Thermal management system, battery assembly and electric equipment

By designing parallel heat exchange pipelines and regulating units in new energy vehicles, the thermal management problems caused by differences in battery pack size are solved, uniform heat dissipation and temperature control of the battery pack are achieved, and the performance of the battery assembly is improved.

CN118763314AActive Publication Date: 2024-10-11BYD CO LTD +1

Patent Information

Application Number
CN202410798896.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-11
Estimated Expiration
2044-06-19

AI Technical Summary

Technical Problem

In new energy vehicles, due to the different sizes of battery packs, heat exchange requirements vary greatly, which affects the uniformity of battery pack temperature. It is difficult to effectively solve the thermal management problem between battery packs with existing technology.

Method used

Design a thermal management system by setting up at least two parallel heat exchange pipelines in the heat exchange unit, each pipeline is equipped with multiple heat exchangers in series, and adjust the refrigerant pressure and flow rate through the regulating unit so that The heat transfer amount of each heat exchange pipeline is consistent within the preset range, ensuring uniform heat dissipation of the battery pack.

Benefits of technology

The temperature uniformity of each battery pack is achieved, the overall performance of the battery assembly is improved, and the performance degradation caused by temperature differences is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118763314A_ABST
    Figure CN118763314A_ABST
Patent Text Reader

Abstract

The invention relates to a heat management system, a battery assembly and electric equipment, the heat management system comprises: a heat exchange unit, the heat exchange unit comprises at least two heat exchange pipelines, the adjacent heat exchange pipelines are arranged in parallel, each heat exchange pipeline is provided with a heat exchanger, the number of the heat exchangers in the at least one heat exchange pipeline is multiple, and the heat exchangers are arranged in series; and the adjusting unit is configured to adjust the heat exchange amount of each heat exchange pipeline by adjusting the pressure and / or flow of a refrigerant in the heat exchange pipelines. Thus, the pressure and / or flow of the refrigerant in each heat exchange pipeline are / is adjusted through the adjusting unit, so that the pressure loss deviation of the refrigerant between the heat exchange pipelines is within the preset range, uniform heat exchange can be conducted on the heat exchangers on the heat exchange pipelines, and the batteries located on the heat exchangers can be uniformly cooled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of thermal management of battery packs, and in particular, to a thermal management system, a battery assembly, and an electrical device. Background Art

[0002] As the power batteries of electric vehicles develop towards higher power and higher charging rates, electrical equipment such as new energy vehicles have higher requirements for the power and response speed of heating and cooling of the battery of the whole vehicle. Since the layout space of the whole vehicle is prioritized, when multiple battery packs or special-shaped battery packs are involved, there is a huge gap in the heat exchange demand between the cold plates used for heat exchange of the battery packs. The different sizes of battery packs lead to large differences in the pressure loss of each cold plate, which affects the uniformity of the battery pack temperature. Summary of the invention

[0003] The purpose of the present disclosure is to provide a thermal management system, a battery assembly and an electrical device, wherein the thermal management system enables the deviation values ​​between the heat exchange amounts of each heat exchange pipeline to be within a preset range, so as to at least partially solve the above technical problems.

[0004] In order to achieve the above-mentioned objectives, the first aspect of the present disclosure provides a thermal management system, comprising: a heat exchange unit, comprising at least two heat exchange pipelines, adjacent heat exchange pipelines are arranged in parallel, each of the heat exchange pipelines is provided with a heat exchanger, and the number of the heat exchangers in at least one of the heat exchange pipelines is multiple and arranged in series; and an adjusting unit, the adjusting unit is configured to adjust the heat exchange capacity of each of the heat exchange pipelines by adjusting the refrigerant pressure and / or flow rate in the heat exchange pipelines.

[0005] Optionally, the deviation between the heat exchange capacities of the heat exchange pipelines is not greater than 30%.

[0006] Optionally, the heat exchange capacities of the heat exchangers in at least two of the heat exchange pipelines are different.

[0007] Optionally, the heat exchange unit includes a first heat exchange pipeline, a second heat exchange pipeline and a third heat exchange pipeline arranged in parallel, and the heat exchanger includes a first heat exchanger arranged in the first heat exchange pipeline and used for heat exchange of the first battery pack, a second heat exchanger arranged in the second heat exchange pipeline and used for heat exchange of the second battery pack, and a third heat exchanger arranged in the third heat exchange pipeline and used for heat exchange of the third battery pack, wherein the first heat exchanger, the second heat exchanger and the third heat exchanger have different heat exchange capacities.

[0008] Optionally, there are multiple first heat exchangers and they are arranged in series in the first heat exchange pipeline; there are multiple second heat exchangers and they are arranged in series in the second heat exchange pipeline; wherein the heat exchange capacity of the first heat exchanger is smaller than the heat exchange capacity of the second heat exchanger.

[0009] Optionally, the regulating unit includes a first regulating component arranged in the first heat exchange pipeline, a second regulating component arranged in the second heat exchange pipeline, and a third regulating component arranged in the third heat exchange pipeline, and the first regulating component, the second regulating component and the third regulating component respectively regulate the refrigerant pressure and flow in the first heat exchange pipeline, the second heat exchange pipeline and the third heat exchange pipeline.

[0010] Optionally, the first regulating component includes a first electronic expansion valve, a second electronic expansion valve, a first temperature sensor and a first pressure-temperature sensor, the first electronic expansion valve and the first temperature sensor are both located at the refrigerant inlet of the first heat exchange pipeline, and the second electronic expansion valve and the first pressure-temperature sensor are both located at the refrigerant outlet of the first heat exchange pipeline; the second regulating component includes a third electronic expansion valve, a fourth electronic expansion valve, a second temperature sensor and a second pressure-temperature sensor, the third electronic expansion valve and the second temperature sensor are both located at the refrigerant inlet of the second heat exchange pipeline, and the fourth electronic expansion valve and the second pressure-temperature sensor are both located at the refrigerant outlet of the second heat exchange pipeline; the third regulating component includes a fifth electronic expansion valve, a sixth electronic expansion valve, a third temperature sensor and a third pressure-temperature sensor, the fifth electronic expansion valve and the third temperature sensor are both located at the refrigerant inlet of the third heat exchange pipeline, and the sixth electronic expansion valve and the third pressure-temperature sensor are both located at the refrigerant outlet of the third heat exchange pipeline.

[0011] Optionally, the deviation value between the heat exchange amounts of the heat exchange pipelines is equal to the ratio of the difference between the maximum heat exchange amount of the first heat exchange pipeline, the second heat exchange pipeline and the third heat exchange pipeline and the minimum heat exchange amount of the three to the maximum heat exchange amount of the three.

[0012] Optionally, the thermal management system further comprises a fourth heat exchanger, a gas-liquid separator, a liquid reservoir and a compressor; the refrigerant outlet of the fourth heat exchanger is provided with a seventh electronic expansion valve and is connected to the refrigerant inlet of each of the heat exchange pipelines; the refrigerant inlet of the fourth heat exchanger is selectively connected to the refrigerant outlet of the compressor or to the refrigerant inlet of the compressor in an on-off manner; the refrigerant inlet of the compressor or the refrigerant outlet of the compressor is selectively connected to the refrigerant outlet of each of the heat exchange pipelines in an on-off manner; the gas-liquid separator is located at the compressor between the refrigerant inlet and the outlet of each of the heat exchange pipelines, and the refrigerant inlet of the gas-liquid separator is selectively connected to the refrigerant outlet of the heat exchange pipeline or the refrigerant outlet of the compressor in an on-off manner, and the refrigerant outlet of the gas-liquid separator is connected to the refrigerant inlet of the compressor; the liquid reservoir is located between the fourth heat exchanger and the refrigerant inlet of the heat exchange pipeline, the refrigerant inlet of the liquid reservoir is connected to the refrigerant outlet of the fourth heat exchanger in an on-off manner, and the refrigerant outlet of the liquid reservoir is connected to the refrigerant inlet of the heat exchange pipeline.

[0013] Optionally, the thermal management system further comprises a fifth heat exchanger, the refrigerant inlet of the fifth heat exchanger is provided with an eighth electronic expansion valve and is connected to the liquid reservoir in an on-off manner, and the refrigerant outlet of the fifth heat exchanger is connected to the gas-liquid separator.

[0014] Optionally, the thermal management system further comprises a first switching component connected to the refrigerant outlet of the heat exchange pipeline, wherein the first switching component is configured to selectively connect the heat exchange pipeline to the refrigerant outlet of the compressor or the refrigerant inlet of the gas-liquid separator.

[0015] Optionally, the thermal management system also includes a second switching component connected to the refrigerant inlet of the fourth heat exchanger, and the second switching component is configured to selectively connect the refrigerant inlet of the fourth heat exchanger to the refrigerant inlet of the gas-liquid separator or the refrigerant outlet of the compressor.

[0016] Optionally, the first switching component includes two first control valves arranged in parallel, one of the first control valves is used to control the connection and disconnection of the refrigerant outlet of the compressor and the refrigerant outlet of the heat exchange pipeline, and the other first control valve is used to control the connection and disconnection of the refrigerant outlet of the gas-liquid separator and the heat exchange pipeline.

[0017] Optionally, the first switching component includes a ninth electronic expansion valve, a tenth electronic expansion valve, and an eleventh electronic expansion valve, wherein the ninth electronic expansion valve is arranged at the refrigerant outlet of the first heat exchange pipeline and is arranged in parallel with the second electronic expansion valve, the second electronic expansion valve is used to control the on-off of the first heat exchange pipeline and the refrigerant inlet of the gas-liquid separator, the ninth electronic expansion valve is used to control the on-off of the first heat exchange pipeline and the refrigerant outlet of the compressor, the tenth electronic expansion valve is arranged at the refrigerant outlet of the second heat exchange pipeline and is arranged in parallel with the fourth electronic expansion valve The fourth electronic expansion valve is used to control the on-off of the second heat exchange pipeline and the refrigerant inlet of the gas-liquid separator, and the tenth electronic expansion valve is used to control the on-off of the second heat exchange pipeline and the refrigerant outlet of the compressor; the eleventh electronic expansion valve is arranged at the refrigerant outlet of the third heat exchange pipeline and is arranged in parallel with the sixth electronic expansion valve, the sixth electronic expansion valve is used to control the on-off of the third heat exchange pipeline and the refrigerant inlet of the gas-liquid separator, and the eleventh electronic expansion valve is used to control the on-off of the third heat exchange pipeline and the refrigerant outlet of the compressor.

[0018] Optionally, the second switching component includes two second control valves arranged in parallel, one of the second control valves is used to control the connection and disconnection of the refrigerant outlet of the compressor and the refrigerant inlet of the fourth heat exchanger, and the other second control valve is used to control the connection and disconnection of the refrigerant inlet of the gas-liquid separator and the refrigerant inlet of the fourth heat exchanger.

[0019] Optionally, the thermal management system also includes an evaporator and a condenser, the refrigerant inlet of the evaporator is provided with a twelfth electronic expansion valve and is connected to the refrigerant outlet of the liquid reservoir in an on-off manner, the refrigerant outlet of the evaporator is connected to the refrigerant inlet of the gas-liquid separator, the refrigerant inlet of the condenser is provided with a thirteenth electronic expansion valve and is connected to the refrigerant outlet of the liquid reservoir in an on-off manner, and the refrigerant outlet of the condenser is connected to the refrigerant outlet of the compressor.

[0020] A second aspect of the present disclosure provides a battery assembly including the above-mentioned thermal management system.

[0021] A third aspect of the present disclosure provides an electrical device, comprising the above-mentioned battery assembly.

[0022] Through the above technical scheme, at least two heat exchange pipelines are arranged in the heat exchange unit, and the adjacent heat exchange pipelines are arranged in parallel, and a heat exchanger is arranged on each heat exchange pipeline, and the number of heat exchangers in at least one heat exchange pipeline is multiple and arranged in series. For example, for multiple battery packs of different sizes, the heat exchange capacities of battery packs of different sizes are different. The heat exchangers corresponding to the different multiple battery packs can be first connected in series in the heat exchange pipeline, and then the adjacent heat exchange pipelines can be arranged in parallel. The refrigerant pressure and / or flow in each of the heat exchange pipelines can be adjusted by the adjustment unit to make the refrigerant pressure loss deviation between the heat exchange pipelines within a preset range, so that the heat exchangers on each heat exchange pipeline can be evenly exchanged, so that the batteries located on the heat exchanger can dissipate heat evenly.

[0023] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:

[0025] Figure 1 is a flow chart of a first embodiment of a thermal management system provided in an exemplary embodiment of the present disclosure;

[0026] Figure 2 is a flow chart of a second embodiment of a thermal management system provided in an exemplary embodiment of the present disclosure.

[0027] Description of Reference Numerals

[0028] 1-heat exchange unit; 11-first heat exchange pipeline; 12-second heat exchange pipeline; 13-third heat exchange pipeline; 2-heat exchanger; 21-first heat exchanger; 22-second heat exchanger; 23-third heat exchanger; 3-regulating unit; 31-first regulating component; 311-first electronic expansion valve; 312-second electronic expansion valve; 313-first temperature sensor; 314-first pressure and temperature sensor; 32-second regulating component; 321-third electronic expansion valve; 322-fourth electronic expansion valve; 323-second temperature sensor; 324-second pressure and temperature sensor; 33-third regulating component; 331-fifth electronic expansion valve; 332-sixth electronic expansion valve; 333-third temperature sensor ;334-third pressure-temperature sensor;4-fourth heat exchanger;41-seventh electronic expansion valve;5-gas-liquid separator;6-liquid reservoir;7-compressor;8-first switching component;81-first control valve;82-ninth electronic expansion valve;83-tenth electronic expansion valve;84-eleventh electronic expansion valve;9-second switching component;91-second control valve;10-fifth heat exchanger;101-eighth electronic expansion valve;110-evaporator;120-condenser;130-twelfth electronic expansion valve;140-thirteenth electronic expansion valve;150-first refrigerant delivery pipeline;160-second refrigerant delivery pipeline;100-first battery pack;200-second battery pack;300-third battery pack. DETAILED DESCRIPTION

[0029] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0030] In the present disclosure, the terms "first", "second", etc. are used to distinguish one element from another element, and do not have order and importance. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements.

[0031] In the related art, since the layout space of new energy vehicles is prioritized, the battery assembly will have a combination of multiple battery packs or special-shaped battery packs. The different numbers of cells in the battery packs result in large differences in the heat exchange requirements of the corresponding direct cooling plates for heat exchange of the battery packs, resulting in large resistance deviations between different battery packs. The corresponding refrigerant inlet and outlet saturation temperatures in the direct cooling plates are large, which can easily lead to larger temperature deviations between battery packs and reduce the overall performance of the battery assembly.

[0032] In order to solve the above technical problems, Figure 1-Figure 2As shown, the first aspect of the present disclosure provides a thermal management system, comprising: a heat exchange unit 1 and an adjustment unit 3, wherein the heat exchange unit 1 comprises at least two heat exchange pipelines, adjacent heat exchange pipelines are arranged in parallel, each heat exchange pipeline is provided with a heat exchanger 2, and the number of heat exchangers 2 in at least one heat exchange pipeline is multiple and arranged in series, and the adjustment unit 3 is configured to be able to adjust the heat exchange capacity of each heat exchange pipeline by adjusting the refrigerant pressure and / or flow in the heat exchange pipeline.

[0033] According to the above technical scheme, at least two heat exchange pipelines are arranged in the heat exchange unit 1, and the adjacent heat exchange pipelines are arranged in parallel, and a heat exchanger 2 is arranged on each heat exchange pipeline, and the number of heat exchangers 2 in at least one heat exchange pipeline is multiple and arranged in series. For example, for multiple battery packs of different sizes, the heat exchange capacities of battery packs of different sizes are different. The heat exchangers 2 corresponding to the different multiple battery packs can be first connected in series in the heat exchange pipeline, and then the adjacent heat exchange pipelines can be arranged in parallel. The heat exchangers 2 in each heat exchange pipeline are distributed, and the refrigerant pressure and / or flow in each heat exchange pipeline are adjusted by the adjustment unit 3, so that the heat exchange capacities in each heat exchange pipeline are approximately or equal, so that the refrigerant pressure deviation of each heat exchange pipeline is within a preset range, so that the refrigerant inlet and outlet saturated temperatures of the heat exchangers 2 on each heat exchange pipeline can be controlled within a preset range, and the batteries located on the heat exchanger 2 can be evenly dissipated through the refrigerant in the heat exchanger 2, so as to control the temperature of each battery pack within a preset range, thereby improving the performance of the entire battery assembly.

[0034] In order to control the deviation value between the heat exchange amounts of each heat exchange pipeline within a preset range, in some practicable manners, the deviation value between the heat exchange amounts of each heat exchange pipeline is not greater than 30%.

[0035] In some practicable embodiments, in order to enable the thermal management system to adapt to multiple battery packs of different sizes, the heat exchange capacity of the heat exchangers 2 in at least two heat exchange pipelines is different. For example, for special-shaped battery packs, the different number of battery cells in the battery packs leads to large differences in the heat exchange requirements of the corresponding direct cooling plates for heat exchange of the battery packs, resulting in different amounts of cold passing through the heat exchangers 2. In order to make the heat exchange of each battery pack uniform, the heat exchangers 2 corresponding to the smaller battery packs can be connected in series in one heat exchange pipeline, and the heat exchangers 2 corresponding to the larger battery packs can be connected in series in one heat exchange pipeline. The heat exchanger 2 is connected in series in another heat exchange pipeline, wherein the refrigerant pressure and / or flow in each heat exchange pipeline is adjusted by the regulating unit 3 so that the heat exchange amount in each heat exchange pipeline is approximately or equal, so that the refrigerant pressure deviation of each heat exchange pipeline is within a preset range, so that the refrigerant inlet and outlet saturation temperatures of the heat exchanger 2 on each heat exchange pipeline can be controlled within a preset range and the batteries located on the heat exchanger 2 can be evenly dissipated through the refrigerant in the heat exchanger 2, so as to control the temperature of each battery pack within a preset range, thereby improving the performance of the entire battery pack.

[0036] In some embodiments, the heat exchange unit 1 may include a first heat exchange pipeline 11, a second heat exchange pipeline 12, and a third heat exchange pipeline 13 arranged in parallel, and the heat exchanger 2 includes a first heat exchanger 21 arranged in the first heat exchange pipeline 11 and used for heat exchange of the first battery pack 100, a second heat exchanger 22 arranged in the second heat exchange pipeline 12 and used for heat exchange of the second battery pack 200, and a third heat exchanger 23 arranged in the third heat exchange pipeline 13 and used for heat exchange of the third battery pack 300, wherein the heat exchange rates of the first heat exchanger 21, the second heat exchanger 22, and the third heat exchanger 23 are different. In this embodiment, the heat exchange rates of the first heat exchanger 21, the second heat exchanger 22, and the third heat exchanger 23 are based on the first battery pack 100 that exchanges heat with the first heat exchanger 21 and the second battery pack 100 that exchanges heat with the second heat exchanger 22. The heat exchange capacity of the first heat exchanger 21 is the same as that of the second heat exchanger 22. The heat exchange capacity of the third heat exchanger 23 is the same as that of the first heat exchanger 21. The heat exchange capacity of the third battery pack 200 is the same as that of the second battery pack 200. The heat exchange capacity of the third battery pack 300 is the same as that of the third heat exchanger 23.

[0037] In some practicable embodiments, in order to reduce the number of heat exchange pipelines and facilitate the adjustment of the refrigerant pressure and flow rate of each heat exchange pipeline, there are multiple first heat exchangers 21 and they are arranged in series in the first heat exchange pipeline 11, and there are multiple second heat exchangers 22 and they are arranged in series in the second heat exchange pipeline 12; wherein the heat exchange capacity of the first heat exchanger 21 is less than that of the second heat exchanger 22. Figure 1As shown, there are three first heat exchangers 21 and three first heat exchangers 21 are arranged in series on the first heat exchange pipeline 11, and the number of battery cells of the first battery pack 100 corresponding to the first heat exchanger 21 is four, the number of second heat exchangers 22 is two and two second heat exchangers 22 are connected in series on the second heat exchange pipeline 12, and the number of battery cells of the second battery pack 200 corresponding to the second heat exchanger is six, the number of third heat exchangers 23 is one, and the number of battery cells of the third heat exchanger is twelve, so that the heat exchange amount in the first heat exchange pipeline 11, the heat exchange amount in the second heat exchange pipeline 12 and the heat exchange amount in the third heat exchange pipeline 13 are the same, thereby, through the series arrangement of multiple first heat exchangers 21 and the series arrangement of multiple second heat exchangers 22 It can save the trouble of separately setting up corresponding heat exchange pipelines for each first heat exchanger 21 and each second heat exchanger 22. At the same time, the series setting of the first heat exchanger 21 and the second heat exchanger 22 also facilitates the control of the refrigerant pressure and refrigerant flow in the first heat exchange pipeline 11 and the second heat exchange pipeline 12. For example, only by controlling the refrigerant inlet and refrigerant outlet of the first heat exchange pipeline 11, the refrigerant flow and refrigerant pressure of the entire first heat exchange pipeline 11 can be controlled by the valve opening of the control valve. Similarly, corresponding control valves can be set at the refrigerant inlet and refrigerant outlet of the second heat exchange pipeline 12. The refrigerant flow and refrigerant pressure of the entire second heat exchange pipeline 12 can be controlled by the valve opening of the control valve.

[0038] It can be understood that the number of the above-mentioned first battery pack 100, the second battery pack 200 and the third battery pack 300 and the number of battery cells in each battery pack are all schematic. In other embodiments, the number of battery cells in the first battery pack 100, the second battery pack 200 and the third battery pack 300 can be other values, the number of first battery packs 100 connected in series on the first heat exchange pipeline 11, and the number of second battery packs 200 connected in series on the second heat exchange pipeline 12 can also be other values. Of course, the first battery pack 100 and the second battery pack 200 can also be mixed and cross-arranged in different heat exchange pipelines, as long as the total number of battery cells in each heat exchange pipeline is similar or equal.

[0039] In order to facilitate the regulation of the refrigerant pressure and flow rate of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13, in some feasible embodiments, the regulating unit 3 includes a first regulating component 31 arranged in the first heat exchange pipeline 11, a second regulating component 32 arranged in the second heat exchange pipeline 12, and a third regulating component 33 arranged in the third heat exchange pipeline 13. The first regulating component 31, the second regulating component 32 and the third regulating component 33 respectively regulate the refrigerant pressure and flow rate in the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13.

[0040] In some embodied embodiments, the first regulating component 31 includes a first electronic expansion valve 311, a second electronic expansion valve 312, a first temperature sensor 313 and a first pressure-temperature sensor 314. The first electronic expansion valve 311 and the first temperature sensor 313 are both located at the refrigerant inlet of the first heat exchange pipeline 11. The valve opening of the first electronic expansion valve 311 controls the refrigerant flow entering the first heat exchange pipeline 11. The refrigerant temperature at the inlet of the first heat exchange pipeline 11 is measured by the first temperature sensor 313. The second electronic expansion valve 312 and the first pressure-temperature sensor 314 are both located at the refrigerant outlet of the first heat exchange pipeline 11. The valve opening of the second electronic expansion valve 312 controls the refrigerant pressure in the first heat exchange pipeline 11. The temperature and pressure at the outlet of the first heat exchange pipeline 11 are measured by the first pressure-temperature sensor 314.

[0041] Of course, the second regulating component 32 includes a third electronic expansion valve 321, a fourth electronic expansion valve 322, a second temperature sensor 323 and a second pressure-temperature sensor 324. The third electronic expansion valve 321 and the second temperature sensor 323 are both located at the refrigerant inlet of the second heat exchange pipeline 12. The valve opening of the third electronic expansion valve 321 controls the refrigerant flow entering the second heat exchange pipeline 12. The second temperature sensor 323 measures the refrigerant temperature at the inlet of the second heat exchange pipeline 12 in real time. The fourth electronic expansion valve 322 and the second pressure-temperature sensor 324 are both located at the refrigerant outlet of the second heat exchange pipeline 12. The valve opening of the third electronic expansion valve 321 controls the refrigerant flow entering the second heat exchange pipeline 12. The valve opening of the fourth electronic expansion valve 322 controls the refrigerant pressure in the second heat exchange pipeline 12. The second pressure-temperature sensor 324 measures the temperature and pressure at the outlet of the second heat exchange pipeline 12 in real time.

[0042] In addition, the third regulating component 33 includes a fifth electronic expansion valve 331, a sixth electronic expansion valve 332, a third temperature sensor 333 and a third pressure-temperature sensor 334. The fifth electronic expansion valve 331 and the third temperature sensor 333 are both located at the refrigerant inlet of the third heat exchange pipeline 13. The valve opening of the fifth electronic expansion valve 331 controls the refrigerant flow entering the third heat exchange pipeline 13. The third temperature sensor 333 measures the refrigerant temperature at the inlet of the third heat exchange pipeline 13 in real time. The sixth electronic expansion valve 332 and the third pressure-temperature sensor 334 are both located at the refrigerant outlet of the third heat exchange pipeline 13. The valve opening of the sixth electronic expansion valve 332 controls the refrigerant pressure in the third heat exchange pipeline 13. The third pressure-temperature sensor 334 measures the temperature and pressure at the outlet of the third heat exchange pipeline 13 in real time.

[0043] When the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 cool and exchange heat for the first battery pack 100 corresponding to the first heat exchanger 21, the second battery pack 200 corresponding to the second heat exchanger 22 and the third battery pack 300 corresponding to the third heat exchanger 23, they are first allocated according to the number of the first battery pack 100, the second battery pack 200 and the third battery pack 300 and the number of battery cells in each battery pack, so that the heat exchange of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 is preset by the number of the first heat exchange pipeline 11, the heat exchange required by the first heat exchange pipeline 11, the heat exchange required by the second heat exchange pipeline 12 The heat exchange rate in the first heat exchange pipeline 11 is approximately or equal to that in the third heat exchange pipeline 13, thereby obtaining a preset target value of the required heat exchange rate of each heat exchange pipeline, controlling the pressure of the first heat exchange pipeline 11 through the second electronic expansion valve 312, and displaying the pressure value in real time through the first pressure-temperature sensor 314. When the pressure value of the first pressure-temperature sensor 314 is within the preset pressure range, the valve opening of the second electronic expansion valve 312 stops adjusting, and the refrigerant flow rate of the first heat exchange pipeline 11 is controlled by the valve opening of the first electronic expansion valve 311. The refrigerant temperature at the outlet of the first heat exchange pipeline 11 is measured in real time through the first pressure-temperature sensor 314. The refrigerant temperature at the outlet of the heat exchange pipe 11 minus the pressure value when the first pressure-temperature sensor 314 is in the preset pressure range is converted into the saturation temperature corresponding to the pressure state to determine whether the refrigerant superheat of the first heat exchange pipe 11 is within the preset range. It should be noted that superheat is an important parameter in the refrigeration system. When the superheat is greater than the preset value, the first electronic expansion valve 311 will open the valve opening to increase the flow rate of the refrigerant and reduce the superheat. When the superheat is less than the set value, the first electronic expansion valve 311 will reduce the valve opening to reduce the flow rate of the refrigerant and increase the superheat, ultimately making the superheat within the preset range. In this embodiment, if the first exchange The refrigerant superheat of the heat pipe 11 is within the preset range. At this time, stop adjusting the valve opening of the first electronic expansion valve 311, and the heat exchange capacity of the first heat exchange pipe 11 is within the preset range. Similarly, the refrigerant flow rate and refrigerant pressure of the second heat exchange pipe 12 and the third heat exchange pipe 13 can be adjusted with reference to the first heat exchange pipe 11, so that the deviation value between the heat exchange capacities of the first heat exchange pipe 11, the second heat exchange pipe 12 and the third heat exchange pipe 13 is not greater than 30%, so that the first battery pack 100, the second battery pack 200 and the third battery pack 300 can be evenly dissipated, so that the overall temperature of the battery assembly is within the preset range.

[0044] It can be understood that in order to facilitate the introduction of refrigerant into the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13, the inlets of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 can all be connected to the first refrigerant delivery pipeline 150, so that the low-temperature liquid refrigerant is delivered to the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 respectively through the first refrigerant delivery pipeline 150.

[0045] In some feasible embodiments, the deviation value between the heat exchange amounts of the heat exchange pipelines is equal to the ratio of the difference between the maximum heat exchange amount of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 and the minimum heat exchange amount of the three to the maximum heat exchange amount of the three. For example, the heat exchange amount of the first heat exchange pipeline 11 is Qa, the heat exchange amount of the second heat exchange pipeline 12 is Qb, and the heat exchange amount of the third heat exchange pipeline 13 is Qc. The deviation value between the heat exchange amounts of the heat exchange pipelines is A, wherein A = (max(Qa, Qb, Qc) - min(Qa, Qb, Qc)) / max(Qa, Qb, Qc), and A≤30%, preferably, A≤20%.

[0046] When the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 heat and exchange heat with the first battery pack 100 corresponding to the first heat exchanger 21, the second battery pack 200 corresponding to the second heat exchanger 22 and the third battery pack 300 corresponding to the third heat exchanger 23, it can be understood that in order to facilitate the introduction of high-temperature refrigerant into the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13, the outlets of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 can be connected to the second refrigerant delivery pipeline 160, so that the high-temperature gaseous refrigerant is respectively transported through the second refrigerant delivery pipeline 160 and moves in the opposite direction to the refrigerant during cooling, that is, the first heat exchange pipeline 11 is connected to the second refrigerant delivery pipeline 160. The refrigerant outlets of the pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 flow toward the refrigerant inlet, so as to heat the corresponding first battery pack 100, the second battery pack 200 and the third battery pack 300 in the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13. The pressure of the first heat exchange pipeline 11 is controlled by the second electronic expansion valve 312, and the pressure value and the temperature value are displayed in real time by the first pressure and temperature sensor 314. When the pressure value of the first pressure and temperature sensor 314 is within the preset pressure range, the valve opening of the second electronic expansion valve 312 stops adjusting, and the refrigerant flow entering the first heat exchange pipeline 11 is controlled by the valve opening of the first electronic expansion valve 311. The refrigerant temperature of the first heat exchange pipeline 11 is measured in real time by the first temperature sensor 313. The saturation temperature corresponding to the pressure state is calculated by subtracting the pressure value of the first pressure temperature sensor 314 when the refrigerant temperature of the first heat exchange pipeline 11 is within the preset pressure range from the refrigerant temperature measured by the first temperature sensor 313 to determine whether the refrigerant supercooling of the first heat exchange pipeline 11 is within the preset range. It should be noted that supercooling is an important parameter in the refrigeration system. When the supercooling is greater than the preset value, the first electronic expansion valve 311 will increase the valve opening to increase the flow rate of the refrigerant, thereby reducing the supercooling. When the supercooling is less than the set value, the first electronic expansion valve 311 will reduce the valve opening to reduce the flow rate of the refrigerant, thereby increasing the supercooling. Finally Make the supercooling degree within the preset range. In the present embodiment, if the refrigerant supercooling degree of the first heat exchange pipeline 11 is within the preset range, at this time, stop adjusting the valve opening of the first electronic expansion valve 311, and the heat exchange amount of the first heat exchange pipeline 11 is within the preset range. Similarly, the refrigerant flow rate and refrigerant pressure of the second heat exchange pipeline 12 and the third heat exchange pipeline 13 can be adjusted with reference to the first heat exchange pipeline 11, so that the deviation value between the heat exchange amounts of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 is not greater than 30%, so that the first battery pack 100, the second battery pack 200 and the third battery pack 300 can be evenly heated, so that the overall temperature of the battery assembly is within the preset range.

[0047] In order to facilitate the thermal management system to cool or heat the first battery pack 100, the second battery pack 200 and the third battery pack 300, in some practicable embodiments, the thermal management system also includes a fourth heat exchanger 4, a gas-liquid separator 5, a liquid reservoir 6 and a compressor 7. The refrigerant outlet of the fourth heat exchanger 4 is provided with a seventh electronic expansion valve 41 and is connected to the refrigerant inlet of each heat exchange pipeline. The refrigerant inlet of the fourth heat exchanger 4 is selectively connected to the refrigerant outlet of the compressor 7 or to the refrigerant inlet of the compressor 7 in an on-off manner. The refrigerant inlet of the compressor 7 or the refrigerant outlet of the compressor 7 is selectively connected to the refrigerant outlet of the compressor 7 or the refrigerant outlet of the compressor 7. The refrigerant outlet of each heat exchange pipeline can be connected in an on-off manner; the gas-liquid separator 5 is located between the refrigerant inlet of the compressor 7 and the outlet of each heat exchange pipeline, and the refrigerant inlet of the gas-liquid separator 5 is selectively connected in an on-off manner with the refrigerant outlet of the heat exchange pipeline or the refrigerant outlet of the compressor 7, and the refrigerant outlet of the gas-liquid separator 5 is connected with the refrigerant inlet of the compressor 7; the liquid reservoir 6 is located between the fourth heat exchanger 4 and the refrigerant inlet of the heat exchange pipeline, and the refrigerant inlet of the liquid reservoir 6 is connected in an on-off manner with the refrigerant outlet of the fourth heat exchanger 4, and the refrigerant outlet of the liquid reservoir 6 is connected with the refrigerant inlet of the heat exchange pipeline.

[0048] When the first battery pack 100, the second battery pack 200 and the third battery pack 300 need to be cooled, the low-temperature refrigerant in the liquid reservoir 6 enters through the refrigerant inlet of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 and cools and exchanges heat with the corresponding first battery pack 100, the second battery pack 200 and the third battery pack 300 through the first heat exchanger 21, the second heat exchanger 22 and the third heat exchanger 23. After the heat exchange and temperature rise, the refrigerant becomes gaseous and is passed through the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13. The refrigerant outlets of the heat pipe 12 and the third heat exchange pipe 13 are discharged and connected to the refrigerant inlet of the gas-liquid separator 5. The high-temperature refrigerant is separated into gas and liquid and enters the compressor 7 for compression. After being cooled by the fourth heat exchanger 4, it is throttled by the seventh electronic expansion valve 41 to form a low-temperature liquid refrigerant and enters the liquid reservoir 6. The first battery pack 100, the second battery pack 200 and the third battery pack 300 are circulated to cool down the temperature of each battery pack so as to maintain the temperature of each battery pack within a preset range to maintain the performance of the battery assembly.

[0049] When the first battery pack 100, the second battery pack 200 and the third battery pack 300 need to be heated, a high-temperature refrigerant is required to enter from the refrigerant outlet of each heat exchange pipeline and be discharged from the refrigerant outlet of each heat exchange pipeline. At this time, the refrigerant is pressurized and heated through the refrigerant outlet of the compressor 7, and the refrigerant outlet of the compressor 7 is connected to the refrigerant outlets of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13. The high-temperature refrigerant is discharged from the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13. The refrigerant outlet of pipeline 13 enters and heats the corresponding first battery pack 100, second battery pack 200 and third battery pack 300, and then is discharged from the refrigerant outlet of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 into the liquid reservoir 6, and then evaporates and absorbs heat through the seventh electronic expansion valve 41 and the fourth heat exchanger 4, and then returns to the gas-liquid separator 5, completing the heated refrigerant cycle, so that the temperature of each battery pack is maintained within a preset range to maintain the performance of the battery assembly.

[0050] In addition, when the first battery pack 100, the second battery pack 200 and the third battery pack 300 are heated, in order to quickly evaporate the refrigerant to absorb heat and cool it down, the thermal management system also includes a fifth heat exchanger 10. The refrigerant inlet of the fifth heat exchanger 10 is connected to the liquid reservoir 6 in an on-off manner, and the refrigerant outlet of the fifth heat exchanger 10 is connected to the gas-liquid separator 5. The fifth heat exchanger 10 can be a plate heat exchanger. For example, the two ends of the heat exchange channel of the plate heat exchanger are respectively connected to the cooling circuits of the vehicle's motor and electronic control. When the battery or the cockpit has a heating demand, the waste heat of the motor or the electronic control can be recovered to exchange heat with the refrigerant. The refrigerant passes through the fifth heat exchanger 10 and enters the gas-liquid separator 5, thereby achieving a high energy efficiency ratio of the entire thermal control system.

[0051] In some practicable embodiments, in order to facilitate the thermal management system to switch between heating and cooling the battery pack, the thermal management system also includes a first switching component 8 connected to the refrigerant outlet of the heat exchange pipeline, and the first switching component 8 is configured to selectively connect the heat exchange pipeline with the refrigerant outlet of the compressor 7 or the refrigerant inlet of the gas-liquid separator 5. In this way, when it is necessary to cool the first battery pack 100, the second battery pack 200 and the third battery pack 300, the low-temperature liquid refrigerant enters the refrigerant inlet of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 from the liquid reservoir 6 to cool the corresponding first battery pack 100, the second battery pack 200 and the third battery pack 300. The heated refrigerant connects the refrigerant outlet of each heat exchange pipeline with the refrigerant inlet of the gas-liquid separator 5 through the first switching component 8, and the refrigerant after gas-liquid separation enters the compressor 7 for compression The refrigerant is compressed and cooled by the fourth heat exchanger 4 and then throttled by the seventh electronic expansion valve 41 to enter the liquid reservoir 6 again. On the contrary, when the first battery pack 100, the second battery pack 200 and the third battery pack 300 need to be heated, the flow direction of the refrigerant is reversed. At this time, the refrigerant outlet of the heat exchange pipeline is switched to be connected with the refrigerant outlet of the compressor 7 through the first switching component 8. At this time, the high-temperature refrigerant compressed by the compressor 7 enters from the refrigerant outlets of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 and heats the first battery pack 100, the second battery pack 200 and the third battery pack 300. The thermal management system also includes a second switching component 9 connected to the refrigerant inlet of the fourth heat exchanger 4, and the second switching component 9 is configured to selectively connect the refrigerant inlet of the fourth heat exchanger 4 to the refrigerant inlet of the gas-liquid separator 5 or the refrigerant outlet of the compressor 7.

[0052] In some specific embodiments, the first switching component 8 includes two first control valves 81 arranged in parallel, wherein one first control valve 81 is used to control the connection and disconnection of the refrigerant outlet of the compressor 7 and the refrigerant outlet of the heat exchange pipeline, and the other first control valve 81 is used to control the connection and disconnection of the refrigerant outlet of the gas-liquid separator 5 and the heat exchange pipeline, wherein the first control valve 81 can be a solenoid valve, so that the refrigerant outlet of the heat exchange pipeline can be selectively connected to the refrigerant outlet of the compressor 7 or the refrigerant inlet of the gas-liquid separator 5 by opening and closing the two first control valves 81, thereby facilitating the switching of cooling or heating of the battery pack.

[0053] In addition, the first switching component 8 can also be a plurality of electronic expansion valves, for example, the first switching component 8 includes a ninth electronic expansion valve 82, a tenth electronic expansion valve 83, and an eleventh electronic expansion valve 84, wherein the ninth electronic expansion valve 82 is arranged at the refrigerant outlet of the first heat exchange pipeline 11 and is arranged in parallel with the second electronic expansion valve 312, the second electronic expansion valve 312 is used to control the on-off of the first heat exchange pipeline 11 and the refrigerant inlet of the gas-liquid separator 5, and the ninth electronic expansion valve 82 is used to control the on-off of the first heat exchange pipeline 11 and the refrigerant outlet of the compressor 7. In this way, when the battery pack needs to be cooled, Close the ninth electronic expansion valve 82 and open the second electronic expansion valve 312 to connect the refrigerant outlet of the first heat exchange pipeline 11 with the refrigerant inlet of the gas-liquid separator 5, so that the high-temperature refrigerant after cooling the first battery pack 100 enters the gas-liquid separator 5. Conversely, when the battery pack needs to be heated, the ninth electronic expansion valve 82 is opened and the second electronic expansion valve 312 is closed to connect the refrigerant outlet of the first heat exchange pipeline 11 with the refrigerant outlet of the compressor 7, so that the high-temperature refrigerant enters the first heat exchange pipeline 11 from the refrigerant outlet of the first heat exchange pipeline 11 to heat the first battery pack 100.

[0054] Of course, the tenth electronic expansion valve 83 is arranged at the refrigerant outlet of the second heat exchange pipeline 12 and is arranged in parallel with the fourth electronic expansion valve 322. The fourth electronic expansion valve 322 is used to control the on-off of the second heat exchange pipeline 12 and the refrigerant inlet of the gas-liquid separator 5, and the tenth electronic expansion valve 83 is used to control the on-off of the second heat exchange pipeline 12 and the refrigerant outlet of the compressor 7. In this way, when the battery pack needs to be cooled, the tenth electronic expansion valve 83 is closed and the fourth electronic expansion valve 322 is opened to make the second heat exchange pipeline 12 The refrigerant outlet of the heat exchange pipeline 12 is connected to the refrigerant inlet of the gas-liquid separator 5, so that the high-temperature refrigerant after cooling the second battery pack 200 enters the gas-liquid separator 5. Conversely, when the battery pack needs to be heated, the tenth electronic expansion valve 83 is opened and the fourth electronic expansion valve 322 is closed to connect the refrigerant outlet of the second heat exchange pipeline 12 with the refrigerant outlet of the compressor 7, so that the high-temperature refrigerant enters the second heat exchange pipeline 12 from the refrigerant outlet of the second heat exchange pipeline 12 to heat the second battery pack 200.

[0055] In addition, the eleventh electronic expansion valve 84 is arranged at the refrigerant outlet of the third heat exchange pipeline 13 and is arranged in parallel with the sixth electronic expansion valve 332. The sixth electronic expansion valve 332 is used to control the on-off of the third heat exchange pipeline 13 and the refrigerant inlet of the gas-liquid separator 5. The eleventh electronic expansion valve 84 is used to control the on-off of the third heat exchange pipeline 13 and the refrigerant outlet of the compressor 7. In this way, when the battery pack needs to be cooled, the eleventh electronic expansion valve 84 is closed and the sixth electronic expansion valve 332 is opened to make the third heat exchange pipeline 13 and the refrigerant outlet of the compressor 7 open. The refrigerant outlet of the heat exchange pipeline 13 is connected to the refrigerant inlet of the gas-liquid separator 5, so that the high-temperature refrigerant after cooling the third battery pack 300 enters the gas-liquid separator 5. Conversely, when the battery pack needs to be heated, the refrigerant outlet of the third heat exchange pipeline 13 is connected to the refrigerant outlet of the compressor 7 by opening the eleventh electronic expansion valve 84 and closing the sixth electronic expansion valve 332, so that the high-temperature refrigerant enters the third heat exchange pipeline 13 from the refrigerant outlet of the third heat exchange pipeline 13 to heat the third battery pack 300.

[0056] In some practicable embodiments, in order to facilitate the thermal management system to switch the heating or cooling of the battery pack, the second switching component 9 includes two second control valves 91 arranged in parallel. The second control valves 91 can be solenoid valves. One of the second control valves 91 is used to control the connection and disconnection of the refrigerant outlet of the compressor 7 and the refrigerant inlet of the fourth heat exchanger 4, and the other second control valve 91 is used to control the connection and disconnection of the refrigerant inlet of the gas-liquid separator 5 and the refrigerant inlet of the fourth heat exchanger 4. In this way, the refrigerant inlet of the fourth heat exchanger 4 can be selectively connected to the refrigerant outlet of the compressor 7 or the refrigerant inlet of the gas-liquid separator 5 by switching the two second control valves 91, thereby facilitating the thermal management system to switch the cooling or heating of the battery pack.

[0057] In some practicable embodiments, in order to facilitate the thermal management system to cool or heat the battery pack, the thermal management system further includes an evaporator 110 and a condenser 120. For example, in a new energy vehicle, the evaporator 110 may be an in-vehicle evaporator, and the condenser 120 may be an in-vehicle condenser. The refrigerant inlet of the evaporator 110 is provided with a twelfth electronic expansion valve 130 and is connected to the refrigerant outlet of the liquid reservoir 6 in an on-off manner. The refrigerant outlet of the evaporator 110 is connected to the refrigerant inlet of the gas-liquid separator 5. The refrigerant inlet of the condenser 120 is provided with a thirteenth electronic expansion valve 140 and is connected to the refrigerant outlet of the liquid reservoir 6 in an on-off manner. The refrigerant outlet of the condenser 120 is connected to the refrigerant outlet of the compressor 7. In this way, when the battery pack needs to be cooled, the high-temperature gaseous refrigerant coming out of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 passes through the gas-liquid separator 5 and then enters the compressor 7 for compression. The partially compressed refrigerant at the refrigerant outlet of the compressor 7 enters the fourth heat exchanger 4 and the seventh electronic expansion valve 41 for throttling and cooling to form a low-temperature liquid refrigerant that enters the liquid reservoir 6. The partially compressed refrigerant enters the condenser 120 and the twelfth electronic expansion valve 130 for throttling and cooling to form a low-temperature liquid refrigerant that enters the liquid reservoir 6. The low-temperature liquid refrigerant is discharged from the liquid reservoir The refrigerant in the compressor 6 is divided into the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 to cool the corresponding first battery pack 100, the second battery pack 200 and the third battery pack 300, so that the efficiency of forming the low-temperature liquid refrigerant can be accelerated by setting the condenser 120, so that there is enough low-temperature refrigerant to enter the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 to cool the first battery pack 100, the second battery pack 200 and the third battery pack 300; when the battery pack needs to be heated, the high-temperature gaseous refrigerant is respectively discharged from the refrigerant outlet of the compressor 7 through the refrigerant outlet of the compressor 7. The refrigerant outlets of the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13 enter and cool down the refrigerant after heat exchange. The cooled refrigerant partially passes through the liquid storage tank 6, the fourth heat exchanger 4 and the fifth heat exchanger 10 for heat exchange and enters the gas-liquid separator 5, and then passes through the compressor 7 to enter the first heat exchange pipeline 11, the second heat exchange pipeline 12 and the third heat exchange pipeline 13. In this embodiment, part of the cooled refrigerant can also pass through the evaporator 110 for heat exchange and then enter the gas-liquid separator 5, thereby increasing the efficiency of the high-temperature refrigerant formed by the clamp, so that the thermal management system has enough high-temperature refrigerant to heat the battery pack.

[0058] The second aspect of the present disclosure provides a battery assembly, including the above-mentioned thermal management system. The above-mentioned thermal management system can cool and heat each battery pack in the battery assembly so that the temperature of each battery pack is controlled within a preset range, thereby reducing the temperature difference between the battery packs and avoiding the performance degradation of the battery assembly due to the temperature difference. It should be noted that the above-mentioned battery assembly includes all the beneficial effects of the above-mentioned thermal management system, which will not be repeated here.

[0059] The third aspect of the present disclosure provides an electric device, including the above-mentioned battery assembly. It should be noted that the electric device may be a new energy vehicle containing a battery assembly, and the battery packs in the battery assembly can be evenly cooled or heated by the above-mentioned battery assembly so that the temperatures of the battery packs tend to be the same, thereby ensuring the performance of the battery packs. Of course, the above-mentioned electric device is a new energy vehicle containing a battery assembly for illustration purposes, and in other embodiments, the electric device may also be in other forms, for example, the electric device may also be an energy storage battery electric device, etc.

[0060] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0061] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0062] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A thermal management system, characterized in that: include: A heat exchange unit, comprising at least two heat exchange pipelines, wherein the adjacent heat exchange pipelines are arranged in parallel, each of the heat exchange pipelines is provided with a heat exchanger, and the number of the heat exchangers in at least one of the heat exchange pipelines is multiple and arranged in series; and The regulating unit is configured to adjust the heat exchange capacity of each heat exchange pipeline by regulating the refrigerant pressure and / or flow rate in the heat exchange pipeline.

2. The thermal management system according to claim 1, characterized in that: The deviation between the heat exchange capacities of the heat exchange pipelines is no more than 30%.

3. The thermal management system according to claim 1, characterized in that: The heat exchange capacities of the heat exchangers in at least two of the heat exchange pipelines are different.

4. The thermal management system according to claim 1, characterized in that: The heat exchange unit comprises a first heat exchange pipeline, a second heat exchange pipeline and a third heat exchange pipeline which are arranged in parallel. The heat exchanger includes a first heat exchanger arranged in the first heat exchange pipeline and used for heat exchange of the first battery pack, a second heat exchanger arranged in the second heat exchange pipeline and used for heat exchange of the second battery pack, and a third heat exchanger arranged in the third heat exchange pipeline and used for heat exchange of the third battery pack, wherein the first heat exchanger, the second heat exchanger and the third heat exchanger have different heat exchange capacities.

5. The thermal management system according to claim 4, characterized in that: There are multiple first heat exchangers, which are arranged in series in the first heat exchange pipeline; There are multiple second heat exchangers, which are arranged in series in the second heat exchange pipeline; Wherein, the heat exchange capacity of the first heat exchanger is smaller than the heat exchange capacity of the second heat exchanger.

6. The thermal management system according to claim 4, characterized in that: The regulating unit includes a first regulating component arranged in the first heat exchange pipeline, a second regulating component arranged in the second heat exchange pipeline, and a third regulating component arranged in the third heat exchange pipeline. The first regulating component, the second regulating component and the third regulating component respectively regulate the refrigerant pressure and flow in the first heat exchange pipeline, the second heat exchange pipeline and the third heat exchange pipeline.

7. The thermal management system according to claim 6, characterized in that: The first regulating component includes a first electronic expansion valve, a second electronic expansion valve, a first temperature sensor and a first pressure-temperature sensor, the first electronic expansion valve and the first temperature sensor are both located at the refrigerant inlet of the first heat exchange pipeline, and the second electronic expansion valve and the first pressure-temperature sensor are both located at the refrigerant outlet of the first heat exchange pipeline; The second regulating component includes a third electronic expansion valve, a fourth electronic expansion valve, a second temperature sensor and a second pressure-temperature sensor, the third electronic expansion valve and the second temperature sensor are both located at the refrigerant inlet of the second heat exchange pipeline, and the fourth electronic expansion valve and the second pressure-temperature sensor are both located at the refrigerant outlet of the second heat exchange pipeline; The third regulating component includes a fifth electronic expansion valve, a sixth electronic expansion valve, a third temperature sensor and a third pressure-temperature sensor. The fifth electronic expansion valve and the third temperature sensor are both located at the refrigerant inlet of the third heat exchange pipeline, and the sixth electronic expansion valve and the third pressure-temperature sensor are both located at the refrigerant outlet of the third heat exchange pipeline.

8. The thermal management system according to claim 4, characterized in that: The deviation value between the heat exchange amounts of the heat exchange pipelines is equal to the ratio of the difference between the maximum heat exchange amount of the first heat exchange pipeline, the second heat exchange pipeline and the third heat exchange pipeline and the minimum heat exchange amount of the three to the maximum heat exchange amount of the three.

9. The thermal management system according to claim 7, characterized in that: The thermal management system further includes a fourth heat exchanger, a gas-liquid separator, a liquid storage device and a compressor. The refrigerant outlet of the fourth heat exchanger is provided with a seventh electronic expansion valve and is connected to the refrigerant inlet of each of the heat exchange pipelines. The refrigerant inlet of the fourth heat exchanger is selectively connected to the refrigerant outlet of the compressor or to the refrigerant inlet of the compressor in an on-off manner. The refrigerant inlet of the compressor or the refrigerant outlet of the compressor is selectively connected to the refrigerant outlet of each heat exchange pipeline in an on-off manner; The gas-liquid separator is located between the refrigerant inlet of the compressor and the outlet of each of the heat exchange pipelines, and the refrigerant inlet of the gas-liquid separator is selectively connected to the refrigerant outlet of the heat exchange pipeline or the refrigerant outlet of the compressor, and the refrigerant outlet of the gas-liquid separator is connected to the refrigerant inlet of the compressor; The liquid reservoir is located between the fourth heat exchanger and the refrigerant inlet of the heat exchange pipeline. The refrigerant inlet of the liquid reservoir is connectable and disconnectable to the refrigerant outlet of the fourth heat exchanger. The refrigerant outlet of the liquid reservoir is connected to the refrigerant inlet of the heat exchange pipeline.

10. The thermal management system according to claim 9, characterized in that: The thermal management system further includes a fifth heat exchanger, wherein a refrigerant inlet of the fifth heat exchanger is provided with an eighth electronic expansion valve and is connected to the liquid reservoir, and a refrigerant outlet of the fifth heat exchanger is connected to the gas-liquid separator.

11. The thermal management system according to claim 9, characterized in that: The thermal management system also includes a first switching component connected to the refrigerant outlet of the heat exchange pipeline, and the first switching component is configured to selectively connect the heat exchange pipeline to the refrigerant outlet of the compressor or the refrigerant inlet of the gas-liquid separator.

12. The thermal management system according to claim 10, characterized in that: The thermal management system also includes a second switching component connected to the refrigerant inlet of the fourth heat exchanger, and the second switching component is configured to selectively connect the refrigerant inlet of the fourth heat exchanger to the refrigerant inlet of the gas-liquid separator or the refrigerant outlet of the compressor.

13. The thermal management system according to claim 11, characterized in that: The first switching component includes two first control valves arranged in parallel, one of which is used to control the connection and disconnection of the refrigerant outlet of the compressor and the refrigerant outlet of the heat exchange pipeline, and the other first control valve is used to control the connection and disconnection of the gas-liquid separator and the refrigerant outlet of the heat exchange pipeline.

14. The thermal management system according to claim 11, characterized in that: The first switching component includes a ninth electronic expansion valve, a tenth electronic expansion valve, and an eleventh electronic expansion valve, The ninth electronic expansion valve is arranged at the refrigerant outlet of the first heat exchange pipeline and is arranged in parallel with the second electronic expansion valve, the second electronic expansion valve is used to control the on-off of the first heat exchange pipeline and the refrigerant inlet of the gas-liquid separator, and the ninth electronic expansion valve is used to control the on-off of the first heat exchange pipeline and the refrigerant outlet of the compressor; The tenth electronic expansion valve is arranged at the refrigerant outlet of the second heat exchange pipeline and is arranged in parallel with the fourth electronic expansion valve, the fourth electronic expansion valve is used to control the connection and disconnection between the second heat exchange pipeline and the refrigerant inlet of the gas-liquid separator, and the tenth electronic expansion valve is used to control the connection and disconnection between the second heat exchange pipeline and the refrigerant outlet of the compressor; The eleventh electronic expansion valve is arranged at the refrigerant outlet of the third heat exchange pipeline and is arranged in parallel with the sixth electronic expansion valve. The sixth electronic expansion valve is used to control the connection and disconnection of the third heat exchange pipeline and the refrigerant inlet of the gas-liquid separator. The eleventh electronic expansion valve is used to control the connection and disconnection of the third heat exchange pipeline and the refrigerant outlet of the compressor.

15. The thermal management system according to claim 12, characterized in that: The second switching component includes two second control valves arranged in parallel, one of which is used to control the connection and disconnection of the refrigerant outlet of the compressor and the refrigerant inlet of the fourth heat exchanger, and the other second control valve is used to control the connection and disconnection of the refrigerant inlet of the gas-liquid separator and the refrigerant inlet of the fourth heat exchanger.

16. The thermal management system according to claim 9, characterized in that: The thermal management system further comprises an evaporator and a condenser. The refrigerant inlet of the evaporator is provided with a twelfth electronic expansion valve and is connected to the refrigerant outlet of the liquid storage device in an on-off manner. The refrigerant outlet of the evaporator is connected to the refrigerant inlet of the gas-liquid separator. The refrigerant inlet of the condenser is provided with a thirteenth electronic expansion valve and is connected to the refrigerant outlet of the liquid storage device in an on-off manner. The refrigerant outlet of the condenser is connected to the refrigerant outlet of the compressor.

17. A battery assembly, characterized in that: The invention comprises the thermal management system described in claims 1-16.

18. An electrical equipment, characterized in that: Comprising the battery assembly as claimed in claim 17.

Citation Information

Patent Citations

  • Temperature equalization control system of vehicle-mounted liquid cooling battery box

    CN109980312A

  • Battery cooling system, electric vehicle and control method

    CN111186290A

  • Power battery pack temperature difference and temperature management system and control method thereof

    CN114094238A

  • Adjusting method and adjusting device of heat exchanger, heat exchanger and air conditioner

    CN114704940A

  • Control method and vehicle

    CN117774598A

Cited By

  • Thermal management system, control method thereof and energy storage container

    CN119481439A

  • Thermal management system, battery assembly and electric device

    WO2025260601A1

  • Thermal management system, battery assembly and electric device

    WO2025260602A1