Industrial park planning three-dimensional model design scheme generation method and system and medium
By generating a basic three-dimensional model and performing sunlight analysis, the problem in the existing technology of failing to verify the compliance of building spacing in the three-dimensional model is solved, the problem of sufficient sunlight and occlusion between buildings is solved, and the rationality of park planning is improved. sex.
Patent Information
- Application Number
- CN202411277504.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-09-12
AI Technical Summary
When converting two-dimensional drawings into three-dimensional models, the existing three-dimensional modeling technology for park planning fails to effectively verify whether the spacing between buildings meets architectural standards, resulting in occlusion problems. Design standards that cannot be considered in two-dimensional drawings cannot be considered in three-dimensional drawings. be reasonably adjusted in the model.
By obtaining the floor plan and height of the building, a basic three-dimensional model is generated, and the sunshine analysis model is used to simulate the sunshine information of the building, analyze whether there is any obstruction between the buildings, and adjust the distance between the buildings if there is obstruction, and generate the final three-dimensional model.
It improves the effectiveness and rationality of the three-dimensional modeling technology for park planning, ensuring sufficient sunlight between buildings, solving shading problems, and rationalizing the spacing between buildings.
Smart Images

Figure CN118779977A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of industrial park planning, and in particular to a method, system and medium for generating a three-dimensional model design scheme for industrial park planning. Background Art
[0002] Park planning 3D modeling technology refers to the use of computer software to create a 3D digital model of the park, which is used to display, analyze and optimize the park layout and design. This technology integrates geographic data, architectural design and environmental factors to provide planners with visualization tools, enabling them to more intuitively evaluate and adjust park plans.
[0003] Existing 3D modeling technology for park planning typically converts park plans directly from 2D drawings into 3D models. However, when designing building spacing in 2D drawings, only roads and green areas are typically reserved, without considering whether other aspects comply with building standards. The 3D model should adjust aspects that are difficult to consider in 2D drawings to ensure that the buildings meet the prescribed standards. Existing 3D modeling technology for park planning merely converts from 2D to 3D without verifying or adjusting the buildings. For example, in a patent application with publication number CN116956402A, a "Building Information Model Forward Design Method, Apparatus, Medium, and Electronic Equipment" is disclosed. This solution simply converts the buildings within the target park from 2D to 3D models without considering the compliance of design standards that cannot be considered in 2D drawings through the 3D model. This results in unreasonable spacing design between buildings. Existing 3D modeling technology for park planning also fails to verify and adjust building standards that are difficult to consider in 2D through the 3D model, resulting in issues such as occlusion between buildings that do not comply with building regulations. Summary of the Invention
[0004] The present invention aims to solve one of the technical problems in the prior art to at least a certain extent. By obtaining the floor plan and building heights of the building planning in the industrial park planning, a basic three-dimensional model of the industrial park is generated, and then the sunlight information of different buildings in the basic three-dimensional model is simulated through a sunlight analysis model. Then, based on the sunlight information, it is analyzed whether there is any obstruction between the buildings. If there is any obstruction between the buildings, the intervals between the buildings are adjusted, and the final three-dimensional model is obtained to solve the problem that the existing three-dimensional modeling technology for park planning still has the problem of not verifying and adjusting the building standards that are difficult to consider at the two-dimensional level through the three-dimensional model, resulting in obstruction between buildings and other problems that do not comply with architectural regulations.
[0005] To achieve the above objectives, in a first aspect, the present application provides a method for generating a three-dimensional model design scheme for industrial park planning, comprising the following steps: Obtain the floor plan and building heights of the buildings in the industrial park plan to generate a basic 3D model of the industrial park; Use the sunlight analysis model to simulate sunlight information of different buildings in the basic three-dimensional model; Analyze whether there is any shading between buildings based on sunlight information; If there is any occlusion between buildings, the distance between the buildings is adjusted to obtain the final 3D model.
[0006] Furthermore, obtaining the floor plan and building heights of the buildings in the industrial park plan and generating a basic three-dimensional model of the industrial park includes the following sub-steps: Obtain the floor plan of the building plan in the industrial park plan; Use the length as the X-axis and Y-axis respectively to establish a plane rectangular coordinate system, named the floor plan frame selection coordinate system, and draw the plane map into the floor plan frame selection coordinate system; The graphic corresponding to the building's footprint is named footprint graphic; For any area graph, obtain the maximum and minimum values of X in the area graph, mark them as Max X and Min X respectively, obtain the maximum and minimum values of Y, mark them as Max Y and Min Y respectively; Connect the coordinate points (minimum X, minimum Y) with (minimum X, maximum Y), connect the coordinate points (minimum X, minimum Y) with (maximum X, minimum Y), connect the coordinate points (maximum X, minimum Y) with (maximum X, maximum Y), and connect the coordinate points (maximum X, maximum Y) with (minimum X, maximum Y). After connecting, a rectangle is obtained, which is the building's footprint rectangle. Analyze all the footprint graphics to obtain the footprint rectangles of all buildings. A rectangular parallelepiped is constructed with the rectangular area of each building in the plan as the base and the corresponding building height as the height. The plan is converted from a two-dimensional image to a three-dimensional image to obtain a basic three-dimensional model.
[0007] Furthermore, simulating the sunlight information of different buildings in the basic three-dimensional model through the sunlight analysis model includes the following sub-steps: Establish a sunlight analysis model; Get the latitude and longitude of the industrial park; Enter the longitude and latitude as well as the basic 3D model into the sunshine analysis model; Randomly select one day from each month of the previous year as the simulation date, sort and number the simulation dates in ascending order of the month, and use the symbol M to n Indicates, where n is a positive integer and n is the sequence number of M; M n Run the sunlight analysis model as a simulation date and record the sunlight information of different buildings.
[0008] Further, in turn, M n Running the sunlight analysis model as a simulation date and recording sunlight information for different buildings includes the following sub-steps: Number the buildings in the basic 3D model, using the symbol B i Represents, where i is a positive integer and i is the serial number of B; Starting with n=1, set M n Run the sunshine analysis model as the simulation date and obtain B at 12:00 noon i The area on the south side of the sun is marked as S (n,i) , S (n,i) Indicates M n As the simulated date B i The area of the south side exposed to sunlight; Increase n by 1 and repeat until n=max(n) and stop the analysis, where max(n) is the maximum value of n; The S (n,i) That is the sunshine information.
[0009] Furthermore, analyzing whether there is any shading between buildings based on sunlight information includes the following sub-steps: Obtaining construction standards of the building, wherein the construction standards include window height from the ground, left margin, right margin, and building length; By formula C i =(BH-2×GCH)×(BL-LR) to calculate the sunny area of the building. i , the sunny area is marked as C i , where C i is the sunny area, BH is the building height, GCH is the window height from the ground, BL is the building length, L is the left distance, and R is the right distance; Starting with i=1, search for S (n,i) The maximum value in is marked as E i , add i+1 and repeat the search for E i , until i=max(i), where max(i) is the maximum value of i; E i with C i Compare, if E i Less than C i , then output insufficient sunshine signal, if E i Greater than or equal to C i , then the output is a normal sunshine signal.
[0010] Furthermore, if there is occlusion between buildings, the intervals between the buildings are adjusted, and obtaining the final 3D model includes the following sub-steps: B for outputting insufficient sunlight signal i , analyze how the spacing between buildings needs to be adjusted; Based on the analysis results, the intervals between buildings are adjusted to obtain the final 3D model.
[0011] Furthermore, for B which outputs insufficient sunlight signal i , analyzing how the spacing between buildings needs to be adjusted includes the following sub-steps: Get the solar declination, represented by the symbol δ, and get the geographical latitude of the industrial park, represented by the symbol φ; The solar altitude angle is calculated using the formula sinθ=cos(φ-δ), where θ is the solar altitude angle. Simplified, we get θ=90-(δ-φ); Get B i The highest point of the shaded area on the south side is marked as the highest obstruction point. The distance between the highest obstruction point and the ground is obtained and marked as the highest obstruction height. Calculate H / tanθ and mark the result as the interval adjustment value, where H is the highest occlusion height; Calculate B of all output sunshine shortage signals i The corresponding interval adjustment value is represented by the symbol T i express.
[0012] Furthermore, adjusting the intervals between buildings according to the analysis results includes the following sub-steps: B for outputting insufficient sunlight signal i , will be temporarily referred to as the building to be adjusted, and the building adjacent to the south of the building to be adjusted will be temporarily referred to as the blocking building; Increase the distance between the building to be adjusted and the blocking building by T i , for all B that output insufficient sunshine signal i All changes were made; If the buildings exceed the scope of the industrial park after adjustment, all buildings will be moved to the south until all buildings are within the industrial park; The adjusted basic 3D model is marked as the final 3D model.
[0013] In a second aspect, the present application provides a system for generating a three-dimensional model design scheme for industrial park planning, including a basic model construction module, a sunlight information simulation module, an occlusion analysis module, and a final model construction module; the basic model construction module, the sunlight information simulation module, and the occlusion analysis module are respectively connected to the data of the final model construction module; The basic model building module is used to obtain the floor plan and building height of the buildings in the industrial park planning and generate a basic three-dimensional model of the industrial park; The sunshine information simulation module is used to simulate the sunshine information of different buildings in the basic three-dimensional model through the sunshine analysis model; The shading analysis module is used to analyze whether there is shading between buildings based on sunlight information; The final model building module is used to adjust the distance between buildings if there is any occlusion between the buildings, and obtain the final three-dimensional model.
[0014] In a third aspect, the present application provides a storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps in the above method are performed.
[0015] The beneficial effects of the present invention are as follows: the present invention generates a basic three-dimensional model of the industrial park by obtaining the floor plan and building heights of the buildings planned in the industrial park planning, and then simulates the sunlight information of different buildings in the basic three-dimensional model through a sunlight analysis model, and then analyzes whether there is any obstruction between the buildings based on the sunlight information. The advantage is that industrial park planning usually adopts two-dimensional graphics for planning, and two-dimensional graphics make it difficult to consider whether there is an obstruction relationship between buildings based on the heights and spacing of different buildings. In order to ensure that the sunlight of the buildings can comply with relevant regulations, the three-dimensional model can be used to analyze whether the sunlight of the buildings is sufficient, thereby improving the effectiveness and rationality of the three-dimensional modeling technology of park planning; The present invention is to output the sunshine shortage signal B i , analyze how the intervals between buildings need to be adjusted, adjust the intervals between buildings based on the analysis results, and obtain the final three-dimensional model. The advantage is that the solar altitude angle is highest at noon during the day, and the buildings can receive the most sunlight at this time. If there is still occlusion at this time, it means that the intervals between buildings are unreasonable. By analyzing the distance that the buildings need to be moved through the occlusion area, the three-dimensional modeling is adjusted, which improves the rationality of the intervals between buildings in the park planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a principle block diagram of the system of the present invention; Figure 2 is a schematic diagram of a plan view of the present invention; Figure 3 A schematic diagram of a coordinate system for selecting an area occupied by the present invention; Figure 4 Schematic diagram of the maximum X, minimum X, maximum Y and minimum Y of the present invention; Figure 5 A schematic diagram of a rectangular area of the present invention; Figure 6 A schematic diagram of the rectangular footprint of all buildings of the present invention; Figure 7A schematic diagram of the definitions of the left margin, right margin, and building length of the present invention; Figure 8 is a schematic diagram of the highest occlusion point of the present invention; Figure 9 Schematic diagram of the sunshine analysis model of the present invention; Figure 10 is a flow chart of the steps of the method of the present invention; Figure 11 Schematic diagram of the structure of the electronic device of the present invention. DETAILED DESCRIPTION
[0017] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0018] Example 1, please refer to Figure 1 As shown, the present application provides a system for generating a three-dimensional model design scheme for industrial park planning, including a basic model construction module, a sunlight information simulation module, an occlusion analysis module, and a final model construction module; the basic model construction module, the sunlight information simulation module, and the occlusion analysis module are respectively connected to the data of the final model construction module; The basic model building module is used to obtain the floor plan and building height of the buildings in the industrial park planning and generate the basic three-dimensional model of the industrial park; The basic model building module is configured with a basic model building strategy, which includes: See also Figure 2 As shown, obtain the floor plan of the building planning in the industrial park planning; See also Figure 3 As shown, use the length as the X-axis and Y-axis respectively to establish a plane rectangular coordinate system, named the floor space frame selection coordinate system, and draw the plane map into the floor space frame selection coordinate system; The graphic corresponding to the building's footprint is named footprint graphic; See also Figure 4 As shown, for any occupied area graph, obtain the maximum and minimum values of X in the occupied area graph, mark them as Max X and Min X respectively, obtain the maximum and minimum values of Y, mark them as Max Y and Min Y respectively; See also Figures 5 and 6As shown, connect the coordinate points (minimum X, minimum Y) with (minimum X, maximum Y), connect the coordinate points (minimum X, minimum Y) with (maximum X, minimum Y), connect the coordinate points (maximum X, minimum Y) with (maximum X, maximum Y), and connect the coordinate points (maximum X, maximum Y) with (minimum X, maximum Y). After connection, a rectangle is obtained, which is the building's footprint rectangle. Analyze all the footprint graphics to obtain the footprint rectangles of all buildings. Using the rectangular area of each building in the plan as the base and the corresponding building height as the height to construct a cuboid, the plan is converted from a two-dimensional image to a three-dimensional image to obtain a basic three-dimensional model; In practical applications, the plane map is obtained as Figure 2 As shown, Figure 2 The plan view shown is only a simplified diagram and is only used as an example in this embodiment. The coordinate system of the occupied frame is constructed as follows Figure 3 As shown, taking the building at the bottom of the plan as an example, the maximum X, minimum X, maximum Y and minimum Y are obtained as follows Figure 4 As shown, draw the area rectangle as Figure 5 As shown, Figure 5 The dotted lines in the figure are the lines connecting the coordinate points. Similarly, all other non-rectangular land figures are designed as rectangles, and several land rectangles are obtained as follows: Figure 6 As shown; the purpose of converting the footprint graphic into a footprint rectangle is to consider the shading relationship between different buildings on sunlight. The irregular shape of the building itself will also have a certain impact on its own sunlight, which will affect the subsequent judgment. Therefore, converting all of them into rectangles can avoid the misjudgment of the shading relationship between buildings caused by their own irregular shapes; using the footprint rectangle of each building in the plan as the base and the corresponding building height as the height to construct a cuboid, convert the plan from a two-dimensional image to a three-dimensional image, that is, convert the two-dimensional rectangle into a three-dimensional cuboid, and obtain a basic three-dimensional model.
[0019] The sunshine information simulation module is used to simulate the sunshine information of different buildings in the basic three-dimensional model through the sunshine analysis model; the sunshine information simulation module includes a sunshine simulation unit and an information recording unit; The sunshine simulation unit is equipped with sunshine simulation strategies, which include: Establish a sunlight analysis model; Get the latitude and longitude of the industrial park; Enter the longitude and latitude as well as the basic 3D model into the sunshine analysis model; Randomly select one day from each month of the previous year as the simulation date, sort and number the simulation dates in ascending order of the month, and use the symbol M to n Indicates, where n is a positive integer and n is the sequence number of M; In actual application, the sunshine analysis model is implemented by using the existing real-time simulation technology of building sunlight. The longitude and latitude of the industrial park are obtained as (117.35, 31.82). The longitude and latitude are used to input the sunshine analysis model to simulate the lighting effect corresponding to the solar altitude angle in different regions at a certain moment. The current year is 2024, and one day is randomly selected from each month from January to December in 2023 as the simulation date to obtain M1 to M2. 12 They are January 12, 2023, February 15, 2023, March 22, 2023, April 8, 2023, May 12, 2023, June 28, 2023, July 5, 2023, August 2, 2023, September 16, 2023, October 4, 2023, November 24, 2023, and December 29, 2023. Multiple days in different months are used as simulation dates to prevent the possibility of not being able to obtain real sunshine information due to weather conditions. The information recording unit is configured with an information recording policy, which includes: Number the buildings in the basic 3D model, using the symbol B i Represents, where i is a positive integer and i is the serial number of B; Starting with n=1, set M n Run the sunshine analysis model as the simulation date and obtain B at 12:00 noon i The area on the south side of the sun is marked as S (n,i) , S (n,i) Indicates M n As the simulated date B i The area of the south side exposed to sunlight; Increase n by 1 and repeat until n=max(n) and stop the analysis, where max(n) is the maximum value of n; S (n,i) That is sunshine information; In practical applications, since the sun rises in the east, is directly above and slightly south at noon, and sets in the west, and the solar altitude angle at noon is the maximum in a day, the area of the south side of the building illuminated by sunlight at 12:00 noon is taken as the building's sunshine information; for example, when running the sunshine analysis model with M1 as the simulation date, the area of the south side of building B1 illuminated by sunlight is 4782 m2, that is, S (1,1) is 122㎡; and so on, we can get several S (n,i) .
[0020] The occlusion analysis module is used to analyze whether there is occlusion between buildings based on sunlight information; The occlusion analysis module is configured with an occlusion analysis strategy, which includes: See also Figure 7 As shown, obtain the building construction standards of the building, which include the height of windows from the ground, the left distance, the right distance and the length of the building; By formula C i =(BH-2×GCH)×(BL-LR) to calculate the sunny area of the building. i , the sunny area is marked as C i , where C i is the sunny area, BH is the building height, GCH is the window height from the ground, BL is the building length, L is the left distance, and R is the right distance; Starting with i=1, search for S (n,i) The maximum value in is marked as E i , add i+1 and repeat the search for E i , until i=max(i), where max(i) is the maximum value of i; E i with C i Compare, if E i Less than C i , then output insufficient sunshine signal, if E i Greater than or equal to C i , then the output is the sunshine normal signal; In practical applications, the definitions of left margin, right margin and building length are as follows: Figure 7 As shown, the left and right distances and building length are all values on the south side of the building. For building B1, the window height from the ground is 1m, the left distance is 1m, the right distance is 1m, the building length is 122m, and the building height is 40m. By calculation, the sunny area C1 of B1 is (40-2×1)×(122-1-1)=4560㎡. For B1, i is always 1. (1,1) To S (12,1) The maximum value E1 of the area of the south side of building B1 that is illuminated by sunlight is 4875 m2. By comparison, if E1 is greater than or equal to C1, a normal sunlight signal is output.
[0021] The final model construction module is used to adjust the distance between buildings if there is occlusion between buildings, and obtain the final three-dimensional model; the final model construction module includes an adjustment analysis unit and a model adjustment unit; Adjust the analysis unit to output the insufficient sunlight signal B i , analyze how the spacing between buildings needs to be adjusted; The adjustment analysis unit is configured with an adjustment analysis strategy, which includes: Get the solar declination, represented by the symbol δ, and get the geographical latitude of the industrial park, represented by the symbol φ; The solar altitude angle is calculated using the formula sinθ=cos(φ-δ), where θ is the solar altitude angle. Simplified, we get θ=90-(δ-φ); See also Figures 8 and 9 As shown, get B i The highest point of the shaded area on the south side is marked as the highest obstruction point. The distance between the highest obstruction point and the ground is obtained and marked as the highest obstruction height. Calculate H / tanθ and mark the result as the interval adjustment value, where H is the highest occlusion height; Calculate B of all output sunshine shortage signals i The corresponding interval adjustment value is represented by the symbol T i express; In actual application, in this embodiment, E1 outputs a normal sunshine signal, while E2 outputs an insufficient sunshine signal, which means that B2 is blocked, resulting in insufficient sunshine. The solar declination δ is obtained to be 8.61°, the geographical latitude of the industrial park is 31.82°, and the calculated solar altitude angle θ is 66.39°. The highest blocking point is as follows: Figure 8 As shown, Figures 2 to 8 These are simple diagrams for easy understanding. The actual sunshine analysis model can be referred to Figure 9 , the highest shielding height is obtained as 12m, and H / tanθ is calculated to obtain the interval adjustment value T2 as 5.25m. The calculation result is rounded to two decimal places. Since B1 outputs a normal sunshine signal, T1 does not exist. Similarly, analyze T of other buildings. i ; The model adjustment unit is used to adjust the distance between buildings according to the analysis results to obtain the final 3D model. The model adjustment unit is configured with a model adjustment strategy, which includes: B for outputting insufficient sunlight signal i , will be temporarily referred to as the building to be adjusted, and the building adjacent to the south of the building to be adjusted will be temporarily referred to as the blocking building; Increase the distance between the building to be adjusted and the blocking building by T i , for all B that output insufficient sunshine signal i All changes were made; If the buildings exceed the scope of the industrial park after adjustment, all buildings will be moved to the south until all buildings are within the industrial park; Mark the adjusted basic 3D model as the final 3D model; In actual application, if B2 outputs a sunlight deficiency signal, B2 will be temporarily called the building to be adjusted, and the adjacent building to the south of B2 is B1. Therefore, the distance between B1 and B2 is 13m, and the distance is increased by T2, that is, 13+5.25=18.25m, and the distance between B2 and B1 is changed to 18.25m. B1 does not move, and B2 moves 5.25m to the north. All buildings to the north of B2 need to move 5.25m to the north to ensure that the distance between B2 and other buildings remains unchanged. For example, B1, B2, B3 and B4 are a row of buildings from south to north. After B2 moves, B3 and B4 They all need to be moved the same distance to ensure that the distance between B2 and B3 and the distance between B3 and B4 remain unchanged. If B3 also outputs a signal of insufficient sunlight, after B3 is moved, B4 needs to be moved again. If B4 exceeds the planning scope of the industrial park, B1, B2, B3 and B4 will be moved south as a whole until B1, B2, B3 and B4 are all within the planning scope of the industrial park. This method is to make the design of buildings in industrial parks with sufficient planning scope more reasonable. If there is no industrial park with sufficient planning scope, no matter how it is changed, the requirements cannot be met. At this time, it is only necessary to perform the 2D to 3D model construction.
[0022] Example 2, please refer to Figure 10 As shown, the present application provides a method for generating a three-dimensional model design scheme for industrial park planning, comprising the following steps: Step S1: Obtain the floor plan and building heights of the buildings in the industrial park plan and generate a basic three-dimensional model of the industrial park. Step S1 includes the following sub-steps: Step S101, obtaining a floor plan of a building in an industrial park plan; Step S102: Using the length as the X-axis and the Y-axis, a rectangular coordinate system is established, named the floor plan frame selection coordinate system, and the floor plan is drawn into the floor plan frame selection coordinate system; Step S103, naming the graphic corresponding to the building's floor area as a floor area graphic; Step S104: For any area occupied by a graph, obtain the maximum and minimum values of X in the graph, marking them as Max X and Min X, respectively; obtain the maximum and minimum values of Y, marking them as Max Y and Min Y, respectively; Step S105: Connect the coordinate points (minimum X, minimum Y) and (minimum X, maximum Y), connect the coordinate points (minimum X, minimum Y) and (maximum X, minimum Y), connect the coordinate points (maximum X, minimum Y) and (maximum X, maximum Y), and connect the coordinate points (maximum X, maximum Y) and (minimum X, maximum Y) to obtain a rectangle, which is the building's footprint rectangle. Analyze all footprint graphics to obtain the footprint rectangles of all buildings. Step S106: Using the rectangular area of each building in the plan view as the base and the corresponding building height as the height, a cuboid is constructed to convert the plan view from a two-dimensional image into a three-dimensional image, thereby obtaining a basic three-dimensional model; Step S2, simulating the sunshine information of different buildings in the basic three-dimensional model through the sunshine analysis model; Step S2 includes the following sub-steps: Step S201, establishing a sunshine analysis model; Step S202, obtaining the longitude and latitude of the industrial park; Step S203, entering the longitude and latitude and the basic three-dimensional model into the sunshine analysis model; Step S204: randomly select one day from each month of the previous year as a simulation date, sort and number the simulation dates in ascending order of the month, and use the symbol M to identify the simulation date. n Indicates, where n is a positive integer and n is the sequence number of M; Step S205, sequentially n Run the sunlight analysis model as a simulation date and record the sunlight information of different buildings; Step S205 includes the following sub-steps: Step S2051: Number the buildings in the basic 3D model, using symbol B i Represents, where i is a positive integer and i is the serial number of B; Step S2052, starting with n=1, M n Run the sunshine analysis model as the simulation date and obtain B at 12:00 noon i The area on the south side of the sun is marked as S (n,i) , S (n,i) Indicates M n As the simulated date B i The area of the south side exposed to sunlight; Step S2053: increase n by 1 and repeat until n=max(n) and stop the analysis, where max(n) is the maximum value of n; Step S2054, S (n,i) That is sunshine information; Step S3, analyzing whether there is any obstruction between buildings based on the sunlight information; Step S3 includes the following sub-steps: Step S301, obtaining the building construction standards, which include window height from the ground, left margin, right margin, and building length; Step S302, by formula C i =(BH-2×GCH)×(BL-LR) to calculate the sunny area of the building. i , the sunny area is marked as C i, where C i is the sunny area, BH is the building height, GCH is the window height from the ground, BL is the building length, L is the left distance, and R is the right distance; Step S303, starting with i=1, search S (n,i) The maximum value in is marked as E i , add i+1 and repeat the search for E i , until i=max(i), where max(i) is the maximum value of i; Step S304: E i with C i Compare, if E i Less than C i , then output insufficient sunshine signal, if E i Greater than or equal to C i , then the output is the sunshine normal signal; Step S4: If there is any occlusion between buildings, the distance between the buildings is adjusted to obtain a final 3D model. Step S4 includes the following sub-steps: Step S401: Outputting a sunlight shortage signal to B i , analyze how the spacing between buildings needs to be adjusted; Step S401 includes the following sub-steps: Step S4011, obtaining the solar declination, represented by the symbol δ, and obtaining the geographical latitude of the industrial park, represented by the symbol φ; Step S4012, using the solar altitude angle calculation formula sinθ=cos(φ-δ), where θ is the solar altitude angle, simplified to θ=90-(δ-φ); Step S4013, obtain B i The highest point of the shaded area on the south side is marked as the highest obstruction point. The distance between the highest obstruction point and the ground is obtained and marked as the highest obstruction height. Step S4014, calculate H / tanθ, and mark the calculation result as the interval adjustment value, where H is the highest occlusion height; Step S4015: Calculate the B of all output sunshine shortage signals. i The corresponding interval adjustment value is represented by the symbol T i express; Step S402: adjusting the distances between buildings based on the analysis results to obtain a final 3D model; Step S402 includes the following sub-steps: Step S4021: For B outputting insufficient sunlight signal i , will be temporarily referred to as the building to be adjusted, and the building adjacent to the south of the building to be adjusted will be temporarily referred to as the blocking building; Step S4022: Increase the distance between the building to be adjusted and the blocking building by T i , for all B that output insufficient sunshine signal i All changes were made; Step S4023: If the adjusted buildings are beyond the scope of the industrial park, all buildings are moved to the south until all buildings are within the industrial park. Step S4024: Mark the adjusted basic 3D model as the final 3D model.
[0023] Example 3, please refer to Figure 11 As shown, Figure 11 The present invention provides a schematic diagram of the structure of an electronic device, which may include: a processor, a communication interface, a memory, and a communication bus, wherein the processor, the communication interface, and the memory communicate with each other via the communication bus. The memory stores computer-readable instructions, and the processor can call the instructions in the memory. When the computer-readable instructions are executed by the processor, the processor performs the steps in a method for generating a three-dimensional model design scheme for industrial park planning to achieve the following functions: obtaining the floor plan and building heights of the planned buildings in the industrial park planning to generate a basic three-dimensional model of the industrial park; simulating the sunlight information of different buildings in the basic three-dimensional model using a sunlight analysis model; analyzing whether there is any obstruction between the buildings based on the sunlight information; and if there is any obstruction between the buildings, adjusting the spacing between the buildings to obtain a final three-dimensional model.
[0024] In addition, the logical instructions in the above-mentioned memory can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present application, or the part that contributes to the existing technology, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, and other media that can store program code.
[0025] Example 4. The present application also provides a computer program product, which includes a computer program stored on a computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer can execute a method for generating a three-dimensional model design scheme for industrial park planning provided by the above methods. The method includes: obtaining the floor plan and building height of the building planning in the industrial park planning, and generating a basic three-dimensional model of the industrial park; simulating the sunlight information of different buildings in the basic three-dimensional model through a sunlight analysis model; analyzing whether there is occlusion between the buildings based on the sunlight information; if there is occlusion between the buildings, adjusting the interval between the buildings, and obtaining the final three-dimensional model.
[0026] Example 5. The present application also provides a computer-readable storage medium. The present application provides a storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps in the above method for generating a three-dimensional model design scheme for industrial park planning are executed to achieve the following functions: obtaining the floor plan and building height of the building planning in the industrial park planning, and generating a basic three-dimensional model of the industrial park; simulating the sunlight information of different buildings in the basic three-dimensional model through a sunlight analysis model; analyzing whether there is occlusion between the buildings based on the sunlight information; if there is occlusion between the buildings, adjusting the interval between the buildings, and obtaining the final three-dimensional model.
[0027] Through the description of the above embodiments, the embodiments of the present invention can be provided as methods, systems, or computer program products. Based on this understanding, the essence of the above technical solutions or the portion that contributes to the prior art can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, or an optical disk, and includes a number of instructions for enabling a computer device (such as a personal computer, server, or network device) to execute the methods described in various embodiments or certain portions of the embodiments.
[0028] In the embodiments provided in this application, it should be understood that the disclosed system or method can be implemented in other ways. The embodiments described above are merely illustrative. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules or units can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of systems, modules and units can be electrical, mechanical or other forms.
[0029] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that The steps include: Obtain the floor plan and building height of the buildings in the industrial park planning, and generate a basic three-dimensional model of the industrial park; The sunshine information of different buildings in the basic three-dimensional model is simulated through the sunshine analysis model; Analyze whether there is any shading between buildings based on sunlight information; If there is any occlusion between buildings, the interval between the buildings is adjusted to obtain the final three-dimensional model.
2. According to claim 1, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that Obtaining the floor plan and building height of the buildings in the industrial park planning and generating the basic 3D model of the industrial park includes the following sub-steps: Obtain the floor plan of the building plan in the industrial park plan; With the length as the X-axis and Y-axis respectively, a plane rectangular coordinate system is established, named the floor space frame selection coordinate system, and the plane map is drawn into the floor space frame selection coordinate system; Name the figure corresponding to the building's footprint as the footprint figure; For any area graph, obtain the maximum and minimum values of X in the area graph, mark them as maximum X and minimum X respectively, and obtain the maximum and minimum values of Y, mark them as maximum Y and minimum Y respectively; Connect the coordinate point (minimum X, minimum Y) with (minimum X, maximum Y), connect the coordinate point (minimum X, minimum Y) with (maximum X, minimum Y), connect the coordinate point (maximum X, minimum Y) with (maximum X, maximum Y), connect the coordinate point (maximum X, maximum Y) with (minimum X, maximum Y), and connect the coordinate point (maximum X, maximum Y) with (minimum X, maximum Y). After connecting, a rectangle is obtained, which is the building's footprint rectangle. Analyze all the footprint graphics to obtain the footprint rectangles of all buildings; Taking the rectangular area of each building in the plan view as the base and the corresponding building height as the height to construct a cuboid, the plan view is converted from a two-dimensional image to a three-dimensional image to obtain a basic three-dimensional model.
3. According to claim 2, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that The sunlight analysis model is used to simulate the sunlight information of different buildings in the basic 3D model, including the following sub-steps: Establish a sunshine analysis model; Get the latitude and longitude of the industrial park; Enter the longitude and latitude and the basic three-dimensional model into the sunshine analysis model; One day is randomly selected from each month of the previous year as the simulation date, and the simulation dates are sorted and numbered in ascending order of the month. n Represents, where n is a positive integer and n is the sequence number of M; M n Run the solar radiation analysis model as a simulation date and record the solar radiation information of different buildings.
4. According to claim 3, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that M n Running the sunlight analysis model as a simulation date and recording sunlight information for different buildings includes the following sub-steps: The buildings in the basic 3D model are numbered using the symbol B i Represents, where i is a positive integer and i is the serial number of B; Starting with n=1, set M n Run the sunshine analysis model as the simulation date and obtain the B at 12:00 noon i The area on the south side of the sun is marked as S (n,i) , S (n,i) Indicates M n As the simulated date B i The area of the south side exposed to sunlight; Increase n by 1 and repeat until n=max(n) and stop the analysis, where max(n) is the maximum value of n. The S (n,i) That is the sunshine information.
5. According to claim 4, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that Analyzing whether there is shading between buildings based on sunlight information includes the following sub-steps: Obtaining construction standards of the building, wherein the construction standards include window height from the ground, left margin, right margin, and building length; By formula C i =(BH-2×GCH)×(BL-LR) Calculate the sunny area of the building. i , the sunny area is marked as C i , where C i is the sunny area, BH is the building height, GCH is the height of the window from the ground, BL is the building length, L is the left distance, and R is the right distance; Starting with i=1, search for S (n,i) The maximum value in is marked as E i , add i+1, and repeat the search for E i , until i=max(i), where max(i) is the maximum value of i; E i With C i Compare, if E i Less than C i , then the output is insufficient sunshine signal, if E i Greater than or equal to C i , then the output is a normal sunshine signal.
6. According to claim 5, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that If there is occlusion between buildings, the interval between the buildings is adjusted, and the final 3D model is obtained, including the following sub-steps: B for outputting insufficient sunlight signal i , analyzing how the spacing between buildings needs to be adjusted; Based on the analysis results, the intervals between buildings are adjusted to obtain the final three-dimensional model.
7. A method for generating a three-dimensional model design scheme for industrial park planning according to claim 6, It is characterized in that B for outputting insufficient sunlight signal i , analyzing how the spacing between buildings needs to be adjusted includes the following sub-steps: Get the solar declination, represented by the symbol δ, and get the geographical latitude of the industrial park, represented by the symbol φ; The solar altitude angle is calculated by the formula sinθ=cos(φ-δ), where θ is the solar altitude angle, which can be simplified to θ=90-(δ-φ); Get B i The highest point of the shaded part on the south side is marked as the highest occlusion point, and the distance between the highest occlusion point and the ground is obtained, which is marked as the highest occlusion height; Calculate H / tanθ and mark the result as the interval adjustment value, where H is the highest occlusion height; Calculate B of all output sunshine shortage signals i The corresponding interval adjustment value is represented by the symbol T i express.
8. According to claim 7, a method for generating a three-dimensional model design scheme for industrial park planning, It is characterized in that Adjusting the spacing between buildings based on the analysis results includes the following sub-steps: B for outputting insufficient sunlight signal i , which will be temporarily referred to as the building to be adjusted, and the building adjacent to the south of the building to be adjusted will be temporarily referred to as the blocking building; Increase the distance between the building to be adjusted and the blocking building by T i , for all B outputting insufficient sunshine signals i All changes were made; If the buildings after adjustment are beyond the scope of the industrial park, all buildings will be moved to the south as a whole until all buildings are within the industrial park; The adjusted basic 3D model is marked as the final 3D model.
9. A system for generating a three-dimensional model design scheme for industrial park planning, used to implement a method for generating a three-dimensional model design scheme for industrial park planning as described in any one of claims 1 to 8, It is characterized in that It includes a basic model construction module, a sunshine information simulation module, a shading analysis module and a final version model construction module; the basic model construction module, the sunshine information simulation module and the shading analysis module are respectively connected with the data of the final version model construction module; The basic model building module is used to obtain the floor plan and building height of the building planning in the industrial park planning, and generate a basic three-dimensional model of the industrial park; The sunshine information simulation module is used to simulate the sunshine information of different buildings in the basic three-dimensional model through the sunshine analysis model; The shading analysis module is used to analyze whether there is shading between buildings based on sunshine information; The final model building module is used to adjust the interval between buildings if there is any obstruction between the buildings, and obtain the final three-dimensional model.
10. A storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are executed.
Citation Information
Patent Citations
High-rise building group daylighting optimization processing method based on BIM (Building Information Modeling) technology
CN107341296A
Method for simultaneously detecting shadows of building roof, building wall body and ground
CN110390715A
Building planning method and device, electronic equipment and storage medium
CN111523189A
Complex building irregular roof photovoltaic panel arrangement system and optimization method
CN113221356A
Building height calculation method, device and equipment based on remote sensing image
CN116434055A
Cited By
Method and system for realizing three-dimensional model planning design based on two-dimensional data
CN120724515A
A method and system for realizing three-dimensional model planning and design based on two-dimensional data
CN120724515B