Slope anti-slide pile design method based on dual-objective optimization

Through the dual-objective optimized slope anti-slide pile design method, the anti-slide pile parameters are screened and optimized, which solves the problem in the existing technology that the slope anti-slide pile design cannot balance the safety factor and economic cost, and achieves the best combination of safety and economy. Best combination.

CN118779968AActive Publication Date: 2024-10-15WUHAN UNIV

Patent Information

Application Number
CN202411120376.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-15
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

It is difficult to achieve the balance between maximizing the safety factor and minimizing the economic cost when designing slope anti-slide piles with the existing technology, resulting in unnecessary economic expenditure.

Method used

Using a slope anti-slide pile design method based on dual-objective optimization, by constructing a finite element model of the slope, screening anti-slide pile reinforcement alternatives, calculating the safety factor and economic cost, drawing a scatter plot, and determining the optimal anti-slide pile parameters , to maximize the safety factor and minimize economic costs.

Benefits of technology

The design parameters of anti-slide piles are optimized to meet the safety requirements of the project while maximizing economic benefits and achieving a balance between safety and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779968A_ABST
    Figure CN118779968A_ABST
Patent Text Reader

Abstract

The invention discloses a side slope anti-slide pile design method based on dual-objective optimization, and belongs to the technical field of side slope reinforcement. The method comprises the steps that a slope finite element model is determined according to a to-be-reinforced slope; an anti-slide pile design parameter alternative set is prepared, and an alternative scheme is formed; building a pile reinforcement slope finite element model; calculating the safety coefficient of the pile reinforced slope and the response of the pile; the economic cost of the anti-slide pile is calculated; screening to obtain feasible alternative schemes; determining an optimal anti-slide pile parameter based on dual-objective optimization; the anti-slide pile design parameters obtained through the method not only meet the engineering safety requirement, but also maximize economic benefits, and balance between safety and economy is achieved. In addition, the engineer can select a safe or economical design scheme of the Pareto frontier according to actual engineering conditions such as wrecks and consequences.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a slope anti-slide pile design method based on dual-objective optimization, and belongs to the technical field of slope reinforcement. Background Art

[0002] Due to the widespread mountainous and hilly terrain in my country, there are a large number of natural slopes. In addition, the construction of roads and railways has produced a large number of engineering slopes. Slopes are often adjacent to structures such as houses, bridges, and hydropower stations, making the stability and safety of slopes closely related to human life. According to statistics, landslide geological disasters are the fourth most serious natural disasters in the world after floods, storms and earthquakes, often causing a large number of casualties and major economic losses. For example: On October 10, 2019, a landslide occurred in Zhenxiong County, Zhaotong City, Yunnan Province, with a volume of 1 million cubic meters. The accident caused 33 people to be urgently relocated, 15 houses collapsed, and direct economic losses of more than 1 million yuan; on August 11, 2023, a landslide and mudslide occurred in Xi'an City, Shaanxi Province, killing 27 people, 900 households without power, and 55 communication base stations were shut down; on January 22, 2024, a landslide occurred in Zhenxiong County, Zhaotong City, Yunnan Province, resulting in 44 people being buried, and the width and height of the landslide body were about 200 meters.

[0003] In order to improve the stability of the slope and ensure the safety of people's lives and property, the slope is often reinforced. For rock slopes, anchor rods and anchor cables are often used for reinforcement, and steel mesh is used to prevent rockfall. For soil slopes, lattice slope protection and anti-slide pile reinforcement are often used. Anti-slide piles are piles used to reinforce unstable slopes or active landslides. They transfer part of the soil pressure from the upper unstable layer to the lower stable layer, thereby improving the stability of the soil behind the piles. Anti-slide piles have been widely used in actual projects since their introduction due to their simple structure, convenient construction and significant reinforcement effect. For example, many active landslides and unstable slopes in the Three Gorges Reservoir area are reinforced with anti-slide piles.

[0004] The design of anti-slide piles should at least consider the following four aspects: First, the piles should have sufficient strength to bear the soil pressure of the upper unstable layer and ensure their own structural safety, which requires that the anti-slide piles should have sufficient cross-sectional area; second, the piles should have sufficient length (or sufficient embedding depth) so that the pre-embedded depth of the piles in the lower stable layer is sufficient to provide the required lateral resistance; third, the location of the piles should significantly increase the safety factor of the reinforced slope or landslide to maximize the reinforcement effect; fourth, the spacing between piles should ensure that an effective soil arch effect is formed between adjacent piles, otherwise the soil may be squeezed out and damaged between piles. In summary, in the design of piles, at least four parameters should be considered: the diameter D (or cross-sectional size), length L, the location X of the piles, and the spacing S of the piles to ensure the reinforcement effect.

[0005] In previous studies, although some scholars have conducted similar research, most of the research is based on single-objective optimization, using the safety factor as the only criterion for reinforcement effect, without emphasizing economic cost. This is not a problem in terms of slope safety, but sometimes it will cause unnecessary economic expenditure. Under the condition of achieving the target safety, the design method that minimizes economic expenditure is worth studying. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a slope anti-slide pile design method based on dual-objective optimization to solve the problem that the prior art design of slope anti-slide piles cannot achieve a balance between maximizing the safety factor and minimizing the economic cost;

[0007] In order to achieve the above purpose / solve the above technical problems, the present invention is implemented by adopting the following technical solutions:

[0008] A slope anti-slide pile design method based on dual-objective optimization, the method comprising:

[0009] Determine the finite element model of the slope according to the slope to be reinforced;

[0010] According to the length alternative parameter set, position alternative parameter set, diameter alternative parameter set and interval alternative parameter set of the anti-slide pile, N anti-slide pile reinforcement alternative schemes are constructed;

[0011] According to the slope finite element model and N anti-slide pile reinforcement alternatives, a finite element model of the slope reinforced with anti-slide piles corresponding to the N anti-slide pile reinforcement alternatives is established;

[0012] Based on the finite element model of the anti-slide pile reinforced slope, the strength reduction method is used to calculate the safety factors of N anti-slide pile reinforcement alternatives and the response of the anti-slide piles.

[0013] According to the safety factors of N anti-slide pile reinforcement alternatives and the responses of the anti-slide piles, the N anti-slide pile reinforcement alternatives are screened to obtain feasible anti-slide pile reinforcement alternatives;

[0014] Calculate the economic costs of feasible anti-slide pile reinforcement alternatives;

[0015] Draw a scatter plot of the feasible anti-slide pile reinforcement alternatives according to the safety factor of the feasible anti-slide pile reinforcement alternatives and the economic cost of the feasible anti-slide pile reinforcement alternatives;

[0016] According to the scatter plot of feasible anti-slide pile reinforcement alternatives, the optimal anti-slide pile reinforcement alternative is obtained, and based on the optimal anti-slide pile reinforcement alternative, the parameters of the optimal anti-slide pile are determined;

[0017] Where N = n1 × n2 × n3 × n4, N is the number of alternative anti-slide pile reinforcement options, n1 is the number of alternative length parameters, n2 is the number of alternative diameter parameters, n3 is the number of alternative interval parameters, and n4 is the number of alternative location parameters.

[0018] Optionally, determining a slope finite element model according to the slope to be reinforced includes:

[0019] The finite element model of the slope is determined according to the geometric shape, stress characteristics and material composition of the slope to be reinforced; wherein the finite element model of the slope includes two-dimensional or three-dimensional model selection, load and boundary conditions and material partitioning.

[0020] Optionally, the length candidate parameter set of the anti-slide pile is determined according to the initial sliding surface depth of the unreinforced slope and the slope height, and the length candidate parameter set of the anti-slide pile is: L = (L+ΔL, L+2ΔL, ..., L+n1ΔL), where L is the minimum alternative length, ΔL is the increment of adjacent alternative lengths, and n1 is the number of length candidate parameters;

[0021] The diameter candidate parameter set of the anti-slide pile is determined based on the slope scale combined with engineering experience and the diameter characteristics of the drilling bit of the construction machinery. The diameter candidate parameter set of the anti-slide pile is: D = (D+ΔD, L+2ΔD, ..., D+n2ΔD), where D is the minimum alternative diameter, ΔD is the increment of the adjacent alternative diameters, and n2 is the number of diameter candidate parameters;

[0022] The interval candidate parameter set of the anti-slide piles is determined based on the standard that the soil between the piles can form a soil arch effect and will not cause extrusion failure. The interval candidate parameter set of the anti-slide piles is: S = (D, 2D, ..., n3D), the interval is taken as an integer multiple of the pile diameter D, and n3 is the number of interval candidate parameters;

[0023] The position of the anti-slide pile is represented by the distance X from the pile to the slope shoulder, and the position candidate parameter set of the anti-slide pile is: X = (X+ΔX, X+2ΔX, ..., X+n4ΔX), where X is the minimum alternative position, ΔX is the increment of adjacent alternative positions, and n4 is the number of position alternative parameters.

[0024] Optionally, the alternative scheme arranges and combines the length alternative parameter set, the position alternative parameter set, the diameter alternative parameter set and the spacing alternative parameter set of the anti-slide pile to form a total of N anti-slide pile reinforcement alternative schemes.

[0025] Alternatively, the safety factor formula for the anti-slide pile reinforcement scheme is calculated using the strength reduction method as follows: Where, φ is the effective internal friction angle of the slope soil, c is the effective cohesion of the slope soil; is the effective internal friction angle when the soil is reduced until the slope reaches the limit equilibrium state, It is the effective cohesion of the soil when it is reduced until the slope reaches the limit equilibrium state; FS is the safety factor of the reinforced slope.

[0026] Optionally, the anti-slide pile reinforcement alternative schemes are screened according to the safety factor of the anti-slide pile alternative reinforcement schemes and the response of the anti-slide piles to obtain feasible anti-slide pile reinforcement alternative schemes, including:

[0027] First, the target safety factor is given, and the alternatives whose safety factor after reinforcement is less than the target safety factor are eliminated;

[0028] Based on excluding the alternative schemes whose safety factor after reinforcement is less than the target safety factor, the ultimate bending moment and shear force of the anti-slide piles are calculated according to the reinforced concrete structure theory, and the alternative reinforcement schemes whose actual bending moment or shear force of the anti-slide piles is greater than the ultimate bending moment and shear force are eliminated. The resulting scheme set is the feasible anti-slide pile reinforcement alternative scheme.

[0029] Optionally, the calculation of the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement solution includes:

[0030] According to the length, diameter, spacing and reinforcement ratio of the anti-slide piles, the amount of concrete and steel bars is calculated to obtain the economic cost of the anti-slide piles for the feasible anti-slide pile reinforcement scheme, where the economic cost of the anti-slide piles includes the cost of hole making and subsequent maintenance.

[0031] Optionally, the determining of the optimal anti-slide pile parameters based on the optimal anti-slide pile reinforcement alternative includes:

[0032] A dual-objective optimization was conducted with the goal of maximizing the safety factor and minimizing the economic cost to determine the Pareto frontier of feasible anti-slide pile reinforcement alternatives.

[0033] The normal boundary intersection method is used to normalize the Pareto front, determine the inflection point on the Pareto front, and obtain the optimal anti-slide pile reinforcement alternative, thereby determining the optimal anti-slide pile parameters.

[0034] Optionally, the Pareto front is normalized using the normal frontier intersection method, including:

[0035] Taking the maximum and minimum values ​​of the safety factor and the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement alternatives as the boundary, the safety factor and the economic cost of the anti-slide piles are normalized to the interval [0, 1]. The specific formula is as follows: Where, FS N is the normalized safety factor, C N is the normalized economic cost; FS maxis the maximum safety factor of all feasible alternatives, FS min is the minimum safety factor of all feasible alternatives; C max is the maximum economic cost of all feasible alternatives, C min is the minimum economic cost of all feasible alternatives, is the economic cost of the feasible alternative, Safety factor for reinforced slope.

[0036] Optionally, the scatter plot of feasible anti-slide pile reinforcement alternative solutions is a scatter plot of all feasible anti-slide pile reinforcement alternative solutions drawn with economic cost as the horizontal axis and safety factor as the vertical axis.

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] The present invention proposes design parameters of four piles, namely, pile length, pile diameter, pile position and pile spacing, to form a design space based on the length candidate parameter set, position candidate parameter set, diameter candidate parameter set and spacing candidate parameter set of the anti-sliding pile, and screens feasible alternative solutions based on the target safety degree and pile body response, and finally obtains the optimal design parameters of the anti-sliding pile based on dual-objective optimization, maximizing the safety factor and minimizing the economic cost;

[0039] The anti-slide pile design parameters obtained by this method not only meet the engineering safety requirements, but also maximize the economic benefits, achieving a balance between safety and economy;

[0040] This method not only recommends the optimal design parameters, but engineers can also choose other alternatives on the Pareto frontier based on the actual project. When the project is large or the consequences of an accident are serious, a design with a larger safety factor and relatively higher economic cost can be selected; or if the project is small and will not cause serious losses after an accident, the safety factor requirement can be appropriately reduced to save costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 A flow chart of a slope anti-slide pile design method based on dual-objective optimization provided by an embodiment of the present invention;

[0042] Figure 2 It is a schematic diagram of the finite element model of the slope to be reinforced in an embodiment of the present invention.

[0043] Figure 3 Schematic diagram of pile parameters of alternative anti-slide piles in an embodiment of the present invention;

[0044] Figure 4 Schematic diagram of the sliding surface of the slope to be reinforced in an embodiment of the present invention;

[0045] Figure 5This is a relationship diagram between the anti-slide pile diameter and the ultimate bending moment and shear force in an embodiment of the present invention;

[0046] Figure 6 A scatter plot and a Pareto front of feasible alternative solutions in an embodiment of the present invention;

[0047] Figure 7 It is the normalized Pareto front of the feasible alternative solutions in the embodiment of the present invention. DETAILED DESCRIPTION

[0048] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0049] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0051] The embodiment of the present invention discloses a slope anti-slide pile design method based on dual-objective optimization. The method proposes four pile design parameters, namely pile length, pile diameter, pile position and pile spacing, to form a design space, and screens feasible alternatives based on target safety and pile body response. Finally, based on dual-objective optimization, the optimal design parameters of the anti-slide piles are obtained by maximizing the safety factor and minimizing the economic cost. This method not only meets the engineering safety requirements, but also achieves the greatest economic benefits, effectively achieving a balance between safety and economy, and has certain innovation and practical engineering significance. Figure 1 As shown, the specific steps include:

[0052] Step 1, determining a slope finite element model according to the slope to be reinforced;

[0053] Step 2, constructing an alternative anti-slide pile reinforcement scheme according to an alternative parameter set of length, an alternative parameter set of position, an alternative parameter set of diameter and an alternative parameter set of spacing of the anti-slide pile;

[0054] Step 3, based on the slope finite element model and the anti-slide pile reinforcement alternative scheme, establish a finite element model of the slope reinforced with anti-slide piles; wherein a total of n1 × n2 × n3 × n4 finite element models of the slope reinforced with anti-slide piles are included;

[0055] Step 4, based on the finite element model of the anti-slide pile reinforcement slope, the strength reduction method is used to calculate the safety factors of n1 × n2 × n3 × n4 anti-slide pile reinforcement alternatives and the pile responses;

[0056] Step 5, screening the anti-sliding pile reinforcement alternative schemes according to the safety factors of the anti-sliding pile reinforcement alternative schemes and the responses of the anti-sliding piles, and obtaining feasible anti-sliding pile reinforcement alternative schemes;

[0057] Step 6, calculating the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement alternatives;

[0058] Step 7, drawing a scatter plot of the feasible anti-slide pile reinforcement alternative solutions according to the safety factors of the feasible anti-slide pile reinforcement alternative solutions and the economic costs of the feasible anti-slide pile reinforcement alternative solutions;

[0059] Step 8, based on the scatter plot of feasible anti-slide pile reinforcement alternatives, the optimal anti-slide pile reinforcement alternative is obtained, and based on the optimal anti-slide pile reinforcement alternative, the parameters of the optimal anti-slide pile are determined. The anti-slide pile reinforcement alternative includes four parameters: length, diameter, position and spacing. In other words, these four parameters determine the specific situation of a pile, that is, an anti-slide pile reinforcement alternative. The optimal anti-slide pile reinforcement alternative is obtained, that is, the length, diameter, position and spacing of the optimal anti-slide pile are determined.

[0060] In one embodiment, step 1, determining the slope finite element model according to the slope to be reinforced, specifically includes: taking a road embankment slope as an example, the slope is large enough in the length direction and satisfies the plane strain condition, so a two-dimensional slope plane strain finite element model is used for numerical simulation. The load only considers gravity, the bottom boundary is fixedly constrained, the two sides of the boundary are normal constrained, the slope is homogeneous, the cohesion c = 20 kPa, the friction angle φ = 30 ° , bulk density γ = 17 kN / m 3, elastic modulus E = 100 MPa Poisson's ratio v = 0.3. Slope height 20m Slope 45 ° , Figure 2 A schematic diagram of the finite element model of the slope to be reinforced is given.

[0061] In one embodiment, step 2, based on the length candidate parameter set, the position candidate parameter set, the diameter candidate parameter set and the spacing candidate parameter set of the anti-sliding pile, constructs an anti-sliding pile reinforcement alternative scheme, which specifically includes:

[0062] The design parameters of the anti-slide piles include the length of the anti-slide piles (L), the position of the anti-slide piles (X), the diameter of the anti-slide piles (D) and the spacing of the piles (S). Figure 3 A schematic diagram of various parameters of pile-reinforced slopes is provided, wherein the lateral spacing (S) of the piles is achieved by specifying the thickness of the plane strain, and the embodiment of the present invention takes a single row of piles as an example.

[0063] The length candidate parameter set L = (L+ΔL, L+2ΔL, ..., L+n1ΔL) of the anti-slide pile is determined according to the depth of the initial sliding surface of the unreinforced slope and the height of the slope. The embodiment of the present invention uses the K-means clustering partitioning method to extract the initial sliding surface. Figure 4 The initial sliding surface of the slope to be reinforced and the sliding surface depth at some locations are given. It can be seen that the maximum sliding surface depth is about 7m. Combined with the slope height of 20m, the proposed pile length parameter set here is: L = (5m, 7.5m, 10m, 12.5m, 15m, 17.5m, 20m), then n1 = 7.

[0064] According to the slope scale, engineering experience, and the characteristics of the construction machinery drilling drill bit diameter, the pile diameter candidate parameter set D = (D+ΔD, L+2ΔD, ..., D+n2ΔD) is determined. Here, the anti-slide pile diameter parameter set is proposed to be D = (0.2m, 0.4m, 0.6m, 0.8m, 1.0m), then n2 = 5.

[0065] The pile spacing candidate parameter set S = (D, 2D, ..., n3D) is determined based on the standard that the soil between piles can effectively form a soil arch effect without extrusion damage. Some scholars at home and abroad have studied the soil arch effect between piles and found that when the pile axis spacing S ≤ 4D, the soil arch effect can be effectively formed to avoid soil extrusion damage between piles. In order to maximize economic benefits, the embodiment of the present invention takes S = 4D, so n3 = 1.

[0066] The distance from the anti-slide pile to the slope shoulder (X) represents the position of the pile, and the candidate parameter set of the anti-slide pile position is X = (X+ΔX, X+2ΔX, ..., X+n4ΔX). Here, the candidate parameter set of X is X = (1m, 4m, 7m, 10m, 13m,16m, 19m), so n4 = 7.

[0067] Finally, the above four parameters and their alternative parameter sets were combined to form a total of 200 pile reinforcement alternatives.

[0068] In one embodiment, step 3, based on the slope finite element model and the anti-slide pile reinforcement alternative scheme, a finite element model of the slope reinforced with anti-slide piles is established; wherein a total of n1 × n2 × n3 × n4 finite element models of the slope reinforced with anti-slide piles are established, specifically including:

[0069] According to the finite element model of the slope to be reinforced and the 200 anti-slide pile reinforcement alternatives, a finite element model of the slope reinforced with anti-slide piles is established in ABAQUS, and a finite element model of the slope reinforced with 200 piles is obtained. The establishment of the model can be efficiently achieved by writing an inp file.

[0070] In one embodiment, step 4, based on the finite element model of the anti-slide pile reinforcement slope, the strength reduction method is used to calculate the safety factor of n1 × n2 × n3 × n4 anti-slide pile reinforcement schemes and the pile response, which specifically includes:

[0071] The strength reduction method was used to calculate the safety factor of 200 pile reinforcement alternatives and the response of the piles. The safety factor is used to evaluate the reinforcement effect, and the response of the piles includes the bending moment and shear force of the piles, which are used to evaluate the stability of the piles themselves. The formula for calculating the slope safety factor using the strength reduction method is as follows:

[0072]

[0073] Where, φ and c are the effective internal friction angle and effective cohesion of the slope soil; φ f and c f is the effective internal friction angle and effective cohesion when the soil is reduced until the slope reaches the limit equilibrium state; FS is the safety factor of the reinforced slope. In ABAQUS, the calculation of strength reduction is realized by defining the initial field variable and the end field variable. Here, the initial field variable is defined as 0.5 and the end field variable is defined as 5, indicating that the range of the computable safety factor is 0.5 to 5.

[0074] In one embodiment, step 5, screening feasible alternatives, specifically includes:

[0075] Given a target safety factor (FS T), excluding the alternatives whose safety factor after reinforcement is less than the target safety factor, here we take the target safety factor FS T = 1.2. Assume that the anti-slide pile uses C30 concrete, HRB400 steel bars, reinforcement ratio ρ = 1%, and concrete cover thickness is 50mm. Then, according to the reinforced concrete structure theory, the ultimate bending moment and shear force of the anti-slide pile under various diameter conditions are calculated. The specific results are shown in Figure 5 The maximum bending moment and maximum shear force of each alternative solution were extracted by ABAQUS calculation, and the alternative solutions whose maximum bending moment and maximum shear force were greater than the limit value were eliminated; the remaining solutions (safety factor greater than the target safety factor, and bending moment and shear force of the pile less than the limit value) were feasible alternative solutions.

[0076] In one embodiment, step 6, calculating the economic cost of the anti-slide piles, specifically includes:

[0077] According to the above, the economic cost should include the cost of hole making, concrete, steel bars and maintenance. In order to simplify the calculation, only the cost of hole making, concrete and steel bars is considered in the embodiment of the present invention. c It can be calculated as follows:

[0078]

[0079] The reinforcement ratio ρ is calculated as 1%, then the amount of steel bars V s = 0.01V c The cost of hole making is generally proportional to the volume of the hole. Therefore, the hole making cost (C1), concrete cost (C2) and steel cost (C3) are all proportional to the hole volume. Here, it is assumed that the total unit price of the three per unit volume is C0, C0 = C1 + C2 + C3, so the total economic cost can be calculated using V c ×C0 indicates that the economic cost is the same when the location is different but the pile size parameters are the same. The following table gives the economic cost of each alternative.

[0080] Table 1 Economic costs of each alternative plan (unit: C0 m 3 / m)

[0081] D = 0.2m D = 0.4m D = 0.6m D = 0.8m D = 1.0m L = 5m 0.196 0.393 0.589 0.785 0.982 L = 7.5m 0.294 0.589 0.884 1.178 1.473 L = 10m 0.393 0.785 1.178 1.571 1.963 L = 12.5m 0.491 0.982 1.473 1.963 2.454 L = 15m 0.589 1.178 1.767 2.356 2.945 L = 17.5m 0.687 1.374 2.062 2.749 3.436 L = 20m 0.785 1.571 2.356 3.141 3.927

[0082] In one embodiment, in step 7, the scatter plot of the feasible anti-slide pile reinforcement alternatives is a scatter plot of all feasible anti-slide pile reinforcement alternatives plotted with economic cost as the abscissa and safety factor as the ordinate.

[0083] First, draw a two-dimensional scatter plot of the economic cost and safety factor of the feasible alternatives, see Figure 6As shown; then according to the dual-objective optimization idea, the Pareto frontier of the design scheme is determined by maximizing the safety factor and minimizing the economic cost. Figure 6 As shown in , the Pareto front consists of a set of designs that are better than other designs among the alternatives, but have no advantages or disadvantages over each other;

[0084] In step 8, the Pareto frontier is normalized using the normal boundary intersection method, including:

[0085] Taking the maximum and minimum values ​​of the safety factor and the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement alternatives as the boundary, the safety factor and the economic cost of the anti-slide piles are normalized to the interval [0, 1]. The specific formula is as follows:

[0086]

[0087] Where, FS N is the normalized safety factor, C N is the normalized economic cost; FS max is the maximum safety factor of all feasible alternatives, FS min is the minimum safety factor of all feasible alternatives; C max is the maximum economic cost of all feasible alternatives, C min is the minimum economic cost of all feasible alternatives, is the economic cost of the feasible alternative, Safety factor for reinforced slope.

[0088] Finally, the Pareto front is normalized and the inflection point of the Pareto front is determined by the normal boundary intersection method. The normal boundary intersection method refers to a straight line connecting the two alternatives with the minimum economic cost and the maximum economic cost (or the minimum safety factor and the maximum safety factor) in the Pareto front. The design with the largest distance from the straight line on the Pareto front is the optimal design (inflection point). Figure 7 . The distances from the points on the normalized Pareto preamble to the normal boundary in the embodiment of the present invention are 0, 0.001, 0.054, 0.222, 0.359, 0.353, 0.360, 0.407, 0.370, 0.282, 0.241, 0.174 and 0, respectively, and the maximum distance is 0.407. Therefore, the pile parameters corresponding to the optimal design scheme in the embodiment of the present invention are: L = 15m, X = 1m, D = 0.4m, S = 4D = 1.6m. The safety factor FS = 1.372, and the economic cost is 1.178 C0 m 3 / m.

[0089] The normal boundary intersection method means: connecting the two end points of the Pareto preamble to form a normal boundary. The point on the Pareto preamble with the maximum distance from the normal boundary is called the inflection point. The inflection point is the optimal anti-slide pile reinforcement alternative, and the corresponding parameters are the anti-slide pile design parameters.

[0090] It is worth noting that the above optimal design scheme is not the only one. Engineers can choose other design points on the Pareto frontier according to the actual project situation and economic strength. When the project is large or the consequences of the accident are serious, a design scheme with a larger safety factor and relatively high economic cost can be selected; or when the project is small and the accident will not cause serious losses, the safety factor requirement can be appropriately reduced to save costs.

[0091] The present invention forms a design space with the design parameters of four piles, namely, pile length, pile diameter, pile position and pile spacing, and screens the schemes based on the target safety factor and pile body response to determine feasible alternative schemes. Finally, based on dual-objective optimization, the optimal design parameters of the anti-slide piles are obtained by maximizing the safety factor and minimizing the economic cost. The anti-slide pile design parameters obtained by the present invention not only meet the engineering safety requirements, but also maximize the economic benefits, achieving a balance between safety and economy. In addition, engineers can also select a design scheme that is safer or more economical on the Pareto frontier according to actual engineering conditions such as the consequences of the accident. When the scale of the project is large or the consequences of the accident are serious, a design scheme with a larger safety factor and relatively higher economic cost can be selected; or if the scale of the project is small and no serious losses will be caused after the accident, the safety factor requirement can be appropriately reduced to save costs.

[0092] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A slope anti-slide pile design method based on dual-objective optimization, characterized in that: The method comprises: Determine the finite element model of the slope according to the slope to be reinforced; According to the length alternative parameter set, position alternative parameter set, diameter alternative parameter set and interval alternative parameter set of the anti-slide pile, N anti-slide pile reinforcement alternative schemes are constructed; According to the slope finite element model and N anti-slide pile reinforcement alternatives, a finite element model of the slope reinforced with anti-slide piles corresponding to the N anti-slide pile reinforcement alternatives is established; Based on the finite element model of the anti-slide pile reinforced slope, the strength reduction method is used to calculate the safety factors of N anti-slide pile reinforcement alternatives and the response of the anti-slide piles. According to the safety factors of N anti-slide pile reinforcement alternatives and the responses of the anti-slide piles, the N anti-slide pile reinforcement alternatives are screened to obtain feasible anti-slide pile reinforcement alternatives; Calculate the economic costs of feasible anti-slide pile reinforcement alternatives; Draw a scatter plot of the feasible anti-slide pile reinforcement alternatives according to the safety factor of the feasible anti-slide pile reinforcement alternatives and the economic cost of the feasible anti-slide pile reinforcement alternatives; According to the scatter plot of feasible anti-slide pile reinforcement alternatives, the optimal anti-slide pile reinforcement alternative is obtained, and based on the optimal anti-slide pile reinforcement alternative, the parameters of the optimal anti-slide pile are determined; Where N = n1 × n2 × n3 × n4, N is the number of alternative anti-slide pile reinforcement options, n1 is the number of alternative length parameters, n2 is the number of alternative diameter parameters, n3 is the number of alternative interval parameters, and n4 is the number of alternative location parameters.

2. The slope anti-slide pile design method based on dual-objective optimization according to claim 1 is characterized in that: Determining the slope finite element model according to the slope to be reinforced includes: The finite element model of the slope is determined according to the geometric shape, stress characteristics and material composition of the slope to be reinforced; wherein the finite element model of the slope includes two-dimensional or three-dimensional model selection, load and boundary conditions and material partitioning.

3. The slope anti-slide pile design method based on dual-objective optimization according to claim 1 is characterized in that: The length candidate parameter set of the anti-slide pile is determined according to the initial sliding surface depth of the unreinforced slope and the slope height. The length candidate parameter set of the anti-slide pile is: L = ( L + ΔL, L +2 ΔL, ..., L +n1 ΔL ),in L For the alternative minimum length, ΔL is the adjacent candidate length increment, n1 is the number of length candidate parameters; The diameter candidate parameter set of the anti-slide pile is determined based on the slope scale, engineering experience, and the diameter characteristics of the drilling bit of the construction machinery. The diameter candidate parameter set of the anti-slide pile is: D = ( D + ΔD, L +2 ΔD, ..., D +n2 ΔD ),in D For the alternative minimum diameter, ΔD is the adjacent candidate diameter increment, n2 is the number of diameter candidate parameters; The interval candidate parameter set of the anti-slide piles is determined based on the standard that the soil between the piles can form a soil arch effect and will not cause extrusion failure. The interval candidate parameter set of the anti-slide piles is: S = ( D, 2D, ..., n3 D ), the interval is taken as the pile diameter D An integer multiple of , n3 is the number of interval candidate parameters; The position of the anti-slide pile is based on the distance from the pile to the slope shoulder. X Represents the location of the pile. The candidate parameter set for the location of the anti-slide pile is: X = ( X + ΔX, X +2 ΔX, ..., X +n4 ΔX ),in X is the alternative minimum position, ΔX is the increment of adjacent candidate positions, and n4 is the number of position candidate parameters.

4. The slope anti-slide pile design method based on dual-objective optimization according to claim 3 is characterized in that: The alternative scheme arranges and combines the length alternative parameter set, the position alternative parameter set, the diameter alternative parameter set and the spacing alternative parameter set of the anti-slide pile to form a total of N anti-slide pile reinforcement alternative schemes.

5. The slope anti-slide pile design method based on dual-objective optimization according to claim 1 is characterized in that: The safety factor formula for calculating the anti-slide pile reinforcement scheme using the strength reduction method is as follows: ; In the formula, φ is the effective internal friction angle of the slope soil, c is the effective cohesion of the slope soil; is the effective internal friction angle when the soil is reduced until the slope reaches the limit equilibrium state, The effective cohesion of the soil is reduced until the slope reaches the limit equilibrium state; FS Safety factor for reinforced slope.

6. The slope anti-slide pile design method based on dual-objective optimization according to claim 1 is characterized in that: The anti-slide pile reinforcement alternative schemes are screened according to the safety factor of the anti-slide pile alternative reinforcement schemes and the response of the anti-slide piles to obtain feasible anti-slide pile reinforcement alternative schemes, including: First, the target safety factor is given, and the alternatives whose safety factor after reinforcement is less than the target safety factor are eliminated; Based on excluding the alternative schemes whose safety factor after reinforcement is less than the target safety factor, the ultimate bending moment and shear force of the anti-slide piles are calculated according to the reinforced concrete structure theory, and the alternative reinforcement schemes whose actual bending moment or shear force of the anti-slide piles is greater than the ultimate bending moment and shear force are eliminated. The resulting scheme set is the feasible anti-slide pile reinforcement alternative scheme.

7. The slope anti-slide pile design method based on dual-objective optimization according to claim 1 is characterized in that: The calculation of the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement solution includes: According to the length, diameter, spacing and reinforcement ratio of the anti-slide piles, the amount of concrete and steel bars is calculated to obtain the economic cost of the anti-slide piles for the feasible anti-slide pile reinforcement scheme, where the economic cost of the anti-slide piles includes the cost of hole making and subsequent maintenance.

8. The method for designing anti-slide piles for slopes based on dual-objective optimization according to claim 1, characterized in that: The method of determining the optimal anti-slide pile parameters based on the optimal anti-slide pile reinforcement alternative solution includes: A dual-objective optimization was conducted with the goal of maximizing the safety factor and minimizing the economic cost to determine the Pareto frontier of feasible anti-slide pile reinforcement alternatives. The normal boundary intersection method is used to normalize the Pareto front, determine the inflection point on the Pareto front, and obtain the optimal anti-slide pile reinforcement alternative, thereby determining the optimal anti-slide pile parameters.

9. The method for designing slope anti-slide piles based on dual-objective optimization according to claim 8, characterized in that: The Pareto frontier is normalized using the normal frontier intersection method, including: Taking the maximum and minimum values ​​of the safety factor and the economic cost of the anti-slide piles of the feasible anti-slide pile reinforcement alternatives as the boundary, the safety factor and the economic cost of the anti-slide piles are normalized to the interval [0, 1]. The specific formula is as follows: In the formula, FS N is the normalized safety factor, C N is the normalized economic cost; FS max is the maximum safety factor of all feasible alternatives, FS min is the minimum safety factor of all feasible alternatives; C max is the maximum economic cost of all feasible alternatives, C min is the minimum economic cost of all feasible alternatives, is the economic cost of the feasible alternative, Safety factor for reinforced slope.

10. The method for designing anti-slide piles for slopes based on dual-objective optimization according to claim 1, characterized in that: The scatter plot of the feasible anti-slide pile reinforcement alternatives is a scatter plot of all feasible anti-slide pile reinforcement alternatives plotted with economic cost as the horizontal axis and safety factor as the vertical axis.

Citation Information

Patent Citations

  • Anti-slide pile design optimization method based on instability risk of slope system

    CN113832992A

  • Optimal design method and system for slope reinforcement with Anti-slide piles

    US20220207196A1

Cited By

  • Debris flow pile forest prevention and control structure parameter optimization method based on DGPR-EI

    CN121659695A

  • A method for optimizing parameters of a debris flow pile forest prevention and control structure based on a DGPR-EI

    CN121659695B