Sorting plan optimization method and device, computer equipment and storage medium
Using digital twin technology to build a sorting plan simulation model, optimize the grid distribution and flow direction of the small piece sorter, solve the backflow problem caused by unreasonable grid distribution of the sorter, improve the sorting efficiency and production capacity utilization, and achieve Automated sorting plan optimization.
Patent Information
- Application Number
- CN202310410363.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-15
AI Technical Summary
In the existing technology, the unreasonable grid distribution of small-piece sorting machines causes packages to flow back beyond the maximum number of cycles, wasting production capacity and man-hours, and manual corrections are difficult to ensure the rationality of the sorting plan, affecting sorting efficiency.
The sorting plan simulation model built based on digital twin technology is used for simulation testing and optimization. By obtaining the initial sorting plan, training the digital twin model, and optimizing the integer programming model to meet the preset sorting conditions, the automatic optimization of the sorting plan is achieved.
Evaluate and optimize the sorting plan without physical verification, save time and manpower, reduce production risks, improve sorting efficiency, and ensure the rationality of the sorting plan and capacity utilization.
Smart Images

Figure CN118780409A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing, and specifically to a sorting plan optimization method, device, computer equipment and storage medium. Background Art
[0002] For the small-item sorting machine in the transfer yard, when the capacity of the small-item sorting machine is sufficient, there is a possibility that the parcels will return due to the untimely processing of the grid opening, which will not only waste the capacity of the small-item machine but also the man-hours of the return flow. Since the loading platform of the small-item sorting machine is distributed on the left and right sides of the small-item sorting machine, and the drop grid openings are also distributed on the left and right sides of the small-item sorting machine, in the process of sorting, it is possible to make the small-item sorting machine load the parcels as soon as possible and drop the parcels to the corresponding grid opening area as soon as possible, so as to maximize the use of the capacity of the small-item sorting machine.
[0003] In the related technology, on the one hand, a symmetrical distribution method is adopted on the left and right sides of the large flow grid to increase the production capacity as soon as possible. Due to the particularity of some grid destinations, the grid sorting and distribution are also affected. There are many indescribable constraints related to the site, grid flow, manual operation habits, and package building rules (the package starts from the loading platform to the completion of the package building at the grid). On the other hand, experienced small-item sorting machine operators are relied on to perform manual corrections, which have a slow effect and do not have much theoretical basis. In addition, the cost of trial and error is high, which may cause sorting accidents. Therefore, it is necessary to provide a sorting plan optimization solution that can save costs and improve sorting efficiency. Summary of the invention
[0004] The embodiments of the present application provide a sorting plan optimization method, device, computer equipment and storage medium to solve the technical problem that manual sorting correction is difficult to ensure the rationality of the sorting plan and affects the sorting capacity.
[0005] On the one hand, the present application provides a sorting plan optimization method, the sorting plan optimization method comprising:
[0006] Obtain the initial sorting plan of the target transfer station;
[0007] According to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain test results;
[0008] When the test result does not meet the preset sorting condition, the initial sorting plan is optimized by using a preset sorting optimization model to obtain an optimized initial sorting plan;
[0009] According to the optimized initial sorting plan, continue to perform simulation experiments according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain a target sorting plan.
[0010] In some embodiments of the present application, before performing a simulation test according to the initial sorting plan using a transfer field sorting plan simulation model constructed based on digital twin technology to obtain the test results, the method further includes:
[0011] Collect sensor data in the target transfer yard, and obtain historical sorting plans and corresponding historical sorting data;
[0012] Based on the sensor data, the historical sorting plan and the corresponding historical sorting data, the preset digital twin model is trained to obtain a trained digital twin model, and the trained digital twin model is determined as a transfer yard sorting plan simulation model.
[0013] In some embodiments of the present application, the initial sorting plan includes the express data of the target transfer site, the mapping relationship between the initial flow direction and the initial grid, and the test results include the capacity results of the initial sorting plan, and the capacity results include the number of express sorting within a preset time period;
[0014] According to the initial sorting plan, a simulation test is performed using a transfer field sorting plan simulation model constructed based on digital twin technology to obtain test results, including:
[0015] The express data, the mapping relationship between the initial flow direction and the initial grid are input into the transfer yard sorting plan simulation model, the express sorting quantity within a preset time period output by the transfer yard sorting plan simulation model is obtained, and the production capacity result is obtained.
[0016] In some embodiments of the present application, the preset sorting optimization model is an integer programming model; the initial sorting plan is optimized by using the preset sorting optimization model to obtain the optimized initial sorting plan, including:
[0017] The mapping relationship between the express data, the initial flow direction and the initial grid is input into the integer programming model, and the integer programming model is solved according to the preset sorting constraint conditions to obtain the optimized initial sorting plan, wherein the goal of the integer programming model is to meet the preset sorting conditions.
[0018] In some embodiments of the present application, the preset sorting optimization model is a mathematical model; the initial sorting plan is optimized by using the preset sorting optimization model to obtain the optimized initial sorting plan, including:
[0019] The grids of similar initial flow directions in the initial flow directions are merged to reserve a preset number of configurable grids to generate the optimized initial sorting plan.
[0020] In some embodiments of the present application, after merging the grids of similar initial flow directions in the initial flow directions, reserving a preset number of configurable grids, and generating the optimized initial sorting plan, the method further includes:
[0021] If it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than a preset growth rate threshold, a mapping relationship between the initial flow direction and the configurable grid is generated to obtain an updated initial sorting plan.
[0022] In some embodiments of the present application, after obtaining the optimized initial sorting plan and obtaining the target sorting plan, the method further includes:
[0023] According to the updated initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a first test result;
[0024] According to the target sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain a second test result;
[0025] According to the first test result and the test result, a sorting plan with the best test result is determined.
[0026] On the other hand, the present application provides a sorting plan optimization device, the sorting plan optimization device comprising:
[0027] An acquisition module is used to obtain the initial sorting plan of the target transfer station;
[0028] A test module is used to perform a simulation test according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a test result;
[0029] An optimization module, used for optimizing the initial sorting plan by using a preset sorting optimization model to obtain an optimized initial sorting plan when the test result does not meet the preset sorting condition;
[0030] The repeated simulation module is used to continue to execute the simulation test according to the optimized initial sorting plan, using the transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain the test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain the target sorting plan.
[0031] In some embodiments of the present application, the sorting plan optimization device further includes:
[0032] A collection module, used to collect sensor data in the target transfer yard, and obtain historical sorting plans and corresponding historical sorting data;
[0033] A training module is used to train a preset digital twin model based on the sensor data, the historical sorting plan and the corresponding historical sorting data to obtain a trained digital twin model, and determine the trained digital twin model as a transfer yard sorting plan simulation model.
[0034] In some embodiments of the present application, the initial sorting plan includes the express data of the target transfer site, the mapping relationship between the initial flow direction and the initial grid, the test result includes the capacity result of the initial sorting plan, and the capacity result includes the number of express sorting within a preset time period; the test module is specifically used to:
[0035] The express data, the mapping relationship between the initial flow direction and the initial grid are input into the transfer yard sorting plan simulation model, the express sorting quantity within a preset time period output by the transfer yard sorting plan simulation model is obtained, and the production capacity result is obtained.
[0036] In some embodiments of the present application, the preset sorting optimization model is an integer programming model; the optimization module is specifically used for:
[0037] The mapping relationship between the express data, the initial flow direction and the initial grid is input into the integer programming model, and the integer programming model is solved according to the preset sorting constraint conditions to obtain the optimized initial sorting plan, wherein the goal of the integer programming model is to meet the preset sorting conditions.
[0038] In some embodiments of the present application, the preset sorting optimization model is a mathematical model; the optimization module is also specifically used for:
[0039] The grids of similar initial flow directions in the initial flow directions are merged to reserve a preset number of configurable grids to generate the optimized initial sorting plan.
[0040] In some embodiments of the present application, the sorting plan optimization device further includes:
[0041] The generation module is used to generate a mapping relationship between the initial flow direction and the configurable grid if it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than a preset growth rate threshold, so as to obtain an updated initial sorting plan.
[0042] In some embodiments of the present application, the sorting plan optimization device further includes:
[0043] A first simulation module is used to perform a simulation test according to the updated initial sorting plan and the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a first test result;
[0044] A second simulation module is used to perform a simulation test according to the target sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a second test result;
[0045] A determination module is used to determine a sorting plan with the best test results based on the first test result and the test result.
[0046] On the other hand, the present application also provides a computer device, the computer device comprising:
[0047] one or more processors;
[0048] Memory; and
[0049] One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the steps in the sorting plan optimization method described in any one of the first aspects.
[0050] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program is loaded by a processor to execute the steps in the sorting plan optimization method described in any one of the first aspects.
[0051] The present application obtains an initial sorting plan of a target transfer station; according to the initial sorting plan, a simulation test is performed using a transfer station sorting plan simulation model constructed based on digital twin technology to obtain a test result; when the test result does not meet the preset sorting condition, the initial sorting plan is optimized using a preset sorting optimization model to obtain an optimized initial sorting plan; according to the optimized initial sorting plan, the steps of performing a simulation test using a transfer station sorting plan simulation model constructed based on digital twin technology to obtain a test result are continued to be performed until the test result meets the preset sorting condition, and the optimized initial sorting plan is obtained to obtain a target sorting plan. Since the simulation test is performed using the transfer station sorting plan simulation model, the advantages and disadvantages of the sorting plan can be evaluated before physical verification is performed, which saves time, manpower and material resources, and reduces the production risks brought by physical verification. Iterative optimization is performed according to the simulation experiment results to achieve the maximum optimization of the initial sorting plan, thereby greatly improving the sorting efficiency of the target sorting plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0053] Figure 1 This is a schematic diagram of a scene of a sorting plan optimization device provided in an embodiment of the present application;
[0054] Figure 2 It is a schematic diagram of an embodiment of the sorting plan optimization method provided in the embodiments of the present application;
[0055] Figure 3 It is a schematic diagram of the structure of an embodiment of a sorting plan optimization device provided in an embodiment of the present application;
[0056] Figure 4 It is a schematic diagram of the structure of an embodiment of a computer device provided in the embodiments of the present application. DETAILED DESCRIPTION
[0057] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.
[0058] In the description of the present application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present application, "plurality" means two or more, unless otherwise clearly and specifically defined.
[0059] In this application, the word "exemplary" is used to mean "used as an example, illustration, or description." Any embodiment described in this application as "exemplary" is not necessarily to be construed as being preferred or advantageous over other embodiments. The following description is given to enable any technician in the field to implement and use the present application. In the following description, details are listed for the purpose of explanation. It should be understood that a person of ordinary skill in the art can recognize that the present application can be implemented without using these specific details. In other instances, well-known structures and processes will not be elaborated in detail to avoid obscuring the description of the present application with unnecessary details. Therefore, the present application is not intended to be limited to the embodiments shown, but is consistent with the widest scope consistent with the principles and features disclosed in the present application.
[0060] It should be noted that since the method of the embodiment of the present application is executed in a computer device, the processing objects of each computer device exist in the form of data or information. For example, the time described in this article is actually time information, which is used to characterize the information of time. It can be understood that if the size, quantity, position, etc. are mentioned in the subsequent embodiments, they all exist in the corresponding data form to facilitate the computer device to process, and the details will not be repeated here.
[0061] The embodiments of the present application provide a sorting plan optimization method, apparatus, computer equipment, and storage medium, which are described in detail below.
[0062] See also Figure 1 , Figure 1 Schematic diagram of a scene of a sorting plan optimization device provided in an embodiment of the present application. The sorting plan optimization device may include a computer device 100, in which the sorting plan optimization device is integrated. Figure 1 Computer equipment in.
[0063] In the embodiment of the present application, the computer device 100 is mainly used to obtain an initial sorting plan of a target transfer station; according to the initial sorting plan, a simulation test is performed using a transfer station sorting plan simulation model constructed based on the digital twin technology to obtain a test result; when the test result does not meet the preset sorting condition, the initial sorting plan is optimized using a preset sorting optimization model to obtain an optimized initial sorting plan; according to the optimized initial sorting plan, the steps of performing a simulation test using a transfer station sorting plan simulation model constructed based on the digital twin technology to obtain a test result are continued until the test result meets the preset sorting condition, and the optimized initial sorting plan is obtained to obtain a target sorting plan. Since the simulation test is performed using the transfer station sorting plan simulation model, the advantages and disadvantages of the sorting plan can be evaluated before physical verification is performed, which saves time, manpower and material resources, reduces the production risks brought by physical verification, and performs iterative optimization according to the simulation experiment results to achieve the maximum optimization of the initial sorting plan, thereby greatly improving the sorting efficiency of the target sorting plan.
[0064] In the embodiment of the present application, the computer device 100 may be an independent server, or a server network or server cluster composed of servers. For example, the computer device 100 described in the embodiment of the present application includes but is not limited to a computer, a network host, a single network server, a plurality of network server sets or a cloud server composed of a plurality of servers. The cloud server is composed of a large number of computers or network servers based on cloud computing.
[0065] It is understandable that the terminal 100 used in the embodiments of the present application may be a device including both receiving and transmitting hardware, that is, a device having receiving and transmitting hardware capable of performing two-way communication on a two-way communication link. Such a device may include: a cellular or other communication device having a single-line display or a multi-line display or a cellular or other communication device without a multi-line display. The specific terminal 100 may be a desktop terminal or a mobile terminal, and the terminal 100 may also be a mobile phone, a tablet computer, a laptop computer, etc.
[0066] Those skilled in the art will understand that Figure 1 The application environment shown in the figure is only one application scenario of the present application solution and does not constitute a limitation on the application scenario of the present application solution. Other application environments may also include Figure 1 More or less computer equipment as shown in Figure 1 Only one computer device is shown. It can be understood that the sorting plan optimization device can also include one or more other services, which are not specifically limited here.
[0067] In addition, if Figure 1 As shown, the sorting plan optimization device may also include a storage module 200 for storing data, which may include historical sorting data, sensor data, parameter information of entities in the transfer yard, etc.
[0068] It should be noted that Figure 1 The scenario diagram of the sorting plan optimization device shown is only an example. The sorting plan optimization device and scenario described in the embodiment of the present application are intended to more clearly illustrate the technical solution of the embodiment of the present application, and do not constitute a limitation on the technical solution provided by the embodiment of the present application. It is known to those skilled in the art that with the evolution of the sorting plan optimization device and the emergence of new business scenarios, the technical solution provided by the embodiment of the present application is also applicable to similar technical problems.
[0069] First, a sorting plan optimization method is provided in an embodiment of the present application. The execution subject of the sorting plan optimization method is a sorting plan optimization device. The sorting plan optimization device is applied to a computer device. The sorting plan optimization method includes: obtaining an initial sorting plan of a target transfer station; according to the initial sorting plan, using a transfer station sorting plan simulation model constructed based on digital twin technology to perform a simulation test to obtain a test result; when the test result does not meet the preset sorting condition, using a preset sorting optimization model to optimize the initial sorting plan to obtain an optimized initial sorting plan; according to the optimized initial sorting plan, continuing to execute the sorting plan according to the initial sorting plan. an initial sorting plan is prepared, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain test results, until the test results meet the preset sorting conditions, and an optimized initial sorting plan is obtained to obtain a target sorting plan. Since the simulation test is performed using the transfer yard sorting plan simulation model, the pros and cons of the sorting plan can be evaluated before physical verification, which saves time and manpower and material resources, reduces the production risks brought by physical verification, and performs iterative optimization according to the simulation experiment results, thereby achieving the maximum optimization of the initial sorting plan and greatly improving the sorting efficiency of the target sorting plan.
[0070] like Figure 2 As shown, it is a schematic flow chart of an embodiment of the sorting plan optimization method in the embodiment of the present application. The sorting plan optimization method may include the following steps 301 to 303, which are as follows:
[0071] 301. Obtain an initial sorting plan for the target transfer station.
[0072] The target transfer site refers to the sorting site where the sorting plan needs to be optimized. The initial sorting plan refers to a pre-made express sorting plan, which can be used to simulate the pros and cons of the sorting plan and serve as the basic sorting plan for sorting plan optimization.
[0073] Specifically, the initial sorting plan can be obtained from the small item management system of the transfer yard according to the database of the management system.
[0074] 302. According to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain test results.
[0075] Among them, the transfer yard sorting plan simulation model is a digital twin used to test and simulate the pros and cons of the sorting plan. The transfer yard sorting plan simulation model is a model built with the transfer yard as the prototype, including a loading platform model, a six-sided scanning model, a cross-belt sorting machine model, a trolley model, a grid model, a personnel model and a printer model. The transfer yard contains multiple physical equipment, such as a loading platform, a six-sided scanning model, a cross-belt sorting machine, a trolley, a grid model, a personnel model and a printer model. In order to realize the construction of the digital twin of the transfer yard, it is necessary to build a digital twin model for each physical equipment to obtain the digital twin of the transfer yard, so that the sorting plan in the transfer yard can be simulated and predicted in the virtual space, and the pros and cons of the sorting plan can be evaluated before physical verification, saving time and manpower and material resources, and reducing the production risks brought by physical verification.
[0076] 303. When the test result does not meet the preset sorting condition, optimize the initial sorting plan using a preset sorting optimization model to obtain an optimized initial sorting plan.
[0077] Among them, the preset sorting conditions refer to the pre-set conditions for measuring the quality of the experimental results. For example, the sorting conditions can be the sorting time of a preset number of express parcels, such as 30 minutes for 100 express parcels, the return rate of the transfer yard, such as 2%, the number of express parcels sorted within a preset time, such as 20 express parcels sorted in 5 minutes, etc.
[0078] The preset sorting optimization model refers to a pre-set model for optimizing the sorting plan, such as an integer programming model, a machine learning model, an operations research optimization model, etc.
[0079] Specifically, when the experimental results corresponding to the initial sorting plan do not meet the preset sorting conditions, it indicates that the sorting effect of the initial sorting plan is not good. Therefore, the initial sorting plan needs to be optimized to improve the sorting effect of the initial sorting plan. In this embodiment, the initial sorting plan is optimized by a preset sorting optimization model to obtain an optimized initial sorting plan.
[0080] 304. According to the optimized initial sorting plan, continue to perform a simulation test according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a test result, until the test result meets the preset sorting condition, and obtain the optimized initial sorting plan to obtain a target sorting plan.
[0081] Specifically, after obtaining the optimized initial sorting plan, in order to ensure the sorting effect of the optimized initial sorting plan, it is necessary to first perform a simulation test on the optimized initial sorting plan. Therefore, the transfer yard sorting plan simulation model in step 302 is continued to be used to perform a simulation test on the optimized initial sorting plan. When the test result meets the preset sorting condition, sorting is directly performed according to the optimized initial sorting plan; when the test result does not meet the preset sorting condition, the preset sorting optimization model in step 303 is continued to be used to optimize the optimized initial sorting plan until the test result meets the preset sorting condition, and the optimized initial sorting plan is obtained to obtain the target sorting plan, thereby ensuring the sorting effect of the target sorting plan. By iteratively optimizing the initial sorting plan, the maximum degree of optimization of the initial sorting plan is achieved, and the sorting efficiency of the target sorting plan is greatly improved.
[0082] In this embodiment, the simulation model of the transfer yard sorting plan is used to conduct simulation tests, so that the advantages and disadvantages of the sorting plan can be evaluated before physical verification, which saves time and manpower and material resources, reduces the production risks brought by physical verification, and performs iterative optimization according to the simulation experiment results, thereby achieving the maximum optimization of the initial sorting plan and greatly improving the sorting efficiency of the target sorting plan.
[0083] In a specific implementation, in step 302, according to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology. Before obtaining the test results, the following steps 305 to 306 may also be included, as follows:
[0084] 305. Collect sensor data in the target transfer yard, and obtain historical sorting plans and corresponding historical sorting data;
[0085] 306. Based on the sensor data, the historical sorting plan and the corresponding historical sorting data, the preset digital twin model is trained to obtain a trained digital twin model, and the trained digital twin model is determined as a transfer yard sorting plan simulation model.
[0086] Among them, the preset digital twin model is a digital twin for pre-training. In this embodiment, the digital twin includes a loading platform model, a six-sided scanning model, a cross-belt sorting machine model, a trolley model, a grid model, a personnel model and a printer model, and the loading platform model, the six-sided scanning model, the cross-belt sorting machine model, the trolley model, the grid model, the personnel model and the printer model are the same as the sorting process of the target transfer yard, that is, the loading platform model is used to simulate the placement of express parcels on the loading platform, the six-sided scanning model is used to simulate scanning the express parcels to determine the express parcel face sheet information, the cross-belt sorting machine model is used to simulate sorting according to the face sheet information and placing it on the correct position trolley, the trolley model is used to simulate dropping the express parcel into the corresponding grid, the personnel model is used to simulate that when a grid is full, the grid will flash an alarm, the grid is locked and no more parcels will be dropped, and the personnel will go to the corresponding grid to pack when they see the flashing alarm, and after packing is completed, they will press the print button, and the printer model is used to simulate that the corresponding printer will print the package label and stick the package label on the corresponding package.
[0087] Specifically, sensor data in the target transfer yard is collected, and the historical sorting plan and the corresponding historical sorting data are obtained. Based on the sensor data, the historical sorting plan and the corresponding historical sorting data, the preset digital twin model is trained to obtain a trained digital twin model, that is, a simulation model of the transfer yard sorting plan.
[0088] It is worth noting that since the sensor data, historical sorting plans and corresponding historical sorting data in the target transfer site are massive, in order to improve the training efficiency, the sensor data, historical sorting plans and corresponding historical sorting data can be preprocessed, for example, data clarity, data normalization, etc.
[0089] In a specific implementation, the initial sorting plan includes the express data of the target transfer yard, the mapping relationship between the initial flow direction and the initial slot, and the test result includes the capacity result of the initial sorting plan, and the capacity result includes the number of express parcels sorted within a preset time period; the step 302 of performing a simulation test based on the initial sorting plan using the transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain the test result may include the following step 302A, which is specifically as follows:
[0090] 302A. Input the express data, the mapping relationship between the initial flow direction and the initial grid into the transfer yard sorting plan simulation model, obtain the express sorting quantity within a preset time period output by the transfer yard sorting plan simulation model, and obtain the production capacity result.
[0091] The express data refers to the data related to the express to be sorted, for example, the number of express to be sorted. The mapping relationship between the initial flow direction and the initial slot refers to dropping the express in the initial flow direction to the initial slot mapped thereto.
[0092] Specifically, the express data and the mapping relationship between the initial flow direction and the initial grid opening are used as inputs of the transfer yard sorting plan simulation model. The transfer yard sorting plan simulation model simulates the sorting process of the transfer yard according to the mapping between the express data, the initial flow direction and the initial grid opening, outputs the number of express parcels sorted within a preset time period, and uses the number of express parcels sorted within the preset time period as the production capacity result of the initial sorting plan.
[0093] In a specific implementation, the preset sorting optimization model is an integer programming model; the step 303 of optimizing the initial sorting plan by using the preset sorting optimization model to obtain the optimized initial sorting plan may include the following step 303A, which is specifically as follows:
[0094] 303A. Input the express data, the mapping relationship between the initial flow direction and the initial grid into the integer programming model, solve the integer programming model with the preset sorting constraint condition, and obtain the optimized initial sorting plan, wherein the goal of the integer programming model is to meet the preset sorting condition.
[0095] The preset sorting constraint condition may be a unique constraint on flow distribution, a constraint on the minimum number of available slots of a sorting machine, a constraint on the number of flow sorting times, etc. The goal of the integer programming model is to satisfy the preset sorting condition.
[0096] Specifically, the mapping relationship between express data, initial flow direction and initial grid opening is input into the integer programming model, and the integer programming model is solved with preset sorting constraints to obtain an optimized initial sorting plan, thereby achieving optimization of the initial sorting plan.
[0097] In a specific implementation, the preset sorting optimization model is a mathematical model; the step 303 of optimizing the initial sorting plan by using the preset sorting optimization model to obtain the optimized initial sorting plan may include the following step 303B, which is as follows:
[0098] 303B. Merge the grids of similar initial flow directions in the initial flow directions, reserve a preset number of configurable grids, and generate the optimized initial sorting plan.
[0099] Specifically, the grids with similar initial flow directions are merged so that the grids corresponding to the similar flow directions are the same grid, a mapping relationship between a new initial flow direction and the initial grids is generated, an optimized initial sorting plan is obtained, and a certain number of configurable grids are reserved, thereby improving the grid utilization rate.
[0100] In one example, for small flows in close areas, the grids can be merged to increase sorting capacity.
[0101] In a specific implementation, after merging the grids of the initial flow directions that are similar to each other in the initial flow directions in step 303B, reserving a preset number of configurable grids, and generating the optimized initial sorting plan, the following step 303C may also be included, as follows:
[0102] 303C. If it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than a preset growth rate threshold, a mapping relationship between the initial flow direction and the configurable grid is generated to obtain an updated initial sorting plan.
[0103] Specifically, when it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than the preset growth rate threshold, indicating an abnormal growth of the initial flow direction, the configurable grid is called to share the express parcels in the initial flow direction, and at the same time, upstream vehicles and parcel sorting machines are dispatched to reduce the initial flow direction grid from continuing to flow into the small parcel sorting machine, further optimizing the updated initial sorting plan.
[0104] In a specific implementation, after obtaining the optimized initial sorting plan in step 304 and obtaining the target sorting plan, the following steps 307-309 may be further included, as follows:
[0105] 307. According to the updated initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a first test result;
[0106] 308. According to the target sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a second test result;
[0107] 309. Determine a sorting plan with optimal test results according to the first test result and the test result.
[0108] Specifically, the transfer yard sorting plan simulation model is used to perform simulation tests on the updated initial sorting plan and the target sorting plan respectively, and the corresponding first test results and second test results are obtained, so that an optimal express sorting plan can be determined according to the first test results and the second test results.
[0109] In order to better implement the sorting plan optimization method in the embodiment of the present application, based on the sorting plan optimization method, the embodiment of the present application also provides a sorting plan optimization device, such as Figure 3 As shown, the sorting plan optimization device 400 includes:
[0110] An acquisition module 401 is used to acquire an initial sorting plan of a target transfer station;
[0111] The test module 402 is used to perform a simulation test according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a test result;
[0112] The optimization module 403 is used to optimize the initial sorting plan by using a preset sorting optimization model to obtain an optimized initial sorting plan when the test result does not meet the preset sorting condition;
[0113] The repeated simulation module 404 is used to continue to perform the simulation test according to the optimized initial sorting plan, using the transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain the test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain the target sorting plan.
[0114] In the embodiment of the present application, the sorting plan optimization device 400 further includes:
[0115] A collection module, used to collect sensor data in the target transfer yard, and obtain historical sorting plans and corresponding historical sorting data;
[0116] A training module is used to train a preset digital twin model based on the sensor data, the historical sorting plan and the corresponding historical sorting data to obtain a trained digital twin model, and determine the trained digital twin model as a transfer yard sorting plan simulation model.
[0117] In the embodiment of the present application, the initial sorting plan includes the express data of the target transfer site, the mapping relationship between the initial flow direction and the initial grid, the test result includes the capacity result of the initial sorting plan, and the capacity result includes the number of express sorting within a preset time period; the test module 402 is specifically used to:
[0118] The express data, the mapping relationship between the initial flow direction and the initial grid are input into the transfer yard sorting plan simulation model, the express sorting quantity within a preset time period output by the transfer yard sorting plan simulation model is obtained, and the production capacity result is obtained.
[0119] In the embodiment of the present application, the preset sorting optimization model is an integer programming model; the optimization module 403 is specifically used for:
[0120] The mapping relationship between the express data, the initial flow direction and the initial grid is input into the integer programming model, and the integer programming model is solved according to the preset sorting constraint conditions to obtain the optimized initial sorting plan, wherein the goal of the integer programming model is to meet the preset sorting conditions.
[0121] In the embodiment of the present application, the preset sorting optimization model is a mathematical model; the optimization module 403 is also specifically used for:
[0122] The grids of similar initial flow directions in the initial flow directions are merged to reserve a preset number of configurable grids to generate the optimized initial sorting plan.
[0123] In the embodiment of the present application, the sorting plan optimization device 400 further includes:
[0124] The generation module is used to generate a mapping relationship between the initial flow direction and the configurable grid if it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than a preset growth rate threshold, so as to obtain an updated initial sorting plan.
[0125] In the embodiment of the present application, the sorting plan optimization device 400 further includes:
[0126] A first simulation module is used to perform a simulation test according to the updated initial sorting plan and the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a first test result;
[0127] A second simulation module is used to perform a simulation test according to the target sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a second test result;
[0128] A determination module is used to determine a sorting plan with the best test results based on the first test result and the test result.
[0129] The embodiment of the present application further provides a computer device, which integrates any one of the sorting plan optimization devices provided in the embodiment of the present application, and the computer device includes:
[0130] one or more processors;
[0131] Memory; and
[0132] One or more applications, wherein the one or more applications are stored in the memory and are configured to be executed by the processor to execute the steps of the sorting plan optimization method described in any of the above-mentioned sorting plan optimization method embodiments.
[0133] The present application also provides a computer device that integrates any of the sorting plan optimization devices provided in the present application. Figure 4 As shown, it shows a schematic diagram of the structure of the computer device involved in the embodiment of the present application, specifically:
[0134] The computer device may include one or more processing core processors 701, one or more computer readable storage media memories 702, a power supply 703, an input unit 704 and other components. Those skilled in the art will appreciate that Figure 4 The computer device structure shown in the figure does not constitute a limitation on the computer device, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. Among them:
[0135] The processor 701 is the control center of the computer device. It uses various interfaces and lines to connect various parts of the entire computer device. By running or executing software programs and / or modules stored in the memory 702 and calling data stored in the memory 702, it executes various functions of the computer device and processes data, thereby monitoring the computer device as a whole. Optionally, the processor 701 may include one or more processing cores; preferably, the processor 701 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 701.
[0136] The memory 702 can be used to store software programs and modules. The processor 701 executes various functional applications and data processing by running the software programs and modules stored in the memory 702. The memory 702 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 702 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the memory 702 may also include a memory controller to provide the processor 701 with access to the memory 702.
[0137] The computer device also includes a power supply 703 for supplying power to various components. Preferably, the power supply 703 can be logically connected to the processor 701 through a power management system, so as to manage charging, discharging, and power consumption through the power management system. The power supply 703 can also include any combination of one or more DC or AC power supplies, recharging systems, power failure detection circuits, power converters or inverters, power status indicators, etc.
[0138] The computer device may further include an input unit 704, which may be used to receive input digital or character information and generate keyboard, mouse, joystick, optical or trackball signal input related to user settings and function control.
[0139] Although not shown, the computer device may further include a display unit, etc., which will not be described in detail herein. Specifically in this embodiment, the processor 701 in the computer device will load the executable files corresponding to the processes of one or more application programs into the memory 702 according to the following instructions, and the processor 701 will run the application programs stored in the memory 702, thereby realizing various functions, as follows:
[0140] Obtain the initial sorting plan of the target transfer station;
[0141] According to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain test results;
[0142] When the test result does not meet the preset sorting condition, the initial sorting plan is optimized by using a preset sorting optimization model to obtain an optimized initial sorting plan;
[0143] According to the optimized initial sorting plan, continue to perform simulation experiments according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain a target sorting plan.
[0144] A person of ordinary skill in the art will appreciate that all or part of the steps in the various methods of the above embodiments may be completed by instructions, or by controlling related hardware through instructions. The instructions may be stored in a computer-readable storage medium and loaded and executed by a processor.
[0145] To this end, the embodiment of the present application provides a computer-readable storage medium, which may include: a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, etc. A computer program is stored thereon, and the computer program is loaded by a processor to execute the steps in any of the sorting plan optimization methods provided in the embodiment of the present application. For example, the computer program can be loaded by a processor to execute the following steps:
[0146] Obtain the initial sorting plan of the target transfer station;
[0147] According to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain test results;
[0148] When the test result does not meet the preset sorting condition, the initial sorting plan is optimized by using a preset sorting optimization model to obtain an optimized initial sorting plan;
[0149] According to the optimized initial sorting plan, continue to perform simulation experiments according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain a target sorting plan.
[0150] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the detailed description of other embodiments above, and will not be repeated here.
[0151] In specific implementation, the above units or structures can be implemented as independent entities, or can be arbitrarily combined to be implemented as the same or several entities. The specific implementation of the above units or structures can refer to the previous method embodiments, which will not be repeated here.
[0152] The specific implementation of the above operations can be found in the previous embodiments, which will not be described in detail here.
[0153] The above is a detailed introduction to a sorting plan optimization method, device and storage medium provided in an embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and core idea of the present application. At the same time, for those skilled in the art, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as limiting the present application.
Claims
1. A sorting plan optimization method, It is characterized in that The sorting plan optimization method comprises: Obtain the initial sorting plan of the target transfer station; According to the initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain test results; When the test result does not meet the preset sorting condition, the initial sorting plan is optimized by using a preset sorting optimization model to obtain an optimized initial sorting plan; According to the optimized initial sorting plan, continue to perform simulation experiments according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain a target sorting plan.
2. The sorting plan optimization method according to claim 1, It is characterized in that Before performing a simulation test according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain the test results, the method further includes: Collect sensor data in the target transfer yard, and obtain historical sorting plans and corresponding historical sorting data; Based on the sensor data, the historical sorting plan and the corresponding historical sorting data, the preset digital twin model is trained to obtain a trained digital twin model, and the trained digital twin model is determined as a transfer yard sorting plan simulation model.
3. The sorting plan optimization method according to claim 2, It is characterized in that The initial sorting plan includes the express data of the target transfer site, the mapping relationship between the initial flow direction and the initial slot, and the test result includes the capacity result of the initial sorting plan, and the capacity result includes the number of express sorting within a preset time period; According to the initial sorting plan, a simulation test is performed using a transfer field sorting plan simulation model constructed based on digital twin technology to obtain test results, including: The express data, the mapping relationship between the initial flow direction and the initial grid are input into the transfer yard sorting plan simulation model, the express sorting quantity within a preset time period output by the transfer yard sorting plan simulation model is obtained, and the production capacity result is obtained.
4. The sorting plan optimization method according to claim 3, It is characterized in that The preset sorting optimization model is an integer programming model; The method of optimizing the initial sorting plan by using a preset sorting optimization model to obtain an optimized initial sorting plan includes: The mapping relationship between the express data, the initial flow direction and the initial grid is input into the integer programming model, and the integer programming model is solved according to the preset sorting constraint conditions to obtain the optimized initial sorting plan, wherein the goal of the integer programming model is to meet the preset sorting conditions.
5. The sorting plan optimization method according to claim 4, It is characterized in that The preset sorting optimization model is a mathematical model; the initial sorting plan is optimized by using the preset sorting optimization model to obtain the optimized initial sorting plan, including: The grids of similar initial flow directions in the initial flow directions are merged to reserve a preset number of configurable grids to generate the optimized initial sorting plan.
6. The sorting plan optimization method according to claim 5, It is characterized in that After merging the grids of similar initial flow directions in the initial flow directions, reserving a preset number of configurable grids, and generating the optimized initial sorting plan, the method further includes: If it is detected that the growth rate of the number of express parcels in the initial flow direction is greater than a preset growth rate threshold, a mapping relationship between the initial flow direction and the configurable grid is generated to obtain an updated initial sorting plan.
7. The sorting plan optimization method according to any one of claims 1 to 6, It is characterized in that After obtaining the optimized initial sorting plan and obtaining the target sorting plan, the method further includes: According to the updated initial sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a first test result; According to the target sorting plan, a simulation test is performed using a transfer yard sorting plan simulation model constructed based on digital twin technology to obtain a second test result; According to the first test result and the test result, a sorting plan with the best test result is determined.
8. A sorting plan optimization device, It is characterized in that The sorting plan optimization device comprises: An acquisition module is used to obtain the initial sorting plan of the target transfer station; A test module is used to perform a simulation test according to the initial sorting plan using a transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain a test result; An optimization module, used for optimizing the initial sorting plan by using a preset sorting optimization model to obtain an optimized initial sorting plan when the test result does not meet the preset sorting condition; The repeated simulation module is used to continue to execute the simulation test according to the optimized initial sorting plan, using the transfer yard sorting plan simulation model constructed based on the digital twin technology to obtain the test results, until the test results meet the preset sorting conditions, and obtain the optimized initial sorting plan to obtain the target sorting plan.
9. A computer device, It is characterized in that The computer device comprises: one or more processors; Memory; and One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the sorting plan optimization method according to any one of claims 1 to 7.
10. A computer-readable storage medium, It is characterized in that A computer program is stored thereon, and the computer program is loaded by a processor to execute the steps in the sorting plan optimization method described in any one of claims 1 to 7.
Citation Information
Cited By
Multi-target evaluation system optimization method for sorting small pieces in logistics transfer field
CN119962936A
Sorting plan generation method, electronic device, storage medium, and program product
WO2026130018A1
Sorting method, electronic device and computer program product
WO2026144449A1