Water conservancy project information management method and system based on BIM
By constructing 3D models, integrating multi-source data, deploying sensor networks and cloud collaboration platforms based on BIM-based water conservancy engineering information management methods, the accuracy and lack of collaboration of traditional information management methods are solved, and efficient management of water conservancy project projects is achieved. and run.
Patent Information
- Application Number
- CN202411004591.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-18
AI Technical Summary
Traditional water conservancy project information management methods rely on two-dimensional design drawings and manual records, resulting in insufficient information accuracy, real-timeness and collaboration. It cannot achieve efficient integration and sharing of data, and it is difficult to monitor the operating status of engineering facilities in real time and make effective predictions and Early warning analysis leads to construction errors, frequent rework, high maintenance costs, and low efficiency.
Adopt BIM-based water conservancy engineering information management methods, build 3D models through Revit and Civil 3D, combine with Dynamo scripts for calibration and verification, integrate multi-source data and achieve dynamic updates, use BIM 360 platform and MySQL database for data management, apply Python and TensorFlow performs data processing and analysis, deploys sensor networks and IoT Hub for real-time monitoring, and establishes a cloud collaboration platform to achieve data sharing and efficient communication.
It has significantly improved design accuracy, data integration and sharing efficiency, real-time monitoring and early warning capabilities, improved the intelligent level of maintenance management, and ensured efficient, safe and economical operation of the project.
Smart Images

Figure CN118797783A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of water conservancy project information management, and in particular to a water conservancy project information management method and system based on BIM. Background Art
[0002] In current water conservancy projects, traditional information management methods mainly rely on two-dimensional design drawings and manually recorded data, which has significant deficiencies in information accuracy, real-time and collaboration. Although existing technologies have introduced some information management tools, these tools are often isolated and cannot achieve efficient data integration and sharing, resulting in inconsistent information and poor communication in various links. In addition, when facing complex water conservancy projects, traditional management methods lack the ability to integrate and process multi-source data, making it difficult to monitor the operating status of engineering facilities in real time and conduct effective prediction and early warning analysis.
[0003] The main problems in the existing technology include the following aspects: First, the limitations of two-dimensional design drawings make it difficult to fully present design information, which easily leads to errors and rework during the construction process; second, multi-source data is difficult to integrate and share, and the phenomenon of information islands between departments is serious, affecting the efficiency of collaboration; third, the lack of real-time monitoring and intelligent analysis methods makes it impossible to timely discover and deal with abnormal situations in facility operation; finally, traditional maintenance management methods mainly rely on manual experience, which makes it difficult to achieve preventive maintenance, resulting in high maintenance costs and low efficiency.
[0004] The consequences of these problems are obvious. First, due to incomplete and erroneous design information, rework and modification are frequent during the construction process, resulting in construction delays and increased costs. Secondly, inconsistent information and poor communication between departments affect the overall coordination and progress control of the project. The lack of real-time monitoring and intelligent analysis means that the operational safety of engineering facilities cannot be effectively guaranteed, increasing the risk of accidents. In addition, the inefficiency and high cost of maintenance management not only increase operating expenses, but may also lead to premature aging and shortened life of facilities.
[0005] Therefore, a new method and system are needed to solve these problems and realize the efficient management and operation of water conservancy projects. By integrating BIM technology, multi-source data processing, information management, intelligent analysis and collaborative work, the design accuracy, data integration and sharing efficiency, real-time monitoring and early warning capabilities, and the intelligent level of maintenance management can be significantly improved, thereby effectively solving the main problems in the existing technology and ensuring the efficient, safe and economical operation of the project. Summary of the invention
[0006] In order to overcome the shortcomings of the prior art, the present invention proposes a BIM-based water conservancy project information management method and system. Based on BIM 360Docs and Microsoft Teams, a cloud-based collaborative work platform is established to achieve data sharing and real-time communication. Instant messaging, video conferencing and task management functions are provided to promote efficient collaboration among project participants such as designers, construction parties, and operators, ensure the consistency of information among all parties, and improve project management efficiency; the BIM-based water conservancy project information management system integrates advanced BIM technology, data analysis and intelligent management methods to achieve full life cycle management of water conservancy projects, significantly improve the efficiency and accuracy of project management, and provide strong support for the successful implementation of the project.
[0007] To achieve the above object, the present invention provides a water conservancy project information management method based on BIM, comprising the following steps:
[0008] Step 1: Build and calibrate a 3D BIM model using Revit and Civil 3D;
[0009] Step 2: Import multi-source data through Revit API and IFC and implement dynamic updates;
[0010] Step 3: Develop a BIM 360-based management system to store data and perform system integration;
[0011] Step 4: Use Python and TensorFlow to process and analyze data and generate reports;
[0012] Step 5: Use Navisworks and Power BI to visualize information and develop an interactive front end;
[0013] Step 6: Deploy sensor networks and IoT Hubs for real-time monitoring and intelligent maintenance;
[0014] Step 7: Establish a cloud-based collaborative platform to achieve data sharing and efficient communication.
[0015] Furthermore, the method of constructing the BIM model in step 1 is:
[0016] Step 1.1: Collect project design drawings and geographic information data, and use Autodesk Revit and Civil 3D for 3D modeling;
[0017] Step 1.2: Calibrate and verify the model through Dynamo script to ensure that it is consistent with the actual project situation;
[0018] Step 1.3: Integrate models from different disciplines to form a comprehensive BIM model.
[0019] Furthermore, the method for integrating multi-source data in step 2 is:
[0020] Step 2.1: Establish a data interface through Revit API and IFC standard to convert hydrological, meteorological and construction progress data into a unified format;
[0021] Step 2.2: Use ETL tools (such as Talend) to import and synchronize data;
[0022] Step 2.3: Dynamically update and integrate multi-source data to ensure data consistency and real-time performance.
[0023] Furthermore, the method for establishing the information management system in step 3 is:
[0024] Step 3.1: Select the Autodesk BIM 360 platform as the basis and use the MySQL database to store and manage data;
[0025] Step 3.2: Develop a Web application based on the Django framework to implement data query, management, and permission control functions;
[0026] Step 3.3: Perform system integration and stress testing to ensure system stability and performance.
[0027] Furthermore, the method of data processing and analysis in step 4 is:
[0028] Step 4.1: Use Python to clean and preprocess data, including outlier detection and data format conversion;
[0029] Step 4.2: Use TensorFlow to train machine learning models and build hydrological prediction and engineering monitoring models;
[0030] Step 4.3: Generate analysis reports and visualization charts to assist engineering decision making.
[0031] Furthermore, the information visualization and interaction method in step 5 is:
[0032] Step 5.1: Use Navisworks to visualize the 3D model;
[0033] Step 5.2: Use Power BI to visualize data analysis results;
[0034] Step 5.3: Develop a React-based web front-end to implement interactive functions of 3D models and support multi-terminal access.
[0035] Furthermore, the method of intelligent management and maintenance in step 6 is:
[0036] Step 6.1: Deploy LoRa or NB-IoT sensor networks to monitor the status of engineering facilities in real time;
[0037] Step 6.2: Collect sensor data through Azure IoT Hub;
[0038] Step 6.3: Use Kubernetes to deploy artificial intelligence models for data analysis and fault prediction.
[0039] Furthermore, the methods of collaborative work and communication in step 7 are:
[0040] Step 7.1: Establish a cloud-based document management system based on BIM 360Docs to achieve data sharing and version control;
[0041] Step 7.2: Use Microsoft Teams to implement instant messaging, video conferencing, and task management functions to promote efficient collaboration among project participants;
[0042] Step 7.3: Provide real-time data update and notification functions to ensure consistent information among all parties and improve project management efficiency.
[0043] A water conservancy project information management system based on BIM, applicable to the water conservancy project information management method based on BIM, comprising: a BIM model module, a multi-source data integration module, an information management module, a data processing and analysis module, an information visualization and interaction module, an intelligent management and maintenance module, and a collaborative work and communication module;
[0044] The BIM model module is used to build and manage the three-dimensional model of water conservancy projects;
[0045] The multi-source data integration module is used to integrate and synchronize multi-source data;
[0046] The information management module is used to store and manage engineering data at all stages;
[0047] The data processing and analysis module is used to process and analyze the integrated data;
[0048] The information visualization and interaction module is used to display and interact with engineering information;
[0049] Intelligent management and maintenance module is used to monitor and maintain engineering facilities;
[0050] The collaborative work and communication module is used to achieve collaboration and communication among project participants.
[0051] Furthermore, the BIM model module includes:
[0052] Model building unit: used to build 3D models of water conservancy projects using Autodesk Revit and Civil 3D.
[0053] Model calibration unit: Use Dynamo scripts to calibrate and verify models.
[0054] Model integration unit: Integrate models of different disciplines such as structure, water supply and drainage, and electricity to form a comprehensive BIM model.
[0055] The multi-source data integration module includes:
[0056] Data interface unit: Establish data interface through Revit API and IFC standards.
[0057] Data Transformation Unit: Use ETL tools such as Talend for data transformation and integration.
[0058] Data synchronization unit: realizes real-time update and synchronization of multi-source data.
[0059] The information management module includes:
[0060] Data storage unit: Stores engineering data based on MySQL database.
[0061] Data Management Unit: Develop Web applications based on the Django framework to implement data query, management and permission control.
[0062] System testing unit: performs system integration and stress testing to ensure stable system operation.
[0063] The data processing and analysis module includes:
[0064] Data cleaning unit: Use Python for data cleaning and preprocessing.
[0065] Model training unit: Apply TensorFlow to train machine learning models and build hydrological prediction and engineering monitoring models.
[0066] Analysis report unit: Generates analysis reports and visual charts to assist engineering decision-making.
[0067] The information visualization and interaction module includes:
[0068] 3D display unit: Use Autodesk Navisworks to visualize the 3D model.
[0069] Data Visualization Unit: Use Power BI to visualize data analysis results.
[0070] Interactive front-end unit: Develop a React-based web front-end to realize the interactive functions of 3D models.
[0071] The intelligent management and maintenance module includes:
[0072] Sensor network unit: Deploy LoRa or NB-IoT sensor networks to monitor the status of engineering facilities in real time.
[0073] Data collection unit: collects sensor data through Azure IoT Hub.
[0074] Fault prediction unit: Use Kubernetes to deploy artificial intelligence models for data analysis and fault prediction.
[0075] The collaborative work and communication module includes:
[0076] Cloud Collaboration Unit: Establish a cloud document management system based on BIM 360Docs to achieve data sharing and version control.
[0077] Real-time communication unit: Instant messaging, video conferencing and task management functions are implemented through Microsoft Teams to promote efficient collaboration among project participants.
[0078] Data update unit: provides real-time data update and notification functions to ensure that all parties have consistent information.
[0079] Compared with the prior art, the present invention has the following beneficial effects:
[0080] 1. The present invention provides a BIM-based water conservancy project information management method and system. By using Autodesk Revit and Civil 3D to build a three-dimensional model, combined with Dynamo scripts for calibration and verification, the geometric size and position of the model are ensured to be accurate. Models of different disciplines are integrated together to form a comprehensive BIM model, which helps to discover and resolve design conflicts and improve the accuracy and completeness of the design; through the Revit API and IFC standards, multi-source data such as hydrology, meteorology and construction progress are integrated, and ETL tools are used to achieve data consistency and real-time updates. In this way, all participants can access the latest project information, ensure the uniformity and accuracy of data, and improve collaboration efficiency.
[0081] 2. The present invention provides a BIM-based water conservancy project information management method and system. Based on the Autodesk BIM 360 platform, combined with the MySQL database and the Django framework, an information management system is developed to realize data query, management and authority control. The integration and stress testing of the system ensure its stability and efficient operation, improve the overall efficiency of project management, and monitor the operating status of water conservancy project facilities in real time by deploying LoRa or NB-IoT sensor networks. Using technologies such as Azure IoT Hub and TensorFlow, data collection, fault prediction and early warning analysis can be carried out, so that potential problems can be discovered in time, preventive measures can be taken in advance, and the safe operation of the project can be ensured.
[0082] 3. The present invention provides a BIM-based water conservancy project information management method and system, using Autodesk Navisworks and Power BI to perform three-dimensional visualization and chart presentation of BIM models and data analysis results. A React-based Web front end is developed to provide 3D model interaction functions, allowing users to intuitively view and operate project information, improving user experience and decision support capabilities.
[0083] 4. The present invention provides a BIM-based water conservancy project information management method and system, which combines machine learning models to automatically generate maintenance plans and guide maintenance personnel to perform preventive maintenance. Through real-time monitoring and intelligent analysis, the maintenance process is optimized, the timeliness and accuracy of facility maintenance are improved, maintenance costs are reduced, and the life of facilities is extended. BRIEF DESCRIPTION OF THE DRAWINGS
[0084] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0085] Figure 1 It is a schematic diagram of the steps of the present invention DETAILED DESCRIPTION
[0086] The technical solution of the present invention will be more clearly and completely explained below through description of preferred embodiments of the present invention in combination with the accompanying drawings.
[0087] Terminology explanation:
[0088] Revit: A BIM software developed by Autodesk for the design and management of building information models.
[0089] Civil 3D: A civil engineering design software developed by Autodesk for the design and construction of civil engineering projects.
[0090] BIM (Building Information Modeling): Building Information Modeling, a process of digitally representing buildings and their functional characteristics.
[0091] API (Application Programming Interface): Application programming interface, a set of protocols and tools that define how different software components communicate with each other.
[0092] IFC (Industry Foundation Classes): Industry foundation classes, a standard format for describing data in the building and construction industries.
[0093] BIM 360: A cloud-based BIM project management platform provided by Autodesk.
[0094] Python: A high-level programming language widely used in fields such as data analysis and artificial intelligence.
[0095] TensorFlow: An open source machine learning framework developed by Google.
[0096] Navisworks: BIM model viewing and analysis software developed by Autodesk.
[0097] Power BI: A business analytics tool developed by Microsoft for data visualization and business intelligence.
[0098] React: A JavaScript library for building user interfaces, developed by Facebook.
[0099] IoT (Internet of Things): The Internet of Things connects physical devices through the Internet to achieve data exchange and communication.
[0100] LoRa (Long Range): A low-power wide area network protocol suitable for long-distance communication.
[0101] NB-IoT (Narrowband Internet of Things): Narrowband Internet of Things, a low-power wide area network technology used in wide area networks.
[0102] Azure IoT Hub: A managed service provided by Microsoft Azure for connecting, monitoring, and managing IoT devices.
[0103] Dynamo: A visual programming tool for Autodesk Revit that automates design and modeling tasks.
[0104] ETL (Extract, Transform, Load): Extraction, transformation, and loading refers to the process of extracting data from the data source, performing necessary transformations, and loading it into the data warehouse.
[0105] Talend: An ETL tool for data integration.
[0106] MySQL: A relational database management system.
[0107] Django: A high-level Python web framework for rapid development of secure and maintainable websites.
[0108] Kubernetes: An open source platform for automating the deployment, scaling, and management of containerized applications.
[0109] Microsoft Teams: A team collaboration platform developed by Microsoft that provides chat, video conferencing, and file sharing capabilities.
[0110] like Figure 1 As shown, the present invention is specifically:
[0111] Step 1: Build and calibrate the 3D BIM model;
[0112] Step 2: Import multi-source data and implement dynamic updates;
[0113] Step 3: Develop a BIM-based management system to store data and perform system integration;
[0114] Step 4: Process and analyze data and generate reports;
[0115] Step 5: Visualize information and develop interactive front end;
[0116] Step 6: Deploy sensor networks and IoT Hubs for real-time monitoring and intelligent maintenance;
[0117] Step 7: Establish a cloud-based collaborative platform to enable data sharing and communication.
[0118] In this embodiment, a water conservancy project information management system based on BIM is provided, including a BIM model module, a multi-source data integration module, an information management module, a data processing and analysis module, an information visualization and interaction module, an intelligent management and maintenance module, and a collaborative work and communication module. The following is a specific implementation of the system:
[0119] BIM model module:
[0120] Step 1.1: Collect project design drawings and geographic information data, and use Autodesk Revit and Civil 3D to perform 3D modeling, covering water conservancy facilities such as dams, channels, pumping stations, and surrounding geographical environment. Design drawings include detailed building structure drawings, equipment layout drawings, and geographical environment drawings to ensure the comprehensiveness and accuracy of the model. Geographic information data can be obtained through the GIS system, including topographic maps, geological maps, and hydrological maps.
[0121] Step 1.2: Use Dynamo scripts to calibrate and verify the model to ensure that it is consistent with the actual project situation. During the calibration process, by comparing the on-site measurement data with the BIM model, the geometric size and position of the model are adjusted to ensure that its accuracy meets the engineering requirements. Verification includes simulation and analysis of structural strength, fluid flow, and environmental impact.
[0122] Step 1.3: Integrate models of different disciplines such as structure, water supply and drainage, and electricity. Models of different disciplines refer to specific design models of various professional fields in water conservancy projects, including but not limited to the following:
[0123] Structural model: Structural framework, support system, etc. designed by structural engineers.
[0124] Water supply and drainage model: covers water supply network, drainage system, sewage treatment facilities, etc.
[0125] Electrical model: including electrical wiring, lighting system, power distribution equipment, etc.
[0126] HVAC model: involves heating, ventilation and air conditioning systems (HVAC).
[0127] Geological and civil engineering models: ground treatment, earthworks and other civil engineering related content.
[0128] Mechanical equipment model: installation location and connection method of mechanical equipment such as water pumps and gates.
[0129] Road and site model: including road layout, site layout, greening, etc.
[0130] These different professional models are integrated together to form a comprehensive BIM model so that they can be coordinated and managed on the same platform. To form a comprehensive BIM model. Each professional model is established and maintained by the corresponding professional engineers. During the integration process, the merging function and conflict detection tools of the BIM software are used to resolve conflicts and inconsistencies between different professional models to ensure the coordination and unification of the comprehensive model.
[0131] Multi-source data integration module:
[0132] Step 2.1: Establish a data interface through Revit API and IFC standards to import hydrological data (such as flow, rainfall), meteorological data (such as temperature, humidity) and construction progress data into the BIM model. The API interface ensures real-time transmission and update of data, and the IFC standard ensures the consistency and compatibility of data formats.
[0133] Step 2.2: Use ETL (Extract, Transform, Load) tools (such as Talend) to transform and integrate data to achieve data consistency and real-time update. ETL tools automatically extract raw data, perform necessary cleaning, transformation and integration, and import the processed data into the BIM model to ensure data integrity and accuracy.
[0134] Step 2.3: Establish data interfaces to ensure seamless integration and dynamic update of multi-source data in BIM models. The design of data interfaces should take into account the type, format, and transmission speed of data, and use standardized protocols (such as RESTful API) to achieve cross-platform data transmission and integration.
[0135] Information management module:
[0136] Step 3.1: Choose Autodesk BIM 360 platform as the basis and use MySQL database to store and manage engineering data at all stages. BIM 360 platform provides cloud storage, data management and collaboration tools, and MySQL database provides reliable storage and query functions to support efficient processing of large-scale data.
[0137] Step 3.2: Develop a Web application based on the Django framework to implement data query, management, and permission control functions. The Django framework provides the advantages of rapid development and efficient management. Through the Web application interface, users can easily access and manage project data, set access rights for different roles, and ensure data security and privacy.
[0138] Step 3.3: Perform system integration and stress testing to ensure system stability and efficient operation. Perform stress testing by simulating the actual usage environment to detect the performance and stability of the system under high load, discover and solve potential problems in a timely manner, and optimize system architecture and performance.
[0139] Data processing and analysis module:
[0140] Step 4.1: Use Python to write data cleaning and preprocessing scripts to process the integrated data, including outlier detection and data format conversion. The cleaning script automatically identifies and corrects errors and anomalies in the data to ensure the accuracy and consistency of the data, and the format conversion script converts the data into a unified format for subsequent analysis and processing.
[0141] Step 4.2: Use TensorFlow to train machine learning models, build hydrological prediction and engineering monitoring models, and conduct trend analysis and risk prediction. Through the analysis of historical data and real-time data, train a high-precision prediction model to monitor the operating status of water conservancy projects in real time, predict possible risks and problems, and provide early warning and decision support.
[0142] Step 4.3: Generate analysis reports and visualization charts to assist engineering management and decision-making. The report includes detailed data analysis results, prediction models and recommended measures, and the charts show data trends and changes in an intuitive way, which is convenient for managers to understand and make decisions.
[0143] Information visualization and interaction module:
[0144] Step 5.1: Use Autodesk Navisworks to visualize the BIM model in 3D, so that users can intuitively view and analyze engineering information. Navisworks provides powerful model browsing and analysis tools, allowing users to view various parts of the model through 3D views, perform collision detection and construction simulation.
[0145] Step 5.2: Use Power BI to visualize the data analysis results, including dashboards, charts, and other forms, to provide an intuitive data analysis interface. Power BI provides a wealth of visualization components and interactive functions. Users can customize data views and analysis reports to monitor the various indicators and status of the project in real time.
[0146] Step 5.3: Develop a React-based Web front-end that provides 3D model interaction functions, enables users to view and manipulate engineering information through a browser, and supports multi-terminal access. The React framework provides efficient front-end development tools, allowing users to browse models, query data, and operate through a Web interface, supporting multiple terminals such as PCs, tablets, and mobile devices.
[0147] Intelligent management and maintenance module:
[0148] Step 6.1: Deploy LoRa or NB-IoT sensor networks to monitor the operating status of water conservancy project facilities in real time and collect equipment operation data. The sensor network covers key locations and equipment of the project, and collects temperature, humidity, pressure, flow and other data in real time to ensure the safety and stable operation of the project.
[0149] Step 6.2: Collect and process data through Azure IoT Hub, and use machine learning models to predict and warn about failures. IoT Hub provides a reliable data transmission and processing platform, combined with machine learning models, to analyze the operating status of equipment in real time, predict possible failures and risks, and issue warnings in a timely manner.
[0150] Step 6.3: Automatically generate a maintenance plan to guide maintenance personnel to perform preventive maintenance and ensure the safe and stable operation of engineering facilities. Based on the prediction results and equipment status, the system automatically generates a detailed maintenance plan, including maintenance time, location, content and personnel arrangements, to optimize the maintenance process and improve maintenance efficiency.
[0151] Collaboration and Communication Module:
[0152] Step 7.1: Based on BIM 360Docs and Microsoft Teams, establish a cloud-based collaborative work platform to achieve data sharing and real-time communication among project participants. The platform provides document management, version control and collaboration tools to support efficient collaboration and communication among project teams.
[0153] Step 7.2: Provide instant messaging, video conferencing and task management functions to promote efficient collaboration among project participants such as designers, construction parties, and operators. Through the Teams platform, team members can conduct instant communication, remote meetings and task assignments to ensure the smooth progress of the project.
[0154] Step 7.3: Implement document version control and real-time data updates to ensure that all parties have consistent information and improve project management efficiency. The platform automatically records the modification and update history of documents, provides version comparison and recovery functions, and ensures the consistency and accuracy of documents and data.
[0155] Through the above detailed steps, the BIM-based water conservancy project information management system in this embodiment can realize comprehensive management and monitoring of water conservancy project projects, improve project management efficiency and the real-time and accuracy of data, and provide strong support for the design, construction, operation and maintenance of the project.
[0156] As a specific implementation case, a large-scale water conservancy project includes multiple key facilities such as dams, channels, pumping stations, etc. In order to improve the efficiency of project design, construction, operation and maintenance management, a water conservancy project information management system based on BIM is adopted. The steps are as follows:
[0157] The system includes the following modules:
[0158] BIM model module, multi-source data integration module, information management module, data processing and analysis module, information visualization and interaction module, intelligent management and maintenance module and collaborative work and communication module; the specific implementation methods are as follows:
[0159] First, we collected the project design drawings and geographic information data, and used Autodesk Revit and Civil 3D to build a 3D model of facilities including dams, channels, pumping stations, etc. We obtained the topographic map, geological map, hydrological map and other data of the project through the GIS system. We used the Dynamo script to calibrate the model to ensure the accuracy of geometric dimensions and positions, and verified the accuracy of the model through on-site measurement data. We integrated professional models such as structure, water supply and drainage, and electrical, and used the merge function and conflict detection tools of the BIM software to resolve conflicts between models to form a comprehensive BIM model.
[0160] Then, we established interfaces through Revit API and IFC standards to import hydrological data (such as flow and rainfall), meteorological data (such as temperature and humidity), and construction progress data into the BIM model. We used ETL tools such as Talend to convert and integrate data to achieve data consistency and real-time update. We established data interfaces to ensure seamless integration and dynamic update of multi-source data in the BIM model.
[0161] In the information management module, we selected the Autodesk BIM 360 platform and used the MySQL database to store and manage engineering data at all stages. We developed a Web application based on the Django framework to implement data query, management, and authority control. We also conducted system integration and stress testing to ensure the stability and efficient operation of the system.
[0162] In the data processing and analysis module, Python is used to write data cleaning and preprocessing scripts to handle outliers and data format conversion. TensorFlow is used to train machine learning models, build hydrological prediction and engineering monitoring models, and perform trend analysis and risk prediction. Analysis reports and visualization charts are generated to assist engineering management and decision-making.
[0163] In the information visualization and interaction module, Autodesk Navisworks is used to visualize the 3D BIM model. Power BI is used to visualize the data analysis results, including dashboards and charts. A React-based web front end is developed to provide 3D model interaction functions.
[0164] In the intelligent management and maintenance module, deploy LoRa or NB-IoT sensor networks to monitor the operating status of water conservancy project facilities in real time and collect equipment operation data. Collect and process data through Azure IoT Hub, and use machine learning models to perform fault prediction and early warning analysis. Automatically generate maintenance plans to guide maintenance personnel to perform preventive maintenance and ensure the safe and stable operation of engineering facilities.
[0165] In the collaborative work and communication module, a cloud collaborative work platform is established based on BIM 360Docs and Microsoft Teams to achieve data sharing and real-time communication among all project participants. It provides instant messaging, video conferencing and task management functions to promote efficient collaboration among project participants such as designers, construction parties, and operators. It realizes document version control and real-time data updates to ensure that all parties have consistent information and improve project management efficiency.
[0166] Through the implementation of the above system, the water conservancy project has achieved the goals of improving design accuracy, data integration and sharing, efficient management, real-time monitoring and early warning, collaborative work and intelligent maintenance. Specifically, the accuracy of the design plan is ensured through the calibration and verification of the three-dimensional model; the consistency of the data of each participant is ensured through the real-time integration and sharing of multi-source data; the efficiency of data management and query is improved through the information management system; the operation status of the facility is monitored in real time through the sensor network and machine learning model, and potential risks are warned in advance; the cloud platform is used to promote efficient collaboration and communication among project participants; and the timeliness and accuracy of facility maintenance are improved by automatically generating maintenance plans. The BIM-based water conservancy project information management system realizes the full life cycle management of water conservancy projects by integrating advanced BIM technology, data analysis and intelligent management methods, significantly improving the efficiency and accuracy of project management, and has broad application prospects.
[0167] The above specific implementations are only descriptions of the preferred implementations of the present invention, and do not limit the protection scope of the present invention. Without departing from the design concept and spirit of the present invention, various modifications, substitutions and improvements made by ordinary technicians in this field to the technical solution of the present invention based on the text description and drawings provided by the present invention should all fall within the protection scope of the present invention. The protection scope of the present invention is determined by the claims.
Claims
1. A BIM-based water conservancy project information management method, It is characterized in that The following steps are involved: Step 1: Build and calibrate the 3D BIM model; Step 2: Import multi-source data and implement dynamic updates; Step 3: Develop a BIM-based management system to store data and perform system integration; Step 4: Process and analyze data and generate reports; Step 5: Visualize information and develop interactive front end; Step 6: Deploy sensor networks and IoT Hubs for real-time monitoring and intelligent maintenance; Step 7: Establish a cloud-based collaborative platform to enable data sharing and communication.
2. According to the BIM-based water conservancy project information management method of claim 1, It is characterized in that The method for building the BIM model in step 1 is: Step 1.1: Collect project design drawings and geographic information data, and use Autodesk Revit and Civil 3D for 3D modeling; Step 1.2: Calibrate and verify the model through Dynamo script to ensure that it is consistent with the actual project situation; Step 1.3: Integrate models from different disciplines to form a comprehensive BIM model.
3. According to the BIM-based water conservancy project information management method of claim 1, It is characterized in that The method for integrating multi-source data in step 2 is: Step 2.1: Establish a data interface through Revit API and IFC standard to convert hydrological, meteorological and construction progress data into a unified format; Step 2.2: Use ETL tools to import and synchronize data; Step 2.3: Dynamically update and integrate multi-source data to ensure data consistency and real-time performance.
4. A BIM-based water conservancy project information management method according to claim 1, It is characterized in that The method for establishing an information management system in step 3 is: Step 3.1: Select the Autodesk BIM 360 platform as the basis and use the MySQL database to store and manage data; Step 3.2: Develop a Web application based on the Django framework to implement data query, management, and permission control functions; Step 3.3: Perform system integration and stress testing to ensure system stability and performance.
5. A BIM-based water conservancy project information management method according to claim 1, It is characterized in that The method for data processing and analysis in step 4 is: Step 4.1: Use Python to clean and preprocess data, including outlier detection and data format conversion; Step 4.2: Use TensorFlow to train machine learning models and build hydrological prediction and engineering monitoring models; Step 4.3: Generate analysis reports and visualization charts to assist engineering decision making.
6. A BIM-based water conservancy project information management method according to claim 1, It is characterized in that The method of information visualization and interaction in step 5 is: Step 5.1: Use Navisworks to visualize the 3D model; Step 5.2: Use Power BI to visualize data analysis results; Step 5.3: Develop a React-based web front-end to implement interactive functions of 3D models and support multi-terminal access.
7. A BIM-based water conservancy project information management method according to claim 1, It is characterized in that The method of intelligent management and maintenance in step 6 is: Step 6.1: Deploy LoRa or NB-IoT sensor networks to monitor the status of engineering facilities in real time; Step 6.2: Collect sensor data through Azure IoT Hub; Step 6.3: Use Kubernetes to deploy artificial intelligence models for data analysis and fault prediction.
8. The BIM-based water conservancy project information management method according to claim 1, It is characterized in that The methods of collaboration and communication in step 7 are: Step 7.1: Establish a cloud-based document management system based on BIM 360Docs to achieve data sharing and version control; Step 7.2: Use Microsoft Teams to implement instant messaging, video conferencing, and task management functions to promote efficient collaboration among project participants; Step 7.3: Provide real-time data update and notification functions to ensure consistent information among all parties and improve project management efficiency.
9. A water conservancy project information management system based on BIM, applicable to a water conservancy project information management method based on BIM according to any one of claims 1 to 8, It is characterized in that include: BIM model module, multi-source data integration module, information management module, data processing and analysis module, information visualization and interaction module, intelligent management and maintenance module, and collaborative work and communication module; The BIM model module is used to build and manage the three-dimensional model of water conservancy projects; The multi-source data integration module is used to integrate and synchronize multi-source data; The information management module is used to store and manage engineering data at all stages; The data processing and analysis module is used to process and analyze the integrated data; The information visualization and interaction module is used to display and interact with engineering information; Intelligent management and maintenance module is used to monitor and maintain engineering facilities; The collaborative work and communication module is used to achieve collaboration and communication among project participants.
10. The BIM-based water conservancy project information management system according to claim 9, It is characterized in that BIM model modules include: Model building unit: used to build 3D models of water conservancy projects using Autodesk Revit and Civil 3D; Model calibration unit: Use Dynamo scripts to calibrate and verify models; Model integration unit: Integrate models of different disciplines such as structure, water supply and drainage, and electrical to form a comprehensive BIM model; The multi-source data integration module includes: Data interface unit: establish data interface through Revit API and IFC standards; Data Conversion Unit: Use ETL tools (such as Talend) to perform data conversion and integration; Data synchronization unit: realizes real-time update and synchronization of multi-source data; The information management module includes: Data storage unit: storing engineering data based on MySQL database; Data management unit: Develop Web applications based on the Django framework to achieve data query, management and permission control; System testing unit: perform system integration and stress testing to ensure stable operation of the system; Data processing and analysis modules include: Data cleaning unit: use Python to clean and preprocess data; Model training unit: Apply TensorFlow to train machine learning models and build hydrological prediction and engineering monitoring models; Analysis report unit: generates analysis reports and visual charts to assist engineering decision-making; Information visualization and interaction modules include: 3D display unit: Use Autodesk Navisworks to visualize 3D models; Data Visualization Unit: Use Power BI to visualize data analysis results; Interactive front-end unit: Develop a React-based Web front-end to implement interactive functions of 3D models; Intelligent management and maintenance modules include: Sensor network unit: deploy LoRa or NB-IoT sensor networks to monitor the status of engineering facilities in real time; Data collection unit: collects sensor data through AzureIoT Hub; Fault prediction unit: Use Kubernetes to deploy artificial intelligence models for data analysis and fault prediction; The Collaboration and Communication modules include: Cloud Collaboration Unit: Establish a cloud document management system based on BIM 360Docs to achieve data sharing and version control; Real-time communication unit: Realize instant messaging, video conferencing and task management functions through Microsoft Teams to promote efficient collaboration among project participants; Data update unit: provides real-time data update and notification functions to ensure that all parties have consistent information.
Citation Information
Cited By
Building drainage pipeline arrangement system and method based on BIM
CN119646937A
Environmental data and quality information management system based on artificial intelligence
CN119848037A
Building electromechanical full life cycle management platform based on BIM and optimization strategy thereof
CN119863011A
A BIM-based building electromechanical full life cycle management platform and its optimization strategy
CN119863011B
Intelligent construction management and optimization system based on BIM data driving
CN121255877A