Cast-in-place pile head guard plate structure and construction method
By using annular guard plates and positioning frame structures at the cast-in-place pile heads, combined with deployable partitions and driving parts, the low efficiency and concrete quality problems of traditional pile breaking methods are solved, and the protection of longitudinal steel bars and effective concrete are achieved. separation.
Patent Information
- Application Number
- CN202410906241.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-18
AI Technical Summary
During the pouring process of cast-in-place piles, the traditional method of breaking pile heads is labor-intensive and inefficient. It is easy to damage the longitudinal steel bars and it is difficult to maintain the quality of the concrete. It is difficult to effectively solve these problems with existing technology.
A structure including an annular guard plate and a positioning frame is adopted. The inner side of the guard plate is provided with expandable partitions and driving parts. The position of the longitudinal steel bars is determined through the positioning frame and marking parts to prevent damage. After the cast-in-place pile is formed, it is passed through the divider. Separate concrete.
It makes it easy to judge the position of longitudinal steel bars, prevents damage, simplifies the separation process of pile heads, and improves concrete quality and pile breaking efficiency.
Smart Images

Figure CN118793048A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil construction, and in particular to a cast-in-place pile head guard plate structure and a construction method. Background Art
[0002] During the construction of bored piles, in order to ensure the casting quality of the bored piles, super-high casting is generally required. After the bored piles are cast and formed, the super-high cast pile head needs to be broken to peel off the concrete with poor casting quality on the top, and at the same time expose the longitudinal steel bars of the steel cage for connection of the structures on the piles.
[0003] When breaking the pile head, the traditional method of operation is to manually break the concrete, which has high labor intensity, low efficiency, and is easy to damage the longitudinal steel bars, and the top surface of the remaining concrete is seriously damaged. Based on this, those skilled in the art have proposed some targeted solutions, such as a method for pile head free from circumferential cutting of cast-in-place piles disclosed in Application No. 202211028114.8, which separates the pile head concrete by using partitions and partition tubes, and lifts and separates the concrete on the upper side of the partition plate by a prefabricated oil cylinder when breaking the pile. With this method, it is difficult to destroy the concrete in the middle pouring hole of the partition plate by directly lifting it vertically with the oil cylinder, and the rough fracture surface produced in the middle position affects the quality of the remaining concrete. Moreover, the partition plate extends horizontally to the edge of the cast-in-place pile, which makes it easy for the concrete at the edge of the cast-in-place pile to produce problems such as slurry and bubbles at the position of the partition plate, affecting the quality of the remaining concrete.
[0004] In a reinforced concrete bored pile head particle device disclosed in application number 202221368957.8, the problem of the grip between the pile head steel bars and the pile head concrete is solved. However, the concrete formed at the casting hole position still needs to be broken by external force, which makes the pile breaking operation still difficult, and the pile breaking process is still likely to cause serious damage to the remaining concrete.
[0005] Based on this, the applicant proposed a cast-in-place pile head guard plate structure and construction method to solve the problems existing in the prior art. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides a cast-in-place pile head guard plate structure and construction method, which can easily determine the position of the longitudinal steel bars to prevent damage to the longitudinal steel bars when breaking the pile. The separator makes the pile head easy to separate after forming, effectively solving the existing problems.
[0007] In order to solve the above problems, the present invention provides a cast-in-place pile head guard plate structure, comprising an annular guard plate, a positioning frame arranged at intervals along the circumferential direction on the outer edge of the guard plate, a casting hole is formed on the inner side of the guard plate, the guard plate can be installed on the inner side of the longitudinal steel bars of the steel cage, and the longitudinal steel bars can be positioned and inserted in the positioning frame, the outer edge of the positioning frame extends to the longitudinal steel bars by a distance d, d is greater than or equal to 2 cm and less than or equal to 6 cm, a marking portion is formed on the outer edge of the positioning frame, so that the position of the marking portion can be identified from the outside of the pile body after the cast-in-place pile is formed; an installation groove is formed on the inner side of the guard plate, and an expandable partition and a driving member for driving the partition to expand are provided in the installation groove, and the partition can cover at least part of the casting hole when expanded, so that the partition can separate the concrete at the position of the casting hole.
[0008] Furthermore, the guard plate is a plastic guard plate, and the positioning frame is a plastic positioning frame.
[0009] Furthermore, the positioning frame and the guard plate are separate structures, and the guard plate structure also includes a connecting screw, which passes through the positioning frame and is fixed to the guard plate, and the outer end of the connecting screw forms the marking portion.
[0010] Furthermore, an elastic block is provided at the outer end of the connecting screw, and the size of the elastic block is set so that when the guard plate structure is placed in the injection drilled hole, the outer edge of the elastic block can abut against the steel sheath.
[0011] Furthermore, the partition includes a partition rod having an inner cavity and a partition cloth stacked inside the partition rod, the partition rod having a cloth outlet groove connected to the inner cavity, the partition cloth extending from the cloth outlet groove and then connected to the mounting groove, so that after the partition rod moves out of the mounting groove, the partition cloth can be unfolded from the inner cavity to the tank column hole.
[0012] Furthermore, one end of the partition rod forms a hinged end hinged to the mounting groove, and the other end forms a free end.
[0013] Furthermore, the driving member includes a driving motor and a connecting rope connected to the driving motor, and the connecting rope is connected to the dividing rod, so that the driving motor can drive the dividing rod to rotate out of the outside of the installation groove when the connecting rope is reeled in.
[0014] Furthermore, there are two dividing rods, the distance between the free ends of the two dividing rods is less than or equal to 3 cm, and the distance between the connecting line of the hinged ends of the two dividing rods and the center of the perfusion hole is less than or equal to 10 cm; the driving motor is arranged on the side of the center of the perfusion hole away from the free end of the dividing rod; the connecting rope connecting the two dividing rods can respectively fix the corresponding positions on the inner side of the guard plate.
[0015] Furthermore, an embedding groove is provided on the inner side of the guard plate, and the connecting rope is embedded in the embedding groove.
[0016] The present invention also provides a method for constructing a cast-in-place pile head. Based on any one of the cast-in-place pile head guard plate structures described above, the construction method comprises:
[0017] S1. After drilling and forming, the guard plate is installed at the pile head position corresponding to the steel cage, the longitudinal steel bars on the upper side of the guard plate cover the separation layer, and the longitudinal steel bars of the steel cage are inserted and matched with the positioning frame;
[0018] S2, insert the grouting pipe to cast the pile;
[0019] S3, remove the pouring pipe, wait for the concrete to stand for 3 to 6 hours, and then unfold the separator;
[0020] S4. After the cast-in-place pile solidifies and takes shape, the pile head is excavated and exposed;
[0021] S5, determining the position of the marking part, and breaking the pile head between the two marking parts;
[0022] S6. After the pile is broken between the two marking parts, the pile head is further separated and broken at the position of the separator, and the upper concrete is lifted upward after the concrete on the upper and lower sides of the separator are separated.
[0023] The beneficial effect of the present invention is that it can easily determine the position of the longitudinal steel bars to prevent the longitudinal steel bars from being damaged when breaking the piles, and the separator makes it easy to separate the pile heads after they are formed, which effectively solves the existing problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0025] Figure 1 This is a schematic diagram of a top view of the structure of an embodiment of the present invention installed behind a steel cage.
[0026] Figure 2 for Figure 1 A schematic diagram of a partial side cross-sectional structure of the mounting groove position in the illustrated embodiment.
[0027] Figure 3 for Figure 1 A schematic diagram of a partial side cross-sectional structure of the embedding groove position in the illustrated embodiment.
[0028] Figure 4 for Figure 1 A schematic diagram of the front view of the structure of the inner side of the guard plate at the installation position of the drive motor in the illustrated embodiment.
[0029] Figure 5 for Figure 1 The illustrated embodiment is a schematic diagram of the structure after the connecting rope is reeled in and unfolded by a driving motor.
[0030] Figure 6 for Figure 5 A schematic diagram of the structure of one of the partition rods in the embodiment shown is unfolded.
[0031] Among them: 1. Guard plate; 2. Positioning frame; 3. Installation slot; 4. Screws; 5. Elastic block; 6. Dividing rod; 7. Dividing cloth; 8. Cloth outlet slot; 9. Driving motor; 10. Connecting rope; 11. Embedded slot; 12. Longitudinal steel bar; 13. Roller. DETAILED DESCRIPTION
[0032] In order to more clearly illustrate the overall concept of the present invention, a detailed description is given below in an exemplary manner in conjunction with the accompanying drawings.
[0033] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0034] In addition, in the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0035] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. However, if it is indicated as a direct connection, it means that the two connected bodies are not connected through an intermediate structure, but are only connected to form a whole through a connecting structure. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0036] In the present invention, unless otherwise clearly specified and limited, the first feature "on" or "under" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.
[0037] In the present invention, Figure 1-6 As shown, a cast-in-place pile head guard plate 1 structure is provided, comprising an annular guard plate 1, and a positioning frame 2 arranged at intervals along the circumferential direction on the outer edge of the guard plate, a casting hole is formed on the inner side of the guard plate 1, the guard plate 1 can be installed on the inner side of the longitudinal steel bar 12 of the steel cage, and the longitudinal steel bar 12 can be positioned and inserted in the positioning frame 2, the outer edge of the positioning frame 2 extends to the longitudinal steel bar 12 by a distance d, d is greater than or equal to 2 cm and less than or equal to 6 cm, a marking portion is formed on the outer edge of the positioning frame 2, so that the position of the marking portion can be identified from the outside of the pile body after the cast-in-place pile is formed; an installation groove 3 is formed on the inner side of the guard plate 1, and an expandable partition and a driving member for driving the partition to be expanded are provided in the installation groove 3, and the partition can cover at least part of the casting hole when expanded, so that the partition can separate the concrete at the position of the casting hole.
[0038] The cast-in-place pile head guard plate 1 structure of the present invention installs the guard plate 1 at the pile head position of the steel cage, and makes the longitudinal steel bars 12 of the steel cage stick to the outside of the guard plate 1, and the longitudinal steel bars 12 are inserted into the positioning frame 2 to complete the fixation of the guard plate 1 and the steel cage. In this process, the longitudinal steel bars 12 on the upper side of the guard plate 1 can be covered by a sheath pipe or a separation layer such as pearl cotton to separate the longitudinal steel bars 12 on the upper side of the guard plate 1 during pouring. The steel cage is placed in the pouring drilled hole, and the partition is folded and stored in the installation groove 3. The inner side of the guard plate 1 can be inserted with a pouring pipe. After the pouring pipe is inserted from the inner side of the guard plate 1, concrete pouring is carried out. After the pouring is completed, the pouring pipe is pulled out and the steel sheath is pulled out. By unfolding the partition, the concrete above and below the pouring hole can be separated by the partition.
[0039] After the cast-in-place pile is solidified and formed, the position of the guard plate 1 and the longitudinal reinforcement 12 can be determined by detecting the marking part, and then the concrete between two adjacent longitudinal reinforcements 12 can be broken by breaking equipment until it reaches the position of the guard plate 1. At this time, you can try to insert a wedge plate or a flaring tool into the position of the guard plate 1 to expand and separate the concrete on the upper and lower sides of the separator; or you can use a hoisting tool to lift and separate the concrete on the upper side of the separator.
[0040] The guard plate 1 structure of the present invention has the following technical advantages when applied:
[0041] First, the expandable separator can be stored in the installation groove 3 when pouring concrete, without occupying the space inside the guard plate 1. Figure 6 As shown, the pouring adhesion of concrete at the grouting holes on the inner side of the guard plate 1 can be reduced, so as to reduce the difficulty of separating the concrete in the grouting holes when the piles are broken and separated, and it is also easy to keep the separation interface relatively intact, thereby improving the quality of the bored piles.
[0042] Secondly, by arranging a positioning frame 2 outside the guard plate 1, the position of the guard plate 1 and the longitudinal steel bar 12 can be fixed by the positioning frame 2 to prevent the guard plate 1 from moving laterally. At the same time, the longitudinal steel bar 12 can be prevented from moving outward by the limiting abutment between the outer edge of the positioning frame 2 and the steel sheath, so that the longitudinal steel bar 12 has a sufficient protective layer thickness when the cast-in-place pile is poured.
[0043] Thirdly, by forming a marking portion on the positioning frame 2, it is convenient to locate the position of the guard plate and the position of the longitudinal steel bar 12 when breaking the pile, so as to prevent the longitudinal steel bar 12 from being damaged when breaking the pile, and it is also easy to expand and separate the position of the inner partition of the guard plate.
[0044] In a preferred embodiment, for the structure of the present invention, more specifically, as shown in the figure, the guard plate 1 is a plastic guard plate 1, and the positioning frame 2 is a plastic positioning frame 2. By using the plastic guard plate 1 and the plastic positioning frame 2, not only the weight of the entire guard plate 1 structure is simplified, but also the installation and arrangement are easy. It can also be convenient to destroy and separate when breaking piles.
[0045] exist Figure 1 In the embodiment shown, for the structure of the present invention, further specifically, as Figure 2 As shown, the positioning frame 2 and the guard plate 1 are separate structures, and the guard plate 1 structure also includes a connecting screw 4. The connecting screw 4 passes through the positioning frame 2 and is fixed to the guard plate 1. The outer end of the connecting screw 4 forms the marking portion.
[0046] In this way, when the guard plate 1 is installed on the steel cage, the guard plate 1 is first placed on the inner side of each longitudinal steel bar 12, and then the positioning frame 2 is arranged at the position of the longitudinal steel bar 12, and is fixed to the guard plate 1 by self-tapping screws 4 to complete the fixing of the positioning frame 2. In this way, the connection and fixing of the positioning frame 2 and the guard plate 1 are achieved by post-fixing, so as to prevent the occurrence of a working condition in which the position of the longitudinal steel bar 12 does not match the position of the positioning frame 2.
[0047] exist Figure 1 In the illustrated embodiment, more specifically, the positioning frame 2 is configured to be U-shaped, and the longitudinal reinforcement 12 is positioned and fixed at the mouth of the positioning frame 2 .
[0048] Regarding the setting of the marking part, in a preferred embodiment, more specifically, an elastic block 5 is provided at the outer end of the connecting screw 4, and the size of the elastic block 5 is set so that when the guard plate 1 structure is placed in the injection drilled hole, the outer edge of the elastic block 5 can abut against the steel sheath.
[0049] By adopting the marking part in the form of elastic block 5, after the concrete bored pile is cast, in some working conditions, the elastic block 5 directly leaks out of the edge of the bored pile, and the position of the marking part can be directly determined by observation; in some working conditions, part of the concrete is formed outside the position of the elastic block 5, and this part forms a local empty bag of concrete. The position of the elastic block 5 can be determined by knocking, and the actual position of the elastic block 5 can be confirmed by drilling.
[0050] Regarding the specific structure of the elastic block 5, in one implementation mode, as an exemplary explanation, the elastic block 5 includes a foam block body and a waterproof layer coated on the outside of the foam block body. Alternatively, a rubber elastic block 5 is used.
[0051] As for the form of the marking part, in an optional embodiment, the nut of the screw 4 or a metal part or a magnetic part connected to the nut can also be directly formed. After the concrete is poured and formed, the operator determines the position of the marking part by using detection parts such as metal detectors and magnetic detectors.
[0052] Regarding the structural form of the separator, in an optional embodiment, further specifically, as Figure 2 and Figure 6 As shown, the partition includes a partition rod 6 with an inner cavity, and a partition cloth 7 stacked inside the partition rod 6, the partition rod 6 has a cloth outlet groove 8 connected to the inner cavity, and the partition cloth 7 extends out of the cloth outlet groove 8 and is connected to the mounting groove 3, so that after the partition rod 6 moves out of the mounting groove 3, the partition cloth 7 can be unfolded from the inner cavity to the tank column hole.
[0053] In this way, when the partition bar 6 is received in the installation groove 3, the guard plate does not interfere with the pouring operation of the cast-in-place pile. Figure 6 As shown, the partition cloth 7 gradually expands outward from the inner cavity of the partition rod 6, so that the partition cloth 7 can separate and solidify the upper and lower concrete. In the implementation of this embodiment, the partition cloth 7 is stacked and stored inside the inner cavity of the partition rod, so that when the driving member moves the partition rod 6 outward, only the partition cloth 7 in the inner cavity needs to be expanded, and the resistance of the partition cloth 7 to expand in the concrete is small. When expanding the partition, only the resistance of the partition rod 6 to move in the concrete needs to be overcome, so that the partition is easy to expand.
[0054] Regarding the stacking method of the partition cloth 7 in the inner cavity, Figure 1 In the embodiment shown, further specifically, Figure 2 As shown, the separator 7 is stacked in an S-shaped manner.
[0055] In the illustrated embodiment, with regard to the moving mode of the partition rod 6, to be more specific, one end of the partition rod 6 forms a hinged end hinged to the mounting groove 3, and the other end forms a free end.
[0056] In this way, the partition rod 6 can be moved in a rotating manner, and only one end needs to drive the partition rod 6. In an optional embodiment, other structural forms can also be adopted, such as the partition rod 6 and the guard plate 1 are separated, and the two ends of the partition rod 6 are respectively connected to the motor through the connecting rope 10, so that the partition rod 6 is pulled as a whole when it is unfolded.
[0057] exist Figure 1In the embodiment shown, as to the structural form of the driving member, to be more specific, the driving member includes a driving motor 9 and a connecting rope 10 connected to the driving motor 9, wherein the connecting rope 10 is connected to the dividing rod 6, so that the driving motor 9 can drive the dividing rod 6 to rotate out of the outer side of the mounting groove 3 when the connecting rope 10 is wound up.
[0058] like Figure 1 and Figure 2 As shown, when the partition rod 6 is not deployed, the partition rod 6 is stored inside the mounting groove 3, and the connecting rope 10 is attached to the inner side of the guard plate 1. Figure 5 As shown, the connecting rope is gradually straightened, and the connecting rope separates the poured concrete layers during the straightening process. On the one hand, it can reduce the resistance of the dividing rod 6 to the breaking of the concrete layers during the expansion process, and on the other hand, it can break the layers of the concrete positions that are not separated after the dividing cloth 7 is expanded through the connecting rope 10 to reduce its coagulation strength, so as to facilitate the separation process after the cast-in-place pile head is formed.
[0059] exist Figure 1 In the embodiment shown, in order to better improve the separation effect of the separator and reduce the difficulty of separating the concrete on the upper and lower sides of the separator when breaking the pile head, Figure 1 In the embodiment shown, more specifically, two dividing rods 6 are provided, the distance between the free ends of the two dividing rods 6 is less than or equal to 3 cm, and the distance between the connecting line of the two hinged ends of the two dividing rods 6 and the center of the perfusion hole is less than or equal to 10 cm; the driving motor 9 is arranged on the side of the center of the perfusion hole away from the free end of the dividing rod 6.
[0060] like Figure 1 and Figure 5 As shown, by making the distance between the free ends of the two partition rods 6 less than or equal to 3 cm, the separation blind area of the concrete at the initial position of the free end of the partition rod 6 can be reduced. By making the distance between the connecting line of the hinged ends of the two partition rods 6 and the center of the pouring hole less than or equal to 10 cm, the partition rod 6 can be kept at a certain size, ensuring the coverage area of the rotation of the partition rod 6, and further ensuring the separation effect.
[0061] In the illustrated embodiment, Figure 4 As shown, the connecting rope 10 connecting the two partition rods 6 can be respectively fixed to the corresponding positions on the inner side of the guard plate 1. In this way, when the driving motor tightens the connecting rope 10, as shown in FIG. Figure 5 As shown, the connecting rope 10 is gradually straightened and unfolded in the direction of the arrow. During the unfolding process, the connecting rope 10 pre-breaks the concrete in the moving path corresponding to the dividing rod 6, so as to fully break the concrete in the blind area of the dividing rod 6 at the position of the driving motor 9.
[0062] In the embodiment shown in the figure, further optimization is set up, such as Figure 3 As shown, an embedding groove 11 is provided on the inner side of the guard plate 1 , and the connecting rope 10 is embedded in the embedding groove 11 .
[0063] exist Figure 1 In the illustrated embodiment, as for the structure of the driving member, more specifically, as shown in FIG. 4 , the guard plate 1 is provided with an installation cavity for installing the driving motor 9, the mouth of the installation cavity is covered by a cover plate, the driving motor 9 is connected to two rollers 13 respectively through a reducer, and two connecting ropes 10 are connected to the two rollers respectively, so as to drive the two connecting ropes 10 to reel up respectively when the rollers 13 rotate. A through groove is provided on the cover plate for the connecting ropes 10 to pass through, and the through groove is connected to the embedded groove 11. In order to reduce the pouring of concrete into the installation cavity, in a preferred embodiment, a rubber seal can be embedded in the through groove and the embedded groove 11, and the connecting rope 10 can gradually squeeze the rubber seal open during the reeling process. Alternatively, the through groove position can also be directly exposed.
[0064] As for the driving motor 9, it is preferred to use a motor with its own battery and wireless control. Alternatively, a motor with wired control can also be used.
[0065] exist Figure 1 In the illustrated embodiment, for the structure of the present invention, to be more specific, in order to prevent the dividing rod 6, the connecting rope 10, and the driving member from moving outward at will during the pouring of concrete, in a preferred embodiment, rubber seals are embedded at the mouth of the mounting groove 3 and the mouth of the embedding groove 11. When the connecting rope 10 is wound up, the embedded rubber seal is squeezed out to avoid the connecting rope 10 and the dividing rod 6.
[0066] The present invention also provides a method for constructing a cast-in-place pile head. Based on any one of the cast-in-place pile head guard plate 1 structures described above, the construction method comprises:
[0067] S1, after drilling and forming, the guard plate 1 is installed at the pile head position corresponding to the steel cage, the longitudinal steel bars 12 on the upper side of the guard plate 1 cover the partition layer, and the longitudinal steel bars 12 of the steel cage are inserted and matched with the positioning frame 2;
[0068] S2, insert the grouting pipe to cast the pile;
[0069] S3, remove the pouring pipe, wait for the concrete to stand for 2 to 6 hours, and then unfold the separator;
[0070] By waiting for the time mentioned before unfolding the separator, the layer position of the concrete can be stabilized, and the difference between the initial unfolding position of the separator and the actual position of the separator after the final cast-in-place pile is formed is small, so the position of the separator cloth 7 can be easily determined when breaking the pile. Moreover, after standing for this time, the quality of the concrete after the layers are broken and then bonded is easy to form a difference compared with the unbroken area, so that after the connecting rope 10 and the dividing rod 6 break the concrete layers, the concrete in the area not separated by the dividing cloth 7 can easily form a weak area due to the breaking of the connecting rope 10, so as to facilitate separation when breaking the pile head. In addition, during the standing time, the concrete still maintains a certain plastic fluidity, so that the breaking resistance of the connecting rope 10 and the dividing rod 6 is low, which reduces the requirements for the drive motor 9.
[0071] Among them, regarding the time requirement, 3 hours is the appropriate time. During on-site operations, reference and comparison should be made based on the concrete grade, on-site temperature, and on-site concrete forming test, and the waiting time should be flexibly adjusted.
[0072] S4. After the cast-in-place pile solidifies and takes shape, the pile head is excavated and exposed;
[0073] S5, determining the position of the marking part, and breaking the pile head between the two marking parts;
[0074] For breaking the piles at the two marked parts, it is preferred to use equipment such as a pneumatic pick, an electric chisel, etc.
[0075] S6. After the pile is broken between the two marking parts, the pile head is further separated and broken at the position of the separator, and the upper concrete is lifted upward after the concrete on the upper and lower sides of the separator are separated.
[0076] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0077] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.
Claims
1. A cast-in-place pile head guard plate structure, characterized in that: It comprises an annular guard plate, and a positioning frame arranged at intervals along the circumferential direction at the outer edge of the guard plate, a casting hole is formed on the inner side of the guard plate, the guard plate can be installed on the inner side of the longitudinal steel bar of the steel cage, and the longitudinal steel bar can be positioned and inserted in the positioning frame, the outer edge of the positioning frame extends to the longitudinal steel bar by a distance d, d is greater than or equal to 2 cm and less than or equal to 6 cm, and a marking portion is formed on the outer edge of the positioning frame, so that the position of the marking portion can be identified from the outer side of the pile body after the cast-in-place pile is formed; An installation groove is formed on the inner side of the guard plate, and an expandable partition and a driving member for driving the partition to expand are provided in the installation groove. When the partition is expanded, it can cover at least part of the pouring hole, so that the partition can separate the concrete at the position of the pouring hole.
2. The cast-in-place pile head guard plate structure according to claim 1 is characterized in that: The guard plate is a plastic guard plate, and the positioning frame is a plastic positioning frame.
3. The cast-in-place pile head guard plate structure according to claim 2, characterized in that: The positioning frame and the guard plate are separate structures. The guard plate structure also includes a connecting screw. The connecting screw passes through the positioning frame and is fixed to the guard plate. The outer end of the connecting screw forms the marking portion.
4. The cast-in-place pile head guard plate structure according to claim 3, characterized in that: An elastic block is arranged at the outer end of the connecting screw, and the size of the elastic block is arranged so that when the guard plate structure is placed in the injection drilled hole, the outer edge of the elastic block can abut against the steel sheath.
5. The cast-in-place pile head guard plate structure according to claim 1, characterized in that: The partition comprises a partition rod having an inner cavity and a partition cloth stacked inside the partition rod, wherein the partition rod has a cloth outlet groove connected to the inner cavity, and the partition cloth extends out of the cloth outlet groove and is connected to the installation groove, so that after the partition rod moves out of the installation groove, the partition cloth can be unfolded from the inner cavity to the tank column hole.
6. The cast-in-place pile head guard plate structure according to claim 5, characterized in that: One end of the partition rod forms a hinged end hinged to the mounting groove, and the other end forms a free end.
7. The cast-in-place pile head guard plate structure according to claim 6, characterized in that: The driving member includes a driving motor and a connecting rope connected to the driving motor, wherein the connecting rope is connected to the dividing rod, so that the driving motor can drive the dividing rod to rotate out of the outside of the installation groove when the connecting rope is rolled up.
8. The cast-in-place pile head guard plate structure according to claim 7, characterized in that: There are two partition rods, the distance between the free ends of the two partition rods is less than or equal to 3 cm, and the distance between the connecting line of the hinged ends of the two partition rods and the center of the perfusion hole is less than or equal to 10 cm; The driving motor is arranged at a side of the center of the perfusion hole away from the free end of the partition rod; The connecting rope connecting the two dividing rods can respectively fix the corresponding positions on the inner side of the guard plate.
9. The cast-in-place pile head guard plate structure according to claim 6, characterized in that: An embedding groove is provided on the inner side of the guard plate, and the connecting rope is embedded in the embedding groove.
10. A method for constructing a cast-in-place pile head, characterized in that: Based on the cast-in-place pile head guard plate structure according to any one of claims 1 to 9, the construction method comprises: S1. After drilling and forming, the guard plate is installed at the pile head position corresponding to the steel cage, the longitudinal steel bars on the upper side of the guard plate cover the separation layer, and the longitudinal steel bars of the steel cage are inserted and matched with the positioning frame; S2, insert the grouting pipe to cast the pile; S3, remove the pouring pipe, wait for the concrete to stand for 3 to 6 hours, and then unfold the separator; S4. After the cast-in-place pile solidifies and takes shape, the pile head is excavated and exposed; S5, determining the position of the marking part, and breaking the pile head between the two marking parts; S6. After the pile is broken between the two marking parts, the pile head is further separated and broken at the position of the separator, and the upper concrete is lifted upward after the concrete on the upper and lower sides of the separator are separated.