Transformer operation state prediction method based on mechanism model and time-space correlation
Through the ROPN modeling and spatio-temporal multi-dimensional prediction system, combined with the analytic hierarchy process and attribute interval identification, the accuracy and redundant information problems of multiple fault prediction of transformers in the existing technology are solved, and the comprehensive, accurate and real-time operation status of the transformer is achieved. monitor.
Patent Information
- Application Number
- CN202410809690.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-15
AI Technical Summary
Existing transformer operating status prediction methods are difficult to provide accurate prediction results in the case of multiple faults, and have redundant information and weak applicability, making it impossible to achieve comprehensive analysis of the transformer operating status.
Resource-oriented advanced Petri net modeling technology (ROPN) is used for system engineering modeling, a spatio-temporal multi-dimensional comprehensive prediction system is constructed, dynamic weights are calculated through the analytic hierarchy process, and attribute interval identification is used to predict the operating status of the transformer.
It achieves comprehensive, fine-grained mechanism modeling of the operating status of the transformer, improves the accuracy and real-time performance of the prediction, can accurately identify the health status of the transformer, and improves the safe and stable operation of power transmission and transformation equipment.
Smart Images

Figure CN118779771A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of transformer operating state prediction methods, and in particular to a transformer operating state prediction method based on a mechanism model and time-space correlation. Background Art
[0002] The reliability of transformer operation directly determines whether the power grid can operate safely and smoothly. The transformer is always under the influence of many stresses during operation, and its structural performance will gradually age with the continuous action of harsh conditions. It is necessary to ensure the safety and reliability of transformer operation to avoid deterioration of the operating status. In addition, with the widespread application of power big data, a large amount of multidimensional, information-based, and real-time power business data has been integrated into the power system. How to deeply explore the value of data resources of various types and dimensions and make real-time dynamic and comprehensive predictions of the transformer operating status is an important research direction in the state prediction of power transmission and transformation equipment under the current background of big data technology, and it is also a technical problem that power grid companies urgently need to solve.
[0003] At present, the main status and problems of transformer operation status prediction methods at home and abroad are summarized as follows:
[0004] 1) The transformer operation state prediction method based on the BiLSTM and KELM combined model combines the technology of neural network and extreme learning machine to realize the prediction of the future operation state of the transformer. The change trend of dissolved gas in transformer oil is successfully predicted through neural network, and the extreme learning machine is used to judge the future operation state. However, this method is only suitable for analyzing single faults, but in actual situations, the co-occurrence of multiple faults is more common, and the accuracy of this state prediction method is not high.
[0005] 2) The transformer health status prediction method based on situation quantity integrates the time dimension change relationship of transformer state quantity, the correlation relationship between state quantities, the mapping relationship between state quantity and actual operating state, the fuzzy relationship between actual operating state and evaluation results, and the relationship between state quantity and evaluation results in traditional guidelines, realizing the unification of time dimension change law, correlation relationship, diagnosis law, fuzzy relationship and expert experience. However, there are many state quantities used in transformer situation quantity at present, and there may be redundant information. It is necessary to conduct a deeper study on the information of each dimension, and it is necessary to use an appropriate dimensionality reduction method to simplify the state quantity space.
[0006] 3) Transformer fault state prediction method based on oil chromatography data, by introducing the TOPSIS method into transformer state diagnosis, taking some typical fault data as reference, taking the three ratios of normal state as positive ideal solution, and the three ratios of fault state as negative ideal solution, calculating the degree of closeness to the negative ideal solution, and finally analyzing the relationship between the fault state and the oil chromatography gas. However, this algorithm is based on the three ratio method, and cannot diagnose fault types outside the coding table, and has a great impact on the fault degree diagnosis of the transformer when multiple faults occur at the same time.
[0007] At present, the main problem of transformer operating status prediction is that most methods can only predict a single state abnormality and have weak applicability to complex and diverse transformer data. When multiple operating state abnormalities occur, it is difficult to give accurate prediction results and it is impossible to achieve a comprehensive analysis of the transformer operating state process.
[0008] Therefore, it is necessary to provide a transformer operation status prediction method based on mechanism model and time-space association to solve the above technical problems. By adopting the ROPN (resource-oriented advanced Petri net modeling technology) system engineering modeling method to conduct all-round and fine-grained mechanism modeling of the transformer operation status process, quantitative indicators are established for the time and space change characteristics of the data, and a multi-dimensional prediction system considering time and space factors is constructed. Summary of the invention
[0009] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0010] In order to solve the above technical problems, the present invention provides the following technical solutions: a transformer operation state prediction method based on a mechanism model and time-space correlation, characterized in that it includes:
[0011] The ROPN (resource-oriented advanced Petri net modeling technology) system engineering modeling method is used to carry out all-round and fine-grained mechanism modeling of the transformer operation state process, which is used to describe the changes in the operation state and behavior of the transformer. Then, by constructing a spatiotemporal multi-dimensional comprehensive prediction system, the influence of monitoring indicators at different stages on the transformer is considered, and a dynamic weight allocation method based on the dual influence of time distance and external space is proposed. The hierarchical analysis method is used to calculate the indicator weights, and the attribute interval recognition is used to predict the operation state of the transformer.
[0012] As a preferred solution of the transformer operation state prediction method based on mechanism model and time-space association described in the present invention, the adopted mechanism modeling includes: proposing a system engineering modeling technology ROPN of advanced Petri net, realizing the prediction of complex operation state of transformer by establishing a compact model, constructing mathematical formulas of mechanism models of various functional links of substation transformer under different states according to the internal mechanism and law of transformer production process and working principle, reflecting the change of transformer state through strict mathematical expression, thereby accurately realizing transformer operation state trend and fault prediction diagnosis analysis.
[0013] As a preferred solution of the transformer operating state prediction method based on the mechanism model and time-space correlation described in the present invention, the time-space multi-dimensional comprehensive prediction system refers to: selecting key data that can intuitively reflect the operating state of the transformer, integrating multiple types of monitoring data indicators such as characteristic tests and insulation tests in the time dimension, test data indicators and appearance monitoring, operating condition monitoring, and spatial dimension indicators such as the external environmental parameters of the transformer and changes in the internal structure, to construct a time-space multi-dimensional comprehensive prediction indicator system for transformer state evaluation.
[0014] As a preferred scheme of the transformer operating state prediction method based on mechanism model and time-space association described in the present invention, the dynamic weight allocation method based on the dual influence of time distance and external space, using hierarchical analysis method to calculate indicator weights means: different prediction indicators have different degrees of influence on the transformer operating state, and it is necessary to calculate the weights of indicators at each level according to the established transformer time-space multi-dimensional comprehensive prediction system, including dimensional layer weights and indicator layer weights, and then dynamically correct the prediction indicator weights considering the data time distance and external environmental influences.
[0015] As a preferred solution of the transformer operation state prediction method based on the mechanism model and spatiotemporal association described in the present invention, the transformer operation state prediction using attribute interval recognition means: after obtaining the weights of each prediction index, attribute interval recognition is performed, and the prediction problem is converted into the calculation of the attribute measurement value of the prediction index with a certain type of attribute. Based on the spatiotemporal multi-dimensional comprehensive prediction system of the present invention, the attribute measurement space (transformer operation state) can be divided into normal, warning,
[0016] Abnormal, severe abnormality level 4.
[0017] As a preferred solution of the transformer operating state prediction method based on the mechanism model and spatiotemporal association described in the present invention, the hierarchical analysis method includes: comparing the importance of each indicator at the same level with respect to an indicator at the previous level in pairs, using a 1-9 ratio scaling method to determine the pairwise comparison judgment matrix, and performing a consistency test to determine whether the calculated prediction indicator weights can ensure the accuracy of the decision.
[0018] As a preferred solution of the transformer operating state prediction method based on mechanism model and spatiotemporal association described in the present invention, the attribute interval identification refers to: performing the final attribute identification of the transformer operating state according to the three steps of single-index attribute measurement, multi-index comprehensive attribute measurement, and attribute identification of the attribute interval identification method, so as to predict the quality level of the transformer operating state at a certain moment in the future.
[0019] The beneficial effects of the present invention are as follows: (1) Through the Petri net modeling method, a discrete concurrent system can be well described. At the same time, Petri nets are suitable for describing changes in transformer status and behavior. The operating status prediction is characterized by changes in transformer status and behavior. The change in operating status trend and the generation and propagation of faults are a dynamic process. Therefore, Petri nets can well represent changes in transformer status and behavior.
[0020] (2) Based on prediction indicators such as test data and monitoring data, the present invention innovatively constructs time prediction indicators and space prediction indicators from two dimensions of time and space, and dynamically corrects the weights of indicators based on the temporal distance of the data and the staged influence of the external space according to the temporal and spatial fluctuation characteristics of different prediction data, thereby constructing a more comprehensive, accurate and real-time transformer operation status prediction model.
[0021] (3) The transformer operating status prediction method based on the mechanism model and time-space correlation can accurately and comprehensively identify the operating status of the transformer and improve the real-time monitoring effect of the transformer health status. At the same time, the proposed time-space multi-dimensional comprehensive prediction system also has broad horizontal application value and can be widely used in the construction of prediction indicators for various types of power transmission and transformation equipment, thereby comprehensively improving the safe and stable operation level of power transmission and transformation equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0023] in:
[0024] Figure 1 A transformer mechanism modeling construction flow chart of a transformer operating state prediction method based on a mechanism model and time-space association according to an embodiment of the present invention;
[0025] Figure 2 A schematic diagram of a spatiotemporal multi-dimensional comprehensive prediction system for a transformer operating state prediction method based on a mechanism model and spatiotemporal association according to an embodiment of the present invention. DETAILED DESCRIPTION
[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0028] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0029] Embodiment 1
[0030] Reference Figure 1 The first embodiment of the present invention is a transformer operation state prediction method based on mechanism model and time-space association, including: using ROPN (resource-oriented advanced Petri net modeling technology) system engineering modeling method to conduct all-round and fine-grained mechanism modeling of the transformer operation state process, which is used to describe the operation state and behavior changes of the transformer, and then by building a time-space multi-dimensional comprehensive prediction system, considering the influence of monitoring indicators at different stages on the transformer, a dynamic weight allocation method based on the dual influence of time distance and external space is proposed, and the hierarchical analysis method is used to calculate the indicator weight, and the transformer operation state is predicted by using attribute interval recognition. The adopted mechanism modeling includes: proposing a system engineering modeling technology ROPN of advanced Petri net, realizing the prediction of complex transformer operation state by establishing a compact model, constructing the mathematical formula of the mechanism model of each functional link of the transformer under different states according to the internal mechanism and law of the transformer production process and working principle, and reflecting the transformer state change through strict mathematical expression, so as to accurately realize the transformer operation state trend and fault prediction diagnosis analysis.
[0031] The essence of transformer mechanism modeling is to construct the mathematical expression of the mechanism model of each functional link of the transformer under different states. The mechanism model is an accurate mathematical model established through strict derivation based on the internal mechanism and law of the working principle of each component of the transformer. Its parameters have very clear physical meanings and are easy to adjust. The resulting model has strong adaptability. The construction process of transformer mechanism modeling is as follows: Figure 1As shown, first of all, it is necessary to build a preliminary mechanism model based on the structure of the transformer and the inherent scientific laws it follows. Then, when the transformer is running, with the help of a large amount of input and output data, a suitable optimization algorithm is selected to finally obtain a high-precision mechanism model. The mechanism model can be a mathematical expression or a combination of multiple mathematical expressions. Each mathematical expression represents the operating mechanism of a specific functional link of a component under a certain state, and can preliminarily obtain whether the operating state of the transformer has changed.
[0032] Embodiment 2
[0033] Reference Figure 2 , corresponding to the ROPN modeling of the transformer operation mechanism disclosed in the first embodiment of the present invention, the second embodiment of the present invention also provides a method for constructing a spatiotemporal multi-dimensional comprehensive prediction system, referring to Figure 2 The spatiotemporal multi-dimensional comprehensive prediction system refers to: selecting key data that can intuitively reflect the operating status of the transformer, integrating multiple types of monitoring data indicators such as characteristic tests and insulation tests in the time dimension, test data indicators and appearance monitoring, operating condition monitoring, and spatial dimension indicators such as the external environmental parameters of the transformer and changes in the internal structure, to construct a spatiotemporal multi-dimensional comprehensive prediction indicator system for transformer status assessment.
[0034] After predicting whether the transformer operating state has changed through the mechanism model, it is necessary to further predict the quality of the transformer operating state. The data used for state prediction are generally the transformer's historical test data and multi-channel, multi-type monitoring data. This is the key data that can intuitively predict the transformer's operating state at the time dimension level. In addition to performance indicators such as test data and monitoring data that characterize the change of state over time, the transformer's current external environmental parameters and changes in its internal structure also have an important impact on its operating state. The present invention selects these two types of prediction indicators as key data for predicting the transformer's operating state at the spatial dimension level. The present invention integrates the prediction indicators of the time dimension and the space dimension to construct a multi-dimensional comprehensive prediction system in time and space, such as Figure 2 shown.
[0035] Embodiment 3
[0036] Corresponding to the transformer spatiotemporal multi-dimensional comprehensive prediction system disclosed in the second embodiment of the present invention, the third embodiment of the present invention further provides an indicator weight calculation method based on the hierarchical analysis method, including:
[0037] Different prediction indicators have different influences on the transformer operation status. It is necessary to calculate the weights of indicators at each level, including the dimensional layer weights and the indicator layer weights, based on the established transformer spatiotemporal multi-dimensional comprehensive prediction system. The conventional hierarchical analysis method is used to determine the weights of each prediction indicator. The main steps are as follows:
[0038] 1. Analyze the relationship between various prediction indicators and establish a systematic hierarchical structure.
[0039] 2. Compare the importance of each indicator at the same level with respect to an indicator at the previous level, use the 1-9 ratio scaling method to determine the pairwise comparison judgment matrix, and perform a consistency test.
[0040] The relative weight of the compared index to the index is calculated by the judgment matrix. Taking the judgment matrix a as an example, the root method is used to solve the relative weight vector (a1, a2, ..., a n ) T , calculate the maximum characteristic root of the judgment matrix a, and its mathematical expression formula is as follows:
[0041]
[0042] The mathematical expression formula for consistency check is as follows:
[0043]
[0044] Among them, CI is the consistency index, which is used to measure the consistency of the judgment matrix a. RI is the random consistency index, which is taken as the average value of CI. n is the order of the judgment matrix. When CR is less than 0.1, it indicates that the consistency test passes, that is, the calculated prediction index weight can ensure the accuracy of the decision. When the matrix order is less than 3, it always has completely satisfactory consistency and no consistency check is required.
[0045] Embodiment 4
[0046] Corresponding to the indicator weight calculation method based on the hierarchical analysis method disclosed in the third embodiment of the present invention, the fourth embodiment of the present invention further provides a method for correcting the prediction indicator weight considering the data time distance and the external environment influence, and the method includes:
[0047] In the time dimension prediction index, the real-time performance of the test data is low and it may not reflect the current operating status of the equipment. The accuracy of the prediction is greatly affected by the time interval between the test time and the prediction time. Therefore, the time distance factor is introduced for the weight of the test data to dynamically correct the index weight to reflect the impact of the test time interval on the transformer operating status prediction results. The correction calculation process is as follows:
[0048]
[0049] Where s is the time distance factor, d is the calculation base of the time distance factor, which is 2, t is the number of months from the test time of the test indicator to the current time, α and α * are the initial value and revised value of the test index weight respectively.
[0050] Among the spatial dimension prediction indicators, affected by seasonal factors, in summer and winter, affected by extreme weather, the operating environment of the transformer is more severe. At this time, the external environmental parameter indicators and online monitoring indicators are more important for predicting the operating status of the transformer; in spring and autumn, the transformer is in a good external operating environment, the load bearing and climate pressure are more stable, and the test data indicators and internal structure update indicators are more accurate for predicting the operating status of the transformer. Therefore, the seasonal change factor is introduced to correct the indicator weight to reflect the impact of the external environment on the prediction results of the transformer operating status. The correction calculation process is as follows:
[0051] α * =α Ω
[0052] where α and α * are the initial and revised weights of the external environmental parameter indicators, respectively; Ω is the seasonal variation factor, which is less than 1, and is typically 0.5 in summer and winter.
[0053] Embodiment 5
[0054] Corresponding to the index weight calculation method based on the hierarchical analysis method disclosed in the third embodiment of the present invention, the fifth embodiment of the present invention further provides a transformer operation state prediction method based on attribute interval recognition, the method comprising:
[0055] After obtaining the weight of each prediction indicator, attribute interval identification is performed, and the prediction problem is converted into the calculation of the attribute measurement value of the prediction indicator with a certain type of attribute. It can be divided into three steps: single indicator attribute measurement, multi-indicator comprehensive attribute measurement and attribute identification. Based on the spatiotemporal multi-dimensional comprehensive prediction system of the present invention, the attribute measurement space (transformer operating status) can be divided into 4 levels: normal, warning, abnormal, and severe abnormal.
[0056] The transformer operation status prediction process based on attribute interval recognition is as follows:
[0057] 1. Collect and summarize the required forecast indicator data of various types, calculate and correct the indicator attribute weights at the dimension layer and indicator layer.
[0058] 2. Calculate the comprehensive prediction value of the prediction indicators. The comprehensive prediction value of the time prediction indicators is
[0059]
[0060] The comprehensive prediction value of spatial prediction indicators is
[0061]
[0062] The predicted value of the comprehensive index is
[0063] CS =β T C T +β P C P
[0064] in and To consider the index weights after time-space fluctuation correction, and is the index value, n T and n P and the number of temporal and spatial prediction indicators, β T and β P They are the dimension weight values of time index and space index respectively.
[0065] The final attribute identification of the transformer operating status is carried out according to the three steps of single-index attribute measurement, multi-index comprehensive attribute measurement and attribute identification of the attribute interval identification method, so as to predict the level of the transformer operating status at a certain moment in the future.
[0066] In summary, in order to conduct a comprehensive and fine-grained mechanism modeling of the transformer operation state process, quantitative indicators are established for the temporal and spatial variation characteristics of the data, and a multi-dimensional prediction system considering temporal and spatial factors is constructed. The analytic hierarchy process is used to calculate the dimensional layer weights and indicator layer weights in the system to determine the degree of influence of different prediction indicators on the transformer operation state. Then, the influence of temporal and spatial factors is taken into account, and the time distance factor and seasonal variation factor are introduced to correct the indicator weights. To establish a transformer time-space dimension state prediction model, it is necessary to transform the state prediction problem into a problem of the attribute measurement value of the prediction indicator with a certain type of attribute through attribute interval recognition, so as to build a more comprehensive, accurate and real-time transformer operation state prediction model.
[0067] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0068] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0069] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A transformer operation status prediction method based on a mechanism model and time-space correlation, characterized in that: include: The ROPN system engineering modeling method is used to carry out all-round and fine-grained mechanism modeling of the transformer operation state process to describe the changes in the operation state and behavior of the transformer. Then, by constructing a spatiotemporal multi-dimensional comprehensive prediction system, the influence of monitoring indicators at different stages on the transformer is considered, and a dynamic weight allocation method based on the dual influence of time distance and external space is proposed. The hierarchical analysis method is used to calculate the indicator weights, and the attribute interval recognition is used to predict the transformer operation state.
2. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 1 is characterized in that: Mechanism modeling includes: ROPN, a system engineering modeling technology based on advanced Petri nets, which realizes the prediction of complex operating states of transformers by establishing a compact model. According to the internal mechanisms and laws of the transformer production process and working principles, mathematical formulas of the mechanism models of various functional links of substation transformers under different states are constructed. Mathematical expressions are used to reflect the changes in transformer states, thereby accurately realizing the transformer operating state trend and fault prediction and diagnosis analysis.
3. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 1 is characterized in that: The spatiotemporal multi-dimensional comprehensive prediction system includes: selecting key data that can intuitively reflect the operating status of the transformer, integrating characteristic tests and insulation tests in the time dimension, test data indicators and appearance monitoring, and multiple types of monitoring data indicators for operating condition monitoring, as well as spatial dimension indicators of the transformer's external environmental parameters and internal structure changes, to construct a spatiotemporal multi-dimensional comprehensive prediction indicator system for transformer status assessment.
4. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 1 is characterized in that: The dynamic weight allocation method based on the dual influence of time distance and external space adopts the hierarchical analysis method to calculate the indicator weights, including: different prediction indicators have different influences on the operating status of the transformer, and it is necessary to calculate the weights of indicators at each level according to the established transformer time-space multi-dimensional comprehensive prediction system, including the dimensional layer weights and the indicator layer weights, and then dynamically correct the prediction indicator weights considering the data time distance and the external environment.
5. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 1 is characterized in that: The method of using attribute interval recognition to predict the operating status of the transformer includes: after obtaining the weight of each prediction indicator, performing attribute interval recognition, converting the prediction problem into the calculation of the attribute measurement value of a certain type of attribute of the value of the prediction indicator, and based on the spatiotemporal multi-dimensional comprehensive prediction system of the present invention, the attribute measurement space can be divided into four levels: normal, warning, abnormal, and seriously abnormal.
6. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 4 is characterized in that: The analytic hierarchy process includes: comparing the importance of each indicator at the same level with respect to an indicator at the previous level, using a 1-9 ratio scaling method to determine a pairwise comparison judgment matrix, and performing a consistency test to determine whether the calculated prediction indicator weights can ensure the accuracy of the decision.
7. The transformer operation status prediction method based on mechanism model and time-space correlation according to claim 5 is characterized in that: The attribute interval identification includes: performing final attribute identification of the transformer operating status according to the three steps of single-index attribute measurement, multi-index comprehensive attribute measurement, and attribute identification of the attribute interval identification method, so as to predict the quality level of the transformer operating status at a certain moment in the future.
Citation Information
Patent Citations
Transformer comprehensive reliability evaluation and prediction method based on operation data
CN109031014A
Radar embedded health management system
WO2021218003A1
Cited By
Green construction evaluation method and system
CN119919006A