Automatic test system for communication high-frequency switching power supply cabinet
By designing an automated high-frequency switching power supply cabinet testing system, the problem of high labor intensity in regular testing and maintenance of high-frequency switching power supply cabinets has been solved, automated testing has been realized, and the reliability and maintenance safety of the equipment have been improved.
Patent Information
- Application Number
- CN202411042040.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-15
AI Technical Summary
In the existing technology, regular testing and maintenance of high-frequency switching power supply cabinets are labor-intensive, resulting in maintenance personnel being unable to complete the testing in time, which may lead to reduced equipment reliability, damage, and safety accidents.
Design an automatic testing system for communication high-frequency switching power supply cabinets, including maintenance-free high-frequency switching power supply cabinets and remote centralized management and control servers. It automatically performs AC switching tests, battery verification discharge tests and ground conduction resistance tests through active test devices. Collect and analyze data, remotely and centrally control the server to perform data analysis and comparison, and display the results to maintenance personnel.
It realizes automated testing of high-frequency switching power supply cabinets, reduces on-site operations by maintenance personnel, improves detection efficiency and safety, and ensures stable power supply for equipment.
Smart Images

Figure CN118777927A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of communication power distribution cabinet testing, and in particular to an automatic testing system for a communication high-frequency switch power supply cabinet. Background Art
[0002] High-frequency switching power supply cabinet is a kind of communication power supply equipment. It is a power supply equipment that can convert 380V three-phase AC input power into -48V DC power through a rectifier, and has a battery pack as a backup DC power supply. It is suitable for uninterrupted power supply of various equipment in general communication rooms. High-frequency switching power supply is generally composed of cabinet, AC input and switching device, monitoring module, rectifier module, battery input terminal, etc.
[0003] At present, due to the particularity of power supply for communication equipment, high-frequency switching power supply cabinets are required to continuously supply power to communication equipment. In order to ensure the stability of uninterrupted power supply of high-frequency switching power supply cabinets, it is necessary to regularly perform AC switching tests, battery verification discharge tests, and grounding resistance tests on high-frequency switching power supply cabinets. Among them, the AC switching test needs to regularly perform disconnection and restoration tests of the two AC inputs in sequence according to the requirements of the communication power supply operation and maintenance regulations; the battery verification discharge test is to ensure the reliability of backup power supply of the high-frequency switching power supply, timely discover potential problems of the battery, and promptly investigate and control the hidden dangers of the battery. It is necessary to regularly perform verification discharge tests on the battery in accordance with the requirements of the communication power supply operation and maintenance regulations; the grounding resistance test is to prevent the high-frequency switching power supply from malfunctioning due to grounding problems and promptly investigate and control the hidden dangers of grounding problems. It is necessary to regularly perform grounding resistance continuity tests on the high-frequency switching power supply in accordance with the requirements of the communication power supply operation and maintenance regulations before the thunderstorm season.
[0004] However, the existing testing and maintenance methods have the following technical problems: when the number of high-frequency switching power supplies to be tested and maintained increases, maintenance personnel cannot complete the AC switching test, battery verification discharge test, and ground conduction resistance test of all high-frequency switching power supplies in a timely and regular manner even if they work intensively, resulting in the reliability of the high-frequency switching power supplies cannot be guaranteed; at the same time, when regularly testing and maintaining a large number of high-frequency switching power supplies in accordance with the requirements of the communication power supply operation and maintenance regulations, maintenance personnel will dismantle wiring and switches on each high-frequency switching power supply. Due to the increased labor intensity, maintenance personnel may also make operational errors or circuit short circuits, which may cause damage to the high-frequency switching power supply and power supply interruption to communication equipment, which in turn may cause power supply accidents or casualties of maintenance personnel. Summary of the invention
[0005] In view of this, it is necessary to provide an automatic testing system for communication high-frequency switching power supply cabinets to solve the technical problems that the reliability of high-frequency switching power supplies cannot be guaranteed, high-frequency switching power supplies are damaged, and maintenance personnel are injured or killed.
[0006] A communication high-frequency switch power cabinet automatic test system includes a maintenance-free high-frequency switch power cabinet and a remote centralized control server. The maintenance-free high-frequency switch power cabinet includes a dual-channel AC input bus, an AC switching device, a rectifier module, a DC bus, a battery pack, a DC distribution panel cabinet, a grounding resistance conduction device, and an active test device. The active test device is electrically connected to the dual-channel AC input bus, the AC switching device, the rectifier module, the DC bus, the battery pack, the DC distribution device, and the grounding resistance conduction device. The dual-channel AC input bus, the AC switching device, the rectifier module, the DC bus, the battery pack, the DC distribution panel cabinet, and the grounding resistance conduction device are electrically connected in sequence. The remote centralized control server is used to send test task information to the active test device, receive voltage data, current data, internal resistance data, and displacement state value collected by the active test device, and is also used to parse and store the received voltage data, current data, internal resistance data, and displacement state value, compare and judge the voltage data, current data, internal resistance data, and displacement state value after parsing with the preset voltage data, current data, internal resistance data, and displacement state value parameters, and display the judgment result to relevant maintenance personnel; The active testing device is used to receive the test task information sent by the remote centralized control server, and the active testing device executes the test task according to the test task information; The active test device collects the voltage of the dual-channel AC input bus to generate a corresponding first voltage value. The active test device collects the DC 48V voltage and current output by the rectifier module and generates a corresponding second voltage value and a first current value. The active test device collects the overall output 48V voltage and current of the DC bus and generates a corresponding third voltage value and a second current value. The active test device collects the overall voltage and current of the battery pack and generates a corresponding fourth voltage value and a third current value. The active test device collects the total input voltage and current of the DC distribution panel cabinet and generates a corresponding fifth voltage value and a fourth current value. The active test device is also used to collect the voltage of the dual-channel AC input bus on the AC switching device to generate a corresponding sixth voltage value. The active test device collects the voltage output by the AC switching device to generate a corresponding seventh voltage value. The active test device also collects the voltage and internal resistance of the battery pack to generate a corresponding eighth voltage value and a first internal resistance value. The active test device also controls one of the dual-channel input bus to be disconnected to generate a displacement state and generate a corresponding displacement state value. At the same time, the active test device collects the voltage of the dual-channel AC input bus at the input end of the AC switching device to generate a corresponding ninth voltage, and collects the voltage at the output end of the AC switching device to generate a corresponding tenth voltage value. The active test device also collects the total voltage of the battery pack and generates a corresponding eleventh voltage value. The active test device collects the current of the total cable output by the battery pack and generates a corresponding fifth current value. The active test device performs a boost operation on the battery pack according to the set test parameters, so that the total output voltage of the battery pack exceeds the output voltage from the rectifier module to the DC distribution panel cabinet, and the power supply state is changed from the rectifier module supplying power to the DC distribution panel cabinet to the battery pack supplying power to the DC distribution panel cabinet, and the nuclear capacity test is started. The active test device regularly records the voltage, current, and internal resistance of the battery pack during the nuclear capacity test, and generates a corresponding twelfth voltage value, sixth current value, and second internal resistance value. After the nuclear capacity test is completed, the active test device performs a voltage reduction operation on the battery pack to restore the battery pack to its original total output voltage. The active testing device is electrically connected to the grounding resistance conducting device, and regularly measures the conducting resistance of the maintenance-free high-frequency switching power supply cabinet to generate a corresponding third internal resistance value; The active testing device provides the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the sixth voltage value, the seventh voltage value, the eighth voltage value, the ninth voltage value, the tenth voltage value, the eleventh voltage value, and the twelfth voltage value as voltage data to the remote centralized control server, provides the first current value, the second current value, the third current value, the fourth current value, the fifth current value, and the sixth current value as current data to the remote centralized control server, and provides the first internal resistance value, the second internal resistance value, and the third internal resistance value as internal resistance data and displacement state value to the remote centralized control server.
[0007] In the above-mentioned communication high-frequency switch power cabinet automatic test system, the test task information is sent to the active test device through the remote centralized control server. The system overall status acquisition module, AC switching module, battery inspection and capacity module, ground resistance continuity detection module, monitoring and communication module of the active test device can comprehensively test the overall operation of the communication high-frequency switch power cabinet, and collect relevant voltage, current, and displacement state data, which are transmitted to the remote centralized control server through the monitoring and communication module. The remote centralized control server compares the collected voltage, current, and displacement state data with the preset voltage, current, and displacement state parameters, and displays the comparison results. Specifically, the monitoring and communication module receives the test task information sent by the data information receiving and sending module of the remote centralized control server, and the monitoring and communication module controls the system overall status acquisition module, AC switching module, battery inspection and capacity module, and ground resistance continuity detection module to perform the test task according to the test task information. When the first test task information is received, the monitoring and communication module controls the system overall status acquisition module to start the test, and when the second test task information is received, the monitoring and communication module controls the AC switching module to start the test, and when the third test task information is received, the monitoring and communication module controls the AC switching module to start the test. When receiving the test task information, the monitoring and communication module controls the battery inspection and capacity verification module to start testing; when receiving the fourth test task information, the monitoring and communication module controls the grounding resistance continuity detection module to start testing; when receiving the fifth test task information, the system overall status acquisition module, the AC switching module, the battery inspection and capacity verification module, and the grounding resistance continuity detection module start testing in sequence; the system overall status acquisition module collects the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the eighth voltage value, the first current value, the second current value, the third current value, the fourth current value, and the first internal resistance value. , the AC switching module collects the sixth voltage value, the seventh voltage value, the ninth voltage value, the tenth voltage value and the displacement state value; the battery inspection and capacity verification module collects and receives the tenth voltage value, the eleventh voltage value, the twelfth voltage value, the fifth current value, the sixth current value, and the second internal resistance value; the grounding resistance continuity detection module collects the third internal resistance value, and the monitoring and communication module integrates and identifies the voltage data, current data, internal resistance data, and displacement state value collected by the system overall status acquisition module, the AC switching module, the battery inspection and capacity verification module, and the grounding resistance continuity detection module, and transmits them in a unified package to the remote centralized control server;The remote centralized control server compares the collected voltage, current, and displacement state data with the preset voltage, current, and displacement state parameters, and displays the comparison results. The relevant maintenance personnel do not need to go to the maintenance site. The communication high-frequency switch power supply cabinet automatic test system can automatically complete the AC switching test, battery verification discharge test, and grounding resistance test, which improves the safety of the test. The relevant maintenance personnel can understand the voltage data, current data, internal resistance data, and displacement state value of the maintenance-free high-frequency switch power supply cabinet on the remote centralized control server, and promptly handle the fault hidden dangers according to the judgment results of the remote centralized control server to ensure that the maintenance-free high-frequency switch power supply cabinet can provide stable and continuous power supply. ; BRIEF DESCRIPTION OF THE DRAWINGS
[0008] FIG1 is a functional module diagram of a communication high-frequency switch power supply cabinet automatic testing system according to a preferred embodiment.
[0009] Attached Figure 2 It is the overall schematic diagram of the maintenance-free high-frequency switching power supply cabinet.
[0010] Attached Figure 3 Yes Figure 1 Working status diagram of the system overall status acquisition module.
[0011] Attached Figure 4 Yes Figure 1 Working status diagram of AC switching module.
[0012] Attached Figure 5 Yes Figure 1 Battery inspection and nuclear capacity module working status diagram.
[0013] Attached Figure 6 Yes Figure 1 Working status diagram of the ground resistance continuity measurement module.
[0014] Attached Figure 7 Yes Figure 1 Schematic diagram of the monitoring and communication module.
[0015] In the figure: maintenance-free high-frequency switch power supply cabinet 1, dual-channel AC input bus 11, AC switching device 12, rectifier module 13, DC bus 14, battery pack 15, DC distribution panel cabinet 16, grounding resistance conduction device 17, active testing device 18, system overall status acquisition module 181, AC switching module 182, battery inspection and capacity verification module 183, grounding resistance conduction detection module 184, monitoring and communication module 185, AC power supply input acquisition unit 1811, rectifier output acquisition unit 1812, DC output bus acquisition unit 1813, battery pack backup power supply acquisition unit 1814, load DC input bus acquisition unit 1815, upper side dual-channel AC power supply input acquisition unit 1821, AC input contactor control unit 1822, AC bus acquisition unit 1823, common AC input bus 111, spare AC input bus 112, common circuit breaker 113, spare circuit breaker 11 4. Common line contactor 121, standby line contactor 122, ATS AC switching device 123, AC bus 124, core capacity unit 1831, single cell inspection unit 1832, DC / DC core capacity and charging group 18311, normally closed contact 18312, normally open contact 18313, on-resistance acquisition unit 1841, on-resistance measuring instrument 171, high-frequency switch high-frequency switch power supply cabinet grounding bus 172, DC distribution panel cabinet grounding bus 173, room potential grounding point 174, system overall status receiving unit 1851, AC switching status data receiving unit 1852, battery status data receiving unit 1853, ground on-resistance data receiving unit 1854, data recording unit 1855, data integration unit 1856, communication unit 1857, remote centralized control server 2, data information receiving and sending module 21, analysis and storage module 22, data information judgment module 23. DETAILED DESCRIPTION
[0016] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0017] like Figure 1-2As shown, a communication high-frequency switch power cabinet automatic test system includes a maintenance-free high-frequency switch power cabinet 1 and a remote centralized control server 2. The maintenance-free high-frequency switch power cabinet 1 includes a dual-channel AC input bus 11, an AC switching device 12, a rectifier module 13, a DC bus 14, a battery pack 15, a DC distribution panel cabinet 16, a grounding resistance conduction device 17, and an active test device 18. The active test device 18 is electrically connected to the dual-channel AC input bus 11, the AC switching device 12, the rectifier module 13, the DC bus 14, the battery pack 15, the DC distribution panel cabinet 16, and the grounding resistance conduction device 17. The dual-channel AC input bus 11, the AC switching device 12, the rectifier module 13, the DC bus 14, the battery pack 15, the DC distribution panel cabinet 16, and the grounding resistance conduction device 17 are electrically connected in sequence; The remote centralized control server 2 is used to send test task information to the active test device 18, receive the voltage data, current data, internal resistance data, and displacement state value collected by the active test device 18, and is also used to parse and store the received voltage data, current data, internal resistance data, and displacement state value, compare and judge the voltage data, current data, internal resistance data, and displacement state value after parsing with the preset voltage data, current data, internal resistance data, and displacement state value parameters, and display the judgment result to the relevant maintenance personnel; The active testing device 18 is used to receive the test task information sent by the remote centralized control server 2, and the active testing device 18 executes the test task according to the test task information; The active test device 18 is used to collect the voltage of the dual-channel AC input bus 11 and generate a corresponding first voltage value. The active test device 18 collects the DC 48V voltage and current output by the rectifier module 13 and generates a corresponding second voltage value and a first current value. The active test device 18 collects the overall output 48V voltage and current of the DC bus 14 and generates a corresponding third voltage value and a second current value. The active test device 18 collects the overall voltage and current of the battery pack 15 and generates a corresponding fourth voltage value and a third current value. The active test device 18 collects the total input voltage and current of the DC distribution panel cabinet 16 and generates a corresponding fifth voltage value and a fourth current value. The active test device 18 is also used to collect the voltage of the dual-way AC input bus 11 on the AC switching device 12 to generate a corresponding sixth voltage value. The active test device 18 collects the voltage output by the AC switching device 12 to generate a corresponding seventh voltage value. The active test device 18 collects the voltage and internal resistance of the battery pack 15 to generate a corresponding eighth voltage value and a first internal resistance value. The active test device 18 also controls one of the dual-way input bus 11 to be disconnected to generate a displacement state and generate a corresponding displacement state value. At the same time, the active test device 18 collects the voltage of the dual-way AC input bus 11 at the input end of the AC switching device 12 to generate a corresponding ninth voltage, and collects the voltage at the output end of the AC switching device 12 to generate a corresponding tenth voltage value. The active test device 18 also collects the total voltage of the battery group 15 and generates a corresponding eleventh voltage value. The active test device 18 collects the current of the total cable output by the battery group 15 and generates a corresponding fifth current value. The active test device 18 performs a boost operation on the battery group 15 according to the set test parameters, so that the total output voltage of the battery group 15 exceeds the output voltage from the rectifier module 13 to the DC distribution panel cabinet 16, and the power supply state is changed from the rectifier module 13 supplying power to the DC distribution panel cabinet 16 to the battery group 15 supplying power to the DC distribution panel cabinet 16, and the nuclear capacity test is started. The active test device 18 regularly records the voltage, current, and internal resistance of the battery group 15 during the nuclear capacity test, and generates a corresponding twelfth voltage value, a sixth current value, and a second internal resistance value. After the nuclear capacity test is completed, the active test device 18 performs a voltage reduction operation on the battery group 15 to restore the battery group 15 to the total output voltage before the nuclear capacity test; The active testing device 18 is electrically connected to the grounding resistance conducting device 17 to regularly measure the conducting resistance of the maintenance-free high-frequency switching power supply cabinet 1 to generate a corresponding third internal resistance value; The active testing device 18 provides the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the sixth voltage value, the seventh voltage value, the eighth voltage value, the ninth voltage value, the tenth voltage value, the eleventh voltage value, and the twelfth voltage value as voltage data to the remote centralized control server 2, and provides the first current value, the second current value, the third current value, the fourth current value, the fifth current value, and the sixth current value as current data to the remote centralized control server 2, and provides the first internal resistance value, the second internal resistance value, and the third internal resistance value as internal resistance data and displacement state value to the remote centralized control server 2.
[0018] The remote centralized control server 2 includes a data information receiving and sending module 21, an analysis and storage module 22, and a data information judgment module 23. The data information receiving and sending module 21 is used to send test task information to the active test device 18. The test task information includes first test task information, second test task information, third test task information, fourth test task information, and fifth test task information. It is also used to receive voltage data, current data, internal resistance data, and displacement state value collected by the active test device 18. The analysis and storage module 22 parses and stores the voltage data, current data, internal resistance data, and displacement state value received by the data information receiving and sending module 21. The data information judgment module 23 compares and judges the voltage data, current data, internal resistance data, and displacement state value after the analysis is completed with the preset voltage data, current data, internal resistance data, and displacement state value parameters, and displays the judgment result to relevant maintenance personnel.
[0019] The active testing device 18 includes a system overall status acquisition module 181, an AC switching module 182, a battery inspection and capacity verification module 183, a ground resistance continuity detection module 184, and a monitoring and communication module 185. The monitoring and communication module 185 is electrically connected to the system overall status acquisition module 181, the AC switching module 182, the battery inspection and capacity verification module 183, and the ground resistance continuity detection module 184; The monitoring and communication module 185 is used to receive the test task information sent by the data information receiving and sending module 21. The monitoring and communication module 185 controls the system overall state acquisition module 181, the AC switching module 182, the battery inspection and capacity verification module 183, and the ground resistance continuity detection module 184 to perform the test task according to the test task information. When the first test task information is received, the monitoring and communication module 185 controls the system overall state acquisition module 181 to start the test; when the second test task information is received, the monitoring and communication module 185 controls the AC switching module 182 to start the test; when the third test task information is received, the monitoring and communication module 185 controls the battery inspection and capacity verification module 184 to start the test; when the fourth test task information is received, the monitoring and communication module 185 controls the ground resistance continuity detection module 184 to start the test; when the fifth test task information is received, the system overall state acquisition module 181, the AC switching module 182, the battery inspection and capacity verification module 183, and the ground resistance continuity detection module 184 start the test in sequence; The system overall status acquisition module 181 is electrically connected to the dual-channel AC input bus 11, collects the voltage of the dual-channel AC input bus, and generates a corresponding first voltage value. The system overall status acquisition module 181 is electrically connected to the rectifier module 13, collects the DC 48V voltage and current output by the rectifier module 13, and generates a corresponding second voltage value and a first current value. The system overall status acquisition module 181 is electrically connected to the DC bus 14, collects the overall output 48V voltage and current of the DC bus 14, and generates a corresponding third voltage value and a second current value. The system overall status acquisition module 181 is electrically connected to the battery pack 15, collects the overall voltage, current, and internal resistance of the battery pack 15, and generates a corresponding fourth voltage value, an eighth voltage value, a third current value, and a first internal resistance value. The system overall status acquisition module 181 is electrically connected to the DC distribution panel cabinet 16, collects the total input voltage and current of the DC distribution panel cabinet 16, and generates a corresponding fifth voltage value and a fourth current value. The AC switching module 182 is electrically connected to the dual-channel AC input bus 11, collects the voltage of the dual-channel AC input bus 11, and generates a corresponding sixth voltage value. The AC switching module 182 is electrically connected to the AC switching device 12, collects the voltage output by the AC switching device 12, and generates a corresponding seventh voltage value. The AC switching module 182 controls one of the AC dual-channel input bus 11 to be disconnected to generate a displacement state, and generates a corresponding displacement state value. At the same time, the AC switching module 182 collects the voltage of the dual-channel AC input bus 11 at the input end of the AC switching device 12, and generates a corresponding ninth voltage. It also collects the voltage at the output end of the AC switching device 12, and generates a corresponding tenth voltage value. The battery inspection and capacity verification module 183 is electrically connected to the battery pack 15, collects the total voltage of the battery pack 15, and generates a corresponding eleventh voltage value. The battery inspection and capacity verification module 183 is electrically connected to the total cable output by the battery pack 15, collects the current of the total cable output by the battery pack 15, and generates a corresponding fifth current value. The battery inspection and capacity verification module 183 performs a voltage-boosting operation on the battery pack 15 according to the set test parameters, so that the total output voltage of the battery pack 15 exceeds the output voltage from the rectifier module 13 to the DC distribution cabinet 16, and the power supply state changes from the rectifier module 13 supplying power to the DC distribution cabinet 16 to the battery pack 15 supplying power to the DC distribution cabinet 16. The capacity verification test starts, and the voltage, current, and internal resistance of the battery pack 15 are recorded regularly during the capacity verification test, and the corresponding twelfth voltage value, sixth current value, and second internal resistance value are generated. After the capacity verification test is completed, the active test device 18 performs a voltage-reducing operation on the battery pack 15 to restore the total output voltage of the battery pack 15 to the value before the capacity verification test. The grounding resistance conduction detection module 184 is electrically connected to the grounding resistance conduction device 17 , and regularly measures the conduction resistance of the maintenance-free high-frequency switch power supply cabinet 1 to generate a corresponding third internal resistance value.
[0020] The monitoring and communication module 185 provides the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the sixth voltage value, the seventh voltage value, the eighth voltage value, the ninth voltage value, the tenth voltage value, the eleventh voltage value, and the twelfth voltage value as voltage data to the remote centralized control server 2, and provides the first current value, the second current value, the third current value, the fourth current value, the fifth current value, and the sixth current value as current data to the remote centralized control server 2, and provides the first internal resistance value, the second internal resistance value, and the third internal resistance value as internal resistance data and a displacement state value to the remote centralized control server 2.
[0021] In order to facilitate understanding of the technical ideas and technical solutions of the present application, the following describes a detailed working embodiment of the automatic test system for the communication high-frequency switch power supply cabinet of the present application: Monitoring and communication module: like Figure 7 As shown, the monitoring and communication module 185 includes a system overall status receiving unit 1851, an AC switching status data receiving unit 1852, a battery status data receiving unit 1853, a grounding resistance data receiving unit 1854, a data recording unit 1855, a data integration unit 1856, and a communication unit 1857; Integration and transmission of voltage data, current data, internal resistance data, and displacement status values The system overall status receiving unit 1851 is electrically connected to the system overall status acquisition module 181, and receives a first voltage value, a second voltage value, a third voltage value, a fourth voltage value, a fifth voltage value, an eighth voltage value, a first current value, a second current value, a third current value, a fourth current value, and a first internal resistance value. The AC switching state data receiving unit 1852 is electrically connected to the AC switching module 182, and receives a sixth voltage value, a seventh voltage value, a ninth voltage value, a tenth voltage value, and a displacement state value. The battery state data receiving unit 1853 is electrically connected to the battery inspection and capacity verification module 183, and receives an eleventh voltage value, a twelfth voltage value, a fifth current value, a sixth current value, and a second internal resistance value. The grounding resistance data receiving unit 1854 is electrically connected to the grounding resistance conduction detection module 184, and receives a third internal resistance value. The data recording unit 1855 stores and records the voltage data, current data, internal resistance data, and displacement state value received by the system overall status receiving unit 1851, the AC switching status data receiving unit 1852, the battery status data receiving unit 1853, and the ground conduction resistance data receiving unit 1854; the data integration unit 1856 sets the site identification and equipment identification to which the voltage data, current data, and internal resistance data belong, as well as the communication data generated after the protocol conversion and docking, and the communication unit 1857 transmits the communication data generated by the integration unit 1856 to the remote centralized control server 2.
[0022] 2. Receive test task information and control test The communication unit 1857 is also used to receive the test task information sent by the data information receiving and sending module 21. The communication unit 1857 controls the system overall state acquisition module 181, the AC switching module 182, the battery inspection and capacity verification module 183, and the ground resistance conduction detection module 184 to perform the test task according to the test task information. When the first test task information is received, the communication unit 1857 controls the system overall state acquisition module 181 to start the test through the system overall state receiving unit 1851. When the second test task information is received, the communication unit 1857 controls the AC switching module 182 to start the test through the AC switching state data receiving unit 1852. When the third test task information is received, the communication unit 1857 controls the AC switching module 182 to start the test through the AC switching state data receiving unit 1852. 857 controls the battery inspection and capacity verification module 183 to start testing through the battery status data receiving unit 1853. When receiving the fourth test task information, the communication unit 1857 controls the ground resistance continuity detection module 184 to start testing through the ground resistance data receiving unit 1854. When receiving the fifth test task information, the communication unit 1857 controls the system overall status acquisition module 181, the AC switching module 182, the battery inspection and capacity verification module 183, and the ground resistance continuity detection module 184 to start testing in sequence through the system overall status receiving unit 1851, the AC switching status data receiving unit 1852, the battery status data receiving unit 1853, and the ground resistance continuity detection module 184.
[0023] 2. System overall status detection: like Figure 3 As shown, the system overall status acquisition module 181 includes an AC power supply input acquisition unit 1811, a rectifier output acquisition unit 1812, a DC output bus acquisition unit 1813, a battery backup power supply acquisition unit 1814, and a load DC input bus acquisition unit 1815; The AC power supply input acquisition unit 1811 is electrically connected to the dual-channel AC input bus 11, collects the voltage of the dual-channel AC input bus 11, and generates a corresponding first voltage value. The rectifier output acquisition unit 1812 is electrically connected to the rectifier module 13, collects the DC 48V voltage and current output by the rectifier module 13, and generates a corresponding second voltage value and a first current value. The DC output bus acquisition unit 1813 is electrically connected to the DC bus 14, collects the overall output 48V voltage and current of the DC bus 14, and generates a corresponding third voltage value and a second current value. The battery pack backup power supply acquisition unit 1814 is electrically connected to the battery pack 15, collects the overall voltage and current of the battery pack 15. The load DC input bus acquisition unit 1815 is electrically connected to the DC distribution panel cabinet 16 to collect the total input voltage and current of the DC distribution panel cabinet 16, and generate the corresponding fifth voltage value and fourth current value. The first voltage value, the second voltage value, the third voltage value, the fourth voltage value, and the fifth voltage value collected by the system overall status acquisition module 181 are used as voltage data, the first current value, the second current value, the third current value, and the fourth current value are used as current data, and the first internal resistance value is used as internal resistance data. The voltage data, current data, and internal resistance data are uploaded to the remote centralized control server 2 via the communication and monitoring module 185.
[0024] 3. AC switching test: like Figure 4 As shown, the AC switching module 182 includes an upper-side dual-channel AC power supply input acquisition unit 1821, an AC input contactor control unit 1822, and an AC bus acquisition unit 1823; The upper-side dual-channel AC power supply input acquisition unit 1821 is electrically connected to the dual-channel AC input bus 11, collects the voltage of the dual-channel AC input bus 11, and generates a corresponding sixth voltage value. The AC bus acquisition unit 1823 is electrically connected to the output end of the AC switching device 12, collects the voltage output by the AC switching device 12, and generates a corresponding seventh voltage value. The AC input contactor control unit 1822 is electrically connected to the AC switching device 12 to control one of the dual-channel input bus 11 to be disconnected, and generates a displacement state value. At the same time, the upper-side dual-channel AC power supply input acquisition unit 1821 collects the voltage of the dual-channel AC input bus 11 at the input end of the AC switching device 12, and generates a corresponding ninth voltage value. The AC bus acquisition unit 1823 collects the voltage at the output end of the AC switching device 12, and generates a corresponding tenth voltage value. The dual-circuit AC input bus 11 includes a normal-circuit AC input bus 111, a standby-circuit AC input bus 112, a normal-circuit circuit breaker 113, and a standby-circuit circuit breaker 114. The normal-circuit AC input bus 111 is electrically connected to the normal-circuit circuit breaker 113, and the standby-circuit AC input bus 112 is electrically connected to the standby-circuit circuit breaker 114. The AC switching device includes a common circuit contactor 121, a standby circuit contactor 122, an ATS AC switching device 123, and an AC bus 124. The AC bus acquisition unit 1823 is electrically connected to the AC bus 124 at the output end of the AC switching device 12, collects the voltage of the AC bus 124 at the output end of the AC switching device, and generates a corresponding tenth voltage value; The common-circuit AC input bus 111, the common-circuit circuit breaker 113, the common-circuit contactor 121, the ATS AC switching device 123, and the AC bus 124 are electrically connected in sequence, and the standby-circuit AC input bus 112, the standby-circuit circuit breaker 114, the standby-circuit contactor 122, the ATS AC switching device 123, and the AC bus 124 are electrically connected in sequence; 1. Test conditions to be met before starting the AC switching test (1) The upper-side dual-channel AC power supply input acquisition unit 1821 acquires the voltage of the dual-channel AC input bus 11 on the AC switching device 12 to generate a corresponding sixth voltage value. The AC bus acquisition unit 1823 acquires the voltage output by the AC switching device 12 to generate a corresponding seventh voltage value. The battery pack backup power supply acquisition unit 1813 acquires the overall voltage and internal resistance of the battery pack 15 and generates a corresponding eighth voltage value and first internal resistance value. The sixth voltage value, the seventh voltage value, the eighth voltage value, and the first internal resistance value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185 to ensure that the dual-channel AC input bus 11, the AC switching device 12, and the battery pack 15 are operating normally during the AC switching test, thereby eliminating interference with the AC switching test. (2) The normal circuit breaker 113 and the standby circuit breaker 114 are both closed, and the two normally open contacts NO of the normal circuit contactor 121 and the standby circuit contactor 122 are both closed, so that the A1 main contact and the A2 main contact of the normal circuit contactor 121 and the standby circuit contactor 122 are both kept energized, so that the current of the normal circuit AC input bus 111 and the standby circuit AC input bus 112 can be transmitted to the ATS AC switching device 123. At the same time, the ATS AC switching device 123 conducts the normal circuit AC input bus 111 and the AC bus 124, and the normal circuit AC input bus 111 supplies power to the AC bus 124; 2. AC switching test working process (1) Test of the ATS AC switching device 123 switching from the normal AC input bus 111 to the standby AC input bus 112: The AC input contactor control unit 1822 controls the normally open contact NO of the normal contactor 121 to be disconnected, thereby disconnecting the A1 main contact and the A2 main contact of the normal contactor 121, so that the current of the normal AC input bus 111 cannot reach the ATS AC switching device 123. The corresponding ATS AC switching device 123 switches from the normal AC input bus 111 to the standby AC input bus 112, and generates an AC power supply displacement state. The AC input contactor control unit 1822 also generates a corresponding displacement state value a. At the same time, the upper-side dual-channel AC power supply input acquisition unit 1821 acquires the voltage of the normal AC input bus 111. , and generates a corresponding ninth voltage value, the AC bus acquisition unit 1823 acquires the voltage of the AC bus 124 at the output end of the AC switching device 12, and generates a corresponding tenth voltage value, the displacement state value a, the ninth voltage value, and the tenth voltage value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185, and the data information judgment module 23 of the remote centralized control server 2 compares the collected displacement state value a, the ninth voltage value, and the tenth voltage value with the preset displacement state and voltage parameters of the ATS AC switching device 123 switching from the common AC input bus 111 to the standby AC input bus 112 under normal working conditions. When the collected displacement state value a, the ninth voltage value, and the tenth voltage value are different from the preset displacement state and voltage parameters, the data information judgment module 23 gives a warning; (2) After the test (1) is completed, the ATS AC switching device 123 is restored from the standby AC input bus 112 to the normal AC input bus 111 test: the AC input contactor control unit 1822 controls the normally open contact NO of the normal contactor 121 to close and restore power supply, so that the A1 main contact and A2 main contact of the normal contactor 121 are energized, so that the current of the normal AC input bus 111 can reach the ATS AC switching device 123, and the corresponding ATS AC switching device 123 is switched from the standby AC input bus 112 to the normal AC input bus 111, and an AC power supply displacement state is generated at the same time. The AC input contactor control unit 1822 also generates a corresponding displacement state value b. At the same time, the upper-side dual-channel AC power supply input acquisition unit 1821 collects the normal AC input The voltage of the bus 111 is collected, and a corresponding ninth voltage value is generated. The AC bus acquisition unit 1823 collects the voltage of the AC bus 124 at the output end of the AC switching device 12, and generates a corresponding tenth voltage value. The displacement state value b, the ninth voltage value, and the tenth voltage value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185. The data information judgment module 23 of the remote centralized control server 2 compares the collected displacement state value b, the ninth voltage value, and the tenth voltage value with the displacement state and voltage parameters of the preset ATS AC switching device 123 switching from the standby AC input bus 112 to the common AC input bus 111 under normal working conditions. When the collected displacement state value b, the ninth voltage value, and the tenth voltage value are different from the preset displacement state and voltage parameters, the data information judgment module 23 gives a warning. (3) After the ATS AC switching device 123 completes the test on the common AC input bus 111: the AC input contactor control unit 1822 controls the normally open contact NO of the common contactor 121 to disconnect the power supply, thereby disconnecting the A1 main contact and A2 main contact of the common contactor 121, so that the current of the common AC input bus 111 cannot reach the ATS AC switching device 123, and the corresponding ATS AC switching device 123 switches from the common AC input bus 111 to the standby AC input bus 111. Then, the AC input contactor control unit 1822 controls the normally open contact NO of the common contactor 121 to close and restore power supply, so that the A1 main contact and the A2 main contact of the common contactor 121 are energized, so that the current of the common AC input bus 111 can reach the ATS AC switching device 123. At this time, the ATS AC switching device 123 conducts the standby AC input bus 112 and the AC bus 124, and the standby AC input bus 112 supplies power to the AC bus 124. (4) After completing (3), the ATS AC switching device 123 starts to switch from the standby AC input bus 112 to the normal AC input bus 111 test: the AC input contactor control unit 1822 controls the standby contactor 122 normally open contact NO to disconnect the power supply, so that the A1 main contact and A2 main contact of the standby contactor 122 are disconnected, so that the current of the standby AC input bus 112 cannot reach the ATS AC switching device 123, and the corresponding ATS AC switching device 123 switches from the standby AC input bus 112 to the normal AC input bus 111, and generates an AC power supply displacement state. The AC input contactor control unit 1822 also generates a corresponding displacement state value c. At the same time, the upper-side dual-channel AC power supply input acquisition unit 1821 acquires the standby AC input bus 111. 2, and generates a corresponding ninth voltage value, the AC bus acquisition unit 1823 acquires the voltage of the AC bus 124 at the output end of the AC switching device 12, and generates a corresponding tenth voltage value, the displacement state value c, the ninth voltage value, and the tenth voltage value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185, and the data information judgment module 23 of the remote centralized control server 2 compares the collected displacement state value c, the ninth voltage value, and the tenth voltage value with the preset displacement state and voltage parameters of the ATS AC switching device 123 switching from the standby AC input bus 112 to the common AC input bus 111 under normal working conditions, and when the collected displacement state value c, the ninth voltage value, and the tenth voltage value are different from the preset displacement state and voltage parameters, the data information judgment module 23 gives a warning; (5) After the test (4) is completed, the ATS AC switching device 123 is started to restore from the normal AC input bus 111 to the standby AC input bus 112: the AC input contactor control unit 1822 controls the normally open contact NO of the standby contactor 122 to close and restore power supply, so that the A1 main contact and A2 main contact of the standby contactor 122 are energized, so that the current of the standby AC input bus 112 can reach the ATS AC switching device 123, and the corresponding ATS AC switching device 123 switches from the standby AC input bus 112 to the normal AC input bus 111, and generates an AC power supply displacement state. The AC input contactor control unit 1822 also generates a corresponding displacement state value d. At the same time, the upper-side dual-channel AC power supply input acquisition unit 1821 acquires the standby AC input bus 112, and generates a corresponding ninth voltage value, the AC bus acquisition unit 1823 acquires the voltage of the AC bus 124 at the output end of the AC switching device 12, and generates a corresponding tenth voltage value, the displacement state value d, the ninth voltage value, and the tenth voltage value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185, and the data information judgment module 23 of the remote centralized control server 2 compares the collected displacement state value d, the ninth voltage value, and the tenth voltage value with the preset displacement state and voltage parameters of the ATS AC switching device 123 switching from the common AC input bus 111 to the standby AC input bus 112 under normal working conditions. When the collected displacement state value d, the ninth voltage value, and the tenth voltage value are different from the preset displacement state and voltage parameters, the data information judgment module 23 gives a warning; 4. Battery inspection and core capacity module test: like Figure 5 As shown, the battery inspection and capacity verification module 183 includes a capacity verification unit 1831 and a single cell inspection unit 1832. The single cell inspection unit 1832 is electrically connected to the battery pack 15, collects the total voltage of the battery pack 15, and generates a corresponding eleventh voltage value; the single cell inspection unit 1832 is electrically connected to the total cable output of the battery pack 15, collects the current of the total cable output of the battery pack 15, and generates a corresponding fifth current value. The capacity verification unit 1831 is electrically connected to the battery pack 15, and performs a voltage boost operation on the battery pack 15 according to the set test parameters, so that the battery pack 15 is The total output voltage of the battery pack 15 exceeds the output voltage from the rectifier module 13 to the DC distribution cabinet 16, and the power supply state is changed from the rectifier module 13 supplying power to the DC distribution cabinet 16 to the battery pack 15 supplying power to the DC distribution cabinet 16, and the nuclear capacity test is started. The single cell inspection unit 1832 regularly records the voltage, current, and internal resistance of the battery pack 15 during the nuclear capacity test, and generates the corresponding twelfth voltage value, sixth current value, and second internal resistance value. After the nuclear capacity test is completed, the nuclear capacity unit 1821 performs a voltage reduction operation on the battery pack to restore the battery pack 15 to the total output voltage before the nuclear capacity test; The core capacity unit 1831 includes a DC / DC core capacity and charging group 18311, a normally closed contact 18312, and a normally open contact 18313. The DC / DC core capacity and charging unit 18311, the normally closed contact 18312, and the normally open contact 18313 are electrically connected in sequence. The single cell inspection unit 1832 is electrically connected to the battery group 15 to collect the total voltage of the battery group 15 and generate a corresponding eleventh voltage value. The single cell inspection unit 1832 is electrically connected to the main cable output by the battery group 15 to collect The current of the total cable output by the battery group 15, and a corresponding fifth current value is generated. The eleventh voltage value and the fifth current value are uploaded to the remote centralized control server 2 via the communication and monitoring module 185. The data information judgment module 23 of the remote centralized control server 2 compares the collected eleventh voltage value and the fifth current value with the preset voltage and current parameters of the battery group 15 under normal working conditions. When the collected eleventh voltage value and the fifth current value are different from the preset voltage value and current value parameters, the data information judgment module Block 23 gives a warning, the single cell inspection unit 1832 is electrically connected to the positive and negative poles of each storage battery, the single cell inspection unit 1832 regularly records the voltage, current, and internal resistance of each storage battery during the nuclear capacity test, and generates the corresponding twelfth voltage value, sixth current value, and second internal resistance value, which are uploaded to the remote centralized control server 2 via the communication and monitoring module 185, and the data information judgment module 23 of the remote centralized control server 2 compares the collected twelfth voltage value, sixth current value, and second internal resistance value with the voltage, current, and internal resistance parameters of each storage battery during the nuclear capacity test under the preset normal working state. When the collected twelfth voltage value, sixth current value, and second internal resistance value are different from the preset voltage, current, and internal resistance parameters, the data information judgment module 23 gives a warning and displays the warned single cell according to the twelfth voltage value, sixth current value, and second internal resistance value of each storage battery, and the maintenance personnel can carry out targeted maintenance according to the judgment result of the remote centralized control server 2; 1. Battery inspection and core capacity module testing process (1) When the battery inspection and the core capacity module 183 are not tested: the rectifier module 13 supplies power to the DC distribution panel cabinet 16, and at the same time charges the battery group 15 with a small current float charge, the normally closed contact 18312 of the core capacity unit 1831 is closed, and the normally open contact 18313 is disconnected. At this time, the core capacity unit 1831 is in an offline state and does not hinder the normal operation of the maintenance-free high-frequency switching power supply cabinet 1; (2) When the battery inspection and core capacity module 183 are tested: first, the normally closed contact 18312 of the core capacity unit 1831 is disconnected and the normally open contact 18313 is closed. At this time, the circuit between the rectifier module 13 and the battery pack 15 is disconnected, and the rectifier module 13 cannot charge the battery pack 15. The DC / DC core capacity and charging group 18311 of the core capacity unit 1831 increase the total output voltage of the battery pack 15, so that the total output voltage of the battery pack 15 exceeds the output voltage of the rectifier module 13. At this time, the power supply state changes from the rectifier module 13 supplying power to the DC distribution cabinet 16 and charging the battery pack 15 with a small current, to the battery pack 15 supplying power to the DC distribution cabinet 16 load. At the same time, the single cell inspection unit 1831 regularly records the voltage, current, and internal resistance of each battery pack 15 during the core capacity test, and generates the corresponding twelfth voltage value, sixth current value, and second internal resistance value; (3) Battery inspection and core capacity module 183 test stop: According to the core capacity test parameters pre-set in the core capacity unit 1831, for example: the automatic stop condition is the time reaches 8 hours or the capacity reaches 8 hours × 15A = 120Ah capacity. When the automatic stop condition is reached, the DC / DC core capacity and charging group 18311 of the core capacity unit 1831 adjust the voltage of the battery group 15. When the voltage of the battery group 15 is adjusted to the same as the output voltage value of the rectifier module 13, the normally closed contact 18312 of the core capacity unit 1831 is closed and the normally open contact 18313 is disconnected. At this time, the circuit between the rectifier module 13 and the battery group 15 is turned on, and the rectifier module 13 resumes floating charging of the battery group 15 with a small current. The overall system state is restored to the state before the battery inspection and core capacity module 183 test.
[0025] 5. Ground resistance continuity detection: like Figure 6 As shown, the grounding resistance conduction detection module 184 includes a conduction resistance acquisition unit 1841, which is electrically connected to the grounding resistance conduction device 17, and regularly measures the conduction resistance of the maintenance-free high-frequency switch power supply cabinet 1 to generate a corresponding third internal resistance value; The grounding resistance conduction device 17 includes a conduction resistance measuring instrument 171, a grounding busbar 172 in a high-frequency switch power supply cabinet, a grounding busbar 173 in a DC distribution panel cabinet, and a potential grounding point 174 in a machine room. The conduction resistance measuring instrument 171 is electrically connected to the grounding busbar 172 in a high-frequency switch power supply cabinet, the grounding busbar 173 in a DC distribution panel cabinet, and the potential grounding point 174 in a machine room. The on-resistance acquisition unit 1841 is electrically connected to the on-resistance measuring instrument 171, and regularly measures the on-resistance of the grounding bus 172 in the high-frequency switch high-frequency switch power supply cabinet, the grounding bus 173 in the DC distribution panel cabinet, and the computer room potential grounding point 174 to generate a corresponding third internal resistance value. The third internal resistance value is uploaded to the remote centralized control server 2 via the communication and monitoring module 185. The data information judgment module 23 of the remote centralized control server 2 compares the collected third internal resistance value with the overall internal resistance parameter of the maintenance-free high-frequency switch power supply cabinet 1 under the preset normal working state. When the collected third internal resistance value is different from the overall grounding on-resistance parameter of the maintenance-free high-frequency switch power supply cabinet 1 under the preset normal working state, the data information judgment module 23 gives a warning.
[0026] 6. Remote centralized control server: like Figure 1 As shown, the remote centralized control server 2 includes a data information receiving and sending module 21, a parsing and storage module 22, and a data information judgment module 23. The data information receiving and sending module 21 is used to send test task information to the active test device 18, and the test task information includes first test task information, second test task information, third test task information, fourth test task information, and fifth test task information. It is also used to receive voltage data, current data, internal resistance data, and displacement state value collected by the active test device 18; The analysis and storage module 22 analyzes and stores the voltage data, current data, internal resistance data, and displacement state value received by the data information receiving and sending module 21, and analyzes the first voltage value and the sixth voltage value as the test value of the dual-channel AC input bus 11, the second voltage value and the first current value as the test value of the rectifier module 13, the third voltage value and the second current value as the test value of the DC bus 14, the fourth voltage value, the eighth voltage value, the third current value, and the first internal resistance value as the test value of the battery pack 15, the fifth voltage value and the fourth current value as the test value of the DC distribution panel cabinet 16, the displacement state value, the seventh voltage value, the ninth voltage value, and the tenth voltage value as the test value of the AC switching device 12, the eleventh voltage value, the twelfth voltage value, the fifth current value, the sixth current value, and the second internal resistance value as the test value of the core capacity of the battery pack 15, and the third internal resistance value as the test value of the grounding resistance conduction device 17; The data information judgment module 23 compares and judges the test values of the dual-channel AC input bus 11, the rectifier module 13, the DC bus 14, the battery pack 15, the DC distribution cabinet 16, the AC switching device 12, the battery pack 15 core capacity test value, and the grounding resistance conduction device 17 after the analysis is completed with the preset voltage, current, internal resistance, and displacement state value parameters, and issues an alarm for the test values of the dual-channel AC input bus 11, the rectifier module 13, the DC bus 14, the battery pack 15, the DC distribution cabinet 16, the AC switching device 12, the battery pack 15 core capacity test value, and the grounding resistance conduction device 17 that are different from the preset voltage, current, internal resistance, and displacement state value parameters, and displays the relevant alarm test values to the maintenance personnel.
[0027] Relevant maintenance personnel do not need to go to the maintenance site, and do not need a large number of maintenance personnel. The communication high-frequency switch power supply cabinet automatic test system can automatically complete the system overall status detection, AC switching test, battery verification discharge test, and ground conduction resistance test of the maintenance-free high-frequency switch power supply cabinet 1, which improves the efficiency and convenience of detection and ensures the safety of maintenance personnel. Relevant maintenance personnel can understand the voltage data, current data, internal resistance data, and displacement state value of the maintenance-free high-frequency switch power supply cabinet 1 on the remote centralized control server 2, and deal with fault hazards in a timely and targeted manner according to the analysis and judgment results of the remote centralized control server 2, to ensure that the maintenance-free high-frequency switch power supply cabinet 1 can provide stable and continuous power supply.
Claims
1. A communication high-frequency switch power cabinet automatic test system, characterized in that: It includes a maintenance-free high-frequency switch power supply cabinet and a remote centralized control server. The maintenance-free high-frequency switch power supply cabinet includes a dual-channel AC input bus, an AC switching device, a rectifier module, a DC bus, a battery pack, a DC distribution panel cabinet, a grounding resistance conduction device, and an active test device. The active test device is electrically connected to the dual-channel AC input bus, the AC switching device, the rectifier module, the DC bus, the battery pack, the DC distribution device, and the grounding resistance conduction device. The dual-channel AC input bus, the AC switching device, the rectifier module, the DC bus, the battery pack, the DC distribution panel cabinet, and the grounding resistance conduction device are electrically connected in sequence; The remote centralized control server is used to send test task information to the active test device, receive voltage data, current data, internal resistance data, and displacement state value collected by the active test device, and is also used to parse and store the received voltage data, current data, internal resistance data, and displacement state value, compare and judge the voltage data, current data, internal resistance data, and displacement state value after parsing with the preset voltage data, current data, internal resistance data, and displacement state value parameters, and display the judgment result to relevant maintenance personnel; The active testing device is used to receive the test task information sent by the remote centralized control server, and the active testing device executes the test task according to the test task information; The active test device collects the voltage of the dual-channel AC input bus to generate a corresponding first voltage value. The active test device collects the DC 48V voltage and current output by the rectifier module and generates a corresponding second voltage value and a first current value. The active test device collects the overall output 48V voltage and current of the DC bus and generates a corresponding third voltage value and a second current value. The active test device collects the overall voltage and current of the battery pack and generates a corresponding fourth voltage value and a third current value. The active test device collects the total input voltage and current of the DC distribution panel cabinet and generates a corresponding fifth voltage value and a fourth current value. The active test device is also used to collect the voltage of the dual-channel AC input bus on the AC switching device to generate a corresponding sixth voltage value. The active test device collects the voltage output by the AC switching device to generate a corresponding seventh voltage value. The active test device also collects the voltage and internal resistance of the battery pack to generate a corresponding eighth voltage value and a first internal resistance value. The active test device also controls one of the dual-channel input bus to be disconnected to generate a displacement state and generate a corresponding displacement state value. At the same time, the active test device collects the voltage of the dual-channel AC input bus at the input end of the AC switching device to generate a corresponding ninth voltage, and collects the voltage at the output end of the AC switching device to generate a corresponding tenth voltage value. The active test device also collects the total voltage of the battery pack and generates a corresponding eleventh voltage value. The active test device collects the current of the total cable output by the battery pack and generates a corresponding fifth current value. The active test device performs a boost operation on the battery pack according to the set test parameters, so that the total output voltage of the battery pack exceeds the output voltage from the rectifier module to the DC distribution panel cabinet, and the power supply state is changed from the rectifier module supplying power to the DC distribution panel cabinet to the battery pack supplying power to the DC distribution panel cabinet, and the nuclear capacity test is started. The active test device regularly records the voltage, current, and internal resistance of the battery pack during the nuclear capacity test, and generates a corresponding twelfth voltage value, sixth current value, and second internal resistance value. After the nuclear capacity test is completed, the active test device performs a voltage reduction operation on the battery pack to restore the battery pack to its original total output voltage. The active testing device is electrically connected to the grounding resistance conducting device, and regularly measures the conducting resistance of the maintenance-free high-frequency switching power supply cabinet to generate a corresponding third internal resistance value; The active testing device provides the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the sixth voltage value, the seventh voltage value, the eighth voltage value, the ninth voltage value, the tenth voltage value, the eleventh voltage value, and the twelfth voltage value as voltage data to the remote centralized control server, provides the first current value, the second current value, the third current value, the fourth current value, the fifth current value, and the sixth current value as current data to the remote centralized control server, and provides the first internal resistance value, the second internal resistance value, and the third internal resistance value as internal resistance data and displacement state value to the remote centralized control server.
2. The automatic test system for communication high-frequency switch power supply cabinet according to claim 1 is characterized in that: The remote centralized control server includes a data information receiving and sending module, a parsing and storage module, and a data information judgment module; The data information receiving and sending module is used to send test task information to the active test device, the test task information includes first test task information, second test task information, third test task information, fourth test task information, and fifth test task information, and is also used to receive voltage data, current data, internal resistance data, and displacement state value collected by the active test device; The analysis and storage module analyzes and stores the voltage data, current data, internal resistance data, and displacement state value received by the data information receiving and sending module; The data information judgment module compares and judges the voltage data, current data, internal resistance data, and displacement state value after the analysis with the preset voltage data, current data, internal resistance data, and displacement state value parameters, and displays the judgment results to relevant maintenance personnel.
3. The automatic test system for communication high-frequency switch power supply cabinet according to claim 2 is characterized in that: The active test device includes a system overall status acquisition module, an AC switching module, a battery inspection and capacity verification module, a ground resistance continuity detection module, and a monitoring and communication module. The monitoring and communication module is electrically connected to the system overall status acquisition module, the AC switching module, the battery inspection and capacity verification module, and the ground resistance continuity detection module; The monitoring and communication module is used to receive the test task information sent by the data information receiving and sending module. The monitoring and communication module controls the system overall status acquisition module, the AC switching module, the battery inspection and capacity verification module, and the ground resistance continuity detection module to perform the test task according to the test task information. When the first test task information is received, the monitoring and communication module controls the system overall status acquisition module to start the test; when the second test task information is received, the monitoring and communication module controls the AC switching module to start the test; when the third test task information is received, the monitoring and communication module controls the battery inspection and capacity verification module to start the test; when the fourth test task information is received, the monitoring and communication module controls the ground resistance continuity detection module to start the test; when the fifth test task information is received, the system overall status acquisition module, the AC switching module, the battery inspection and capacity verification module, and the ground resistance continuity detection module start the test in sequence; The system overall status acquisition module is electrically connected to the dual-channel AC input bus, collects the voltage of the dual-channel AC input bus, and generates a corresponding first voltage value. The system overall status acquisition module is electrically connected to the rectifier module, collects the DC 48V voltage and current output by the rectifier module, and generates a corresponding second voltage value and a first current value. The system overall status acquisition module is electrically connected to the DC bus, collects the overall output 48V voltage and current of the DC bus, and generates a corresponding third voltage value and a second current value. The system overall status acquisition module is electrically connected to the battery pack, collects the overall voltage, current, and internal resistance of the battery pack, and generates a corresponding fourth voltage value, an eighth voltage value, a third current value, and a first internal resistance value. The system overall status acquisition module is electrically connected to the DC distribution panel cabinet, collects the total input voltage and current of the DC distribution panel cabinet, and generates a corresponding fifth voltage value and a fourth current value. The AC switching module is electrically connected to the dual-channel AC input bus, collects the voltage of the dual-channel AC input bus, and generates a corresponding sixth voltage value. The AC switching module is electrically connected to the AC switching device, collects the voltage output by the AC switching device, and generates a corresponding seventh voltage value. The AC switching module controls one of the dual-channel AC input bus to be disconnected to generate a displacement state, and generates a corresponding displacement state value. At the same time, the AC switching module collects the voltage of the dual-channel AC input bus at the input end of the AC switching device, and generates a corresponding ninth voltage. The AC switching module also collects the voltage at the output end of the AC switching device, and generates a corresponding tenth voltage value. The battery inspection and capacity core module is electrically connected to the battery pack, collects the total voltage of the battery pack, and generates a corresponding eleventh voltage value. The battery inspection and capacity core module is electrically connected to the total cable output by the battery pack, collects the current of the total cable output by the battery pack, and generates a corresponding fifth current value. The battery inspection and capacity core module performs a voltage-boosting operation on the battery pack according to the set test parameters, so that the total output voltage of the battery pack exceeds the output voltage from the rectifier module to the DC distribution panel cabinet, and the power supply state changes from the rectifier module supplying power to the DC distribution panel cabinet to the battery pack supplying power to the DC distribution panel cabinet, and the capacity core test is started, and the voltage, current, and internal resistance of the battery pack during the capacity core test are regularly recorded, and the corresponding twelfth voltage value, sixth current value, and second internal resistance value are generated. After the capacity core test is completed, the active test device performs a voltage-reducing operation on the battery pack to restore the total output voltage of the battery pack to that before the capacity core test; The grounding resistance conduction detection module is electrically connected to the grounding resistance conduction device, and regularly measures the conduction resistance of the maintenance-free high-frequency switch power supply cabinet to generate a corresponding third internal resistance value; The monitoring and communication module provides the first voltage value, the second voltage value, the third voltage value, the fourth voltage value, the fifth voltage value, the sixth voltage value, the seventh voltage value, the eighth voltage value, the ninth voltage value, the tenth voltage value, the eleventh voltage value, and the twelfth voltage value as voltage data to the remote centralized control server, provides the first current value, the second current value, the third current value, the fourth current value, the fifth current value, and the sixth current value as current data to the remote centralized control server, and provides the first internal resistance value, the second internal resistance value, and the third internal resistance value as internal resistance data and displacement state value to the remote centralized control server.
4. The automatic test system for communication high-frequency switch power supply cabinet according to claim 3 is characterized in that: The system overall status acquisition module includes an AC power supply input acquisition unit, a rectifier output acquisition unit, a DC output bus acquisition unit, a battery backup power supply acquisition unit, and a load DC input bus acquisition unit; The AC power supply input acquisition unit is electrically connected to the dual AC input bus, collects the voltage of the dual AC input bus, and generates a corresponding first voltage value. The rectifier output acquisition unit is electrically connected to the rectifier module, collects the DC 48V voltage and current output by the rectifier module, and generates a corresponding second voltage value and a first current value. The DC output bus acquisition unit 1813 is electrically connected to the DC bus, collects the overall output 48V voltage and current of the DC bus, and generates a corresponding third voltage value and a second current value. The battery pack backup power supply acquisition unit is electrically connected to the battery pack, collects the overall voltage, current, and internal resistance of the battery pack, and generates a corresponding fourth voltage value, an eighth voltage value, a third current value, and a first internal resistance value; the load DC input bus acquisition unit is electrically connected to the DC distribution panel cabinet, collects the total input voltage and current of the DC distribution panel cabinet, and generates a corresponding fifth voltage value and a fourth current value.
5. The automatic test system for communication high-frequency switch power supply cabinet according to claim 3 is characterized in that: The AC switching module includes an upper-side dual-channel AC power supply input acquisition unit, an AC input contactor control unit, and an AC bus acquisition unit; The upper-level dual-channel AC power supply input acquisition unit is electrically connected to the dual-channel AC input bus, collects the voltage of the dual-channel AC input bus, and generates a corresponding sixth voltage value. The AC bus acquisition unit is electrically connected to the output end of the AC switching device, collects the voltage output by the AC switching device, and generates a corresponding seventh voltage value. The AC input contactor control unit is electrically connected to the AC switching device to control one of the dual-channel input bus to be disconnected, and generates a displacement state value. At the same time, the upper-level dual-channel AC power supply input acquisition unit collects the voltage of the dual-channel AC input bus at the input end of the AC switching device to generate a corresponding ninth voltage value. The AC bus acquisition unit collects the voltage at the output end of the AC switching device and generates a corresponding tenth voltage value.
6. The automatic test system for communication high-frequency switch power supply cabinet according to claim 3 is characterized in that: The battery inspection and capacity verification module includes a single cell inspection unit and a capacity verification unit. The single cell inspection unit is electrically connected to the battery pack, collects the total voltage of the battery pack, and generates a corresponding eleventh voltage value. The single cell inspection unit is electrically connected to the total cable output by the battery group, collects the current of the total cable output by the battery group, and generates a corresponding fifth current value. The core capacity unit is electrically connected to the battery group and, according to the set test parameters, performs a boost operation on the battery group so that the total output voltage of the battery group exceeds the output voltage from the rectifier module to the DC distribution panel cabinet, and the power supply state is changed from the rectifier module supplying power to the DC distribution panel cabinet to the battery group supplying power to the DC distribution panel cabinet, and the core capacity test is started. The single cell inspection unit periodically records the voltage, current, and internal resistance of the battery group during the core capacity test, and generates a corresponding twelfth voltage value, sixth current value, and second internal resistance value. After the core capacity test is completed, the core capacity unit performs a voltage reduction operation on the battery group to restore the total output voltage of the battery group to the value before the core capacity test.
7. The automatic test system for communication high-frequency switch power supply cabinet according to claim 3 is characterized in that: The grounding resistance conduction detection module includes a conduction resistance acquisition unit, which is electrically connected to the grounding resistance conduction device, and regularly measures the conduction resistance of the maintenance-free high-frequency switching power supply cabinet to generate a corresponding third internal resistance value.
8. The automatic testing system for communication high-frequency switch power supply cabinet according to claim 3 is characterized in that: The monitoring and communication module includes a system overall status receiving unit, an AC switching status data receiving unit, a battery status data receiving unit, a grounding resistance data receiving unit, a data recording unit, a data integration unit, and a communication unit; The system overall status receiving unit is electrically connected to the system overall status acquisition module, and receives a first voltage value, a second voltage value, a third voltage value, a fourth voltage value, a fifth voltage value, an eighth voltage value, a first current value, a second current value, a third current value, a fourth current value, and a first internal resistance value. The AC switching state data receiving unit is electrically connected to the AC switching module, and receives a sixth voltage value, a seventh voltage value, a ninth voltage value, a tenth voltage value, and a displacement state value. The battery state data receiving unit is electrically connected to the battery inspection and capacity verification module, and receives an eleventh voltage value, a twelfth voltage value, a fifth current value, a sixth current value, and a second internal resistance value. The grounding resistance data receiving unit is electrically connected to the grounding resistance conduction detection module, and receives a third internal resistance value. The data recording unit stores and records the voltage data, current data, internal resistance data, and displacement state value received by the system overall state receiving unit, the AC switching state data receiving unit, the battery state data receiving unit, and the grounding resistance data receiving unit. The data integration unit sets the site identification and device identification of the voltage data, current data, and internal resistance data, as well as the protocol conversion docking. The communication unit transmits the communication data generated by the integration unit to the remote centralized control server, and is also used to receive the test task information sent by the data information receiving and sending module. The communication unit controls the system overall state acquisition module, the AC switching module, the battery inspection and capacity verification module, and the ground resistance continuity detection module to perform the test task according to the test task information. When the first test task information is received, the communication unit controls the system overall state acquisition module through the system overall state receiving unit to start the test; when the second test task information is received, the communication unit controls the AC switching module through the AC switching state data receiving unit to start the test; when the third test task information is received, the communication unit controls the battery inspection and capacity verification module through the battery state data receiving unit to start the test; when the fourth test task information is received, the communication unit controls the ground resistance continuity detection module through the ground resistance data receiving unit to start the test; when the fifth test task information is received, the communication unit controls the system overall state acquisition module, the AC switching module, the battery inspection and capacity verification module, and the ground resistance continuity detection module through the system overall state receiving unit, the AC switching state data receiving unit, the battery state data receiving unit, and the ground resistance data receiving unit to start the test in sequence.