Heating system and method for cold start boiler

By transporting high-temperature flue gas to the front and rear arches of the furnace of the boiler, and using temperature sensors to control the furnace temperature, the problem of high fuel consumption during cold start is solved, reducing fuel consumption and improving economic benefits.

CN118775880APending Publication Date: 2024-10-15SHANGHAI KANGHENG ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049210.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The fuel consumption in the cold start boiler process is large, which affects the operating cost of waste incineration. In addition, the existing technology's use of primary hot air heating will increase the steam consumption of adjacent boilers and reduce economic benefits.

Method used

Design a cold start boiler heating system that uses high-temperature flue gas fans and damper devices to transport high-temperature flue gas from the first boiler to the front and rear arches of the furnace of the second boiler. The furnace temperature is monitored and maintained in real time through temperature sensors, reducing Fuel consumption.

Benefits of technology

It is possible to reduce fuel consumption during cold start without affecting the economic benefits of adjacent boilers. The waste heat of high-temperature flue gas is used to heat the working fluid in the water-cooled wall, thereby improving the startup efficiency of the boiler.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775880A_ABST
    Figure CN118775880A_ABST
Patent Text Reader

Abstract

The invention provides a heating system and method for a cold start boiler. An air door device is used for receiving a cold start instruction sent by a second boiler, and the air inlet end and the air outlet end of the air door device are communicated; a high-temperature flue gas fan is used for receiving a cold start instruction sent by the second boiler, and high-temperature flue gas exhausted by the first boiler is conveyed to a hearth front arch and a hearth rear arch of the second boiler to be heated; and a temperature sensor is used for detecting the hearth temperature of the second boiler in real time and sending the hearth temperature to the second boiler, so that the second boiler is started when the duration of keeping the hearth temperature unchanged reaches the preset duration. In the scheme, the high-temperature flue gas of the adjacent boiler is conveyed to the hearth front arch and the hearth rear arch of the starting boiler to heat the working medium in the water cooling wall, and compared with the scheme of generating primary hot air by utilizing fuel in the prior art, the waste heat of the high-temperature flue gas is utilized, so that the consumption of the fuel can be reduced, and the economic benefit of the adjacent boiler is not influenced. And the fuel consumption in the starting process of the cold starting furnace is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler waste heat recycling, and in particular to a heating system and method for a cold start boiler. Background Art

[0002] The cold start process of a waste incineration boiler takes a long time, and it often takes more than ten hours from the start of the furnace to full load normal operation. During the cold start process, auxiliary fuel (fuel oil or natural gas) needs to be added to heat the working fluid inside the furnace and the furnace heating surface so that the flue gas temperature at the furnace outlet reaches the requirement of 850°C. During this period, a large amount of fuel will be consumed, increasing the operating cost of the waste incineration.

[0003] In the prior art, the primary hot air directly generated during the combustion of fuel in the adjacent boiler is pressurized by a primary fan and sent to the primary air duct of the cold start boiler, thereby reducing the fuel consumed in the cold start.

[0004] The prior art uses primary hot air as a heating source for the current cold start boiler, which increases the steam consumption of adjacent boilers, thereby causing a reduction in the economic benefits of the adjacent boilers. Summary of the invention

[0005] In view of this, an embodiment of the present invention provides a heating system and method for a cold start boiler, so as to achieve the purpose of reducing the fuel consumption during the startup of the cold start boiler without affecting the economic benefits of adjacent boilers.

[0006] To achieve the above objectives, the embodiments of the present invention provide the following technical solutions:

[0007] A first aspect of an embodiment of the present invention discloses a heating system for a cold start boiler, the heating system comprising: a high-temperature flue gas fan, a damper device and a temperature sensor;

[0008] The air inlet end of the damper device is connected to the economizer flue gas outlet of the first boiler, and the air outlet end of the damper device is connected to the air inlet of the high-temperature flue gas fan; the air outlet of the high-temperature flue gas fan is respectively connected to the furnace front arch and the furnace rear arch of the second boiler; the first boiler and the second boiler are adjacent to each other; the temperature sensor is arranged in the furnace of the second boiler;

[0009] The damper device is used to connect the air inlet and the air outlet of the damper device when receiving the cold start instruction sent by the second boiler;

[0010] The high-temperature flue gas fan is used to enter a start state when receiving a cold start instruction sent by the second boiler, and to transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler;

[0011] The temperature sensor is used to detect the furnace temperature of the second boiler in real time and send the furnace temperature to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time.

[0012] Preferably, the damper device comprises: a first damper baffle and a second damper baffle;

[0013] The air inlet end of the first damper plate is connected to one side of the economizer flue gas outlet of the first boiler through a pipeline, and the air inlet end of the second damper plate is connected to the other side of the economizer flue gas outlet of the first boiler through a pipeline;

[0014] The air outlet end of the first damper plate and the air outlet end of the second damper plate are connected to the air inlet of the high-temperature flue gas fan through a pipeline;

[0015] The first damper is configured to enter an open state upon receiving a cold start instruction sent by the second boiler;

[0016] The second air damper is used to enter an open state when receiving a cold start instruction sent by the second boiler.

[0017] Preferably, the first damper baffle is specifically used for:

[0018] When receiving the cold start instruction sent by the second boiler, gradually increasing the opening of the first air damper until the opening of the first air damper reaches a maximum;

[0019] Accordingly, the second air door baffle is specifically used for:

[0020] When the cold start instruction sent by the second boiler is received, the opening of the second air damper is gradually increased until the opening of the second air damper reaches a maximum.

[0021] Preferably, the system further comprises: a dust collector;

[0022] The air inlet of the dust collector is connected to the air outlet end of the damper device, and the air outlet of the dust collector is connected to the air inlet of the high-temperature flue gas fan;

[0023] The dust collector is used to remove dust from the high-temperature flue gas discharged from the first boiler.

[0024] Preferably, the system further comprises: a third damper plate and a fourth damper plate;

[0025] The air inlet end of the third damper is connected to the air outlet of the high-temperature flue gas fan, and the air outlet end of the third damper is connected to the front arch and the rear arch of the furnace of the second boiler respectively;

[0026] The air inlet end of the fourth damper is connected to the pipeline between the third damper and the high-temperature flue gas fan, and the air outlet end of the fourth damper is respectively connected to the furnace front arch and the furnace rear arch of the first boiler;

[0027] The third damper is used to enter an open state when receiving a cold start instruction sent by the second boiler; and enter a closed state when the second boiler is started;

[0028] The fourth air damper is used to maintain a closed state until the second boiler is started and then enters an open state.

[0029] Preferably, the system further comprises: a flow meter;

[0030] The flow meter is arranged in the pipeline between the high-temperature flue gas blower and the second boiler;

[0031] The flow meter is used to detect the flue gas flow rate of the high-temperature flue gas in the pipeline in real time. When the flue gas flow rate is less than a flow rate threshold, the high-temperature flue gas fan is controlled to increase its rotation speed.

[0032] Preferably, the system further comprises: a pressure transmitter;

[0033] The pressure transmitter is arranged in the pipeline between the high-temperature flue gas blower and the second boiler;

[0034] The pressure transmitter is used to detect the flue gas pressure of the high-temperature flue gas in the pipeline in real time. When the flue gas pressure is less than the pressure threshold, the high-temperature flue gas fan is controlled to increase the rotation speed.

[0035] Preferably, the system further comprises: a thermocouple;

[0036] The thermocouple is arranged in the pipeline between the high-temperature flue gas blower and the second boiler;

[0037] The thermocouple is used to detect the flue gas temperature of the high-temperature flue gas in the pipeline in real time, and display the flue gas temperature through a display instrument.

[0038] Preferably, the high-temperature flue gas fan is specifically used for:

[0039] When receiving the cold start command sent by the second boiler, it enters the start state and gradually increases the fan speed to transport the high-temperature flue gas exhausted by the first boiler to the front arch and rear arch of the furnace of the second boiler to heat the second boiler.

[0040] A second aspect of an embodiment of the present invention discloses a heating method for a cold start boiler, which is applied to a heating system for a cold start boiler as described in any one of the first aspects of an embodiment of the present invention. The heating method comprises:

[0041] Using the damper device to receive the cold start instruction sent by the second boiler, and connecting the air inlet and air outlet of the damper device;

[0042] Using the high-temperature flue gas fan to receive the cold start instruction sent by the second boiler, enter the start state, and transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler;

[0043] The furnace temperature of the second boiler is detected in real time by using a temperature sensor, and the furnace temperature is sent to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time.

[0044] Based on the above-mentioned embodiment of the present invention, a heating system and method for a cold start boiler are provided, the heating system comprising: a high-temperature flue gas fan, a damper device and a temperature sensor; the air inlet end of the damper device is connected to the economizer flue gas outlet of the first boiler, and the air outlet end of the damper device is connected to the air inlet of the high-temperature flue gas fan; the air outlet of the high-temperature flue gas fan is respectively connected to the furnace front arch and the furnace rear arch of the second boiler; the first boiler and the second boiler are adjacent to each other; the temperature sensor is arranged in the furnace of the second boiler; the damper device is used to connect the air inlet end and the air outlet end of the damper device when receiving a cold start instruction sent by the second boiler; the high-temperature flue gas fan is used to enter a start state when receiving a cold start instruction sent by the second boiler, and transport the high-temperature flue gas discharged from the first boiler to the furnace front arch and the furnace rear arch of the second boiler to heat the second boiler; the temperature sensor is used to detect the furnace temperature of the second boiler in real time, and send the furnace temperature to the second boiler, so that the second boiler starts when the furnace temperature remains unchanged for a preset time. In this scheme, the high-temperature flue gas from the adjacent furnace is transported to the front arch and the rear arch of the furnace of the startup furnace to heat the working medium in the water-cooled wall. Compared with the prior art scheme of using primary hot air generated by fuel, the waste heat of the high-temperature flue gas can be used to reduce fuel consumption, thereby achieving the purpose of reducing fuel consumption during the startup of the cold startup furnace without affecting the economic benefits of the adjacent boiler. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0046] Figure 1 A structural diagram of a heating system for a cold start boiler disclosed in an embodiment of the present invention;

[0047] Figure 2 A structural diagram of a boiler disclosed in an embodiment of the present invention;

[0048] Figure 3 It is a structural diagram of another heating system of a cold start boiler disclosed in an embodiment of the present invention;

[0049] Figure 4 The present invention is a flowchart of a method for heating a cold start boiler disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] In this application, the terms "comprises", "comprising" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device comprising the element.

[0052] As can be seen from the background technology, in the prior art, the primary hot air directly generated during the combustion of fuel in the adjacent boiler is pressurized by the primary fan and sent to the primary air duct of the cold start boiler, thereby reducing the fuel consumed in the cold start. Using the primary hot air as the heating heat source of the current cold start boiler will increase the steam consumption of the adjacent boiler, thereby reducing the economic benefits of the adjacent boiler.

[0053] Therefore, an embodiment of the present invention discloses a heating system and method for a cold start boiler. In this scheme, the high-temperature flue gas of the adjacent furnace is transported to the front arch and the rear arch of the furnace of the start-up furnace to heat the working medium in the water-cooled wall. Compared with the prior art scheme of using primary hot air generated by fuel, the waste heat of the high-temperature flue gas can be used to reduce fuel consumption, thereby achieving the purpose of reducing fuel consumption during the startup process of the cold start furnace without affecting the economic benefits of the adjacent boiler.

[0054] like Figure 1, which is a structural diagram of a heating system for a cold start boiler disclosed in an embodiment of the present invention, the heating system includes: a damper device 1, a high-temperature flue gas fan 2, and a temperature sensor 3.

[0055] The air inlet end of the damper device 1 is connected to the economizer flue gas outlet of the first boiler, and the air outlet end of the damper device 1 is connected to the air inlet of the high-temperature flue gas fan 2; the air outlet of the high-temperature flue gas fan 2 is respectively connected to the front arch and the rear arch of the furnace of the second boiler; the first boiler and the second boiler are adjacent to each other; the temperature sensor 3 is arranged in the furnace of the second boiler.

[0056] The damper device 1 is used to connect the air inlet end and the air outlet end of the damper device 1 when receiving a cold start instruction sent by the second boiler.

[0057] In one embodiment, when a cold start command sent by the second boiler is received, the opening between the air inlet and the air outlet of the damper device 1 gradually increases until the maximum opening is reached, and the air inlet and the air outlet are fully connected.

[0058] The high-temperature flue gas fan 2 is used to enter the start-up state when receiving the cold start command sent by the second boiler, and transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler.

[0059] In one embodiment, when a cold start command is received from the second boiler, the startup state is entered and the fan speed is gradually increased until the fan speed reaches a speed threshold, the air volume transported in the pipeline is kept stable, and the high-temperature flue gas discharged from the first boiler is transported to the front arch and rear arch of the furnace of the second boiler to heat the second boiler.

[0060] It should be noted that the prior art solution is to send the primary hot air and / or flue gas of the first boiler into the primary air duct of the second boiler after being pressurized by a primary fan, and then enter the furnace. Different from the high-temperature flue gas input position in the prior art, the present invention inputs the high-temperature flue gas of the first boiler through the front and rear arches of the furnace of the second boiler, heats the working fluid in the heating surface of the furnace of the second boiler, and then discharges it from the second boiler through the induced draft fan, so as to utilize the working fluid to absorb as much heat of the high-temperature flue gas as possible, thereby achieving the purpose of fully utilizing the heat of the high-temperature flue gas.

[0061] like Figure 2 , which is a structural diagram of a boiler disclosed in an embodiment of the present invention, that is, a structural diagram of the second boiler in this solution.

[0062] Among them, a is the front arch of the furnace, b is the rear arch of the furnace, and c is the furnace. Both the front arch and the rear arch of the furnace are provided with water-cooled walls, and a temperature sensor 3 is arranged in the furnace.

[0063] It should be noted that during the normal operation of the boiler, the working fluid inside the water-cooled wall absorbs the heat inside the furnace and naturally circulates to the boiler drum at the top of the boiler. This scheme is based on the above-mentioned existing heat exchange process. During the cold start of the boiler, after the working fluid in the heating surface of the furnace of the second boiler is heated, the heat of the working fluid is higher than that of the furnace that has not yet been started, so the heat will be transferred to the furnace to heat the furnace.

[0064] The temperature sensor 3 is used to detect the furnace temperature of the second boiler in real time and send the furnace temperature to the second boiler, so that the second boiler starts when the furnace temperature remains unchanged for a preset time.

[0065] It should be noted that the furnace temperature of the second boiler remains unchanged, which means that the temperature of the high-temperature flue gas is not enough to continue to increase the furnace temperature of the second boiler. Therefore, the second boiler needs to be started at this time. After being heated by the high-temperature flue gas, the heat generated by the combustion of the auxiliary fuel is used to increase the furnace temperature of the second boiler.

[0066] It is understandable that when the second boiler is started, the furnace has a certain temperature base, so auxiliary fuel can be saved to improve economic benefits. In addition, the present invention can be modified on the original system of the unit, with a small amount of modification work and moderate investment, but with obvious fuel saving effect and high investment cost performance, and is particularly suitable for units with frequent furnace startup.

[0067] Based on the above-mentioned embodiment of the present invention, a heating system for a cold start boiler is disclosed. In this scheme, the high-temperature flue gas of the adjacent furnace is transported to the front arch and the rear arch of the furnace of the start-up furnace to heat the working medium in the water-cooled wall. Compared with the prior art scheme of using the primary hot air generated by the fuel, the waste heat of the high-temperature flue gas is used to reduce the fuel consumption, thereby achieving the purpose of reducing the fuel consumption during the startup of the cold start-up furnace without affecting the economic benefits of the adjacent boiler.

[0068] exist Figure 1 Based on the cold start boiler heating system shown, further, as Figure 3 As shown, it is a structural diagram of another heating system of a cold start boiler disclosed in an embodiment of the present invention, and the heating system includes: a damper device 1, a high-temperature flue gas fan 2, a temperature sensor 3, a dust collector 4, a third damper plate 5, a fourth damper plate 6, a flow meter 7, a pressure transmitter 8 and a thermocouple 9.

[0069] The damper device 1 comprises a first damper plate 11 and a second damper plate 12 .

[0070] Specifically, the air inlet end of the first damper plate 11 is connected to one side of the economizer flue gas outlet of the first boiler through a pipe, the air inlet end of the second damper plate 12 is connected to the other side of the economizer flue gas outlet of the first boiler through a pipe, and the air outlet end of the first damper plate 11 and the air outlet end of the second damper plate 12 are connected to the air inlet of the high-temperature flue gas fan through a pipe.

[0071] The first air door damper 11 is used to enter an open state when receiving a cold start instruction sent by the second boiler.

[0072] Preferably, the first damper 11 is used to gradually increase the opening of the first damper when receiving the cold start command sent by the second boiler, until the opening of the first damper reaches the maximum;

[0073] The second air door damper 12 is used to enter an open state when receiving a cold start instruction sent by the second boiler.

[0074] Preferably, the second damper plate 12 is used to gradually increase the opening of the second damper plate 12 when receiving a cold start instruction sent by the second boiler, until the opening of the second damper plate reaches a maximum.

[0075] It should be noted that the first damper plate 11 and the second damper plate 12 are respectively connected to the two sides of the high-temperature flue gas outlet of the economizer to prevent excessive deviation of the flue gas temperature on both sides.

[0076] The air inlet of the dust collector 4 is connected to the air outlet end of the damper device 1 , and the air outlet of the dust collector 4 is connected to the air inlet of the high-temperature flue gas fan 2 .

[0077] The dust collector 4 is used to remove dust from the high-temperature flue gas discharged from the first boiler.

[0078] It is understandable that the high-temperature flue gas contains a large amount of particulate dust, which can easily damage the high-temperature flue gas fan 2. The dust collector 4 can remove large particles and unburned particles in the flue gas and reduce the wear of the high-temperature flue gas fan 2.

[0079] The air inlet end of the third air damper 5 is connected to the air outlet of the high-temperature flue gas fan, and the air outlet end of the third air damper is respectively connected to the furnace front arch and the furnace rear arch of the second boiler.

[0080] The air inlet end of the fourth air damper 6 is connected to the pipeline between the third air damper 5 and the high-temperature flue gas fan, and the air outlet end of the fourth air damper 6 is respectively connected to the furnace front arch and the furnace rear arch of the first boiler.

[0081] The third air door damper 5 is used to enter the open state when receiving the cold start instruction sent by the second boiler; and enter the closed state when the second boiler is started.

[0082] The fourth air door damper 6 is used to maintain a closed state until the second boiler is started and then enters an open state.

[0083] It should be noted that, when the third damper plate 5 is opened and the fourth damper plate 6 is closed, the high-temperature flue gas of the first boiler enters the front arch and the rear arch of the furnace of the second boiler to heat the second boiler. When the temperature of the high-temperature flue gas is not enough to continue to increase the temperature in the second boiler, the second boiler is started and continues to heat up using the heat of fuel combustion, and the third damper plate 5 is closed and the fourth damper plate 6 is opened to allow the high-temperature flue gas to be transported to the front arch and the rear arch of the furnace of the first boiler.

[0084] Among them, after the second boiler is started, the beneficial effect of conveying the high-temperature flue gas back to the front arch and rear arch of the furnace of the first boiler is that the high-temperature flue gas can be used as the recycled flue gas of the first boiler to adjust the combustion condition of this boiler.

[0085] In one embodiment, the third damper baffle 5 and the fourth damper baffle 6 may be manually opened damper baffles.

[0086] The flow meter 7 is arranged in the pipeline between the high-temperature flue gas fan 2 and the second boiler. The flow meter 7 is used to detect the flue gas flow of the high-temperature flue gas in the pipeline in real time. When the flue gas flow is less than the flow threshold, the high-temperature flue gas fan 2 is controlled to increase the speed.

[0087] The pressure transmitter 8 is arranged in the pipeline between the high-temperature flue gas fan 2 and the second boiler. The pressure transmitter 8 is used to detect the flue gas pressure of the high-temperature flue gas in the pipeline in real time. When the flue gas pressure is less than the pressure threshold, the high-temperature flue gas fan 2 is controlled to increase the speed.

[0088] The thermocouple 9 is arranged in the pipeline between the high-temperature flue gas fan 2 and the second boiler. The thermocouple 9 is used to detect the flue gas temperature of the high-temperature flue gas in the pipeline in real time and display the flue gas temperature through a display instrument.

[0089] It should be noted that the thermocouple 9 is generally used in conjunction with a display instrument, which displays the flue gas temperature in real time for the staff to check the pipeline condition. When the temperature in the pipeline drops too much in a short period of time, it usually means that there is an air leak somewhere in the pipeline. At this time, the staff is required to turn off the high-temperature flue gas fan 2 and the damper device 1, and suspend the transportation of high-temperature flue gas through the pipeline. The staff will check the pipeline and repair it and then restart it manually.

[0090] It can be understood that the heating system disclosed in the present invention has a simple structure. In addition to the pipeline, the electrical part has only one high-temperature flue gas fan 2, and the thermal instrument part has conventional control and measurement elements such as electric dampers, thermocouples, pressure sensors and flow meters, which are easy to operate.

[0091] Based on the above-mentioned embodiment of the present invention, a heating system for a cold start boiler is disclosed. In this scheme, the high-temperature flue gas of the adjacent furnace is transported to the front arch and the rear arch of the furnace of the start-up furnace to heat the working medium in the water-cooled wall. Compared with the prior art scheme of using the primary hot air generated by fuel, the waste heat of the high-temperature flue gas can be used to reduce fuel consumption, thereby achieving the purpose of reducing the fuel consumption during the startup of the cold start furnace without affecting the economic benefits of the adjacent boilers. In addition, air intakes are arranged on both sides of the economizer flue outlet to prevent excessive deviation of the flue gas temperature on both sides of the boiler. A dust collector is arranged to remove large particles in the flue gas to reduce fan wear. The high-temperature flue gas can be used as recycled flue gas to adjust the combustion conditions.

[0092] like Figure 4 FIG. 1 is a flow chart of a method for heating a cold start boiler disclosed in an embodiment of the present invention. The method is applied to any one of the heating systems for cold start boilers disclosed in the above embodiments of the present invention, and includes the following steps:

[0093] Step S401: using the damper device to receive the cold start instruction sent by the second boiler, and connecting the air inlet end and the air outlet end of the damper device.

[0094] Step S402: using the high-temperature flue gas fan to receive the cold start command sent by the second boiler, entering the start state, and transporting the high-temperature flue gas discharged from the first boiler to the furnace front arch and furnace rear arch of the second boiler to heat the second boiler.

[0095] Step S403: using a temperature sensor to detect the furnace temperature of the second boiler in real time, and sending the furnace temperature to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time.

[0096] It should be noted that the specific implementation process has been described in detail in the heating of the cold start boiler disclosed in the above-mentioned embodiment of the present invention, and reference can be made to each other, and no further description will be given here.

[0097] Based on the above-mentioned embodiment of the present invention, a heating method for a cold start boiler is disclosed. A damper device is used to receive a cold start instruction sent by the second boiler, and the air inlet and air outlet of the damper device are connected; a high-temperature flue gas fan is used to receive a cold start instruction sent by the second boiler, enter a start-up state, and transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler; a temperature sensor is used to detect the furnace temperature of the second boiler in real time, and the furnace temperature is sent to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time. In this solution, the high-temperature flue gas of the adjacent furnace is transported to the front arch and the rear arch of the furnace of the start-up furnace to heat the working medium in the water-cooled wall. Compared with the prior art solution of using the primary hot air generated by fuel, the waste heat of the high-temperature flue gas can be used to reduce fuel consumption, thereby achieving the purpose of reducing fuel consumption during the start-up of the cold start furnace without affecting the economic benefits of the adjacent boiler.

[0098] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can refer to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can refer to the partial description of the method embodiment. The system and system embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without creative work.

[0099] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0100] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A heating system for a cold start boiler, characterized in that: The heating system comprises: a high-temperature flue gas fan, a damper device and a temperature sensor; The air inlet end of the damper device is connected to the economizer flue gas outlet of the first boiler, and the air outlet end of the damper device is connected to the air inlet of the high-temperature flue gas fan; the air outlet of the high-temperature flue gas fan is respectively connected to the furnace front arch and the furnace rear arch of the second boiler; the first boiler and the second boiler are adjacent to each other; the temperature sensor is arranged in the furnace of the second boiler; The damper device is used to connect the air inlet and the air outlet of the damper device when receiving the cold start instruction sent by the second boiler; The high-temperature flue gas fan is used to enter a start state when receiving a cold start instruction sent by the second boiler, and to transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler; The temperature sensor is used to detect the furnace temperature of the second boiler in real time and send the furnace temperature to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time.

2. The system according to claim 1, characterized in that The damper device comprises: a first damper baffle and a second damper baffle; The air inlet end of the first damper plate is connected to one side of the economizer flue gas outlet of the first boiler through a pipeline, and the air inlet end of the second damper plate is connected to the other side of the economizer flue gas outlet of the first boiler through a pipeline; The air outlet end of the first damper plate and the air outlet end of the second damper plate are connected to the air inlet of the high-temperature flue gas fan through a pipeline; The first damper is configured to enter an open state upon receiving a cold start instruction sent by the second boiler; The second air damper is used to enter an open state when receiving a cold start instruction sent by the second boiler.

3. The system according to claim 2, characterized in that The first damper plate is specifically used for: When receiving the cold start instruction sent by the second boiler, gradually increasing the opening of the first air damper until the opening of the first air damper reaches a maximum; Accordingly, the second air door baffle is specifically used for: When the cold start instruction sent by the second boiler is received, the opening of the second air damper is gradually increased until the opening of the second air damper reaches a maximum.

4. The system according to claim 1, characterized in that The system further comprises: a dust collector; The air inlet of the dust collector is connected to the air outlet end of the damper device, and the air outlet of the dust collector is connected to the air inlet of the high-temperature flue gas fan; The dust collector is used to remove dust from the high-temperature flue gas discharged from the first boiler.

5. The system according to claim 1, characterized in that The system further comprises: a third damper plate and a fourth damper plate; The air inlet end of the third damper is connected to the air outlet of the high-temperature flue gas fan, and the air outlet end of the third damper is connected to the front arch and the rear arch of the furnace of the second boiler respectively; The air inlet end of the fourth damper is connected to the pipeline between the third damper and the high-temperature flue gas fan, and the air outlet end of the fourth damper is respectively connected to the furnace front arch and the furnace rear arch of the first boiler; The third damper is used to enter an open state when receiving a cold start instruction sent by the second boiler; and enter a closed state when the second boiler is started; The fourth air damper is used to maintain a closed state until the second boiler is started and then enters an open state.

6. The system according to claim 1, characterized in that The system further comprises: a flow meter; The flow meter is arranged in the pipeline between the high-temperature flue gas blower and the second boiler; The flow meter is used to detect the flue gas flow rate of the high-temperature flue gas in the pipeline in real time. When the flue gas flow rate is less than a flow rate threshold, the high-temperature flue gas fan is controlled to increase its rotation speed.

7. The system according to claim 1, characterized in that The system further comprises: a pressure transmitter; The pressure transmitter is arranged in the pipeline between the high-temperature flue gas blower and the second boiler; The pressure transmitter is used to detect the flue gas pressure of the high-temperature flue gas in the pipeline in real time. When the flue gas pressure is less than the pressure threshold, the high-temperature flue gas fan is controlled to increase the rotation speed.

8. The system according to claim 1, characterized in that The system also includes: a thermocouple; The thermocouple is arranged in the pipeline between the high-temperature flue gas blower and the second boiler; The thermocouple is used to detect the flue gas temperature of the high-temperature flue gas in the pipeline in real time, and display the flue gas temperature through a display instrument.

9. The system according to any one of claims 1 to 8, characterized in that: The high temperature flue gas fan is specifically used for: When receiving the cold start command sent by the second boiler, it enters the start state and gradually increases the fan speed to transport the high-temperature flue gas exhausted by the first boiler to the front arch and rear arch of the furnace of the second boiler to heat the second boiler.

10. A method for heating a cold start boiler, characterized in that: A heating system for a cold start boiler according to any one of claims 1 to 9, wherein the heating method comprises: Using the damper device to receive the cold start instruction sent by the second boiler, and connecting the air inlet and air outlet of the damper device; Using the high-temperature flue gas fan to receive the cold start instruction sent by the second boiler, enter the start state, and transport the high-temperature flue gas discharged from the first boiler to the front arch and the rear arch of the furnace of the second boiler to heat the second boiler; The furnace temperature of the second boiler is detected in real time by using a temperature sensor, and the furnace temperature is sent to the second boiler, so that the second boiler is started when the furnace temperature remains unchanged for a preset time.