Drainage basin flood season division method and system, electronic equipment and storage medium

The optimal threshold point is determined through the threshold regression model and self-sampling method, which solves the problem of large errors in the flood season staging of the basin, achieves more accurate and objective flood season staging, and is suitable for areas with discontinuous data.

CN118779841APending Publication Date: 2024-10-15GUIZHOU WUJIANG HYDROPOWER DEV +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410776795.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing technology has the problems of large errors, subjective results, complex calculations, and difficulty in applying to missing and missed areas with discontinuous data in the division of flood season in river basins.

Method used

A threshold regression model is used for data fitting, and the optimal threshold point is determined through iterative rate determination and self-sampling methods to achieve accurate division of the pre- and post-flood seasons.

Benefits of technology

Errors caused by human subjective factors are reduced, and flood season segmentation points can be accurately identified in missing or missed areas, improving the accuracy and widespread applicability of staging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779841A_ABST
    Figure CN118779841A_ABST
Patent Text Reader

Abstract

The invention discloses a watershed flood season division method and system, electronic equipment and a storage medium, and the method comprises the following steps: obtaining watershed data information, carrying out the data preprocessing, and obtaining annual sequence data; fitting the annual sequence data to obtain a threshold regression model; based on the established threshold regression model, performing iteration calibration to obtain a threshold point; on the basis of the step 3, a self-sampling method is adopted to carry out multiple independent fitting on the threshold regression model, and an optimal threshold point is determined; and according to the optimal threshold point obtained in the step 4 and the sequence starting day of the annual sequence data, completing division of the previous flood season and the next flood season. According to the method, errors caused by human subjective factors during flood season division can be reduced, meanwhile, the method can be applied to missing measurement and missing measurement areas with discontinuous data, and the flood season staging process which is smaller in error, more accurate in staging and wider in application is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of reservoir flood season operation management, and specifically relates to a method, system, electronic equipment and storage medium for dividing the flood season into stages in a river basin. Background Art

[0002] Flood season staging has many practical uses in runoff forecasting, floodplain management, and reservoir flood season operation management. Under the premise of ensuring flood control safety, it is very necessary to implement a phased dispatching method to manage the flood season operation of the reservoir, which is very necessary to tap the power generation potential of the reservoir during the flood season. Reasonable determination of flood season staging is not only the basis for phased design of floods and phased flood limit water levels, but also can make full use of local water resources, maximize the use of the reservoir's regulation and storage capacity, and convert floods into usable water resources.

[0003] According to the specification, the methods for dividing the flood season before and after can be divided into two categories: qualitative and quantitative. The qualitative analysis method mainly relies on rich practical experience and subjective judgment and analysis ability to divide the flood season. Its typical representative method is the cause analysis method. The quantitative method can be divided into statistical analysis methods and cluster analysis methods. Commonly used methods include mathematical statistics, vector statistics, and fuzzy set analysis. The cause analysis method is based on the analysis of the hydrology and meteorology of the study basin, but for larger basins, there are often many combinations of disastrous weather, and the workload of stage division is large; statistical methods generally have a strong mathematical and physical background and sufficient theoretical basis, but the calculation process is complex and the amount of calculation is large. In the analysis process, the selection of critical values ​​is subjective, and the results of stage division vary from person to person and vary greatly.

[0004] Based on the above-mentioned defects in the existing technology for basin flood season staging, how to propose a basin flood season staging method with smaller errors and more objective and accurate results is a problem that technical personnel in this field urgently need to solve. Summary of the invention

[0005] The purpose of the present invention is to address the shortcomings of the prior art and provide a method for dividing the flood season into stages in a river basin, which can not only reduce the errors caused by human subjective factors when dividing the flood season, but also be applicable to areas with discontinuous data, where data is missing or missed, to achieve a flood season division process with smaller errors, more accurate division and wider application.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] A method for dividing the flood season of a river basin into stages, characterized by comprising the following steps:

[0008] Step 1: Obtain basin data and perform data preprocessing to obtain annual series data;

[0009] Step 2, fitting the annual series data to obtain the threshold regression model;

[0010] Step 3, based on the established threshold regression model, perform iterative calibration to obtain the threshold point;

[0011] Step 4: Based on step 3, the threshold regression model is independently fitted multiple times using a self-sampling method to determine the optimal threshold point;

[0012] Step 5, based on the optimal threshold point obtained in step 4 and the sequence start date of the annual series data, complete the division of the front and back flood seasons.

[0013] Furthermore, the watershed data obtained in step 1 include:

[0014] Obtain any one of precipitation data, flow data and water level data;

[0015] Among them, the precipitation data are the measured data of the meteorological station, and the flow data and water level data are the measured data of the hydrological station.

[0016] Furthermore, the year series data obtained in step 1 includes:

[0017] The peak values ​​in the basin data of each year are selected. If a peak value appears multiple times on a certain day, the maximum value is taken as the new sequence value. If no peak value appears, the maximum value of that day in the multi-year sequence is taken. In the new sequence, the value and the adjacent values ​​come from different years, thereby constructing annual series data.

[0018] Furthermore, in step 2, the annual series data is fitted using the step threshold effect form, and the specific formula of the threshold regression model is obtained as follows:

[0019]

[0020] In the formula, e is the threshold parameter, x is the predictor variable with threshold effect, and z represents the additional predictor variable; when x>e, I=1; otherwise it is 0.

[0021] Furthermore, step 3 specifically includes:

[0022] Step 301: Perform hypothesis testing on the coefficients related to the threshold covariate, and select the threshold corresponding to the maximum test statistic as the starting value. The calculation formula is:

[0023] LR max =max{Q(e1),…,Q(e M )}

[0024] In the formula, LR max is the maximum value of the likelihood ratio test statistic, Q(ei ) represents the function used to compare the threshold regression model and the candidate change point e i is the likelihood ratio statistic of the conditional null model, i = 1…M, M represents the total candidate change points;

[0025] Step 302: Optimize the threshold value by smoothing algorithm according to the initial value. The calculation formula is:

[0026] [1+exp{b(xe)}] -1 →I(x>e)

[0027] In the formula, a two-parameter logistic function is used to approximate the step function I(x>e), b is a constant, and the threshold point e is iterated based on the initial estimate of the threshold regression model parameters.

[0028] Furthermore, in step 4, the threshold regression model is independently fitted several times using a self-sampling method, and a threshold point is identified for each sampling, and the threshold point selected most frequently in several samplings is regarded as the optimal threshold point.

[0029] Furthermore, the confidence of the optimal threshold point is evaluated by:

[0030] Certainty=e max / n

[0031] In the formula, Certainty represents the confidence of the optimal threshold point, e max It indicates the most selected threshold points, and n indicates the total number of fittings.

[0032] Another object of the present invention is to provide a system for implementing the above-mentioned method for dividing the flood season into stages, characterized in that it comprises:

[0033] The data acquisition and processing module is used to acquire basin data and perform data preprocessing to obtain annual series data;

[0034] Model building module, used to fit the annual series data to obtain the threshold regression model;

[0035] A threshold point iteration module is used to perform iterative calibration based on the established threshold regression model to obtain the threshold point;

[0036] An optimal threshold point acquisition module is used to perform multiple independent fittings on the threshold regression model using a self-sampling method to determine the optimal threshold point;

[0037] The flood season division module is used to complete the division of the previous and later flood seasons based on the optimal threshold point.

[0038] An electronic device includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned method for dividing the flood season of a river basin into stages when executing the computer program.

[0039] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for dividing the flood season into stages.

[0040] Compared with the prior art, the invention has the following beneficial effects: the invention fits the basin sequence data through the threshold regression model in the form of fitting function, identifies the turning point of the data sequence in the form of function fitting to divide the flood season before and after, overcomes the non-uniformity and discontinuity characteristics of the hydrological sequence, can still accurately identify the flood season segmentation point in the areas without measurement or missed measurement, and can determine the best flood season segmentation point through multiple self-sampling processes and evaluate its recognition accuracy;

[0041] The present invention overcomes the defects of the prior art in flood season division, not only eliminating the errors caused by human subjective factors, but also can be used in areas with incomplete data. At the same time, it can determine the best segmentation point and evaluate its accuracy, thereby achieving a flood season division process with smaller errors and more accurate division. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 This is a flow chart of a method for dividing a river basin flood season into stages according to an embodiment of the present invention;

[0043] Figure 2 This is a runoff diagram of the Goupitan Reservoir in the Wujiang River Basin according to an embodiment of the present invention;

[0044] Figure 3 It is a threshold point diagram for identifying a threshold regression model according to an embodiment of the present invention;

[0045] Figure 4 The figure is the distribution and confidence histogram of 100 self-sampling results in the embodiment of the present invention. DETAILED DESCRIPTION

[0046] The technical solutions in the embodiments of the present invention will be described clearly and completely below in combination with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0048] The present invention will be further described below in conjunction with specific embodiments, but the present invention is not limited thereto.

[0049] Taking the basin above the Wujiang Goupitan Reservoir as an example, the present invention is explained

[0050] Wujiang River is the largest tributary on the right bank of the upper reaches of the Yangtze River. It originates from the eastern foot of Wumeng Mountain in the northwest of Guizhou Province. After the Sancha River and Liuchong River merge at Huawuji, which is the junction of Qianxi, Qingzhen and Zhijin counties, they flow from southwest to northeast across the central part of Guizhou Province. After flowing through the river section from Heitabao to Simaoba, the boundary between Guizhou and Chongqing, they enter Chongqing and flow into the Yangtze River in Fuling. The Wujiang River Basin is a precipitation-fed river. Floods are mainly caused by heavy rains, which are concentrated in May to October. The annual maximum peak flow occurs in the flood season from May to October, concentrated in June and July, especially in mid-to-late June. The Goupitan Hydropower Station is located on the main stream of the Wujiang River in Yuqing County, Guizhou Province. The Goupitan Hydropower Station controls a basin area of ​​43,251 km2 above the dam site, accounting for 49% of the entire basin.

[0051] like Figure 1 As shown, the embodiment of the present invention discloses a method for dividing the flood season into stages in a river basin, comprising the following steps:

[0052] Step 1: Obtain basin data and perform data preprocessing to obtain annual series data;

[0053] The watershed data obtained include:

[0054] Obtain any one of precipitation data, flow data and water level data;

[0055] Among them, the precipitation data are the measured data of the meteorological station, and the flow data and water level data are the measured data of the hydrological station.

[0056] See Figure 2 The data obtained here are the basin flow data to explain how to obtain annual series data, select the peak value in the annual flow data, if there are multiple peaks on a certain day, take the maximum value as the new sequence value, if there is no peak, take the maximum value of that day in the multi-year sequence, but ensure that the value and the adjacent values ​​in the new sequence are from different years, so as to construct the annual maximum peak flow sequence. If the data is discontinuous, there is no need to consider the interpolation problem.

[0057] Step 2, fitting the annual series data to obtain a threshold regression model;

[0058] In this embodiment, the annual maximum flood peak flow is fitted using the step threshold effect form, and a nonlinear relationship between time and flow is established, and the specific formula of the threshold regression model is obtained as follows:

[0059]

[0060] In the formula, e is the threshold parameter, x is the predictor variable with threshold effect, and z represents the additional predictor variable; when x>e, I=1; otherwise it is 0.

[0061] Step 3, based on the established threshold regression model, perform iterative calibration to obtain the threshold point;

[0062] The solution found based on the smoothing algorithm may be a local optimal solution. Its performance depends mainly on the selection of the starting value. In order to obtain a good starting value, it is necessary to perform hypothesis testing on the coefficients related to the threshold covariate and select the threshold corresponding to the maximum test statistic as the starting value. The calculation formula is:

[0063] LR max =max{Q(e1),…,Q(e M )}

[0064] In the formula, LR max is the maximum value of the likelihood ratio test statistic, Q(e i ) represents the function used to compare the threshold regression model and the candidate change point e i is the likelihood ratio statistic of the conditional null model, i = 1…M, M represents the total candidate change points;

[0065] Step 302: Optimize the threshold value by smoothing algorithm according to the initial value. The calculation formula is:

[0066] [1+exp{b(xe)}] -1 →I(x>e)

[0067] In the formula, a two-parameter logistic function is used to approximate the step function I(x>e), b is selected as an appropriately large constant, and the threshold point e is iterated based on the initial estimate of the threshold regression model parameters.

[0068] According to the maximum likelihood ratio test, a good candidate turning point is selected as 92 (July 31st), and the threshold point is determined by iterative optimization of the initial value selected in this embodiment. There are two methods for threshold model parameter calibration: manual and automatic. Manual calibration is to manually adjust the parameters by trial and error. This method is greatly affected by human subjectivity and requires the modeler to correctly understand the model structure and the meaning of each parameter. Automatic calibration is based on the idea of ​​optimization and converts parameter calibration into solving an optimization problem. Not only is the result objective and accurate, but the efficiency is also significantly improved. This embodiment approximates the criterion function to approach the optimal threshold point based on a logical function smoothing function, and identifies the threshold point as 90 (July 29th). Figure 3 shown.

[0069] Step 4: In order to improve the accuracy of the threshold point, based on step 3, the threshold regression model is fitted multiple times independently using the self-sampling method, and the threshold point is identified for each sampling. The threshold point selected most frequently in several samplings is regarded as the optimal threshold point. The confidence of the optimal threshold point is then evaluated by:

[0070] Certainty=e max / n

[0071] In the formula, Ceratinty represents the confidence of the optimal threshold point, e max It indicates the most selected threshold points, and n indicates the total number of fittings.

[0072] In this embodiment, the fitting is performed independently 100 times, and the threshold point with the most selection in the 100 samplings is regarded as the optimal threshold point, and its confidence is calculated, see Table 1 and Figure 4 .

[0073] Table 1 Threshold points selected in the 100 self-sampling process

[0074]

[0075]

[0076] Step 5, based on the optimal threshold point obtained in step 4 and the sequence start date of the annual series data, complete the division of the front and back flood seasons.

[0077] In this embodiment, according to the result of step 4, the optimal threshold point is 90, and based on the starting date of the annual maximum flood peak flow sequence, the flood season division point before and after the Wujiang Goupitan Reservoir is obtained as July 29, with a confidence level of 43%. It can be appropriately advanced or postponed according to the water and rainfall situation.

[0078] The embodiment of the present invention further provides a system for implementing the above-mentioned method for dividing the flood season into stages, comprising:

[0079] The data acquisition and processing module is used to acquire basin data and perform data preprocessing to obtain annual series data;

[0080] Model building module, used to fit the annual series data to obtain the threshold regression model;

[0081] A threshold point iteration module is used to perform iterative calibration based on the established threshold regression model to obtain the threshold point;

[0082] An optimal threshold point acquisition module is used to perform multiple independent fittings on the threshold regression model using a self-sampling method to determine the optimal threshold point;

[0083] The flood season division module is used to complete the division of the previous and later flood seasons based on the optimal threshold point.

[0084] An electronic device includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned method for dividing the flood season into stages when executing the computer program.

[0085] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for dividing the flood season into stages.

[0086] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the contents of the specification of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for dividing the flood season into stages in a river basin, characterized in that: The following steps are involved: Step 1: Obtain basin data and perform data preprocessing to obtain annual series data; Step 2, fitting the annual series data to obtain the threshold regression model; Step 3, based on the established threshold regression model, perform iterative calibration to obtain the threshold point; Step 4: Based on step 3, the threshold regression model is independently fitted multiple times using a self-sampling method to determine the optimal threshold point; Step 5, based on the optimal threshold point obtained in step 4 and the sequence start date of the annual series data, complete the division of the front and back flood seasons.

2. The method for dividing the flood season into stages according to claim 1 is characterized in that: The watershed data obtained in step 1 include: Obtain any one of precipitation data, flow data and water level data; Among them, the precipitation data are the measured data of the meteorological station, and the flow data and water level data are the measured data of the hydrological station.

3. The method for dividing the flood season into stages according to claim 1, characterized in that: The annual series data obtained in step 1 include: The peak values ​​in the basin data of each year are selected. If a peak value appears multiple times on a certain day, the maximum value is taken as the new sequence value. If no peak value appears, the maximum value of that day in the multi-year sequence is taken. In the new sequence, the value and the adjacent values ​​come from different years, thereby constructing annual series data.

4. The method for dividing the flood season into stages according to claim 1, characterized in that: In step 2, the annual series data is fitted using the step threshold effect form, and the specific formula of the threshold regression model is obtained as follows: In the formula, e is the threshold parameter, x is the predictor variable with threshold effect, and z represents the additional predictor variable; when x>e, I=1; otherwise it is 0.

5. The method for dividing the flood season into stages according to claim 3 is characterized in that: Step 3 specifically includes: Step 301: Perform hypothesis testing on the coefficients related to the threshold covariate, and select the threshold corresponding to the maximum test statistic as the starting value. The calculation formula is: LR max =max{Q(e1),…,Q(e M )} In the formula, LR max is the maximum value of the likelihood ratio test statistic, Q(e i ) represents the function used to compare the threshold regression model and the candidate change point e i is the likelihood ratio statistic of the conditional null model, i = 1…M, M represents the total candidate change points; Step 302: Optimize the threshold value by smoothing algorithm according to the initial value. The calculation formula is: [1+exp{b(x-e)}] -1 →I(x>e) In the formula, a two-parameter logistic function is used to approximate the step function I(x>e), b is a constant, and the threshold point e is iterated based on the initial estimate of the threshold regression model parameters.

6. The method for dividing the flood season into stages according to claim 1, characterized in that: In step 4, the threshold regression model is independently fitted several times using the self-sampling method, and the threshold point is identified for each sampling. The threshold point selected most frequently in several samplings is regarded as the optimal threshold point.

7. The method for dividing the flood season into stages according to claim 6 is characterized in that: The confidence of the optimal threshold point is evaluated by: Certainty=e mac / n In the formula, Certainty represents the confidence of the optimal threshold point, e max It indicates the most selected threshold points, and n indicates the total number of fittings.

8. A system for implementing the method for dividing the flood season into stages according to any one of claims 1 to 7, characterized in that: include: The data acquisition and processing module is used to acquire basin data and perform data preprocessing to obtain annual series data; Model building module, used to fit the annual series data to obtain the threshold regression model; A threshold point iteration module is used to perform iterative calibration based on the established threshold regression model to obtain the threshold point; An optimal threshold point acquisition module is used to perform multiple independent fittings on the threshold regression model using a self-sampling method to determine the optimal threshold point; The flood season division module is used to complete the division of the previous and next flood seasons based on the optimal threshold point and the sequence start date of the annual series data.

9. An electronic device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Improved watershed flood season staging method and system and storage medium

    CN114065521A

  • Flood forecasting method based on flood season staging

    CN116307233A

  • Urban three-dimensional landscape-oriented surface runoff source and sink analysis method

    CN117875564A

  • Performing-time-series based predictions with projection thresholds using secondary time-series-based information stream

    US20140309977A1