Production material information association method, electronic equipment and production system
By obtaining and binding the material information of production materials and carrier acupoint information, the problem of difficult material traceability in the production of electronic devices is solved, and efficient traceability and management of materials are achieved.
Patent Information
- Application Number
- CN202310316702.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-15
AI Technical Summary
In the production process of electronic devices, the problem of difficult material traceability is due to the complexity of the production process, which involves a lot of information and is difficult to manage.
By obtaining the material information of the production material and the acupoint information of the carrier, binding the acupoint information and material information, and associating the processing information with the material information, the acupoints of the carrier and the processing materials are associated with the production materials, achieving effective traceability of materials.
It improves the efficiency and accuracy of material traceability, facilitates querying of material processing history and used processing materials during the production process, and simplifies material management.
Smart Images

Figure CN118780508A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of production management, and in particular to a method for associating information of production materials, electronic equipment and a production system. Background Art
[0002] With the upgrading of manufacturing products, the process steps of the production process are becoming more and more complicated, and each process step needs to be processed for the specified production materials. For example, in the production process of electronic devices, the motherboard is one of the main production materials. In the production process, the motherboard needs to be processed by multiple machines in sequence, such as the dispensing operation of the dispensing machine.
[0003] However, since the production process is complicated and involves a lot of information that is difficult to manage, material traceability is difficult. Summary of the invention
[0004] In view of the above, it is necessary to provide a production material information association method, electronic equipment and production system to solve the problem of material traceability difficulties.
[0005] The first aspect of the present application provides an information association method for production materials, the information association method comprising: obtaining material information of production materials; obtaining acupoint information of a carrier, wherein the carrier is provided with a plurality of acupoints, the acupoints are used to place production materials, and the acupoint information is used to indicate the acupoints where the production materials are located; binding the acupoint information and the material information; obtaining processing information corresponding to the acupoint information, wherein the processing information is used to indicate the processing materials used when processing at the acupoints; and associating the processing information with the material information bound to the acupoint information.
[0006] The embodiment of the present application obtains material information and acupoint information, and then binds the acupoint information to the material information, so that the acupoints of the carrier are bound to the production materials, and binds the processing information to the material information, so that the processing materials used in processing are associated with the production materials. Therefore, in material tracing, through the material information of the main board, the acupoints of the main board during processing and the corresponding processing materials can be traced back, which is convenient for material tracing.
[0007] In one embodiment, the material information includes an identity tag of a production material; after obtaining the material information of the production material, the information association method further includes: when material information identical to the identity tag exists in a database, outputting a duplicate upload error message, wherein the database stores material information of the production material that has been processed.
[0008] In one of the embodiments, the information association method further includes: obtaining processing parameter information corresponding to the acupoint information, wherein the processing parameter information is used to indicate equipment parameters of production equipment for processing at the acupoint; and associating the processing parameter information with material information bound to the acupoint information.
[0009] In one of the embodiments, the production material includes a batch material, the batch material includes a plurality of sub-materials and connectors connecting the sub-materials, the connectors are provided with material tags, the material tags carry judgment number information, the judgment number information includes material sequences corresponding to the plurality of sub-materials; the material information includes a material sequence; after obtaining the material information of the production material and before binding the acupoint information and the material information, the information association method further includes: when the material type is a batch material, obtaining the judgment number information and parsing it to obtain the material sequence corresponding to the plurality of sub-materials; binding the acupoint information and the material information, including: binding the material sequence of the sub-material corresponding to the acupoint to the acupoint information corresponding to the acupoint.
[0010] In one of the embodiments, the material type includes a monomer material, the monomer material includes a single sub-material, the sub-material is provided with a material tag, and the material tag carries a material sequence; the material information includes a material sequence; after obtaining the material information of the production material and before binding the acupoint information and the material information, the information association method further includes: when the material type is a monomer material, obtaining the material sequence corresponding to the sub-material; binding the acupoint information and the material information, including: binding the material sequence of the sub-material corresponding to the acupoint to the acupoint information corresponding to the acupoint.
[0011] The second aspect of the present application provides a method for processing production materials, the processing method includes the information association method of production materials provided in the first aspect above; after associating the processing information with the material information bound to the acupoint information, the processing method also includes: loading a pre-stored production control program; outputting production control information to production equipment to control the operation of the production equipment; acquiring processing parameter information corresponding to the acupoint information in real time, wherein the processing parameter information is used to indicate the equipment parameters of the production equipment when working at the acupoint; when the corresponding value in the processing parameter information exceeds a preset threshold, outputting equipment alarm information.
[0012] In one embodiment, before loading the pre-stored production control program, the method further includes: when the program name of the production control program does not meet the preset standard naming format, outputting program alarm information.
[0013] The third aspect of the present application provides an electronic device, which includes: a processor; and a memory for storing executable instructions of the processor; wherein the processor executes the executable instructions so that the electronic device implements the information association method provided in the first aspect above.
[0014] The fourth aspect of the present application provides an electronic device, which includes: a processor; and a memory for storing executable instructions of the processor; wherein the processor executes the executable instructions so that the electronic device implements the processing method provided in the second aspect above.
[0015] A fifth aspect of the present application provides a production system, including the electronic device provided in the third aspect, or including the electronic device provided in the fourth aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is an application scenario diagram of the method for associating information on production materials provided in an embodiment of the present application.
[0017] Figure 2 A first flow chart of the method for associating information of production materials provided in an embodiment of the present application.
[0018] Figure 3 A schematic diagram of the structure of a carrier provided in an embodiment of the present application.
[0019] Figure 4 A first detailed flow chart of the method for associating information on production materials provided in an embodiment of the present application.
[0020] Figure 5 A second flow chart of the method for associating information on production materials provided in an embodiment of the present application.
[0021] Fig. 6A It is a schematic diagram of the structure of the batch material in the embodiment of the present application.
[0022] Figure 6B Schematic diagram of the structure of the monomer material in the examples of this application.
[0023] Figure 7 A second detailed flow chart of the method for associating information on production materials provided in an embodiment of the present application.
[0024] Figure 8 A schematic diagram of a process flow of a production material processing method provided in an embodiment of the present application.
[0025] Fig. 9 A first detailed flow chart of the method for processing production materials provided in an embodiment of the present application.
[0026] Fig.10 A second detailed flow chart of the method for processing production materials provided in an embodiment of the present application.
[0027] Fig.11 A third detailed flow chart of the method for processing production materials provided in an embodiment of the present application.
[0028] Fig.12 A schematic diagram of the functional modules of the information association device for production materials provided in an embodiment of the present application.
[0029] Fig.13 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0031] It should be noted that the method disclosed in the embodiments of the present application or the method shown in the flowchart includes one or more steps for implementing the method. Without departing from the scope of the claims, the execution order of multiple steps can be interchangeable with each other, and some of the steps can also be deleted.
[0032] In the description of the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in specific implementations.
[0033] See also Figure 1 In the production line of electronic devices, there are multiple workstations (or machines), such as workstation A, workstation B, workstation C, workstation D, etc. in the figure. Each workstation is equipped with production equipment, and the production equipment can work according to the preset working mode. Taking the production process of the circuit board of the mobile phone in the electronic device as an example, the production material of the circuit board is the motherboard, the production equipment in the workstation is the glue dispenser, and the processing material of the glue dispenser is glue. In the actual processing process, after the motherboard is inspected at the feeding position, it needs to be transported through workstation A, workstation B, workstation C, and workstation D in sequence, and every time the motherboard arrives at a workstation, the corresponding glue dispenser will dispense glue on the motherboard according to the specified glue amount through the corresponding glue. After the glue dispensing work of the workstation is completed, the motherboard will be transported to the next workstation until the motherboard is processed by all workstations.
[0034] In order to better manage the material information and machine information involved in the production process and to facilitate material traceability of finished products after production, an embodiment of the present application provides a production material information association method, an electronic device 600 and a production system.
[0035] This application first proposes a method for associating information of production materials.
[0036] See also Figure 2 ,The information association method for production materials includes the following steps.
[0037] S201. Obtain material information of production materials.
[0038] Among them, material information refers to the information that has the function of identifying the production materials, which can reflect the identity of the production materials. Different production materials correspond to different material information.
[0039] In one embodiment of the present application, the production material is a motherboard. The material information includes the SN code (serial number) corresponding to the motherboard, and the motherboard can be queried through the SN code.
[0040] In one embodiment of the present application, a material label is provided on the surface of the mainboard, and the material label is printed with identifiable graphic content, which may be a QR code, a barcode, or text, etc., and carries the material information corresponding to the mainboard. By scanning and identifying the material label, the material information corresponding to the mainboard can be obtained.
[0041] In one embodiment of the present application, the specific implementation of step S201 may be: photographing the material label of the production material through the first image acquisition module to obtain the label image, and identifying the label image to obtain the corresponding material information.
[0042] Among them, the first image acquisition module can be a CCD (charge coupled device) camera or other types of cameras.
[0043] S202 , obtaining acupoint information of the vehicle 10 .
[0044] Among them, the acupoint information is used to indicate the acupoint where the production material is located, that is, the position of the main board that needs to be processed.
[0045] See also Figure 3 Specifically, the carrier 10 is used to carry production materials, and the carrier 10 is provided with a plurality of acupuncture points, and the acupuncture points are used to place corresponding main boards. During material transportation and production and processing, the main boards are placed on the carrier 10. Moreover, the acupuncture points have a positioning effect on the main boards. After the main boards are placed in the acupuncture points, the main boards are not easily displaced during material transportation and production and processing.
[0046] In one embodiment of the present application, in the production process of the assembly line, the transportation mechanism of the assembly line will transport the carrier 10 to each work station in sequence according to the production and processing sequence, so that the motherboard can reach each dispensing machine. The dispensing machine works according to the preset control program and performs dispensing operation at the designated processing position, wherein the processing position corresponds to the position of the acupoint, that is, after the carrier 10 moves to the dispensing machine, the dispensing machine determines the position of the acupoint that needs to be dispensed, and then the dispensing machine dispenses glue for the motherboard in the designated acupoint.
[0047] In one embodiment of the present application, a carrier label 11 is provided on the surface of the carrier 10, and the carrier label 11 is printed with recognizable graphic content, which may be a QR code, a barcode, or text, etc., and carries the acupoint information of the carrier 10. By scanning and identifying the carrier label 11, the acupoint information corresponding to the carrier 10 can be obtained.
[0048] In one embodiment of the present application, the specific implementation of step S202 may be: photographing the material label of the production material through the second image acquisition module to obtain the label image, and identifying the label image to obtain the corresponding material information.
[0049] The second image acquisition module may be a CCD camera or other types of cameras. In one embodiment of the present application, the first image acquisition module and the second image acquisition module may use the same CCD camera.
[0050] See also Figure 2 , S203, binding acupoint information and material information.
[0051] Among them, the acupoint information corresponding to the acupoint where the mainboard is located is bound to the material information of the mainboard.
[0052] In material traceability, the corresponding acupuncture points can be traced back through the material information on the main board.
[0053] In one embodiment of the present application, step S203 may be: generating first link information corresponding to the material information according to the binding relationship between the acupoint information and the material information, and uploading the first link information to a database, wherein the database may be a SFC system (Shop-Floor Control System, on-site monitoring system).
[0054] S204, obtaining processing information corresponding to the acupoint information.
[0055] The processing information is used to indicate the processing materials used when processing at the acupoints. The processing information is pre-stored in the SFC system and can be called through the SFC interface when it is needed.
[0056] Specifically, the processing information includes the type of glue used when dispensing glue at the acupuncture points.
[0057] It can be understood that since the glue dispensing machine uses the specified glue to dispense glue at each acupoint according to a preset control program, the corresponding glue signal can be obtained using the acupoint information.
[0058] S205. Associating the processing information with the material information bound to the acupoint information.
[0059] According to the association relationship between the processing information and the material information, the second link information corresponding to the material information is generated, and the second link information is uploaded to the database.
[0060] In material traceability, the corresponding processing information can be traced back through the material information of the mainboard, and then the glue used during dispensing can be queried.
[0061] The embodiment of the present application obtains material information and acupoint information, and then binds the acupoint information to the material information, so that the acupoints of the carrier 10 are bound to the production materials, and binds the processing information to the material information, so that the processing materials used in the processing are associated with the production materials. Therefore, in the material tracing, through the material information of the main board, the acupoints of the main board during processing and the corresponding processing materials can be traced back, which is convenient for material tracing.
[0062] See also Figure 4 In one embodiment of the present application, after step S201, the method for associating production material information further includes the following steps.
[0063] S401. Determine whether there is material information identical to the identity tag in the database. If so, execute step S402; if not, execute step S202.
[0064] The material information includes an identity tag, each production material has a unique identity tag, and different production materials have different corresponding identity tags. The database stores the material information of the processed production materials, that is, the historical data of the material information.
[0065] S402: Output duplicate upload error information.
[0066] Among them, when the material information that is the same as the identity tag exists in the database, a duplicate upload error message is output.
[0067] It can be understood that since material information is the unique identifier of production materials, if material information identical to the identity tag exists in the database, it means that the production material has been processed, so there is an abnormality, which triggers an alarm action to notify management personnel to check or handle it in time.
[0068] In one implementation of the present application, the repeated upload error message can be sent to an alarm module. After receiving the repeated upload error message, the alarm module triggers an alarm action such as a sound alarm, a light alarm, or sends an alarm email to a management personnel.
[0069] See also Figure 5 In one embodiment of the present application, after steps S201 to S205, the method for associating production material information further includes the following steps.
[0070] S501, obtaining processing parameter information corresponding to acupoint information.
[0071] The processing parameter information is used to indicate the equipment parameters of the production equipment used for acupoint processing. The equipment parameters can reflect the processing conditions of the production equipment and the working status during actual processing. The processing parameter information is acquired in real time during the processing and uploaded to the SFC system. When it is needed, it can be called through the SFC interface.
[0072] In one embodiment of the present application, the equipment parameters include glue usage and monitoring data. The glue usage is the amount of glue used by the glue dispenser when dispensing glue on the mainboard. The glue dispenser is provided with a sensor module, which is used to monitor the state of the glue dispenser during the actual production process, such as monitoring the internal temperature and internal air pressure of the glue dispenser, so as to obtain monitoring data.
[0073] It can be understood that the above glue usage and monitoring data are exemplary descriptions of equipment parameters. In some embodiments, all parameter data related to the production process of the production equipment can be used as processing parameter information.
[0074] S502. Associating the processing parameter information with the material information bound to the acupoint information.
[0075] According to the binding relationship between the processing parameter information and the material information, the third link information corresponding to the material information is generated, and the third link information is uploaded to the database.
[0076] In material traceability, the corresponding processing parameter information can be traced back through the material information of the mainboard, and then the glue usage and monitoring data during dispensing can be queried.
[0077] See also Figure 2 and Fig. 6A In one implementation of the present application, the production material includes a batch material 20. The production material belonging to the batch material 20 includes a plurality of sub-materials 21, and the plurality of sub-materials 21 are connected by a connector 22. The number of sub-materials 21 in each batch material 20 and the position distribution of the sub-materials 21 are consistent.
[0078] Specifically, the material tag of the batch material 20 is the first material tag 23. Multiple sub-materials 21 belonging to the same production material share a first material tag 23, which is set on the connecting piece 22. The first material tag 23 carries the judgment number information of the production material, which includes multiple material sequences, and the multiple material sequences correspond to multiple sub-materials 21 one by one. The material sequence records the identity ID of the corresponding sub-material 21, and a single sub-material 21 can be directly queried through the material sequence. Correspondingly, the material information includes the material sequence corresponding to multiple sub-materials 21 one by one.
[0079] For example, the batch material 20 is a collection of 4 main boards, and the sub-material 21 is a single independent main board. The 4 main boards are arranged in sequence according to a preset order (such as from top to bottom), and two adjacent main boards are connected by a connector 22, and a first material label 23 is printed on the connector 22. The first material label 23 carries judgment number information, and the judgment number information is composed of multiple material sequences in a specified order.
[0080] After scanning the first material tag 23 to obtain the judgment number information, the judgment number information can be parsed to obtain 4 material sequences, and then the 4 material sequences are allocated to the corresponding 4 main boards in sequence according to the specified order, so that the material sequences corresponding to the 4 main boards can be obtained, that is, the material information can be obtained.
[0081] Furthermore, each sub-material 21 can be placed in an independent acupoint separately, and the position distribution of each sub-material 21 in the production material corresponds to the position distribution of each acupoint in the carrier 10 .
[0082] Multiple acupuncture points belonging to the same carrier 10 share a carrier tag 11. The carrier tag 11 carries carrier information. The carrier information includes acupuncture point information corresponding to the multiple acupuncture points, and the carrier information is composed of each acupuncture point information in a specified order.
[0083] Specifically, each carrier 10 is provided with each acupoint in a matrix layout, and the number of the acupoints in each column is consistent with the number of sub-materials 21 in the batch material 20 , and the position distribution of the acupoints in each column corresponds to the position distribution of each sub-material 21 .
[0084] For example, the carrier 10 has each acupoint arranged in a matrix, and each column has two accommodating areas 12, and the accommodating area 12 includes 4 acupoints, and the accommodating area 12 can just accommodate 4 main boards of production materials at the same time, and can also accommodate corresponding connectors 22. After scanning the carrier label 11, the carrier information can be obtained, and the carrier information can be parsed to obtain multiple acupoint information, and then the multiple acupoint information is sequentially allocated to each acupoint in a specified order, and the acupoint information corresponding to each acupoint can be obtained.
[0085] Since the four main boards are arranged in sequence according to a preset order, that is, the four main boards are distributed in each acupoint in each column according to a preset distribution rule, after obtaining the acupoint information corresponding to each acupoint and the material sequence of each main board, the acupoint information can be allocated to each main board in sequence according to the distribution rule, so that a separate material sequence can be bound to the corresponding acupoint.
[0086] Meanwhile, when the batch materials 20 are placed in each column of the carrier 10, the first material tags 23 of the connectors 22 are scanned in sequence according to the distribution order of each column, that is, the material sequences of the multiple groups of main boards are obtained in sequence. Similarly, after the acupuncture point information corresponding to each acupuncture point and the material sequence of each group of main boards are obtained, the acupuncture point information can be allocated to each group of main boards in sequence according to the distribution rule, so that the separate material sequence can be bound to the corresponding acupuncture point.
[0087] It can be understood that the above operation can obtain multiple material sequences corresponding to multiple sub-materials 21 at one time through one scan. In addition, multiple acupoint information corresponding to multiple acupoints can be obtained at one time through one scan, thereby improving production efficiency.
[0088] See also Figure 7 Correspondingly, in one embodiment of the present application, after step S201, the method for associating production material information further includes the following steps.
[0089] S701. Determine whether the production material is batch material 20. If so, execute step S702.
[0090] Among them, after scanning and identifying the material label of the production material, it is analyzed whether the identified content meets the preset judgment number naming conditions. If so, it means that the identified content is the corresponding judgment number information.
[0091] S702, parsing the judgment number information to obtain the material sequences corresponding to the multiple sub-materials 21.
[0092] Among them, after scanning the material tag to obtain the judgment number information, the judgment number information can be parsed to obtain multiple material sequences, and then the multiple material sequences are sequentially allocated to the corresponding multiple mainboards in the specified order, so that the material sequences corresponding to the multiple mainboards can be obtained, that is, the material information is obtained.
[0093] It can be understood that, under the premise that the carrier 10 has a plurality of acupuncture points for placing one or more sub-materials 21, the specific implementation of step S202 can be:
[0094] The carrier tag 11 is scanned to obtain carrier information, and the carrier information is analyzed to obtain a plurality of acupoint information.
[0095] Corresponding to the above premise, the specific implementation of step S205 can be:
[0096] The material sequence of the sub-material 21 corresponding to the acupoint is bound to the acupoint information corresponding to the acupoint.
[0097] Among them, when a main board is placed corresponding to an acupuncture point, the material sequence of the main board is bound to the acupuncture point information of the acupuncture point.
[0098] See also Figure 6B In one implementation of the present application, the production material also includes a monomer material 30. The production material belonging to the monomer material 30 is a single sub-material 21. The material label of the monomer material 30 is a second material label 31, which is set on the surface of the sub-material 21, and the second material label 31 carries the material sequence corresponding to the sub-material 21.
[0099] It can be understood that the monomer material 30 is equivalent to the sub-material 21 peeled off from the batch material 20. In the process of sampling and removing damaged motherboards, one or several sub-materials 21 in the batch material 20 will be extracted, and the remaining sub-materials 21 in the batch material 20 or the extracted sub-materials 21 are all regarded as the monomer material 30.
[0100] At the same time, each sub-material 21 in the batch material 20 is connected by a connector 22. When an individual sub-material 21 is extracted, the corresponding connector 22 needs to be removed. Therefore, the first material label 23 on the connector 22 of the batch material 20 cannot be identified, and only the second material label 31 of the single material 30 can be identified, thereby preventing the risk of scanning the first material label 23 when a sub-material 21 has been extracted from the batch material 20, thereby achieving a fool-proof effect.
[0101] It can be understood that, under normal circumstances, multiple sub-materials 21 are connected by detachable connectors 22 to form a batch material 20 for storage and transportation, and when obtaining material information, the first material label 23 on the connector 22 is identified to achieve batch operation and improve work efficiency. After a sub-material 21 is extracted from the batch material 20, the remaining sub-materials 21 or the extracted sub-materials 21 are stored and transported as independent monomer materials 30, and when obtaining material information, the second material label 31 of the sub-material 21 itself is identified to achieve batch operation and improve work efficiency.
[0102] Correspondingly, in step S701, if it is determined that the production material is not a batch material 20, that is, it is determined that the production material is a single material 30, step S703 is executed.
[0103] After scanning and identifying the material label of the production material, it is analyzed whether the identified content meets the preset judgment number naming condition. If not, it means that the identified content is not the judgment number information, and it is determined that the production material is a monomer material 30.
[0104] Alternatively, the identified content is analyzed to see whether it meets a preset monomer sequence naming condition. If so, it means that the identified content is a material sequence, and the production material is determined to be a monomer material 30.
[0105] S703. Obtain the material sequence corresponding to sub-material 21.
[0106] The material sequence obtained by scanning the second material tag 31 is used as the material sequence of the sub-material 21 where the second material tag 31 is located.
[0107] In one embodiment of the present application, the specific implementation of step S205 may be:
[0108] S2051. Obtain material distribution information.
[0109] The material distribution information is used to reflect the distribution of acupuncture points in the carrier 10 that are involved in subsequent production and processing.
[0110] It can be understood that the acupuncture points involved in subsequent production and processing refer to the acupuncture points where the sub-material 21 is placed, and the sub-material 21 participates in the subsequent production and processing.
[0111] It can be understood that when all production materials are batch materials 20, each batch material 20 is arranged and distributed in each acupoint of the carrier 10 in a specified order, and all the acupoints on the carrier 10 can be filled. At this time, the information of each acupoint can be allocated to each sub-material 21 in turn according to the default distribution rule, so that a separate material sequence can be bound to the corresponding acupoint.
[0112] When the production material contains a monomer material 30 , some of the holes on the carrier 10 may be empty, so it is necessary to define the holes in the carrier 10 where the sub-materials 21 are placed through the material distribution information.
[0113] Specifically, the workstation is configured with an interactive platform, which pre-stores a configuration template of the carrier 10. The manager can select the corresponding acupoints in the carrier 10 as the acupoints with the sub-material 21 in the interactive platform, thereby determining the material distribution information.
[0114] S2052. According to the material distribution information, the material sequence of the sub-material 21 corresponding to the acupoint is bound to the acupoint information corresponding to the acupoint.
[0115] Among them, according to the position distribution of the sub-material 21 in the material distribution information, each acupoint information is allocated to each sub-material 21 in sequence, so that a separate material sequence can be bound to the corresponding acupoint.
[0116] The present application also proposes a method for processing production materials, which includes the information association method for production materials in any of the above embodiments. Specifically, the method for processing production materials is applied to a production system, which has multiple workstations, and the multiple workstations realize material transportation through a transportation mechanism.
[0117] The processing method of the production material includes the following steps.
[0118] See also Figure 8 S801: transport the carrier 10 containing the production materials to the feeding position through the transport mechanism.
[0119] The material feeding position is provided with a CCD camera, which can scan the carrier label 11 of the carrier 10 and the material label of the production material.
[0120] S802. Obtain material information of production materials through a CCD camera.
[0121] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0122] S803 , obtaining acupuncture point information of the carrier 10 through a CCD camera.
[0123] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0124] S804 , bind the acupoint information and the material information, call the SFC interface, and upload the first link information to the SFC system.
[0125] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0126] S805 . The carrier 10 carrying the production materials is transported to a designated workstation by a transport mechanism.
[0127] The workstation is provided with production equipment, which may be a glue dispenser for performing glue dispensing operations on production materials.
[0128] S806. Obtain processing information corresponding to the acupoint information, that is, call the SFC interface to query the processing information.
[0129] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0130] S807. Associate the processing parameter information with the material information bound to the acupoint information.
[0131] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0132] S808. Control the operation of production equipment at the workstation.
[0133] Among them, the pre-stored production control program is loaded, and the production control information is output to the production equipment to control the operation of the production equipment.
[0134] It can be understood that there can be multiple workstations, and when there are multiple workstations, the transportation mechanism can transport the carrier 10 to the corresponding workstations in turn, and the processing information of each workstation is bound accordingly, and is backed up and uploaded synchronously.
[0135] See also Fig. 9 In one embodiment of the present application, the method for processing production materials also includes the following steps.
[0136] S901. Acquire processing parameter information corresponding to acupoint information in real time.
[0137] The processing parameter information is used to indicate the equipment parameters of the production equipment when it is working at the acupoint. The equipment parameters are obtained in real time during the processing and production process through the sensor module and uploaded to the SFC system as processing parameter information.
[0138] S902, determine whether the corresponding value in the processing parameter information exceeds the preset threshold, if so, execute step S903; if not, execute step S904.
[0139] S903. Output device alarm information.
[0140] The preset threshold is a threshold range set according to the normal working state of the production equipment. When the corresponding value in the processing parameter information exceeds the preset threshold, it means that the production equipment is working abnormally, and the equipment alarm information is output. In addition, the equipment alarm information and the processing parameter information are associated with the material information bound to the acupoint information.
[0141] The device alarm information can be sent to the alarm module. After receiving the alarm information, the alarm module triggers alarm actions such as sound alarm, light alarm or sending an alarm email to the management personnel.
[0142] It is understood that the preset threshold can be set according to the type of relevant data in the processing parameter information. For example, if the processing parameter information includes the internal temperature and internal air pressure of the dispensing machine, the preset threshold includes a temperature threshold range corresponding to the internal temperature and other threshold ranges corresponding to other internal parameters.
[0143] S904. Associate the processing parameter information with the material information bound to the acupoint information.
[0144] See also Fig.10 In one embodiment of the present application, before step S808, the method for processing production materials further includes the following steps.
[0145] S1001. Obtain production control procedures.
[0146] S1002. Determine whether the program name of the production control program meets the preset standard naming format. If so, execute step S808; if not, execute step S1003.
[0147] Among them, the standard naming format is the naming format of the production control program under normal circumstances.
[0148] S808. Load the production control program.
[0149] Among them, when the program name of the production control program meets the standard naming format, it means that the current production control program can be used for processing.
[0150] S1003. Output program alarm information.
[0151] The program alarm information can be sent to the alarm module. After receiving the alarm information, the alarm module triggers alarm actions such as sound alarm, light alarm or sending an alarm email to the management personnel.
[0152] It can be understood that the production equipment in the workstation realizes the corresponding functions by executing the corresponding control program, and the system usually pre-stores multiple control programs to realize a variety of different processing schemes. The manager needs to select the corresponding control program for processing. By setting a standard naming format to check the production control program, it can effectively avoid the risk that the production equipment will process according to the wrong processing plan after the manager selects the wrong control program, achieve a fool-proof effect, improve production quality, and reduce production cost waste.
[0153] See also Fig.11 In one embodiment of the present application, after step S803 and before step S804, the method for processing the production material further includes the following steps.
[0154] S1101. Determine whether the acupoint information has historical first link information in the current workstation. If so, execute step S1102; if not, execute step S1103.
[0155] The carrier 10 will be reused during the production process, and the carrier 10 will transport different production materials to the workstations in multiple production operations. Therefore, the acupoint information of the carrier 10 may be bound to the historical production materials.
[0156] S1102: invalidate the historical first link information, and execute step S1103.
[0157] The current material information and processing information are actually associated through the acupoint information. If the acupoint information is still bound to the historical material information, the historical data may affect the current material information. Therefore, it is necessary to release the binding state between the acupoint information and the historical production materials.
[0158] S1103, determine whether material information identical to the identity tag exists in the database, if so, execute step S1104; if not, execute step S1105.
[0159] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0160] S1104: Output duplicate upload error information.
[0161] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0162] S1105. Determine whether the production material is batch material 20. If so, execute step S1106; if not, execute step S1107.
[0163] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0164] S1106. Analyze the judgment number information, obtain the material sequence corresponding to the multiple sub-materials 21, and execute step S804.
[0165] The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0166] S1107. Obtain the material sequence corresponding to sub-material 21, and execute step S804.
[0167] See also Fig.12 The implementation principle of this step can be seen in the relevant content of the embodiment of the above-mentioned production material information association method.
[0168] The present application also provides an information association device for production materials. The information association device includes:
[0169] The material information acquisition module 100 is used to acquire material information of production materials.
[0170] The vehicle information acquisition module 200 is used to acquire acupoint information of the vehicle 10 .
[0171] The material carrier binding module 300 is used to bind the acupoint information and the material information.
[0172] The processing information acquisition module 400 is used to acquire processing information corresponding to the acupoint information.
[0173] The material processing binding module 500 is used to associate the processing information with the material information bound to the acupoint information.
[0174] It is understandable that the module division described above is a logical function division, and there may be other division methods in actual implementation. In addition, the functional modules in each embodiment of the present application may be integrated in the same processing unit, or each module may exist physically separately, or two or more modules may be integrated in the same unit. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0175] The present application also provides an electronic device 600 .
[0176] See also Fig.13 The electronic device 600 includes a processor 601 and a memory 602, wherein the memory 602 is used to store executable instructions of the processor 601. The processor 601 executes the executable instructions so that the electronic device 600 implements the information association method of the production material in the above technical solution, or is used to implement the processing method of the production material in the above technical solution.
[0177] The processor 601 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.
[0178] The memory 602 can be used to store the computer program and / or module. The processor 601 implements various functions of the electronic device 600 by running or acquiring the computer program and / or module stored in the memory 602 and calling the data stored in the memory 602. The memory 602 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the electronic device 600, etc. In addition, the memory 602 can include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, S7) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0179] The memory 602 may be an external memory and / or an internal memory of the electronic device 600. Furthermore, the memory 602 may be a memory in a physical form, such as a memory stick, a TF card (Trans-flash Card), and the like.
[0180] If the program code and various data in the memory 602 are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, such as the information association method of production materials, and can also be completed by instructing related hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), etc.
[0181] The present application also provides a production system.
[0182] The production system includes a first electronic device or a second electronic device, wherein the first electronic device is the electronic device 600 for implementing the above-mentioned method for associating information of production materials, and the second electronic device is the electronic device 600 for implementing the above-mentioned method for processing production materials.
[0183] It can be understood that the beneficial effects that can be achieved by the production material processing method, production material information association device and production system provided in the embodiments of the present application can refer to the beneficial effects of the corresponding production material information association method provided above, and will not be repeated here.
[0184] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person of ordinary skill in the art should understand that the technical solution of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application.
Claims
1. A method for associating information of production materials, characterized in that: The information association method comprises: Get material information of production materials; Acquire acupoint information of a carrier, wherein the carrier is provided with a plurality of acupoints, the acupoints are used to place the production materials, and the acupoint information is used to indicate the acupoints where the production materials are located; Binding the acupoint information and the material information; Acquire processing information corresponding to the acupoint information, wherein the processing information is used to indicate a processing material used when processing at the acupoint; The processing information is associated with the material information bound to the acupoint information.
2. The method for associating production material information according to claim 1, characterized in that: The material information includes the identity tag of the production material; after obtaining the material information of the production material, the information association method further includes: When the material information identical to the identity tag exists in the database, a duplicate upload error message is output, wherein the database stores the material information of the production material that has been processed.
3. The method for associating production material information according to claim 1, characterized in that: The information association method further includes: Acquire processing parameter information corresponding to the acupoint information, wherein the processing parameter information is used to indicate equipment parameters of a production equipment for processing at the acupoint; The processing parameter information is associated with the material information bound to the acupoint information.
4. The method for associating production material information according to any one of claims 1 to 3, characterized in that: The production material includes a batch material, the batch material includes a plurality of sub-materials and a connector connecting the sub-materials, the connector is provided with a material tag, the material tag carries judgment number information, the judgment number information includes a material sequence corresponding to the plurality of sub-materials; the material information includes the material sequence; After acquiring the material information of the production material and before binding the acupoint information and the material information, the information association method further includes: When the material type is the batch material, the judgment number information is obtained and parsed to obtain the material sequence corresponding to the plurality of sub-materials; The binding of the acupoint information and the material information includes: The material sequence of the sub-material corresponding to the acupoint is bound to the acupoint information corresponding to the acupoint.
5. The method for associating production material information according to claim 4, characterized in that: The material type includes a monomer material, the monomer material includes a single sub-material, the sub-material is provided with a material tag, and the material tag carries a material sequence; the material information includes the material sequence; After acquiring the material information of the production material and before binding the acupoint information and the material information, the information association method further includes: When the material type is the monomer material, obtaining the material sequence corresponding to the sub-material; The binding of the acupoint information and the material information includes: The material sequence of the sub-material corresponding to the acupoint is bound to the acupoint information corresponding to the acupoint.
6. A method for processing production materials, characterized in that: The processing method includes the information association method of production materials as described in any one of claims 1 to 5; After associating the processing information with the material information bound to the acupoint information, the processing method further includes: Load pre-stored production control programs; Outputting production control information to production equipment to control the operation of the production equipment; Acquire processing parameter information corresponding to the acupoint information in real time, wherein the processing parameter information is used to indicate equipment parameters of the production equipment when working at the acupoint; When the corresponding value in the processing parameter information exceeds a preset threshold, equipment alarm information is output.
7. The method for processing production materials according to claim 6, characterized in that: Before loading the pre-stored production control program, the method further includes: When the program name of the production control program does not meet the preset standard naming format, a program alarm message is output.
8. An electronic device, characterized in that: The electronic device comprises: Processor; and A memory for storing executable instructions of the processor; wherein the processor executes the executable instructions so that the electronic device implements the information association method as described in any one of claims 1-5.
9. An electronic device, characterized in that: The electronic device comprises: Processor; and A memory for storing executable instructions of the processor; wherein the processor executes the executable instructions so that the electronic device implements the processing method as described in claim 6 or 7.
10. A production system, characterized in that: Includes the electronic device as claimed in claim 8, or includes the electronic device as claimed in claim 9.