Tunnel construction protection structure
Through the sliding connection of the upper bracket and the lower bracket and the design of the pulley rail, the problem of the arch guard deviating from the center line and inaccurate positioning during tunnel construction is solved, and accurate and safe installation of the tunnel construction is achieved.
Patent Information
- Application Number
- CN202411162066.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In traditional tunnel construction methods, arch guards and root arch guards tend to deviate from the centerline of the tunnel when installed in a narrow space, resulting in scratches and inaccurate positioning.
The upper bracket and the lower bracket are designed to be slidingly connected, and the pulleys move on the slide rails to ensure that the arch guard arch frame and the root arch guard frame are installed symmetrically along the center line of the tunnel, and precise position adjustment is achieved through adjustment pieces to avoid scratches and scratches. Shift.
The precise positioning and stable installation of the arch guard frame and root arch guard frame are achieved, which avoids scratches with the inner wall of the tunnel and improves construction efficiency and safety.
Smart Images

Figure CN118793464A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a tunnel construction protective structure. Background Art
[0002] In tunnel construction, the installation and initial support of arch guards are extremely challenging, especially in environments with narrow space and complex conditions. Traditional arch guard splicing and support methods have problems such as high difficulty in operation, low efficiency, and many safety hazards.
[0003] In order to improve construction efficiency, reduce operation difficulty and potential safety hazards, the patent with publication number CN118065942A discloses a tunnel construction support device and construction method. The invention assembles the guard arch in advance in a relatively wide area of the site, and divides the structure for supporting the inner wall of the tunnel into three parts, namely, an arch guard arch frame and two root guard arch frames. After that, the arch guard arch frame is lifted and clamped on the arch guard arch clamp, and each root guard arch frame is clamped in the corresponding end guard arch clamp; then, the arch guard arch frame and the root guard arch frame are controlled to be staggered by a certain distance, and then the lifting bracket is controlled to descend, so that the arch guard arch frame moves downward for a distance, so that the arch guard arch frame has a certain distance from the top of the tunnel, so that the arch guard arch frame is prevented from colliding with the inner wall of the tunnel when the lifting bracket moves in the tunnel, and then the adjustable locking mechanism is operated to lock the arch guard arch clamp and the end guard arch clamp. Afterwards, the lifting bracket is driven to move to the predetermined position of the tunnel, and the winch is controlled to drive the arched arch clamp and the end arched arch clamp to move to the predetermined position, and then the locking of the arched arch clamp and the end arched arch clamp by the adjustable locking mechanism is released, and then the lifting bracket is controlled to rise, and then the arched arch clamp and the end arched arch clamp are aligned, and then the arched arch frame and the two root arched arch frames are connected and fixed; finally, the arched arch frame and the two root arched arch frames are fixed to the inner wall of the tunnel, and the steel bars are tied to form a tying skeleton between the arched arch frame and the two root arched arch frames, and after the tying is completed, the grouting operation is carried out. In summary, the present invention improves the efficiency and accuracy of the initial support of the tunnel, reduces the intensity and difficulty of the operation, and avoids the occurrence of safety accidents.
[0004] However, this patent has the following defects: a slide wheel or a running wheel is installed on each fixed plate to facilitate the movement of the lifting bracket in the tunnel. Since no slide rail is provided, the slide wheel or the running wheel is prone to deviate from the center line of the tunnel during the movement, causing scratches on the arch guard frame and / or the root guard frame, and when the arch guard frame and the root guard frame are fixed, they are prone to displacement along the length direction of the tunnel, resulting in inaccurate installation positioning. Summary of the invention
[0005] The present invention aims to provide a tunnel construction protection structure to overcome the above-mentioned shortcomings.
[0006] In order to achieve the above object, the technical solution of the present invention is:
[0007] A tunnel construction protection structure, comprising:
[0008] An upper bracket and a lower bracket are respectively used to selectively clamp the arched arch protection frame and the root arch protection frame along the inner side, wherein the upper bracket is slidably connected to the upper part of the lower bracket and can selectively drive the arched arch protection frame to stagger or dock with the root arch protection frame;
[0009] The lower end of the lower bracket is rotatably connected to a pulley; and
[0010] A slide rail is arranged along the length direction of the tunnel, and the slide rail is fixedly and slidably connected with the pulley.
[0011] Furthermore, the upper bracket includes:
[0012] A top frame, on which a first clamp is mounted, the first clamp being used to selectively clamp the top of the arched arch guard;
[0013] A bottom frame located below the top frame, the bottom frame being slidably connected to a lower bracket;
[0014] an intermediate frame fixedly connected between the top frame and the bottom frame, and a sliding frame slidably connected between the top frame and the bottom frame along the tunnel width direction, the sliding frames are arranged on both sides of the intermediate frame along the tunnel width direction, and a second clamp is installed on a side of the sliding frame away from the intermediate frame, and the second clamp is used to selectively clamp both sides of the arched arch guard frame; and
[0015] An adjusting member for adjusting the distance between the middle frame and the sliding frame.
[0016] Furthermore, the first fixture comprises:
[0017] Two first frames fixedly connected to the top frame on both sides along the tunnel length direction in a one-to-one correspondence;
[0018] A first clamping plate slidably connected to the first frame in a one-to-one correspondence along the length direction of the tunnel, a first fastener being connected between the first clamping plate and the first frame, a side of the first clamping plate away from the first frame being arranged opposite to the top of the arched arch protection frame, and being provided with a plurality of first sliding grooves; and
[0019] A plurality of first clamping blocks are respectively connected to the top of the arched arch protection frame in a sliding manner, and the plurality of first clamping blocks are arranged in a one-to-one correspondence with the plurality of first sliding grooves (305). The first clamping block is fixedly connected to a first screw rod on the side away from the arched arch protection frame, and the first screw rod passes through the first sliding groove and is fixedly connected to a first nut.
[0020] Furthermore, the top frame is movably connected with a first support assembly along the vertical direction, the first support assembly is located between the two first frames, and the first support assembly is used to selectively abut against the lower surface of the top end of the arched arch guard frame;
[0021] Preferably, the first supporting assembly comprises:
[0022] a second screw rod rotatably connected to the top frame;
[0023] A first threaded sleeve located above the top frame and threadedly connected to the second screw rod;
[0024] A first support base hinged to one end of the first threaded sleeve away from the top frame, wherein a first arc-shaped end surface is provided on a side of the first support base away from the top frame, and a convex surface of the first arc-shaped end surface faces the top of the arched arch guard; and
[0025] Two first support blocks are rotatably connected to the first arc-shaped end face, and the two first support blocks are spaced apart along the extension direction of the arched arch protection frame. The first support block protrudes from the first arc-shaped end face and is provided with a friction surface, and the friction surface is used to selectively abut against the lower surface of the top end of the arched arch protection frame. The rotation axis of the first support block and the first arc-shaped end face is set along the length direction of the tunnel.
[0026] Furthermore, two sliding frames are respectively arranged on both sides of the middle frame along the width of the tunnel;
[0027] The second fixture comprises:
[0028] A second frame fixedly connected to the sliding frame in a one-to-one correspondence;
[0029] A second clamping plate slidably connected to the second frame in a one-to-one correspondence along the length direction of the tunnel, a second fastener being connected between the second clamping plate and the second frame, a side of the second clamping plate away from the second frame being arranged opposite to the arched arch guard frame, and being provided with a plurality of second sliding grooves; and
[0030] A plurality of second clamping blocks are respectively slidably connected to one side of the arched arch protection frame, the plurality of second clamping blocks are arranged in one-to-one correspondence with the plurality of second sliding grooves, the second clamping blocks are fixedly connected to the side away from the arched arch protection frame with a third screw, the third screw passes through the second sliding groove and is fixedly connected to a second nut;
[0031] A plurality of second clamping blocks located on the same side of the middle frame respectively clamp both sides of the arch support frame along the tunnel length direction.
[0032] Further, two groups of second support components are movably connected to the sliding frame along the tunnel width direction. One group of the second support components is located between two of the second frames on the same side of the middle frame, and the other group of the second support components is located between two of the second frames on the other side of the middle frame. The second support components are used to selectively abut against the inner surface of the side of the arch support frame.
[0033] Preferably, the second support component includes:
[0034] A fourth screw rod rotatably connected to the sliding frame;
[0035] A second threaded sleeve located on the side of the sliding frame away from the middle frame and threadedly connected to the fourth screw rod;
[0036] A second support seat hinged to one end of the second threaded sleeve away from the middle frame. A second arc-shaped end face is provided on the side of the second support seat away from the middle frame, and the convex surface of the second arc-shaped end face faces the side wall of the arch support frame; and
[0037] Two second support blocks rotatably connected to the second arc-shaped end face. The two second support blocks are arranged at intervals along the extension direction of the arch support frame. A roller is protrudingly rotatably connected to the second support block. The roller is used to selectively slide and abut against the inner surface of one side of the arch support frame. The rotation axis of the second support block and the second arc-shaped end face is arranged along the tunnel length direction.
[0038] Further, it further includes:
[0039] One clamping plate is provided at each of the two ends of the lower support along the tunnel width direction. The cross-section of the clamping plate in the horizontal direction is "匚"-shaped. The opening of the clamping plate faces the root support frame and includes two end plates and a middle plate integrally formed. The two end plates are integrally formed with the two ends of the middle plate respectively, and the two end plates are respectively located on both sides of the lower support along the tunnel length direction;
[0040] A plurality of sixth screw rods are threadedly connected to each end plate. A third clamping block is rotatably connected to one end of the sixth screw rod away from the end plate. A plurality of the third clamping blocks along the tunnel length direction are used to clamp both ends of the root support frame along the tunnel length direction; and
[0041] The fifth screw rod is threadedly connected to the middle part and the lower bracket, and one end of the fifth screw rod is rotatably connected to the clamping plate. The fifth screw rod is arranged along the width direction of the tunnel.
[0042] Further, it further includes:
[0043] A first slider is fixedly arranged on the lower surface of the bottom frame. A plurality of sliding protrusions are arranged at intervals on the lower surface of the first slider. A third slider is fixedly connected to the side wall of the first slider;
[0044] A second slider is fixedly arranged on the upper surface of the lower bracket. A plurality of sliding grooves are arranged at intervals on the upper surface of the second slider. The sliding grooves are adapted to the sliding protrusions. A fourth slider is fixedly connected to the side wall of the second slider;
[0045] A driving plate that is slidably connected to both the upper bracket and the lower bracket. Vertical sliding grooves and horizontal sliding grooves are arranged on the driving plate. The horizontal sliding grooves are arranged along the length direction of the tunnel. The third slider and the fourth slider are respectively slidably connected to the vertical sliding grooves and the horizontal sliding grooves in a one-to-one correspondence; and
[0046] A driving member for driving the driving plate to move along the length direction of the tunnel.
[0047] Further, the sliding protrusions and the sliding grooves are isosceles trapezoids.
[0048] Further, two groups of slide rails are provided. The two groups of slide rails are symmetrically arranged along the center line of the tunnel. The cross section of the slide rail is a "U" - shaped structure and the opening is upward. A plurality of first positioning holes are arranged at intervals along the length direction of the side wall of the slide rail. A positioning rod is detachably connected in the first positioning holes;
[0049] Two groups of sliding wheels are arranged at the lower end of the lower bracket. The two groups of sliding wheels are respectively slidably connected to the two groups of slide rails in a one - to - one correspondence. A second positioning hole is arranged at the lower end of the lower bracket. The second positioning hole is detachably connected to the positioning rod.
[0050] The present invention has at least the following advantages compared with the prior art:
[0051] When in use, first, the arch guard frame and the root guard frame are assembled in advance, and the upper bracket and the lower bracket are used to clamp and fix the arch guard frame and the root guard frame respectively, and the upper slide rail is installed in the tunnel where the arch guard frame and the root guard frame are to be installed, and the pulley is moved on the slide rail to achieve the position adjustment of the arch guard frame and the root guard frame in the tunnel. By adjusting the direction and position in the tunnel, it can be ensured that the arch guard frame and the root guard frame are symmetrically arranged along the center line of the tunnel, and the arch guard frame and the root guard frame are avoided from being scratched during transportation; secondly, the upper bracket and the lower bracket are relatively slid to stagger the arch guard frame and the root guard frame by a certain distance, and then the upper bracket is controlled to descend so that the arch guard frame can be moved along The upper bracket and the lower bracket are positioned at the positions of the arch guard frame to be installed and the root arch guard frame by sliding the pulley on the slide rail, and the upper bracket is controlled to rise and the upper bracket and the lower bracket slide relative to each other, so that the arch guard frame and the root arch guard frame are relatively arranged, and the pulley slides on the slide rail again to fine-tune the positions of the upper bracket and the lower bracket, so that the position of the arch guard frame coincides with the preset position, and the pulley is used to brake on the slide rail, and then the arch guard frame and the root arch guard frame are installed on the inner wall of the tunnel in turn; finally, the steel bars are tied to form a tying skeleton between the arch guard frame and the root arch guard frame, and then the grouting operation is carried out.
[0052] Compared with the traditional construction method, the present invention can realize that the arched arch guard frame and the root arch guard frame always move along the center line of the tunnel, can avoid scratches between the inner wall of the tunnel, and when the arched arch guard frame and the root arch guard frame are fixed, the pulley is braked on the slide rail, thereby ensuring a relatively static working environment between the upper bracket and the tunnel, and between the lower bracket and the tunnel, avoiding the phenomenon of displacement of the arched arch guard frame and the root arch guard frame when they are respectively fixed to the tunnel, and achieving the effect of precise positioning. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0054] Figure 1 It is a structural schematic diagram of the protective arch in the present invention;
[0055] Figure 2 This is a rendering of the tunnel construction protection structure of the present invention when it is in use (when the arched arch protection frame and the root arch protection frame are staggered);
[0056] Figure 3It is a structural schematic diagram of the tunnel construction protection structure of the present invention;
[0057] Figure 4 It is a structural schematic diagram of the tunnel construction protection structure (without slide rails) of the present invention;
[0058] Figure 5 It is a cross-sectional view of the tunnel construction protection structure of the present invention (when the arched arch protection frame and the root arch protection frame are staggered);
[0059] Figure 6 This is a rendering of the tunnel construction protection structure of the present invention when it is in use (when the arched arch protection frame and the root arch protection frame are butt-jointed);
[0060] Figure 7 It is a cross-sectional view of the tunnel construction protection structure of the present invention (when the arched arch protection frame and the root arch protection frame are butt-jointed);
[0061] Figure 8 is an exploded view of the first support assembly of the present invention;
[0062] Fig. 9 It is an exploded view of the second supporting assembly of the present invention.
[0063] 1. Arch guard frame; 2. Root arch guard frame; 3. Upper bracket; 4. Lower bracket; 5. Second positioning hole; 6. Pulley; 7. Slide rail; 8. First positioning hole; 9. Positioning rod; 10. First support assembly; 11. Second support assembly; 12. First slider; 13. Sliding protrusion; 14. Third slider; 15. Second slider; 16. Sliding groove; 17. Fourth slider; 18. Drive plate; 19. Vertical slide groove; 20. Horizontal slide groove; 21. Drive member; 301. Top frame; 302. First frame; 303. First clamping plate; 304. First fastener; 305. First sliding groove; 306. First clamping block; 307. First screw; 308. First A nut; 309, an intermediate frame; 310, a sliding frame; 311, a second frame; 312, a second clamping plate; 313, a second fastener; 314, a second sliding groove; 315, a second clamping block; 316, a third screw; 317, a second nut; 318, a bottom frame; 319, an adjusting member; 401, a clamping plate; 402, a fifth screw; 403, a third clamping block; 404, a sixth screw; 1001, a second screw; 1002, a first threaded sleeve; 1003, a first support seat; 1004, a first support block; 1101, a fourth screw; 1102, a second threaded sleeve; 1103, a second support seat; 1104, a second support block; 1105, a roller. DETAILED DESCRIPTION
[0064] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0065] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0066] Reference Figure 1 The present invention provides a tunnel construction protection structure for assisting the installation process of the arch guard in the tunnel. The structure of the arch guard is divided into three parts, including an arched arch guard frame 1 and two root arch guard frames 2. The arched arch guard frame 1 and the root arch guard frame 2 are made of I-beams. A plurality of I-beams are arranged at intervals along the length direction of the tunnel and connected together by connecting rods. Flanges are installed at the lower end of the arched arch guard frame 1 and the upper end of the root arch guard frame 2, and the two are connected together by flanges after docking. The specific installation method refers to the publication number CN118065942A, and the patent name is a connection method of the arched arch guard frame 1 and the root arch guard frame 2 in a tunnel construction support device and construction method. This belongs to the prior art and will not be repeated here.
[0067] Reference Figure 2-7 As described above, the present invention provides a tunnel construction protection structure, the specific structure of which includes an upper bracket 3, a lower bracket 4, a pulley 6 and a slide rail 7.
[0068] Wherein: the upper bracket 3 and the lower bracket 4 are used to selectively clamp the arched arch frame 1 and the root arched arch frame 2, respectively. When clamping, the upper bracket 3 is located on the inner side of the arched arch frame 1, and the lower bracket 4 is located between the two root arched arch frames 2. The upper bracket 3 is located above the lower bracket 4, and the upper bracket 3 and the lower bracket 4 are slidably connected. During the relative sliding process of the upper bracket 3 and the lower bracket 4, the arched arched arch frame 1 and the root arched arch frame 2 can be selectively driven to stagger or dock; the lower end of the lower bracket 4 is rotatably connected with a pulley 6, and by installing the pulley 6, the upper bracket 3 and the lower bracket 4 can be conveniently moved in the tunnel; the slide rail 7 is arranged along the length direction of the tunnel, and the slide rail 7 is fixedly slidably connected with the pulley 6.
[0069] When in use, first, assemble the arched arch frame 1 and the root arched arch frame 2 in advance, and use the upper bracket 3 and the lower bracket 4 to clamp and fix the arched arch frame 1 and the root arched arch frame 2 respectively, and install the upper slide rail 7 in the tunnel where the arched arch frame 1 and the root arched arch frame 2 are to be installed to ensure that the pulley 6 moves on the slide rail 7. During the project, the arched arch frame 1 and the root arched arch frame 2 are symmetrically arranged along the center line of the tunnel; secondly, the upper bracket 3 and the lower bracket 4 slide relative to each other, so that the arched arch frame 1 and the root arched arch frame 2 are staggered by a certain distance, and then the upper bracket 3 is controlled to descend, so that the arched arch frame 1 moves downward for a distance, and at this time, the gap between the arched arch frame 1 and the top of the tunnel is matched; secondly, The pulley 6 slides on the slide rail 7 so that the upper bracket 3 and the lower bracket 4 are located at the positions of the arch guard frame 1 and the root guard frame 2 to be installed. The upper bracket 3 is controlled to rise and the upper bracket 3 and the lower bracket 4 are relatively slidable, so that the arch guard frame 1 and the root guard frame 2 are relatively arranged. The position of the pulley 6 on the slide rail 7 is used to fine-tune the position of the upper bracket 3 and the lower bracket 4. After the position of the arch guard frame 1 coincides with the preset position, the pulley 6 is used to brake on the slide rail 7. Subsequently, the arch guard frame 1 and the root guard frame 2 are installed on the inner wall of the tunnel in turn. Finally, the steel bars are tied to form a tying skeleton between the arch guard frame 1 and the root guard frame 2, and then the grouting operation is carried out.
[0070] Compared with the traditional construction method, the present invention can realize that the arched arch frame 1 and the root arched arch frame 2 always move along the center line of the tunnel, can avoid scratches with the inner wall of the tunnel, and when the arched arch frame 1 and the root arched arch frame 2 are fixed, the pulley 6 is braked on the slide rail 7, ensuring a relatively static working environment between the upper bracket 3 and the tunnel, and between the lower bracket 4 and the tunnel, avoiding the displacement of the arched arch frame 1 and the root arched arch frame 2 when they are respectively fixed to the tunnel, and achieving the effect of precise positioning.
[0071] Preferably, the upper bracket 3 includes a top frame 301, an intermediate frame 309, a sliding frame 310, a bottom frame 318 and an adjusting member 319. A first clamp is installed on the top frame 301, and the first clamp is used to selectively clamp the top of the arched arch protection frame 1; the bottom frame 318 is located below the top frame 301, and the bottom frame 318 is slidably connected to the lower bracket 4; the intermediate frame 309 is fixedly connected between the top frame 301 and the bottom frame 318, and plays a role in connecting the top frame 301 and the bottom frame 318; the sliding frame 310 is slidably connected between the top frame 301 and the bottom frame 318 along the tunnel width direction; both sides of the intermediate frame 309 along the tunnel width direction are provided with sliding frames 310, and a second clamp is installed on the side of the sliding frame 310 away from the intermediate frame 309, and the second clamp is used to selectively clamp the two sides of the arched arch protection frame 1; the adjusting member 319 is used to adjust the distance between the intermediate frame 309 and the sliding frame 310.
[0072] Specifically, a long guide rail is fixedly arranged on one side of the top frame 301 and the bottom frame 318 near the middle frame 309, and guide grooves are arranged at both ends of the middle frame 309 near the top frame 301 and the bottom frame 318, and the guide rail and the guide groove are slidably connected, and the guide rail and the guide groove are arranged along the width direction of the tunnel. The adjusting member 319 is a bidirectional screw, the middle part of which is rotatably connected to the middle frame 309, and the two sliding frames 310 on both sides of the middle frame 309 are respectively threadedly connected to the two thread segments of the bidirectional screw with opposite thread directions. By rotating the bidirectional screw, the two sliding frames 310 on both sides of the middle frame 309 can move toward or away from each other. When the two sliding frames 310 on both sides of the middle frame 309 move toward each other, they can drive the two ends of the arched arch frame 1 to approach each other. This process is used to achieve the clearance fit between the arched arch frame 1 and the inner wall of the tunnel, and avoid the arched arch frame 1 and the tunnel from being scratched due to the deviation of the tunnel center line during the movement of the upper bracket 3 and the lower bracket 4.
[0073] In the present invention, the slide rail 7 is laid forward in a recycling manner. The above design can avoid scratches when the arched arch guard frame 1 is moved in a tunnel where the slide rail 7 is not laid.
[0074] Preferably, the first clamp includes a first frame 302, a first clamping plate 303, a first fastener 304, a first clamping block 306, a first screw 307 and a first nut 308. The first frame 302 and the first clamping plate 303 are both provided with two, and the two first frames 302 are respectively fixedly connected to the top frame 301 on both sides of the tunnel length direction along the tunnel length direction, the first frame 302 and the first clamping plate 303 are provided in a one-to-one correspondence, one end of the first clamping plate 303 is slidably connected with the first frame 302 in a one-to-one correspondence along the tunnel length direction, and the first fastener 304 is connected between the first clamping plate 303 and the first frame 302, and the first fastener 304 is a bolt and nut structure, and the first The end of the clamping plate 303 away from the first frame 302 is arranged opposite to the top of the arched arch protection frame 1, and is provided with a plurality of first sliding grooves 305; a plurality of first clamping blocks 306 are arranged one-to-one corresponding to the plurality of first sliding grooves 305, the first clamping block 306 is located between the two flanges of the I-beam, the first clamping block 306 can slide along the I-beam, and the first clamping block 306 is fixedly connected to the side away from the arched arch protection frame 1 with a first screw 307, the first screw 307 passes through the first sliding groove 305 and is fixedly connected to a first nut 308.
[0075] Specifically, the top frame 301 is movably connected with the first support assembly 10 in the vertical direction. The first support assembly 10 is located between the two first frames 302. The first support assembly 10 is used to selectively abut against the lower surface of the top of the arched arch frame 1. By providing the first support assembly 10, the arched arch frame 1 in the middle can be supported, avoiding the situation that the arched arch frame 1 in the middle part is not tightly fitted with the tunnel due to the support at both ends, so as to facilitate the connection between the arched arch frame 1 and the tunnel in the subsequent construction process.
[0076] Optionally, in conjunction with reference Figure 8 The first support assembly 10 includes a second screw 1001, a first threaded sleeve 1002, a first support seat 1003 and a first support block 1004. The second screw 1001 is rotatably connected to the top frame 301; the first threaded sleeve 1002 is located above the top frame 301 and is threadedly connected to the second screw 1001; the first support seat 1003 is hinged to one end of the first threaded sleeve 1002 away from the top frame 301, and a first arc-shaped end face is provided on the side of the first support seat 1003 away from the top frame 301; two first support blocks 1004 are rotatably connected to the first arc-shaped end face, the first arc-shaped end face is convex to the top of the arched arch frame 1, and the first support block 1004 is protruding from the first arc-shaped end face and is provided with a friction surface, which is used to selectively abut against the lower surface of the top of the arched arch frame 1, and the rotation axis of the first support block 1004 and the first arc-shaped end face is arranged along the length direction of the tunnel. One end of the second screw rod 1001 away from the first support seat 1003 is coaxially fixedly connected with a hand wheel.
[0077] In a specific embodiment of the present invention, two first support blocks 1004 are rotatably connected to each first support seat 1003. The first support block 1004 is semicircular, and its cross-sectional edge is formed by a major arc and a straight line connected end to end. A friction surface is arranged on the planar end face of the first support block 1004.
[0078] Refer again Figure 2-7 Two sliding frames 310 are respectively arranged on both sides of the middle frame 309 along the width of the tunnel, and the four sliding frames 310 are distributed in a rectangular array.
[0079] The second clamp includes a second frame 311, a second clamping plate 312, a second fastener 313, a second clamping block 315, a third screw 316 and a second nut 317. The second frame 311 is located on the side of the sliding frame 310 away from the middle frame 309, and the second frame 311 is fixedly connected with the sliding frame 310 in a one-to-one correspondence; the second clamping plate 312 is slidably connected with the second frame 311 in a one-to-one correspondence along the length direction of the tunnel, and a second fastener 313 is connected between the second clamping plate 312 and the second frame 311. The second fastener 313 is a bolt and nut structure. The side of the second clamping plate 312 away from the second frame 311 is arranged opposite to the side of the arched arch, and the side of the second clamping plate 312 away from the second frame 311 is arranged A plurality of second sliding grooves 314 are provided; a plurality of second clamping blocks 315 are arranged in one-to-one correspondence with the plurality of second sliding grooves 314, the second clamping block 315 is located between the two flanges of the I-beam, the second clamping block 315 can slide along the I-beam, and the second clamping block 315 is fixedly connected to a third screw 316 on the side away from the arch guard frame 1, the third screw 316 passes through the second sliding groove 314 and is fixedly connected to a second nut 317; the plurality of second clamping blocks 315 located on the same side of the intermediate frame 309 respectively clamp the two sides of the arch guard frame 1 along the length direction of the tunnel.
[0080] Specifically, the sliding frame 310 is movably connected with the second support assembly 11 along the tunnel direction. The second support assembly 11 is provided in two groups, one of which is located between the two second frames 311 on the same side of the middle frame 309, and the other is located between the two second frames 311 on the other side of the middle frame 309. The number of second support assemblies 11 in each group is at least one, and the second support assembly 11 is used to selectively abut against the inner surface of the side of the arched arch guard frame 1. By providing the second support assembly 11, it is possible to support both sides of the middle arched arch guard frame 1, avoiding the situation that the middle part of the arched arch guard frame 1 is not tightly fitted with the tunnel due to only providing support at both ends, so as to facilitate the connection between the arched arch guard frame 1 and the tunnel during the subsequent construction process.
[0081] Optionally, in conjunction with reference Fig. 9The second support assembly 11 includes a fourth screw 1101, a second threaded sleeve 1102, a second support seat 1103 and a second support block 1104. The fourth screw 1101 is rotatably connected to the sliding frame 310; the second threaded sleeve 1102 is located on the side of the sliding frame 310 away from the intermediate frame 309 and is threadedly connected to the fourth screw 1101; the second support seat 1103 is hinged to one end of the second threaded sleeve 1102 away from the intermediate frame 309, and the side of the second support seat 1103 away from the intermediate frame 309 is provided with a second arc-shaped end face, and the second arc-shaped end face is convex to the arched arch frame 1; two second support blocks 1104 are rotatably connected to the second arc-shaped end face, and the second support blocks 1104 protrude from the second arc-shaped end face and are rotatably connected to a plurality of rollers 1105, and the rollers 1105 are used to selectively slide against the inner surface of one side of the arched arch frame 1, and the rotation axis of the second support block 1104 and the second arc-shaped end face is arranged along the tunnel length direction. One end of the fourth screw rod 1101 away from the second support block 1104 is coaxially fixedly connected with a hand wheel.
[0082] In a specific embodiment of the present invention, two second support blocks 1104 are rotatably connected to each second support block 1104, the second support block 1104 is semicircular, and its cross-sectional edge is formed by a major arc and a straight line connected end to end, and a plurality of rollers 1105 are rotatably connected to the planar end face of the second support block 1104.
[0083] When the arched arch guard frame 1 is positioned and installed between the present invention and the tunnel, first, its top is positioned and installed, and then the two sides of the arched arch guard frame 1 are positioned. The roller 1105 and the arched arch guard frame 1 can be slidably connected, and the second clamping block 315 can slide along the I-beam, which can facilitate the arched arch guard frame 1 to better fit the inner wall of the tunnel.
[0084] Refer again Figure 2-7, the present invention further includes a clamping plate 401, a fifth screw 402, a sixth screw 404, and a third clamping block 403. A clamping plate 401 is provided at each of the two ends of the bottom frame 318 in the tunnel width direction. The cross-section of the clamping plate 401 in the horizontal direction is in a "C" shape. The opening of the clamping plate 401 faces the adjacent root arch support 2, and it includes two end plates and an intermediate plate integrally formed. The end plates are perpendicular to the intermediate plate, and the two end plates are integrally formed with the two ends of the intermediate plate respectively. The two end plates are respectively located on both sides of the lower frame in the tunnel length direction, and a plurality of sixth screws 404 are threadedly connected to each end plate. A third clamping block 403 is rotatably connected to the end away from the end plate of the sixth screw 404. A plurality of third clamping blocks 403 in the tunnel length direction are used to clamp the two ends of the root arch support 2 in the tunnel length direction. The fifth screw 402 is arranged in the tunnel width direction, and its middle part is threadedly connected to the lower frame. The end away from the tunnel center line is rotatably connected to the clamping plate 401, and a handwheel is coaxially and fixedly connected to the end close to the tunnel center line.
[0085] Preferably, a first slider 12 is fixedly provided on the lower surface of the upper bracket 3. The first slider 12 is arranged in the tunnel length direction. A plurality of sliding protrusions 13 are provided on the lower surface of the first slider 12. The plurality of sliding protrusions 13 are spaced apart in the tunnel length direction. A third slider 14 is fixedly connected to the side wall of the first slider 12. The third slider 14 is a T-shaped block; a second slider 15 is fixedly provided on the upper surface of the lower bracket 4. A plurality of sliding grooves 16 are provided on the upper surface of the second slider 15. The plurality of sliding grooves 16 are spaced apart in the tunnel length direction. The sliding grooves 16 are adapted to the sliding protrusions 13. A fourth slider 17 is fixedly connected to the side wall of the second slider 15. The fourth slider 17 is also a T-shaped block. The lower surface of the first slider 12 is slidably connected to the upper surface of the second slider 15, and the sliding protrusions 13 are selectively embedded in the sliding grooves 16. In addition, the present invention is also provided with a driving plate 18 and a driving member 21. The driving plate 18 is located on one side of the upper bracket 3 and the lower bracket 4, and the driving plate 18 is slidably connected to the upper bracket 3 and the lower bracket 4 respectively. Vertical sliding grooves 19 and horizontal sliding grooves 20 are arranged on the driving plate 18. The horizontal sliding grooves 20 are arranged in the tunnel length direction. The third slider 14 and the fourth slider 17 are respectively slidably connected to the vertical sliding grooves 19 and the horizontal sliding grooves 20 in a one-to-one correspondence; the driving member 21 is preferably a hydraulic telescopic rod, and the hydraulic telescopic rod drives the driving plate 18 to move in the tunnel length direction through telescoping.
[0086] Specifically, the sliding protrusions 13 and the sliding grooves 16 are isosceles trapezoids.
[0087] Refer to Figure 5 and Figure 7, a stop plate is fixedly connected to the side wall of the second slider 15. The hydraulic telescopic rod is arranged along the length direction of the tunnel. The fixed end of the hydraulic telescopic rod is fixedly connected to the stop plate, and the movable end of the hydraulic telescopic rod is fixedly connected to the driving plate 18. It should be noted that the present invention is provided with two stop plates and two hydraulic telescopic rods. The two stop plates and the two hydraulic telescopic rods are arranged in one-to-one correspondence and symmetrically arranged along the center line of the tunnel. During use, the two hydraulic telescopic rods expand and contract synchronously.
[0088] Specifically refer to Figure 5 , the hydraulic telescopic rod is in a contracted state. At this time, the sliding protrusion 13 and the sliding groove 16 are staggered, and the arched arch support 1 and the root arch support 2 are butted. When it is necessary to stagger the arched arch support 1 and the root arch support 2, the two hydraulic telescopic rods extend synchronously. At this time, the fourth slider 17 slides along the transverse sliding groove 20, and uses the vertical sliding groove 19 to push the third slider 14 to drive the first slider 12 and the upper bracket 3 to move relative to the second slider 15 and the lower bracket 4. Gradually, the arched arch support 1 and the root arch support 2 are staggered. Subsequently, the upper bracket 3 moves obliquely downward relative to the lower bracket 4, and the third slider 14 moves downward along the vertical sliding groove until it reaches Figure 6-7 state, the hydraulic telescopic rod pauses. At this time, the arched arch support 1 and the root arch support 2 are staggered, and there is a gap between the arched arch support 1 and the tunnel. On the contrary, by contracting the two hydraulic telescopic rods again, the effect of the relative arrangement of the arched arch support 1 and the root arch support 2 can be achieved.
[0089] In the present invention, two sets of slide rails 7 are provided. The two sets of slide rails 7 are symmetrically arranged along the center line of the tunnel. The cross-section of the slide rail 7 is a "U" - shaped structure and the opening is upward. A plurality of first positioning holes 8 are arranged at intervals along the length direction on the side wall of the slide rail 7. A positioning rod 9 is detachably connected in the first positioning hole 8; two sets of sliding wheels are arranged at the lower end of the lower bracket 4. The two sets of sliding wheels are slidably connected to the two sets of slide rails 7 in one-to-one correspondence. A second positioning hole 5 is arranged at the lower end of the lower bracket 4. The second positioning hole 5 is detachably connected to the positioning rod 9.
[0090] The working principle of the present invention:
[0091] In the first step, the hydraulic telescopic rod is kept in a retracted state, and the arched arch frame 1 and the root arched arch frame 2 are assembled in advance; the first clamping block 306 and the second clamping block 315 are used to clamp the front and rear ends of the arched arch frame 1 along the length direction of the tunnel respectively, and then the first screw 307 is passed through the first sliding groove 305 and the first nut 308 to cooperate so that the first clamping block 306 is fixed to the first clamping plate 303, and the position of the first clamping plate 303 on the first frame 302 is adjusted by the first fastener 304 to achieve the clamping effect on the top of the arched arch frame 1, ensuring that the first support block 1004 can be arranged relative to the middle of the arched arch frame 1. Similarly, , the third screw 316 is passed through the second sliding groove 314 and matched with the second nut 317, so that the second clamping block 315 is fixed to the second clamping plate 312, and the second clamping block 315 is positioned on the second clamping plate 312 by the second fastener 313, so as to achieve the clamping effect on both sides of the arched arch frame 1, and ensure that the second support block 1104 can be arranged relative to the middle of the arched arch frame 1; by rotating the fifth screw 402, the third clamping block 403 is opposite to the two ends of the root arch frame 2 along the tunnel length direction, and by screwing the sixth screw 404, the third clamping block 403 is clamped on the root arch frame 2, so as to achieve the clamping of the root arch frame 2. At the same time, it is ensured that the arched arch frame 1 and the root arch frame 2 are arranged relative to each other at this time.
[0092] The second step is to install two sets of slide rails 7 in the tunnel where the arched arch guard frame 1 and the root arch guard frame 2 are to be installed. The two sets of slide rails 7 are symmetrically arranged along the center line of the tunnel to ensure that the pulley 6 moves on the slide rails 7. During the project, the arched arch guard frame 1 and the root arch guard frame 2 are symmetrically arranged along the center line of the tunnel, and the positioning rod 9 is removed from the first positioning hole 8 to ensure that the pulley 6 can slide freely in the slide rail 7.
[0093] In the third step, the two hydraulic telescopic rods are synchronously and gradually extended, driving the upper bracket 3 and the lower bracket 4 to slide relative to each other, so that the arched arch frame 1 and the root arched arch frame 2 are staggered by a certain distance, and gradually, the sliding protrusion 13 is gradually embedded in the sliding groove 16, so that the upper bracket 3 drives the arched arch frame 1 to descend. At this time, the gap between the arched arch frame 1 and the top of the tunnel is matched, and the hydraulic telescopic rod stops moving; by rotating the bidirectional screw, the two sliding frames 310 on both sides of the middle frame 309 move toward each other, so that the gap between the arched arch frame 1 and the inner wall of the tunnel is increased.
[0094] In the fourth step, by rotating the fifth screw rod 402, the clamping plate 401 drives the root arch guard frame 2 to move closer to the lower support 4, so that the gap between the root arch guard frame 2 and the inner wall of the tunnel is increased.
[0095] The fifth step is to synchronously move the upper bracket 3 and the lower bracket 4 inside the tunnel to the position where the arch guard frame 1 and the root guard arch frame 2 are to be installed, and use the two hydraulic telescopic rods to retract again so that the arch guard frame 1 and the root guard arch frame 2 are relatively arranged, and then fine-tune the position of the upper bracket 3 and the lower bracket 4 by the pulley 6 again. After the position of the arch guard frame 1 coincides with the preset position, the pulley 6 is braked on the slide rail 7 by simultaneously passing the positioning rod 9 through the first positioning hole 8 and the second positioning hole 5.
[0096] In the fifth step, the arched arch guard frame 1 and the root arch guard frame 2 are connected by flange mounting bolts; by rotating the bidirectional screw, the two sliding frames 310 on both sides of the middle frame 309 move away from each other, and the two sides of the arched arch guard frame 1 fit against the inner wall of the tunnel; synchronously, by rotating the fifth screw 402, the root arch guard frame 2 fits against the inner wall of the tunnel.
[0097] Step 6: By rotating the second screw 1001, the friction surface of the first support block 1004 abuts against the lower surface of the top of the middle part of the arched arch frame 1, and the top of the arched arch frame 1 is fitted with the inner wall of the tunnel. Loosen the second nut 317, so that the second clamping block 315 can clamp the arched arch frame 1, and the third screw 316 can slide relatively along the second sliding groove 314; loosen the sixth screw 404, so that the second support block 1104 can slide relatively along the root arch frame 2; by rotating the fourth screw 1101, the roller 1105 abuts against the inner side of the arched arch frame 1, so that the outer side of the arched arch frame 1 is fitted with the inner wall of the tunnel.
[0098] Step 7: Tie the steel bars to form a binding frame between the arch guard frame 1 and the root guard frame 2, and then perform the spraying operation.
[0099] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicate orientations or positional relationships based on the orientations or positional relationships described in the accompanying drawings, and are only for the convenience of describing the present invention, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0100] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A tunnel construction protection structure, characterized in that: include: An upper bracket (3) and a lower bracket (4) are respectively used to selectively clamp the arched arch protection frame (1) and the root arch protection frame (2) along the inner side, wherein the upper bracket (3) is slidably connected to the upper part of the lower bracket (4) and can selectively drive the arched arch protection frame (1) and the root arch protection frame (2) to stagger or dock with each other; The lower end of the lower bracket (4) is rotatably connected to a pulley (6); and A slide rail (7) is arranged along the length direction of the tunnel, and the slide rail (7) is fixedly and slidably connected to the pulley (6).
2. The tunnel construction protection structure according to claim 1, characterized in that: The upper bracket (3) comprises: A top frame (301), wherein a first clamp is mounted on the top frame (301), and the first clamp is used to selectively clamp the top of the arch-shaped arch protection frame (1); A bottom frame (318) located below the top frame (301), wherein the bottom frame (318) is slidably connected to the lower bracket (4); an intermediate frame (309) fixedly connected between the top frame (301) and the bottom frame (318), and a sliding frame (310) slidably connected between the top frame (301) and the bottom frame (318) along the tunnel width direction, the sliding frames (310) being arranged on both sides of the intermediate frame (309) along the tunnel width direction, and a second clamp being installed on a side of the sliding frame (310) away from the intermediate frame (309), the second clamp being used for selectively clamping both sides of the arched arch guard frame (1); and An adjusting member (319) is used to adjust the distance between the middle frame (309) and the sliding frame (310).
3. The tunnel construction protection structure according to claim 2, characterized in that: The first fixture comprises: Two first frames (302) fixedly connected to the top frame (301) on both sides along the tunnel length direction in a one-to-one correspondence; a first clamping plate (303) slidably connected to the first frame (302) in a one-to-one correspondence along the length direction of the tunnel, a first fastener (304) being connected between the first clamping plate (303) and the first frame (302), a side of the first clamping plate (303) away from the first frame (302) being arranged opposite to the top of the arched arch protection frame (1), and being provided with a plurality of first sliding grooves (305); and A plurality of first clamping blocks (306) are respectively connected to the top of the arched arch protection frame (1) in a sliding manner, and the plurality of first clamping blocks (306) are arranged in a one-to-one correspondence with the plurality of first sliding grooves (305). The first clamping block (306) is fixedly connected to a first screw rod (307) on a side away from the arched arch protection frame (1), and the first screw rod (307) passes through the first sliding groove (305) and is fixedly connected to a first nut (308).
4. The tunnel construction protection structure according to claim 3, characterized in that: The top frame (301) is movably connected to a first support assembly (10) in a vertical direction, the first support assembly (10) is located between the two first frames (302), and the first support assembly (10) is used to selectively abut against the lower surface of the top end of the arched arch guard frame (1); Preferably, the first supporting assembly (10) comprises: a second screw rod (1001) rotatably connected to the top frame (301); A first threaded sleeve (1002) located above the top frame (301) and threadedly connected to the second screw rod (1001); a first support seat (1003) hingedly connected to one end of the first threaded sleeve (1002) away from the top frame (301), wherein a first arc-shaped end surface is provided on a side of the first support seat (1003) away from the top frame (301), and a convex surface of the first arc-shaped end surface faces the top of the arched arch protection frame (1); and Two first support blocks (1004) are rotatably connected to the first arc-shaped end surface, and the two first support blocks (1004) are arranged at intervals along the extension direction of the arched arch protection frame (1). The first support block (1004) protrudes from the first arc-shaped end surface and is provided with a friction surface, and the friction surface is used to selectively abut against the lower surface of the top end of the arched arch protection frame (1). The rotation axis of the first support block (1004) and the first arc-shaped end surface is arranged along the length direction of the tunnel.
5. The tunnel construction protection structure according to claim 2, characterized in that: Two sliding frames (310) are respectively arranged on both sides of the middle frame (309) along the width of the tunnel; The second fixture comprises: A second frame (311) fixedly connected to the sliding frame (310) in a one-to-one correspondence; a second clamping plate (312) slidably connected to the second frame (311) in a one-to-one correspondence along the length direction of the tunnel, a second fastener (313) being connected between the second clamping plate (312) and the second frame (311), a side of the second clamping plate (312) away from the second frame (311) being arranged opposite to the arched arch protection frame (1) and being provided with a plurality of second sliding grooves (314); and A plurality of second clamping blocks (315) are respectively slidably connected to one side of the arched arch protection frame (1), the plurality of second clamping blocks (315) are arranged in one-to-one correspondence with the plurality of second sliding grooves (314), a third screw rod (316) is fixedly connected to the side of the second clamping block (315) away from the arched arch protection frame (1), the third screw rod (316) passes through the second sliding groove (314) and is fixedly connected to a second nut (317); A plurality of second clamping blocks (315) located on the same side of the intermediate frame (309) clamp the two sides of the arched arch protection frame (1) respectively along the tunnel length direction.
6. The tunnel construction protection structure according to claim 5, characterized in that: The sliding frame (310) is movably connected with two groups of second support assemblies (11) along the tunnel width direction, wherein one group of the second support assemblies (11) is located between two second frames (311) on the same side of the middle frame (309), and the other group of the second support assemblies (11) is located between two second frames (311) on the other side of the middle frame (309), and the second support assemblies (11) are used to selectively abut against the inner surface of the side edge of the arched arch guard frame (1); Preferably, the second supporting assembly (11) comprises: a fourth screw rod (1101) rotatably connected to the sliding frame (310); A second threaded sleeve (1102) located on the side of the sliding frame (310) away from the intermediate frame (309) and threadedly connected to the fourth screw (1101); A second support seat (1103) hinged to one end of the second threaded sleeve (1102) away from the intermediate frame (309). A second arc-shaped end face is provided on the side of the second support seat (1103) away from the intermediate frame (309), and the convex surface of the second arc-shaped end face faces the side wall of the arch-shaped arch support (1); and Two second support blocks (1104) rotatably connected to the second arc-shaped end face. The two second support blocks (1104) are spaced apart along the extending direction of the arch-shaped arch support (1). A roller (1105) is rotatably connected to the second support block (1104) protruding from the second arc-shaped end face. The roller (1105) is used to selectively slide and abut against the inner surface of one side of the arch-shaped arch support (1). The rotation axis of the second support block (1104) and the second arc-shaped end face is arranged along the tunnel length direction.
7. The tunnel construction protection structure according to claim 1, characterized in that: Further comprising: A clamping plate (401) is provided at each of the two ends of the lower bracket (4) in the tunnel width direction. The cross-section of the clamping plate (401) in the horizontal direction is "匚"-shaped. The opening of the clamping plate (401) faces the root arch support (2), and it includes two end plates and an intermediate plate integrally formed. The two end plates are integrally formed with the two ends of the intermediate plate respectively, and the two end plates are respectively located on both sides of the lower bracket (4) in the tunnel length direction; A plurality of sixth screws (404) are threadedly connected to each end plate. A third clamping block (403) is rotatably connected to the end of the sixth screw (404) away from the end plate. The plurality of third clamping blocks (403) in the tunnel length direction are used to clamp the two ends of the root arch support (2) in the tunnel length direction; And A fifth screw (402) with the middle part threadedly connected to the lower bracket (4) and one end rotatably connected to the clamping plate (401). The fifth screw (402) is arranged along the tunnel width direction.
8. The tunnel construction protection structure according to claim 2, characterized in that: Further comprising: A first slider (12) is fixedly provided on the lower surface of the bottom frame (318). A plurality of spaced sliding protrusions (13) are provided on the lower surface of the first slider (12). The side wall of the first slider (12) is fixedly connected to a third slider (14); A second slider (15) is fixedly provided on the upper surface of the lower bracket (4). A plurality of spaced sliding grooves (16) are provided on the upper surface of the second slider (15). The sliding grooves (16) are adapted to the sliding protrusions (13). The side wall of the second slider (15) is fixedly connected to a fourth slider (17); A driving plate (18) that is slidably connected to both the upper bracket (3) and the lower bracket (4). A vertical chute (19) and a horizontal chute (20) are arranged on the driving plate (18). The horizontal chute (20) is arranged along the tunnel length direction. The third slider (14) and the fourth slider (17) are respectively slidably connected to the vertical chute (19) and the horizontal chute (20) in a one-to-one correspondence; and A driving member (21) for driving the driving plate (18) to move along the tunnel length direction.
9. The tunnel construction protection structure according to claim 8, characterized in that: The sliding protrusion (13) and the sliding groove (16) are isosceles trapezoids.
10. The tunnel construction protection structure according to claim 1, characterized in that: There are two groups of the slide rails (7). The two groups of slide rails (7) are symmetrically arranged along the tunnel center line. The cross section of the slide rail (7) is a "U" - shaped structure with the opening facing upward. A plurality of first positioning holes (8) spaced at intervals along its length direction are arranged on the side wall of the slide rail (7). A positioning rod (9) is detachably connected in the first positioning hole (8); Two groups of sliding wheels are arranged at the lower end of the lower bracket (4). The two groups of sliding wheels are respectively slidably connected to the two groups of slide rails (7). A second positioning hole (5) is arranged at the lower end of the lower bracket (4). The second positioning hole (5) is detachably connected to the positioning rod (9).
Citation Information
Cited By
Device for accurately and rapidly installing steel frame in limited space
CN120270761A
A device for accurately and quickly installing steel frames in confined spaces
CN120270761B
Steel arch welding auxiliary device for unfavorable geological tunnel
CN121156641A