Underground diaphragm wall reinforcement cage hoisting system and method

By using supporting rotating parts and tire frames on the ground to realize the flipping of the steel cage, and combining it with a single crane to complete the hoisting, it solves the problems of high mechanical costs and complex construction in the traditional method, improves construction safety and efficiency, and reduces the footprint. land area.

CN118771192APending Publication Date: 2024-10-15CHINA FIRST METALLURGICAL GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411009653.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The traditional underground diaphragm wall steel cage lifting method has high mechanical costs, a large construction area, cumbersome lifting process and high safety requirements. The construction process needs to be simplified and the cost of machinery use needs to be reduced.

Method used

Design a steel cage hoisting system that includes a foundation pit and supporting rotating parts. By excavating the foundation pit on the ground of the construction site and setting up supporting rotating parts, the tire frame and hoisting equipment are used to realize the transformation of the steel cage from a horizontal to a vertical state, which avoids It is flipped in the air and hoisted using a single crane.

Benefits of technology

It simplifies the rebar cage flipping steps, reduces the dwell time, improves construction safety and efficiency, saves machinery usage costs, reduces construction area requirements, and improves space utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118771192A_ABST
    Figure CN118771192A_ABST
Patent Text Reader

Abstract

The invention discloses an underground diaphragm wall reinforcement cage hoisting system and method. The system comprises a foundation pit, a supporting rotating component and hoisting equipment. The foundation pit is provided with a structure for accommodating and supporting the rotating part; the supporting and rotating part comprises a base, a rolling shaft, a jig frame and a supporting piece, a roller base is fixed to the top of the base, a bearing is installed in the roller base, the rolling shaft is fixed through the bearing and penetrates through the two sides of the jig frame to divide the jig frame into the two ends, and the jig frame does not make contact with the lower portion of the base when rotating; the upper end of the jig frame is flush with the ground; during hoisting operation, the supporting piece is removed, the reinforcement cage located on the ground and the jig frame is hoisted by hoisting equipment, and the jig frame rotates to achieve conversion of the reinforcement cage from the horizontal state to the vertical state. The steel reinforcement cage can be turned over to be in the vertical state on the ground, the steel reinforcement cage is prevented from being turned over in the air, the turning step is simplified, and the construction safety and the construction efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of continuous wall reinforcement cage hoisting construction, and in particular to an underground continuous wall reinforcement cage hoisting system and method. Background Art

[0002] The lifting of steel cages has always been the focus and difficulty of underground continuous wall construction. The traditional construction method uses a main crane and a secondary crane to lift and flip the steel cage in the air until the steel cage is changed from a horizontal state to a vertical state and finally put into the groove. The cost of using machinery is high, the construction area is large, the lifting process is cumbersome, and the safety requirements are high.

[0003] In view of this, there is an urgent need to build an underground continuous wall steel cage hoisting system, which can not only effectively reduce machinery costs and construction area requirements, but also simplify the hoisting operation process and complete the hoisting work safely and effectively. Summary of the invention

[0004] In order to solve the problems existing in the prior art, the present invention provides an underground continuous wall steel cage hoisting system, including a foundation pit, a supporting rotating component, and a hoisting device; The foundation pit is obtained by excavating the ground of the construction site, and is provided with a structure for accommodating the supporting rotating component; The supporting rotating component comprises a base with a roller base fixed on the top, a roller, a tire frame and a support member, a bearing is installed in the roller base, the roller is fixed by the bearing and passes through both sides of the tire frame to divide the tire frame into two ends, the tire frame will not contact the lower position of the base when rotating, and the support member is placed at the lower part of one end of the tire frame to ensure that the upper end of the tire frame is flush with the ground; During the hoisting operation, the support member is removed, the steel cage located on the ground and the tire frame is lifted by the hoisting equipment, and the tire frame is rotated to realize the transformation of the steel cage from horizontal to vertical.

[0005] Furthermore, the roller divides the tire frame into two ends of different lengths, and the support member is placed at the lower part of the longer end of the tire frame; The hoisting position of the steel cage is located at the position of the steel cage on the ground, and the end of the steel cage away from the hoisting position does not exceed the longer end of the tire frame.

[0006] Furthermore, a fixing piece for fixing the steel cage is also provided at the upper end of the tire frame.

[0007] Furthermore, the base and the roller foundation are made of reinforced concrete.

[0008] Furthermore, the flatness of the ground is ≤5mm.

[0009] Furthermore, the deviation between the two ends of the roller is ≤5mm.

[0010] Further, the hoisting equipment includes a crane, a balance beam with a lifting lug at the upper end, a single-wheel pulley, a first steel wire rope and a second steel wire rope; The hoist is connected to the lifting lug via the first steel wire rope; The single-wheel pulley is arranged at the lower end of the balance beam; The single-wheel pulley is connected to the steel cage to be hoisted via the second steel wire rope; The described crane is provided with one.

[0011] The present invention also provides a method for hoisting the underground continuous wall reinforcement cage using the above-mentioned hoisting system, comprising: Complete the construction of the foundation pit and supporting rotating parts in the construction area of ​​the underground continuous wall reinforcement cage; Complete the production of the steel cage at the upper end of the foundation pit and the tire frame and use trusses to reinforce the steel cage's hanging points; The hoisting equipment enters the site and connects to the lifting point of the steel cage. After removing the supporting parts, the steel cage on the ground and the frame is lifted by the hoisting equipment. The frame rotates to realize the transformation of the steel cage from horizontal to vertical. The lifting equipment moves the steel cage to the underground continuous wall foundation trench.

[0012] Furthermore, supporting bars are arranged at the trusses of the steel cage.

[0013] Compared with the prior art, the present invention has the following beneficial effects: The present invention flips the tire frame and the steel cage together, and the steel cage can be turned over to a vertical state on the ground, avoiding the steel cage from turning over in the air, simplifying the turning steps, reducing the hovering time, and improving construction safety and efficiency.

[0014] The present invention saves machinery use expenses, simplifies the installation procedure, reduces the construction plane and space occupied by the steel cage and the hoisting equipment, and improves the plane and space utilization rate of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The structural schematic diagram of the underground continuous wall reinforcement cage hoisting system of the present invention is shown; Figure 2 A schematic diagram of the structure of the supporting rotating component of the present invention is shown; Figure 3 A schematic diagram showing the construction of the steel cage on the ground and the upper end of the tire frame; Figure 4 A schematic diagram showing the rotation of the steel cage with the tire frame during hoisting; Figure 5A schematic diagram showing the steel cage being turned to a vertical state and separated from the tire frame during hoisting; Description of reference numerals: 10. Foundation pit; 20. Support rotating parts; 201. Base; 202. Roller foundation; 203. Roller; 204. Cradle; 205. Support; 30. Lifting equipment; 301. First steel wire rope; 302. Lifting eye; 303. Balance beam; 304. Monowheel pulley; 305. Second steel wire rope; 40. Steel cage; 50. Ground. DETAILED DESCRIPTION

[0016] The following will be combined with the specific embodiments of the present invention and the drawings of the specification to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] Example 1 An underground continuous wall steel cage hoisting system, such as Figure 1 and Figure 2 As shown, it includes a foundation pit 10, a supporting rotating component 20, and a hoisting device 30. The foundation pit 10 is obtained by excavating the ground 50 of the construction site, and is provided with a structure for accommodating the supporting rotating component 20.

[0018] The supporting rotating component 20 includes a base 201 with a roller base 202 fixed on the top, a roller 203, a tire frame 204 and a support member 205. A bearing is installed in the roller base 202. The roller 203 is fixed by the bearing and passes through both sides of the tire frame 204 to divide the tire frame 204 into two ends. When the tire frame 204 rotates, it will not contact the lower position of the base 201. The support member 205 is placed at the lower part of one end of the tire frame 204 to ensure that the upper end of the tire frame 204 is flush with the ground 50.

[0019] In order to better support and rotate the tire frame 204, the roller 203 in this embodiment is arranged at 1 / 3 of the tire frame 204, dividing the tire frame 204 into two ends of different lengths, and the support member 205 is placed at the lower part of the longer end of the tire frame 204. The hoisting place of the steel cage 40 is located at the position of the steel cage on the ground 50, and the end of the steel cage 40 away from the hoisting place does not exceed the longer end of the tire frame 204. A fixing member for fixing the steel cage 40 is also arranged at the upper end of the tire frame 204.

[0020] After the ground 50 of the construction site is excavated to obtain the foundation pit 10, C20 concrete is also laid on the ground 50 to make the flatness of the ground 50 ≤5mm; the base 201 and the roller foundation 202 are cast by C30 concrete with steel mesh, the roller foundation 202 is in the form of a cap, and bolt holes are set at the bottom. The roller foundation 202 is fixed to the top of the base 201 by bolts; the deviation of the two ends of the roller 203 is ≤5mm. The tire frame 204 is welded by a number of steel sections, and the whole is a rectangular parallelepiped structure, and a steel plate is laid on the upper part and fixed with fixings.

[0021] The hoisting equipment 30 includes a crane, a balance beam 303 with a lifting eye 302 at the upper end, a single-wheel pulley 304, a first steel wire rope 301, and a second steel wire rope 305; the crane is connected to the lifting eye 302 through the first steel wire rope 301, the single-wheel pulley 304 is arranged at the lower end of the balance beam 303, and the single-wheel pulley 304 is connected to the steel cage 40 to be hoisted through the second steel wire rope 305. In this embodiment, only one crane is provided; two lifting eyes 302 are provided, and four single-wheel pulleys 304 are provided.

[0022] The properties and materials of the support member 205 do not need to be strictly limited, but it is necessary to ensure that when it is placed at the lower part of the longer end of the tire frame 204, the upper end of the tire frame 204 is flush with the ground 50. The support member 205 is a steel section in this embodiment.

[0023] Example 2 A method for hoisting a steel cage of an underground continuous wall, the steps are as follows: Step 1: excavate the ground 50 at the construction site of the underground continuous wall steel cage to obtain a foundation pit 10, and lay C20 concrete on the ground 50 to make the flatness of the ground 50 ≤5mm; set up a steel mesh at the reserved structure of the foundation pit 10, lay C30 concrete to complete the construction of the base 201 supporting the rotating component 20, and make a roller foundation 202, assemble and weld the tire frame 204 with steel sections, and after the strength of the roller foundation 202 reaches the requirement, After installing the roller 203 in the foundation 202, fix it on the upper end of the base 201. Finally, lift the tire frame 204 and align the roller 203 to 1 / 3 of the length of the tire frame 204. Install the roller 203 with a deviation of ≤5mm at both ends. The roller 203 divides the tire frame 204 into 1 / 3 and 2 / 3 sections. Place the support 205 at the lower part of the 2 / 3 section so that the upper part of the tire frame 204 is flush with the ground 50. Weld the fixing parts at the upper end of the tire frame 204.

[0024] Step 2: Figure 3 As shown, the construction workers carry out the bottom plate reinforcement laying, truss and hanging point welding, and panel reinforcement laying in sequence according to the manufacturing sequence of the reinforcement cage 40 on the ground 50 and the upper end of the tire frame 204 until the reinforcement cage 40 is tied.

[0025] Step 3: After the steel cage 40 is manufactured, support bars are set at the load-bearing trusses. The support bars are arranged at the intersection of the longitudinal and transverse trusses of the steel cage 40. After the support bars are arranged, the hoisting conditions are met.

[0026] Step 4, the hoisting equipment 30 enters the site, and a single crawler crane is used as the crane. The hook of the crane is connected to the two lifting ears 302 at the upper end of the balance beam 303 through the first steel wire rope 301, and four single-wheel pulleys 304 are provided at the lower end of the balance beam 303. The single-wheel pulley 304 is connected to the steel cage 40 to be hoisted at the lifting point through the second steel wire rope 305.

[0027] The present invention is based on the principle of the traditional longitudinal four-point lifting method. A longitudinal lifting point is set at the top of the steel cage 40 and 1 / 3 of the distance from the top of the steel cage 40, and 4 lifting points are set horizontally (0.11H, 0.37H, 0.63H, and 0.89H positions, H refers to the width of the steel cage 40), totaling 8 lifting points.

[0028] Step 5: After the hoisting equipment 30 is set up, the support member 205 at the bottom of the tire frame 204 is pulled out, and the steel cage 40 is slowly lifted. At this time, the steel cage 40 is slowly turned over with the tire frame 204. During the lifting process, the crawler crane gradually swings and moves to the roller 203. Figure 4 As shown, the steel cage 40 rotates with the tire frame 204 with the double action of lifting and translation.

[0029] Step 6: Figure 5 As shown, after the steel cage 40 is in a stable vertical state, the crawler crane slightly lifts the steel cage 40 and then moves it horizontally out of the range of action of the fixing member to achieve the transformation of the steel cage 40 from horizontal to vertical.

[0030] Step 7: The crawler hoist is moved to transport the steel cage 40 to the upper part of the underground continuous wall foundation trench, and the cage is placed into the trench.

[0031] Step 8: After the first reinforcement cage 40 is hoisted, steps 1-7 are repeated to complete the entire construction operation.

[0032] In summary, the present invention uses a special steel cage processing tire frame, and the tire frame and the steel cage are flipped together, so that the steel cage can be flipped to a vertical state on the ground, avoiding the steel cage from flipping and converting in the air, simplifying the flipping steps, reducing the airborne time, and improving construction safety and efficiency. The present invention utilizes the coordinated construction of the tire frame and a single crawler crane, which reduces the construction plane and space occupied by the steel cage and the crawler crane, and improves the plane and space utilization of the construction site. Compared with the traditional underground continuous wall steel cage lifting method of double-machine lifting construction, the present invention only uses one crane to complete the flipping and lifting of the steel cage, saving the cost of machinery use and simplifying the installation procedure.

[0033] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An underground continuous wall steel cage hoisting system, characterized in that: Including foundation pit, supporting rotating parts, and lifting equipment; The foundation pit is obtained by excavating the ground of the construction site, and is provided with a structure for accommodating the supporting rotating component; The supporting rotating component comprises a base with a roller base fixed on the top, a roller, a tire frame and a support member, a bearing is installed in the roller base, the roller is fixed by the bearing and passes through both sides of the tire frame to divide the tire frame into two ends, the tire frame will not contact the lower position of the base when rotating, and the support member is placed at the lower part of one end of the tire frame to ensure that the upper end of the tire frame is flush with the ground; During the hoisting operation, the support member is removed, the steel cage located on the ground and the tire frame is lifted by the hoisting equipment, and the tire frame is rotated to realize the transformation of the steel cage from horizontal to vertical.

2. The underground continuous wall reinforcement cage hoisting system according to claim 1 is characterized in that: The roller divides the tire frame into two ends of different lengths, and the support member is placed at the lower part of the longer end of the tire frame; The hoisting position of the steel cage is located at the position of the steel cage on the ground, and the end of the steel cage away from the hoisting position does not exceed the longer end of the tire frame.

3. The underground continuous wall reinforcement cage hoisting system according to claim 1 is characterized in that: The upper end of the tire frame is also provided with a fixing piece for fixing the steel cage.

4. The underground continuous wall reinforcement cage hoisting system according to claim 1 is characterized in that: The base and the roller foundation are made of reinforced concrete.

5. The underground continuous wall reinforcement cage hoisting system according to claim 1 is characterized in that: The flatness of the ground is ≤5mm.

6. The underground continuous wall reinforcement cage hoisting system according to claim 1 is characterized in that: The deviation between the two ends of the roller is ≤5mm.

7. The underground continuous wall reinforcement cage hoisting system according to any one of claims 1 to 6, characterized in that: The hoisting equipment includes a crane, a balance beam with a lifting lug at the upper end, a single-wheel pulley, a first steel wire rope and a second steel wire rope; The hoist is connected to the lifting lug via the first steel wire rope; The single-wheel pulley is arranged at the lower end of the balance beam; The single-wheel pulley is connected to the steel cage to be hoisted via the second steel wire rope; The described crane is provided with one.

8. A method for hoisting an underground continuous wall reinforcement cage using the underground continuous wall reinforcement cage hoisting system according to any one of claims 1 to 7, characterized in that: include, Complete the construction of the foundation pit and supporting rotating parts in the construction area of ​​the underground continuous wall reinforcement cage; Complete the production of the steel cage at the upper end of the foundation pit and the tire frame and use trusses to reinforce the steel cage's hanging points; The hoisting equipment enters the site and connects to the lifting point of the steel cage. After removing the supporting parts, the steel cage on the ground and the frame is lifted by the hoisting equipment. The frame rotates to realize the transformation of the steel cage from horizontal to vertical. The lifting equipment moves the steel cage to the underground continuous wall foundation trench.

9. The method according to claim 8, characterized in that Support bars are also provided at the trusses of the steel cage.