The test environment of the existing temporary speed limit server is not integrated, resulting in device connection errors, long time to find problems, low test efficiency, and inconsistent test results, affecting credibility.
A test device for temporary speed-limited servers is designed, integrated in a metal cabinet, including power module, industrial computer PC1 and PC2, communication module and display, industrial computer PC1 simulates the dispatching centralized system and train control maintenance center, and industrial computer PC2 simulates The wireless block center and vehicle-mounted equipment, communication module supports data transmission, and the display displays test data to achieve an integrated test platform.
It saves the time to set up the test environment, reduces connection errors, improves the test efficiency and the accuracy and credibility of the results, and reduces the difficulty of equipment management.
Smart Images

Figure CN118770327A_ABST
Abstract
Description
Technical Field
[0001] This article relates to equipment testing technology, and in particular to a testing device for a temporarily speed-limited server. Background Art
[0002] The Temporary Speed Restriction Server (TSRS) receives the speed limit command information issued by the dispatching centralized system or adjacent TSRS equipment, and promptly issues it to other adjacent TSRS equipment, train control center equipment, unlimited block center equipment, dispatching centralized system equipment, on-board equipment, train control maintenance center, etc., to ensure the normal issuance of speed limits and state maintenance and storage, and to ensure the safety of train operation; the new train control temporary speed limit server equipment must also realize communication with on-board equipment. This equipment is mainly used in the China Train Operation Control System CTCS-2 and CTCS-3 ground control systems. Therefore, the hardware function or type test of the temporary speed limit server is very important. However, during the test process, it is impossible to use all external real devices to connect to the temporary speed limit server for testing. Therefore, a set of integrated and comprehensive test devices is required to realize communication and control with the temporary speed limit server to meet the test requirements of the temporary speed limit server. However, due to the large number of peripheral simulation devices, the current environment has the following problems:
[0003] 1. Non-integrated test environment. There are many peripherals used in the test. It is necessary to temporarily connect various analog test devices together. There are many connecting cables, which may cause device connection errors. It is difficult to find device problems. It takes a long time to build the environment and find problems, and the test efficiency is low.
[0004] 2. In a non-integrated test environment, test equipment is easily misappropriated when it is idle. When testing, it is necessary to temporarily find equipment or use new equipment, which will lead to inconsistency between each test equipment and environment, and bring great uncertainty and inconsistency to the test results of the equipment under test;
[0005] 3. During the type test, the equipment protection grounding of the temporary simulation equipment end and the discharge grounding of the lightning protection module may result in differences in the grounding method each time. In particular, different testers have very different building environments, which brings a lot of uncertainty to the test results. It may lead to inconsistent test results each time and affect the credibility of the test results;
[0006] 4. The placement of peripheral simulation is not integrated. When the type test is carried out outside, the equipment is placed in different packaging boxes. There are many packaging boxes, which is not conducive to the transportation of the equipment. Some equipment may be lost during the transportation process, which is not conducive to equipment management and reduces the test efficiency. Summary of the invention
[0007] The embodiment of the present application provides a test device for a temporary speed limit server, which is deployed in a metal cabinet, and the test device includes:
[0008] Power modules distribute power to various devices in the metal cabinet;
[0009] 2 industrial computers PC1 and PC2; among them, industrial computer PC1 is used to simulate the dispatching centralized system and train control maintenance center that communicate with the temporary speed limit server under test; industrial computer PC2 is used to simulate the wireless block center, train control center, on-board equipment, ground-based augmentation system and adjacent temporary speed limit server that communicate with the temporary speed limit server under test;
[0010] There is a deployment space between adjacent devices in the power module, the industrial computer PC1, and the industrial computer PC2, and the deployment space is provided with a communication module and a display, wherein:
[0011] The communication module is connected to two industrial computers PC1 and PC2, and is used to support data transmission operations between the two industrial computers PC1 and PC2 and the temporarily speed-limited server under test;
[0012] The display is connected to two industrial computers PC1 and PC2 and is used to display data generated by the test operation.
[0013] The test device provided in the embodiment of the present application provides a comprehensive and integrated test platform to meet the communication and control test requirements of the temporary speed limit server, save time in setting up the test environment, reduce test connection errors, improve test efficiency, and ensure the accuracy, consistency and credibility of the test results.
[0014] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or be understood by implementing the present application. Other advantages of the present application can be realized and obtained by the schemes described in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings are used to provide an understanding of the technical solution of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the technical solution of the present application and do not constitute a limitation on the technical solution of the present application.
[0016] Figure 1 A schematic diagram of the connection of peripheral devices for communicating with a temporarily speed-limited server under test in the related art;
[0017] Figure 2 A schematic diagram of the structure of a test device for a temporary speed limit server provided in an embodiment of the present application;
[0018] Figure 3 for Figure 2 The schematic diagram of the deployment of the test device in the metal cabinet is shown;
[0019] Figure 4 for Figure 3 A schematic diagram showing the connection between the power module P1 and various devices in the test device;
[0020] Figure 5 for Figure 3 A schematic diagram of the deployment of the protective structure shown;
[0021] Figure 6 for Figure 3 The test device is shown in a front view of a metal cabinet;
[0022] Figure 7 for Figure 3 The test setup is shown as a rear view in a metal cabinet. DETAILED DESCRIPTION
[0023] The present application describes multiple embodiments, but the description is exemplary rather than restrictive, and it is obvious to those skilled in the art that there may be more embodiments and implementations within the scope of the embodiments described in the present application. Although many possible feature combinations are shown in the drawings and discussed in the specific embodiments, many other combinations of the disclosed features are also possible. Unless specifically limited, any feature or element of any embodiment may be used in combination with any other feature or element in any other embodiment, or may replace any other feature or element in any other embodiment.
[0024] The present application includes and contemplates combinations of features and elements known to those of ordinary skill in the art. The embodiments, features and elements disclosed in the present application may also be combined with any conventional features or elements to form a unique invention scheme. Any features or elements of any embodiment may also be combined with features or elements from other invention schemes to form another unique invention scheme. Therefore, it should be understood that any feature shown and / or discussed in the present application may be implemented individually or in any appropriate combination. Therefore, except for the limitations made according to the attached claims and their equivalents, the embodiments are not subject to other restrictions. In addition, various modifications and changes may be made within the scope of protection of the attached claims.
[0025] In addition, when describing representative embodiments, the specification may have presented the method and / or process as a specific sequence of steps. However, to the extent that the method or process does not rely on the specific order of the steps described herein, the method or process should not be limited to the steps of the specific order described. As will be understood by those of ordinary skill in the art, other sequences of steps are also possible. Therefore, the specific sequence of the steps set forth in the specification should not be interpreted as a limitation to the claims. In addition, the claims for the method and / or process should not be limited to the steps of performing them in the order written, and those skilled in the art can easily understand that these sequences can be changed and still remain within the spirit and scope of the embodiments of the present application.
[0026] In view of the defects in the existing technology, a comprehensive and integrated test device is needed to meet the communication and control test requirements of the temporary speed limit server, so as to facilitate the hardware type test of the temporary speed limit server, such as climate environment temperature test, electromagnetic compatibility test, lightning protection test, etc.
[0027] According to the product standards and specifications related to temporary speed limit servers, the device interface requirements are as follows: Figure 1 As shown, the peripheral devices communicating with the temporary speed limit server under test mainly include the temporary speed limit server, computer interlocking equipment, dispatching centralized system, train control maintenance center, on-board equipment and the temporary speed limit server adjacent to the temporary speed limit server under test.
[0028] According to the existing product standards of temporary speed limit server equipment, as well as the comprehensive requirements of the new train control system and high-speed railway ATO system for temporary speed limit servers, the interface requirements of temporary speed limit servers are as follows: Figure 1 As shown. The peripheral communication interfaces are mainly safety data network interface, CTC dedicated digital channel interface, train control maintenance center communication interface, vehicle-mounted equipment wireless network communication interface, and ground-based augmentation system communication interface. The main external equipment includes train control center equipment related to the safety data network, adjacent temporary speed limit server equipment, and wireless block center equipment; dispatching centralized system equipment related to the CTC dedicated digital channel; and train control maintenance center, vehicle-mounted equipment communication, ground-based augmentation system equipment, etc. Therefore, the simulation test comprehensive device needs to have simulation equipment for the corresponding peripheral equipment. Therefore, the integrated test device can at least simulate the functions of the peripheral equipment that communicates with the temporary speed limit server under test, and has a communication module that supports the peripheral equipment to communicate with the temporary speed limit server under test. In addition, necessary displays should be provided for testers to understand the execution status of the test operation.
[0029] Based on the above analysis, the present application provides the following solutions, including:
[0030] Figure 2A schematic diagram of the structure of a test device for a temporary speed limit server provided in an embodiment of the present application. Figure 2 As shown, the test device is deployed in a metal cabinet.
[0031] The cabinet frame of the metal cabinet uses a metal cabinet with a standard 19-inch internal width and a 30U high frame. The frame and sides of the metal cabinet are metal structures, and the front and rear switch doors are metal doors; the inside of the front and rear doors are equipped with file boxes to place files, mice, keyboards, etc.
[0032] Among them, a cable outlet hole is set at the bottom of the frame, and the bottom outlet method is adopted. The cable connected to the temporarily speed-limited server under test can be inserted into the test equipment through the cable outlet hole, so that the front and rear doors of the metal cabinet can be closed during the test to prevent the laboratory's spatial electromagnetic interference signals from interfering with the normal operation of various devices in the metal cabinet.
[0033] Optionally, in order to facilitate internal heat dissipation of the metal cabinet, a fan may be provided in the metal cabinet.
[0034] Specifically, air inlets are provided at the bottom of the front and rear doors of the cabinet frame, and a fan and air outlets are provided at the top of the cabinet frame, so that cold air enters from the bottom and hot air is discharged from the top, helping the equipment in the cabinet to dissipate heat and keeping the test device in good ambient temperature conditions.
[0035] The test device includes a power module P1, two industrial computers PC1 and PC2, a communication module and a display X1.
[0036] in:
[0037] Power module P1 distributes power to various devices in the metal cabinet.
[0038] The power module P1 can be connected to each power-consuming functional module in the metal cabinet through a power cable to provide power therefor.
[0039] The functions implemented by each main control machine of the two industrial computers PC1 and PC2 are different.
[0040] Specifically, industrial computer PC1 is used to simulate the dispatching centralized system and train control maintenance center that communicate with the temporary speed limit server under test; industrial computer PC2 is used to simulate the wireless block center, train control center, on-board equipment, ground-based augmentation system and adjacent temporary speed limit server that communicate with the temporary speed limit server under test.
[0041] In the embodiment of the present application, the reasons for setting up two industrial computers PC1 and PC2 are that, firstly, there are many simulation software, and opening the simulation software at the same time and communicating will occupy more memory. The industrial computer will get stuck after working for a long time. In order to prevent the industrial computer from running abnormally, the functions to be implemented are set separately in the two industrial computers; secondly, the simulation equipment is divided according to different communication media to avoid cross-wiring of simulations with different communication media properties and mutual interference; thirdly, the communication units used by different industrial computers are controlled to be connected to their corresponding industrial computers PC nearby to avoid long cables and confusing wiring.
[0042] The power module, the industrial computer PC1, and the industrial computer PC2 are arranged in a metal cabinet at intervals. There is a deployment space between adjacent devices in the power module P1, the industrial computer PC1, and the industrial computer PC2. The deployment space is provided with a communication module and a display X1.
[0043] The communication module is connected to two industrial computers PC1 and PC2, and is used to support data transmission operations between the two industrial computers PC1 and PC2 and the temporarily speed-limited server under test;
[0044] The display is connected to two industrial computers PC1 and PC2 and is used to display data generated by the test operation.
[0045] By using the deployment space between adjacent industrial computers to deploy communication modules and displays, the integration of the test device is improved and the layout of the space is optimized.
[0046] Take the communication process of the test device simulating the centralized dispatching system as an example to illustrate:
[0047] According to the communication configuration of the temporary speed limit server under test, the industrial computer PC1 is configured to communicate with the temporary speed limit server under test through the coaxial interface; after the external dispatching centralized communication cable is connected, the temporary speed limit server under test is powered on and enters normal working state, waiting for the communication state with the dispatching centralized system. At this time, the dispatching centralized system simulation software in the industrial computer PC1 is opened, and the "communication connection" button in the simulation software is clicked. The simulation software can automatically send the data of the dispatching centralized system to the temporary speed limit server. The temporary speed limit server receives the data from the dispatching centralized system, and then replies with the data according to the equipment operation information. The simulation software displays the replied information, processes it, and then sends the data in a loop to realize the communication between the temporary speed limit server under test and the dispatching centralized system.
[0048] Similarly, the train control maintenance center, wireless block center, train control center, on-board equipment, ground-based augmentation system and adjacent temporary speed limit servers, etc., all need to configure the communication methods used in the corresponding industrial computers; after the external cable connection is completed, the temporary speed limit server under test is powered on and enters normal working state, waiting to be connected to external devices. At this time, open the corresponding simulation software and click the "communication connection" button. Each simulation software sends data information to the train control center under test. After the train control center under test receives the information, it replies to each simulation software. The simulation software displays the reply information, processes it, and then sends data in a loop to realize the communication between the temporary speed limit server under test and each functional simulation unit.
[0049] The test device provided in the embodiment of the present application provides a comprehensive and integrated test platform to meet the communication and control test requirements of the temporary speed limit server, save time in setting up the test environment, reduce test connection errors, improve test efficiency, and ensure the accuracy, consistency and credibility of the test results.
[0050] Figure 3 for Figure 2 The following is a schematic diagram of the deployment of the test device in a metal cabinet. Figure 3 As shown, based on the functions of two industrial computers PC1 and PC2, the communication module includes a communication unit supporting the communication of industrial computer PC1 and a communication unit supporting the communication of industrial computer PC2. Among them, the communication unit supporting the communication of industrial computer PC1 can realize the communication between industrial computer PC1 and the temporarily speed-limited server under test, and the communication unit supporting the communication of industrial computer PC2 can realize the communication between industrial computer PC2 and the temporarily speed-limited server under test.
[0051] By deploying the communication units used by the two industrial computers PC1 and PC2 separately, the cross routing of communication cables can be avoided and the occurrence of signal interference can be reduced.
[0052] The above two communication units are both arranged adjacent to their respective industrial computers PC to facilitate wiring. The deployment position of each communication unit is determined according to its respective industrial computer PC.
[0053] exist Figure 3 In the test device shown, a power module P1 is deployed at the bottom of the metal cabinet to facilitate the routing of power cables. In the remaining deployment space of the metal cabinet except for the deployment space occupied by the power module P1, the metal cabinet is sequentially deployed with industrial computers PC1 and PC2 from the bottom to the top.
[0054] Based on the deployment positions of the power module, the industrial computer PC1 and the industrial computer PC2, the deployment positions of the communication module and the display are determined in the deployment space between adjacent devices among the power module, the industrial computer PC1 and the industrial computer PC2.
[0055] Based on the deployment positions of the two industrial computers PC1 and PC2, the communication unit in the communication module that supports communication with the industrial computer PC1 is deployed between the power module and the industrial computer PC1, so that the wiring distance between the industrial computer PC1 is as short as possible; the communication unit that supports communication with the industrial computer PC2 is deployed between the industrial computer PC2 and the industrial computer PC1, and is adjacent to one side of the industrial computer PC2, so that the wiring distance between the industrial computer PC2 is as short as possible.
[0056] As for the display, the display X1 is a foldable display, wherein when the display is in use, it can be pulled out from the cabinet and the display screen can be unfolded. The display screen is 19 inches. When not in use, the display can be folded and pushed into the cabinet to save the space occupied by the display. After folding, it is 1U in height.
[0057] The display X1 is deployed between the industrial computer PC1 and the industrial computer PC2 so that there is sufficient placement space for the display X1 after it is unfolded.
[0058] Among them, the display X1 supports 8-channel video display channel input interfaces, currently 2 channels are used, which are connected to the display communication ports of two industrial computers PC1 and PC2 through display communication cables respectively; the display X1 itself has an 8-channel video display switching switch, and pressing the corresponding display button can display the operating content of the corresponding industrial computer; the display X1 has at least one power port, supporting 220VAC input.
[0059] In addition, the keyboard X3 and the mouse X4 are basic industrial computer operation input devices, which are used to operate the industrial computer and the software thereon. When not in use, the wireless keyboard X3 and the mouse X4 can be placed in the storage space provided inside the front door of the metal cabinet.
[0060] In an embodiment of the present application, the keyboard X3 and the mouse X4 communicate with the industrial computer via a wireless Bluetooth connection. Since the wired connection is easily interfered with during the electromagnetic compatibility test, causing the mouse or keyboard to fail during the test and unable to operate the display interface of the industrial computer, a wireless keyboard and mouse are used in the test device to prevent the electromagnetic interference signal in the laboratory from interfering with the mouse or keyboard. The display interface can be viewed during the electromagnetic compatibility test, thereby improving the test efficiency.
[0061] See also Figure 3 It can be seen that the communication unit supporting communication with the industrial computer PC1 and the communication unit supporting communication with the industrial computer PC2 are separated by the display X1 and the industrial computer PC1, which effectively reduces signal interference between the communication units.
[0062] In an exemplary embodiment, the first communication unit includes two routers R1 and R2 that are redundant to each other.
[0063] Each router supports at least one pair of optical fibers, one pair of coaxial communication interfaces, and two RJ45 Ethernet interfaces, and has at least one power port that supports 220VAC input.
[0064] The router R1 and the router R2 are respectively connected to the industrial computer PC1 in the test device through Ethernet cables. The industrial computer PC1 is installed with simulation software of the centralized scheduling system for simulating the functions of the centralized scheduling system.
[0065] For example, the optical fiber communication cable A that communicates with the temporarily speed-limited server under test is connected to the optical fiber port of router R1, and then the Ethernet RJ45 port of router R1 is connected to the Ethernet RJ45 port of industrial computer PC1 through an Ethernet cable; the optical fiber communication cable B is connected to the optical fiber port of router R2, and then the Ethernet RJ45 port of router R2 is connected to the Ethernet RJ45 port of industrial computer PC1 through an Ethernet cable.
[0066] In an exemplary embodiment, the second communication unit includes two switches SW1 and SW2 that are redundant with each other.
[0067] Each switch has at least 2 pairs of fiber optic interfaces and 4 RJ45 Ethernet ports, and has at least one power port that supports 220VAC input.
[0068] The switch SW1 and the switch SW2 are respectively connected to the industrial computer PC3 through Ethernet cables, wherein the industrial computer PC3 is installed with simulation software of adjacent wireless block center equipment, simulation software of the temporary speed limit server, and simulation software of the computer interlocking equipment.
[0069] The two switches SW1 and SW2 communicate with the temporarily speed-limited server under test through a secure data network.
[0070] Specifically, the test device realizes communication between at least one of the wireless block center, the train control center and the adjacent temporary speed limit server and the temporary speed limit server under test through the safety data network communication cable A and the safety data network communication cable B. Among them, the communication port of the switch SW1 is directly connected to the temporary speed limit server under test through the safety data network communication cable A line, and the Ethernet RJ45 port of the switch SW1 is connected to the Ethernet RJ45 port of the industrial computer PC2 through an Ethernet cable; the communication port of the switch SW2 is directly connected to the temporary speed limit server under test through the safety data network communication cable B, and the Ethernet RJ45 port of the switch SW2 is connected to the Ethernet RJ45 port of the industrial computer PC2 through an Ethernet cable.
[0071] In an exemplary embodiment, the third communication unit includes two switches SW3 and SW4 that are redundant with each other.
[0072] Specifically, the test device realizes the communication between the vehicle-mounted equipment and the temporary speed limit server under test through the vehicle-mounted equipment communication cable A and the vehicle-mounted equipment communication cable B; the ground-based augmentation system realizes the communication between the ground-based augmentation system and the temporary speed limit server under test through the ground-based augmentation system communication cable A and the ground-based augmentation system communication cable B. Among them, the vehicle-mounted equipment communication cable A and the ground-based augmentation system communication cable A are both connected to the two optical fiber ports of the switch SW3, and then the two Ethernet RJ45 ports of the switch SW3 are connected to the two Ethernet RJ45 ports of the industrial computer PC2 through two Ethernet cables; the vehicle-mounted equipment communication cable B and the ground-based augmentation system communication cable B are both connected to the two optical fiber ports of the switch SW4, and then the two Ethernet RJ45 ports of the switch SW4 are connected to the two Ethernet RJ45 ports of the industrial computer PC2 through two Ethernet cables.
[0073] In practical applications, the peripheral device communicates with the temporary speed limit server at least through an optical fiber port, a coaxial communication interface, and a serial port.
[0074] For industrial computer PC1, the simulation software of the centralized dispatching system and the simulation software of the train control maintenance center are installed on the industrial computer PC1 to realize the communication with the controlled temporary speed limit server. Among them:
[0075] When the industrial computer PC1 realizes the function of the centralized dispatching system, the industrial computer PC1 can communicate with the temporary speed limit server under test through an optical fiber communication cable, for example, the optical fiber communication cable A of the centralized dispatching system is connected to the optical fiber port of the router R1, and then the Ethernet RJ45 port of the router R1 is connected to the Ethernet RJ45 port of the industrial computer PC1 through an Ethernet cable; the optical fiber communication cable B of the centralized dispatching system is connected to the optical fiber port of the router R2, and then the Ethernet RJ45 port of the router R2 is connected to the Ethernet RJ45 port of the industrial computer PC1 through an Ethernet cable. Alternatively, the industrial computer PC1 can communicate with the temporary speed limit server under test through a coaxial communication cable, for example, the coaxial communication cable A is used to connect to the coaxial port of the router R1, and then the Ethernet RJ45 port of the router R1 is connected to the Ethernet RJ45 port of the industrial computer PC1 through an Ethernet cable; the coaxial communication cable B is used to connect to the coaxial port of the router R2, and then the Ethernet RJ45 port of the router R2 is connected to the Ethernet RJ45 port of the industrial computer PC1 through an Ethernet cable.
[0076] When the industrial computer PC1 realizes the function of the train control maintenance center, the industrial computer PC1 can communicate with the temporary speed limit server under test through the serial port interface. For example, a communication cable of the train control maintenance center is used to connect to the serial port of the industrial computer PC1.
[0077] For industrial computer PC2, the industrial computer PC2 is installed with simulation software for equipment related to the safety data network, including simulation software for the train control center, wireless block center, and adjacent temporary speed limit server. In addition, simulation software for vehicle-mounted equipment and simulation software for the ground-based augmentation system are also installed. Each simulation software is configured with a different IP to mark different devices. Among them:
[0078] When the industrial computer PC2 realizes the functions of the equipment related to the secure data network, the industrial computer PC2 communicates with the temporarily speed-limited server under test by using the second communication unit. For example, the secure data network communication cable A is connected to the optical fiber port of the switch SW1, and then the Ethernet RJ45 port of the switch SW1 is connected to the Ethernet RJ45 port of the industrial computer PC2 through an Ethernet cable; the secure data network communication cable B is connected to the optical fiber port of the switch SW2, and then the Ethernet RJ45 port of the switch SW2 is connected to the Ethernet RJ45 port of the industrial computer PC2 through an Ethernet cable.
[0079] When the industrial computer PC2 realizes the function of the vehicle-mounted device or the ground-based augmentation system, the industrial computer PC2 communicates with the temporary speed limit server under test by using the third communication unit. For example, the vehicle-mounted device communication line A and the ground-based augmentation system communication line A are respectively connected to the two optical fiber ports of the switch SW3, and then the two Ethernet RJ45 ports of the switch SW3 are connected to the two Ethernet RJ45 ports of the industrial computer PC2 through two Ethernet cables; the vehicle-mounted device communication line B and the ground-based augmentation system communication line B are respectively connected to the two optical fiber ports of the switch SW4, and then the two Ethernet RJ45 ports of the switch SW4 are connected to the two Ethernet RJ45 ports of the industrial computer PC2 through two Ethernet cables.
[0080] Based on the communication mode between the two industrial computers PC1 and PC2 and the temporarily speed-limited server under test, it can be known that the industrial computer PC1 supports communication through the optical fiber communication interface or the coaxial communication interface and the serial port. The industrial computer PC2 supports communication through the optical fiber communication interface. Since the optical fiber cable is not easily interfered with and does not need to be tested during the test, the main equipment using optical fiber communication is placed on the upper part of the test device, that is, the industrial computer PC2 realizes the simulation of the relevant optical fiber communication equipment. Since the communication cables used by the coaxial communication interface and the serial port are easily interfered with by lightning surge signals, it is necessary to add corresponding protective structures on the signal line. When the coaxial communication interface or the serial port is transmitting data, the interference signal may be transmitted along the equipment on the communication cable. In order to avoid affecting the normal influence of other equipment, the equipment using the coaxial communication interface or the serial port is placed at the bottom of the test device, thereby determining that the deployment position of the industrial computer PC1 is located at the bottom of the metal cabinet.
[0081] By deploying industrial computer PC1 at the bottom of the metal cabinet, there is no need to cross the communication cables of industrial computer PC2, thus avoiding mutual interference; if industrial computer PC2 is used to replace industrial computer PC1 for simulation, the Ethernet cable needs to run from the bottom of the cabinet to the top, resulting in cross-routing with other communication cables, which may introduce interference into industrial computer PC2 and cause other simulations in industrial computer PC2 to work abnormally. Similarly, since industrial computer PC2 communicates with the second communication unit and the third communication unit via Ethernet cables, if the simulation originally performed by industrial computer PC2 is implemented by industrial computer PC1, another network cable needs to be added, and the added network cable may cross-route with other communication port cables in industrial computer PC1, which may cause mutual interference and affect the communication of the security data network.
[0082] In an exemplary embodiment, the power module P1 includes one main switch device and at least two sub-switch devices, wherein:
[0083] The main switch device is connected to the at least two sub-switch devices and is used to control whether the power module supplies power to the equipment deployed in the metal cabinet;
[0084] Each sub-switch device is connected to at least one device deployed in the metal cabinet, and is used to control whether the power module supplies power to the device connected to each sub-switch device.
[0085] The switch device may be an air switch, that is, the power module P1 includes a main air switch and at least two sub-air switches.
[0086] Figure 4 for Figure 3 The connection diagram between the power module P1 and each device in the test device is shown in FIG. Figure 4 As shown, taking the air switch as an example, a main air switch K1 and four sub-air switches K2, K3, K4, and K5 are set in the power module P1. Figure 4 As shown, one main power supply is divided into four power supplies at the isolation filter protection back end to connect different unit devices. The four-way air switch is set as follows: the air switch K2 controls the power of the two routers R1 and R2 in the first communication module; the air switch K3 controls the power of the industrial computer PC1 and the display X1; the air switch K4 controls the power of the industrial computer PC2, the two switches SW1 and SW2 in the second communication unit, and the two switches SW3 and SW4 in the third communication unit; the air switch K5 controls the power of the fan.
[0087] When powering on the test device, first close the main air switch K1, and all the sub-air switches are in the disconnected state. At this time, the current and impact current required for powering on the equipment are small, and will not affect the overall power supply of the laboratory; then close each sub-air switch to power the equipment connected to the sub-air switch; when the equipment corresponding to each sub-air switch works abnormally, disconnect the corresponding sub-air switch, which will not affect the normal operation of other equipment controlled by the sub-air switch, save the overall power-on startup time of the test equipment, and improve the test efficiency.
[0088] Furthermore, the power module P1 is used to perform protection operations on the electric energy used by each device in the test apparatus.
[0089] Specifically, a power lightning protector is arranged between the main switch device and the power supply end; the main switch device is connected to at least two sub-switch devices through a power terminal block, and an isolation filter device is also arranged between the main switch device and the power terminal block.
[0090] exist Figure 4 In the structure shown, the isolation filter device includes an isolation transformer and a filter.
[0091] Among them, the isolation filter device filters and protects the interference signals on the laboratory power line to prevent the laboratory high-voltage lightning surge and other electromagnetic interference signals from interfering with other unit equipment in the test device through the power port, ensuring the normal operation of each unit equipment; on the other hand, the isolation filter device also filters and isolates the external electromagnetic conducted disturbance interference signals generated by the power port of each unit equipment in the test device to prevent each device in the test device from generating conducted interference to the laboratory's 220VAC power network, causing abnormal operation of the test equipment in the laboratory.
[0092] According to the interface requirements of the temporary speed limit server, the temporary speed limit server communicates with the centralized dispatching system through a redundant coaxial communication interface; and communicates with the train control maintenance center through a single serial port interface. Since the communication medium of the coaxial communication interface and the serial port interface is a shielded cable, and the signal is an electrical signal, electromagnetic compatibility testing and lightning pulse protection testing are required according to standard requirements. In actual applications, when the temporary speed limit server communicates with other real devices, protective devices need to be added at both ends of the cable to protect the communication cable from surge and lightning interference, which can be quickly discharged to the ground through the protective devices to avoid interference with the equipment. Therefore, the test device is equipped with a protective structure for surge problems to avoid interference with the equipment in the test device when performing electromagnetic compatibility and lightning pulse protection tests on the tested temporary speed limit server, causing the test device to work abnormally, and ultimately causing the tested temporary speed limit server to fail the test.
[0093] To solve the above technical problems, the embodiments of the present application provide the following solutions, including:
[0094] Figure 5 for Figure 3 The deployment diagram of the protective structure is shown in Figure 1. Figure 5 As shown, a protective structure is also deployed on the back of the metal cabinet, and the protective structure includes a protective bracket R3, a lightning protection grounding bar, and an insulating structure arranged between the protective bracket R3 and the lightning protection grounding bar, wherein the lightning protection grounding bar is fixed on the protective bracket R3 through the insulating structure; wherein the protective bracket R3 is provided with a communication surge protector, and the lightning protection grounding wire of the communication surge protector is connected to the lightning protection grounding bar isolated by the insulating structure, wherein the lightning protection grounding bar is independent of the protective grounding bar of the metal cabinet.
[0095] The insulating structure realizes insulation isolation between the protective bracket R3 and the lightning protection grounding bar, so that the interference of the communication surge protector is discharged to the lightning protection grounding bar, and then connected to the lightning protection grounding bar of the cabinet frame through the insulating grounding wire; in addition, since the lightning protection grounding bar and the protective grounding bar of the metal cabinet are independent of each other, the interference discharge path is isolated from the signal ground of other equipment in the test device, preventing the equipment in the test device from being interfered with.
[0096] When performing the test operation, the lightning protection grounding bar and the protective grounding bar are connected to the laboratory grounding column at the remote end through two grounding cables. The lightning protection discharge ground of the communication surge protector is connected to the lightning protection grounding bar through an insulated cable, and then the interference signal is discharged to the ground through the cable connected to the laboratory grounding column.
[0097] In the embodiment of the present application, the communication surge protector processes interference signals such as lightning surges generated by coaxial communications. The communication surge protector used is mainly for protecting low-voltage, high-frequency small signals, and the protection voltage is relatively low, which is different from the power supply lightning protector used for protection of the 220V AC power supply used in the related technology.
[0098] Specifically, the communication surge protector includes a first protection unit and a second protection unit; wherein:
[0099] The first protection unit has one end connected to the coaxial communication interface used by the dispatching centralized system simulated in the industrial computer PC1, and the other end connected to the temporary speed limit server under test;
[0100] Specifically, the coaxial communication cable A is connected to the external line side of the communication surge protector FL1, the device side of the communication surge protector FL1 is connected to the coaxial port of the router R1 using the coaxial cable, and then the Ethernet RJ45 port of the router R1 is connected to the Ethernet RJ45 port of the industrial computer PC1 through the Ethernet cable; the coaxial communication cable B is connected to the external line side of the communication surge protector FL2, the device side of the communication surge protector FL2 is connected to the coaxial port of the router R2 using the coaxial cable, and then the Ethernet RJ45 port of the router R2 is connected to the Ethernet RJ45 port of the industrial computer PC1 through the Ethernet cable.
[0101] The second protection unit has one end connected to the serial port used by the train control maintenance center simulated in the industrial computer PC1, and the other end connected to the temporary speed limit server under test;
[0102] Specifically, the communication cable of the train control maintenance center is connected to the external line side of the communication surge protector FL3, and the device side of the communication surge protector FL3 is connected to the serial communication port of the industrial computer PC1 using a serial communication cable.
[0103] Based on the above content, it can be known that the test device needs to set up two communication surge protectors FL1 and FL2 for the coaxial communication of the dispatching centralized system; and set up one communication surge protector FL3 for the serial interface communication of the train control maintenance center.
[0104] exist Figure 5 In the structure shown, the lightning protection grounding bar and the protective grounding bar are arranged at the bottom of the metal cabinet. The protective bracket R3 is deployed in the area corresponding to the dispatching centralized communication unit at the back of the metal cabinet to facilitate wiring.
[0105] The overall layout of the test device is from bottom to top, and the layout of each device and unit is as follows Figure 6 and Figure 7 As shown, each device is described below:
[0106] 1. Cabinet frame: The internal width is a standard 19-inch wide and 30U high metal frame with a front door and a rear door. A group of cooling fans FAN1 are set on the top for cabinet heat dissipation; the bottom is provided with outlet holes for convenient cable outlet, and the air inlet holes are convenient for cold air to enter; there are two grounding terminal blocks in the cabinet, one is the protective grounding bar, and the other is the lightning protection grounding bar;
[0107] 2. Power module P1 is deployed at the bottom layer of the metal cabinet;
[0108] The power module P1 occupies 6U of space and is used to install the main power circuit breaker, sub-circuit breaker, isolation filter device, power terminal block, etc., which are connected to various devices in the cabinet through power cables. The power circuit breaker is placed in front of the cabinet for easy operation. Among them, the main circuit breaker K1 and the four sub-circuit breaker K2, K3, K4, and K5 are installed on the front door side to facilitate the power-on and power-off operations of the simulation test device; on the corresponding rear door side, a row of WANGO terminal blocks are installed for 220VAC power input and power output to each unit in the cabinet.
[0109] 3. The first communication unit is located above the power module P1 and separated by 1U space;
[0110] The dispatching centralized communication unit includes two routers R1 and R2, each of which occupies 1U of space, with a 1U space between the two routers R1 and R2; the router is mainly responsible for the communication between the dispatching centralized system in the industrial computer PC1 and the temporary speed limit server under test. Each router has at least one pair of optical fiber communication ports, one coaxial communication port, and one RJ45 communication port; the input power is 220VAC.
[0111] 4. Industrial computer PC1, located above the first communication unit and separated by 1U space;
[0112] Industrial computer PC1 uses 4U space and mainly has an 8-channel communication serial port card that supports RS485, RS422, and RS232 communications; 4 basic USB ports, 4 Ethernet ports, and 1 VGA display port; the input power is 220VAC.
[0113] 5. Monitor X1, located above industrial computer PC1 and separated by 1U space;
[0114] Monitor X1 is a foldable, push-pull device. It occupies 1U space when folded and can be unfolded into a 19-inch display screen when opened. The monitor supports 8-way VGA display interface input and the input power is 220VAC. It is also equipped with a wireless Bluetooth mouse X3 and keyboard X4 for operating industrial computer software. The monitor is located in the upper middle of the cabinet, which is convenient for the monitor to be unfolded and for the operator to operate.
[0115] 6. The second communication unit is located above the display X1 and separated by 1U space;
[0116] The second communication unit includes two switches SW1 and SW2, each of which uses 1U space and is separated by 1U space; each security data network switch has at least 2 fiber optic communication ports, 4 RJ45 Ethernet communication ports, and an input power supply of 220VAC.
[0117] 7. The third communication unit is located above the second communication unit and separated by 1U space;
[0118] The third communication unit includes two switches SW3 and SW4, each of which uses 1U space and is separated by 1U space. Each switch has at least 2 fiber optic communication ports, 4 RJ45 Ethernet ports, and an input power supply of 220VAC;
[0119] 8. Industrial computer PC2 is located above the third communication unit and separated by 1U space;
[0120] The industrial computer PC2 has at least six RJ45 Ethernet ports, two USB ports, and one VGA display port, and the input power is 220VAC.
[0121] 9. A protective structure, located on the back of the metal cabinet, specifically installed at a position corresponding to the first communication unit on the back of the metal cabinet, at least above the power module P1;
[0122] The protection structure uses a 4U space and is mainly used to handle surges generated by coaxial communication and serial communication. The protection structure is provided with a protection bracket R3 installed on the back door of the metal cabinet, and two communication surge protectors FL1 and FL2 corresponding to coaxial communication and one surge protector FL3 corresponding to serial communication are installed on the protection bracket. The lightning protection grounding wire of each communication surge protector is connected to the lightning protection grounding bar isolated by an insulating structure.
[0123] The test device integrates various communication simulation devices into a cabinet frame, and pre-wires the power cords of each device, the connecting wires for mutual communication, the protective grounding wires of each device, and the lightning protection grounding wires into the cabinet frame, and reserves the external connector terminals, making the communication comprehensive simulation device highly integrated. In actual testing, only the connecting cables between the temporarily speed-limited server under test and the test device need to be connected, which improves the efficiency of setting up the test environment.
[0124] The main purposes and advantages of the above layout are as follows: First, the industrial computer PC1 and the communication module are placed nearby to shorten the wiring length between the industrial computer and the communication module, and avoid wiring crossing and confusion; second, the layout is based on the communication cable medium of the temporarily speed-limited server under test. The equipment using optical fiber communication cables is deployed in the upper part of the test device, because electromagnetic compatibility-related tests are not performed during optical fiber cable testing, and optical fiber communication is not easily interfered with, so it is placed in the upper half of the test device; the equipment using the communication cable medium used by serial and coaxial communications is arranged in the lower part of the cabinet, because the communication cables used by serial and coaxial communications need to be tested and are easily interfered with, and the communication ports need to add protective structures, and the protective structures need to be grounded nearby, so they are placed in the lower half of the cabinet to make the grounding wire as short as possible; third, the levels are clear to avoid cross-placement of different functional simulation equipment, confusion of equipment, and difficulty in identification.
[0125] The protective structure and the industrial computer PC1 are placed centrally nearby, at the lower part of the test device, and the communication cables are connected nearby.
[0126] The industrial computer PC1 uses the communication cable medium of the serial port and coaxial communication. The protection bracket is deployed at the bottom of the test device. The protection device is close to the cabinet frame grounding bar. The grounding wire is short, which is conducive to the discharge of interference. Moreover, it is arranged separately from the industrial computer PC2 that simulates other equipment.
[0127] The second communication unit and the third communication unit using optical fiber communication are deployed on the upper part of the metal cabinet and can be deployed close to the industrial computer PC2, so that the Ethernet communication cable is shorter. In addition, since the communication cable of optical fiber communication does not require additional protective devices, it can be farther away from the protective grounding bar to avoid cross-wiring with the industrial computer PC1 and is not easily interfered.
[0128] The display X1 is deployed in the middle of the test device, which is conducive to the unfolding of the display. If it is deployed in the upper part, the display will interfere with the frame of the test device when unfolded, so that the display cannot be fully opened, which is not conducive to operation; if it is deployed in the lower part, the display is too low, which is also not conducive to the operator's operation.
[0129] Since the power module P1 is equipped with isolation filter components and air switches, etc., and there are many connections between the components, they are concentrated at the bottom of the metal cabinet, which is beneficial to the connection between the various parts of the metal cabinet, and the connection can be as short as possible to avoid interference with other simulation equipment; in addition, the protection structure needs to be equipped with a lightning protection grounding bar nearby, and it is deployed at the bottom, close to the protective grounding bar of the metal cabinet frame, and the grounding wire is short, which is beneficial to the discharge of interference signals in the power network.
[0130] In summary, the test device for the temporary speed limit server has the following advantages:
[0131] 1. Integrate the peripheral simulation devices that communicate with the temporary speed limit server into a cabinet, and connect the power cords of each device, the connecting wires for mutual communication, the grounding wires of the protection structure, and the protection grounds of each device to the metal frame nearby, fix them in the cabinet frame in advance, and reserve the communication port connected to the temporary speed limit server. When setting up the environment, only the communication cable with the temporary speed limit server is connected, and there is no need to temporarily build the connection simulation equipment, which saves the time of setting up the environment and improves the test efficiency;
[0132] 2. Use one display to display the contents of two industrial computers, saving test equipment; the installation position of the protective structure is fixed at the bottom of the cabinet, and the grounding connection point is fixed to ensure that each device in the test device is well grounded, preventing electromagnetic interference signals from interfering with the equipment in the simulation test device, making the equipment work well, and improving test accuracy and test efficiency.
[0133] 3. Highly integrated test equipment reduces the uncertainty of test conditions and improves test accuracy. If the peripheral simulation is not integrated into a cabinet, the simulation equipment is temporarily placed in a place, and the various simulation test equipment and the cables connecting them are completely exposed to the electromagnetic interference space, which may cause problems with the simulation test equipment and ultimately cause the temporary speed-limited server test to fail. The cabinet frame of the comprehensive simulation test device uses an all-metal structure with good electromagnetic shielding effect, which can better protect the simulation test equipment in the cabinet from electromagnetic interference, and each simulation equipment is divided and wired in advance according to the functional area to avoid cross-connection of cables with different communication functions, reduce mutual interference, and make the simulation test equipment run more stably.
[0134] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0135] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include at least one of the features.
[0136] In the description of the present application, “plurality” means at least two, for example, two, three, etc., unless otherwise clearly and specifically defined.
[0137] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0138] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0139] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0140] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A testing device for a temporary speed-limited server, characterized in that: The testing device is deployed in a metal cabinet, and the testing device includes: Power modules distribute power to various devices in the metal cabinet; 2 industrial computers PC1 and PC2; among them, industrial computer PC1 is used to simulate the dispatching centralized system and train control maintenance center that communicate with the temporary speed limit server under test; industrial computer PC2 is used to simulate the wireless block center, train control center, on-board equipment, ground-based augmentation system and adjacent temporary speed limit server that communicate with the temporary speed limit server under test; There is a deployment space between adjacent devices in the power module, the industrial computer PC1, and the industrial computer PC2, and the deployment space is provided with a communication module and a display, wherein: The communication module is connected to two industrial computers PC1 and PC2, and is used to support data transmission operations between the two industrial computers PC1 and PC2 and the temporarily speed-limited server under test; The display is connected to two industrial computers PC1 and PC2 and is used to display data generated by the test operation.
2. The testing device according to claim 1, characterized in that: The deployment space of the metal cabinet is sequentially deployed with a power module, an industrial computer PC1 and an industrial computer PC2 from the bottom to the top; The communication module includes a communication unit supporting the communication of the industrial computer PC1 and a communication unit supporting the communication of the industrial computer PC2, wherein the communication unit supporting the communication of the industrial computer PC1 is deployed between the power module and the industrial computer PC1; the communication unit supporting the communication of the industrial computer PC2 is deployed between the industrial computer PC2 and the industrial computer PC1, and adjacent to one side of the industrial computer PC2; The display is disposed between the industrial computer PC2 and the industrial computer PC1 and is adjacent to one side of the industrial computer PC1.
3. The testing device according to claim 2, characterized in that: The communication unit supporting the communication of the industrial computer PC1 includes a first communication unit, wherein the first communication unit supports the data transmission operation of the scheduling centralized system simulated by the industrial computer PC1; The communication unit supporting the communication of the industrial computer PC2 includes a second communication unit and a third communication unit, wherein the second communication unit supports the data transmission operations of the wireless block center, the train control center and the adjacent temporary speed limit server simulated by the industrial computer PC2, and the third communication unit supports the data transmission operations of the on-board equipment and the ground-based augmentation system simulated by the industrial computer PC2.
4. The testing device according to claim 3, characterized in that: The first communication unit includes two mutually redundant routers; At least one of the second communication unit and the third communication unit includes two switches that are redundant to each other.
5. The testing device according to claim 1, characterized in that: The display is a drawer-type display, and when in use, it can be pulled out from the cabinet and unfolded up and down.
6. The testing device according to claim 1, characterized in that: A fan is also arranged on the top of the metal cabinet.
7. The testing device according to any one of claims 2 to 6, characterized in that: The power module includes a main switch device and at least two sub-switch devices, wherein: The main switch device is connected to the at least two sub-switch devices and is used to control whether the power module supplies power to the equipment deployed in the metal cabinet; Each sub-switch device is connected to at least one device deployed in the metal cabinet, and is used to control whether the power module supplies power to the device connected to each sub-switch device.
8. The testing device according to claim 7, characterized in that: One of the sub-switch devices is connected to a communication unit supporting communication with the industrial computer PC1; or, One of the sub-switch devices is connected to the industrial computer PC1 and the display respectively; or, One of the sub-switch devices is respectively connected to the industrial computer PC2 and the communication unit supporting the communication of the industrial computer PC2; or, One of the sub-switch devices is connected to a fan.
9. The testing device according to claim 7, characterized in that: A power supply lightning protection device is provided between the main switch device and the power supply end; The main switch device is connected to at least two sub-switch devices via a power terminal block, wherein an isolation filter device is further provided between the main switch device and the power terminal block.
10. The testing device according to any one of claims 1 to 6, characterized in that: A protective structure is also deployed on the back of the metal cabinet, wherein: The protection structure comprises a protection bracket, a lightning protection grounding bar, and an insulating structure arranged between the protection bracket and the lightning protection grounding bar, wherein the insulating structure is fixed on the protection bracket, wherein the lightning protection grounding bar is independent of the protective grounding bar of the metal cabinet; The protection bracket is provided with a communication surge protector used for the communication operation between the industrial computer PC1 and the temporarily speed-limited server under test, and the lightning protection grounding wire of the communication surge protector is connected to the lightning protection grounding bar isolated by the insulating structure; Wherein, the communication surge protector comprises: The first protection unit has one end connected to the coaxial communication interface used by the dispatching centralized system simulated in the industrial computer PC1, and the other end connected to the temporary speed limit server under test; The second protection unit has one end connected to the serial port used by the train control maintenance center simulated in the industrial computer PC1, and the other end connected to the temporary speed limit server under test.
Citation Information
Cited By
Double-system warm standby redundant ground-based augmentation system and working method
CN120573148A