Buffer material piling body installation and scanning multi-item cooperation system and working method

By designing multiple collaborative systems for the installation and scanning of buffer material stacks, and using automated equipment and three-dimensional scanning systems, the installation and scanning accuracy problems caused by manual operations in the existing technology have been solved, and efficient and accurate installation and scanning of buffer material stacks have been achieved. scanning.

CN118782283APending Publication Date: 2024-10-15BEIJING RES INST OF URANIUM GEOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411067727.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing buffer material stacking installation equipment relies on manual operation, resulting in poor positioning accuracy, time and energy consumption, and artificial bumps during the scanning process lead to data deviation, making it difficult to ensure the accuracy of installation and scanning.

Method used

A multi-collaboration system for the installation and scanning of buffer material stacks is designed, including a stack installation system and a stack data acquisition and scanning system. It uses positioning tooling, palletizing robotic arms, vacuum suction cups, air pump boxes and PLC controllers to achieve automated installation. , the scanning robot arm and the 3D scanning system realize high-precision scanning of the entire mechanical operation.

Benefits of technology

It achieves high efficiency, high precision and automated installation and scanning of buffer material stacks, reduces human errors, improves the accuracy of installation and scanning, and reduces the difficulty of operation and the need for floor space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118782283A_ABST
    Figure CN118782283A_ABST
Patent Text Reader

Abstract

The invention discloses a buffer material piling body installation and scanning multi-item cooperation system and a working method, and relates to the technical field of buffer material piling body installation, and the buffer material piling body installation and scanning multi-item cooperation system comprises a piling body installation system and a piling body data acquisition and scanning system; the stacking body mounting system comprises a positioning tool, a stacking mechanical arm, a vacuum suction cup, an air pump box and a PLC, the positioning tool is provided with a conveying device, the conveying device can convey building blocks located at the first end of the positioning tool to the second end of the positioning tool, and the vacuum suction cup is mounted at the moving end of the stacking mechanical arm; the stacking body data collecting and scanning system comprises a scanning mechanical arm and a three-dimensional scanning system, the three-dimensional scanning system comprises a scanner, a plurality of trackers and a background computer, the fixed end of the scanning mechanical arm is installed on the stacking mechanical arm, and the scanner is installed at the movable end of the scanning mechanical arm. According to the invention, mechanical piling and scanning can be realized, and manual participation is not needed, so that the working accuracy can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of buffer material stacking body installation, and in particular to a buffer material stacking body installation and scanning multi-cooperative system and working method. Background Art

[0002] As a clean energy, nuclear energy, while bringing significant economic benefits, inevitably produces a large amount of high-level radioactive waste (abbreviated as "high-level waste"). The internationally accepted method for dealing with high-level radioactive waste is deep geological disposal. This method involves selecting an area with stable geological structure below the surface to build a high-level radioactive waste disposal facility. The facility adopts a "multiple barrier system" design system to achieve long-term isolation of high-level radioactive waste from the biosphere. This system includes multiple levels from the outside to the inside: first, the surrounding rock, which provides the first layer of protection; second, the buffer material. Bentonite is selected as the base material of the buffer material for its low permeability, high swelling and high adsorption properties. It plays a role in slowing down the migration of radioactive substances; then there is the metal container for storing waste, which is used to wrap the innermost layer of high-level radioactive waste.

[0003] Buffer materials are usually piled around waste tanks in the form of prefabricated high-density blocks. The masonry uses 1 / 8 fan-shaped blocks (such as inner diameter 600mm, outer diameter 1200mm, angle 45°, thickness 200-300mm) and cylindrical blocks (such as outer diameter 600mm, thickness 200-300mm) as the combined units of the masonry. At present, the installation equipment of the buffer material masonry adopts a vacuum suction lifter (crane and vacuum suction cup). During the installation process, it is necessary to manually use a vacuum suction lifter to absorb the buffer material blocks, manually judge whether the position of the adsorbed block surface is appropriate, and turn to the preset installation position after sucking up the blocks. It is also necessary to judge whether the installed blocks have reached the preset installation position based on human experience. If the acceptable accuracy requirements are not met, rework and reinstallation are required until the requirements are met. In general, the manual lifting and installation method has poor positioning accuracy, is time-consuming and labor-intensive, and is prone to shaking or even falling off during manual operation; it also requires a large space to accommodate the crane, and a high-strength support is required as the foundation of the crane, which requires a high floor space. After the masonry is installed, it is necessary to scan the entire surface of the masonry with a handheld scanner when collecting information, which is time-consuming and labor-intensive, and human jolting during the scanning process is inevitable. This situation will cause the scanned data to have more deviation data points, making it difficult to guarantee the scanning accuracy and not conducive to subsequent data processing.

[0004] Therefore, there is an urgent need in the art for a buffer material stacking body installation and scanning multi-cooperative system and working method to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a buffer material masonry installation and scanning multi-cooperative system and working method to solve the problems existing in the above-mentioned prior art. The installation of the buffer material masonry can be realized through the masonry installation system, and the masonry data acquisition and scanning system can realize the scanning of the buffer material masonry. The whole process is mechanical operation and no human participation is required, thereby effectively improving the accuracy of the work.

[0006] To achieve the above object, the present invention provides the following solutions:

[0007] The present invention discloses a buffer material stacking body installation and scanning multi-cooperation system, including a stacking body installation system and a stacking body data acquisition and scanning system;

[0008] Wherein, the stacking body installation system includes a positioning tool, a stacking robot arm, a vacuum suction cup, an air pump box and a PLC controller, the positioning tool is provided with a conveying device, the conveying device can convey the block located at the first end of the positioning tool to the second end of the positioning tool, the vacuum suction cup is installed on the moving end of the stacking robot arm, the vacuum suction cup on the stacking robot arm can absorb the block located at the second end of the positioning tool, the vacuum suction cup is also connected to the air pump box, and the stacking robot arm is electrically connected to the PLC controller;

[0009] The stacking data acquisition and scanning system includes a scanning robot arm and a three-dimensional scanning system. The three-dimensional scanning system includes a scanner, a plurality of trackers and a background computer. The fixed end of the scanning robot arm is installed on the stacking robot arm, and the scanner is installed on the mobile end of the scanning robot arm. The scanning robot arm is electrically connected to the PLC controller, and the three-dimensional scanning system is electrically connected to the background computer.

[0010] Preferably, the conveying device includes a plurality of horizontal transmission rollers rotatably connected to the upper surface of the positioning tooling, and the horizontal transmission rollers are arranged parallel to each other. A propulsion cylinder is installed at the first end of the positioning tooling, and the propulsion cylinder is connected to the air pump box through a pipeline. A propulsion plate is provided at the telescopic end of the propulsion cylinder, and the propulsion plate is used to push the building blocks.

[0011] Preferably, a lateral limit bracket is respectively provided on both sides of the upper end of the positioning tooling, and the distance between the two lateral limit brackets gradually decreases from the first end to the second end of the positioning tooling, and each of the lateral limit brackets is rotatably connected to a plurality of lateral limit rollers.

[0012] Preferably, the propulsion plate is an arc-shaped plate.

[0013] Preferably, a pressure sensor is provided on the propulsion plate, and a displacement sensor is provided on the lateral limiting bracket.

[0014] Preferably, a base support is respectively provided at the lower end of each of the four corners of the positioning tool, and a fixing plate is provided at the lower end of the base support.

[0015] Preferably, there are two trackers, namely a first tracker and a second tracker, the first tracker is installed on a first tripod, and the second tracker is installed on a second tripod, and the first tracker and the second tracker are respectively arranged on both sides of the stacked buffer material masonry.

[0016] Preferably, it also includes a safety system, which includes a first safety grating, a second safety grating, a third safety grating and a fourth safety grating, and the first safety grating, the second safety grating, the third safety grating and the fourth safety grating are respectively arranged at the four corners of the stacked buffer material masonry.

[0017] Preferably, the palletizing robot arm is installed on the upper end of the steel support.

[0018] The present invention discloses a working method of a buffer material stacking body installation and scanning multi-cooperative system, based on the above-mentioned buffer material stacking body installation and scanning multi-cooperative system, including a buffer material stacking body installation process and a buffer material stacking body scanning process;

[0019] Installation process of buffer material stacking body: first, connect the power of PLC controller and air pump box, turn on the power switch of air pump box, turn on the start button on PLC controller, after the teaching pendant of stacking robot arm and scanning robot arm is initialized, the preparatory work is completed, then the installation of buffer material stacking body can be started; first, use crane to lift the block and place it on positioning fixture, then press the start button on positioning fixture, the propulsion plate pushes the block forward under the action of propulsion cylinder, after reaching the position, the propulsion plate returns to the initial position, the stacking robot arm moves to the top of the block according to the preset program, then moves downward to make the vacuum suction cup fit the upper surface of the block, and starts to perform vacuuming action, after the vacuuming is completed, it moves to the preset stacking position of buffer material stacking body according to the preset program, after reaching the preset position, the vacuum suction cup deflates, the block is released and the installation of one block is completed, then the stacking robot arm returns to the initial position, waiting for the instruction after the next block is loaded; after all the blocks are installed, the stacking robot arm returns to the initial position, and the installation process is completed;

[0020] Scanning process of buffer material masonry: After the whole process of buffer material masonry installation is completed, the teaching pendant of the palletizing robot arm is used to call the scanning program. After the application is applied, the palletizing robot arm will move to the appropriate position to wait for the operator to install the scanner on the scanning robot arm, and then build the first tracker and the second tracker. Confirm whether the scanner, the first tracker and the second tracker are successfully connected on the corresponding background computer. After the display is successful, the dynamic tracking mode is turned on, and the palletizing robot arm teaching pendant is used to continue running the scanning program; the scanning starts immediately, and the palletizing robot arm and the scanning robot arm will work together to ensure that the scanner scans the entire surface of the buffer material masonry. After the scanning program is completed, the palletizing robot arm and the scanning robot arm return to their original positions and wait for subsequent instructions. Check whether the scanning data on the background computer is complete. After confirming that it is complete, save the project file. The scanning process is completed and the scanner can be removed.

[0021] Compared with the prior art, the present invention has achieved the following technical effects:

[0022] The present invention provides a high-efficiency, high-precision and automated installation and scanning collaborative system for buffer material masonry and its working method. The installation of the buffer material masonry can be realized through the masonry installation system, and the masonry data acquisition and scanning system can realize the scanning of the buffer material masonry. The hoisting process can meet the hoisting requirements and the blocks will not fall off, and the blocks will not be damaged due to factors such as bumps; the positioning tooling can push the blocks to the predetermined limit, eliminating the installation errors caused by different adsorption positions caused by human factors; the installation process of the stacking robot arm is completed by the designer writing a preset running program, and the stacking robot arm runs stably and occupies a small space; the mechanical scanning process eliminates the jitter and bump caused by manual scanning, resulting in more deviation points in the collected data; the whole process can achieve high efficiency, high precision and automation, and provide technical support for the installation of buffer material masonry in underground laboratories and disposal repositories.

[0023] Furthermore, the buffer material stacking masonry installation and scanning multi-cooperative system and working method provided by the present invention are equipped with a positioning tool that matches the fan-shaped blocks and cylindrical blocks. The positioning tool has a horizontal transmission roller and two wing lateral limiting rollers to form a 1 / 8 fan-shaped block and a cylindrical block limiting slot. The angle between the two wing lateral limiting rollers of the positioning tool is 45°, which can accommodate blocks with an inner diameter of 600mm, an outer diameter of 1200mm, an angle of 45°, and a thickness of 200-300mm. A propulsion plate driven by a propulsion cylinder is set at the center line of the horizontal transmission roller. Under the guidance of a preset program, the fan-shaped or cylindrical blocks are pushed. The propulsion plate cooperates with the horizontal transmission roller to guide the blocks to move forward to the limiting slot. After reaching the limit, wait for the vacuum suction cup at the end of the stacking robot arm to adhere to the upper surface of the block for vacuum adsorption and then return to its original position. The positioning tool is also equipped with a displacement sensor and a pressure sensor to realize the automatic positioning of the block adsorption position.

[0024] Furthermore, the buffer material stacking body installation and scanning multi-cooperative system and working method provided by the present invention are equipped with a scanning robot arm and a three-dimensional scanning system. The scanning robot arm is fixed above the top joint of the stacking robot arm and has six degrees of freedom. The front end is equipped with a scanner of the three-dimensional scanning system. The three-dimensional scanner system is also equipped with a tracker. When the tracker can identify the scanner, scanning can be carried out. The designers write the displacement program of the scanning robot arm scanning the stacking body in the teaching pendants of the scanning robot arm and the stacking robot arm respectively. The scanning robot arm runs stably, and there will be no scanner jitter caused by human factors, resulting in the collection of too many data deviation points, which can effectively improve the accuracy of the stacking body scanning data.

[0025] Furthermore, the buffer material stacking body installation and scanning multi-cooperative system and working method provided by the present invention are equipped with an air pump box and a PLC controller. The air pump box can supply air to the propulsion cylinder set on the positioning tooling platform, and can also provide vacuum negative pressure for the vacuum suction cup at the end of the stacking robot arm. The PLC controller is a central device that feeds back to the stacking robot arm and the scanning robot arm after writing the program as a teaching pendant, and can operate stably and provide timely feedback.

[0026] Furthermore, the buffer material stacking body installation and scanning multi-cooperative system and working method provided by the present invention are equipped with a safety grating. When a person mistakenly enters the working area and touches the parallel light beam emitted by the safety grating, the stacking robot arm and the scanning robot arm can stop the action in time to ensure that no safety accidents occur. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 It is a structural schematic diagram of a buffer material stacking body installation and scanning multi-cooperative system according to Example 1;

[0029] Figure 2 A top view of a positioning tool in a multi-cooperative system for installing and scanning a buffer material stacking body in Example 1;

[0030] Figure 3 It is a side view of a positioning tool in the buffer material stacking masonry installation and scanning multi-cooperative system of Example 1;

[0031] Figure 4 An isometric view of a positioning tool for installing and scanning a plurality of collaborative systems for buffer material stacking in Example 1;

[0032] In the figure: 1-buffer material stacking body; 2-PLC controller; 3-air pump box; 4-steel support; 5-palletizing robot arm; 6-scanning robot arm; 7-scanner; 8-vacuum suction cup; 9-first safety grating; 10-second safety grating; 11-third safety grating; 12-fourth safety grating; 13-first tracker; 14-first tripod; 15-second tracker; 16-positioning tooling; 17-horizontal transmission roller; 18-lateral limiting roller; 19-propelling cylinder; 20-lateral limiting bracket; 21-base support; 22-propelling plate; 23-second tripod. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] The purpose of the present invention is to provide a buffer material masonry installation and scanning multi-cooperative system and working method to solve the problems existing in the above-mentioned prior art. The installation of the buffer material masonry can be realized through the masonry installation system, and the masonry data acquisition and scanning system can realize the scanning of the buffer material masonry. The whole process is mechanical operation and no human participation is required, thereby effectively improving the accuracy of the work.

[0035] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0036] Embodiment 1

[0037] like Figure 1-Figure 4 As shown, this embodiment provides a buffer material stacking body installation and scanning multi-cooperation system, including a stacking body installation system and a stacking body data acquisition and scanning system.

[0038] Among them, the stacking body installation system is used to realize the stacking of the buffer material stacking body 1, and the stacking body installation system includes a positioning tool 16, a stacking robot arm 5, a vacuum suction cup 8, an air pump box 3 and a PLC controller 2. The positioning tool 16 is provided with a conveying device, which can convey the building blocks located at the first end of the positioning tool 16 to the second end of the positioning tool 16. The vacuum suction cup 8 is installed on the moving end of the stacking robot arm 5. The stacking robot arm 5 uses an existing six-axis robot arm. The vacuum suction cup 8 on the stacking robot arm 5 can adsorb the building blocks located at the second end of the positioning tool 16. The vacuum suction cup 8 is also connected to the air pump box 3, and an air pump is provided in the air pump box 3. The vacuum suction cup 8 can be sucked or supplied with air through the air pump box 3, so as to realize the adsorption and release of the building blocks by the vacuum suction cup 8. The stacking robot arm 5 is electrically connected to the PLC controller 2, and the operation of the stacking robot arm 5 can be controlled by the PLC controller 2.

[0039] The data collection and scanning system for the stacked body includes a scanning robot arm 6 and a three-dimensional scanning system, wherein the three-dimensional scanning system uses an existing tracking three-dimensional scanner, and the three-dimensional scanning system includes a scanner 7, several trackers and a background computer. The scanning robot arm 6 uses a six-axis robot arm, and the fixed end of the scanning robot arm 6 is installed on the top joint of the palletizing robot arm 5. The palletizing robot arm 5 here has two functions. First, it is used to install the scanning robot arm 6; second, the movement of the palletizing robot arm 5 can also drive the scanning robot arm 6 to move, so it can assist the movement of the scanning robot arm 6. It should be noted that generally only the scanning robot arm 6 is required to drive the scanner 7 to move. If the scanning robot arm 6 cannot drive the scanner 7 to the specified position, the palletizing robot arm 5 is used to assist the movement. The scanner 7 is installed on the mobile end of the scanning robot arm 6. The scanning robot arm 6 is electrically connected to the PLC controller 2, and the scanning robot arm 6 can be controlled to run by the PLC controller 2. The three-dimensional scanning system is electrically connected to the background computer, which is used to transmit the scanning data to the background computer, and the background computer performs data collection and analysis.

[0040] In actual use, the blocks to be stacked are first placed on the first end of the positioning fixture 16 by a crane, and then transported to the second end of the positioning fixture 16 by a conveying device. At this time, the stacking robot arm 5 is used to drive the vacuum suction cup 8 to suck the blocks located at the second end of the positioning fixture 16, and the stacking robot arm 5 is moved to move the blocks to the designated position for stacking, and this is repeated until the stacking work is completed. The stacking robot arm 5 and the scanning robot arm 6 are used to drive the scanner 7 to move, and the buffer material stack 1 is scanned from different angles, thereby realizing the three-dimensional scanning of the buffer material stack 1, and transmitting the relevant data to the background computer.

[0041] In this embodiment, the conveying device includes a plurality of horizontal transmission rollers 17 rotatably connected to the upper surface of the positioning fixture 16, and each horizontal transmission roller 17 is arranged parallel to each other, and each horizontal transmission roller 17 is spaced from the first end to the second end of the positioning fixture 16. In addition, a propulsion cylinder 19 is installed at the first end of the positioning fixture 16, and the propulsion cylinder 19 is connected to the air pump box 3 through a pipeline. As for the specific connection relationship of the pipeline, the air outlet of the air pump box 3 is respectively connected to the two air ports of the propulsion cylinder 19 through two branches. By ventilating one of the air ports and exhausting the other air port, the linear movement of the propulsion cylinder 19 can be achieved. These are all prior arts, so they will not be described in detail here. The telescopic end of the propulsion cylinder 19 is provided with a propulsion plate 22, and the propulsion plate 22 is used to push the block located at the first end of the positioning fixture 16.

[0042] In actual use, when the propulsion cylinder 19 is extended, the propulsion plate 22 at the end of the propulsion cylinder 19 will drive the building block to move toward the second end of the positioning tool 16, and because the building block moves on the horizontal transmission roller 17, there is rolling friction between the two, which can effectively reduce the friction between the two and reduce the wear on the building block.

[0043] In this embodiment, a lateral limiting bracket 20 is provided on both sides of the upper end of the positioning tool 16, and the two lateral limiting brackets 20 are distributed in an "eight" shape, that is, the spacing between the two lateral limiting brackets 20 gradually decreases from the first end to the second end of the positioning tool 16, that is, there is an angle between the two lateral limiting brackets 20, and the angle is 45° in this embodiment. Each lateral limiting bracket 20 is rotatably connected to a plurality of lateral limiting rollers 18, and the lateral limiting rollers 18 on both sides can not only reduce the friction of the lateral limiting bracket 20 on the block, but also support and limit the block.

[0044] When the block is pushed from the first end to the second end of the positioning fixture 16 by the push plate 22, the push plate 22, the horizontal transmission roller 17 and the lateral limiting roller 18 can limit the block in a fan shape, so that the movement of the block is similar to the movement along the radius to the center of the circle. When the block moves to the second end of the positioning fixture 16, the spacing between the lateral limiting rollers 18 on both sides is the smallest, so that the block cannot move forward further. The position here is the limiting slot, and the push plate 22 stops pushing the block every time it pushes it to the limiting slot. The vacuum suction cup 8 on the stacking robot arm 5 also accurately absorbs the block at the limiting slot every time, so that there is no difference in the position of the block adsorbed each time, thereby ensuring the accuracy of the system operation.

[0045] In this embodiment, the pushing plate 22 is an arc-shaped plate that can fit closely with the outer circumference of the building block and will not wear or damage the building block during the pushing process.

[0046] In this embodiment, a pressure sensor is provided on the propulsion plate 22, and the pressure sensor is electrically connected to the PLC controller 2. When the propulsion plate 22 pushes the building block to move to the limit slot, the building block cannot move further, so the pressure sensor senses the pressure change at this time and transmits the corresponding data to the PLC controller 2, which controls the propulsion plate 22 to move backward.

[0047] In addition, a displacement sensor is provided on the lateral limit bracket 20, and the displacement sensor is also electrically connected to the PLC controller 2. The displacement sensor includes but is not limited to existing proximity switches or photoelectric sensors and other devices. When the block moves to the limit slot, the displacement sensor senses that the block has reached the specified position and transmits the position signal of the block to the PLC controller 2, and then the PLC controller 2 controls the propulsion plate 22 to move backward.

[0048] In this embodiment, the skeleton of the positioning tool 16 is a hollow steel frame with a square cross-section. This steel frame reduces the weight while maintaining the bearing capacity. A base support 21 is provided at the lower end of the four corners of the positioning tool 16. A fixing plate is provided at the lower end of the base support 21, and a plurality of threaded holes are provided on the fixing plate so that the fixing plate can be fixed to the ground by bolts, thereby ensuring the stability of the positioning tool 16 and preventing the slight movement of the positioning tool 16 from causing changes in the adsorption position of the building blocks.

[0049] In this embodiment, two trackers are provided, namely, a first tracker 13 and a second tracker 15. The first tracker 13 is mounted on a first tripod 14, and the second tracker 15 is mounted on a second tripod 23. The first tracker 13 and the second tracker 15 are fixed by the first tripod 14 and the second tripod 23. The first tracker 13 and the second tracker 15 are respectively arranged on both sides of the stacked buffer material masonry 1. The scanner 7 can emit cross blue light to collect data parameters such as the flatness, fit and gap width between different blocks on the surface of the buffer material masonry 1. The first tracker 13 and the second tracker 15 can identify the scanner 7 within a certain range around the buffer material masonry 1.

[0050] In this embodiment, a safety system is also included, which includes a first safety grating 9, a second safety grating 10, a third safety grating 11 and a fourth safety grating 12. The four safety gratings are in pairs and are all electrically connected to the PLC controller 2. The first safety grating 9 and the second safety grating 10 are a pair, and the third safety grating 11 and the fourth safety grating 12 are a pair. In each pair, one is a transmitting end and the other is a receiving end. In addition, the first safety grating 9, the second safety grating 10, the third safety grating 11 and the fourth safety grating 12 are respectively arranged at the four corners of the stacked buffer material masonry 1. The specific distribution positions can be referred to Figure 1The first safety grating 9, the second safety grating 10, the third safety grating 11 and the fourth safety grating 12 can surround the buffer material stacking body 1 and the palletizing robot arm 5. When a worker enters the area surrounded by the first safety grating 9, the second safety grating 10, the third safety grating 11 and the fourth safety grating 12, the PLC controller 2 promptly controls the palletizing robot arm 5 and the scanning robot arm 6 to stop running to prevent harm to the worker. After the safety hazard is eliminated, the operator gives subsequent instructions.

[0051] In this embodiment, the stacking robot arm 5 is installed on the upper end of the steel support 4, and the steel support 4 is the bottom support of the stacking robot arm 5, which can bear the total weight of the stacking robot arm 5, the scanning robot arm 6, the scanner 7 and a single building block.

[0052] Embodiment 2

[0053] This embodiment provides a working method of a buffer material stacking body installation and scanning multi-cooperative system, based on the buffer material stacking body installation and scanning multi-cooperative system disclosed in the first embodiment, including a buffer material stacking body 1 installation process and a buffer material stacking body 1 scanning process;

[0054] Installation process of buffer material stacking body 1: First, connect the power of PLC controller 2 and air pump box 3, turn on the power switch of air pump box 3, turn on the start button on PLC controller 2, and rotate the lower connection button to the on state. After the teaching device of stacking robot 5 and scanning robot 6 is initialized, the preparatory work is completely completed, and then the installation of buffer material stacking body 1 can be started. In this embodiment, the buffer material stacking body 1 to be installed has a total of ten layers, each layer is composed of 8 to 9 fan-shaped blocks and cylindrical blocks. The first two layers are composed of a solid cylinder formed by the middle cylindrical block and the surrounding eight fan-shaped blocks, and the last eight layers are hollow cylinders without middle cylindrical blocks. The installation process of each block is similar. Taking the installation of one of the blocks as an example, first, a crane is used to lift the fan-shaped building block and place it on the horizontal transmission roller 17 of the positioning tool 16, with the inner circle of the fan-shaped building block facing the limit slot and the outer circle facing the push plate 22. Then, the start button on the positioning tool 16 is pressed, and the push plate 22 pushes the fan-shaped building block forward under the action of the push cylinder 19, and moves toward the limit slot as guided by the horizontal transmission roller 17 below and the lateral limit rollers 18 on both sides. After reaching the limit, the push plate 22 returns to the initial position, and the stacking robot arm 5 runs to the top of the fan-shaped building block at the limit according to the preset program, and then moves downward to make the vacuum suction cup 8 fit the upper surface of the building block, and starts the vacuuming action. After the vacuuming is completed, it moves to the preset stacking position according to the preset program. After reaching the preset position, the vacuum suction cup 8 deflates, the building block is released and the installation of one block is completed. Then the stacking robot arm 5 returns to the initial position, waiting for instructions after the next building block is loaded. After the ten-layer buffer material stacking body 1 is installed, the stacking robot arm 5 returns to the initial position, and the installation process is completed.

[0055] Scanning process of buffer material stacking body 1: After the whole process of buffer material stacking body 1 installation is completed, the teaching pendant of stacking robot arm 5 is used to call the scanning program. After the application is applied, stacking robot arm 5 will run to the appropriate position to wait for the operator to install scanner 7 on scanning robot arm 6, and then build the first tracker 13 and the second tracker 15. In the scanning system on the corresponding background computer, confirm whether the scanner 7, the first tracker 13 and the second tracker 15 are successfully connected. After the display is successful, the dynamic tracking mode is turned on, and the scanner 7 immediately emits a cross blue light. Then, the teaching pendant of stacking robot arm 5 continues to run the scanning program. The scanning starts immediately, and the stacking robot arm 5 and the scanning robot arm 6 will work together to ensure that the cross blue light emitted by the scanner 7 scans the entire surface of the buffer material stacking body 1. After the scanning program is completed, the stacking robot arm 5 and the scanning robot arm 6 return to their original positions to wait for subsequent instructions, check whether the scanning data on the background computer is complete, and save the engineering file after confirming that it is complete. The scanning process is completed and the scanner 7 is removed.

[0056] In addition, it also includes a safety system: the safety gratings are divided into two pairs, a total of four. Before turning on the PLC controller 2, the first safety grating 9, the second safety grating 10, the third safety grating 11 and the fourth safety grating 12 are placed in the specified position. After the PLC controller 2 is powered on and turned on, the first safety grating 9, the second safety grating 10, the third safety grating 11 and the fourth safety grating 12 are immediately turned on. The first safety grating 9 will send a parallel light beam to the second safety grating 10. Adjust the position until the green indicator lights of the two safety gratings light up, and the safety grating arrangement is completed. The arrangement process of the third safety grating 11 and the fourth safety grating 12 is the same. Before running the installation program, first use the manual mode of the teach pendant to slowly move the stacking robot arm 5 and touch the parallel light beam to check whether the stacking robot arm 5 will stop moving. If it stops, it means that the safety grating is operating normally. Then all personnel retreat to a safe position, and move the stacking robot arm 5 to the initial position, and then start the subsequent installation and scanning work.

[0057] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A buffer material masonry installation and scanning multi-cooperative system, characterized in that: Including masonry installation system and masonry data collection and scanning system; Wherein, the stacking body installation system includes a positioning tool, a stacking robot arm, a vacuum suction cup, an air pump box and a PLC controller, the positioning tool is provided with a conveying device, the conveying device can convey the block located at the first end of the positioning tool to the second end of the positioning tool, the vacuum suction cup is installed on the moving end of the stacking robot arm, the vacuum suction cup on the stacking robot arm can absorb the block located at the second end of the positioning tool, the vacuum suction cup is also connected to the air pump box, and the stacking robot arm is electrically connected to the PLC controller; The stacking data acquisition and scanning system includes a scanning robot arm and a three-dimensional scanning system. The three-dimensional scanning system includes a scanner, a plurality of trackers and a background computer. The fixed end of the scanning robot arm is installed on the stacking robot arm, and the scanner is installed on the mobile end of the scanning robot arm. The scanning robot arm is electrically connected to the PLC controller, and the three-dimensional scanning system is electrically connected to the background computer.

2. The buffer material stacking body installation and scanning multi-cooperative system according to claim 1, characterized in that: The conveying device includes a plurality of horizontal transmission rollers rotatably connected to the upper surface of the positioning tooling, and the horizontal transmission rollers are arranged parallel to each other. A propulsion cylinder is installed at the first end of the positioning tooling, and the propulsion cylinder is connected to the air pump box through a pipeline. A propulsion plate is provided at the telescopic end of the propulsion cylinder, and the propulsion plate is used to push the building blocks.

3. The buffer material stacking body installation and scanning multi-cooperative system according to claim 2, characterized in that: A lateral limiting bracket is respectively provided on both sides of the upper end of the positioning tooling, and the spacing between the two lateral limiting brackets gradually decreases from the first end to the second end of the positioning tooling. Each of the lateral limiting brackets is rotatably connected to a plurality of lateral limiting rollers.

4. The buffer material stacking body installation and scanning multi-cooperative system according to claim 2, characterized in that: The propulsion plate is an arc-shaped plate.

5. The buffer material stacking body installation and scanning multi-cooperative system according to claim 3, characterized in that: The propulsion plate is provided with a pressure sensor, and the lateral limiting bracket is provided with a displacement sensor.

6. The buffer material stacking body installation and scanning multi-cooperative system according to claim 1, characterized in that: A base support is respectively provided at the lower end of the four corners of the positioning tool, and a fixing plate is provided at the lower end of the base support.

7. The buffer material stacking body installation and scanning multi-cooperative system according to claim 1, characterized in that: The trackers are provided with two, namely a first tracker and a second tracker. The first tracker is installed on a first tripod, and the second tracker is installed on a second tripod. The first tracker and the second tracker are respectively arranged on both sides of the stacked cushioning material masonry.

8. The buffer material stacking body installation and scanning multi-cooperative system according to claim 1, characterized in that: It also includes a safety system, which includes a first safety grating, a second safety grating, a third safety grating and a fourth safety grating, and the first safety grating, the second safety grating, the third safety grating and the fourth safety grating are respectively arranged at the four corners of the stacked buffer material masonry.

9. The buffer material stacking body installation and scanning multi-cooperative system according to claim 1, characterized in that: The stacking robot arm is installed on the upper end of the steel support.

10. A working method of a buffer material stacking body installation and scanning multi-cooperative system, characterized in that: A buffer material stacking masonry installation and scanning multi-cooperative system based on any one of claims 1 to 9, including a buffer material stacking masonry installation process and a buffer material stacking masonry scanning process; Installation process of buffer material stacking body: first, connect the power of PLC controller and air pump box, turn on the power switch of air pump box, turn on the start button on PLC controller, after the teaching pendant of stacking robot arm and scanning robot arm is initialized, the preparatory work is completed, then the installation of buffer material stacking body can be started; first, use crane to lift the block and place it on positioning fixture, then press the start button on positioning fixture, the propulsion plate pushes the block forward under the action of propulsion cylinder, after reaching the position, the propulsion plate returns to the initial position, the stacking robot arm moves to the top of the block according to the preset program, then moves downward to make the vacuum suction cup fit the upper surface of the block, and starts to perform vacuuming action, after the vacuuming is completed, it moves to the preset stacking position of buffer material stacking body according to the preset program, after reaching the preset position, the vacuum suction cup deflates, the block is released and the installation of one block is completed, then the stacking robot arm returns to the initial position, waiting for the instruction after the next block is loaded; after all the blocks are installed, the stacking robot arm returns to the initial position, and the installation process is completed; Scanning process of buffer material masonry: After the whole process of buffer material masonry installation is completed, the teaching pendant of the palletizing robot arm is used to call the scanning program. After the application is applied, the palletizing robot arm will move to the appropriate position to wait for the operator to install the scanner on the scanning robot arm, and then build the first tracker and the second tracker. Confirm whether the scanner, the first tracker and the second tracker are successfully connected on the corresponding background computer. After the display is successful, the dynamic tracking mode is turned on, and the palletizing robot arm teaching pendant is used to continue running the scanning program; the scanning starts immediately, and the palletizing robot arm and the scanning robot arm will work together to ensure that the scanner scans the entire surface of the buffer material masonry. After the scanning program is completed, the palletizing robot arm and the scanning robot arm return to their original positions and wait for subsequent instructions. Check whether the scanning data on the background computer is complete. After confirming that it is complete, save the project file. The scanning process is completed and the scanner can be removed.