Water delivery tunnel lining structure and water delivery tunnel construction method
By using prefabricated inverted arch and side arch steel sleeve sets and circumferential stress-bearing steel bar connections in the water conveyance tunnel lining structure, the problem of weak stress in the existing technology is solved, and the overall integrity of the water conveyance tunnel lining structure is improved. Force characteristics and safety.
Patent Information
- Application Number
- CN202411252767.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
There are weak points in the existing water conveyance tunnel lining structure, and the structural strength cannot meet the technical requirements. Especially at the connection between the inverted arch and the side arch, the pull-out force is small, and the mechanical connection joints cannot meet the stress requirements.
Prefabricated invert and side arch lining structures are adopted. The two sides of the prefabricated invert are connected with steel sleeve groups. Multiple steel bars for circumferential stress are set on both sides of the side arch lining. The steel sleeve groups are arranged alternately and at intervals. The prefabricated inverts are The inner surface is equipped with spike holes and three-stage parallel joint concrete to improve the stress characteristics.
Through the connection of the steel sleeve group and the circumferentially stressed steel bars, the overall stress characteristics of the prefabricated inverted arch and side arch lining are improved, the safety and reliability of the water conveyance tunnel lining structure are enhanced, and the technical requirements for structural strength are met. Require.
Smart Images

Figure CN118774877A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a water conveyance tunnel lining structure and a water conveyance tunnel construction method. Background Art
[0002] Open-type TBM construction has a fast excavation speed and strong adaptability to different geological conditions. It is widely used in the construction of long and large tunnels. During the rapid excavation of TBM, the secondary lining can be constructed simultaneously, which can make full use of the construction time and thus shorten the construction period. In order to achieve synchronous lining, there are roughly three types of tunnel concrete lining structures: (1) both the invert and the side and top arches are cast-in-place reinforced concrete structures; (2) the invert is a prefabricated structure, the side and top arches are cast-in-place reinforced concrete, and the prefabricated invert blocks are embedded with steel bars as connecting bars; (3) the invert is a prefabricated structure, the side and top arches are cast-in-place reinforced concrete, and the sleeve arch connection is pre-buried on the surface of the prefabricated invert blocks. If the invert is a cast-in-place reinforced concrete structure, the cross-interference between TBM excavation and cast-in-place invert construction is large, the construction efficiency is low, and the construction space for the invert lining is insufficient, the bottom space is narrow, the labor intensity is high, and the construction quality is difficult to guarantee. When using a prefabricated inverted arch structure, if the prefabricated inverted arch block is embedded with steel bars as connecting bars, the connecting bars cannot be connected to the internal steel bars of the prefabricated inverted arch, resulting in a small tensile pull-out force and a weak stress point between the prefabricated inverted arch and the cast-in-place lining; if the prefabricated inverted arch block is pre-embedded with steel sleeves, the mechanical connection joints are all located in the same section, which cannot meet the technical requirements that the mechanical connection joints of the stress-bearing steel bars should be staggered, the length of the connection section of the steel bar mechanical connection joints, and the percentage of the longitudinal tensile steel bar joint area in the same connection section should not be too large. It can be seen that the existing water diversion tunnel lining structure has a weak stress position and the structural strength is difficult to meet the technical requirements. Summary of the invention
[0003] The object of the present invention is to provide a water conveyance tunnel lining structure and a water conveyance tunnel construction method, so as to alleviate the technical problems of weak stress positions and poor structural strength in the water conveyance tunnel lining structure in the prior art.
[0004] In a first aspect, the present invention provides a water conveyance tunnel lining structure, comprising: a prefabricated invert arch and a side-top arch lining; Both sides of the prefabricated invert are respectively connected with steel bar sleeve groups; The prefabricated inverted arch and the side top arch lining are arranged in the circumferential direction, and the two sides of the side top arch lining are respectively provided with a plurality of side top arch steel bars which are subjected to circumferential force along the side top arch lining; A plurality of the side and top arch steel bars are respectively inserted into the steel bar sleeve group.
[0005] In combination with the first aspect, the present invention provides a first possible implementation manner of the first aspect, wherein the steel bar sleeve group comprises: a plurality of first steel bar sleeves and a plurality of second steel bar sleeves; A plurality of the first steel bar sleeves and a plurality of the second steel bar sleeves are arranged alternately and at intervals; The distance between the first steel bar sleeve and the inner surface of the prefabricated inverted arch is smaller than the distance between the second steel bar sleeve and the inner surface of the prefabricated inverted arch.
[0006] In combination with the first possible implementation manner of the first aspect, the present invention provides a second possible implementation manner of the first aspect, wherein the spacing between any two adjacent first steel bar sleeves is 400mm to 500mm, and the spacing between any two adjacent second steel bar sleeves is 400mm to 500mm.
[0007] In combination with the second possible implementation of the first aspect, the present invention provides a third possible implementation of the first aspect, wherein the distance between the second steel sleeve and the inner surface of the prefabricated inverted arch is 35d, wherein d is the diameter of the circumferentially stressed side top arch steel bar 31.
[0008] In combination with the first aspect, the present invention provides a fourth possible implementation manner of the first aspect, wherein a low side wall is cast between the prefabricated invert arch and the side and top arch lining.
[0009] In combination with the first aspect, the present invention provides a fifth possible implementation of the first aspect, wherein a plurality of inverted arch steel bars are connected inside the prefabricated inverted arch, the plurality of inverted arch steel bars are arranged at intervals, and the plurality of inverted arch steel bars are respectively inserted into the steel bar sleeve group.
[0010] In combination with the first aspect, the present invention provides a sixth possible implementation manner of the first aspect, wherein the inner surface of the prefabricated invert is provided with a plurality of spike holes, and the plurality of spike holes are arranged at intervals; The inner side of the prefabricated invert is poured with three phases of jointed concrete.
[0011] In a second aspect, the present invention provides a water conveyance tunnel construction method, comprising the following steps: Installing a prefabricated inverted arch, wherein both sides of the prefabricated inverted arch are respectively connected to a steel sleeve group; pouring cement mortar into the bottom of the prefabricated invert; The side top arch lining is cast to form a side top arch lining, and a plurality of side top arch steel bars which are subjected to circumferential force along the side top arch lining are provided on both sides of the side top arch lining, and the plurality of side top arch steel bars are respectively inserted into the steel bar sleeve groups.
[0012] In combination with the second aspect, the present invention provides a first possible implementation manner of the second aspect, wherein the water conveyance tunnel construction method further includes: Before casting to form the side and top arch lining, casting to form short side walls on both sides of the prefabricated invert arch; When the side and top arch lining is formed by casting, the short side wall is connected to the prefabricated invert arch and the side and top arch lining.
[0013] In combination with the second aspect, the present invention provides a second possible implementation of the second aspect, wherein the water transfer tunnel construction method further includes: pouring three-phase joint concrete on the inner side of the prefabricated invert.
[0014] The embodiment of the present invention brings the following beneficial effects: a prefabricated inverted arch is respectively connected with a steel sleeve group on both sides, the prefabricated inverted arch and the side top arch lining are arranged in a circumferential direction, and both sides of the side top arch lining are respectively provided with a plurality of side top arch steel bars that are subjected to circumferential force along the side top arch lining, and the plurality of side top arch steel bars are respectively inserted in the steel sleeve group, so that the stress characteristics of the prefabricated inverted arch and the side top arch lining can be improved, and the overall stress effect can be achieved, and the lining structure of the water diversion tunnel is safer and more reliable.
[0015] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the related technologies, the drawings required for use in the specific embodiments or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 A schematic cross-sectional view of a water conveyance tunnel lining structure provided by an embodiment of the present invention; Figure 2 A schematic diagram of a prefabricated invert of a water conveyance tunnel lining structure provided by an embodiment of the present invention; Figure 3 A perspective view of a first steel sleeve and a second steel sleeve in a prefabricated invert of a water tunnel lining structure provided by an embodiment of the present invention; Figure 4 A schematic diagram of the connection between the first reinforcement sleeve and the side and top arch reinforcement of the water conveyance tunnel lining structure provided by an embodiment of the present invention; Figure 5 A schematic diagram of the connection between the second reinforcement sleeve and the side and top arch reinforcement of the water conveyance tunnel lining structure provided by an embodiment of the present invention; Figure 6 A partial cross-sectional view of a prefabricated invert of a water conveyance tunnel lining structure provided by an embodiment of the present invention; Figure 7 A partial cross-sectional view of a prefabricated invert and three-phase joint concrete of a water conveyance tunnel lining structure provided in an embodiment of the present invention.
[0018] Icons: 1-precast inverted arch; 11-first steel sleeve; 12-second steel sleeve; 13-inverted arch steel bar; 14-spike hole; 15-grouting drainage hole; 16-bolt slot; 17-waterstop groove; 18-bolt hole; 19-drainage ditch; 2-low side wall; 3-side top arch lining; 31-side top arch steel bar; 4-three-phase joint concrete; 41-surface steel bar; 42-inserted bars. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are only used to describe the difference in names, and cannot be understood as indicating or implying relative importance. The physical quantities in the formula, if not separately marked, should be understood as basic quantities of the basic units of the International System of Units, or derived quantities derived from the basic quantities through mathematical operations such as multiplication, division, differentiation or integration.
[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] like Figure 1 , Figure 2 , Figure 4 and Figure 5 As shown, the water conveyance tunnel lining structure provided by the embodiment of the present invention includes: a prefabricated inverted arch 1 and a side top arch lining 3; steel bar sleeve groups are respectively connected to both sides of the prefabricated inverted arch 1; the prefabricated inverted arch 1 and the side top arch lining 3 are arranged in the circumferential direction, and both sides of the side top arch lining 3 are respectively provided with a plurality of side top arch steel bars 31 subjected to circumferential force along the side top arch lining 3; and the plurality of side top arch steel bars 31 are respectively inserted into the steel bar sleeve groups.
[0023] By inserting a plurality of side and top arch steel bars 31 into the steel bar sleeve group to realize mechanical connection, the prefabricated inverted arch 1 and the side and top arch lining 3 are subjected to overall force in the circumferential direction inside the prefabricated inverted arch 1, the force characteristics are improved, and the lining structure of the water conveyance tunnel is safer and more reliable. In addition, the construction method of first installing the prefabricated inverted arch 1 and then casting the side and top arch lining 3 in situ can realize secondary lining construction while realizing open TBM excavation, which can speed up the construction progress and shorten the construction period.
[0024] Preferably, the prefabricated invert is prefabricated using concrete with a grade of C40 or above.
[0025] like Figure 1 , Figure 2 and Figure 3 As shown, in an embodiment of the present invention, the steel bar sleeve group includes: a plurality of first steel bar sleeves 11 and a plurality of second steel bar sleeves 12; the plurality of first steel bar sleeves 11 and the plurality of second steel bar sleeves 12 are alternately and spaced apart; the spacing between the first steel bar sleeve 11 and the inner surface of the prefabricated invert 1 is smaller than the spacing between the second steel bar sleeve 12 and the inner surface of the prefabricated invert 1.
[0026] The steel sleeve group can be a plurality of steel sleeves with a length greater than 100 mm and an inner diameter equal to that of the side and top arch steel bars 31. The first steel sleeve 11 is reserved in a shallow buried manner, and the second steel sleeve 12 is reserved in a deep buried manner, so that a deep and shallow staggered layout can be achieved, thereby improving the stress characteristics of the joint surface.
[0027] In an optional embodiment, the distance between any two adjacent first steel sleeves 11 is 400mm-500mm, and the distance between any two adjacent second steel sleeves 12 is 400mm-500mm. Among them, the distance between two adjacent first steel sleeves 11 can be set to 410mm, 420mm, 450mm or 480mm, and the distance between two adjacent second steel sleeves 12 can be set to 410mm, 420mm, 450mm or 480mm. The first steel sleeve 11 adopts a shallow burial process, and the inner surface of the prefabricated invert 1 is just flush with the first steel sleeve 11.
[0028] In an optional embodiment, the distance between the second steel sleeve 12 and the inner surface of the prefabricated inverted arch 1 is 35d, where d is the diameter of the circumferentially stressed side arch steel bars 31. The embedded depth of the first steel sleeve 11 and the second steel sleeve 12 can be designed by simulation tests or finite element analysis.
[0029] In an optional embodiment, in order to facilitate the later side and top arch lining 3 trolley to move, a short side wall 2 is cast between the prefabricated inverted arch 1 and the side and top arch lining 3, and the short side wall 2 provides a walking platform for the trolley. Of course, the short side wall 2 can be selected to be retained according to actual construction needs.
[0030] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, a plurality of inverted arch steel bars 13 are connected inside the prefabricated inverted arch 1, the plurality of inverted arch steel bars 13 are arranged at intervals, and the plurality of inverted arch steel bars 13 are respectively inserted into the steel bar sleeve groups.
[0031] The first steel sleeve 11 and the second steel sleeve 12 are respectively screwed with the inverted arch steel bars 13, and the inverted arch steel bars 13 extend to half the length of the first steel sleeve 11 and the second steel sleeve 12. When casting the prefabricated inverted arch 1, a ceramic rod with a diameter equal to that of the first steel sleeve 11 and the second steel sleeve 12 can be used as a mold at the hole position. The ceramic rod is rotated to loosen it during the initial setting stage, and then the ceramic rod is pulled out when the concrete is demoulded. The hole is sealed with a rubber plug when leaving the factory to prevent slag from entering the reserved hole.
[0032] like Figure 2 , Figure 4 , Figure 5 and Figure 6 As shown, the inner surface of the prefabricated invert 1 is provided with a plurality of spike holes 14, which are arranged at intervals; the inner side of the prefabricated invert 1 is poured with three-stage joint concrete 4. The spike holes 14 can be used as hoisting holes and can also be used as installation and fixing points for TBM transport tracks. Figure 1 and Figure 6 It can be used as a steel bar connector when pouring the three-phase joint concrete 4, so that the new and old concrete above and below can be tightly combined.
[0033] like Figure 2 , Figure 4 and Figure 5 As shown, the prefabricated inverted arch 1 is provided with a grouting drainage hole 15, and the grouting drainage hole 15 runs through the prefabricated inverted arch 1 from top to bottom, and has the functions of both grouting and drainage.
[0034] The inner surface of the prefabricated inverted arch 1 is provided with multiple bolt grooves 16 at intervals, and a trapezoidal groove with a depth of 10 mm is provided around it as a water stop groove 17. In addition, the front and rear ends of the prefabricated inverted arch 1 are respectively provided with bolt holes 18, and the upstream and downstream prefabricated inverted arches 1 can be connected by screw devices.
[0035] In an optional embodiment, the inner surface of the prefabricated invert 1 is provided with a drainage ditch 19 with a width of 550 mm and a depth of 300 mm. Figure 1 and Figure 2 The pouring thickness of the three-phase joint concrete 4 is 20cm. During construction, the drainage ditch 19 should be filled first, and then 20cm higher.
[0036] See also Figure 7As shown, the surface layer of the three-stage joint concrete 4 is cast and fixed with a surface layer steel bar 41 , and the inserted steel bar 42 is connected to the surface layer steel bar 41 , passes through the three-stage joint concrete 4 and is inserted into the spike hole 14 .
[0037] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 As shown, the water conveyance tunnel construction method provided by the embodiment of the present invention is used to construct and form the water conveyance tunnel lining structure recorded in the above-mentioned embodiment, and the method comprises the following steps: Install the prefabricated inverted arch 1. The two sides of the prefabricated inverted arch 1 are connected with steel sleeve groups. The bottom of the hole should be cleaned before installation to ensure that the bottom of the hole is clean and flat. During the installation process, the misalignment between the rings of the prefabricated inverted arch 1 is no more than 9mm, and the gap between the rings is no more than 4mm. 10cm long concave and convex keyways are set at both ends of the longitudinal direction. The upstream and downstream prefabricated inverted arches 1 are docked and positioned through the concave and convex keyways; Pour cement mortar into the bottom of the prefabricated inverted arch 1. During grouting, pay attention to the overflow of grout around the inverted arch to prevent the grout from clogging the water stop groove 17. The side top arch lining 3 is cast, and the side top arch lining 3 is provided with a plurality of side top arch steel bars 31 which are subjected to circumferential force along the side top arch lining 3 on both sides, and the plurality of side top arch steel bars 31 are respectively inserted into the steel bar sleeve group. In order to facilitate the side top arch steel bars 31 of the cast-in-place lining to be screwed into the first steel bar sleeve 11 and the second steel bar sleeve 12, the lower inverted arch steel bar 13 can be designed as a broken line type (see Figure 4 and Figure 5 When pouring the third-phase joint concrete 4, one end of the dowel 42 can be directly processed into a threaded thread and screwed into the spike sleeve in the spike hole 14, and the other end can be welded to the surface steel bar 41 in the upper concrete, so as to achieve the purpose of connecting the new and old concrete.
[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A water conveyance tunnel lining structure, characterized in that: include: Prefabricated invert arch (1) and side arch lining (3); Both sides of the prefabricated invert (1) are respectively connected to a steel sleeve group; The prefabricated inverted arch (1) and the side and top arch lining (3) are arranged in a circumferential direction, and both sides of the side and top arch lining (3) are respectively provided with a plurality of side and top arch steel bars (31) which are subjected to circumferential force along the side and top arch lining (3); A plurality of the side and top arch steel bars (31) are respectively inserted into the steel bar sleeve group; The steel bar sleeve group comprises: a plurality of first steel bar sleeves (11) and a plurality of second steel bar sleeves (12); A plurality of the first steel bar sleeves (11) and a plurality of the second steel bar sleeves (12) are arranged alternately and at intervals; The distance between the first steel reinforcement sleeve (11) and the inner surface of the prefabricated invert (1) is smaller than the distance between the second steel reinforcement sleeve (12) and the inner surface of the prefabricated invert (1).
2. The water diversion tunnel lining structure according to claim 1, characterized in that: The distance between any two adjacent first steel bar sleeves (11) is 400 mm to 500 mm, and the distance between any two adjacent second steel bar sleeves (12) is 400 mm to 500 mm.
3. The water diversion tunnel lining structure according to claim 1, characterized in that: The distance between the second steel bar sleeve (12) and the inner surface of the prefabricated inverted arch (1) is 35d, wherein d is the diameter of the side and top arch steel bars (31) that bear circumferential force.
4. The water diversion tunnel lining structure according to claim 1, characterized in that: A short side wall (2) is cast between the prefabricated inverted arch (1) and the side and top arch lining (3).
5. The water diversion tunnel lining structure according to claim 1, characterized in that: The prefabricated inverted arch (1) has a plurality of inverted arch steel bars (13) connected thereto, the plurality of inverted arch steel bars (13) are arranged at intervals, and the plurality of inverted arch steel bars (13) are respectively inserted into the steel bar sleeve groups.
6. The water diversion tunnel lining structure according to claim 1, characterized in that: The inner surface of the prefabricated invert (1) is provided with a plurality of spike holes (14), and the plurality of spike holes (14) are arranged at intervals; The inner side of the prefabricated invert (1) is cast with three-stage joint concrete (4).
7. A water conveyance tunnel construction method, characterized in that: The following steps are involved: A prefabricated inverted arch (1) is installed, wherein both sides of the prefabricated inverted arch (1) are respectively connected to a steel bar sleeve group, wherein the steel bar sleeve group comprises: a plurality of first steel bar sleeves (11) and a plurality of second steel bar sleeves (12); the plurality of first steel bar sleeves (11) and the plurality of second steel bar sleeves (12) are arranged alternately and at intervals; and the distance between the first steel bar sleeves (11) and the inner surface of the prefabricated inverted arch (1) is smaller than the distance between the second steel bar sleeves (12) and the inner surface of the prefabricated inverted arch (1); pouring cement mortar into the bottom of the prefabricated invert (1); The side top arch lining (3) is cast to form a side top arch lining (3), and a plurality of side top arch steel bars (31) that are subjected to circumferential force along the side top arch lining (3) are provided on both sides of the side top arch lining (3), and the plurality of side top arch steel bars (31) are respectively inserted into the steel bar sleeve group.
8. The water diversion tunnel construction method according to claim 7, characterized in that: The water conveyance tunnel construction method also includes: Before casting to form the side and top arch lining (3), casting to form low side walls (2) on both sides of the prefabricated invert arch (1); When the side and top arch lining (3) is formed by casting, the short side wall (2) is joined to the prefabricated invert arch (1) and the side and top arch lining (3).
9. The water diversion tunnel construction method according to claim 7, characterized in that: The water conveyance tunnel construction method also includes: Three-stage joint concrete (4) is poured on the inner side of the prefabricated invert (1).
Citation Information
Patent Citations
Equivalent cast-in-place assembly type prefabricated vertical component connecting structure and construction method
CN114837350A
Full-section composite lining structure suitable for open-type TBM construction tunnel and construction method
CN114941542A
Inverted arch block suitable for diversion tunnel of water conservancy project
CN115263368A
Reinforced steel mesh
JP1995026431U
Cited By
Hidden water stop and drainage system for TBM non-pressure water delivery tunnel and construction method thereof
CN121556898A
Hidden drainage system of TBM non-pressure water conveyance tunnel and construction method thereof
CN121556898B