Shale gas low-pressure stage gas lift drainage gas recovery device and implementation method
By designing high-pressure gathering and transportation pipelines and data acquisition and control systems in shale gas wells, and using high-pressure natural gas for gas lift and liquid drainage, the problem of insufficient formation energy in the low-pressure production stage was solved, and stable improvement in gas well production and cost savings were achieved.
Patent Information
- Application Number
- CN202310366521.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-15
AI Technical Summary
In the low-pressure production stage of shale gas wells, due to insufficient formation energy, the flowback fluid cannot be effectively carried to the surface, resulting in problems such as liquid accumulation in the wellbore and reduced gas well production.
Design a low-pressure stage gas lift drainage gas production device for shale gas, combining the form of pipe network and high and low pressure distribution technology, through data acquisition and monitoring control system, PLC programmable logic controller, flow meter and regulating valve and other components. Build a new high-pressure gathering and transportation pipeline to the gas production tree, and use high-pressure natural gas to lift and drain gas wells to reduce inter-well pressure interference and ensure production stability.
It realizes gas lift without power equipment, saves costs, has fine control of gas lift volume and remote operation functions, improves efficiency, increases timeliness, reduces labor and operation and maintenance requirements, and is suitable for gas lift management of multiple gas wells.
Smart Images

Figure CN118774685A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shale gas development, and in particular to a shale gas low-pressure stage gas lift drainage gas production device and an implementation method thereof. Background Art
[0002] Compared with conventional natural gas reservoirs, shale reservoirs have poor physical properties, low porosity, and extremely low permeability. Under original conditions, formation fluids cannot flow, and industrial gas flow can only be obtained through production enhancement and transformation. Therefore, shale gas reservoirs are also called "artificial gas reservoirs", and horizontal well drilling and staged fracturing have become key technologies for shale gas development. Shale gas reservoirs have low permeability, and their development depends on horizontal wells and artificial fracturing. Currently, shale gas fracturing uses large-volume hydraulic fracturing, and a large amount of liquid is injected into the gas well during the fracturing process. In the early stage of gas well production, the formation energy is sufficient, and the fracturing fluid can be discharged from the formation to the ground through its own energy. However, shale gas wells have the characteristics of high initial production and rapid decline. In the middle and late stages of gas well production, the gas well lacks energy and cannot effectively return the liquid injected during fracturing to the ground, causing liquid accumulation and water flooding in the gas wellbore, making it impossible for the gas well to produce normally. In the low-pressure production stage, shale gas cannot carry the return fluid to the ground process due to insufficient formation energy. The return fluid forms liquid accumulation in the wellbore, which will reduce the gas well production. Summary of the invention
[0003] In order to solve the problem that shale gas in the low-pressure production stage of the above-mentioned gas well production cannot carry the return fluid to the ground process due to insufficient formation energy, and the return fluid forms liquid accumulation in the wellbore, which will reduce the gas well production. The present invention proposes a shale gas low-pressure stage gas lift drainage gas production device and an implementation method, which effectively combines the pipeline form with high and low pressure distribution technology, can greatly reduce the pressure interference between wells, thereby ensuring the production stability of the entire ground system.
[0004] To achieve the above object, the technical solution adopted by the present invention is as follows: In a first aspect, the present invention provides a shale gas low-pressure stage gas lift drainage gas production device, including a data acquisition and monitoring control system, a PLC programmable logic controller, a flow meter three, a valve, a regulating valve one, a regulating valve two and a gas well system; a high-pressure gathering and transmission pipeline is connected to the gas well system through a pipeline; The pipeline between the high-pressure gathering and transmission pipeline and the gas well system is provided with valves and flowmeters three in sequence, the pipeline is divided into branch one and branch two, and the branch one and branch two are connected to the gas well system; The flow meter three, regulating valve one and regulating valve two are all connected to a PLC programmable logic controller through cables, and the PLC programmable logic controller is connected to a data acquisition and monitoring control system.
[0005] Specifically, the branch line 1 is connected to a gas production tree 1 in the gas well system, and the gas production tree 1 is connected to a downhole tubular column.
[0006] Specifically, in the gas well system, gas production tree 1 is connected to vertical desander 1, vertical separator 1 and flowmeter 1 in sequence and then divided into branch 3 and branch 4; branch 3 is connected to a low-pressure gathering pipeline, and branch 4 is connected back to a high-pressure gathering pipeline.
[0007] Specifically, a pneumatic shut-off valve 1 is provided on the branch line 3; and a pneumatic shut-off valve 2 is provided on the branch line 4.
[0008] Specifically, the branch line 2 is connected to the gas production tree 2 in the gas well system, and the gas production tree 2 is connected to the vertical desander 2, the vertical separator 2 and the flow meter 2 in sequence and then split into branch line 5 and branch line 6; the branch line 5 is connected to the low-pressure gathering pipeline, and the branch line 6 is connected back to the high-pressure gathering pipeline.
[0009] Specifically, the branch line five is provided with a pneumatic shut-off valve three; the branch line six is provided with a pneumatic shut-off valve four.
[0010] In a second aspect, the present invention provides a method for realizing gas lift drainage gas production in the low-pressure stage of shale gas, which is realized based on the aforementioned gas lift drainage gas production device in the low-pressure stage of shale gas, and the method comprises: According to the production situation of the gas well, the valve position instructions of the regulating valve 1 and the regulating valve 2 are remotely controlled through the data acquisition and monitoring control system; The valve position command is transmitted to the local PLC programmable logic controller through the cable. After receiving the command, the PLC programmable logic controller sends the command to the actuators of the regulating valve 1 and the regulating valve 2; The actuator controls the regulating valve 1 and regulating valve 2 to open to the command valve position according to the command requirements, so that the high-pressure natural gas is injected into the wellbore of the gas well through the branch line 1 and the branch line 2 for gas lift drainage; The valve position opening information of control valve one and control valve two and the instantaneous flow information of flow meter three are obtained through the PLC programmable logic controller and transmitted to the data acquisition and monitoring control system to confirm the execution of the instruction and the completion of the operation.
[0011] Furthermore, it also includes: The time period cumulative flow rate of natural gas in the pipeline is calculated based on the instantaneous flow information of flow meter 3, and the amount of natural gas injected into the gas well system of the high-pressure gathering and transmission branch line is calculated.
[0012] Furthermore, it also includes: Prepare the corresponding control program in the PLC programmable logic controller in advance and provide the corresponding power supply; After the program runs, the PLC programmable logic controller controls the valve position opening of control valve one and control valve two and displays the valve position opening status and the instantaneous flow of the flow meter. It communicates with the data acquisition and monitoring control system through the PLC programmable logic controller to form a control link.
[0013] Beneficial effects of the invention: The invention proposes a shale gas low-pressure stage gas lift drainage gas production device and its implementation method, a new high-pressure gathering and transmission branch line to the gas tree natural gas transmission process pipeline is built, the gas tree at the wellhead of the gas well is connected to the high-pressure gathering and transmission pipeline, and the high-pressure natural gas in the high-pressure gathering and transmission pipeline is used as the gas source for gas well gas lift. After the process is connected, the natural gas in the high-pressure gathering and transmission pipeline enters the gas well, which can realize gas lift and drainage of the gas well, and has the following advantages: (1) Gas lift can be achieved by using high-pressure gathering and transmission pipelines, without the need for vehicle-mounted gas lift vehicles and compressors and other power equipment. After cost comparison, it can significantly save costs.
[0014] (2) The gas lift injection volume is controlled by a regulating valve, and the valve position opening is controlled between 0-100%. This can achieve the adjustment and fine control of the gas lift volume of the gas well, achieve the best gas lift effect, and meet the needs of refined management. Vehicle-mounted gas lifts are mostly reciprocating compressors with fixed displacement, which cannot achieve fine control of the gas lift volume.
[0015] (3) Through the data acquisition and monitoring control system, functions such as gas lift start and stop and injection volume adjustment can be remotely controlled without the need for on-site operation, saving manpower and improving efficiency.
[0016] (4) Process gas lift and continuous gas lift can be used at any time. Compared with vehicle-mounted gas lift, the timeliness is greatly improved. Compared with gas lift vehicles, the process does not require mechanical pump operation, achieving energy saving effects; gas lift vehicles need to be shut down for maintenance and refueling for a long time, while this achievement does not require related work and can be used for a long time.
[0017] (5) Gas lift can be performed on multiple gas wells at the same time, and the gas lift injection volume can be reasonably adjusted according to the production conditions of different gas wells. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a structural diagram of a shale gas low-pressure stage gas lift drainage gas production device provided by the present invention; In the figure, 1-data acquisition and monitoring control system, 2-PLC programmable logic controller, 3-valve, 4-pneumatic shut-off valve 1, 5-pneumatic shut-off valve 2, 6-flow meter 1, 7-vertical separator 1, 8-vertical desander 1, 9-gas tree 1, 10-downhole tubing, 11-regulating valve 1, 12-regulating valve 2, 13-gas tree 2, 14-vertical desander 2, 15-vertical separator 2, 16-flow meter 2, 17-pneumatic shut-off valve 3, 18-pneumatic shut-off valve 4, 19-high-pressure gathering and transportation pipeline, 20-low-pressure gathering and transportation pipeline, 21-flow meter 3, 22-branch 1, 23-branch 2. DETAILED DESCRIPTION
[0019] The present invention is further described below. The following examples are only used to more clearly illustrate the technical solution of the present invention, and are not intended to limit the protection scope of the present invention.
[0020] The main reason for the problem of liquid accumulation in gas wells is that as the production cycle of gas wells is extended, the formation energy decays, and the natural gas production from gas wells is lower than the critical liquid-carrying flow rate of gas wells, resulting in the inability of the liquid accumulated in gas wells to be effectively carried to the ground by natural gas. In order to solve the problem of insufficient formation energy in gas wells and production lower than the critical liquid-carrying flow rate, high-pressure gas can be injected into the gas well through the casing of the gas tree at the wellhead of the gas well, and the natural gas flow rate of the oil pipe in the wellbore can be increased by using the U-tube principle, and the liquid accumulated in the gas well can be discharged to the ground through the oil pipe, eliminating the liquid accumulated in the wellbore and ensuring the normal production of the gas well.
[0021] A new high-pressure gathering and transmission branch line is built to the natural gas transmission process pipeline from the gas tree, and the gas tree at the wellhead of the gas well is connected to the high-pressure gathering and transmission pipeline. The high-pressure natural gas in the high-pressure gathering and transmission pipeline is used as the gas source for gas lift of the gas well. After the process is connected, the natural gas from the high-pressure gathering and transmission pipeline enters the gas well, which can realize gas lift and liquid drainage of the gas well.
[0022] Based on the above invention concept, the present invention provides a shale gas low-pressure stage gas lift drainage gas production device, such as Figure 1 As shown, it includes a data acquisition and monitoring control system 1, a PLC programmable logic controller 2, a flow meter 3 21, a valve 3, a regulating valve 1 11, a regulating valve 2 12 and a gas well system.
[0023] The high-pressure gathering and transportation pipeline 19 is connected to the gas well system through a pipeline.
[0024] See also Figure 1 A valve 3 and a flow meter 3 21 are arranged in sequence on the pipeline between the high-pressure gathering pipeline 19 and the gas well system. The pipeline is divided into a branch 1 22 and a branch 2 23, and is connected to the gas well system through the branch 1 22 and the branch 2 2.
[0025] Among them, the first branch 22 is provided with a regulating valve 11 ; the second branch 23 is provided with a regulating valve 2 12 .
[0026] In the present invention, the flow meter three 21 , the regulating valve one 11 and the regulating valve two 12 are all connected to the PLC programmable logic controller 2 through cables, and the PLC programmable logic controller 2 is connected to the data acquisition and monitoring control system 1 .
[0027] See also Figure 1 , branch 1 22 is connected to a gas tree 1 9 in the gas well system, and the gas tree 1 9 is connected to the downhole pipe string 10. The gas tree 1 9 is connected to the vertical desander 1 8, the vertical separator 1 7 and the flow meter 1 6 in sequence, and then divided into branch 3 and branch 4; branch 3 is connected to the low-pressure gathering pipeline 20, and branch 4 is connected back to the high-pressure gathering pipeline 19.
[0028] Among them, a pneumatic cut-off valve 1 4 is arranged on branch line 3; a pneumatic cut-off valve 2 5 is arranged on branch line 4.
[0029] Branch 2 23 is connected to gas production tree 2 13 in the gas well system, and gas production tree 2 13 is connected to vertical desander 2 14, vertical separator 2 15 and flow meter 2 16 in sequence and then split into branch 5 and branch 6; branch 5 is connected to low-pressure gathering pipeline 20, and branch 6 is connected to high-pressure gathering pipeline 19.
[0030] Among them, a pneumatic shut-off valve three 17 is provided on branch line five, and a pneumatic shut-off valve four 18 is provided on branch line six.
[0031] The present invention also provides a method for realizing gas lift water drainage gas production in the low-pressure stage of shale gas, which is realized based on the above-mentioned gas lift water drainage gas production device in the low-pressure stage of shale gas, and the method comprises: According to the production situation of the gas well, the valve position instructions of the regulating valve 1 11 and the regulating valve 2 12 are remotely controlled through the data acquisition and monitoring control system 1; The valve position command is transmitted to the local PLC programmable logic controller 2 through the cable. After receiving the command, the PLC programmable logic controller 2 sends the command to the actuators of the regulating valve 1 11 and the regulating valve 2 12; The actuator controls the regulating valve 11 and the regulating valve 2 12 to open to the command valve position according to the command requirements, so that the high-pressure natural gas is injected into the gas wellbore through the branch line 1 and the branch line 2 for gas lift drainage; The valve position opening information of the regulating valve 1 11 and the regulating valve 2 12 and the instantaneous flow information of the flow meter 3 21 are obtained through the PLC programmable logic controller 2 and transmitted to the data acquisition and monitoring control system 1 to confirm that the instruction is executed and the operation is completed.
[0032] The method further includes: The valve position opening of the regulating valve 1 11 and the regulating valve 2 12 is controlled by the actuator to realize the natural gas flow control in the pipeline; The instantaneous flow information of the flow meter 3 21 is used to measure the cumulative flow of natural gas in the pipeline during the period, and the amount of natural gas injected into the gas well system by the high-pressure gathering and transmission branch line 19 is calculated.
[0033] The data acquisition and monitoring control system 1 and the PLC programmable logic controller 2 control the valve position opening of the regulating valve 1 11 and the regulating valve 2 12, display the valve position opening, display the instantaneous flow of the flow meter and calculate the accumulated flow during the period.
[0034] The method further includes: Prepare the corresponding control program in the PLC programmable logic controller 2 in advance and provide the corresponding power supply; After the program runs, the PLC programmable logic controller 2 controls the valve position opening of the regulating valve 11 and the regulating valve 2 12 and displays the valve position opening status and the instantaneous flow of the flow meter. The PLC programmable logic controller 2 communicates with the data acquisition and monitoring control system 1 to form a control link.
[0035] After the data acquisition and monitoring control system 1 completes programming and configuration, the remote monitoring and remote control of the regulating valve 11, the regulating valve 2 12 and the flow meter 3 21 can be realized.
[0036] In this embodiment, if Figure 1 As shown in the figure, a gas transmission process from a high-pressure gathering pipeline to a Christmas tree is established using steel pipelines. A flow meter is installed in the newly built gas transmission process to measure the gas flow. An electric (pneumatic) regulating valve is installed in the section where the gas pipeline enters the Christmas tree to regulate the gas flow. The high-pressure natural gas from the high-pressure pipeline is transported to the oil pipe or casing of the Christmas tree for gas lift in the gas well. The flow meter and the electric (pneumatic) regulating valve are connected to the PLC via cables, and the PLC is connected to the SCADA system via optical fiber or 4G DTU signals.
[0037] Hardware part: The electric (pneumatic) regulating valve controls the valve position opening through the actuator to realize the natural gas flow control in the pipeline; the flow meter measures the instantaneous flow rate and cumulative flow rate of natural gas in the pipeline, and calculates the amount of natural gas injected into the gas well of the high-pressure gathering and transmission branch line; the main functions of the PLC and SCADA system are to control the valve position opening of the electric (pneumatic) regulating valve, display the valve position opening, display the instantaneous flow rate of the flow meter and calculate the cumulative flow rate.
[0038] Software part: After the electric (pneumatic) control valve and flow meter are installed, they are connected to the PLC through the communication signal line. The corresponding control program is compiled in the PLC and the corresponding power supply is provided. After the program is running, the PLC can control the valve position opening of the electric (pneumatic) control valve and display the valve position opening status and the instantaneous flow of the flow meter. The PLC communicates to the SCADA system through optical fiber or 4G signal to form a control link. After the SCADA system is programmed and configured, remote monitoring and remote control of the electric (pneumatic) control valve and flow meter can be realized.
[0039] During the implementation process, shale gas cannot carry the return fluid to the ground process due to insufficient formation energy in the low-pressure production stage. The return fluid forms liquid accumulation in the wellbore, which will reduce the gas well production. The operator remotely controls the valve position command of the electric (pneumatic) control valve in the SCADA system according to the production situation of the gas well. The command is transmitted to the local PLC system through the communication model. After the PLC grounds the command, it sends a command to the electric (pneumatic) control valve actuator. The electric (pneumatic) control valve opens to the command valve position as required by the command, and high-pressure natural gas is injected into the gas wellbore through the control valve for gas lift drainage. The electric (pneumatic) control valve and flowmeter transmit the valve position opening and instantaneous flow rate signals to the PLC system respectively. The PLC then transmits the valve position opening and instantaneous flow rate information to the SCADA system. The operator confirms the execution of the command and the operation is completed.
[0040] The gas transmission process is equipped with flow meters and electric (pneumatic) regulating valves, and the control circuits of flow meters and electric (pneumatic) regulating valves are connected to the on-site PLC. The PLC sets the control program, and the opening of the electric (pneumatic) regulating valve is adjusted on the PLC control panel to control the gas lift injection volume, so as to realize gas lift modes such as continuous gas lift and intermittent gas lift. The on-site PLC communicates with the SCADA system to realize remote gas lift automatic control and flow monitoring.
[0041] The present invention proposes a shale gas low-pressure stage gas lift drainage gas production device and an implementation method thereof, a new high-pressure gathering and transmission branch line to the gas tree natural gas transmission process pipeline is newly built, the gas tree at the wellhead of the gas well is connected to the high-pressure gathering and transmission pipeline, and the high-pressure natural gas in the high-pressure gathering and transmission pipeline is used as the gas source for gas well gas lift. After the process is connected, the natural gas in the high-pressure gathering and transmission pipeline enters the gas well, and gas well gas lift drainage can be realized, which has the following advantages: (1) Gas lift can be achieved by using high-pressure gathering and transmission pipelines, without the need for vehicle-mounted gas lift vehicles and compressors and other power equipment. After cost comparison, it can significantly save costs.
[0042] (2) The gas lift injection volume is controlled by a regulating valve, and the valve position opening is controlled between 0-100%. This can achieve the adjustment and fine control of the gas lift volume of the gas well, achieve the best gas lift effect, and meet the needs of refined management. Vehicle-mounted gas lifts are mostly reciprocating compressors with fixed displacement, which cannot achieve fine control of the gas lift volume.
[0043] (3) The SCADA system can remotely control gas lift start and stop, injection volume adjustment and other functions without the need for on-site operation, saving manpower and improving efficiency.
[0044] (4) Process gas lift and continuous gas lift can be used at any time. Compared with vehicle-mounted gas lift, the timeliness is greatly improved. Compared with gas lift vehicles, the process does not require mechanical pump operation, achieving energy saving effects; gas lift vehicles need to be shut down for maintenance and refueling for a long time, while this achievement does not require related work and can be used for a long time.
[0045] (5) Gas lift can be performed on multiple gas wells at the same time, and the gas lift injection volume can be reasonably adjusted according to the production conditions of different gas wells.
[0046] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A shale gas low-pressure stage gas lift drainage gas production device, characterized in that: It includes a data acquisition and monitoring control system (1), a PLC programmable logic controller (2), a flow meter three (21), a valve (3), a regulating valve one (11), a regulating valve two (12) and a gas well system; The high-pressure gathering and transmission pipeline (19) is connected to the gas well system through a pipeline; A valve (3) and a flow meter three (21) are arranged in sequence on the pipeline between the high-pressure gathering pipeline (19) and the gas well system, and the pipeline is divided into a branch line one (22) and a branch line two (23), and the branch line one (22) and the branch line two (23) are connected to the gas well system; The flow meter three (21), the regulating valve one (11) and the regulating valve two (12) are all connected to a PLC programmable logic controller (2) via cables, and the PLC programmable logic controller (2) is connected to a data acquisition and monitoring control system (1).
2. A shale gas low-pressure stage gas lift drainage gas production device according to claim 1, characterized in that: The branch line 1 (22) is connected to a gas production tree 1 (9) in the gas well system, and the gas production tree 1 (9) is connected to a downhole pipe string (10).
3. A shale gas low-pressure stage gas lift drainage gas production device according to claim 2, characterized in that: In the gas well system, a gas production tree (9) is connected in sequence to a vertical desander (8), a vertical separator (7) and a flow meter (6) to split into a branch line (3) and a branch line (4); the branch line (3) is connected to a low-pressure gathering pipeline (20), and the branch line (4) is connected back to a high-pressure gathering pipeline (19).
4. A shale gas low-pressure stage gas lift drainage gas production device according to claim 3, characterized in that: The branch line three is provided with a pneumatic shut-off valve one (4); the branch line four is provided with a pneumatic shut-off valve two (5).
5. The shale gas low-pressure stage gas lift drainage gas production device according to claim 1, characterized in that: The branch line 2 (23) is connected to the gas production tree 2 (13) in the gas well system, and the gas production tree 2 (13) is connected to the vertical desander 2 (14), the vertical separator 2 (15) and the flow meter 2 (16) in sequence, and then divided into branch line 5 and branch line 6; the branch line 5 is connected to the low-pressure gathering pipeline (20), and the branch line 6 is connected back to the high-pressure gathering pipeline (19).
6. A shale gas low-pressure stage gas lift drainage gas production device according to claim 5, characterized in that: The branch line five is provided with a pneumatic shut-off valve three (17); the branch line six is provided with a pneumatic shut-off valve four (18).
7. A method for realizing gas lift drainage and gas production in the low-pressure stage of shale gas, based on a gas lift drainage and gas production device in the low-pressure stage of shale gas according to any one of claims 1 to 6, characterized in that: The method comprises: According to the production situation of the gas well, the valve position instructions of the regulating valve 1 (11) and the regulating valve 2 (12) are remotely controlled through the data acquisition and monitoring control system (1); The valve position command is transmitted to the local PLC programmable logic controller (2) through a cable. After receiving the command, the PLC programmable logic controller (2) sends the command to the actuators of the regulating valve 1 (11) and the regulating valve 2 (12); The actuator controls the regulating valve 1 (11) and the regulating valve 2 (12) to open to the command valve position according to the command requirements, so that the high-pressure natural gas is injected into the wellbore of the gas well through the branch line 1 and the branch line 2 for gas lift drainage; The valve position opening information of the regulating valve 1 (11) and the regulating valve 2 (12) and the instantaneous flow information of the flow meter 3 (21) are obtained through the PLC programmable logic controller (2) and transmitted to the data acquisition and monitoring control system (1), confirming that the instruction is executed and the operation is completed.
8. A method for realizing gas production by gas lift drainage at low pressure stage of shale gas according to claim 7, characterized in that: Also includes: The time period cumulative flow rate of natural gas in the pipeline is calculated based on the instantaneous flow rate information of flow meter three (21), and the amount of natural gas injected into the gas well system by the high-pressure gathering and transmission branch line (19) is calculated.
9. A method for realizing gas production by gas lift drainage at low pressure stage of shale gas according to claim 7, characterized in that: Also includes: A corresponding control program is compiled in advance in the PLC programmable logic controller (2), and a corresponding power supply is provided; After the program is run, the PLC programmable logic controller (2) controls the valve position opening of the regulating valve 1 (11) and the regulating valve 2 (12) and displays the valve position opening status and the instantaneous flow rate of the flow meter. The PLC programmable logic controller (2) communicates with the data acquisition and monitoring control system (1) to form a control link.
Citation Information
Cited By
Shale gas platform well testing and gas production integrated gathering and transportation system and method
CN120251163A
Shale gas platform well testing and gas production integrated gathering system and method
CN120251163B
Shale gas one-machine multi-lift pumping and lifting integrated pressurization system
CN224260316U