Automatic early warning, tracking and checking system for illegal construction
By using diversified data collection and convolutional neural network identification technology in the automatic early warning and tracking verification system for illegal buildings, the problem that existing technologies cannot provide timely early warning is solved, the timely identification and tracking verification of illegal buildings is realized, and the subsequent cost is reduced. Demolition costs.
Patent Information
- Application Number
- CN202410915790.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology cannot provide timely early warning in the early stages of illegal building construction, which makes subsequent demolition work more difficult and costly.
Design an automatic early warning and tracking verification system for illegal construction, including a data collection module, an illegal building identification module, a data update module and a screening module. It uses drones, satellites and ground photography to collect data, and combines convolutional neural networks for automatic identification and Alarm, and regularly formulate collection plans for tracking and verification through the data update module.
It has achieved timely early warning and follow-up verification of illegal buildings, reduced subsequent demolition costs, and avoided the double-handedness of dealing with illegal buildings.
Smart Images

Figure CN118780942A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of illegal construction identification, and in particular to an automatic early warning and tracking and verification system for illegal construction. Background Art
[0002] With the acceleration of urbanization, the problem of illegal buildings has become increasingly prominent, which not only occupies public resources, but also may endanger public safety and affect the city's image. Traditional manual judgment methods are inefficient and costly, so it is particularly important to study and apply intelligent illegal building recognition technology.
[0003] Most of the existing intelligent identification of illegal construction can only issue alarms or early warnings after the construction of illegal buildings has begun and obvious changes have occurred in the area.
[0004] If illegal buildings cannot be stopped and demolished in time at the initial stage of construction, the difficulty of subsequent demolition work will increase and higher demolition costs will be incurred. Therefore, there is a need for timely early warning of illegal buildings in the early stages of construction. Summary of the invention
[0005] To this end, the present invention provides an automatic early warning and tracking and verification system for illegal construction to solve the above-mentioned problems in the prior art.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] According to a first aspect of the present invention, an automatic early warning and tracking and verification system for illegal construction includes:
[0008] Data collection module, including drone photography collection module, satellite image collection module, and ground photography collection module, used to realize diversified data collection;
[0009] An illegal building identification module, wherein the illegal building identification module includes a variety of illegal building identification modules for intelligently identifying illegal buildings, and the illegal building identification module also includes an alarm module for alarming areas where illegal buildings appear;
[0010] The data update module regularly formulates data collection plans for execution by the data collection module, which is used to update the image data set and track and verify the progress of rectification of illegal buildings;
[0011] Screening module to remove invalid and low-quality image data;
[0012] The data storage module internally stores the graphics and data submitted by the acquisition module, and the initial graphics and data of the legal buildings.
[0013] Furthermore, the working steps of the diversified illegal building identification module include:
[0014] Step 1: Collect the data of the day through the data collection module and upload it to the data storage module, marking the latitude and longitude, altitude, weather and time;
[0015] Step 2: The screening module screens the data of the day in the data storage module and removes images and videos with poor quality;
[0016] Step 3: The screened data is input into the illegal building recognition module for identification. The diversified illegal building data set based on the convolutional neural network in the diversified illegal building recognition module is used to realize automatic analysis of video streams or continuous images and timely discover the existence of illegal buildings.
[0017] Step 4: When the existence of illegal buildings is discovered, an alarm is immediately sounded, and the location information and image information are immediately transmitted to the urban management department and the urban planning department. The data collection module dispatches drones to take all-round photos of the illegal buildings in the current area, and uploads the all-round camera data to the data storage module.
[0018] Furthermore, after step 4, there is step 5: after obtaining the illegal building demolition deadline from the urban management department or the urban planning department, upload it to the data update module to formulate a data collection plan for the illegal building demolition deadline, and after each data collection is completed, execute steps 1 to 3 to realize tracking and verification of the illegal building demolition;
[0019] Step 6: For areas where the demolition plan has not been completed within the demolition deadline for illegal buildings, the alarm system will immediately sound an alarm and execute step 5 until the illegal buildings are completely demolished.
[0020] Furthermore, the data collection plan formulation logic includes:
[0021] S1: Initial data collection. After the screening module screens the image data, the initial image data is compared with the initial graphics and data of the legal building stored in the data storage module;
[0022] S2: After comparison, the raster patches of building outline changes are obtained through the initial graphics of the legal building and the building outline change detection, and converted into the vector patches of building outline changes;
[0023] S3: Generate the current area change vector according to the building outline change vector patch;
[0024] S4: Based on the size of the regional change vector, a long-interval collection plan is formulated for areas with small vector changes, and a short-interval collection plan is formulated for areas with large vector changes.
[0025] Furthermore, building a diverse illegal building dataset includes the following steps:
[0026] S1: Data collection, using the data acquisition module to collect multi-source data, using drones, satellites or ground photography to obtain images of illegal buildings in different regions and of different types, and using a variety of acquisition equipment and under different environmental conditions to increase data diversity. At the same time, it is necessary to obtain the initial graphics and data of legal buildings for comparison. The above image data are stored in the data storage module;
[0027] S2: Data preprocessing, converting all images into a unified JPEG format and adjusting them to the same resolution, followed by a preliminary screening of the collected images. The screening module removes images of poor quality and deletes them in the data storage module;
[0028] S3: Dynamic data augmentation;
[0029] S4: Annotation classification:
[0030] Accurate labeling: Accurately label the illegal buildings in each image with their bounding boxes and assign corresponding category labels;
[0031] Fine-grained classification: In addition to marking illegal buildings, legal buildings are also annotated to divide the dataset into positive and negative samples;
[0032] S5: Construction of validation set and test set:
[0033] Stratified sampling: From the preprocessed and enhanced dataset, stratified sampling is used to construct training sets, validation sets, and test sets, respectively, to ensure that each subset contains a variety of illegal building types and scenarios;
[0034] Proportional division: Divide the data into 70% training set, 15% validation set, and 15% test set to evaluate the performance of the model;
[0035] S6: After the model’s judgment accuracy reaches 95%, it is put into use in CNN, and artificial sampling data is used to determine the final judgment result.
[0036] Furthermore, the identification step of the construction tool identification module includes:
[0037] S1: During the operation of the data collection module, conventional medium and large-scale building tools appearing in the area are identified;
[0038] S2: For areas where construction tools appear, the collected image information is transmitted to the alarm module in the illegal building recognition module, and the alarm information is submitted to the urban management department and the urban planning department;
[0039] S3: After obtaining construction information for the current area from the urban management department and the urban planning department, the early warning and alarm information for the current area is cancelled, and image acquisition for the current area is no longer performed during the construction period;
[0040] S4: For construction tools that do not have construction permits, continue to submit alarm information to the urban management department and urban planning department until rectification is completed.
[0041] Furthermore, multi-source data collection can also use the ImageNet open source dataset to collect image resources for illegal building identification.
[0042] The present invention has the following advantages:
[0043] 1. Through the construction tool identification module, medium and large construction tools appearing in the area are identified to warn of the upcoming construction site in advance, so that early warning or alarm can be directly issued until rectification is made or the relevant department provides construction permits for the corresponding area, which can stop the appearance of illegal construction sites in time, avoid early stage construction of illegal construction, and reduce subsequent demolition costs;
[0044] 2. Use the data update module to regularly formulate data collection plans for the data collection module to execute. After illegal buildings appear, formulate data collection plans within the time limit for demolition of illegal buildings to track and verify the demolition of illegal buildings and avoid lip service to illegal building handling. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 A workflow diagram of an automatic early warning and tracking and verification system for illegal construction provided in some embodiments of the present invention. DETAILED DESCRIPTION
[0046] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] like Figure 1 As shown, an automatic early warning and tracking and verification system for illegal construction in an embodiment of the first aspect of the present invention includes:
[0048] Data collection module, including drone photography collection module, satellite image collection module, and ground photography collection module, to achieve diversified data collection;
[0049] An illegal building identification module, wherein the illegal building identification module includes a variety of illegal building identification modules for intelligently identifying illegal buildings, and the illegal building identification module also includes an alarm module for alarming areas where illegal buildings appear;
[0050] The construction tool recognition module identifies medium and large construction tools in the area and is used to warn of upcoming construction sites in advance.
[0051] The data update module regularly formulates data collection plans for execution by the data collection module, which is used to update the image data set and track and verify the progress of rectification of illegal buildings;
[0052] The screening module and the data storage module store the graphics and data submitted by the acquisition module and the initial graphics and data of the legal buildings;
[0053] The working steps of the diversified illegal building identification module include:
[0054] Step 1: Collect the data of the day through the data collection module and upload it to the data storage module, marking the latitude and longitude, altitude, weather and time;
[0055] Step 2: The screening module screens the data of the day in the data storage module and removes images and videos with poor quality;
[0056] Step 3: The screened data is input into the illegal building recognition module for identification. The diversified illegal building data set based on the convolutional neural network in the diversified illegal building recognition module is used to realize automatic analysis of video streams or continuous images and timely discover the existence of illegal buildings.
[0057] Step 4: After discovering the existence of illegal buildings, an alarm is immediately sounded, and the location information and image information are immediately transmitted to the urban management department and the urban planning department. The data collection module dispatches drones to take all-round photos of the illegal buildings in the current area, and uploads the all-round camera data to the data storage module;
[0058] Step 5: After obtaining the illegal building demolition deadline from the urban management department or urban planning department, upload it to the data update module to formulate a data collection plan for the illegal building demolition deadline, and execute steps 1 to 3 after each data collection is completed to track and verify the demolition of illegal buildings;
[0059] Step 6: For areas where the demolition plan has not been completed within the demolition deadline for illegal buildings, the alarm system will immediately sound an alarm and execute step 5 until the illegal buildings are completely demolished.
[0060] The data collection plan formulation logic includes:
[0061] S1: Initial data collection. After the screening module screens the image data, the initial image data is compared with the initial graphics and data of the legal building stored in the data storage module;
[0062] S2: After comparison, the raster image of the building outline change is obtained through the initial graphics of the legal building and the building outline change detection, and converted into the building outline change vector image, wherein the vectorization process includes: Step 1: Generate a building heat map through the building recognition model to obtain a building vector;
[0063] Step 2: Smooth the building vector according to the building shape feature principle to eliminate the jagged edges in the generated vector;
[0064] Step 3: Identify the building corners according to the directions generated in the building recognition model and mark the corner positions;
[0065] Step 4: Delete the vectors between the corners and optimize the position of the generated building outline vector;
[0066] S3: Generate the current area change vector according to the building outline change vector patch;
[0067] S4: Based on the size of the regional change vector, a long-interval collection plan is formulated for areas with small vector changes, and a short-interval collection plan is formulated for areas with large vector changes.
[0068] Building a diverse dataset of illegal buildings includes the following steps:
[0069] S1: Data collection, using the data collection module to collect multi-source data, using drones, satellites or ground photography to obtain images of illegal buildings of different regions and types, and using a variety of collection equipment and under different environmental conditions (such as different weather and time periods) to increase data diversity. Open source data sets can also be used to collect image resources for illegal building identification, such as ImageNet. At the same time, the initial graphics and data of legal buildings need to be obtained to provide comparison. The establishment of diversity requires ensuring that the data set contains various types of illegal buildings, such as temporary structures, illegal expansions, and buildings that have been changed without authorization. At the same time, buildings of different sizes, different building materials, and different geographical locations should be included to fully represent the diversity of illegal buildings. The above image data are all stored in the data storage module;
[0070] S2: Data preprocessing: convert all images into a unified JPEG format and adjust them to the same resolution for subsequent processing. Then, the collected images are preliminarily screened. The screening module removes images with poor quality (such as too blurry or overexposed). At the same time, they are deleted in the data storage module to ensure the quality of the data set and reduce the burden on the data storage module.
[0071] S3: Dynamic data enhancement, which applies data enhancement techniques in real time during model training, such as random rotation angles and random brightness adjustments, so that the model can learn on more diverse data;
[0072] S4: Annotation classification:
[0073] Accurate labeling: Accurately label the illegal buildings in each image with their bounding boxes and assign corresponding category labels;
[0074] Fine-grained classification: In addition to marking illegal buildings, legal buildings can also be annotated, and the dataset can be divided into positive and negative samples, which helps the model learn the features that distinguish illegal and non-illegal buildings;
[0075] S5: Construction of validation set and test set:
[0076] Stratified sampling: From the preprocessed and enhanced dataset, stratified sampling is used to construct training sets, validation sets, and test sets, respectively, to ensure that each subset contains a variety of illegal building types and scenarios;
[0077] Proportional division: 70% training set, 15% validation set, and 15% test set are divided to fully evaluate the performance of the model;
[0078] S6: After the model’s judgment accuracy reaches 95%, it is put into use in CNN, and artificial sampling data is used to determine the final judgment result.
[0079] The identification step of the construction tool identification module includes:
[0080] S1: During the operation of the data collection module, conventional medium and large-scale building tools appearing in the area are identified;
[0081] S2: For areas where construction tools appear, the collected image information is transmitted to the alarm module in the illegal building recognition module, and the alarm information is submitted to the urban management department and the urban planning department;
[0082] S3: After obtaining construction information for the current area from the urban management department and the urban planning department, the early warning and alarm information for the current area is cancelled, and image acquisition for the current area is no longer performed during the construction period;
[0083] S4: For construction tools that do not have construction permits, continue to submit alarm information to the urban management department and urban planning department until rectification is completed.
Claims
1. An automatic early warning and tracking verification system for illegal construction, characterized in that: include: Data collection module, including drone photography collection module, satellite image collection module, and ground photography collection module, used to realize diversified data collection; An illegal building identification module, wherein the illegal building identification module includes a variety of illegal building identification modules for intelligently identifying illegal buildings, and the illegal building identification module also includes an alarm module for alarming areas where illegal buildings appear; The construction tool recognition module identifies medium and large construction tools in the area and is used to warn of upcoming construction sites in advance. The data update module regularly formulates data collection plans for execution by the data collection module, which is used to update the image data set and track and verify the progress of rectification of illegal buildings; Screening module to remove invalid and low-quality image data; The data storage module internally stores the graphics and data submitted by the acquisition module, and the initial graphics and data of the legal buildings.
2. According to claim 1, the automatic early warning and tracking and verification system for illegal construction is characterized in that: The working steps of the diversified illegal building identification module include: Step 1: Collect the data of the day through the data collection module and upload it to the data storage module, marking the latitude and longitude, altitude, weather and time; Step 2: The screening module screens the data of the day in the data storage module and removes images and videos with poor quality; Step 3: The screened data is input into the illegal building recognition module for identification. The diversified illegal building data set based on the convolutional neural network in the diversified illegal building recognition module is used to realize automatic analysis of video streams or continuous images and timely discover the existence of illegal buildings. Step 4: When the existence of illegal buildings is discovered, an alarm is immediately sounded, and the location information and image information are immediately transmitted to the urban management department and the urban planning department. The data collection module dispatches drones to take all-round photos of the illegal buildings in the current area, and uploads the all-round camera data to the data storage module.
3. The automatic early warning and tracking and verification system for illegal construction according to claim 2 is characterized in that: After step 4, there is step 5: after obtaining the illegal building demolition deadline from the urban management department or the urban planning department, upload it to the data update module to formulate a data collection plan for the illegal building demolition deadline, and after each data collection is completed, execute steps 1 to 3 to realize the tracking and verification of the illegal building demolition; Step 6: For areas where the demolition plan has not been completed within the demolition deadline for illegal buildings, the alarm system will immediately sound an alarm and execute step 5 until the illegal buildings are completely demolished.
4. According to claim 1, the automatic early warning and tracking and verification system for illegal construction is characterized in that: The data collection plan formulation logic includes: S1: Initial data collection. After the screening module screens the image data, the initial image data is compared with the initial graphics and data of the legal building stored in the data storage module; S2: After comparison, the raster patches of building outline changes are obtained through the initial graphics of the legal building and the building outline change detection, and converted into the vector patches of building outline changes; S3: Generate the current area change vector according to the building outline change vector patch; S4: Based on the size of the regional change vector, a long-interval collection plan is formulated for areas with small vector changes, and a short-interval collection plan is formulated for areas with large vector changes.
5. The automatic early warning and tracking and verification system for illegal construction according to claim 2 is characterized in that: Building a diverse dataset of illegal buildings includes the following steps: S1: Data collection, using the data acquisition module to collect multi-source data, using drones, satellites or ground photography to obtain images of illegal buildings in different regions and of different types, and using a variety of acquisition equipment and under different environmental conditions to increase data diversity. At the same time, it is necessary to obtain the initial graphics and data of legal buildings for comparison. The above image data are stored in the data storage module; S2: Data preprocessing, converting all images into a unified JPEG format and adjusting them to the same resolution, followed by a preliminary screening of the collected images. The screening module removes images of poor quality and deletes them in the data storage module; S3: Dynamic data augmentation; S4: Annotation classification: Accurate labeling: Accurately label the illegal buildings in each image with their bounding boxes and assign corresponding category labels; Fine-grained classification: In addition to marking illegal buildings, legal buildings are also annotated to divide the dataset into positive and negative samples; S5: Construction of validation set and test set: Stratified sampling: From the preprocessed and enhanced dataset, stratified sampling is used to construct training sets, validation sets, and test sets, respectively, to ensure that each subset contains a variety of illegal building types and scenarios; Proportional division: Divide the data into 70% training set, 15% validation set, and 15% test set to evaluate the performance of the model; S6: After the model’s judgment accuracy reaches 95%, it is put into use in CNN, and artificial sampling data is used to determine the final judgment result.
6. The automatic early warning and tracking verification system for illegal construction according to claim 1 is characterized in that: The identification step of the construction tool identification module includes: S1: During the operation of the data collection module, conventional medium and large-scale building tools appearing in the area are identified; S2: For areas where construction tools appear, the collected image information is transmitted to the alarm module in the illegal building recognition module, and the alarm information is submitted to the urban management department and the urban planning department; S3: After obtaining construction information for the current area from the urban management department and the urban planning department, the early warning and alarm information for the current area is cancelled, and image acquisition for the current area is no longer performed during the construction period; S4: For construction tools that do not have construction permits, continue to submit alarm information to the urban management department and urban planning department until rectification is completed.
7. The automatic early warning and tracking and verification system for illegal construction according to claim 1 is characterized in that: Multi-source data collection can also use the ImageNet open source dataset to collect image resources for illegal building identification.