Urban road comprehensive rod prefabricated conversion foundation and construction method

By adopting prefabricated conversion foundations in urban roads, using steel pipe pile foundation piles and prefabricated conversion caps, the problem of insufficient space and noise in rod renovation has been solved, efficient integration of rods and construction efficiency improvement have been achieved, and the urban environment and construction conditions.

CN118774166APending Publication Date: 2024-10-15SHANGHAI URBAN CONSTRUCTION DESIGN & RESEARCH INSTITUTE (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411134934.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

There are many poles on urban roads, resulting in insufficient space utilization, construction noise affecting residents, and it is difficult to implement comprehensive pole renovation in the case of complex pipes and culverts, affecting city appearance and safety.

Method used

Prefabricated conversion foundations are used, including steel pipe pile foundation piles and prefabricated conversion caps. Through cantilever beams and torsion-resistant steel plate components, the comprehensive rod foundation is converted to a suitable position, reducing construction noise and space occupation, and improving construction efficiency.

Benefits of technology

It realizes the integration of rods under complex foundation conditions, improves the urban interface image, reduces construction noise, increases construction speed, and reduces the impact on traffic.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774166A_ABST
    Figure CN118774166A_ABST
Patent Text Reader

Abstract

The invention discloses an urban road comprehensive rod prefabricated conversion foundation and a construction method. The urban road comprehensive rod prefabricated conversion foundation comprises steel pipe pile foundation piles, a prefabricated conversion bearing platform and comprehensive rods. The prefabricated conversion bearing platform comprises a prefabricated bearing platform main body connected with the upper end of the steel pipe pile foundation pile and a conversion beam which is arranged on the side face of the prefabricated bearing platform main body and extends in the horizontal direction; a cast-in-place preformed hole used for being connected with a steel pipe pile foundation pile is vertically formed in the middle of the prefabricated bearing platform body. The other end of the transfer beam is suspended, and the upper surface of the other end is connected with the lower end of the comprehensive rod; an anti-torsion steel plate assembly is arranged at the position, close to the upper end, of the outer side face of the part, arranged in the cast-in-place preformed hole, of the steel pipe pile foundation pile, and a plurality of studs are arranged on the outer side face, within the range of the cast-in-place preformed hole, below the anti-torsion steel plate assembly. Space can be utilized more effectively, construction efficiency is improved, and influences on the periphery of a construction team are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of urban road integrated pole construction, in particular to a prefabricated conversion foundation and a construction method for an urban road integrated pole. Background Art

[0002] With the development of urban construction and smart roads, various poles are everywhere within the scope of urban roads, there are many design rights and interests units, and various facilities and equipment are set up repeatedly, which is messy and affects the cityscape.

[0003] According to survey statistics, the number of road poles in the central urban area of ​​megacities reaches 150 to 200 poles per kilometer, and there are even more poles at intersections, reaching 20 to 30 poles per intersection. These poles seriously affect the appearance of the city, and some poles affect pedestrian traffic and even pose certain safety hazards.

[0004] In order to efficiently utilize the limited ground and space resources in cities and eliminate various safety hazards, in recent years, provincial capital cities such as Shanghai and Nanjing have begun to implement comprehensive urban road pole improvement projects. By integrating the functions of original poles with similar positions into the same pole with a unified style, the above problems are better solved, which has a significant effect on creating a "smart city" and improving the quality of urban road environment.

[0005] At present, there are two main types of foundations for urban road integrated poles: reinforced concrete extended foundation and steel pipe pile foundation. Reinforced concrete extended foundation takes up less space in depth, but has certain requirements for the bottom area of ​​the foundation; steel pipe pile foundation takes up less space in plane, but has certain requirements for the depth of space. In general, the pile length varies from 4.5m to 6.0m.

[0006] During the actual implementation process, under some pole points, especially those at intersections, there are strict restrictions on the foundation plane size and depth range due to the existence of complex conditions such as existing culverts and pipelines, making it impossible to implement both foundation forms. As a result, the original old poles at this location cannot be comprehensively renovated, and the road comprehensive pole renovation project is not carried out thoroughly, which cannot completely improve the city’s interface image and eliminate the safety hazards of the original poles.

[0007] At the same time, in order not to affect urban traffic, the construction time of the urban road comprehensive pole improvement project is arranged at night. The pedestals of the reinforced concrete extended foundation and the steel pipe pile foundation are all cast-in-place concrete components, which require on-site steel bar tying and concrete pouring. During the night construction, the construction noise often causes complaints from surrounding residents, resulting in serious delays in the construction progress.

[0008] Therefore, how to more effectively utilize space, improve construction efficiency, and reduce the impact of construction noise on the surrounding area has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0009] In view of the above-mentioned defects of the prior art, the present invention provides a prefabricated conversion foundation and a construction method for urban road integrated poles, which aims to more effectively utilize space, improve construction efficiency, and reduce the impact on the surrounding areas of the construction team.

[0010] To achieve the above object, the present invention discloses a prefabricated conversion foundation for an urban road integrated pole, comprising a steel pipe pile foundation pile, a prefabricated conversion cap and an integrated pole connected in sequence from bottom to top;

[0011] The prefabricated conversion cap comprises a prefabricated cap body connected to the upper end of the steel pipe pile foundation pile, and a conversion beam arranged on the side of the prefabricated cap body and extending in the horizontal direction;

[0012] A vertically arranged cast-in-place reserved hole is provided in the middle of the prefabricated foundation body;

[0013] The cast-in-place reserved hole passes through the upper and lower surfaces of the prefabricated cap body and matches the upper end of the steel pipe pile foundation pile;

[0014] The conversion beam is a cantilever beam, one end of which is connected to the side of the prefabricated bearing platform body, and the other end is suspended, and the upper surface of the other suspended end is connected to the lower end of the integrated rod;

[0015] The outer side surface of the steel pipe pile foundation pile arranged in the cast-in-place reserved hole is provided with a torsion-resistant steel plate assembly near the upper end, and a plurality of bolts are provided on the outer side surface within the cast-in-place reserved hole below the torsion-resistant steel plate assembly;

[0016] The torsion-resistant steel plate assembly comprises two circular flange steel plates extending radially outwardly along the steel pipe pile foundation pile, and a plurality of reinforcing rib plates evenly distributed around the torsion-resistant steel plate assembly and arranged between the two circular flange steel plates;

[0017] Each of the reinforcing rib plates extends along the radial direction of the steel pipe pile foundation pile corresponding to the position thereof until it is flush with the outer edges of the two circular flange steel plates.

[0018] Preferably, the steel pipe pile foundation piles are arranged in multiple layers along the vertical direction corresponding to the plurality of bolts within the range of the cast-in-place reserved holes;

[0019] The plurality of studs in each layer are evenly distributed around the steel pipe pile foundation piles;

[0020] The axial direction of each bolt is the radial direction of the steel pipe pile foundation pile corresponding to the position thereof.

[0021] Preferably, the prefabricated platform body is a rectangular parallelepiped including multiple hoops;

[0022] A plurality of said hoops are evenly distributed along the length, width and height of the cuboid respectively;

[0023] Among them, the planes formed by all the hoops evenly distributed along the height are all parallel to the horizontal plane;

[0024] All the hoops evenly distributed along the length and width are parallel to the vertical direction, and the parts located at the upper end of the cast-in-place reserved hole all pass through the cast-in-place reserved hole, and the parts located at the lower end of the cast-in-place reserved hole are all disconnected at positions close to the cast-in-place reserved hole.

[0025] More preferably, the transfer beam is isosceles trapezoidal on the horizontal plane, the side close to the precast pile cap main body corresponds to the lower base of the trapezoid, and a group of longitudinal stressed steel bars parallel to the waist are respectively arranged inside at positions close to the two waists;

[0026] Each group of the longitudinal stressed steel bars is composed of a plurality of mutually parallel "冂"-shaped steel bars and stirrups corresponding to the "冂"-shaped steel bars;

[0027] Each "冂"-shaped steel bar includes two symmetrical "L"-shaped steel bars;

[0028] The two straight ends of all the "冂"-shaped steel bars of the two groups of longitudinal stressed steel bars are inserted into the steel cage formed by a plurality of said hoops of the precast pile cap main body, are respectively located on both sides of the cast-in-place reserved hole, and are respectively tied to the hoops located on the top surface and the bottom surface of the precast pile cap main body;

[0029] A plurality of transfer beam stirrups are arranged along the height direction of the trapezoid of the transfer beam to hoop the two groups of longitudinal stressed steel bars into a stressed whole.

[0030] Preferably, a buried flange and corresponding buried bolts are provided on the upper surface of the transfer beam, and the lower end of the integrated pole is connected through the buried flange and the corresponding buried bolts.

[0031] The present invention also provides a construction method for a precast conversion foundation of an urban road integrated pole, including the following steps:

[0032] Step 1: Excavate the soil within the range where the precast conversion pile cap needs to be built to the elevation required for the precast conversion pile cap to form a foundation pit;

[0033] Step 2: Drive steel pipe pile foundations at the bottom of the foundation pit to the design elevation;

[0034] Step 3: Construct a cushion layer at the bottom of the foundation pit;

[0035] Step 4: Hoist the precast conversion pile cap to the designed position on the cushion layer at the bottom of the foundation pit;

[0036] Step 5, pouring concrete into the cast-in-place reserved holes of the prefabricated conversion cap to connect the prefabricated conversion cap and the steel pipe pile foundation pile into one;

[0037] Step 6: Backfill the earth to restore the road surface;

[0038] Step 7: After the concrete strength of the cast-in-place reserved hole reaches the design requirement, a comprehensive rod is arranged on the transfer beam.

[0039] Beneficial effects of the present invention:

[0040] The present invention sets a prefabricated conversion foundation around the design point of the integrated pole, and converts the foundation under the design position of the integrated pole to a position around the integrated pole that meets the depth and plane size requirements. The method is convenient to construct and has a short construction period, providing a practical and economical technical means for the urban road integrated pole improvement project.

[0041] The present invention is mainly composed of steel pipe pile foundation piles and prefabricated foundation conversion cap. Through the conversion beam of the prefabricated foundation conversion cap, the steel pipe pile foundation piles that should originally be located at the projection position of the centroid of the integrated rod are converted to the centroid position of the reserved hole of the prefabricated cap.

[0042] The present invention can effectively solve the problem of cancellation of the integrated pole due to insufficient foundation construction space below the integrated pole design position, truly combine various poles as much as possible, thoroughly improve the urban interface image, and eliminate the safety hazards of the original poles.

[0043] The present invention can effectively reduce noise at the construction site, alleviate conflicts with surrounding residents during the renovation of urban road integrated poles, and simultaneously speed up the construction speed of the integrated pole foundation, thereby minimizing the impact on urban road traffic during the construction process.

[0044] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 A schematic diagram of the overall structure of an embodiment of the present invention is shown.

[0046] Figure 2 A schematic structural diagram of a prefabricated conversion support in one embodiment of the present invention is shown.

[0047] Figure 3 A schematic structural diagram of a steel pipe pile foundation pile in one embodiment of the present invention is shown.

[0048] Figure 4 A schematic diagram showing the internal reinforcement structure of a prefabricated conversion cap in one embodiment of the present invention. DETAILED DESCRIPTION

[0049] Example

[0050] like Figures 1 to 3 As shown, the prefabricated conversion foundation of the urban road integrated pole includes a steel pipe pile foundation pile 1, a prefabricated conversion cap 2 and an integrated pole 3 connected in sequence from bottom to top;

[0051] The prefabricated conversion cap 2 comprises a prefabricated cap body 21 connected to the upper end of the steel pipe pile foundation pile 1, and a conversion beam 22 arranged on the side of the prefabricated cap body 21 and extending in the horizontal direction;

[0052] A vertically arranged cast-in-place reserved hole 23 is provided in the middle of the prefabricated foundation body 21;

[0053] The cast-in-place reserved hole 23 passes through the upper and lower surfaces of the prefabricated cap body 21 and matches the upper end of the steel pipe pile foundation pile 1;

[0054] The conversion beam 22 is a cantilever beam, one end of which is connected to the side of the prefabricated foundation body 21, and the other end is suspended, and the upper surface of the other suspended end is connected to the lower end of the integrated rod 3;

[0055] The outer side surface of the steel pipe pile foundation pile 1 arranged in the cast-in-place reserved hole 23 is provided with a torsion-resistant steel plate assembly 11 near the upper end, and a plurality of bolts 12 are provided on the outer side surface within the cast-in-place reserved hole 23 below the torsion-resistant steel plate assembly 11;

[0056] The torsion-resistant steel plate assembly 11 comprises two circular flange steel plates 111 extending radially outwardly along the steel pipe pile foundation pile 1, and a plurality of reinforcing rib plates 112 arranged between the two circular flange steel plates 111 and uniformly distributed around the torsion-resistant steel plate assembly 11;

[0057] Each reinforcing rib plate 112 extends along the radial direction of the corresponding steel pipe pile foundation pile 1 until it is flush with the outer edges of the two circular flange steel plates 111 .

[0058] The present invention converts the foundation of the integrated pole 3 originally located in the foundationless construction space to a position with construction space around it through a prefabricated conversion foundation composed of a prefabricated conversion cap 2 and a steel pipe pile foundation pile 1. The internal force at the bottom of the integrated pole 3 is transmitted to the prefabricated cap body 21 through the conversion beam 22 on the prefabricated conversion cap 2, and then the internal force is transmitted to the steel pipe pile foundation pile 1 through the torsion steel plate assembly 11 and the bolts 12 of the steel pipe pile foundation pile 1 and the friction between concrete and steel. When wind load acts on various equipment on the integrated pole 3, the internal force at the bottom of the integrated pole 3 can be effectively and reliably transmitted to the foundation, thereby ensuring the safety of the integrated pole 3.

[0059] In some embodiments, the steel pipe pile foundation pile 1 is provided with multiple layers in the vertical direction corresponding to the plurality of studs 12 within the range of the cast-in-place reserved holes 23;

[0060] A plurality of stud bolts 12 in each layer are evenly distributed around the steel pipe pile foundation pile 1;

[0061] The axial direction of each stud bolt 12 is the radial direction of the steel pipe pile foundation pile 1 corresponding to the position where it is located.

[0062] As Figure 4 shown, in some embodiments, the precast cap body 21 is a cuboid including a plurality of hoop bands 211;

[0063] The plurality of hoop bands 211 are evenly distributed along the length, width and height of the cuboid respectively;

[0064] Among them, the planes formed by all the hoop bands 211 evenly distributed along the height are all parallel to the horizontal plane;

[0065] All the hoop bands 211 evenly distributed along the length and width are parallel to the vertical direction, and the parts located at the upper end of the cast-in-place reserved hole 23 all pass through the cast-in-place reserved hole 23, and the parts located at the lower end of the cast-in-place reserved hole 23 are all disconnected at positions close to the cast-in-place reserved hole 23.

[0066] In practical applications, the parts of all the hoop bands 211 parallel to the vertical direction located at the lower end of the cast-in-place reserved hole 23 are all disconnected at positions close to the cast-in-place reserved hole 23, which can ensure the smooth insertion of the steel pipe pile foundation pile.

[0067] In some embodiments, the transfer beam 22 is an isosceles trapezoid on the horizontal plane, the side close to the precast cap body 21 corresponds to the lower base of the trapezoid, and a group of longitudinal stressed steel bars 222 parallel to the waist are respectively arranged inside at positions close to the two waists;

[0068] Each group of longitudinal stressed steel bars 222 is composed of a plurality of mutually parallel "冂"-shaped steel bars and a plurality of stirrups (224) corresponding to the "冂"-shaped steel bars;

[0069] Each "冂"-shaped steel bar includes two symmetrical "L"-shaped steel bars;

[0070] The two straight ends of all the "冂"-shaped steel bars of the two groups of longitudinal stressed steel bars 222 are inserted into the steel bar cage formed by a plurality of hoop bands 211 of the precast cap body 21, are respectively located on both sides of the cast-in-place reserved hole 23, and are respectively tied to the hoop bands 211 located on the top surface and the bottom surface of the precast cap body 21;

[0071] The transfer beam 22 is provided with a plurality of transfer beam stirrups 223 along the trapezoid height direction to hoop the two groups of longitudinal stressed steel bars 222 into a stressed whole.

[0072] In some embodiments, a预埋法兰及相应的预埋螺栓221 (embedded flange and corresponding embedded bolts 221) are provided on the upper surface of the transfer beam 22, and the lower end of the integrated rod 3 is connected through the embedded flange and the corresponding embedded bolts 221.

[0073] The present invention also provides a construction method for a prefabricated conversion foundation of an urban road integrated pole, comprising the following steps:

[0074] Step 1: excavate the earthwork within the range of the prefabricated conversion cap 2 to the required elevation of the prefabricated conversion cap 2 to form a foundation pit;

[0075] Step 2: Driving steel pipe pile foundation piles 1 at the bottom of the foundation pit to the designed elevation;

[0076] Step 3: construct a cushion layer at the bottom of the foundation pit;

[0077] Step 4: hoist the prefabricated conversion cap 2 to the designed position on the cushion layer at the bottom of the foundation pit;

[0078] Step 5, pouring concrete in the cast-in-place reserved hole 23 of the prefabricated conversion cap 2 to connect the prefabricated conversion cap 2 and the steel pipe pile foundation pile 1 into one;

[0079] Step 6: Backfill the earth to restore the road surface;

[0080] Step 7: After the concrete strength of the cast-in-place reserved hole 23 reaches the design requirement, the integrated rod 3 is arranged on the transfer beam 22 .

[0081] In practical applications, the present invention can be used for the integrated pole foundation in urban road integrated pole improvement projects, which can effectively solve the problem of cancellation of the integrated pole due to insufficient foundation construction space below the designed position of the integrated pole, truly achieve the best possible integration of various poles, thoroughly improve the urban interface image, and eliminate the safety hazards of the original poles.

[0082] The present invention adopts a steel pipe pile foundation to prefabricate the conversion cap. There is no steel bar binding at the construction site, and only a small amount of concrete needs to be poured, which effectively reduces the noise at the construction site, alleviates the conflict with surrounding residents during the process of urban road comprehensive pole renovation, and speeds up the construction speed of the comprehensive pole foundation, minimizing the impact on urban road traffic during the construction process.

[0083] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. Prefabricated conversion foundation of urban road integrated pole; characterized in that: It includes a steel pipe pile foundation pile (1), a precast conversion bearing platform (2), and a comprehensive pole (3) connected in sequence from bottom to top; The precast conversion bearing platform (2) includes a precast bearing platform main body (21) connected to the upper end of the steel pipe pile foundation pile (1), and a conversion beam (22) arranged on the side of the precast bearing platform main body (21) and extending horizontally; A vertically arranged cast-in-place reserved hole (23) is provided at the middle position of the precast bearing platform main body (21); The cast-in-place reserved hole (23) penetrates the upper and lower surfaces of the precast bearing platform main body (21) and matches the upper end of the steel pipe pile foundation pile (1); The conversion beam (22) is a cantilever beam, one end is connected to the side of the precast bearing platform main body (21), the other end is suspended, and the upper surface of the suspended other end is connected to the lower end of the comprehensive pole (3); On the outer side of the part of the steel pipe pile foundation pile (1) arranged in the cast-in-place reserved hole (23), a torsional resistance steel plate assembly (11) is provided near the upper end. Below the torsional resistance steel plate assembly (11), a plurality of stud bolts (12) are provided on the outer side within the range of the cast-in-place reserved hole (23); The torsional resistance steel plate assembly (11) includes two circular flange steel plates (111) extending radially outward along the steel pipe pile foundation pile (1), and a plurality of reinforcing rib plates (112) evenly distributed around the torsional resistance steel plate assembly (11) and arranged between the two circular flange steel plates (111); Each of the reinforcing rib plates (112) extends along the radial direction of the steel pipe pile foundation pile (1) corresponding to its position to be flush with the outer edges of the two circular flange steel plates (111).

2. The urban road integrated pole prefabricated conversion foundation according to claim 1 is characterized in that: A plurality of the stud bolts (12) corresponding to the range of the cast-in-place reserved hole (23) on the steel pipe pile foundation pile (1) are arranged in multiple layers along the vertical direction; A plurality of the stud bolts (12) in each layer are evenly distributed around the steel pipe pile foundation pile (1); The axial direction of each of the stud bolts (12) is the radial direction of the steel pipe pile foundation pile (1) corresponding to its position.

3. The urban road integrated pole prefabricated conversion foundation according to claim 1 is characterized in that: The precast bearing platform main body (21) is a cuboid and includes multiple hoop bars (211); The multiple hoop bars (211) are evenly distributed along the length, width, and height of the cuboid respectively; Among them, the planes formed by all the hoop bars (211) evenly distributed along the height are parallel to the horizontal plane; All the hoop bars (211) evenly distributed along the length and width are parallel to the vertical direction, and in the part located at the upper end of the cast-in-place reserved hole (23), they all pass through the cast-in-place reserved hole (23), and in the part located at the lower end of the cast-in-place reserved hole (23), they are all disconnected near the cast-in-place reserved hole (23).

4. The urban road integrated pole prefabricated conversion foundation according to claim 3 is characterized in that: The conversion beam (22) is an isosceles trapezoid on the horizontal plane. The side close to the precast bearing platform main body (21) corresponds to the lower base of the trapezoid, and a group of longitudinal stressed steel bars (222) parallel to the waist are respectively provided inside near the two waists; Each group of the longitudinal stressed steel bars (222) is composed of multiple "冂”-shaped steel bars parallel to each other and stirrups (224) of the "冂”-shaped steel bars; Each of the "冂”-shaped steel bars includes two symmetric "L”-shaped steel bars; All the straight ends of the two grids of the "冂"-shaped steel bars of the two groups of the longitudinal stressed steel bars (222) are inserted into the steel bar cage surrounded by multiple hoop bars (211) of the precast cap body (21), located on both sides of the cast-in-place reserved hole (23) respectively, and are respectively tied to the hoop bars (211) on the top surface and the bottom surface of the precast cap body (21); Multiple transfer beam stirrups (223) are arranged along the trapezoidal height direction of the transfer beam (22) to hoop the two groups of longitudinal stressed steel bars (222) into a stressed whole body.

5. The urban road integrated pole prefabricated conversion foundation according to claim 1 is characterized in that: An embedded flange and corresponding embedded bolts (221) are provided on the upper surface of the transfer beam (22), and are connected to the lower end of the composite rod (3) through the embedded flange and the corresponding embedded bolts (221).

6. The construction method of prefabricated conversion foundation of urban road comprehensive pole is characterized by: It includes the following steps: Step 1: Excavate the soil within the range where the precast transfer cap (2) needs to be built to the elevation required for the precast transfer cap (2) to form a foundation pit; Step 2: Drive steel pipe pile foundations (1) at the bottom of the foundation pit; Step 3: Construct a cushion layer at the bottom of the foundation pit; Step 4: Hoist the precast transfer cap (2) to the designed position on the cushion layer at the bottom of the foundation pit; Step 5: Pour concrete into the cast-in-place reserved hole (23) of the precast transfer cap (2) to connect the precast transfer cap (2) and the steel pipe pile foundation (1) into one body; Step 6: Backfill the soil to restore the road surface; Step 7: After the concrete strength of the cast-in-place reserved hole (23) reaches the design requirements, set the composite rod (3) on the transfer beam (22).