nodes, the data is more likely to be routed to this node for processing. This probability-based routing decision supports the system to optimize resource usage, improve processing efficiency and data quality; once the data is processed, the performance of the relevant nodes will be fed back to the system, which may affect the future probability values ​​of the node and its associated nodes. This feedback loop ensures that the system can adjust adaptively and optimize the overall data processing process.

[0089] During the traversal process, the system continuously evaluates and updates the probability values ​​of the nodes. These values ​​are based on the real-time performance, processing capabilities, and success rate of the nodes in the previous data processing. The evaluation includes data quality checks, processing speed assessments, and compatibility tests with specific data types. The node with the highest probability value in each level is selected as the representative node of that level. This selection process is iterative and may be updated each time data flows through the network. The links between the selected nodes are determined based on the location and hierarchical relationship of the nodes. These links ensure that data can flow smoothly from one node to the next, and finally reach the target format and specifications. Once the selected nodes and links of all levels are determined, a solution process is formed. This process is used to guide the actual data processing operations. Each batch of data is processed according to this process. Once the process is established, it can be used for subsequent data processing tasks until the system updates the node selection again or optimizes the process. The effect and efficiency of the solution process will be monitored and evaluated. Based on feedback, the system may adjust the probability value of the node, or reselect nodes and remap links when necessary to further optimize data processing efficiency.

[0090] Specifically, the steps of obtaining at least one probability value of determining the medium are marked on each node, including:

[0091] The level corresponding to the water resources data is used as the input layer of the topological network, and the types of water resources data are represented by the types of features.

[0092] Obtain the accuracy of each node in the input layer converted from water resources data to the feature type corresponding to the current node.

[0093] In the level corresponding to the optimization algorithm, the processing algorithm, and the target data, the influence of the node on each node in the previous adjacent level is obtained.

[0094] The influence and accuracy are taken as probability values ​​respectively.

[0095] In view of the above specific description, the input layer is the first point of contact for data input in the topological network. All water resource data are first input to this layer. At the input layer, the data are preliminarily classified based on their physical or chemical characteristics, such as flow, water level, temperature, pH value, cumulative water volume, etc.; each water resource data is characterized by its feature type. Feature types may include the measurement accuracy, update frequency, importance or any other key attributes of the data. These features help define the processing priority and routing path of the data, as well as the processing method in the network. At the input layer, each node is responsible for converting the received water resource data into the feature type (such as water level, flow, etc.) that the node specifically processes, and calculating the accuracy of this conversion. Accuracy reflects the ability of the node to process data, including accuracy and reliability, and is a key indicator for measuring the quality of data processing; each node converts the raw data into a more informative format or calculation result based on its design and function, for example, converting the raw water level data into flow estimation or cumulative consumption. The conversion process involves data cleaning, correction and analysis to improve the application value of the data. At the optimization algorithm, processing algorithm and target data level, the system needs to evaluate how each node affects the data processing effect and efficiency of each node in the previous level, including but not limited to the improvement of data processing speed, improvement of data quality, reduction of processing error rate, etc.; determine how the nodes interact with each other, for example, how the output of a node becomes the effectiveness and efficiency of the input of another node. This relationship helps the system optimize the data flow and ensure that the data is transmitted and converted in the most efficient way. The impact of a node on the processing effect of its subsequent nodes is quantified as a probability value, which reflects the degree of positive contribution of the node to the subsequent data processing. The accuracy and reliability of the node in processing data are quantified as a probability value, which indicates the quality and credibility of the output data of the node; the system uses these probability values ​​to guide the routing decisions of the data flow, giving priority to those nodes with high influence and high precision. The probability value is also used to dynamically adjust the resource allocation of nodes. For example, more computing resources may be allocated to nodes with high probability values.

[0096] It can be seen that when data enters the system, the input layer first receives and classifies it. According to the physical or chemical properties of the data, the system assigns it to the corresponding category. The classification is based on the characteristic type of the data, which defines the basic processing requirements and paths of the data; the system analyzes the characteristics of each type of data and determines how to process the data to maximize its value and application. For example, water level data that is updated frequently may require real-time analysis, while historical accumulated water volume data may be used for long-term trend analysis. Feature analysis helps the system decide how the data flows to the next processing node in the network; based on the characteristics and classification of the data, the processing logic of the input layer determines which subsequent nodes the data should be sent to for further processing. This routing decision is based on the priority of the data, the processing requirements, and the current load of the network to ensure that the data is processed in the most efficient way; the input layer also receives feedback from other parts of the network to adjust the data processing and classification strategy. This feedback mechanism allows the system to continuously optimize its processing and application of data, improving overall performance and response speed.

[0097] When water resource data arrives at the input layer, each node first performs preliminary processing on the data, including verification, cleaning and preliminary analysis. This step is to ensure data quality and provide clean and reliable input for subsequent accuracy calculation and data conversion. The node converts the data into a specific feature type according to its function, such as converting time series water level data into flow trend analysis. During the conversion process, the node will evaluate the accuracy of its conversion, including the accuracy of data conversion and the fidelity of data during processing. This may involve statistical analysis, comparison of historical data or model prediction results; after the conversion accuracy is calculated, this information will be fed back to the system as a reference for evaluating the future processing of similar data by the node. High-precision nodes may get more similar data processing tasks, while low-precision nodes may trigger the need for adjustment or optimization; the system dynamically adjusts the data flow and processing strategy according to the accuracy performance of the node. For example, if a node shows high accuracy when processing a specific type of data, the system may route more data of the same type to the node. At the same time, the system will monitor the performance of the overall network to ensure the optimization of data processing and the reasonable allocation of resources.

[0098] When data is passed from one node to the next level of nodes, the receiving node evaluates the impact based on the quality of the input data and related processing indicators. This evaluation is based on predetermined performance indicators, such as data accuracy, processing time and resource consumption. Statistical methods and / or machine learning algorithms are used to analyze the data transmission and processing effects between nodes to quantify the impact. For example, regression analysis is used to determine how changes in the output of one node affect the performance of the next node. This analysis helps the system learn and predict the most effective data processing strategy between nodes. Based on the impact evaluation, the system can dynamically adjust the data flow and processing strategy between nodes. Nodes with high impact may receive more data traffic or influence system decisions, such as increasing resource allocation. This adjustment is to maximize the efficiency and output quality of the entire system. The system uses impact data to support higher-level decision-making, such as how to optimize the configuration of the entire network, which nodes need to be upgraded or optimized, etc. This decision support ensures that the system continues to improve and adapt to changing data processing needs and technological developments.

[0099] The influence and accuracy of each node are derived through a series of evaluations and tests. These evaluations may be based on historical data, real-time monitoring results, and predetermined performance benchmarks. The influence may be calculated by evaluating the degree to which the node improves the performance of downstream nodes, for example, how a node helps reduce error rates or improves data processing speed. Accuracy is evaluated by comparing the deviation of node output data from known standards or expected results. The system uses the calculated probability values ​​to determine how data should flow from one node to another. Data tends to flow to nodes with higher probability values, which can ensure the quality and efficiency of data processing. For example, if a node shows high accuracy and influence when processing a specific type of data, the system will be more likely to route the relevant data to this node. Based on the probability value of the node, the system can adjust the resource allocation to the node. Nodes with high probability values ​​may obtain more processing power, memory, or other resources to support their efficient data processing. This dynamic resource allocation helps the system optimize its overall performance and ensure that key tasks and data are properly processed. Probability values ​​are not fixed, they will be dynamically adjusted according to the actual performance of the node. The system continuously monitors the performance of nodes and updates probability values ​​based on new performance data. This adaptive adjustment mechanism ensures that the system can respond to changes in the internal and external environment and continuously optimize data processing paths and resource allocation.

[0100] S104, binding each solution process with the corresponding client, and delivering target data to all clients in real time.

[0101] Here, a dedicated solution process is designed according to the specific needs and specifications of each customer. This process ensures that all processing steps meet the customer's data requirements and business logic. The binding process allows each customer to receive data specifically customized for them to meet their unique business or operational needs; the system is configured to deliver processed target data to the client in real time. This ensures that customers can obtain the latest data for monitoring, decision support or other real-time applications.

[0102] As can be seen from the above, the corresponding data processing process is designed according to the demand parameters provided by the customer. This includes selecting appropriate processing nodes, setting specific data processing algorithms, and adjusting the path of data flow. This design process requires a detailed understanding of the customer's business background, data utilization methods, and the data quality they expect to achieve; the solution process of each client is determined by a series of configurations and rules within the system to ensure that the data can flow along a specific path. These paths are determined based on the optimization of efficiency and data processing quality. Binding a specific process to each customer means that the system can maintain a high degree of flexibility and responsiveness, and can be adjusted quickly even when customer needs change; the real-time data transmission mechanism ensures that the data is sent to the client once it is processed. This may involve the use of real-time data transmission technologies such as WebSocket, long polling, or server push (Server-SentEvents). The system monitors the completion of data processing and ensures that the data is sent on time without delay; the system constantly monitors the efficiency and punctuality of data transmission to ensure that all clients can receive data within the scheduled time. For any delays or data quality issues found, the system automatically adjusts the process to optimize data processing and transmission paths.

[0103] The present invention provides a water resource data calculation and analysis method, which can automatically identify and shield abnormal data caused by equipment failure or external interference by configuring an optimization algorithm. If these abnormal data are not processed, it may lead to inaccurate water volume calculation and affect the final decision; the optimization algorithm analyzes the statistical characteristics of the data, such as mutation point detection, outlier detection algorithm (such as Z-score, Grubbs' Test, etc.) to identify anomalies in the data. Once an anomaly is detected, the data will be marked and excluded from subsequent calculations or corrected with a prediction model.

[0104] By hierarchizing water resource data with processing algorithms and optimization algorithms, different calculation strategies can be adopted for different types of data. For example, the accumulated water volume data can be directly used to calculate the hourly water volume, while the water level data can be converted into flow data through the water level-flow relationship model. The corresponding processing algorithm is automatically selected according to the characteristics of the data type. For example, the flow calculation may use a continuous equation, while the accumulated water volume is directly summed. This method ensures the accuracy and adaptability of processing different types of data.

[0105] Not only does it process and optimize the input data, but it also formats the output data according to industry standards so that it can be directly used by other systems or modules. The target data layer converts the processed data into a standard format (such as XML, JSON, etc.) and provides it to other systems through data push, API calls or data subscriptions. This ensures the ease of use and interoperability of the data and supports seamless data exchange between systems.

[0106] In summary, the whole process from data collection, processing to output is automated, which improves the accuracy and efficiency of data processing, while reducing the need for manual operations and the error rate. In addition, the flexibility and scalability of the system design also ensure that it can adapt to water resource management and analysis needs of all sizes.

[0107] In any of the above embodiments, the sum of the probability values ​​of all nodes in the same level selecting nodes in the previous adjacent level to obtain the judgment medium is equal to 1.

[0108] In this embodiment, in each level, the total probability value of all nodes obtaining the judgment medium must be equal to 1. This ensures that the data transmission from one level to the next level is completely covered and mutually exclusive in probability, avoiding excessive concentration or dilution of probability; through normalization processing, each node has a fair chance to receive data from the previous level. This avoids some nodes being overly favored or ignored due to improper probability setting.

[0109] When a node in a layer is selected as the source node for data transmission, it passes the data to all nodes in the next layer. The probability of each lower node receiving data is assigned by the upper node according to specific rules or performance indicators. For example, if there are three nodes in a layer, the upper node may give different initial probabilities based on the processing capacity or historical performance of these nodes; after the initial probability is assigned, the system will perform normalization to ensure that the sum of these probability values ​​is 1. This step usually involves simple mathematical adjustments, such as dividing each probability value by their sum. This adjustment ensures the statistical legitimacy of the probability and ensures that the data can be evenly distributed to each node in theory according to the proportion of its probability value; according to the adjusted probability value, the data flows from the selected nodes of the previous layer to the nodes of the next layer. This flow is random, but guided by the probability value. Nodes with high probability are more likely to receive more data. This method makes data distribution both random and orderly, taking into account efficiency and fairness; the system continuously monitors data flow and node performance, and may adjust the probability value according to actual conditions. For example, if a node performs beyond expectations, its probability value may be increased. This dynamic adjustment is based on performance feedback and enables the system to adapt to changing operating environments and data characteristics.

[0110] In any of the above embodiments, each collection end for acquiring water resource data is respectively configured with a topological network, and the optimization algorithm determines whether each type of water resource data and target data is qualified through a plurality of set thresholds;

[0111] When judged as unqualified, it will be marked in the historical database and the unqualified water resource data will be blocked in the Top Network.

[0112] In this embodiment, each acquisition terminal is equipped with a topological network, which enables the preliminary processing, evaluation and transmission of data to be carried out independently close to the data source, reducing delays and losses during data transmission; multiple thresholds are set for each type of water resource data and target data, which are used to evaluate whether the data meets the predetermined quality standards. The thresholds can be based on various parameters, such as accuracy, completeness, timeliness, etc.; when the data does not meet the set quality standards, the optimization algorithm will automatically mark it as unqualified and shield the data in the topological network to prevent it from being further processed or analyzed.

[0113] The data is first received and preliminarily processed in the respective topological networks. This stage may include data cleaning, formatting and preliminary quality assessment; the optimization algorithm evaluates various indicators of the data according to preset thresholds. These thresholds reflect the minimum standards that the data needs to meet to ensure the availability and reliability of the data. Threshold judgments may involve complex logic. For example, not only checking a single value, but also advanced functions such as trend analysis and pattern recognition may be involved; when data is judged to be non-compliant with quality standards, the system will mark it in the historical database, which not only helps track the problem data source, but also provides a reference for future data quality improvements. At the same time, the data will be blocked in the topological network to prevent it from flowing to other parts of the system, thereby avoiding misleading analysis results or wrong business decisions; the system continuously monitors data quality and processing effects, and adjusts thresholds and processing logic based on feedback. This dynamic adjustment mechanism ensures that the system is continuously optimized as the environment changes and technology advances.

[0114] In any of the above embodiments, water resource data is obtained through a collection terminal, and the following conditions are met:

[0115] Scenario 1: When the client needs more than one target data at the same time, the target data obtained by the qualified water resource number of the same client is converted to replace the target data obtained by the unqualified water resource number.

[0116] In the second situation, when the collection end obtains more than one water resource data at the same time, the qualified water resource data obtained through the same collection end is converted to replace the unqualified water resource data.

[0117] In this embodiment, in the proposed water resource data processing system, the strategy for handling multiple target data requests is particularly important, especially when these requests come from the same client and involve both qualified and unqualified water resource data. The system must be able to flexibly adjust to ensure that even if some data sources are unqualified, the client can still receive all the required target data. The following are the coping strategies for different situations:

[0118] For scenario 1, when the client requests multiple target data, the quality of each data source is checked first. If some data sources are unqualified, other qualified data sources in the same client will be tried to replace them to complete the conversion of the target data; qualified water resources data will be used first to generate target data. When qualified data is sufficient to cover the client's needs, unqualified data will not be used; if qualified data is not enough to meet the needs of all target data, a specific algorithm will be used to try to extract possible valid information from unqualified data, or replace this part of data as much as possible through historical data, model prediction, etc.

[0119] After the data is acquired through the collection end, it is first subject to a quality review and classified as qualified or unqualified according to the set standards. This step usually involves an automated detection system, such as using a machine learning model to evaluate possible errors or missing data; real-time monitoring of the client's data needs and the quality status of each data source. When a data source is detected to be unqualified, the system automatically searches for other qualified data sources within the same client to find out whether it can replace the unqualified part. If a suitable qualified data source is found, the system will perform data conversion to ensure that the generation of target data is not affected; when qualified data is not enough to completely replace unqualified data, the system may use data fusion technology, combined with historical data, statistical models or prediction algorithms, to try to generate missing target data. This method relies on advanced data processing technologies, such as time series analysis, regression models or neural network predictions, to fill in data gaps; once the target data is generated, the system will deliver it to the client in real time. At the same time, the system will also collect feedback from the client on data quality and services to optimize future data processing and replacement strategies.

[0120] For the second scenario, when a collection terminal simultaneously obtains multiple water resource data, the system first performs a quality check on each data source to determine whether they meet the preset standards; for unqualified data, the system will try to use other qualified data obtained from the same collection terminal to replace it. This replacement strategy can effectively utilize the available qualified data to ensure the quality and consistency of data output.

[0121] Once the data is acquired by the acquisition end, the system immediately conducts a real-time review. This includes checking the completeness, accuracy, and timeliness of the data, using automated tools and algorithms (e.g., outlier detection, data consistency check, etc.) to identify which data is qualified and which is unqualified; after identifying unqualified data, the system evaluates whether other data sources acquired by the same acquisition end can be used as substitutes. This includes analyzing the correlation and compatibility between data, ensuring that the replacement data matches the original data in content and context. If there is suitable qualified data, the system will perform data replacement operations to replace the unqualified data with qualified data; the replaced data may need to undergo specific conversion or adjustment to adapt to the application scenario of the original data. This may involve unit conversion, time window adjustment, or other necessary data processing steps. The system will ensure that the data maintains its validity and consistency during the conversion process; the replaced and converted data will be output to the next processing stage or directly provided to the client. The system also monitors the data processing process and output quality, and collects feedback for optimizing future data processing strategies.

[0122] In any of the above embodiments, all time scales are sorted according to size, and the target data at the smallest time scale is processed by an algorithm to generate target data at all other time scales; and the following situations are also present:

[0123] Scenario three: When the same client requires more than one time scale, the unqualified target data is replaced by the qualified target data conversion at other time scales of the same client.

[0124] In this embodiment, all available time scales are first sorted from the smallest to the largest. Such sorting helps to clarify the starting point and direction of data processing, ensuring that data is gradually expanded from the most basic units to larger units; the data of the smallest time scale is usually the most detailed and frequently updated data. Use these data as a basis to generate target data of other time scales, such as generating hourly, daily or even monthly data from minute-level data. Use data aggregation methods to generate data of larger time scales from data of the smallest time scale. For example, if the smallest time scale is one piece of data per minute, 60 pieces of data in one hour can be summed, averaged or other statistical methods to generate one piece of hourly data. Aggregation can be based on different mathematical models, such as simple arithmetic operations, weighted averages or more complex statistical models, depending on the needs of the target data; define a time window for each larger time scale, and use these windows to summarize or calculate data from the smallest time scale. These windows ensure the consistency and accuracy of the data during the conversion process, and possible data missing or outliers need to be processed to ensure the quality of the generated data; once the data conversion rules from the smallest time scale to other time scales are established, these rules can be automatically applied to process real-time incoming data or regularly updated data sets. This automated processing supports large-scale data operations, reduces the need for manual intervention, and improves processing efficiency; the quality of the generated data and processing efficiency will be monitored, and the processing algorithm or parameters will be adjusted based on feedback. This may include adjusting the size of the time window, modifying the aggregation method, or optimizing the data processing process.

[0125] For scenario three, manage the target data of multiple time scales requested by the same client to ensure that the data at each time scale meets the quality standards; when the target data at a certain time scale is judged to be unqualified, the system automatically searches for qualified data at other time scales of the same client for replacement; the replacement operation involves converting the qualified data from its original time scale to the required time scale of the unqualified data to ensure the consistency of the data in content and format.

[0126] First, the data quality of each time scale is evaluated, including checking the data integrity, accuracy and timeliness, and using automated quality detection tools such as outlier detection and integrity inspection to ensure that the data meets the preset standards; once the data of a certain time scale is identified as unqualified, the system immediately marks the data and triggers the replacement mechanism; the system checks the databases of other time scales of the same client to find qualified data that can be used as replacements. This search takes into account the relevance and compatibility of the data to ensure that the replacement data is equivalent to the original data in analysis and application; after selecting qualified replacement data, the system performs necessary conversion processing to adapt the data to the time scale of the original unqualified data. For example, if the data to be replaced is the daily data and the available qualified data is the hourly data, the system may need to aggregate the hourly data to generate the daily data. This conversion ensures the adaptability and functionality of the data in the time scale; after the replacement is completed, the updated data is delivered to the client and its performance is monitored. The system collects feedback to evaluate the effectiveness of the replacement strategy and make necessary adjustments.

[0127] In any of the above embodiments, the solution process for obtaining single target data includes a node in each level and a link connecting nodes between adjacent levels.

[0128] In this embodiment, an independent solution process is configured for each target data. The process consists of a selected node sequence. A most suitable node is selected at each level and connected through a precisely designed link sequence. Each selected node is optimized for its specific function in the process, such as data cleaning, formatting, calculation or aggregation, to ensure that the processing of the target data meets the preset quality standards.

[0129] The most suitable node in each level is selected based on the performance indicators of each node (such as processing speed, data quality, and historical performance). This selection is made through pre-defined rules or dynamic calculations, such as predicting the best match for the node through a machine learning algorithm. After selecting the node, the system builds links between the nodes, which define how data is transmitted from one node to the next. The link design takes into account the efficiency and security of data transmission, ensuring the integrity and confidentiality of data during the transmission process; the data is processed in sequence according to the set nodes and links in the solution process. From the initial data input, after a series of transformations and calculations, the target data that meets customer needs is finally generated; the performance of each solution process is continuously monitored, such as processing time, error rate, and the quality of output data. Based on this information, the system may dynamically adjust the node selection or link configuration to improve processing efficiency or data quality; the client or system operator can provide feedback on the target data, which is used to further optimize the solution process. For example, if the accuracy of the target data does not meet expectations, the system may adjust the configuration or algorithm of the nodes involved in the calculation or aggregation.

[0130] The embodiment of the second aspect of the present invention provides a system 2. In some embodiments of the present invention, such as Figure 5 As shown, the system 2 includes:

[0131] The data input and processing module 201 is used to collect water resource data, and configure or select processing algorithms and optimization algorithms for processing water resource data.

[0132] The hierarchical structure and topological network module 202 is used to construct a hierarchical structure according to the types of water resource data, processing algorithms, optimization algorithms, target data and related features.

[0133] The solution process and optimization module 203 is used to map the solution process of data processing in the topological network according to the water resource data and the target data required by the client.

[0134] The client management and data output module 204 is used to manage the configuration information of the client and process the binding of data and the client to transmit the target data to the bound client in real time.

[0135] The system monitoring and management module 205 is used to monitor the operating status of the entire system, including data processing efficiency, error rate and resource utilization; and record the system operation log for fault diagnosis and performance analysis.

[0136] The present invention provides a system that effectively collects and preliminarily processes water resource data through a data input and processing module, and uses advanced processing and optimization algorithms to ensure the quality and accuracy of the data before entering the analysis process. This preprocessing enhances the usability of the data and lays a solid foundation for subsequent in-depth analysis.

[0137] The hierarchical structure and topological network module enables the system to build a clear hierarchical structure based on the specific characteristics of data and algorithms. This not only helps the orderly processing of data, but also improves the system's ability to manage complex data flows, making data processing more systematic and controllable.

[0138] The solution process and optimization module maps the optimal solution process for data processing in the topological network according to actual needs. This customized process design ensures that data can be processed and converted in the most effective way, greatly improving processing efficiency and data quality.

[0139] The client management and data output module not only manages the client configuration, but also ensures that the target data can be transmitted to the bound client in real time and accurately. This is crucial for application scenarios that require instant data support (such as real-time monitoring systems), ensuring the timeliness of data and the response speed of applications.

[0140] The system monitoring and management module comprehensively monitors the operating status of the system, including key indicators such as data processing efficiency, error rate, and resource utilization. By recording operation logs and supporting fault diagnosis and performance analysis, this module helps the system operation and maintenance team respond to problems quickly and ensure the long-term stable operation of the system.

[0141] Embodiments of the third aspect of the present invention provide electronic devices. In some embodiments of the present invention, such as Figure 6 As shown, an electronic device is provided, which includes: electronic devices such as desktop computers, notebooks, handheld computers, and cloud servers. The electronic device 3 may include but is not limited to a processor 301 and a memory 302. Those skilled in the art will understand that Figure 6 The electronic device 3 is merely an example and does not limit the electronic device 3 , and may include more or less components than those shown in the figure, or different components.

[0142] The processor 301 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0143] The memory 302 may be an internal storage unit of the electronic device 3, for example, a hard disk or memory of the electronic device 3. The memory 302 may also be an external storage device of the electronic device 3, for example, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 3. The memory 302 may also include both an internal storage unit of the electronic device 3 and an external storage device. The memory 302 is used to store computer programs and other programs and data required by the electronic device.

[0144] The embodiment of the fourth aspect of the present invention proposes a computer-readable storage medium. In some embodiments of the present invention, a computer-readable storage medium is provided, and when the computer-readable storage medium is executed by the processor 301, the steps of the above method are implemented. Therefore, the computer-readable storage medium provided by the third aspect of the present invention has all the technical effects of the above steps, which will not be repeated here.

[0145] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0146] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this disclosure.

[0147] In the embodiments provided in the present disclosure, it should be understood that the disclosed devices / electronic devices and methods can be implemented in other ways. For example, the device / electronic device embodiments described above are merely schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. Multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed may be through some interfaces, indirect coupling or communication connection of devices or units, which may be electrical, mechanical or other forms.

[0148] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present disclosure implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. The computer program may include computer program code, and the computer program code may be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable medium does not include electric carrier signals and telecommunication signals.

[0149] The above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them. Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present disclosure, and should all be included in the protection scope of the present disclosure.

Claims

1. A water resources data calculation and analysis method, characterized in that: The steps include: A processing algorithm for converting the water resource data into target data required by the client and an optimization algorithm for improving the accuracy of the target data are configured; The water resource data, the optimization algorithm, the processing algorithm and the target data are used as features to sequentially construct a hierarchy, and nodes are set in each hierarchy according to the types contained in the features, and the association relationship between the nodes in different hierarchies is used as a link to construct a topological network; the type of the feature corresponding to the target data includes at least one time scale and the type contained in the feature corresponding to the water resource data, and the processing algorithm is also used to process the conversion of the target data at different time scales; wherein the nodes of the water resource data include a first cumulative water volume node, a first water flow node and a first water level node; the nodes of the processing algorithm include a time period water volume calculation node, an hourly water volume calculation node, a daily water volume calculation node, a monthly water volume calculation node, a cumulative water volume calculation node, a water flow calculation node and a water level calculation node; the nodes of the optimization algorithm include: an error correction optimization node, a data smoothing optimization node, a prediction model optimization node and a threshold judgment screening node; the nodes of the target data include a time period water volume node, an hourly water volume node, a daily water volume node, a monthly water volume node, a second cumulative water volume node, a second water flow node and a second water level node; According to the type of feature corresponding to the water resource data and the type of feature corresponding to the target data currently required by the client; use the water resource data as a judgment medium circulating on the link; use the level corresponding to the water resource data as the input layer of the topology network, and characterize the type of the water resource data by the type of feature; obtain the accuracy of each node in the input layer converted from the water resource data to the feature type corresponding to the current node; in the level corresponding to the optimization algorithm, the processing algorithm and the target data, obtain the influence of the node on each node in the previous adjacent level; use the influence and the accuracy as probability values ​​respectively; use the node with the highest probability value in the same level as the selected node; when there is a selected node in the current level, all the nodes in the next level retain the nodes from the Select a node to obtain the probability value of the judgment medium; traverse all the levels until each level has a selected node, and form a solution process through all the selected nodes and the links of the selected nodes between the adjacent levels; wherein, the data processing process customized based on the client's needs includes determining the required data type and time scale, and selecting the optimal data processing path in the topological network to convert the water resources data into the target data required by the client; specifically includes: analyzing the data characteristics and time scale requirements of the client request, determining the data type to be processed and the required output format; traversing the topological network, finding the most effective path for converting from the type of water resources data to the type of target data, using multiple intermediate nodes, each node performs conversion or processing on the water resources data, and dynamically configures the data processing nodes according to the current state of the water resources data and the client's needs; When water resource data enters the solution process, it is first received and classified. According to the physical or chemical properties of the water resource data, it is assigned to the corresponding category. The classification is based on the characteristic type of the water resource data. The characteristics of each type of water resource data are analyzed to determine how to process the data to maximize its value and application; based on the characteristics and classification of the water resource data, it is determined to which subsequent nodes the water resource data should be sent for further processing. Based on the priority of the water resource data, the processing requirements and the current load of the network, the data is ensured to be processed in the most efficient way; Each node first performs preliminary processing on the water resource data. The node converts the water resource data into a specific feature type. During the conversion process, the node evaluates the accuracy of the conversion. After the conversion accuracy is calculated, it serves as a reference for evaluating the future processing of similar data by the node. The flow direction and processing strategy of the water resource data are dynamically adjusted according to the accuracy performance of the node. Binding each of the solution processes with a corresponding client, and delivering the target data to all the clients in real time; Among them, the total probability value of all nodes in the same level selecting nodes in the previous adjacent level to obtain the judgment medium is equal to 1.

2. The computational analysis method according to claim 1, characterized in that: Each collection end for acquiring water resource data is respectively configured with a topological network, and the optimization algorithm determines whether each type of water resource data and the target data are qualified through a plurality of set thresholds; When it is judged to be unqualified, it is marked in the historical database and the unqualified water resource data is shielded in the top network.

3. The computational analysis method according to claim 2, characterized in that: The water resource data is obtained through the collection terminal and has the following conditions: Scenario 1: When the client needs more than one target data at the same time, the target data obtained by the qualified water resource number of the same client is converted to replace the target data obtained by the unqualified water resource number; Scenario 2: When the acquisition end obtains more than one water resource data at the same time, the qualified water resource data is obtained through the same acquisition end to convert and replace the unqualified water resource data.

4. The computational analysis method according to claim 3, characterized in that: All time scales are sorted according to size, and the target data at the smallest time scale is used to generate the target data at all other time scales through the processing algorithm; and there is also the following situation: Scenario three: when the same client requires more than one time scale, the unqualified target data is replaced by the qualified target data at other time scales of the same client.

5. The computational analysis method according to any one of claims 1 to 4, characterized in that: The solution process for obtaining a single target data includes a node in each level and a link connecting the nodes between adjacent levels.

6. A system for implementing the computational analysis method according to any one of claims 1 to 5, characterized in that: include: A data input and processing module, used for collecting the water resource data, and configuring or selecting the processing algorithm and the optimization algorithm for processing the water resource data; A hierarchical structure and topological network module, used to construct the hierarchical structure according to the water resource data, the processing algorithm, the optimization algorithm and the type of the target data and related features; A solution process and optimization module, used for mapping the solution process of data processing in the topological network according to the water resource data and the target data required by the client; A client management and data output module, used to manage the configuration information of the client and process the binding of data and the client, so as to transmit the target data to the bound client in real time; System monitoring and management module, used to monitor the operating status of the entire system, including data processing efficiency, error rate and resource utilization; Record system operation logs for troubleshooting and performance analysis.