Concrete pouring equipment for hydraulic engineering construction

By adopting the design of arc-shaped connecting rods in concrete pouring equipment, the problem of uneven mixing of gravel before pouring is solved, the uniform flow and precise pouring of concrete are achieved, the pouring accuracy and uniformity are improved, equipment maintenance is simplified, and equipment maintenance is improved. Improve construction efficiency and quality.

CN118774130APending Publication Date: 2024-10-15河南省豫东水利保障中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411092685.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing concrete pouring equipment cannot effectively and evenly mix gravel before pouring, resulting in uneven pouring of finished products and poor mixing quality.

Method used

Using concrete pouring equipment including radial offset components, lateral offset components, swing components and fixed components, through the design of arc connecting rods, the uniform flow and precise pouring of concrete can be achieved, the pressure during the pouring process can be dispersed, and the pressure can be adapted to different shapes. and size pouring requirements.

Benefits of technology

It improves the accuracy and uniformity of pouring, reduces the risk of equipment deformation and damage, simplifies equipment cleaning and maintenance, reduces manual intervention and labor intensity, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774130A_ABST
    Figure CN118774130A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of water conservancy project construction, and provides concrete pouring equipment for water conservancy project construction, the concrete pouring equipment for water conservancy project construction comprises a radial offset assembly and a transverse offset assembly, and further comprises a swing assembly and a fixing assembly, the fixing assembly comprises a supporting plate, a supporting seat and a control groove, the supporting plate is fixedly connected to the supporting base, a groove is formed in the supporting plate, the control groove is a rectangular groove, a sliding rod is slidably connected into the control groove, a second linkage groove is formed in the control groove, a second linkage column is fixedly connected to the middle of the second linkage groove, the second linkage column is rotationally connected with a swing rod, and a spring is fixedly connected to the middle of a rotating rod. The side, away from the first linkage column, of the rotating rod is fixedly connected with a guide column, a gap exists between the side, close to the rotating disc, of the guide column and the rotating disc, and the rotating disc is fixedly connected with a guide protruding block.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy project construction, and in particular relates to concrete pouring equipment for water conservancy project construction. Background Art

[0002] The construction of water conservancy projects has many similarities with the construction of general civil engineering projects such as roads, railways, bridges and house buildings. Its characteristics are as follows: water conservancy projects undertake the tasks of water retaining, water storage and water discharge, and therefore have special requirements for the stability, pressure bearing, anti-seepage, impact resistance, wear resistance, frost resistance and crack resistance of hydraulic structures. It is necessary to adopt special construction methods and measures in accordance with the technical specifications of water conservancy projects to ensure the quality of the project; water conservancy projects have stricter requirements on foundations, and the projects are often located in areas and locations with complex geological conditions. If the foundation is not properly treated, it will leave hidden dangers that are difficult to remedy afterwards, and special foundation treatment measures need to be taken; water conservancy projects are mostly constructed in rivers, lakes, coastal areas and other waters, and diversion, interception and underwater operations need to be carried out according to the natural conditions of the water flow and the requirements of the project construction; water conservancy projects should make full use of the dry season for construction, have strong seasonality and necessary construction intensity, and some projects need to take temperature control measures due to the influence of climate to ensure the quality of the project. Summary of the invention

[0003] The purpose of the embodiment of the present invention is to provide a concrete pouring equipment for water conservancy project construction, aiming to solve the problem that the existing concrete pouring equipment will continuously stir the concrete before pouring to ensure that the internal slag can be evenly mixed in the concrete, avoiding the accumulation of more slag in the same part, resulting in uneven pouring of the finished product and poor mixing quality.

[0004] The embodiment of the present invention is implemented as follows: a concrete pouring device for water conservancy project construction, the concrete pouring device for water conservancy project construction comprising: a support seat, a support plate is installed on the support seat, a radial offset assembly is installed on the support plate, and the radial offset is used to pre-treat concrete; A concrete pouring device for water conservancy project construction, comprising: a radial offset component, a lateral offset component, a swing component and a fixed component; The fixing assembly comprises a support plate, a support seat and a control slot; The support plate is a rectangular body, and the support plate is fixedly connected to the support seat; The support plate is provided with a groove, which is a control groove; The control groove is a rectangular groove, and a slide bar is slidably connected inside the control groove; A linkage block is fixedly connected to one side of the slide bar away from the spring, and a lateral offset assembly is fixedly connected to the slide bar; The lateral displacement assembly is used to guide the movement of the swing rod, and the lateral displacement assembly includes an arc-shaped connecting rod; There is one arc-shaped connecting rod, and the arc size has multiple specifications and can be replaced; The arc-shaped connecting rods are multiple arc-shaped connecting rods, which are connected end to end for use, and adjacent arc-shaped connecting rods have opposite opening directions; The arc-shaped connecting rod is divided into a first arc-shaped connecting rod and a second arc-shaped connecting rod; The first arc-shaped connecting rod is an arc-shaped rod with an opening upward; The second arc-shaped connecting rod is an arc-shaped rod with an opening downward; The swing assembly includes a guide protrusion, a rotating disk, a guide column, a swing rod, a spring, a second linkage column, a slide bar 270, and a second linkage groove; A second linkage groove is formed inside the control groove, the second linkage groove is a rectangular groove, and a connection hole is formed inside the second connection groove; The connection hole opening is circular, and a second linkage column is fixedly connected in the connection hole; The second connecting column is a cylindrical body, and the second linkage column is rotatably connected to the swing rod; The swing rod is a trapezoidal body, a spring is fixedly connected to the middle of the swing rod, and a guide column is fixedly connected to the side of the swing rod away from the first linkage column; The guide column is an elliptical body, and one side of the guide column is rotatably connected to a turntable; The turntable is a cylindrical body, a gap exists between the side of the guide column close to the turntable and the turntable, and a guide protrusion is fixedly connected to the turntable; The radial swing assembly includes a connecting column, a linkage block, a first linkage groove, a first linkage column, a connecting rod, and a fixed block; The linkage block is a rectangular body, and the linkage block is fixedly connected to the connecting column; The connecting column is a cylindrical body, and a fixing block is fixedly connected to the top of the connecting column; The fixing block is a rectangular body, and a U-shaped groove is provided inside the fixing block, the groove is a first linkage groove, the first linkage groove is a rectangular groove, and a first linkage column is fixedly connected to the first linkage groove; The first linkage column is a cylindrical body, and a connecting rod is fixedly connected to the first linkage column; The connecting rod is a rectangular rod, and the side of the connecting rod away from the first linkage column is fixedly connected to the rear of the support plate; The spring is always in a stretched state; The middle part of the linkage block is surrounded by threads for connection.

[0005] The upward arc connecting rod can effectively guide the flow direction of cement slurry, ensuring that it can accurately and evenly reach the predetermined position during the pouring process. And improve the accuracy of pouring. The downward arc connecting rod is connected to the upward arc connecting rod to form a stable support structure. This structure can effectively disperse the pressure generated during the pouring process and prevent the equipment from being deformed or damaged due to uneven force. The design of the arc connecting rod allows the various parts of the equipment to flexibly adjust the angle and position to meet the pouring needs of different shapes and sizes. This flexibility not only improves the applicability of the equipment, but also facilitates the operation of the operator. Therefore, after the pouring is completed, the cleaning and maintenance of the equipment are relatively simple and quick. This helps to reduce manual intervention and labor intensity, and improve construction efficiency and quality. The cement pouring equipment with an upward arc connecting rod and a downward arc connecting rod has high pouring accuracy, structural stability, and the design of the arc connecting rod allows the various parts of the equipment to flexibly adjust the angle and position to meet the pouring needs of different shapes and sizes. This flexibility not only improves the applicability of the equipment, but also facilitates the operation of the operator. BRIEF DESCRIPTION OF THE DRAWINGS

[0006] Figure 1 A schematic diagram of the structure of a control mechanism in a concrete pouring device for water conservancy project construction provided by an embodiment of the present invention Figure 1 Figure 2 A schematic diagram of the structure of a control mechanism in a concrete pouring device for water conservancy project construction provided by an embodiment of the present invention Figure 2 Figure 3 A schematic diagram of the structure of a control mechanism in a concrete pouring device for water conservancy project construction provided by an embodiment of the present invention Figure 3 ; Figure 4 A schematic diagram of replacing an arc-shaped rod of a control mechanism in a concrete pouring device for water conservancy project construction provided by an embodiment of the present invention; Figure 5 A schematic cross-sectional structure diagram of a control mechanism in a concrete pouring device for water conservancy project construction provided by an embodiment of the present invention; In the figure: 100, fixing assembly; 110, supporting seat; 120, supporting plate; 130, controlling groove; 200, swinging assembly; 210, guiding protrusion; 220, rotating disk; 230, guiding column; 240, swinging rod; 250, spring; 260, second linkage column; 270, sliding rod; 280, second linkage groove; 281, connecting hole; 300, radial displacement assembly; 310, connecting column; 320, linkage block; 330, first linkage groove; 340, first linkage column; 350, connecting rod; 360, fixing block; 400, lateral displacement assembly; 410, first arc-shaped connecting rod; 420, second arc-shaped connecting rod. DETAILED DESCRIPTION

[0007] To facilitate the understanding of the present invention, the present application will be described more comprehensively below with reference to the relevant drawings; the drawings show preferred embodiments of the present invention, but the present invention can be implemented in many different forms and is not limited to the embodiments described herein; on the contrary, the purpose of providing these embodiments is to enable a more thorough and comprehensive understanding of the disclosed content of the present invention.

[0008] It should be noted that the terms “vertical”, “horizontal”, “up”, “down”, “left”, “right” and similar expressions used in this document are only for illustrative purposes and do not represent the only implementation method.

[0009] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs; the terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the term "and / or" used herein includes any and all combinations of one or more related listed items.

[0010] See also Figure 1 , which is a schematic diagram of the structural stereogram of a concrete pouring equipment for water conservancy project construction of the present invention; the present application optimizes and improves the pouring equipment in the prior art, and utilizes an arc-shaped structure rod to achieve stable lateral movement; reduces the occurrence of concrete accumulation in the pouring equipment, thereby improving the pouring accuracy and uniformity.

[0011] Embodiment 1: Figure 1-5 As shown, the present application is a concrete pouring equipment for water conservancy project construction, including a radial offset assembly 300 and a lateral offset assembly 400, characterized in that: it also includes a swing assembly 200 and a fixed assembly 100; The fixing assembly 100 includes a support plate 110, a support seat 120 and a control slot 130; The support plate 110 is a rectangular body, and the support plate 110 is fixedly connected to the support seat 120; The support plate 120 is provided with a groove, and the groove is a control groove 130; The control groove 130 is a rectangular groove, and a slide bar 270 is slidably connected inside the control groove 130; A linkage block 320 is fixedly connected to one side of the slide bar 270 away from the spring 250 , and a lateral offset assembly 400 is fixedly connected to the slide bar 270 ; The lateral displacement assembly 400 is used to guide the movement of the swing rod, and the lateral displacement assembly 400 includes an arc-shaped connecting rod 440; The arc-shaped connecting rod 440 has one arc-shaped connecting rod 440, and has a variety of arc sizes and can be replaced. The arc-shaped connecting rod 440 is a plurality of arc-shaped connecting rods, which are connected end to end for use, and adjacent arc-shaped connecting rods 440 have opposite opening directions; The arc-shaped connecting rod 440 is divided into a first arc-shaped connecting rod 410 and a second arc-shaped connecting rod 420; The first arc-shaped connecting rod 410 is an arc-shaped rod with an opening upward; The second arc-shaped connecting rod 420 is an arc-shaped rod with an opening downward; The swing assembly includes a guide protrusion 210, a rotating disk 220, a guide column 230, a swing rod 240, a spring 250, a second linkage column 260, a sliding rod 270, and a second linkage groove 280; The control groove 130 has a second linkage groove 280 formed inside. The second connecting groove 280 is a rectangular groove, and a connecting hole 281 is formed inside the second connecting groove 280; The connecting hole 281 has a circular opening, and a second linkage column 260 is fixedly connected to the connecting hole 281. The second linkage column 260 is a cylindrical body, and the second linkage column 260 is rotatably connected to the swing rod 240. The swing rod 240 is a trapezoidal body, a spring 250 is fixedly connected to the middle of the swing rod 240, and a guide column 230 is fixedly connected to the side of the swing rod 250 away from the first linkage column 340; The guide column 230 is an elliptical body, and one side of the guide column 230 is rotatably connected to the turntable 220; The turntable 220 is a cylindrical body, and there is a gap between the guide column 230 and the turntable 220 on one side close to the turntable 220, and the guide protrusion 210 is fixedly connected to the turntable 220; The radial swing assembly includes a connecting column 310, a linkage block 320, a first linkage groove 330, a first linkage column 340, a connecting rod 350, and a fixing block 360; The linkage block 320 is a rectangular body, and the linkage block 320 is fixedly connected to the connection column 310; The connecting column 310 is a cylindrical body, and a fixing block 360 is fixedly connected to the top of the connecting column 310; The fixing block 360 is a rectangular body, and a U-shaped groove is formed inside the fixing block 360 , and the groove is the first linkage groove 330 ; The first linkage groove 330 is a rectangular groove, and a first linkage column 340 is fixedly connected to the first linkage groove 330; The first linkage column 340 is a cylindrical body, and a connecting rod 350 is fixedly connected to the first linkage column 340; The connecting rod 350 is a rectangular rod, and the side of the connecting rod 350 away from the first linkage column 340 is fixedly connected to the rear of the support plate 120; The spring 250 is always in a stretched state; The middle part of the linkage block 320 is provided with threads for connection around it.

[0012] As the concrete pouring equipment works for a long time, the working state and working efficiency of its radial reciprocating mixing equipment will have errors. The simultaneous operation of the transverse auxiliary mixing equipment and the radial reciprocating mixing equipment can greatly improve the working efficiency and pouring quality of the concrete pouring equipment, and avoid uneven pouring caused by the accumulation of more slag in the same part.

[0013] The design of the first arc-shaped connecting rod 410 allows the pouring equipment to move more flexibly in the horizontal direction, so that uniform pouring can be performed in a wider area. By adjusting the angle and length of the first arc-shaped connecting rod 410, the running path of the pouring equipment can be optimized to better meet the actual shape and requirements of the pouring area. This helps to achieve a more uniform pouring effect, reduce the occurrence of concrete accumulation, and thus improve the accuracy and uniformity of pouring.

[0014] Embodiment 2: During the offset process, the center of the mixing device is difficult to control. In order to further improve the working quality and working efficiency of the casting device, a second arc-shaped connecting rod 420 is added to improve the stability of the mixing device.

[0015] It also includes a second arc-shaped connecting rod 420, which is arc-shaped. The first arc-shaped connecting rod 410 and the second arc-shaped connecting rod 420 are symmetrically distributed inside the control groove 130, and the first arc-shaped connecting rod 410 and the second arc-shaped connecting rod 420 are respectively fixedly connected to the sliding rod 270.

[0016] The design of the double arc connecting rod allows the pouring equipment to be more widely displaced and rotated in the horizontal direction, thereby adapting to pouring areas of different shapes and sizes. This flexibility helps to reduce pouring dead angles and improve the uniformity of pouring. By switching the curvature of the arc connecting rod, the running path of the pouring equipment can be optimized to make it more closely fit the actual shape of the pouring area. This helps to reduce unnecessary movement and repetitive work and improve pouring efficiency. After the first arc connecting rod 410 has been working for a certain period of time, it switches to the second arc connecting rod 420 to continue working, which can effectively reduce the wear and fatigue of a single component, thereby extending the service life of the equipment and reducing maintenance costs. At the same time, this alternating work also reduces the labor intensity of the operator.

[0017] After the first arc-shaped connecting rod 410 has been working for a certain period of time, in order to ensure work quality and work efficiency and reduce work intensity, it is necessary to switch to the second arc-shaped connecting rod 420 to continue working. During the pouring process, the first arc-shaped connecting rod 410 and the second arc-shaped connecting rod 420 can work simultaneously to achieve a more efficient pouring operation. In addition, the first arc-shaped connecting rod 410 and the second arc-shaped connecting rod 420 can be replaced with longer or shorter connecting rods to meet other work requirements.

[0018] The simultaneous use of the first and second poles means that the equipment can cover a larger pouring area in a shorter time, achieving parallel operations. This parallelism significantly shortens the pouring cycle and improves overall work efficiency.

[0019] In single-rod operation, the equipment may generate waiting time when moving or adjusting its position. When two rods are used simultaneously, one rod can be used for pouring while the other rod is adjusted or prepared for the next pouring, thereby reducing the waiting time. The simultaneous operation of two rods can better control the uniformity of pouring. Since the two rods can be poured from different directions or positions at the same time, they can complement each other and reduce the uneven pouring phenomenon that may be caused by single-rod operation, and the first arc-shaped connecting rod 410 and the second arc-shaped connecting rod 420 can be replaced with longer or shorter connecting rods to meet other work requirements. In the double-rod operation mode, errors are reduced. The simultaneous operation of two rods shares the load pressure of a single rod, reduces the wear and fatigue of equipment components, and thus extends the service life of the equipment.

[0020] Before pouring, the pouring area should be reasonably planned to determine the appropriate pouring path and the curvature of the arc connecting rod to improve the pouring efficiency and uniformity. The design of the double arc connecting rod brings higher flexibility and efficiency to the concrete pouring equipment. The smooth progress and high-quality completion of the pouring work can be ensured through reasonable planning and strict implementation of the operating procedures. The simultaneous use of the first arc connecting rod and the second arc connecting rod in the concrete pouring equipment is an efficient and high-quality operation method. It not only improves work efficiency and pouring quality, but also reduces work intensity and saves time costs.

[0021] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A concrete pouring equipment for water conservancy project construction, characterized in that: include: A radial offset assembly (300), a lateral offset assembly (400), a swing assembly (200) and a fixing assembly (100); The fixing assembly (100) comprises a support plate (110), a support seat (120) and a control groove (130); The support plate (110) is a rectangular body. The support plate (110) is fixedly connected to the support seat (120). A groove is formed on the support plate (110), and the groove is a control groove (130). The control groove (130) is a rectangular groove. A slide bar (270) is slidably connected inside the control groove (130). A link block (320) is fixedly connected to the side of the slide bar (270) away from the spring (250). A lateral offset component (400) is fixedly connected to the slide bar (270). The lateral offset component (400) is used to guide the movement of the swing rod. The lateral offset component (400) includes an arc-shaped connecting rod (440).

2. A concrete pouring equipment for water conservancy project construction as claimed in claim 1, characterized in that: The arc-shaped connecting rod (440) has one arc-shaped connecting rod (440) with various arc sizes and can be replaced.

3. A concrete pouring equipment for water conservancy project construction as claimed in claim 2, characterized in that: The arc-shaped connecting rod (440) is a plurality of arc-shaped connecting rods, and the plurality of arc-shaped connecting rods (440) are connected end to end for use, and adjacent arc-shaped connecting rods (440) have opening directions opposite to each other.

4. A concrete pouring equipment for water conservancy project construction as claimed in claim 2, characterized in that: The arc-shaped connecting rod (440) is divided into a first arc-shaped connecting rod (410) and a second arc-shaped connecting rod (420); the first arc-shaped connecting rod (410) is an arc-shaped rod with an opening facing upward, and the second arc-shaped connecting rod (420) is an arc-shaped rod with an opening facing downward.

5. The concrete pouring equipment for water conservancy project construction as claimed in claim 1, characterized in that: The swing assembly comprises a guide protrusion (210), a rotating disk (220), a guide column (230), a swing rod (240), a spring (250), a second linkage column (260), a sliding rod (270), and a second linkage groove (280); The control groove (130) has a second linkage groove (280) formed inside, the second linkage groove (280) being a rectangular groove, the second connection groove (280) has a connection hole (281) formed inside, the connection hole (281) having a circular opening, a second linkage column (260) being fixedly connected to the connection hole (281), the second connection column (260) being a cylindrical body, the second linkage column (260) being rotatably connected to a swing rod (240), the swing rod (240) being a trapezoidal body, the swing rod (240) A spring (250) is fixedly connected to the middle part; a side of the swing rod (240) away from the first linkage column (340) is fixedly connected to a guide column (230); the guide column (230) is an elliptical body; one side of the guide column (230) is rotatably connected to a turntable (220); the turntable (220) is a cylindrical body; a gap exists between the side of the guide column (230) close to the turntable (220) and the turntable (220); and a guide protrusion (210) is fixedly connected to the turntable (220).

6. The concrete pouring equipment for water conservancy project construction as claimed in claim 1, characterized in that: The radial swing assembly comprises a connecting column (310), a linkage block (320), a first linkage groove (330), a first linkage column (340), a connecting rod (350), and a fixed block (360); The linkage block (320) is a rectangular body. The linkage block (320) is fixedly connected to the connection column (310). The connection column (310) is a cylindrical body. A fixing block (360) is fixedly connected to the top of the connection column (310). The fixing block (360) is a rectangular body. A U-shaped groove is provided inside the fixing block (360). The groove is a first linkage groove (330). The first linkage groove (330) is a rectangular groove. A first linkage column (340) is fixedly connected to the first linkage groove (330). The first linkage column (340) is a cylindrical body. A connecting rod (350) is fixedly connected to the first linkage column (340). The connecting rod (350) is a rectangular rod. The side of the connecting rod (350) away from the first linkage column (340) is fixedly connected to the rear of the support plate (120).

7. The concrete pouring equipment for water conservancy project construction as claimed in claim 1, characterized in that: The spring (250) is always in a stretched state.

8. The concrete pouring equipment for water conservancy project construction as claimed in claim 4, characterized in that: The middle part of the linkage block (320) is provided with threads for connection all around.