Accurate and rapid hoisting construction method for large PC column

By using devices such as annular positioning plates and reflectors in PC column hoisting to accurately install reserved steel bars and quickly hoist PC columns, the problem of insufficient positioning accuracy in pre-embedded steel bars and hoisting in the existing technology is solved, achieving high efficiency and high efficiency. Precise large-scale PC column hoisting construction.

CN118774408APending Publication Date: 2024-10-15THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411138373.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing technology is difficult to ensure the accuracy of steel bar embedding and hoisting positioning during the hoisting construction of large PC columns, resulting in low hoisting efficiency and quality and long construction period.

Method used

Devices such as annular positioning plates and reflectors are used to accurately install reserved steel bars and quickly hoist PC columns. Through the insertion of grouting sleeves and reserved steel bars, combined with lifting marks and temporary steel tie rod adjustments, the verticality of PC columns is ensured. and location accurate.

Benefits of technology

It greatly improves the accuracy and efficiency of large PC column hoisting, shortens the construction period, and improves construction quality and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774408A_ABST
    Figure CN118774408A_ABST
Patent Text Reader

Abstract

The invention provides an accurate and rapid hoisting construction method for a large PC column, and relates to the technical field of PC column hoisting construction, and the method comprises the steps of prefabricating the PC column, installing reserved steel bars, installing the PC column and the like. According to the method, the steel bar pre-embedding and hoisting positioning precision of the PC column can be guaranteed, the hoisting efficiency and quality of the large PC column are greatly improved, the working efficiency is improved, the construction period of PC hoisting is shortened, and certain economic benefits are brought.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of PC column hoisting construction, and in particular to a precise and rapid hoisting construction method for large PC columns. Background Art

[0002] In the environment of advocating high-quality and efficient construction, prefabricated buildings have a bright future. At present, cast-in-place (partial) or prefabricated reinforced concrete beams, columns, and slabs are mostly used, and the beams, slabs, columns, and nodes are connected into a whole through the post-cast reinforced concrete part. This prefabricated building structure system has gradually been widely used in the construction of the construction industry, greatly shortening the construction cycle, making the prefabricated construction method widely used, changing the traditional construction mode in construction, and helping to improve the level of building management. Summary of the invention

[0003] In view of the above-mentioned prior art, the present invention proposes a method for accurate and rapid lifting construction of large PC columns.

[0004] The present invention provides a method for accurate and rapid hoisting construction of large PC columns, comprising the following steps: S1. Prefabricated PC columns: According to the positions of the reserved steel bars, several grouting sleeves are installed on the inner side of the bottom of the PC columns; S2. Installing the reserved steel bars: installing the reserved steel bars by using a positioning device, the positioning device comprising an annular positioning plate, the annular positioning plate comprising two half-ring plates, the two half-ring plates being connected by a spring, the inner circumference of the annular positioning plate being provided with openings for the reserved steel bars to pass through, and the upper surface of the annular positioning plate being provided with a plurality of reflectors; S3. Install the PC column: lift the PC column transported to the site, adjust the direction of the PC column according to the lifting mark on the PC column and lift it above the corresponding installation position of the PC column, adjust the grouting sleeve on the inner side of the bottom of the PC column through the reflector to plug it into the reserved steel bar, remove the positioning device, and lower the PC column to sit on the structural surface layer.

[0005] Preferably, in S1, on the prefabricated PC column, the hoisting mark is sprayed according to the detailed drawing, and the lifting ring of the PC column is installed vertically at 90° to the hoisting mark, and the exposed length of the lifting ring is 10 cm.

[0006] Preferably, in S2, angle steels are provided at the four corners of the annular positioning plate.

[0007] Preferably, it also includes S4, subsequent construction: after the PC column is hoisted into place, a temporary steel tie rod of the PC column is installed and the corresponding verticality is adjusted. After the verticality of the PC column is accepted, subsequent seat slurry sealing and subsequent steel sleeve grouting construction are carried out, and the lifting ring on the PC column is cut off to facilitate subsequent construction.

[0008] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a method for accurate and rapid lifting construction of large PC columns, which can ensure the steel bar pre-embedding and lifting positioning accuracy of PC columns, greatly improve the lifting efficiency and quality of large PC columns, improve work efficiency, save PC lifting time, and bring certain economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 Schematic diagram of the structure of the PC column in an embodiment of the present invention.

[0010] Figure 2 Schematic diagram of a top view of a positioning device in an embodiment of the present invention.

[0011] Figure 3 It is a side schematic diagram of a positioning device in an embodiment of the present invention.

[0012] Figure 4 Schematic diagram of the installation of the PC column in an embodiment of the present invention.

[0013] In the figure: 1. annular positioning plate; 2. spring; 3. opening; 4. reflector; 5. angle steel. DETAILED DESCRIPTION

[0014] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.

[0015] Example: Figure 1-4 As shown, a method for accurate and rapid lifting construction of large PC columns includes the following steps: S1. Prefabricated PC columns: In the early stage of PC component deepening work, the lifting rings to be embedded shall be checked with the lifting positions in advance, and the lifting positions of the PC columns shall be marked in the drawings; on the prefabricated PC columns, the lifting marks shall be sprayed according to the deepening drawings, and the lifting rings of the PC columns shall be installed vertically at 90° to the lifting marks, with the exposed length of the lifting rings being 10 cm; according to the positions of the reserved steel bars, several grouting sleeves shall be installed on the inner side of the bottom of the PC columns, and the PC columns with concrete strength that meets the requirements shall be transported to the construction site, and protective measures shall be taken during transportation; S2. Install reserved steel bars: Use a positioning device to install reserved steel bars, the positioning device includes an annular positioning plate 1, the annular positioning plate 1 includes two semi-annular plates, the two semi-annular plates are connected by a spring 2, the inner circumference of the annular positioning plate 1 is provided with an opening 3 for the reserved steel bars to pass through, the upper surface of the annular positioning plate 1 is provided with eight reflectors 4, and the four corners of the annular positioning plate 1 are provided with angle steels 5 to ensure accurate positioning of the reserved steel bars during concrete pouring, improve the success rate of one-time hoisting of the PC column and improve construction efficiency; S3, installing the PC column: the PC column transported to the site is hoisted by a hoisting device, the direction of the PC column is adjusted according to the hoisting mark on the PC column and hoisted to the top of the corresponding installation position of the PC column, and the grouting sleeve on the inner side of the bottom of the PC column is adjusted to be plugged with the reserved steel bar through the reflector 4, the positioning device is removed, and the PC column is lowered and seated on the structural surface layer; S4. Subsequent construction: After the PC column is hoisted into place, the temporary steel tie rod of the PC column is installed and the corresponding verticality is adjusted. After the verticality of the PC column is accepted, the subsequent seat slurry sealing and subsequent steel sleeve grouting construction are carried out, and the lifting ring on the PC column is cut off to facilitate subsequent construction.

[0016] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the present invention's specification and drawings, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.

Claims

1. A method for accurate and rapid lifting construction of large PC columns, characterized in that: The steps include: S1. Prefabricated PC columns: According to the positions of the reserved steel bars, several grouting sleeves are installed on the inner side of the bottom of the PC columns; S2. Installing the reserved steel bars: using a positioning device to install the reserved steel bars, the positioning device comprising an annular positioning plate (1), the annular positioning plate (1) comprising two half-ring plates, the two half-ring plates being connected via a spring (2), the inner circumference of the annular positioning plate (1) being provided with an opening (3) for the reserved steel bars to pass through, and the upper surface of the annular positioning plate (1) being provided with a plurality of reflectors (4); S3, installing the PC column: hoisting the PC column transported to the site, adjusting the direction of the PC column according to the hoisting mark on the PC column and hoisting it above the corresponding installation position of the PC column, adjusting the grouting sleeve on the inner side of the bottom of the PC column to be plugged into the reserved steel bar through the reflector (4), removing the positioning device, and lowering the PC column to sit on the structural surface layer.

2. The method for accurate and rapid lifting construction of large PC columns according to claim 1, characterized in that: In S1, on the prefabricated PC column, the hoisting mark is sprayed according to the detailed drawing, and the lifting ring of the PC column is installed vertically at 90° to the hoisting mark, and the exposed length of the lifting ring is 10 cm.

3. The method for accurate and rapid lifting construction of large PC columns according to claim 1 or 2, characterized in that: In S2, angle steels (5) are provided at the four corners of the annular positioning plate (1).

4. The method for accurate and rapid lifting construction of large PC columns according to claim 1 or 2, characterized in that: It also includes S4, subsequent construction: after the PC column is hoisted into place, the temporary steel tie rod of the PC column is installed and the corresponding verticality is adjusted. After the verticality of the PC column is accepted, the subsequent seat slurry sealing and subsequent steel sleeve grouting construction are carried out, and the lifting ring on the PC column is cut off to facilitate subsequent construction.

Citation Information

Patent Citations

  • Method for assembling precast column

    CN105625730A

  • Removable prefabricated column rebar positioning device and installation method thereof

    CN110295754A

  • Accurate and rapid PC column mounting tool

    CN210598199U

  • Positioning and mounting device suitable for fabricated building construction

    CN213710460U