Clamp holder with pressure compensation function

By introducing a pressure compensation unit and a guide assembly into the overhead holder, the problems of drill pipe shackle slipping and low installation efficiency of large drilling tools are solved, stable clamping and efficient installation are achieved, and construction efficiency and safety are improved.

CN118793382APending Publication Date: 2024-10-18CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411039570.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The existing overhead holder is prone to slipping when the drill pipe is unfastened, and the installation and disassembly efficiency of large drilling tools is low, resulting in high construction efficiency and safety hazards.

Method used

A clamper with pressure compensation function is designed. By setting the pressure compensation unit and guide assembly on the clamping cylinder, the power head motor and hydraulic lock are used together with the one-way valve and booster oil line to realize the control of the clamping cylinder. Stable clamping and pressurization ensure that the drill pipe does not slip, and the design of the swing body and turning part simplifies the installation process of large drilling tools.

Benefits of technology

It effectively prevents the drill pipe from slipping during the unfastening process, improves the clamping force, simplifies the installation process of large drilling tools, reduces manpower input and construction time, improves construction efficiency and reduces safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793382A_ABST
    Figure CN118793382A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mine hydraulic drilling rigs, and discloses a clamp holder with a pressure compensation function, which comprises a base, a first through hole for a drill rod to penetrate through is formed in the base, a swing body is arranged on the base, the swing body can rotate around the first through hole, a clamping unit is mounted on the swing body, and the clamping unit comprises two clamping parts. Each clamping part comprises a clamping oil cylinder, the clamping oil cylinders are installed on the swing bodies, each clamping oil cylinder comprises a piston rod, a slip is installed on the piston rod, and the clamping device further comprises a pressure compensation unit used for conducting pressure compensation on rodless cavities of the clamping oil cylinders. An opening enabling the first through hole to be opened is formed in the side, away from the rack, of the first through hole, the large drilling tool can pass through the opening, an overturning part is arranged on the side face of the base, and the swing body can overturn around the overturning part and be away from the opening. According to the scheme, the pressure of the clamping oil cylinder can be compensated, the clamping force of the clamping oil cylinder is improved, a drill rod is prevented from slipping, and meanwhile the installation process of a large drilling tool can be simplified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine hydraulic drilling rigs, and in particular to a clamp with a pressure compensation function. Background Art

[0002] The top clamp is a common clamp type for mining drills. It is usually installed on the frame and clamps the drill rod through the clamping cylinders symmetrically arranged on both sides. It has the advantages of simple structure, reliable clamping and easy maintenance. However, the existing top clamps generally have the problem of occasional slippage, especially when the drill is unhooked.

[0003] When the drill pipe is connected, since the resistance of the drill pipe threaded joint is extremely small, the power head motor only needs to provide a small rotational torque to complete the connection. Correspondingly, the clamp only needs to provide a small clamping force to ensure that the drill pipe it clamps does not slip during the connection process.

[0004] When the drill pipe is unhooked, the torque of fully tightening the thread must be overcome. After drilling into the bottom of the hole and twisting, this torque is much larger than the torque required for connection. The power head motor needs to provide a large reversal torque to complete the unhooking. Correspondingly, the clamp also needs to provide a large and stable clamping force to ensure that when the power head motor reverses, the drill pipe it clamps does not rotate with the power head motor, that is, to avoid slipping.

[0005] The above slippage is usually caused by defects in the hydraulic system. An analysis of the hydraulic system of the existing top clamp shows that the reasons for the slippage of the shackle are as follows: the clamping cylinder clamps the drill pipe under the action of hydraulic pressure, and maintains pressure through the hydraulic lock, and then uses the power head motor to reverse to shackle. However, the hydraulic lock or the clamping cylinder will have different degrees of leakage. As the use time increases, the leakage amount and leakage rate will gradually increase. Therefore, in the process from clamping to reverse shackle, the clamping force will decrease, causing the clamp to slip when unloading the drill, and ultimately causing the shackle to fail, seriously affecting the construction efficiency and site safety.

[0006] At the same time, the drill pipe loading and unloading technology of the directional drilling rig not only covers the loading and unloading of ordinary drill pipes, but also involves the loading and unloading of large drilling tools with relatively long length and relatively large outer diameter. Taking the bottom hole motor as an example, since the length and outer diameter of the bottom hole motor are much larger than ordinary drill pipes, it is impossible to install or disassemble the drill pipe from the rear end or middle of the frame, which is commonly used by drilling rigs. The only way to install it is to insert the clamp from the clamp, that is, the front end of the frame. However, the distance from the front end of the clamp to the hole wall is very limited, making it difficult to directly install the bottom hole motor into the clamp. There are generally two solutions at the current construction site: First, the bottom hole motor is tilted at a certain angle relative to the axis of the inner hole of the clamp (i.e., the drilling axis) and inserted into the clamp, but the scope of application of this method is very limited. When the distance between the clamp and the hole wall is small to a certain extent, the overly tilted bottom hole motor will not be able to align with the inner hole of the clamp. At this time, the frame needs to be tilted as a whole to change the up and down inclination angle of the frame, so that the inner hole of the clamp and the bottom hole motor have the same inclination angle. After installing the bottom hole motor into the clamp, adjust the up and down inclination angle of the frame again. Second, the clamp is dismantled as a whole, the bottom hole motor is installed and sent into the hole, and then the clamp is reinstalled to adapt to the installation of other drill rods. This method has a wide range of applications and can also be used when the distance between the clamp and the hole wall is small.

[0007] However, the first solution not only requires multiple adjustments to the up and down inclination of the inner hole axis of the clamp, but also requires the installation of a bottom hole motor in a narrow operating space, which undoubtedly consumes a lot of manpower and construction time. The second solution requires a lot of manpower and construction time for both disassembly and installation due to the large size, heavy weight and complex structure of the clamp. Both methods consume a lot of manpower and construction time, greatly affecting construction efficiency, and there are huge safety hazards. Summary of the invention

[0008] The present invention aims to provide a clamp with a pressure compensation function to compensate for the pressure of the clamping cylinder, improve the clamping force of the clamping cylinder, prevent the drill rod from slipping during the drill rod shackle, and at the same time, simplify the installation process of large drilling tools.

[0009] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a clamp with pressure compensation function, including a base, a through hole No. 1 for the drill rod to pass through is provided on the base, a swinging body is provided on the base, the swinging body can rotate around the through hole No. 1, a clamping unit is installed on the swinging body, the clamping unit includes two clamping parts, the two clamping parts are relatively arranged at two ends of the swinging body, each clamping part includes a clamping cylinder, the clamping cylinder is installed on the swinging body, the clamping cylinder includes a piston rod, a cava is installed on the piston rod, the piston rod of the clamping cylinder can drive the cava to extend toward the center of the through hole No. 1, and also includes a pressure compensation unit, the pressure compensation unit is used to compensate the rodless cavity of the clamping cylinder for pressure; the through hole No. 1 is provided with an opening to open the through hole No. 1 away from the frame side, and large drilling tools can pass through the opening, and a flipping part is provided on the side of the base, and the swinging body can flip around the flipping part and away from the opening.

[0010] The beneficial effects of this solution are as follows: when clamping the drill rod, this technical solution first passes the drill rod through the No. 1 through hole and the No. 2 through hole, and then drives the clamping cylinder, which drives the cava to extend to the center of the No. 1 through hole, and clamps the drill rod through the cava; when the drill rod is detached, with the help of the power head motor, the power head motor provides the reversal torque required for detaching the drill rod, and at the same time, the pressure compensation unit can perform pressure compensation on the rodless chamber of the clamping cylinder, so that the clamping cylinder can provide a large and stable clamping force, ensuring that when the power head motor reverses, the clamped drill rod does not rotate with the power head motor, that is, to avoid slipping.

[0011] The clamping unit has two working conditions: swinging condition: under normal construction conditions, sometimes the drill rod in the clamping unit and the drill rod in the power head need to rotate relative to each other at a small angle (such as pre-loosening the drill rod joint), but the power head rotates at a fast speed and it is difficult to control the rotation angle. Therefore, at this time, the swing body swings back and forth with the No. 1 through hole as the rotation axis to complete the pre-loosening of the rotating rod; flipping condition: when large drilling tools need to be installed, since the length and outer diameter of large drilling tools are much larger than ordinary drill rods, it is impossible to use the drilling rig’s usual method of loading and unloading drill rods from the rear end or middle of the frame for installation or disassembly. It can only be installed by inserting the clamp from the front end of the frame. However, the distance from the front end of the clamp to the hole wall is extremely limited, making it difficult to directly load large drilling tools into the clamp. However, due to the setting of the opening, when installing the large drilling tool, the swing body turns around the flip part. According to the principle of lever, since the rotation fulcrum moves to the flip part, the rotation amplitude of the rear end of the clamping unit is larger than that of the swinging condition, and the swing body can turn clockwise over the center of the base, so that it is almost completely exposed from the base. At this time, a very spacious space is formed inside and on the top of the clamp, and the large drilling tool can be directly placed from top to bottom. The swing body can avoid the large drilling tool and will not interfere with the installation of the large drilling tool. The large drilling tool is clamped with the help of other clamps. This process only requires the disassembly and assembly of a small number of small parts, which not only reduces the space requirement for the front end of the clamp for the installation of large drilling tools, but also saves a lot of time and manpower for the overall removal of the clamp, and ensures on-site safety. This technical solution simplifies the installation process of large drilling tools, reduces manpower investment, shortens construction time, improves construction efficiency, and reduces safety hazards.

[0012] Furthermore, the compensation unit includes a No. 1 power head motor, a No. 1 hydraulic lock and a No. 1 one-way valve. The No. 1 power head motor is provided with a forward oil inlet A and a reverse oil inlet B. The rodless chambers on the two clamping cylinders are interconnected, and the rod chambers on the two clamping cylinders are interconnected. The rodless chamber is provided with a pressure oil inlet B1, and the rod chamber is provided with a pressure oil inlet A1. The No. 1 hydraulic lock is installed in the oil circuits of the rodless chamber and the rod chamber, the oil inlet of the No. 1 one-way valve is connected to the reverse oil circuit of the No. 1 power head motor, and the oil outlet of the No. 1 one-way valve is connected to the rodless chamber oil circuit after the No. 1 hydraulic lock.

[0013] The beneficial effect of this scheme is: when the No. 1 power head motor drives the power head to rotate forward, according to the working principle of the drilling rig, the clamping unit needs to loosen the drill rod, that is, before the No. 1 power head motor rotates forward, the pressure oil must be passed into the rod chamber of the clamping cylinder through the A1 port, and the piston rod of the clamping cylinder is retracted so that the clamping unit is in a loosened state that does not affect the rotation of the drill rod, and then the oil can be passed to the A port of the No. 1 power head motor to start the forward rotation. At this time, the A port of the No. 1 power head motor enters the oil, and the B port returns the oil. Theoretically, part of the return oil of the No. 1 power head motor (that is, the oil flowing to the B port) will flow to the No. 1 check valve. As long as the opening pressure of the No. 1 check valve is set higher than the return oil pressure, it can be ensured that the No. 1 check valve will not open. In addition, since the rod chamber of the clamping cylinder is a high-pressure chamber under the pressure-maintaining action of the No. 1 hydraulic lock, and the rodless chamber is a low-pressure chamber for returning oil, even in the extreme case of failure of the No. 1 check valve, the pressure difference at both ends of the cylinder will ensure that the loosening state of the clamp is not affected. This forms a double insurance of the clamp being released and retained, ensuring that the clamp will not affect normal drilling.

[0014] When the drill rod is unhooked, the clamping unit needs to clamp the front drill rod (usually the first drill rod exposed in the borehole), and the power head reverses to loosen the threaded connection between the drill rod (i.e., active drill rod) installed on the power head and the front drill rod, thus completing the thread unhooking. Before unhooking, according to the drilling rig structure and workflow, the clamping unit is used to clamp the drill rod, and oil is passed to the rodless chamber of the clamping cylinder of the forward clamp through B1, and then the pressure is maintained through the No. 1 hydraulic lock, and then oil is passed to the No. 1 power head motor through the B port to drive it to reverse. At the same time, the reversed pressure oil passes through the No. 1 check valve into the rodless chamber of the clamping cylinder, forming a linkage pressurization for the clamping cylinder.

[0015] Since the tightness of each threaded joint varies during shackle, when the shackle load (i.e., the reverse load of the power head) increases, the clamping force required by the clamp needs to increase accordingly. The advantage of this system is that when the reverse pressure of the No. 1 power head motor increases, the pressure oil of the reverse oil circuit enters the clamping oil circuit and the rodless chamber of the clamping cylinder after the No. 1 hydraulic lock, compensating for the leakage of the No. 1 hydraulic lock and the clamping cylinder, and preventing the top clamp from slipping during shackle.

[0016] This technical solution connects the reverse oil circuit of the No. 1 power head motor and the clamping oil circuit of the clamping unit, and sets a No. 1 one-way valve, which cooperates with the No. 1 hydraulic lock to form an anti-skid hydraulic system for the top clamp in which reverse linkage booster, forward rotation and single action of the clamping cylinder do not affect each other. This solves the problem of slipping caused by the decrease of clamping force due to leakage of the clamping cylinder and the No. 1 hydraulic lock in the existing hydraulic system of the top clamp, thereby ensuring the safety of on-site construction and improving construction efficiency.

[0017] Furthermore, the compensation unit includes a No. 2 power head motor, a No. 2 hydraulic lock, a boost oil circuit and an electromagnetic reversing valve. The No. 2 power head motor is provided with a forward oil inlet A3 and a reverse oil inlet B3. The rodless chambers on the two clamping cylinders are interconnected, and the rod chambers on the two clamping cylinders are interconnected. The rodless chamber is provided with a pressure oil inlet B2, and the rod chamber is provided with a pressure oil inlet A2. The No. 2 hydraulic lock is installed on the oil circuits of the rodless chamber and the rod chamber, and the boost oil circuit is provided with a pressure oil inlet P1. The electromagnetic reversing valve is connected to the boost oil circuit and the rodless chamber oil circuit before the No. 2 hydraulic lock. A No. 2 check valve is installed on the oil circuit between the electromagnetic reversing valve and the rodless chamber oil circuit, and a No. 3 check valve is installed on the oil circuit between the electromagnetic reversing valve and the boost oil circuit.

[0018] The beneficial effects of this solution are as follows: when the No. 2 power head motor drives the power head to rotate forward, according to the working principle of the drilling rig, the clamping unit needs to loosen the drill rod, that is, before the power head rotates forward, pressurized oil must be introduced into the rod chamber of the clamping cylinder through the A2 port, and the piston rod is retracted so that the clamping unit is in a loosened state that does not affect the rotation of the drill rod, and then oil can be passed to the A3 port of the No. 2 power head motor to start forward rotation. At this time, the A3 port of the No. 2 power head motor is inlet with oil, and the B3 port is outlet with oil. The electromagnetic reversing valve is always in the right position. During this process, the No. 2 hydraulic lock keeps the pressure on the rod chamber of the clamping cylinder to ensure that the clamping unit is loosened. Theoretically, both the No. 2 hydraulic lock and the cylinder will leak, but because the stroke of the clamping cylinder is long enough, leakage will not cause the clamping unit to change from a loose state to a clamped state.

[0019] When the drilling rig is in working conditions such as reverse shackle, the clamping unit needs to be pressurized to ensure that the clamping force is stable and reliable.

[0020] Generally, before breaking out, according to the drilling rig structure and workflow, the drill rod is clamped with a clamping cylinder, oil is passed to the rodless chamber of the clamping cylinder through B2, and then the pressure is maintained through the No. 2 hydraulic lock, and then oil is passed to the No. 2 power head motor through the B3 port to drive it to reverse. While reversing, the electromagnetic reversing valve is controlled to switch to the left position, and the booster oil circuit P1 is supplied with oil. The pressure oil will enter the rodless chamber of the clamping cylinder through the electromagnetic reversing valve and the No. 2 check valve behind it, thereby actively pressurizing the clamping cylinder to make up for the clamping force loss caused by leakage.

[0021] This technical solution uses the electromagnetic reversing valve to open the clamping oil circuit of the clamping cylinder when the buckle is reversed, and by arranging a No. 3 check valve before the electromagnetic reversing valve and a No. 2 check valve after the electromagnetic reversing valve, a valve bridge that can automatically select the high-pressure boosting oil circuit is formed, and the cut-off effect of the No. 2 check valve and the No. 3 check valve is utilized to ensure the reliable operation of the clamping unit and the safety of components during single clamping operation and boosting, thereby solving the problem of slipping caused by a decrease in clamping force due to leakage of the clamping cylinder and the hydraulic lock in the existing hydraulic system of the top double clamper, thereby ensuring on-site construction safety and improving construction efficiency.

[0022] Furthermore, a No. 2 through hole is provided on the swing body, and the No. 2 through hole is connected to the No. 1 through hole. Guide components are installed at the No. 2 through holes on both sides of the swing body. The guide components are detachably connected to the swing body, and the guide components can pass through the No. 1 through hole and be rotatably connected to the base.

[0023] The beneficial effects of this solution are as follows: since guide assemblies are installed at the No. 2 through holes on both sides of the swing body, when the drill rod enters or exits the No. 1 through hole, the guide assembly can limit the radial direction of the drill rod to prevent the drill rod from shifting in the radial direction, ensuring that the drill rod is always within the range that can be clamped by the clamping unit, while protecting the clamping unit and the drilling rig power head from damage caused by excessive deviation of the drill rod.

[0024] In this technical solution, since the guide assembly is rotatably connected to the base, under normal construction conditions, it is sometimes necessary to rotate the drill rod in the clamping unit and the drill rod in the power head at a small angle (such as pre-loosening the drill rod joint), and the power head rotates at a fast speed, making it difficult to control the rotation angle. Therefore, at this time, the swing body uses the guide assembly as the central axis to achieve reciprocating swing of the swing body.

[0025] In this technical solution, since the guide assembly is detachably connected to the swing body, the guide assembly is integrated on the swing body, which can save installation space and make the overall layout of the drilling rig more compact.

[0026] Furthermore, the guide assembly includes a guide outer sleeve and a guide inner sleeve, the guide outer sleeve and the guide inner sleeve are detachably connected, the inner diameter of the guide outer sleeve matches the drill rod with a smaller outer diameter, and the inner diameter of the guide inner sleeve matches the drill rod with a larger outer diameter.

[0027] The beneficial effects of this solution are as follows: since the guide assembly of this technical solution is composed of a guide outer sleeve and a guide inner sleeve, and the inner diameter of the guide outer sleeve matches the drill rod with a small outer diameter, and the inner diameter of the guide inner sleeve matches the drill rod with a large outer diameter, when the guide inner sleeve and the guide outer sleeve are installed at the same time, it can be suitable for the drill rod with a small outer diameter, and when the guide outer sleeve is removed and only the guide inner sleeve is used, it is suitable for the drill rod with a large outer diameter. Therefore, one guide assembly can meet the guiding requirements of two drill rods, and the disassembly and assembly of the guide outer sleeve is very convenient.

[0028] This technical solution facilitates on-site accessory management and identification due to the obvious structural differences between the guide outer sleeve and the guide inner sleeve.

[0029] Furthermore, a driving member is hinged on the frame, and an output shaft of the driving member is hinged on the bottom of the swing body below the flipping part.

[0030] The beneficial effects of this solution are as follows: due to the setting of the driving part, when it is necessary to replace the cava or remove parts, the swing body needs to be flipped out of the base as a whole for operation. At this time, the guide assembly is removed and the swing body is flipped around the flipping part. According to the principle of lever, since the rotation fulcrum is moved to the flipping part, the end of the swing body away from the flipping part has a larger rotation range than the swinging condition. The swing body can be flipped beyond the center of the base, so that it is almost completely exposed from the base, which is convenient for replacing the cava or removing parts.

[0031] Furthermore, the cava includes an inner cava and an outer cava. The outer cava is installed on the piston rod of the clamping cylinder. The inner cava and the inner side of the outer cava are detachably connected. The inner diameter of the inner cava matches the drill rod with a small outer diameter, and the inner diameter of the outer cava matches the drill rod with a large outer diameter.

[0032] The beneficial effects of this solution are as follows: in this technical solution, since the inner diameter of the inner cava matches the drill rod with a smaller outer diameter, and the inner diameter of the outer cava matches the drill rod with a larger outer diameter, the drill rod with a larger outer diameter can be switched by quickly disassembling and assembling the inner cava, thereby improving the application scope of the clamping unit, and is particularly suitable for situations where a directional drilling rig uses both ordinary drill rods and special drilling tools such as large drilling tools.

[0033] Furthermore, the inner side surfaces of the inner slip and the outer slip are provided with a plurality of protrusions.

[0034] The beneficial effect of this solution is that since the inner side surfaces of the inner slip and the outer slip are both provided with a plurality of protrusions, it is convenient to increase the friction coefficient of the inner side surfaces of the inner slip and the outer slip and reduce the probability of the drill rod slipping.

[0035] Furthermore, the cava also includes fasteners, and the inner cava is fixedly connected with positioning bosses on both sides along its radial direction, and the outer cava is provided with accommodating grooves on both sides along its radial direction. The accommodating grooves correspond to the positioning bosses one by one, and the positioning bosses can be inserted into the accommodating grooves. The positioning bosses are connected to the outer cava by fasteners.

[0036] The beneficial effects of this solution are as follows: Due to the arrangement of the positioning boss and the receiving groove, this technical solution uses a larger plane to position the inner slip axially, and uses fasteners to achieve radial positioning of the inner slip. The plane bears the shear force for the fasteners, which greatly reduces the possibility of deformation of the fasteners under stress and improves the reliability of positioning. At the same time, since the inner slip is fixed to the inner side of the outer slip by fasteners, when replacing the inner slip, the piston rod of the clamping cylinder retracts to form an open space for disassembling and assembling the slip. The slip can be quickly replaced by simply removing the fasteners, which is convenient and quick to operate.

[0037] Furthermore, a reinforcing plate is detachably connected to the top of the base, and a limiting protrusion is fixedly connected to one side of the reinforcing plate close to the opening. The limiting protrusion can be inserted into the opening, and the bottom of the limiting protrusion is tangent to the cylinder where the No. 1 through hole is located.

[0038] The beneficial effect of this solution is that the design of the reinforcement plate not only ensures the overall strength of the clamp during normal construction, but also meets the space requirement of the clamp for installing large drilling tools. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 A three-dimensional diagram of a clamp with a pressure compensation function in Example 1 of the present invention;

[0040] Figure 2 A three-dimensional diagram of the base in Example 1 of the present invention;

[0041] Figure 3 is a three-dimensional diagram of the swinging body in Example 1 of the present invention;

[0042] Figure 4 It is a front view of a clamp with pressure compensation function in Example 1 of the present invention;

[0043] Figure 5 For the present invention Figure 4 Sectional view at AA in the middle;

[0044] Figure 6 A three-dimensional diagram of the guide jacket in Example 1 of the present invention;

[0045] Figure 7 This is a schematic structural diagram of the guide inner sleeve in Example 1 of the present invention;

[0046] Figure 8 For the present invention Figure 7 Sectional view at the middle BB;

[0047] Fig. 9 A three-dimensional diagram of the inner slip in Example 1 of the present invention;

[0048] Fig.10 A three-dimensional diagram of the external slip in Example 1 of the present invention;

[0049] Fig.11 is a schematic diagram of the structure of a compensation unit in Embodiment 1 of the present invention;

[0050] Fig.12 Schematic diagram of the structure of the compensation unit in Example 2 of the present invention. DETAILED DESCRIPTION

[0051] The following is further described in detail through specific implementation methods:

[0052] The reference numerals in the drawings of the specification include: base 1, mounting base plate 2, front support plate 3, rear support plate 4, No. 1 through hole 5, flip plate 6, pin 7, swing body 8, driving member 9, No. 1 support plate 10, No. 2 support plate 11, front mounting plate 12, rear mounting plate 13, No. 2 through hole 14, swing ear seat 15, lining plate 16, flip shaft seat 17, guide assembly 18, guide outer sleeve 19, guide inner sleeve 20, No. 1 small diameter section 21, No. 1 large diameter section 22 , No. 2 small diameter section 23, No. 2 large diameter section 24, clamping cylinder 25, slips 26, inner slips 27, outer slips 28, protrusions 29, positioning bosses 30, countersunk through holes 31, accommodating grooves 32, threaded holes 33, reinforcing plates 34, limiting protrusions 35, No. 1 power head motor 36, No. 1 hydraulic lock 37, No. 1 one-way valve 38, No. 2 power head motor 39, No. 2 hydraulic lock 40, solenoid reversing valve 41, No. 2 one-way valve 42, No. 3 one-way valve 43.

[0053] Example 1

[0054] The pressure compensation gripper is basically Figure 1-11 shown.

[0055] like Figure 1 The clamp with pressure compensation function shown includes a base 1, a swing unit, a guide assembly 18, a clamping unit and a pressure compensation unit.

[0056] like Figure 2 As shown, the base 1 includes a mounting base plate 2, a front support plate 3 and a rear support plate 4. The upper side of the mounting base plate 2 is provided with a plurality of mounting holes for connecting with the frame. The front support plate 3 and the rear support plate 4 are symmetrically welded to the left and right sides of the upper side of the mounting base plate 2, respectively. The left sides of the front support plate 3 and the rear support plate 4 are provided with a coaxial No. 1 through hole 5, and the No. 1 through hole 5 is used for the drill rod to pass through. The front end of the base 1 is provided with a flip part, specifically, the flip part includes two flip plates 6, which are respectively welded to the front ends of the front support plate 3 and the rear support plate 4, and each flip plate 6 is provided with a flip hole. The tops of the front support plate 3 and the rear support plate 4 are both provided with openings, which are connected to the No. 1 through hole 5, and large drilling tools can pass through the openings. The tops of the front support plate 3 and the rear support plate 4 are both installed with reinforcement plates 34 by bolts. A limiting protrusion 35 is integrally formed at the center position of the bottom of the reinforcement plate 34. The limiting protrusion 35 can be inserted into the opening, and the bottom of the limiting protrusion 35 is tangent to the cylinder where the No. 1 through hole 5 is located.

[0057] like Figure 1 and Figure 3As shown, the swing unit is arranged between the front support plate 3 and the rear support plate 4, and there is a spacing between the bottom of the swing unit and the mounting base plate 2, which is convenient for the swinging or flipping of the swing unit. Specifically, the swing unit includes a swing body 8, a driving member 9 and a pin shaft 7. The swing body 8 includes a No. 1 support plate 10, a No. 2 support plate 11, a front mounting plate 12 and a rear mounting plate 13. The No. 1 support plate 10 and the No. 2 support plate 11 are arranged in parallel, and the left sides of the No. 1 support plate 10 and the No. 2 support plate 11 are each provided with a No. 2 through hole 14 for installing the guide assembly 18, and the No. 2 through hole 14 is connected to the No. 1 through hole 5. The front mounting plate 12 is welded to the front ends of the No. 1 support plate 10 and the No. 2 support plate 11. A swing ear seat 15 is installed at the bottom of the front mounting plate 12 by bolts. The output shaft of the driving member 9 is hinged on the swing ear seat 15, and the cylinder body of the driving member 9 is hinged on the frame. The rear mounting plate 13 is welded to the rear ends of the No. 1 support plate 10 and the No. 2 support plate 11, two lining plates 16 are welded to the top and bottom of the swing body 8, and the space formed between the lining plate 16 at the top of the swing body 8 and the lining plate 16 at the bottom of the swing body 8 provides a guide channel for the clamping unit, and the left and right sides of the front end of the swing body 8 are welded with a flip shaft seat 17, the flip plate 6 and the flip shaft seat 17 are connected by a pin 7, and the driving member 9 can drive the swing body 8 to rotate around the flip shaft seat 17. In this embodiment, the driving member 9 adopts a hydraulic cylinder.

[0058] like Figure 1 As shown, there are two guide assemblies 18, and the two guide assemblies 18 are respectively arranged on the left and right sides of the base 1. Specifically, as shown in FIG. Figure 4-8 As shown, each guide assembly 18 includes a guide outer sleeve 19 and a guide inner sleeve 20, the guide outer sleeve 19 includes a No. 1 small diameter section 21 and a No. 1 large diameter section 22 connected in sequence, the No. 1 small diameter section 21 and the No. 1 large diameter section 22 are integrally formed, the guide inner sleeve 20 includes a No. 2 small diameter section 23 and a No. 2 large diameter section 24 connected in sequence, the No. 2 small diameter section 23 and the No. 2 large diameter section 24 are integrally formed, the outer diameter of the No. 1 small diameter section 21 matches the inner diameter of the No. 2 small diameter section 23, and the outer diameter of the No. 1 large diameter section 22 matches the inner diameter of the No. 2 large diameter section The inner diameter of the No. 2 large diameter section 24 matches that of the drill rod with a small outer diameter, and the inner hole of the No. 2 small diameter section 23 forms a step shape, which can limit the axial position of the guide sleeve 19. The No. 1 large diameter section 22 and the No. 2 large diameter section 24 are installed on the swing body 8 by screws and are rotatably set in the No. 1 through hole 5. The inner diameter of the guide sleeve 19 matches that of the drill rod with a small outer diameter, and the inner diameter of the guide inner sleeve 20 matches that of the drill rod with a large outer diameter. The guide assembly 18 is rotatably set on the base 1, and the driving member 9 can drive the swing body 8 to rotate around the center of the guide inner sleeve 20.

[0059] like Figure 1As shown, the clamping unit is installed on the swing body 8 and is used to clamp the drill rod. Specifically, the clamping unit includes a front clamping part and a rear clamping part, which are respectively arranged on the front and rear sides of the guide assembly 18. The structures of the front clamping part and the rear clamping part are the same. Taking the front clamping part as an example for explanation, the front clamping part includes a clamping cylinder 25, which is installed on the front mounting plate 12 by bolts. A cava 26 is installed on the piston rod of the clamping cylinder 25 by bolts. The piston rod of the clamping cylinder 25 can drive the cava 26 to extend toward the center of the No. 1 through hole 5, and the cava 26 is used to clamp the drill rod.

[0060] like Figure 5 and Figure 9-10 As shown, the slip 26 includes an inner slip 27, an outer slip 28 and a fastener. The inner side surfaces of the inner slip 27 and the outer slip 28 are provided with a plurality of protrusions 29, which are block-shaped or finely pointed. Due to the arrangement of the protrusions 29, the friction coefficient of the inner side surfaces of the inner slip 27 and the outer slip 28 is increased, and the probability of the drill rod slipping is reduced. The front projection of the inner slip 27 is a "cross" shape, and the main body of the middle section cross section of the inner slip 27 is an arc shape. The inner slip 27 has a positioning boss 30 integrally formed on both the upper and lower sides, and a countersunk through hole 31 is opened on the positioning boss 30. The upper and lower sides of the inner surface of the outer slip 28 are provided with a receiving groove 32, and the bottom of the receiving groove 32 is provided with a threaded hole 33. The positioning boss 30 corresponds to the receiving groove 32 one by one. The fastener passes through the countersunk through hole 31 to fix the positioning boss 30 on the outer slip 28. This positioning method makes good use of the advantages of high tensile strength of threaded connection, avoids its weak shear strength, and greatly reduces the possibility of deformation of the fastener. Due to the setting of the receiving groove 32, the inner slip 27 can be axially limited, and the outer slip 28 is installed on the output shaft of the clamping cylinder 25 by bolts. In this embodiment, the fastener is a fastening screw.

[0061] like Fig.11As shown, the compensation unit includes a No. 1 power head motor 36, a No. 1 hydraulic lock 37 and a No. 1 one-way valve 38. The No. 1 power head motor 36 is used to provide the power required for the rotation of the drill pipe. The No. 1 power head motor 36 is provided with a forward oil inlet A and a reverse oil inlet B; the rodless chambers on the two clamping cylinders 25 are interconnected, and the rod chambers on the two clamping cylinders 25 are interconnected. The rodless chamber is provided with a pressure oil inlet B1, and the rod chamber is provided with a pressure oil inlet A1. Oil inlet to the rodless chamber is for clamping, and oil inlet to the rod chamber is for loosening. The No. 1 hydraulic lock 37 is installed in the oil circuit of the rodless chamber and the rod chamber. The No. 1 hydraulic lock 37 is a pressure maintaining element of the clamping cylinder. After the pressure oil that drives the clamping cylinder 25 to clamp or loosen enters the cylinder through the hydraulic lock from A1 and B1, the oil supply is stopped, and the hydraulic lock enters a pressure maintaining state to prevent the pressure oil in the cylinder from flowing out immediately. The oil inlet of the No. 1 check valve 38 is connected to the reverse oil circuit of the No. 1 power head motor 36 , and the oil outlet of the No. 1 check valve 38 is connected to the rodless chamber oil circuit behind the No. 1 hydraulic lock 37 .

[0062] The specific implementation process is as follows:

[0063] Under normal construction conditions, the flip plate 6 and the flip shaft seat 17 are not connected by the pin shaft 7. The swing body 8 takes the guide inner sleeve 20 as the central axis and realizes reciprocating swing within a smaller angle range under the drive of the No. 1 driving member 9.

[0064] When it is necessary to flip the flip body out of the base 1 as a whole through the No. 1 driving member 9, the flip plate 6 and the flip shaft seat 17 are connected through the pin 7, and the reinforcing plate 34 and the guide assembly 18 are removed, so that the swing body 8 rotates around the flip hole.

[0065] Working principle:

[0066] (1) Guiding effect on drill pipe

[0067] In the present technical solution, since guide assemblies 18 are provided on both sides of the swing body 8, when the drill rod enters or exits the No. 1 through hole 5, the guide assembly 18 can limit the radial direction of the drill rod to prevent the drill rod from deviating in the radial direction, thereby ensuring that the drill rod is always within the range that can be clamped by the clamping unit, and at the same time protecting the clamping unit and the drilling rig power head from damage caused by excessive deviation of the drill rod.

[0068] (2) Suitable for drill rods with different outer diameters

[0069] Since the guide assembly 18 of the present technical solution is composed of a guide outer sleeve 19 and a guide inner sleeve 20, and the inner diameter of the guide outer sleeve 19 matches the drill rod with a small outer diameter, and the inner diameter of the guide inner sleeve 20 matches the drill rod with a large outer diameter, when the guide inner sleeve 20 and the guide outer sleeve 19 are installed at the same time, it can be suitable for drill rods with small outer diameters, and when the guide outer sleeve 19 is removed and only the guide inner sleeve 20 is used, it is suitable for drill rods with large outer diameters.

[0070] (3) Swinging of the swinging body

[0071] Under normal construction conditions, it is sometimes necessary to rotate the drill rod in the clamping unit and the drill rod in the power head at a small angle (for example, to pre-loosen the drill rod joint), but the power head rotates at a high speed and it is difficult to control the rotation angle. Therefore, at this time, the flip plate 6 and the flip shaft seat 17 are not connected by the pin 7, and the swing body 8 takes the guide inner sleeve 20 as the central axis, and realizes the reciprocating swing of the swing body 8 under the drive of the driving member 9.

[0072] (4) Swinging body flips

[0073] When it is necessary to install a large drilling tool, since the length and outer diameter of the large drilling tool are much larger than those of an ordinary drill rod, it is impossible to use the method of loading and unloading the drill rod from the rear end or the middle of the frame, which is usually used by the drilling rig, to install or disassemble it. The only way to install it is to insert the clamp from the front end of the frame. However, the distance from the front end of the clamp to the hole wall is extremely limited, and it is difficult to directly load the large drilling tool into the clamp. Due to the opening setting of the technical solution, when installing the large drilling tool, the guide assembly 18 can be removed, and the swing body 8 is driven by the driving member 9 to turn around the flip part. According to the principle of the lever, since the rotation fulcrum moves to the flip part, the amplitude of the rotation of the rear end of the clamping unit is larger than that of the swinging condition, and the swing body 8 can turn clockwise over the center of the base, so that it is almost completely exposed from the base. At this time, the reinforcing plate 34 is removed, and a very spacious space is formed inside and on the top of the clamp, and the large drilling tool can be directly placed from top to bottom. The swing body 8 can avoid the large drilling tool and does not interfere with the installation of the large drilling tool. The large drilling tool is clamped by other clamps. This process only requires the disassembly and assembly of a small number of small parts, which not only reduces the space requirement for the front end of the clamp for the installation of large drilling tools, but also saves a lot of time and manpower for the overall removal of the clamp, and ensures on-site safety. This technical solution simplifies the installation process of large drilling tools, reduces manpower investment, shortens construction time, improves construction efficiency, and reduces safety hazards.

[0074] When it is necessary to replace the cava 26 or internal parts, the swing body 8 needs to be flipped out of the base 1 as a whole for operation. At this time, the guide assembly 18 is removed and the swing body 8 is flipped around the flipping part. According to the principle of leverage, since the rotation fulcrum moves to the flipping part, the rotation amplitude of the rear end of the swing body 8 is larger than that of the swinging condition. Under the driving action of the driving member 9, the swing body 8 can be flipped clockwise beyond the center of the base 1, so that it is almost completely exposed to the base 1, which is convenient for replacing internal parts. When the inner cava 27 needs to be replaced due to severe wear or the drill rod with a small outer diameter needs to be replaced with a drill rod with a large outer diameter, the inner cava 27 needs to be removed. Just retract the piston rod of the clamping cylinder 25, unscrew the fastening screws between the inner cava 27 and the outer cava 28, and the inner cava 27 can be removed. The installation steps are the opposite.

[0075] (5) Working principle of pressure compensation unit

[0076] When the No. 1 power head motor 36 drives the power head to rotate forward, according to the working principle of the drilling rig, the clamping unit needs to loosen the drill rod, that is, before the No. 1 power head motor 36 rotates forward, pressure oil must be introduced into the rod chamber of the clamping cylinder 25 through the A1 port, and the piston rod of the clamping cylinder 25 is retracted so that the clamping unit is in a loosened state that does not affect the rotation of the drill rod, and then oil can be passed to the A port of the No. 1 power head motor 36 to start forward rotation. At this time, the A port of the No. 1 power head motor 36 enters oil, and the B port returns oil. Theoretically, part of the return oil of the No. 1 power head motor 36 (that is, the oil flowing to the B port) will flow to the No. 1 check valve 38. As long as the opening pressure of the No. 1 check valve 38 is set higher than the return oil pressure, it can be ensured that the No. 1 check valve 38 will not open. In addition, since the rod chamber of the clamping oil cylinder 25 is a high-pressure chamber under the pressure-maintaining action of the No. 1 hydraulic lock 37, and the rodless chamber is a low-pressure chamber for oil return, even in the extreme case of failure of the No. 1 check valve 38, the pressure difference at both ends of the oil cylinder will ensure that the release state of the clamp is not affected. Thus, a double insurance is formed for the release and retention of the clamp, ensuring that the clamp will not affect normal drilling.

[0077] When the drill rod is unhooked, the clamping unit needs to clamp the front drill rod (usually the first drill rod exposed in the borehole), and the power head is reversed to loosen the threaded connection between the drill rod (i.e., the active drill rod) installed on the power head and the front drill rod, thus completing the thread unhooking. Before unhooking, according to the drilling rig structure and workflow, the clamping unit is used to clamp the drill rod, and oil is passed to the rodless chamber of the clamping cylinder 25 of the forward clamp through B1, and then the pressure is maintained through the No. 1 hydraulic lock 37, and then oil is passed to the No. 1 power head motor 36 through the B port to drive it to reverse. At the same time, the reversed pressure oil passes through the No. 1 check valve 38 into the rodless chamber of the clamping cylinder 25, forming a linkage pressurization for the clamping cylinder 25.

[0078] Since the tightness of each threaded joint varies during shattering, when the shattering load (i.e., the reversing load of the power head) increases, the clamping force required by the clamp needs to be increased accordingly. The advantage of this system is that, while the reversing pressure of the No. 1 power head motor 36 increases, the pressure oil of the reversing oil circuit enters the clamping oil circuit and the rodless chamber of the clamping cylinder 25 after the No. 1 hydraulic lock 37, compensating for the leakage of the No. 1 hydraulic lock 37 and the clamping cylinder 25, and preventing the top clamp from slipping during shattering.

[0079] This technical solution connects the reverse oil circuit of the No. 1 power head motor 36 and the clamping oil circuit of the clamping unit, and sets a No. 1 one-way valve 38, which cooperates with the No. 1 hydraulic lock 37 to form an anti-skid hydraulic system for the top clamp in which reverse linkage boosting, forward rotation and single action of the clamping cylinder do not affect each other. This solves the problem of slipping caused by the decrease of clamping force due to leakage of the clamping cylinder 25 and the No. 1 hydraulic lock 37 in the existing top clamp hydraulic system, ensures on-site construction safety and improves construction efficiency.

[0080] Example 2

[0081] Different from Example 1, Fig.12 As shown, the compensation unit includes a No. 2 power head motor 39, a No. 2 hydraulic lock 40, a boost oil circuit, an electromagnetic reversing valve 41, a No. 2 check valve 42 and a No. 3 check valve 43. The oil circuit of the No. 2 power head motor 39 is relatively independent from the clamping unit. The No. 2 power head motor 39 is used to provide the power required for the rotation of the drill pipe. The No. 2 power head motor 39 is provided with a forward oil inlet A3 and a reverse oil inlet B3; the rodless chambers on the two clamping cylinders 25 are interconnected, and the rod chambers on the two clamping cylinders 25 are interconnected. The rodless chamber is provided with a pressure oil inlet B2, and the rod chamber is provided with a pressure oil inlet A2. Oil entering the rodless chamber is for clamping, and oil entering the rod chamber is for loosening. The No. 2 hydraulic lock 40 is installed on the oil circuit of the rodless chamber and the rod chamber. The No. 2 hydraulic lock 40 is a pressure maintaining element of the clamping cylinder 25. After the pressure oil that drives the clamping cylinder 25 to clamp or loosen enters the cylinder through the hydraulic lock from A2 and B2, the oil supply is stopped, and the hydraulic lock enters a pressure maintaining state to prevent the pressure oil in the cylinder from flowing out immediately. The boost oil circuit is provided with a pressure oil inlet P1, the electromagnetic reversing valve 41 connects the boost oil circuit and the rodless chamber oil circuit before the No. 2 hydraulic lock 40, the No. 2 check valve 42 is installed between the electromagnetic reversing valve 41 and the rodless chamber oil circuit, the No. 3 check valve 43 is installed between the electromagnetic reversing valve 41 and the boost oil circuit, the No. 2 check valve 42 is used to control the one-way flow from the electromagnetic reversing valve 41 to the rodless chamber oil circuit, and the No. 3 check valve 43 is used to control the one-way flow of oil from the boost oil circuit to the electromagnetic reversing valve 41. The electromagnetic reversing valve 41 controls the on-off of the boost oil circuit P1 and the rodless chamber of the clamping oil cylinder 25 by switching the left and right positions, the left position is connected, and the right position is disconnected.

[0082] Working principle of compensation unit:

[0083] When the No. 2 power head motor 39 drives the power head to rotate forward, according to the working principle of the drilling rig, the clamping unit needs to loosen the drill rod, that is, before the power head rotates forward, pressurized oil must be introduced into the rod chamber of the clamping cylinder 25 through the A2 port, and the piston rod is retracted so that the clamping unit is in a loosened state that does not affect the rotation of the drill rod, and then oil can be introduced into the A3 port of the No. 2 power head motor 39 to start the forward rotation. At this time, the A3 port of the No. 2 power head motor 39 is inlet with oil, and the B3 port is outlet with oil. The electromagnetic reversing valve 41 is always in the right position. During this process, the No. 2 hydraulic lock 40 keeps the pressure in the rod chamber of the clamping cylinder 25 to ensure that the clamping unit is loosened. Theoretically, there will be leakage in both the No. 2 hydraulic lock 40 and the cylinder, but because the stroke of the clamping cylinder 25 is long enough, leakage will not cause the loose state of the clamping unit to change to the clamping state.

[0084] When the drilling rig is in working conditions such as reverse shackle, the clamping unit needs to be pressurized to ensure that the clamping force is stable and reliable.

[0085] Generally, before breaking out, according to the drilling rig structure and work flow, the drill rod is clamped with the clamping cylinder 25, oil is passed to the rodless chamber of the clamping cylinder 25 through B2, and then the pressure is maintained through the No. 2 hydraulic lock 40, and then oil is passed to the No. 2 power head motor 39 through the B3 port to drive it to reverse. While reversing, the electromagnetic reversing valve 41 is controlled to switch to the left position, and the booster oil circuit P1 is supplied with oil. The pressure oil will enter the rodless chamber of the clamping cylinder 25 through the electromagnetic reversing valve 41 and the No. 2 check valve 42 thereafter, thereby actively pressurizing the clamping cylinder 25 to supplement the clamping force loss caused by leakage.

[0086] The technical solution uses the electromagnetic reversing valve 41 to open the clamping oil circuit of the clamping cylinder 25 when the buckle is reversed, and sets the No. 3 check valve 43 before the electromagnetic reversing valve 41 and the No. 2 check valve 42 after the electromagnetic reversing valve 41 to form a valve bridge that can automatically select the high-pressure boosting oil circuit. The cut-off effect of the No. 2 check valve 42 and the No. 3 check valve 43 is used to ensure the reliable operation of the clamping unit and the safety of components during single clamping and boosting, which solves the problem of slipping caused by the reduction of clamping force due to leakage of the clamping cylinder 25 and the hydraulic lock in the existing hydraulic system of the top double clamper, ensures the safety of on-site construction and improves construction efficiency.

[0087] The above is only an embodiment of the present invention, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A clamp with a pressure compensation function comprises a base, a through hole No. 1 for the drill pipe to pass through is provided on the base, a swing body is provided on the base, the swing body can rotate around the through hole No. 1, a clamping unit is installed on the swing body, the clamping unit comprises two clamping parts, the two clamping parts are arranged at two ends of the swing body oppositely, each clamping part comprises a clamping cylinder, the clamping cylinder is installed on the swing body, the clamping cylinder comprises a piston rod, a slip is installed on the piston rod, and the piston rod of the clamping cylinder can drive the slip to extend toward the center of the through hole No.

1. Features: It also includes a pressure compensation unit, which is used to compensate the pressure of the rodless chamber of the clamping cylinder; an opening that opens the No. 1 through hole is arranged away from the frame side, and a large drilling tool can pass through the opening; a flip part is arranged on the side of the base, and the swing body can flip around the flip part and move away from the opening.

2. The clamp with pressure compensation function according to claim 1, Features: The compensation unit includes a No. 1 power head motor, a No. 1 hydraulic lock and a No. 1 one-way valve. The No. 1 power head motor is provided with a forward oil inlet A and a reverse oil inlet B. The rodless chambers on the two clamping cylinders are interconnected, and the rod chambers on the two clamping cylinders are interconnected. The rodless chamber is provided with a pressure oil inlet B1, and the rod chamber is provided with a pressure oil inlet A1. The No. 1 hydraulic lock is installed on the oil circuits of the rodless chamber and the rod chamber, the oil inlet of the No. 1 one-way valve is connected to the reverse oil circuit of the No. 1 power head motor, and the oil outlet of the No. 1 one-way valve is connected to the rodless chamber oil circuit after the No. 1 hydraulic lock.

3. The clamp with pressure compensation function according to claim 1, Features: The compensation unit includes a No. 2 power head motor, a No. 2 hydraulic lock, a boost oil circuit and an electromagnetic reversing valve. The No. 2 power head motor is provided with a forward oil inlet A3 and a reverse oil inlet B3. The rodless chambers on the two clamping cylinders are interconnected, and the rod chambers on the two clamping cylinders are interconnected. The rodless chamber is provided with a pressure oil inlet B2, and the rod chamber is provided with a pressure oil inlet A2. The No. 2 hydraulic lock is installed on the oil circuits of the rodless chamber and the rod chamber, and the boost oil circuit is provided with a pressure oil inlet P1. The electromagnetic reversing valve is connected to the boost oil circuit and the rodless chamber oil circuit before the No. 2 hydraulic lock. A No. 2 check valve is installed on the oil circuit between the electromagnetic reversing valve and the rodless chamber oil circuit, and a No. 3 check valve is installed on the oil circuit between the electromagnetic reversing valve and the boost oil circuit.

4. The clamp with pressure compensation function according to any one of claims 2 or 3, Features: A No. 2 through hole is provided on the swing body, and the No. 2 through hole is connected to the No. 1 through hole. Guide components are installed at the No. 2 through holes on both sides of the swing body. The guide components are detachably connected to the swing body, and the guide components can pass through the No. 1 through hole and be rotatably connected to the base.

5. The clamp with pressure compensation function according to claim 4, Features: The guide assembly comprises a guide outer sleeve and a guide inner sleeve, the guide outer sleeve and the guide inner sleeve are detachably connected, the inner diameter of the guide outer sleeve matches the drill rod with a small outer diameter, and the inner diameter of the guide inner sleeve matches the drill rod with a large outer diameter.

6. The clamp with pressure compensation function according to claim 5, Features: A driving member is hinged on the frame, and an output shaft of the driving member is hinged on the bottom of the swing body below the turning part.

7. The clamp with pressure compensation function according to claim 6, Features: The slips include inner slips and outer slips. The outer slips are installed on the piston rod of the clamping cylinder. The inner slips are detachably connected to the inner sides of the outer slips. The inner diameter of the inner slips matches the drill rod with a smaller outer diameter, while the inner diameter of the outer slips matches the drill rod with a larger outer diameter.

8. The clamp with pressure compensation function according to claim 7, Features: The inner sides of the inner slip and the outer slip are both provided with a plurality of protrusions.

9. The clamp with pressure compensation function according to claim 8, Features: The slip also includes fasteners. The inner slip is fixedly connected with positioning bosses on both sides along its radial direction. The outer slip is provided with accommodating grooves on both sides along its radial direction. The accommodating grooves correspond to the positioning bosses one by one, and the positioning bosses can be inserted into the accommodating grooves. The positioning bosses are connected to the outer slip by fasteners.

10. The clamp with pressure compensation function according to claim 9, Features: The top of the base is detachably connected with a reinforcing plate, and a limiting protrusion is fixedly connected to one side of the reinforcing plate close to the opening. The limiting protrusion can be inserted into the opening, and the bottom of the limiting protrusion is tangent to the cylinder where the No. 1 through hole is located.