Offshore wind power flexible DC transmission system receiving end pre-charging control method and device
The dynamic model prediction control strategy optimizes the receiving pre-charge process of the flexible DC transmission system of offshore wind power, solves the problem of low charging stability, and achieves a more efficient and stable charging effect.
Patent Information
- Application Number
- CN202411253991.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The charging stability of the flexible DC transmission system at the offshore wind power supply is low during the pre-charge process. The existing technologies such as the closed-loop PI controller is complex and the parameter adjustment is difficult, the dynamic response is poor, and the non-difference control system depends on the precise system model, computing power and speed. High requirements and susceptible to model deviations.
Adopt a control strategy based on dynamic model prediction, by obtaining the bridge arm current, AC side current and voltage at the current moment, sorting and summing the voltage of the submodule, predicting the AC side current and circulation at the next moment, building a cost function, and iteratively optimizing the submodule Invest quantity to ensure the stability and efficiency of the charging process.
It improves the stability and efficiency of the charging process, simplifies the calculation process, reduces the requirements for computing capabilities, and ensures the safety and efficiency of charging.
Smart Images

Figure CN118763715B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power high voltage direct current transmission control, and in particular to a receiving end pre-charging control method and device for an offshore wind power flexible direct current transmission system. Background Art
[0002] The existing technology mainly uses a closed-loop PI controller for pre-charging. The charging current on the DC bus or the AC side can be adjusted to a constant value, so the charging speed is significantly improved. In addition, in order to improve the complexity of the closed-loop control system and the difficulty of parameter adjustment, the researchers proposed a deadbeat control system for pre-charging. Compared with the closed-loop PI controller, the deadbeat predictive control strategy has fast dynamic response and small current fluctuation.
[0003] The closed-loop PI controller has high control complexity, difficult parameter adjustment, and poor dynamic response. The PI controller mainly adjusts the system through proportional and integral links, and it is necessary to determine the optimal parameters through repeated experiments and experience, which increases the complexity and time cost of debugging. In addition, the PI controller may not be able to effectively compensate for the dynamic errors of the system.
[0004] The deadbeat control system predicts the system behavior at the next control moment through a mathematical model based on the current state and future goals of the system, and calculates the control amount that should be applied accordingly. The key to this method is to establish an accurate system model and be able to quickly solve the required control instructions. The performance of deadbeat predictive control is highly dependent on the accuracy of the system model. If there is a deviation between the model and the actual system, the control effect may be affected. Since the deadbeat control system needs to perform accurate calculations and predictions at each control moment, it has high requirements on the computing power and speed of the controller. Summary of the invention
[0005] Therefore, the technical problem to be solved by the present invention is to overcome the problem of low stability of the charging process during the pre-charging process of the receiving end of the DC transmission system in the prior art, thereby providing a pre-charging control method and device for the receiving end of the offshore wind power flexible DC transmission system.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] In the first aspect, the present invention provides a receiving-end pre-charging control method for an offshore wind power flexible direct current transmission system, wherein the receiving-end converter of the transmission system is connected to an alternating current grid, and the method comprises: obtaining the arm current, the AC side phase current, the arm submodule capacitor voltage and the AC side phase voltage of each phase of the receiving-end converter at the current moment; sorting the arm submodule capacitor voltages of each phase according to the voltage magnitude, and then summing the corresponding number of submodule capacitor voltages in the order of arrangement according to the number of arm submodules put into use at the current moment, and obtaining the sum of the arm submodule voltages put into use for each phase at the next moment; based on the current After calculating the AC side phase voltage at the next moment, the AC side phase voltage at the next moment is obtained by combining the voltage and the bridge arm current of each phase at the next moment, the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value are calculated; after iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different moments, the number of bridge arm sub-modules corresponding to the lowest cost function value is obtained; the corresponding number of sub-modules with the smallest voltage on each phase bridge arm of the receiving-end converter is controlled to be put into pre-charging.
[0008] The receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system provided by the present invention predicts future behavior according to the dynamic model of the system, and optimizes the current control decision accordingly. The model predictive control strategy is used to optimize the pre-charging process in the controllable charging process. The safety, stability and efficiency of the charging process are ensured by adding constraints to the control targets such as the controllable charging current, submodule voltage and circulating current. The cost function is introduced to quantify the balance relationship between different control targets, thereby finding the optimal pre-charging control strategy to ensure the stability, safety and efficiency of the charging process.
[0009] In an optional embodiment, the bridge arm submodule capacitor voltage includes an upper bridge arm submodule capacitor voltage and a lower bridge arm submodule capacitor voltage, the upper bridge arm includes n upper bridge arm submodules, and the lower bridge arm includes n lower bridge arm submodules. The process of sorting the bridge arm submodule capacitor voltages of each phase according to the voltage size includes: arranging the n upper bridge arm submodule capacitor voltages in ascending order and numbering them, and establishing an upper bridge arm submodule voltage matrix; arranging the n lower bridge arm submodule capacitor voltages in ascending order and numbering them, and establishing a lower bridge arm submodule voltage matrix; wherein n is a positive integer.
[0010] In an optional embodiment, according to the number of bridge arm submodules put into operation at the current moment, after summing the capacitor voltages of the corresponding number of submodules in order of arrangement, the process of obtaining the sum of the bridge arm submodule voltages of each phase at the next moment includes: calculating the voltage sum of the first x items of the upper bridge arm submodule voltage matrix to obtain the upper bridge arm submodule voltage sum value, and using the upper bridge arm submodule voltage sum value as the upper bridge arm submodule voltage sum at the next moment; calculating the voltage sum of the first y items of the lower bridge arm submodule voltage matrix to obtain the lower bridge arm submodule voltage sum value, and using the lower bridge arm submodule voltage sum value as the lower bridge arm submodule voltage sum at the next moment; x is an integer between 1 and n, and its value at the next moment is 1 greater than that at the current moment; y is an integer between 1 and n, and its value at the next moment is 1 greater than that at the current moment.
[0011] In an optional embodiment, the process of calculating the predicted value of the AC side phase current, the circulating current and the predicted value of the bridge arm energy at the next moment in combination with the sum of the bridge arm input sub-module voltages of each phase at the next moment includes: obtaining the relationship between the bridge arm current, the AC side phase current and the circulating current at the current moment according to Kirchhoff's current law; differentiating and discretizing the relationship to obtain the predicted value of the AC side phase current and the circulating current at the next moment; and calculating the predicted value of the bridge arm energy at the next moment according to the sum of the bridge arm input sub-module voltages of each phase at the next moment.
[0012] In an optional embodiment, the process of iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times includes: constructing a cost function, setting the minimum value of the cost function, and setting x at the current time to 1, and setting y to 1; at the current time, substituting the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value into the cost function to obtain a calculated value, and comparing it with the minimum value; if the calculated value is less than the minimum value, the current calculated value is used as the minimum value at the next moment, and the input number of the upper bridge arm submodule is assigned according to the current value of x , assign a value to the input number of the lower bridge arm submodule according to the current value of y; determine whether x is equal to n and whether y is equal to n; if x is not equal to n, control x to be added by one at the next moment and return to the step of "substituting the predicted value of the AC side phase current, the circulating current predicted value and the bridge arm energy predicted value into the cost function to obtain the calculated value, and compare it with the minimum value"; if y is not equal to n, control y to be added by one at the next moment and return to the step of "substituting the predicted value of the AC side phase current, the circulating current predicted value and the bridge arm energy predicted value into the cost function to obtain the calculated value, and compare it with the minimum value"; until x is equal to n and y is equal to n.
[0013] The receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system provided by the present invention finds the corresponding conduction number of upper and lower bridge arm submodules when the cost function value is the lowest through a cyclic iteration method. The iterative process has high accuracy, a simple algorithm, and small errors, thereby improving the stability of the calculation process.
[0014] In an optional embodiment, the process of controlling the corresponding number of submodules with the minimum voltage on each phase arm of the receiving-end converter to be put into pre-charging includes: obtaining the value of x and the value of y corresponding to the lowest cost function value; controlling the first x submodules in the upper arm submodule voltage matrix to be put into pre-charging, and controlling the remaining nx submodules to exit; controlling the first y submodules in the lower arm submodule voltage matrix to be put into pre-charging, and controlling the remaining ny submodules to exit.
[0015] The receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system provided by the present invention obtains the number of bridge arm sub-modules corresponding to the time when the cost function value is the lowest through a cyclic iteration method, and then performs pre-charging according to the corresponding number of sub-modules that control the minimum voltage on the bridge arm, thereby greatly improving the charging efficiency and the charging stability.
[0016] In an optional implementation, the pre-charging control method further includes: if the calculated value is greater than or equal to the minimum value, entering the step of "determining whether x is equal to n and whether y is equal to n".
[0017] In the second aspect, the present invention provides a receiving-end pre-charging control device for an offshore wind power flexible direct current transmission system, including: an acquisition module, used to obtain the bridge arm current, AC side phase current, bridge arm submodule capacitor voltage and AC side phase voltage of each phase of the receiving-end converter at the current moment; a sorting module calculation, used to sort the bridge arm submodule capacitor voltage of each phase according to the voltage size, and according to the number of bridge arm submodules put into use at the current moment, sum the corresponding number of submodule capacitor voltages in the order of arrangement, and obtain the sum of the bridge arm submodule voltages of each phase at the next moment; a prediction module, used to obtain the sum of the bridge arm submodule voltages of each phase at the next moment based on the AC side current moment. After the phase voltage is calculated to obtain the AC side phase voltage at the next moment, the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment are calculated in combination with the voltage and the bridge arm current of each phase at the next moment; the iteration module is used to iterate the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different moments to obtain the number of bridge arm sub-modules corresponding to the lowest cost function value; the driving module is used to control the corresponding number of sub-modules with the smallest voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging.
[0018] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system of the first aspect by executing the computer instructions.
[0019] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the receiving-end pre-charging control method for an offshore wind power flexible direct current transmission system according to the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a flow chart of a receiving-end pre-charging control method of an offshore wind power flexible direct current transmission system according to an embodiment of the present invention;
[0022] Figure 2 is a single-phase equivalent circuit of a three-phase receiving-end converter according to an embodiment of the present invention;
[0023] Figure 3 is a schematic diagram of a receiving-end pre-charging control method for an offshore wind power flexible direct current transmission system according to an embodiment of the present invention;
[0024] Figure 4 is a schematic diagram of a specific flow chart of a submodule sorting method according to an embodiment of the present invention;
[0025] Figure 5 is a schematic diagram of a specific flow chart of a method for obtaining a bridge arm input submodule voltage of each phase at the next moment according to an embodiment of the present invention;
[0026] Figure 6 is a schematic diagram of a specific flow chart of a method for iterating a cost function according to an embodiment of the present invention;
[0027] Figure 7 It is a specific flow chart of the receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system according to an embodiment of the present invention;
[0028] Figure 8 is a structural block diagram of a receiving-end pre-charging control device for an offshore wind power flexible direct current transmission system according to an embodiment of the present invention;
[0029] Fig. 9 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0030] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0032] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0033] When the receiving-end converter in a DC transmission system is first connected to the AC grid, it will go through an uncontrolled charging stage. In this stage, the capacitor is charged through the current-limiting resistor in the system. The current is mainly determined by the grid voltage and the current-limiting resistor. This stage does not involve complex control strategies. Then it enters the controlled charging stage, at which time certain control strategies need to be adopted to ensure the stability, safety and efficiency of the charging process.
[0034] This embodiment provides a receiving-end pre-charging control method for an offshore wind power flexible DC transmission system. The receiving-end converter of the transmission system is connected to an AC power grid. This embodiment takes a three-phase receiving-end converter as an example. Figure 1 As shown, the method includes:
[0035] Step S1: obtaining the bridge arm current, AC side phase current, bridge arm submodule capacitor voltage and AC side phase voltage of each phase of the receiving end converter at the current moment.
[0036] Specifically, Figure 2 The single-phase equivalent circuit of the three-phase receiving-end converter is shown in Figure 1. Each phase bridge arm includes an upper and lower bridge arm composed of multiple half-bridge rectifier circuits connected in series. Taking phase A as an example, its bridge arm can be equivalent to a pre-charge resistor. R p , two bridge arm inductors L a The AC phase voltage is U a, the upper bridge arm input submodule voltage and U au , the voltage of the lower bridge arm input submodule is U al , DC bus voltage is U dc , pre-charging control is achieved by controlling the charging current of the upper and lower bridge arms of each phase to be stable and suppressing the circulating current.
[0037] Step S2: After sorting the bridge arm submodule capacitor voltages of each phase according to the voltage magnitude, according to the number of bridge arm submodules put into operation at the current moment, summing up the corresponding number of submodule capacitor voltages in the order of arrangement, and obtaining the sum of the bridge arm submodule voltages of each phase at the next moment.
[0038] Specifically, assuming that the upper bridge arm and the lower bridge arm of each phase have n sub-modules respectively, after sorting the capacitor voltages of the upper bridge arm and the lower bridge arm sub-modules of each phase from small to large, the capacitor voltage sum of the first x sub-modules of the upper bridge arm of each phase and the capacitor voltage sum of the first y sub-modules of the lower bridge arm of each phase are obtained respectively, where x=1,2,…,n, and its value at the next moment is 1 greater than the current moment, that is, for example, if x is 2 at the current moment, then x is 3 at the next moment; y=1,2,…,n, and its value at the next moment is 1 greater than the current moment, that is, for example, if y is 2 at the current moment, then y is 3 at the next moment.
[0039] Step S3: After calculating the AC side phase voltage at the next moment based on the AC side phase voltage at the current moment, combine the bridge arm input sub-module voltage and the bridge arm current and the AC side phase current of each phase at the next moment to calculate the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment.
[0040] Specifically, x and y at each moment are controlled to increase between 1 and n. According to the capacitor voltage sum of the first x submodules of the upper bridge arm of each phase, the capacitor voltage sum of the first y submodules of the lower bridge arm of each phase, the bridge arm current and the AC side phase current at the current moment, the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment are calculated and brought into the cost function.
[0041] Step S4: After iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times, the number of bridge arm sub-modules corresponding to the lowest cost function value is obtained.
[0042] Specifically, if the cost function value calculated at the current moment is less than the preset cost function value and less than the minimum cost function value obtained at the previous moment, the cost function value at the current moment is stored as the minimum value, compared with the minimum value at the next moment, and the values of x and y at this time are recorded.
[0043] Step S5: Control the corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging.
[0044] Specifically, after all iterations, that is, when x=n and y=n, the system stores the minimum cost function value of all control moments. According to the values of x and y corresponding to the cost function value, the first x sub-modules of the upper bridge arm of each phase and the first y sub-modules of the lower bridge arm of each phase are turned on for pre-charging, and the remaining sub-modules are turned off.
[0045] Exemplarily, when all iterative processes are completed, the system traverses all combinations of the number of upper bridge arm sub-modules and lower bridge arm sub-modules that are turned on, and stores the corresponding upper bridge arm sub-module turn-on number x and lower bridge arm sub-module turn-on number y when the cost function value is the lowest. Assuming that the cost function value is the lowest, the corresponding x value is 3 and the y value is 5, then the first three sub-modules with the smallest capacitor voltage of the upper bridge arm sub-module are controlled to be turned on for pre-charging, and the first five sub-modules with the smallest capacitor voltage of the lower bridge arm sub-module are controlled to be turned on for pre-charging. At this time, the power consumption of the control system is the lowest and the efficiency is the highest. The control system can quickly and evenly complete the pre-charging of the sub-module capacitors, effectively suppressing the circulating current.
[0046] The receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system provided in this embodiment predicts future behavior according to the dynamic model of the system, and optimizes the current control decision accordingly. The model predictive control strategy is used to optimize the pre-charging process in the controllable charging process. The safety, stability and efficiency of the charging process are ensured by adding constraints to the control targets such as the controllable charging current, submodule voltage and circulating current. The cost function is introduced to quantify the balance relationship between different control targets, so as to find the optimal pre-charging control strategy and ensure the stability, safety and efficiency of the charging process.
[0047] In some optional embodiments, such as Figure 3 As shown, the bridge arm submodule capacitor voltage includes n upper bridge arm submodules and n lower bridge arm submodules. Figure 4 As shown, the process of sorting the capacitor voltages of the bridge arm submodules of each phase according to the voltage magnitude includes:
[0048] Step S21: Arrange and number the n upper bridge arm submodule capacitor voltages in ascending order, and establish an upper bridge arm submodule voltage matrix.
[0049] Step S22: Arrange and number the n lower bridge arm submodule capacitor voltages in ascending order, and establish a lower bridge arm submodule voltage matrix; wherein n is a positive integer.
[0050] Specifically, Figure 3In the above example, after sorting the capacitor voltages of all the upper bridge arm submodules of the three-phase bridge arm according to the sorting algorithm, the sorted upper bridge arm submodule capacitor voltages are sequentially stored in the upper bridge arm submodule voltage matrix in ascending order, and the serial numbers of the corresponding submodules are sequentially stored in the upper bridge arm submodule serial number matrix. Then U ju1 is the first upper bridge arm submodule capacitor voltage in the j-phase upper bridge arm submodule voltage matrix, which has the smallest value in the upper bridge arm submodule voltage matrix. U jun It is the sum of the capacitor voltages of the first n upper bridge arm submodules in the j-phase upper bridge arm submodule voltage matrix. The value of j is a, b or c, corresponding to phase A, phase B and phase C respectively.
[0051] Specifically, Figure 3 Similarly, after sorting the capacitor voltages of all the submodules of the lower bridge arm of the three-phase bridge arm according to the sorting algorithm, the sorted capacitor voltages of the lower bridge arm submodules are sequentially stored in the lower bridge arm submodule voltage matrix in ascending order, and the serial numbers of the corresponding submodules are sequentially stored in the lower bridge arm submodule serial number matrix, then U jl1 is the first lower bridge arm submodule capacitor voltage in the j-phase lower bridge arm submodule voltage matrix, which has the smallest value in the lower bridge arm submodule voltage matrix. U jln It is the sum of the capacitor voltages of the first n lower bridge arm submodules in the j-phase lower bridge arm submodule voltage matrix. The value of j is a, b or c, corresponding to phase A, phase B and phase C respectively.
[0052] Specifically, Figure 3 middle, U u1 is the sum of the capacitor voltages of the first submodule in the upper bridge arm submodule voltage matrix of each phase, U un is the sum of the capacitor voltages of the first n three-phase bridge arm submodules in each phase upper bridge arm submodule voltage matrix, U l1 is the sum of the capacitor voltages of the first submodule in the voltage matrix of the lower bridge arm submodules of each phase, U ln It is the sum of the capacitor voltages of the first n three-phase bridge arm submodules in the bridge arm submodule voltage matrix of each phase.
[0053] Specifically, Figure 3 In the above example, the upper arm current at the current moment (i.e. moment k) is obtained by sampling. i ju ( k ) and the lower arm current i jl ( k ), and the AC side phase voltage at time k Uj ( k ), providing a basis for calculation in subsequent steps.
[0054] In some optional embodiments, such as Figure 5 As shown, according to the number of bridge arm submodules put into operation at the current moment, the capacitor voltages of the corresponding number of submodules are summed in the order of arrangement to obtain the sum of the bridge arm submodule voltages of each phase at the next moment, including:
[0055] Step S23: Calculate the voltage sum of the first x items of the upper bridge arm submodule voltage matrix to obtain the upper bridge arm submodule voltage sum value, and use the upper bridge arm submodule voltage sum value as the upper bridge arm input submodule voltage sum at the next moment.
[0056] Step S24: Calculate the voltage sum of the first y items of the lower bridge arm submodule voltage matrix to obtain the lower bridge arm submodule voltage sum value, and use the lower bridge arm submodule voltage sum value as the lower bridge arm input submodule voltage sum at the next moment; x is an integer between 1 and n, and its value at the next moment is 1 greater than the current moment; y is an integer between 1 and n, and its value at the next moment is 1 greater than the current moment.
[0057] Specifically, Figure 3 , respectively calculate the sum of the capacitor voltages of the first x submodules in the upper bridge arm submodule voltage matrix of each phase and the sum of the capacitor voltages of the first y submodules in the lower bridge arm submodule voltage matrix of each phase, where x is an integer increasing from 1 to n, and its value at the next moment is 1 greater than that at the current moment; y is an integer increasing from 1 to n, and its value at the next moment is 1 greater than that at the current moment.
[0058] In some optional implementations, the process of calculating and obtaining the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment in combination with the bridge arm input submodule voltage of each phase at the next moment includes:
[0059] Step S31: Obtain the relationship between the bridge arm current, the AC side phase current and the circulating current at the current moment according to Kirchhoff's current law.
[0060] Specifically, Figure 2 In the example, taking the A-phase bridge arm as an example, according to Kirchhoff's voltage law, the following equation is given for the A-phase bridge arm:
[0061] (1)
[0062] in, I as is the AC side phase current, I au is the upper arm current, I al is the lower arm current, Rp is the pre-charge resistor, L a is the bridge arm inductance, U a is the AC phase voltage, U au The voltage of the submodule is input to the upper bridge arm and, U al The submodule voltage is input to the lower bridge arm and, U dc is the DC bus voltage. Then the AC side phase voltage reference value at time k+1 is U a * ( k +1) is:
[0063] (2)
[0064] in, ω is the angular velocity, θ is the phase, T s is a period of k moments.
[0065] Specifically, Figure 2 According to Kirchhoff's voltage law, the alternating current I as , upper arm current I au , lower arm current I al , circulation I ac The relationship between them is as follows:
[0066] (3)
[0067] Step S32: Differentiate and discretize the relationship to obtain the predicted value of the AC side phase current at the next moment and the predicted value of the circulating current at the next moment.
[0068] Specifically, by substituting formula (1) into formula (3), we can obtain:
[0069] (4)
[0070] in, I a is the alternating current, so we can get I a The differential equation is:
[0071] (5)
[0072] Discretization yields:
[0073] (6)
[0074] in, I a ( k ) is the AC side phase current at time k, I a ( k +1) is the AC side phase current at time k+1 (i.e., the predicted value of the AC side phase current), U au ( k +1) is the sum of the capacitor voltages of the upper bridge arm submodules at time k+1, U al ( k +1) is the sum of the capacitor voltages of the lower bridge arm input submodules at time k+1, U a * ( k +1) is the k+1 moment U a reference value.
[0075] According to formula (6), the predicted value of AC side phase current can be obtained: I a ( k +1) is:
[0076] (7)
[0077] According to formula (1) and formula (3), we can get:
[0078] (8)
[0079] in, IU is the upper arm current, Il is the lower arm current.
[0080] After discretizing formula (8), we get the circulation at time k+1: Ic ( k +1) (i.e., the circulation prediction value) is:
[0081] (9)
[0082] in, I c ( k ) is the circulation at time k, U dc * ( k +1) is the DC bus voltage reference value at time k+1.
[0083] Step S33: Calculate and obtain the predicted value of the bridge arm energy at the next moment according to the sum of the bridge arm input submodule voltages of each phase at the next moment.
[0084] Specifically, considering that the influence of interphase circulating current on switching devices due to energy imbalance between phases A, B, and C or between phases α and β should be avoided as much as possible during the charging process, for each phase bridge arm at time k+1:
[0085] (10)
[0086] in, Wij ( k +1) is the upper bridge arm energy (i.e., the upper bridge arm energy prediction value) or the lower bridge arm energy (i.e., the lower bridge arm energy prediction value) at time k+1, C is the submodule capacitance value, N is the number of upper bridge arm or lower bridge arm submodules, is the predicted value of the sum of the voltages of the submodules put into the upper bridge arm at time k+1, is the predicted value of the voltage and of the submodule put into the lower bridge arm at time k+1, and the two can be calculated by the following formula:
[0087] (11)
[0088] in, n ij The number of submodules put into use for the upper or lower bridge arm of phase A, B or C, i ij ( k ) is the current value of the upper bridge arm or lower bridge arm of phase A, B or C at time k, V cij ( k ) is the capacitor voltage at the corresponding time k.
[0089] In some optional embodiments, such as Figure 6 As shown in FIG. 1 , the process of iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times includes:
[0090] Step S41: construct a cost function, set the minimum value of the cost function, and set x at the current moment to 1 and y to 1.
[0091] Specifically, considering the pre-charging current, circulating current and energy balance between bridge arms, the cost function g is determined as:
[0092] (12)
[0093] Among them, when j=A,B,C When corresponding to phase A, phase B, and phase C, λ 1. λ 2. λ3 are the weights of the three variables, which are set by the operator. i js * ( k +1) is the reference value of the j-phase AC current at time k+1, i jc * ( k +1) is the reference value of the j-phase circulating current at time k+1, i js ( k +1) is the AC side phase current of the j-phase bridge arm at time k+1 (i.e., the predicted value of the AC side phase current), i jc ( k +1) is the circulating current of the j-phase bridge arm at time k+1 (i.e., the predicted circulating current value).
[0094] Specifically, refer to Figure 7 , set the k moment to the current moment, and set the initial cost function minimum value to J min =10 8 , set x to cycle from 1 to n, and y to cycle from 1 to n, that is, at time k, the first x submodules in the voltage matrix of the upper bridge arm submodule of each phase are put into operation, and the first y submodules in the voltage matrix of the lower bridge arm submodule of each phase are put into operation, and the upper bridge arm submodule voltage matrix is calculated respectively U u The first x voltages and U x ( k +1) and the lower bridge arm submodule voltage matrix U l The voltage of the first y terms and U y ( k +1).
[0095] Step S42: At the current moment, the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy are substituted into the cost function to obtain the calculated value, and compared with the minimum value.
[0096] Specifically, refer to Figure 7 , calculate the current time to get U a * ( k +1) and read U dc * ( k +1), calculate the predicted value of the AC side phase current i jc ( k +1), circulation prediction value ijs ( k +1) and bridge arm energy prediction value W j ( k +1) Substitute the cost function and the minimum value of the cost function J min Make a comparison.
[0097] Step S43: If the calculated value is less than the minimum value, the current calculated value is used as the minimum value at the next moment, and the number of upper bridge arm submodules is assigned according to the current value of x, and the number of lower bridge arm submodules is assigned according to the current value of y.
[0098] Specifically, refer to Figure 3 , if the calculated cost function value J Less than J min , then the current cost function value J As the minimum value of the cost function at the next moment J min , use the current x value as the conduction number of the upper bridge arm submodule N au Assign value, use the current y value as the conduction number of the lower bridge arm submodule N al Assignment. If the current cost function value J Greater than or equal to the minimum cost function value J min , then go to step S44.
[0099] Step S44: Determine whether x is equal to n and whether y is equal to n.
[0100] Step S45: If x is not equal to n, then control x to be incremented by one at the next moment and then return to the step of "substituting the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy into the cost function to obtain the calculated value, and comparing it with the minimum value".
[0101] Step S46: If y is not equal to n, control y to be incremented by one at the next moment and then return to the step of "substituting the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy into the cost function to obtain the calculated value, and comparing it with the minimum value".
[0102] Step S47: until x equals n and y equals n.
[0103] Specifically, refer to Figure 3, determine whether x is equal to n. If not, it indicates that the upper bridge arm submodules have not yet been fully put into the loop calculation. Control y to keep the value unchanged, add 1 to x, and enter step S42 again to start the next iterative calculation. If x is equal to n, determine whether y is equal to n. If not, it indicates that the lower bridge arm submodules have not yet been fully put into the loop calculation. Control x to keep the value unchanged, add 1 to y, and enter step S42 again to start the next iterative calculation until x is equal to n and y is equal to n.
[0104] In some optional implementations, the process of controlling a corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging includes:
[0105] Step S51: Obtain the value of x and the value of y corresponding to the lowest cost function value.
[0106] Specifically, refer to Figure 3 , when x is equal to n and y is equal to n, it indicates that the iteration is over. At this time, the value of J is the value with the minimum cost function value in all iterations, and its corresponding upper bridge arm submodule conduction number x is N au Assignment, the corresponding lower bridge arm submodule conduction number y is N al Assignment.
[0107] Step S52: Control the first x submodules in the upper bridge arm submodule voltage matrix to start precharging, and control the remaining nx submodules to exit.
[0108] Step S53: controlling the first y submodules in the lower bridge arm submodule voltage matrix to be put into pre-charging, and controlling the remaining ny submodules to exit.
[0109] Specifically, refer to Figure 3 ,according to N au The numerical control of the upper bridge arm submodule voltage matrix, the first x submodules are put into pre-charging, according to N al Under the numerical value of , the first y sub-modules in the bridge arm sub-module voltage matrix are put into pre-charging, and the other sub-modules remain in the off state. The current sub-module input state corresponds to the lowest cost function value, that is, the highest efficiency and the lowest power consumption.
[0110] In this embodiment, a pre-charging control device for a receiving end of an offshore wind power flexible DC transmission system is also provided, which is used to implement the above-mentioned embodiment and any optional implementation mode, and will not be repeated hereafter. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0111] This embodiment provides a receiving-end pre-charging control device for an offshore wind power flexible direct current transmission system, such as Figure 8 As shown, including:
[0112] The acquisition module 801 is used to obtain the bridge arm current, AC side phase current, bridge arm submodule capacitor voltage and AC side phase voltage of each phase of the receiving end converter at the current moment.
[0113] The sorting module calculates 802, which is used to sort the bridge arm submodule capacitor voltages of each phase according to the voltage size, and then sums the corresponding number of submodule capacitor voltages in the arrangement order according to the number of bridge arm submodules put into use at the current moment, so as to obtain the sum of the bridge arm submodule voltages of each phase at the next moment.
[0114] The prediction module 803 is used to calculate the AC side phase voltage at the next moment based on the AC side phase voltage at the current moment, and then combine the voltage and bridge arm input sub-module of each phase at the next moment, the bridge arm current and the AC side phase current to calculate the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment.
[0115] The iteration module 804 is used to iterate the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times to obtain the number of bridge arm sub-modules invested when the cost function value is the lowest.
[0116] The driving module 805 is used to control the corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging.
[0117] The receiving-end pre-charging control device of the offshore wind power flexible direct current transmission system in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0118] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0119] The embodiment of the present invention also provides a computer device having the above Figure 8 The shown figure is a receiving-end pre-charging control device for an offshore wind power flexible DC transmission system.
[0120] See also Fig. 9 , Fig. 9 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Fig. 9 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Fig. 9 A processor 10 is taken as an example.
[0121] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0122] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0123] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the use of a computer device based on the presentation of a small program landing page, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0124] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0125] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0126] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0127] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0128] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A receiving-end pre-charging control method for an offshore wind power flexible direct current transmission system, characterized in that: The receiving-end converter of the power transmission system is connected to the AC power grid, and the method comprises: Obtain the bridge arm current, AC side phase current, bridge arm submodule capacitor voltage and AC side phase voltage of each phase of the receiving end converter at the current moment; After sorting the bridge arm submodule capacitor voltages of each phase according to the voltage magnitude, according to the number of bridge arm submodules put into use at the current moment, summing up the corresponding number of submodule capacitor voltages in the order of arrangement, and obtaining the sum of the bridge arm submodule voltages put into use at the next moment for each phase; After calculating the AC side phase voltage at the next moment based on the AC side phase voltage at the current moment, combining the voltage of the bridge arm input submodule of each phase at the next moment, the bridge arm current and the AC side phase current, calculate the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment; After iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times, the number of bridge arm submodules corresponding to the lowest cost function value is obtained; Control the corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging; The upper bridge arm includes n upper bridge arm submodules, and the lower bridge arm includes n lower bridge arm submodules; Wherein, n is a positive integer; x is an integer between 1 and n, and its value at the next moment is 1 greater than the current moment; y is an integer between 1 and n, and its value at the next moment is 1 greater than the current moment; The process of calculating and obtaining the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy at the next moment by combining the sum of the bridge arm input submodule voltages of each phase at the next moment includes: According to Kirchhoff's current law, the relationship between the bridge arm current, the AC side phase current and the circulating current at the current moment is obtained; After differentiating and discretizing the relationship, a predicted value of the AC side phase current at the next moment and a predicted value of the circulating current at the next moment are obtained; According to the sum of the bridge arm input submodule voltages of each phase at the next moment, the predicted bridge arm energy value at the next moment is calculated; The process of iterating the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times includes: Construct the cost function, set the minimum value of the cost function, and set x to 1 and y to 1 at the current moment; At the current moment, the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy are substituted into the cost function to obtain a calculated value, and compared with the minimum value; If the calculated value is less than the minimum value, the current calculated value is used as the minimum value at the next moment, and the input number of the upper bridge arm submodule is assigned a value according to the current value of x, and the input number of the lower bridge arm submodule is assigned a value according to the current value of y; Determine whether x is equal to n and whether y is equal to n; If x is not equal to n, then control y to be incremented by one at the next moment and then return to the step of "substituting the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy into the cost function to obtain a calculated value, and comparing it with the minimum value"; If y is not equal to n, then control y to be incremented by one at the next moment and then return to the step of "substituting the predicted value of the AC side phase current, the predicted value of the circulating current and the predicted value of the bridge arm energy into the cost function to obtain a calculated value, and comparing it with the minimum value"; Until x equals n and x equals n; The process of controlling a corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging includes: Get the x and y values corresponding to the lowest cost function value; Control the first x submodules in the upper bridge arm submodule voltage matrix to start precharging, and control the remaining nx submodules to exit; Control the first y submodules in the lower bridge arm submodule voltage matrix to start precharging, and control the remaining ny submodules to exit; If the calculated value is greater than or equal to the minimum value, the process proceeds to the step of "determining whether x is equal to n and whether y is equal to n".
2. The method according to claim 1, characterized in that The bridge arm submodule capacitor voltage includes an upper bridge arm submodule capacitor voltage and a lower bridge arm submodule capacitor voltage. The process of sorting the bridge arm submodule capacitor voltages of each phase according to voltage magnitude includes: Arrange and number the capacitor voltages of the n upper bridge arm submodules in ascending order, and establish an upper bridge arm submodule voltage matrix; The n lower bridge arm submodule capacitor voltages are arranged in ascending order and numbered, and a lower bridge arm submodule voltage matrix is established.
3. The method according to claim 2, characterized in that The process of obtaining the sum of the bridge arm submodule voltages of each phase at the next moment after summing the capacitor voltages of the corresponding number of submodules in the order of arrangement according to the number of bridge arm submodules put into operation at the current moment includes: Calculate the voltage sum of the first x items of the upper bridge arm submodule voltage matrix to obtain the upper bridge arm submodule voltage sum value, and use the upper bridge arm submodule voltage sum value as the upper bridge arm input submodule voltage sum at the next moment; The voltage sum of the first y items of the voltage matrix of the lower bridge arm submodule is calculated to obtain the voltage sum value of the lower bridge arm submodule, and the voltage sum value of the lower bridge arm submodule is used as the voltage sum of the lower bridge arm input submodule at the next moment.
4. A pre-charging control device for a receiving end of an offshore wind power flexible direct current transmission system, characterized in that: include: An acquisition module is used to obtain the bridge arm current, AC side phase current, bridge arm submodule capacitor voltage and AC side phase voltage of each phase of the receiving end converter at the current moment; The sorting module calculates and is used to sort the bridge arm submodule capacitor voltages of each phase according to the voltage size, and then sum the corresponding number of submodule capacitor voltages according to the arrangement order according to the number of bridge arm submodules put into use at the current moment, so as to obtain the sum of the bridge arm submodule voltages put into use at each phase at the next moment; A prediction module, which is used to calculate the AC side phase voltage at the next moment based on the AC side phase voltage at the current moment, and then calculate the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at the next moment in combination with the bridge arm input submodule voltage of each phase at the next moment, the bridge arm current and the AC side phase current; An iteration module is used to iterate the cost function using the AC side phase current prediction value, circulating current prediction value and bridge arm energy prediction value at different times to obtain the number of bridge arm sub-modules invested when the cost function value is the lowest; The driving module is used to control the corresponding number of submodules with the minimum voltage on each phase bridge arm of the receiving-end converter to be put into pre-charging.
5. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the receiving-end pre-charging control method of the offshore wind power flexible direct current transmission system according to any one of claims 1 to 3 by executing the computer instructions.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the receiving-end pre-charging control method for an offshore wind power flexible direct current transmission system according to any one of claims 1 to 3.