Preparation method of magnetic cantilever beam and electromagnetic scanning galvanometer module

The magnetic cantilever beam prepared and magnetized through screen printing method, combined with the electromagnet, solves the problem of complex preparation process and high cost of MEMS electromagnetic driver, and realizes a low-cost, highly adaptable and maintainable electromagnetic scanning galvanometer. Enhanced micromirror control capabilities.

CN118771301APending Publication Date: 2024-10-15SICHUAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410689943.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The preparation process of existing MEMS electromagnetic actuators is complex, costly, and difficult to repair, making it difficult to realize a low-cost, highly adaptable and maintainable electromagnetic scanning galvanometer.

Method used

The screen printing method is used to prepare the magnetic cantilever beam, which is formed by laminating the passive layer and the active layer, and is externally magnetized. It is combined with an electromagnet to drive the electromagnetic scanning galvanometer, replacing the traditional coil winding method, simplifying the process and Reduce costs.

Benefits of technology

It achieves simple preparation and convenient disassembly and assembly of the magnetic cantilever beam, reduces production and use costs, improves the performance and maintainability of the electromagnetic scanning galvanometer, and enhances the ability to control the micromirror.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118771301A_ABST
    Figure CN118771301A_ABST
Patent Text Reader

Abstract

The invention discloses a preparation method of a magnetic cantilever beam and an electromagnetic scanning galvanometer module, the magnetic cantilever beam comprises the prepared magnetic cantilever beam and a groove-box-shaped shell, a fixing support is arranged in the shell, an electromagnet is installed on the fixing support, a mounting frame is detachably arranged at an opening of the shell, and the electromagnetic scanning galvanometer module is arranged in the mounting frame. Two parallel guide rails are arranged on the mounting frame, two clamping pieces used for clamping the two ends of the magnetic cantilever beam respectively are arranged on the guide rails, and a micro-mirror is fixed to the middle of the surface of the magnetic cantilever beam; according to the scheme, the magnetic cantilever beam replaces a fixed frame wound by a coil, the preparation method is simple, the production period is short, and thus the preparation cost is greatly reduced; and meanwhile, the magnetic cantilever beam and the electromagnet are convenient to disassemble and assemble, so that maintenance and replacement are facilitated, and the use cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of galvanometer mirrors, and in particular to a method for preparing a magnetic cantilever beam and an electromagnetic scanning galvanometer mirror module. Background Art

[0002] Galvanometer technology has undergone a long period of development and gradually matured from the initial mechanical device to the modern high-speed, high-precision electronic optical equipment. The early mechanical galvanometer consisted of a reflector, a drive motor (such as an electromagnetic coil and magnet system), a position sensor (such as an optical encoder) and a control system, and mainly relied on mechanical movement (such as motor drive) to achieve the swing of the reflector.

[0003] At present, the multi-axis galvanometer system combined with the intelligent control system can scan in multiple directions simultaneously and adaptively adjust the scanning parameters through feedback in real time, which can improve the scanning efficiency, stability and accuracy; the application of new materials (such as lightweight and high-strength alloys, composite materials) and new technologies (such as optical encoders, laser interferometers) has further improved the performance and reliability of the galvanometer; new technologies such as adding carbon fiber composite materials to 3D printing slurry to print the galvanometer torsion beam to improve the strength and toughness of the torsion beam; and new technologies such as optical encoders and laser interferometers, by providing high-precision displacement and angle feedback, improve the control accuracy and stability of the galvanometer; At present, the optimization and innovation of the galvanometer structure and performance is still one of the research hotspots and important development directions of MEMS galvanometers.

[0004] A MEMS galvanometer is an optical MEMS device that integrates a micro-mirror and a MEMS driver, and is manufactured using optical MEMS technology. It is a small galvanometer manufactured based on micro-electromechanical system technology, and is composed of a micro-mirror, a cantilever beam, a driver, and a supporting structure. MEMS galvanometers are mostly driven by electrostatics, piezoelectrics, electromagnetics, and electrothermals. Compared with the large size, high power consumption, and slow response of mechanical galvanometers, MEMS galvanometers have the advantages of miniaturization, low power consumption, and high-speed response. Currently, electromagnetic drive is the most mainstream and mature drive method for MEMS galvanometers. Electromagnetic drivers provide a stable and adjustable driving force for galvanometer vibration, and are an important factor in determining the working performance of galvanometers.

[0005] At present, most MEMS electromagnetic actuators often use a solution that winds the drive coil on a fixed frame, controls the size and direction of the current in the coil, and realizes frame vibration under the action of an external magnetic field; then, the galvanometer is placed on the frame to realize galvanometer vibration; although the method of using a wound coil to prepare a magnetically driven galvanometer can achieve precise control of the vibration frequency and amplitude of the galvanometer by controlling the size and direction of the coil current, there are problems such as difficulty in winding and long processing cycle when winding the coil on a tiny frame, which leads to complex manufacturing processes; when a large number of preparations are required, a huge cost burden will be incurred; in addition, if the coil is damaged, short-circuited, or broken, the galvanometer device will be directly scrapped; At present, engineers mainly focus on optimizing the coil arrangement and improving the physical structure of the fixed frame to achieve a more stable and cheaper galvanometer driver; but the technology in this area has reached saturation to a certain extent, and it is difficult to achieve major breakthroughs and significant performance improvements in a short period of time. Therefore, there is an urgent need for an electromagnetic scanning galvanometer and a preparation method that are both low-cost, highly adaptable, and highly maintainable. Summary of the invention

[0006] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method for preparing a magnetic cantilever beam and an electromagnetic scanning galvanometer module, which solve the problems of the existing magnetic drive galvanometer preparation process being complex, costly and difficult to maintain.

[0007] To achieve the above purpose, the technical solution adopted by the present invention is:

[0008] In a first aspect, a method for preparing a magnetic cantilever beam is provided, comprising the following steps:

[0009] S1: preparing a passive layer slurry and an active layer slurry, and forming a cantilever beam sheet formed by laminating the passive layer slurry and the active layer slurry by screen printing;

[0010] S2: heating and curing the cantilever beam sheet;

[0011] S3: The cantilever beam slice is magnetized, and the direction of the magnetizing magnetic field is parallel to the width direction of the surface of the cantilever beam slice, and finally a magnetic cantilever beam is obtained.

[0012] Further, the method of screen printing the cantilever beam sheet in step S1 includes:

[0013] A1: A plurality of through grooves for forming cantilever beam sheets are provided on the first screen printing plate and the second screen printing plate, and the plurality of through grooves on the first screen printing plate and the second screen printing plate are aligned one by one;

[0014] A2: After placing and fixing the first screen printing plate on the glass plate, pour the passive layer slurry on the first screen printing plate, and evenly scrape the passive layer slurry into several through grooves on the first screen printing plate with a scraper;

[0015] A3: After placing the second screen printing plate on the first screen printing plate and aligning and fixing it, pour the active layer slurry on the second screen printing plate, and evenly scrape the active layer slurry into several through grooves on the second screen printing plate with a scraper;

[0016] A4: Pull the first screen printing plate and the second screen printing plate upward, and form a plurality of cantilever beam sheets formed by laminating the passive layer slurry and the active layer slurry on the glass plate.

[0017] Furthermore, the thickness of the first screen printing plate and the second screen printing plate ranges from 50 to 100 μm.

[0018] Furthermore, the passive layer slurry includes uniformly mixed aluminum powder and silica gel, and the mass ratio of aluminum powder to silica gel is 0.2-0.4, and the active layer slurry includes uniformly mixed NdFeB powder and silica gel, and the mass ratio of NdFeB powder to silica gel is 0.8-0.95.

[0019] Furthermore, the method for magnetizing the cantilever beam sheet is: applying a magnetizing magnetic field with a magnetic induction intensity of 1.0-5.0T to the cantilever beam sheet through an external magnetizing device, and the magnetizing time is 20-30s.

[0020] Furthermore, the cantilever beam slice is heated and cured at a temperature of 50-100° C. and a heating time of 30-60 min.

[0021] In a second aspect, an electromagnetic scanning galvanometer is provided, which includes a magnetic cantilever beam and a trough-box-shaped shell, a fixed bracket is arranged inside the shell, an electromagnet is mounted on the fixed bracket, a mounting frame is detachably arranged at the opening of the shell, two parallel guide rails are arranged on the mounting frame, two clamping parts are arranged on the guide rails for respectively clamping the two ends of the magnetic cantilever beam, and a micromirror is fixed in the middle of the surface of the magnetic cantilever beam.

[0022] Furthermore, the clamping member includes two clamping plates, the end of the magnetic cantilever beam is fixed between the two clamping plates, both ends of the clamping plates are provided with threaded holes for facilitating the fixed connection of the two clamping plates by bolts, and a positioning ear is provided on the outer side of the middle part of the clamping plate, and the positioning ear is fastened to the strip groove formed by the two guide rails by bolts.

[0023] Furthermore, the magnetic field generated by the electromagnet is perpendicular to the surface of the micromirror and the internal magnetic field of the magnetic cantilever beam, respectively.

[0024] Furthermore, a clamp for fixing the laser is hinged on the outer side wall of the shell, and the rotation plane of the clamp is a vertical plane.

[0025] The beneficial effects of the present invention are:

[0026] 1. The magnetic cantilever beam of this scheme replaces the fixed frame for winding the coil. Its preparation method is simple and the production cycle is short, thereby greatly reducing the preparation cost. At the same time, the magnetic cantilever beam and the electromagnet are easy to disassemble and assemble, so as to facilitate maintenance and replacement, thereby reducing the use cost.

[0027] 2. The magnetic cantilever beam of this scheme has stable performance, and the clamping piece can clamp and fix magnetic cantilever beams of different sizes, which has strong practicality. At the same time, the magnetic cantilever beam, as a magnetically driven programmable material, can respond to external stimulation (magnetic field) and change its own shape, volume or function. Neodymium iron boron powder, aluminum powder, and silicone rubber are used as raw materials to make a passive layer and an active layer that can be magnetically excited, and then the two are combined to make a magnetic cantilever beam as a driving frame. The magnetic cantilever beam is magnetized in a specified direction by an external device, so that the magnetic cantilever beam has an internal magnetic field (magnetism) in a certain direction, which is orthogonal to the magnetic field direction of the electromagnet, thereby increasing the direction and dimension of the internal magnetic field of this scheme, thereby enhancing the control of the micromirror, so that this scheme can realize all the functions of the electromagnetic driver.

[0028] 3. The electromagnetic scanning galvanometer of this scheme can realize the test of vibration performance through the cooperation of laser and electromagnet, and can adjust the structure, size and thickness of passive layer and active layer of magnetic cantilever beam according to the test results, so that this scheme can achieve the expected vibration performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 Schematic diagram of the structure of the electromagnetic scanning galvanometer.

[0030] Figure 2 A schematic diagram of the structure of the shell.

[0031] Figure 3 A schematic diagram of the structure of the installation frame.

[0032] Figure 4 It is a structural schematic diagram of the cooperation between the magnetic cantilever beam and the clamping piece.

[0033] Figure 5 (A) is a top view of the first screen printing plate.

[0034] Figure 5 (B) is a side cross-sectional view of the first screen printing plate.

[0035] Figure 6 It is a schematic diagram of the structure of scraping the passive layer slurry on the first screen printing plate.

[0036] Figure 7 It is a schematic diagram of the structure of scraping active layer slurry on the second screen printing plate.

[0037] Figure 8 It is a schematic diagram of the structure of extracting the first screen printing plate and the second screen printing plate.

[0038] Fig. 9 Schematic diagram of magnetizing the cantilever beam sheet.

[0039] Among them, 1. magnetic cantilever beam, 2. first screen printing plate, 3. second screen printing plate, 4. through groove, 5. glass plate, 6. scraper, 7. shell, 8. pillar, 9. electromagnet, 10. installation frame, 11. guide rail, 12. micromirror, 13. clamping piece, 14. positioning ear, 15. fixture. DETAILED DESCRIPTION

[0040] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.

[0041] like Figures 1 to 4 As shown, the electromagnetic scanning galvanometer of the present scheme includes a magnetic cantilever beam 1 and a housing 7 in a slot box shape, a fixed bracket is arranged in the housing 7, and the fixed bracket includes four pillars 8 arranged in the circumferential direction, an electromagnet 9 is installed between the four pillars 8, and one of the pillars 8 is provided with an open slot for the electromagnet 9 to pass through; a mounting frame 10 is arranged at the opening of the housing 7, and the mounting frame 10 is detachably connected to the housing 7 by bolts, and two parallel guide rails 11 are arranged on the mounting frame 10, and two clamping members for clamping the two ends of the magnetic cantilever beam 1 are arranged on the guide rail 11, and a micromirror 12 is fixed in the middle of the surface of the magnetic cantilever beam 1. During implementation, the micromirror 12 can be bonded to the magnetic cantilever beam 1 by an adhesive (epoxy resin, polyurethane glue), and then heat or current is applied to the contact surface of the micromirror 12 and the magnetic cantilever beam 1, so that they are partially melted and combined together; at the same time, the micromirror 12 can also be fixed to the magnetic cantilever beam 1 by a screw or a threaded structure.

[0042] During the design, the clamping member includes two clamping plates 13, and the end of the magnetic cantilever beam 1 is fixed between the two clamping plates 13. Both ends of the clamping plate 13 are provided with threaded holes for fixing the two clamping plates 13 by bolts. A positioning ear 14 is provided on the outer side of the middle part of the clamping plate 13, and the positioning ear 14 is fastened to the strip groove formed by the two guide rails 11 by bolts; the clamping member of this scheme can be adjusted in position on the guide rail 11, so that the clamping member can clamp and fix magnetic cantilever beams 1 of different sizes, and it is convenient to disassemble and assemble, and its practicality is strong.

[0043] The magnetic field generated by the electromagnet 9 of the present invention is respectively perpendicular to the surface of the micromirror 12 and the internal magnetic field of the magnetic cantilever beam 1, so that the internal magnetic field of the magnetic cantilever beam 1 is orthogonal to the magnetic field direction of the electromagnet 9, thereby increasing the direction and dimension of the internal magnetic field of the present invention, thereby enhancing the control over the micromirror 12, so that the present invention can realize all the functions of the electromagnetic driver.

[0044] A clamp 15 for fixing the laser is hinged on the outer wall of the shell 7, and the rotation plane of the clamp 15 is a vertical plane; the micromirror 12 can be irradiated by the laser and the vibration performance of the micromirror 12 can be tested; at the same time, the electromagnet 9 can control the MOS switch through the PWM signal generated by the single-chip microcomputer, and its signal frequency is 10-1000Hz, thereby controlling the current size and direction passing through the electromagnet 9, so as to verify the vibration effect of the electromagnetic scanning galvanometer.

[0045] like Figures 5 to 9 As shown, the present invention also provides a method for preparing a magnetic cantilever beam 1, which comprises the following steps:

[0046] S1: preparing a passive layer slurry and an active layer slurry, wherein the passive layer slurry comprises uniformly mixed aluminum powder and silica gel, and the mass ratio of the aluminum powder to the silica gel is 0.2-0.4, and the active layer slurry comprises uniformly mixed neodymium iron boron powder and silica gel, and the mass ratio of the neodymium iron boron powder to the silica gel is 0.8-0.95; and then forming a cantilever beam sheet formed by laminating the passive layer slurry and the active layer slurry by screen printing; specifically comprising:

[0047] A1: A plurality of through grooves 4 for forming cantilever beam sheets are provided on the first screen printing plate 2 and the second screen printing plate 3, and the plurality of through grooves 4 on the first screen printing plate 2 and the second screen printing plate 3 are aligned one by one;

[0048] A2: After placing and fixing the first screen printing plate 2 on the glass plate 5, pour the passive layer slurry on the first screen printing plate 2, and evenly scrape the passive layer slurry into the plurality of through grooves 4 on the first screen printing plate 2 by using a scraper 6;

[0049] A3: After placing the second screen printing plate 3 on the first screen printing plate 2 and aligning and fixing it, pour the active layer slurry on the second screen printing plate 3, and evenly scrape the active layer slurry into the plurality of through grooves 4 on the second screen printing plate 3 by using a scraper 6;

[0050] A4: Pull the first screen printing plate 2 and the second screen printing plate 3 upward, and form a plurality of cantilever beam sheets formed by laminating the passive layer slurry and the active layer slurry on the glass plate 5;

[0051] S2: The cantilever beam sheet is heated and cured in an oven at a temperature of 50-100° C. for a heating time of 30-60 min.

[0052] S3: applying a magnetizing magnetic field with a magnetic induction intensity of 1.0-5.0T to the cantilever beam sheet through an external magnetizing device, and the magnetizing time is 20-30s. The direction of the magnetizing magnetic field is parallel to the width direction of the surface of the cantilever beam sheet, and finally a magnetic cantilever beam 1 is obtained.

[0053] In particular, the plurality of through grooves 4 on the first screen printing plate 2 and the second screen printing plate 3 may be rectangular, curved, elliptical, etc., so as to prepare cantilever beam sheets of different shapes. The thickness of the passive layer slurry and the active layer slurry in the cantilever beam sheet are respectively determined by the thickness of the first screen printing plate 2 and the second screen printing plate 3. Preferably, the thickness range of the first screen printing plate 2 and the second screen printing plate 3 is 50-100 μm, so as to respectively regulate the thickness of the passive layer slurry and the active layer slurry.

[0054] In summary, the magnetic cantilever beam 1 of the present scheme replaces the fixed frame wound with a coil, and its preparation method is simple and the production cycle is short, thereby greatly reducing the preparation cost; the magnetic cantilever beam 1 and the electromagnet 9 are easy to disassemble and assemble, so as to facilitate maintenance and replacement, thereby reducing the cost of use; the electromagnetic scanning galvanometer of the present scheme can realize the vibration performance test through the cooperation of the laser and the electromagnet 9, and can adjust the structure, size and thickness of the passive layer and the active layer of the magnetic cantilever beam 1 according to the test results, so that the present scheme can achieve the expected vibration performance.

Claims

1. A method for preparing a magnetic cantilever beam, characterized in that: The following steps are involved: S1: preparing a passive layer slurry and an active layer slurry, and forming a cantilever beam sheet formed by laminating the passive layer slurry and the active layer slurry by screen printing; S2: heating and curing the cantilever beam sheet; S3: The cantilever beam slice is magnetized, and the direction of the magnetizing magnetic field is parallel to the width direction of the surface of the cantilever beam slice, and finally a magnetic cantilever beam is obtained.

2. The method for preparing a magnetic cantilever beam according to claim 1, characterized in that: The method of screen printing the cantilever beam sheet in step S1 includes: A1: A plurality of through grooves for forming cantilever beam sheets are provided on the first screen printing plate and the second screen printing plate, and the plurality of through grooves on the first screen printing plate and the second screen printing plate are aligned one by one; A2: After placing and fixing the first screen printing plate on the glass plate, pour the passive layer slurry on the first screen printing plate, and evenly scrape the passive layer slurry into several through grooves on the first screen printing plate with a scraper; A3: After placing the second screen printing plate on the first screen printing plate and aligning and fixing it, pour the active layer slurry on the second screen printing plate, and evenly scrape the active layer slurry into several through grooves on the second screen printing plate with a scraper; A4: Pull the first screen printing plate and the second screen printing plate upward, and form a plurality of cantilever beam sheets formed by laminating the passive layer slurry and the active layer slurry on the glass plate.

3. The method for preparing a magnetic cantilever beam according to claim 2, characterized in that: The thickness of the first screen printing plate and the second screen printing plate ranges from 50 to 100 μm.

4. The method for preparing a magnetic cantilever beam according to claim 1, characterized in that: The passive layer slurry includes uniformly mixed aluminum powder and silica gel, and the mass ratio of the aluminum powder to the silica gel is 0.2-0.

4. The active layer slurry includes uniformly mixed NdFeB powder and silica gel, and the mass ratio of the NdFeB powder to the silica gel is 0.8-0.

95.

5. The method for preparing a magnetic cantilever beam according to claim 1, characterized in that: The method for magnetizing the cantilever beam sheet is as follows: applying a magnetizing magnetic field with a magnetic induction intensity of 1.0-5.0T to the cantilever beam sheet through an external magnetizing device, and the magnetizing time is 20-30s.

6. The method for preparing a magnetic cantilever beam according to claim 1, characterized in that: The heating temperature for heating and curing the cantilever beam sheet is 50-100° C., and the heating time is 30-60 minutes.

7. An electromagnetic scanning galvanometer module, characterized in that: It comprises the magnetic cantilever beam as described in any one of claims 1 to 6 and a casing in the shape of a trough box, wherein a fixing bracket is arranged inside the casing, an electromagnet is mounted on the fixing bracket, a mounting frame is detachably arranged at the opening of the casing, two parallel guide rails are arranged on the mounting frame, two clamping members for respectively clamping the two ends of the magnetic cantilever beam are arranged on the guide rails, and a micromirror is fixed in the middle of the surface of the magnetic cantilever beam.

8. The electromagnetic scanning galvanometer module according to claim 7, characterized in that: The clamping member includes two clamping plates, the end of the magnetic cantilever beam is fixed between the two clamping plates, both ends of the clamping plates are provided with threaded holes for convenient fixed connection of the two clamping plates by bolts, and a positioning ear is provided on the outer side of the middle part of the clamping plate, and the positioning ear is fastened to the strip groove formed by the two guide rails by bolts.

9. The electromagnetic scanning galvanometer module according to claim 7, characterized in that: The magnetic field generated by the electromagnet is perpendicular to the surface of the micromirror and the internal magnetic field of the magnetic cantilever beam.

10. The electromagnetic scanning galvanometer module according to claim 7, characterized in that: A clamp for fixing the laser is hinged on the outer side wall of the shell, and the rotation plane of the clamp is a vertical plane.